You are on page 1of 29

INVENTARISASI TANAMAN / BANGUNAN

Sheet : Of
Keperluan / Proyek :
Letak / Lokasi :
Desa : Pemilik Tanaman / Bangunan
Kecamatan :
Kabupaten : Nama :
CC / AFE No. : Alamat :
SPK No. : Hp :

Tanaman :
Klasifikasi Tanaman Jumlah
No Jenis Keterangan Tanaman
Hasil Sedang Kecil Tanaman

Bangunan :
Klasifikasi Tanaman
No Jenis Keterangan Tanama
Ukuran Luas Kondisi

Sketch / Gambar :

Dihitung Oleh, Diperiksa Oleh, Disetujui Oleh, Disaksikan Oleh Aparat

Juru hitung Surveyor Pemilik Tnm / Bang Pertanahan PT. PHR Desa
SURVEY FIELD SKETCH

Date : Location :
Job Description : Project Title :
SR No :

Checked by, Checked by, Witness by:

Drafter/instrumen-Survey PMCoW-Survey QS/CS-


PT. PERTAMINA HULU ROKAN
Construction Services Work Unit Rate Earthwork Package
Contract No : SPHR00361A
SKETCH DRAWING (JOINT SURVEY)
Initiated Date : 03 Mei 2023 Location : 29 AC 8
Work Title : Install Bruching power pole sintong feeder dan ketigul feeder SPK No. : CCMSPHR/SPK/3700103287

STRUCTURE CALCULATION
1 PIPE 12" 1.5 X 73.86 = 110.79 kg

2 PIPE 8" 4.84 X 33.31 = 161.22 kg

3 PIPE SLEEVE 1.2 X 53.08 = 63.70 kg

4 PLATE 0.07 X 110.8571 = 7.76 kg

TOTAL 343.47 kg

0,6

3,24

1,6 1,5
1,6

Checked by, Witness by:

QS-PDC QS-TPE
PT. PERTAMINA HULU ROKAN
Construction Services Work Unit Rate Earthwork Package
Contract No : SPHR00361A
SKETCH DRAWING (JOINT SURVEY)
Initiated Date : 03 Mei 2023 Location : 29 AC 6
Work Title : Install Bruching power pole sintong feeder dan ketigul feeder SPK No. : CCMSPHR/SPK/3700103287

STRUCTURE CALCULATION
1 PIPE 12" 1.5 X 73.86 = 110.79 kg

2 PIPE 8" 5.15 X 33.31 = 171.55 kg

3 PIPE SLEEVE 1.2 X 53.08 = 63.70 kg

4 PLATE 0.07 X 110.8571 = 7.76 kg

TOTAL 353.80 kg

0,6

3,5

0,6 1,5
1,65

Checked by, Witness by:

QS-PDC QS-TPE
PT. PERTAMINA HULU ROKAN
Construction Services Work Unit Rate Earthwork Package
Contract No : SPHR00361A
SKETCH DRAWING (JOINT SURVEY)
Initiated Date : 03 Mei 2023 Location : 29 AC 2
Work Title : Install Bruching power pole sintong feeder dan ketigul feeder SPK No. : CCMSPHR/SPK/3700103287

STRUCTURE CALCULATION
1 PIPE 12" 1.5 X 73.86 = 110.79 kg

2 PIPE 8" 5.27 X 33.31 = 175.54 kg

3 PIPE SLEEVE 1.2 X 53.08 = 63.70 kg

4 PLATE 0.07 X 110.8571 = 7.76 kg

TOTAL 357.79 kg

0,6

3,47

0,6 1,5
1,8

Checked by, Witness by:

QS-PDC QS-TPE
PT. PERTAMINA HULU ROKAN
Construction Services Work Unit Rate Earthwork Package
Contract No : SPHR00361A
SKETCH DRAWING (JOINT SURVEY)
Initiated Date : 03 Mei 2023 Location : 29 AC 1
Work Title : Install Bruching power pole sintong feeder dan ketigul feeder SPK No. : CCMSPHR/SPK/3700103287

STRUCTURE CALCULATION
1 PIPE 12" 1.5 X 73.86 = 110.79 kg

2 PIPE 8" 5.48 X 33.31 = 182.54 kg

3 PIPE SLEEVE 1.2 X 53.08 = 63.70 kg

4 PLATE 0.07 X 110.8571 = 7.76 kg

TOTAL 364.79 kg

0,6

3,75

0,6 1,5
1,73

Checked by, Witness by:

QS-PDC QS-TPE
RESUME PERUBAHAN DESIGN BRUCHING EXISTING POWER POLE

DIMENSI SLEEVE ADAPTOR BRUCHING BRUCHING


NO POLE NO TOP BUTTOM TOP BUTTOM HORIZONTAL VERTICAL
(M) (M) (M)
1 29 AB 10 1.20 1.20 Dipasang Dipasang 2.16 4.32
2 29 AB 9 1.20 1.20 Dipasang Dipasang 2.04 4.08
3 29 AB 6 1.20 1.20 Dipasang Dipasang 1.77 3.54
4 29 AB 5 1.20 1.20 Dipasang Dipasang 1.52 3.04
5 29 AB 4 1.20 1.20 Dipasang Dipasang 1.86 3.72
6 29 AB 3 1.20 1.20 Dipasang Dipasang 1.72 3.44
7 29 AB 2 1.20 1.20 Dipasang Dipasang 2.34 4.68
8 29 AC 13 1.20 1.20 Dipasang Dipasang 1.75 3.50
9 28 AA 14 1.20 1.20 Dipasang Dipasang 2.05 4.10
10 28 AB 6A 1.20 1.20 Dipasang Dipasang 1.9 3.80
11 29 AB 11B 1.20 1.20 Dipasang Dipasang 2.33 4.66
12 29 AC 12 0.60 1.20 T. Dipasang Dipasang 2.68 5.36
13 29 AB 26B 0.60 0.60 T. Dipasang T. Dipasang 1.92 3.84
14 29 AB 19 0.60 0.60 T. Dipasang T. Dipasang 1.71 3.42
15 29 AB 17 0.60 0.60 T. Dipasang T. Dipasang 1.86 3.72
16 29 AB 16 0.60 0.60 T. Dipasang T. Dipasang 1.62 3.24
17 29 AB 15 0.60 0.60 T. Dipasang T. Dipasang 1.76 3.52
18 28 AB 3 0.60 0.60 T. Dipasang T. Dipasang 1.7 3.40
19 29 AB 13 0.60 0.60 T. Dipasang T. Dipasang 1.80 3.60
20 29 AB 12 0.60 0.60 T. Dipasang T. Dipasang 1.68 3.36
21 28 AB 8B 0.60 0.60 T. Dipasang T. Dipasang 1.87 3.74
22 29 AC 14 0.60 0.60 T. Dipasang T. Dipasang 1.84 3.68
23 28 AA 13 0.60 0.60 T. Dipasang T. Dipasang 2.06 4.12
24 28 AA 12 0.60 0.60 T. Dipasang T. Dipasang 1.89 3.78
25 28 AA 10 0.60 0.60 T. Dipasang T. Dipasang 2.40 4.80
26 28 AA 9 0.60 0.60 T. Dipasang T. Dipasang 1.85 3.70
27 28 AA 8 0.60 0.60 T. Dipasang T. Dipasang 2.00 4.00
28 28 AB 5 0.60 0.60 T. Dipasang T. Dipasang 1.97 3.94
29 28 AB 3 0.60 0.60 T. Dipasang T. Dipasang 1.73 3.46
30 28 AA 6 0.60 0.60 T. Dipasang T. Dipasang 1.97 3.94
31 28 AA 7 0.60 0.60 T. Dipasang T. Dipasang 2.15 4.3
32 28 AA 4 0.60 0.60 T. Dipasang T. Dipasang 1.87 3.74
33 28 AA 2 0.60 0.60 T. Dipasang T. Dipasang 1.93 3.86
34 28 AA 15 0.60 0.60 T. Dipasang T. Dipasang 1.84 3.68
35 29 AD 8 0.60 0.60 T. Dipasang T. Dipasang 1.63 3.26
36 29 AC 1 0.60 0.60 T. Dipasang T. Dipasang 1.72 3.44
37 29 AC 2 0.60 0.60 T. Dipasang T. Dipasang 1.72 3.44
38 29 AC 5 0.60 0.60 T. Dipasang T. Dipasang 1.72 3.44
39 29 AC 11 0.60 0.60 T. Dipasang T. Dipasang 1.86 3.72
40 29 AC 16 0.60 0.60 T. Dipasang T. Dipasang 1.76 3.52
41 28 AA 18 0.60 0.60 T. Dipasang T. Dipasang 2.11 4.22
42 28 AA 19 0.60 0.60 T. Dipasang T. Dipasang 1.96 3.92
43 28 AA 20 0.60 0.60 T. Dipasang T. Dipasang 1.96 3.92
44 28 AA 22 0.60 0.60 T. Dipasang T. Dipasang 2.10 4.20
45 28 AA 23 0.60 0.60 T. Dipasang T. Dipasang 2.22 4.44
46 28 AA 24 0.60 0.60 T. Dipasang T. Dipasang 2.02 4.04
47 29 Z 3 0.60 0.60 T. Dipasang T. Dipasang 1.63 3.26
48 29 Z 4 0.60 0.60 T. Dipasang T. Dipasang 1.60 3.20
49 29 Z 5 0.60 0.60 T. Dipasang T. Dipasang 1.78 3.56
50 29 Z 6 0.60 0.60 T. Dipasang T. Dipasang 1.84 3.68
51 29 Z 7 0.60 0.60 T. Dipasang T. Dipasang 1.51 3.02
52 29 Z 8 0.60 0.60 T. Dipasang T. Dipasang 1.80 3.60
53 29 Z 9 0.60 0.60 T. Dipasang T. Dipasang 1.65 3.30
54 29 Z 10 0.60 0.60 T. Dipasang T. Dipasang 1.67 3.34
55 29 Z 12 0.60 0.60 T. Dipasang T. Dipasang 1.78 3.56
56 29 Z 13 0.60 0.60 T. Dipasang T. Dipasang 1.42 2.84
57 29 Z 15 0.60 0.60 T. Dipasang T. Dipasang 1.52 3.04
58 29 Z 15 0.60 0.60 T. Dipasang T. Dipasang 2.02 4.04
59 29 AA 10 0.60 0.60 T. Dipasang T. Dipasang 1.97 3.94
60 29 AA 8 0.60 0.60 T. Dipasang T. Dipasang 2.07 4.14
61 28 AA 21 0.60 0.60 T. Dipasang T. Dipasang 2.00 4.00
62 28 AA 1 0.60 0.60 T. Dipasang T. Dipasang 1.83 3.66
EXTENTION
PIPA 12" REMARK
(M)
1.40 JS UB
1.40 JS UB
1.85 JS UB
1.30 JS UB
1.45 JS UB
1.45 JS UB
1.10 JS UB
0.85 JS UB
1.35 JS UB
1.50 JS UB
1.20 Sudah Joint Survey
1.85
1.35 Sudah Joint Survey
1.50 Sudah Joint Survey
1.45 Sudah Joint Survey
1.35 Sudah Joint Survey
1.50 Sudah Joint Survey
1.55 Sudah Joint Survey
1.40 Progress plan cut off 18 April
1.35 Sudah Joint Survey
1.55 Sudah Joint Survey
1.35 Progress plan cut off 18 April
1.35 Progress plan cut off 18 April
1.40 Progress plan cut off 18 April
1.30 Progress plan cut off 18 April
1.40 Progress plan cut off 18 April
1.30 Progress plan cut off 18 April
1.35
1.40
2.05
2.20
1.50
2.30
1.35
1.40
1.45
1.35
1.45
1.55
1.45
1.35 Progress plan cut off 18 April
2.50 Progress plan cut off 18 April
1.40 Progress plan cut off 18 April
1.40 Progress plan cut off 18 April
1.35 Progress plan cut off 18 April
2.15 Progress plan cut off 18 April
1.25
1.4
1.3
1.3
1.35
1.25
3.00
1.35
2.00
2.50
1.80
1.75
1.50 Belum JS
1.50 Belum JS
1.30 Belum JS
1.35 Belum JS
PT. PERTAMINA HULU ROKAN
Construction Services Work Unit Rate Earthwork Package
Contract No :
SKETCH DRAWING (JOINT SURVEY)
Initiated Date : Location : Existing Power Pole Sintong Feeder
Work Title : Install Bruching power pole sintong feeder dan ketigul feeder SPK No. :

Checked by, Witness by:

QS-PDC QS-TPE
PT. PERTAMINA HULU ROKAN

Construction Services Work Unit Rate Earthwork Package

Contract No : SPHR00361A

RESUME STRUCTURE

Work Title : Install Bruching power pole sintong feeder dan ketigul feeder SPK NO :CCMSPHR/SPK/3700103287

PIPE
PIPE 12" WEIGH PIPE 8" WEIHGT/ PLATE
NO LOCATION TOTAL TOTAL SLEEVE WEIGHT TOTAL WEIGHT TOTAL GRAND TOTAL
(M) T/M (M) M (M3)
(M)
1 29 AB 15 1.4 73.86 103.404 5.61 33.31 186.8691 1.2 53.08 63.70 0.07 110.86 7.76 361.73
2 29 AB 17 1.6 73.86 118.176 5.48 33.31 182.5388 1.2 53.08 63.70 0.07 110.86 7.76 372.17
3 29 AB 16 1.51 73.86 111.5286 4.83 33.31 160.8873 1.2 53.08 63.70 0.07 110.86 7.76 343.87
4 29 AB 19 1.5 73.86 110.79 5.31 33.31 176.8761 1.2 53.08 63.70 0.07 110.86 7.76 359.12
5 29 AB 26 B 1.5 73.86 110.79 6.06 33.31 201.8586 1.2 53.08 63.70 0.07 110.86 7.76 384.10
6 29 AA 1 1.5 73.86 110.79 5.59 33.31 186.2029 1.2 53.08 63.70 0.07 110.86 7.76 368.45
7 29 AA 10 1.5 73.86 110.79 5.44 33.31 181.2064 1.2 53.08 63.70 0.07 110.86 7.76 363.45
8 28 AB 8 B 1.5 73.86 110.79 6.74 33.31 224.5094 1.8 53.08 95.54 0.07 110.86 7.76 438.60 UB
9 29 AB 11B 1.5 73.86 110.79 6.60 33.31 219.846 2.4 53.08 127.39 0.07 110.86 7.76 482.95 UB
10 29 AA 8 1.5 73.86 110.79 7.01 33.31 233.5031 1.2 53.08 63.70 0.07 110.86 7.76 415.75
GRAND TOTAL 3890.20

Prepared by, Checked by, Reviewed by, Approved by,


Quantity Surveyor PDC ECM Construction TPE ECM Quantity Surveyor TPE CPI User / Facility Rep.

Name : Name : Name : Name :


Date : Date : Date : Date :
PT. PERTAMINA HULU ROKAN
Construction Services Work Unit Rate Earthwork Package
Contract No :
SKETCH DRAWING (JOINT SURVEY)
Initiated Date : 28-Apr-23 Location : 29 AC 12
Work Title : Install Bruching power pole sintong feeder dan ketigul feeder SPK No. : SPHR00361A

STRUCTURE CALCULATION
1 PIPE 12" 2 X 73.86 = 147.72 kg

2 PIPE 8" 8.24 X 33.31 = 274.47 kg

3 PIPE SLEEVE 1.2 X 53.08 = 63.70 kg

4 PLATE 0.07 X 110.8571 = 7.76 kg

TOTAL 493.65 kg

0.6

5.64

0.6 2.0

2.6

Checked by, Checked by, Witness by:

QS-PDC CS-TPE QS-TPE


PT. PERTAMINA HULU ROKAN
Construction Services Work Unit Rate Earthwork Package
Contract No :
SKETCH DRAWING (JOINT SURVEY)
Initiated Date : 28-Apr-23 Location : 29 AC 11
Work Title : Install Bruching power pole sintong feeder dan ketigul feeder SPK No. : SPHR00361A

STRUCTURE CALCULATION
1 PIPE 12" 1.5 X 73.86 = 110.79 kg

2 PIPE 8" 5.95 X 33.31 = 198.19 kg

3 PIPE SLEEVE 1.2 X 53.08 = 63.70 kg

4 PLATE 0.07 X 110.8571 = 7.76 kg

TOTAL 380.44 kg

0.6

3.92

1.5

2.03

Checked by, Checked by, Witness by:

QS-PDC CS-TPE QS-TPE


PT. PERTAMINA HULU ROKAN
Construction Services Work Unit Rate Earthwork Package
Contract No :
SKETCH DRAWING (JOINT SURVEY)
Initiated Date : 28-Apr-23 Location : 28 AB 3
Work Title : Install Bruching power pole sintong feeder dan ketigul feeder SPK No. : SPHR00361A

STRUCTURE CALCULATION
1 PIPE 12" 1.6 X 73.86 = 118.176 kg

2 PIPE 8" 5.78 X 33.31 = 192.53 kg

3 PIPE SLEEVE 1.2 X 53.08 = 63.70 kg

4 PLATE 0.07 X 110.8571 = 7.76 kg

TOTAL 382.17 kg

0.6

3.8

0.6 1.6

1.98

Checked by, Checked by, Witness by:

QS-PDC CS-TPE QS-TPE


PT. PERTAMINA HULU ROKAN
Construction Services Work Unit Rate Earthwork Package
Contract No :
SKETCH DRAWING (JOINT SURVEY)
Initiated Date : 17-Apr-23 Location : 29 AA 21
Work Title : Install Bruching power pole sintong feeder dan ketigul feeder SPK No. :

STRUCTURE CALCULATION
1 PIPE 12" X 73.86 = 0 kg

2 PIPE 8" X 33.31 = 0.00 kg

3 PIPE SLEEVE 1.2 X 53.08 = 63.70 kg

4 PLATE 0.07 X 110.8571 = 7.76 kg

TOTAL 71.46 kg

Checked by, Checked by, Witness by:

QS-PDC CS-TPE QS-TPE


PT. PERTAMINA HULU ROKAN
Construction Services Work Unit Rate Earthwork Package
Contract No :
SKETCH DRAWING (JOINT SURVEY)
Initiated Date : 17-Apr-23 Location : 29 AA 1
Work Title : Install Bruching power pole sintong feeder dan ketigul feeder SPK No. :

STRUCTURE CALCULATION
1 PIPE 12" 1.5 X 73.86 = 110.79 kg

2 PIPE 8" 5.59 X 33.31 = 186.20 kg

3 PIPE SLEEVE 1.2 X 53.08 = 63.70 kg

4 PLATE 0.07 X 110.8571 = 7.76 kg

TOTAL 368.45 kg

0.6

3.62

0.6 1.5

1.97

Checked by, Checked by, Witness by:

QS-PDC CS-TPE QS-TPE


PT. PERTAMINA HULU ROKAN
Construction Services Work Unit Rate Earthwork Package
Contract No :
SKETCH DRAWING (JOINT SURVEY)
Initiated Date : 17-Apr-23 Location : 29 AA 8
Work Title : Install Bruching power pole sintong feeder dan ketigul feeder SPK No. :

STRUCTURE CALCULATION
1 PIPE 12" 1.5 X 73.86 = 110.79 kg

2 PIPE 8" 7.01 X 33.31 = 233.50 kg

3 PIPE SLEEVE 1.2 X 53.08 = 63.70 kg

4 PLATE 0.07 X 110.8571 = 7.76 kg

TOTAL 415.75 kg

0.6

4.21

0.6 1.5

2.08

Checked by, Checked by, Witness by:

QS-PDC CS-TPE QS-TPE


PT. PERTAMINA HULU ROKAN
Construction Services Work Unit Rate Earthwork Package
Contract No :
SKETCH DRAWING (JOINT SURVEY)
Initiated Date : 17-Apr-23 Location : 29 AA 10
Work Title : Install Bruching power pole sintong feeder dan ketigul feeder SPK No. :

STRUCTURE CALCULATION
1 PIPE 12" 1.5 X 73.86 = 110.79 kg

2 PIPE 8" 5.44 X 33.31 = 181.21 kg

3 PIPE SLEEVE 1.2 X 53.08 = 63.70 kg

4 PLATE 0.07 X 110.8571 = 7.76 kg

TOTAL 363.46 kg

0.6

3.46

0.6 1.5

1.98

Checked by, Checked by, Witness by:

QS-PDC CS-TPE QS-TPE


PT. PERTAMINA HULU ROKAN
Construction Services Work Unit Rate Earthwork Package
Contract No :
SKETCH DRAWING (JOINT SURVEY)
Initiated Date : 17-Apr-23 Location : 28 AB 8 B
Work Title : Install Bruching power pole sintong feeder dan ketigul feeder SPK No. :

STRUCTURE CALCULATION
1 PIPE 12" 1.5 X 73.86 = 110.79 kg

2 PIPE 8" 6.74 X 33.31 = 224.51 kg

3 PIPE SLEEVE 1.8 X 53.08 = 95.55 kg

4 PLATE 0.07 X 110.8571 = 7.76 kg

TOTAL 438.61 kg

0.6

4.87

0.6 1.5

1.87

Checked by, Checked by, Witness by:

QS-PDC CS-TPE QS-TPE


PT. PERTAMINA HULU ROKAN
Construction Services Work Unit Rate Earthwork Package
Contract No :
SKETCH DRAWING (JOINT SURVEY)
Initiated Date : 17-Apr-23 : 29 AB 11 B
Work Title : Install Bruching power pole sintong feeder dan ketigul feeder :

STRUCTURE CALCULATION
1 PIPE 12" 1.5 X 73.86 = 110.79 kg

2 PIPE 8" 6.6 X 33.31 = 219.85 kg

3 PIPE SLEEVE 2.4 X 53.08 = 127.40 kg

4 PLATE 0.07 X 110.86 = 7.76 kg

4 Adapter 1 0.6 X 0.28 x 0.01 x 7850 = 13.19 kg

2 x 0.6 X 0.035 x 0.01 x 7850 = 3.30 kg

4 Adapter 2 0.28 X 0.28 x 0.01 x 7850 = 6.15 kg

2 x 0.28 X 0.035 x 0.01 x 7850 = 1.54 kg

4 Adapter 3 1 X 0.4 x 0.01 x 7850 = 31.40 kg

4 2 x 1 X 0.35 x 0.01 x 7850 = 27.48 kg

Total = 548.85 kg

1.2
4.3
8

1.5
1.2

2.22

Checked by, Checked by, Witness by:

QS-PDC CS-TPE QS-TPE


PT. PERTAMINA HULU ROKAN
Construction Services Work Unit Rate Earthwork Package
Contract No :
SKETCH DRAWING (JOINT SURVEY)
Initiated Date : 13-Apr-23 Location : 29 AB 15
Work Title : Install Bruching power pole sintong feeder dan ketigul feeder SPK No. :

STRUCTURE CALCULATION
1 PIPE 12" 1.4 X 73.86 = 103.404 kg

2 PIPE 8" 5.61 X 33.31 = 186.87 kg

3 PIPE SLEEVE 1.2 X 53.08 = 63.70 kg

4 PLATE 0.07 X 110.8571 = 7.76 kg

TOTAL 361.73 kg
0.6

3.76
0.6

1.8
1.40

Checked by, Checked by, Witness by:

QS-PDC CS-TPE QS-TPE


PT. PERTAMINA HULU ROKAN
Construction Services Work Unit Rate Earthwork Package
Contract No :
SKETCH DRAWING (JOINT SURVEY)
Initiated Date : 13-Apr-23 Location : 29 AB 16
Work Title : Install Bruching power pole sintong feeder dan ketigul feeder SPK No. :

STRUCTURE CALCULATION
1 PIPE 12" 1.4 X 73.86 = 103.404 kg

2 PIPE 8" 4.83 X 33.31 = 160.89 kg

3 PIPE SLEEVE 1.2 X 53.08 = 63.70 kg

4 PLATE 0.07 X 110.8571 = 7.76 kg

TOTAL 335.75 kg
0.6

3.76
0.6

1.8
1.40

Checked by, Checked by, Witness by:

QS-PDC CS-TPE QS-TPE


PT. PERTAMINA HULU ROKAN
Construction Services Work Unit Rate Earthwork Package
Contract No :
SKETCH DRAWING (JOINT SURVEY)
Initiated Date : 13-Apr-23 Location : 29 AB 17
Work Title : Install Bruching power pole sintong feeder dan ketigul feeder SPK No. :

STRUCTURE CALCULATION
1 PIPE 12" 1.6 X 73.86 = 118.176 kg

2 PIPE 8" 5.48 X 33.31 = 182.54 kg

3 PIPE SLEEVE 1.2 X 53.08 = 63.70 kg

4 PLATE 0.07 X 110.8571 = 7.76 kg

TOTAL 372.17 kg
0.6

3.76
0.6

1.8
1.40

Checked by, Checked by, Witness by:

QS-PDC CS-TPE QS-TPE


PT. PERTAMINA HULU ROKAN
Construction Services Work Unit Rate Earthwork Package
Contract No :
SKETCH DRAWING (JOINT SURVEY)
Initiated Date : 13-Apr-23 Location : 29 AB 19
Work Title : Install Bruching power pole sintong feeder dan ketigul feeder SPK No. :

STRUCTURE CALCULATION
1 PIPE 12" 1.5 X 73.86 = 110.79 kg

2 PIPE 8" 5.31 X 33.31 = 176.88 kg

3 PIPE SLEEVE 1.2 X 53.08 = 63.7 kg

4 PLATE 0.07 X 110.8571 = 7.76 kg

TOTAL 359.13 kg
0.6

3.76
0.6

1.8
1.40

Checked by, Checked by, Witness by:

QS-PDC CS-TPE QS-TPE


PT. PERTAMINA HULU ROKAN
Construction Services Work Unit Rate Earthwork Package
Contract No :
SKETCH DRAWING (JOINT SURVEY)
Initiated Date : 13-Apr-23 Location : 29 AB 26 B
Work Title : Install Bruching power pole sintong feeder dan ketigul feeder SPK No. :

STRUCTURE CALCULATION
1 PIPE 12" 1.5 X 73.86 = 110.79 kg

2 PIPE 8" 6.06 X 33.31 = 201.86 kg

3 PIPE SLEEVE 1.2 X 53.08 = 63.7 kg

4 PLATE 0.07 X 110.8571 = 7.76 kg

TOTAL 384.11 kg
0.6

3.76
0.6

1.8
1.40

Checked by, Checked by, Witness by:

QS-PDC CS-TPE QS-TPE


PT. PERTAMINA PDC PATRA DRILLING CONTRACTOR
Construction Services Work Unit Rate Earthwork Package
Contract No : 39PHR21-0681

SURVEY FIELD SKETCH

PROPOSED FINAL
WELL NO NORTHING EASTING ELEVATION NORTHING EASTING LATITUDE LONGITUDE

ELEVATION
NORTHING EASTING ELEVATION
METER FEET

You might also like