You are on page 1of 10

11/27/2022

CE-51022 Estimating and Specification

CHAPTER (1) PROCEDURE OF ESTIMATING

INTRODUCTION

1) What is Estimated Cost?


- to know beforehand the probable cost of construction for all
engineering works
2) How to prepare Estimate?
- by using sample measuring method.
- by calculating the quantities of different items of works
- by having knowledge of drawing, is essential
- by multiplying length, breadth and height (or) length and breadth (or)
length and height
- by finding the dimension from the drawing (plans, elevations,
sections, etc.,)

1
11/27/2022

UNIT - SI

1. Length = (m) Metre


2. Area = (sq.m) Square Metre
3. Volume = (cu.m) Cubic Metre
4. Mass = (Kg) Kilogram
5. Capacity = (L) Litre

Unit Conversion

1 yard = 0.9144 m (or) 1 m = 1.09361 yard = 3.28084 ft

FORM

2
11/27/2022

MAIN ITEM OF WORK Continued Study in page 14 to 23


Item Description Different type of Work Calculation Unit
(Different item of Work)
1 Earthwork LxBxH Cu m
2 Concrete Foundation 1:3:6,1:4:8 , 1:5:10 LxBxH Cu m
3 Filling Work in Plinth Earth, Sand, Stone LxBxH Cu m
4 Damp Proof Course (D.P.C) 1:1-1/2:3 (2.5cm), 1:2 (2cm) LxB Sq m
5 Masonary
- Foundation & Plinth 1:3 , 1:4, 1:5,etc LxBxH Cu m
-Superstructure 1:3 , 1:4, 1:5,etc LxH Sq m
6 R.C.C Work 1:2:4, etc LxBxH Cu m
7 Flooring & Roofing
- Ground Floor Topping LxB Sq m
- 1st, 2nd Floor etc & Roof R.C.C LxBxH Cu m
8 Plastering and Pointing 12mm thk;(1/2”) LxB Sq m
9 Door and Window
- Chowket LxBxH Cu m
- Leaves LxB Sq m
10 Painting Nearly equal plastering work LxB Sq m

SIZE AND DIMENSION OF VARIOUS WORK

3
11/27/2022

SIZE AND DIMENSION OF VARIOUS WORK

CE-51022 Estimating and Specification

CHAPTER (10) TYPE OF ESTIMATE, SANCTION, PROJECT, ETC

4
11/27/2022

What is Estimate?

-Probable Cost of Work


-Prepared before construction
-Computed or Calculating the quantities and suitable rates

Data for Estimate


1. Drawing – Plan, Sectional Elevation and detailed drawing to scale, full
dimensioned are required.
2. Specification- General Specifications : These gives the nature, quality and class of
work and material in general terms
- Detailed Specifications: These give the detailed description of the
various items of work, qualities of materials,
proportions, the method of preparation,
workmanship and execution of work

3. Rate – The rate per unit of various items of work, the rates of various material and
wages of different categories of labor, skilled or unskilled

5
11/27/2022

Different Types of Estimate

(1) Preliminary Estimate or Approximate Estimate or Abstract


Estimate or Rough Cost Estimate

 Required for preliminary studies of various aspects of a work or

project.

 Decided the financial position and policy for administrative sanction

 Known the project is justified or not

 Prepared from the practical knowledge and cost of the similar works

6
11/27/2022

(2) Plinth Area Estimate for Building (P.A.E)


- Preparing on the basis of plinth area of building
- Multiplying by the plinth area of the building and plinth area rate

Plinth area = building carpet area +area occupied by corridors,(verandahs,


lavatories, staircases, etc) + area occupied by walls

(3) Cube Rate Estimate for Building


- Preparing on the basis of cubical content of building (LxBxH)

- Multiplying by the cubical content of the building and Cube rate


( Estimated cost = Cubical content x C.C.E rate )

7
11/27/2022

Continued,
Height H = h +

R = tanθ + 𝑠𝑒𝑐θ

Where,
R = rise of roof
B = outside to outside dimension of wall plate
r = thickness of rafter
p = thickness of purlin
Ө = slope of the roof

Solution-

8
11/27/2022

Solution-

Prepare the plinth area estimate for a single storeyed masonry building with 0.23m
(225mm) wall and 0.056m (56.25mm) plinth projection. P.A.E rate = 120000 kyats/sqm
Solution-
L1 = 3.65m + 6m + (3 x 0.23)m + ( 2 x 0.056)m
= m
B1 = 6.23m + (2x 0.23)m + (2x0.056)m
= m
A1 = L1 x B1 = mx m
= m2
L2 = 3.65m + (2 x 0.23)m + (2 x 0.056)m
=
B2 = 2.4m + 0.23m =
A2 = L2 x B2 = mx m
= m2
Total Plinth Area = A1 + A2 = m2 + m2
= m 2

Estimated Cost = Total Plinth Area x P.A.E rate


= sqm x 120000 kyats/sqm
= kyats

9
11/27/2022

Prepare the plinth area estimate for a single storeyed masonry building with 0.23m
(225mm) wall and 0.11m plinth projection. P.A.E rate = 90000 kyats/sqm

Prepare the estimated cost of given one storeyed masonry bulding with 9” brick wall.
C.C.E rate is taken as 80 kyats/ft3
Solution-
L = 25 ft + (9/12) ft + (9/12)ft = 26.5 ft
B = 15 ft + (9/12) ft + (9/12) ft = 16.5 ft

R= tanθ + 𝑠𝑒𝑐θ
.
= tan30 + 𝑠𝑒𝑐30
= 5.53 ft
h = 3ft – 1ft + 1.5 ft +12 ft = 15.5 ft
.
Height H = h + = 15.5 + = 18.265 ft

Cubical Content = Lx Bx H
= 26.5 ft x 16.5 ft x 18.625 ft
= 7986.37 ft3
Estimated Cost = Cubical Content x C.C.E rate
= 7986.37 ft3 x 80 kyats/ft3
= 638909 kyats

10