No.

: DAYS PRICE
1 BOUY 22 8,000.00
2 ROPE ( 16mm dia. ) 10 20,000.00
3 CRUDO 100 22 60.00
4 SWIBBLE 22 4,000.00
5 CENTER CABLE
6 BANGKA
7 FLOATING
8 CEMENT
9 WASHSAND
10 LABOR
11 TIE WIRE
12 G.I ROOF
13 TAX
14 SHIPPING + INSURANCE
15 LAND PREP
16 TRACKING
TOTAL AMOUNT
197,472.00 176,000.00
213,792.00 200,000.00
132,000.00 132,000.00
16,755.20 88,000.00
175,929.60
88,000.00
80,000.00
18,000.00
9,000.00
100,000.00
400.00
1,200.00
75,000.00
46,240.00
40,800.00
100,000.00
TOTAL AMOUNT 1,294,588.80
PRICE
1 22 BOUY 13,805.86 303,729.00
2 10 rolls ROPE ( 24mm dia. ) 32,713.50 327,135.00
3 100 ltrs. CRUDO 2,261.52 226,152.00
4 44 pcs. SWIVLE 1,039.55 45,740.00
5 22 length CENTER CABLE 12,415.50 273,141.00
6 22 days BANGKA 6,706.14 147,535.00
7 FLOATING 135,933.00
8 80 bags CEMENT 599.44 47,955.00
9 3 dump WASHSAND 3 cubic 11,512.33 34,537.00
10 LABOR 201,737.00
11 10 kls. TIE WIRE 2,323.50 23,235.00
12 8 shts. G.I ROOF 3,217.50 25,740.00
13 MISCELLANEOUS 122,943.00
14 SHIPPING fee 87,734.00
15 LAND FREIGHT 78,932.00
16 TRUCKING 93,137.00
17 18 drum drum heavy duty color blue 4,063.39 73,141.00
18 10 kls. COMMON NAIL # 4 2,324.00 23,240.00
19 10 kls. COMMON NAIL # 3 2,323.90 23,239.00
20 10 kls. COMMON NAIL # 2 2,324.30 23,243.00
20 60 length BAMBOO 505.67 30,340.00
20 6 kls. NYLON No: 180 4,490.17 26,941.00
20 30 brd./ft. COCO LUMBER 2 x 10 x 12 4,151.37 124,541.00

TOTAL : 2,500,000.00