You are on page 1of 381

ECC800 Data Center Controller

User Manual (ECC800-Pro


V100R023C00)

Issue 02
Date 2023-02-15

HUAWEI DIGITAL POWER TECHNOLOGIES CO., LTD.


Copyright © Huawei Digital Power Technologies Co., Ltd. 2023. All rights reserved.
No part of this document may be reproduced or transmitted in any form or by any means without prior
written consent of Huawei Digital Power Technologies Co., Ltd.

Trademarks and Permissions

and other Huawei trademarks are the property of Huawei Technologies Co., Ltd.
All other trademarks and trade names mentioned in this document are the property of their respective
holders.

Notice
The purchased products, services and features are stipulated by the contract made between Huawei
Digital Power Technologies Co., Ltd. and the customer. All or part of the products, services and features
described in this document may not be within the purchase scope or the usage scope. Unless otherwise
specified in the contract, all statements, information, and recommendations in this document are
provided "AS IS" without warranties, guarantees or representations of any kind, either express or implied.
The information in this document is subject to change without notice. Every effort has been made in the
preparation of this document to ensure accuracy of the contents, but all statements, information, and
recommendations in this document do not constitute a warranty of any kind, express or implied.

Huawei Digital Power Technologies Co., Ltd.


Address: Huawei Digital Power Antuoshan Headquarters

Futian, Shenzhen 518043

People's Republic of China

Website: https://www.huawei.com
Email: support@huawei.com

Issue 02 (2023-02-15) Copyright © Huawei Digital Power Technologies Co., Ltd. i


ECC800 Data Center Controller
User Manual (ECC800-Pro V100R023C00) About This Document

About This Document

Purpose
This document describes the ECC800-Pro data center controller in terms of
features, devices, user interfaces (UIs), and power-on commissioning, as well as
frequently asked questions (FAQ) and troubleshooting measures.
This document describes all the functions of the ECC800-Pro. Certain functions are
implemented by hardware such as the uninterruptible power system (UPS) and
power distribution unit (PDU), and may be unavailable if the hardware is not
connected to the ECC800-Pro.
The ECC800-Pro functions described in the user manual may be applicable to
either multiple or a few FusionModule solutions. For details, see the FusionModule
solution documentation.
Figures provided in this document are for reference only.

Intended Audience
This document is intended for:
● Technical support engineers
● Commissioning engineers
● Maintenance engineers

Symbol Conventions
The symbols that may be found in this document are defined as follows.

Symbol Description

Indicates a hazard with a high level of risk which, if


not avoided, will result in death or serious injury.

Indicates a hazard with a medium level of risk which,


if not avoided, could result in death or serious injury.

Indicates a hazard with a low level of risk which, if


not avoided, could result in minor or moderate injury.

Issue 02 (2023-02-15) Copyright © Huawei Digital Power Technologies Co., Ltd. ii


ECC800 Data Center Controller
User Manual (ECC800-Pro V100R023C00) About This Document

Symbol Description

Indicates a potentially hazardous situation which, if


not avoided, could result in equipment damage, data
loss, performance deterioration, or unanticipated
results.
NOTICE is used to address practices not related to
personal injury.

Supplements the important information in the main


text.
NOTE is used to address information not related to
personal injury, equipment damage, and environment
deterioration.

Change History
Issue Date Description

02 2023-02-15 ● Optimized the section "ECC800-Pro."


● Optimized the section "WebUI."
● Optimized the section "Setting
Parameters for the General Input Unit
and Power Distribution Unit."
● Optimized the section "Remote
Management."

01 2022-10-30 This issue is the first official release.

Issue 02 (2023-02-15) Copyright © Huawei Digital Power Technologies Co., Ltd. iii
ECC800 Data Center Controller
User Manual (ECC800-Pro V100R023C00) Contents

Contents

About This Document................................................................................................................ ii


1 Safety Information.................................................................................................................. 1
1.1 Personal Safety.........................................................................................................................................................................2
1.2 Electrical Safety........................................................................................................................................................................ 4
1.3 Environmental Requirements.............................................................................................................................................. 8
1.4 Mechanical Safety.................................................................................................................................................................10

2 Overview................................................................................................................................. 13
2.1 Positioning............................................................................................................................................................................... 13
2.2 Features.................................................................................................................................................................................... 13

3 Device Description................................................................................................................ 15
3.1 ECC800-Pro............................................................................................................................................................................. 15
3.1.1 Product Configuration......................................................................................................................................................15
3.1.2 Technical Specifications................................................................................................................................................... 16
3.1.3 Main Control Module....................................................................................................................................................... 19
3.1.4 PSU......................................................................................................................................................................................... 26
3.2 Southbound Device Introduction..................................................................................................................................... 27
3.2.1 UIM20A Expansion Module........................................................................................................................................... 27
3.2.2 Smart ETH Gateway......................................................................................................................................................... 30
3.2.3 Access Control System..................................................................................................................................................... 32
3.2.3.1 Aisle Access Control System....................................................................................................................................... 32
3.2.3.1.1 Access Actuator........................................................................................................................................................... 33
3.2.3.1.2 Fingerprint and Card Reader with a Keypad.....................................................................................................37
3.2.3.1.3 Fingerprint and Card Reader.................................................................................................................................. 38
3.2.3.1.4 Card Reader with a Keypad.....................................................................................................................................40
3.2.3.1.5 Magnetic Lock............................................................................................................................................................. 40
3.2.3.2 Cabinet Access Control System................................................................................................................................. 41
3.2.3.3 Cabinet Electronic Clasp Lock.................................................................................................................................... 43
3.2.4 FusionModule Actuator................................................................................................................................................... 44
3.2.5 AC Actuator......................................................................................................................................................................... 48
3.2.6 Skylight Actuator............................................................................................................................................................... 50
3.2.7 Multi-Functional Sensor.................................................................................................................................................. 53
3.2.8 Smoke Sensor..................................................................................................................................................................... 56

Issue 02 (2023-02-15) Copyright © Huawei Digital Power Technologies Co., Ltd. iv


ECC800 Data Center Controller
User Manual (ECC800-Pro V100R023C00) Contents

3.2.9 Temperature Sensor (BOM Number: 33010348)................................................................................................... 56


3.2.10 Cabinet Temperature Sensor....................................................................................................................................... 57
3.2.11 Alarm Beacon................................................................................................................................................................... 58
3.2.12 (Optional) Smart U Space Manager (52273314)................................................................................................ 59
3.2.13 (Optional) Smart U Space Manager (52275819)................................................................................................ 60
3.2.14 eLight Actuator................................................................................................................................................................ 61
3.2.15 Water Sensor.................................................................................................................................................................... 62
3.2.15.1 WLDS600 Water Sensor (BOM Number: 33010556)...................................................................................... 63
3.2.15.2 WLDS900 Water Sensor (BOM Number: 33010352)...................................................................................... 64
3.2.15.3 Electrode Water Sensor (BOM Number: 33010444)....................................................................................... 65
3.2.16 WiFi Module......................................................................................................................................................................66
3.2.17 ETH Converter.................................................................................................................................................................. 67
3.2.18 PAD...................................................................................................................................................................................... 69
3.2.19 T/H Sensor......................................................................................................................................................................... 70
3.2.19.1 T/H Sensor (BOM Number: 33010346)............................................................................................................... 70
3.2.19.2 T/H Sensor (BOM Number: 02310NBS).............................................................................................................. 72
3.2.19.3 Ambient T/H Sensor (BOM Number: 33010516)............................................................................................. 73
3.2.19.4 T/H Sensor (BOM Number: 02311FQG)..............................................................................................................74
3.2.19.5 T/H Sensor (BOM Number: 02312PBL)............................................................................................................... 75
3.2.20 Infrared Remote Control Module.............................................................................................................................. 76

4 UI Description.........................................................................................................................77
4.1 WebUI....................................................................................................................................................................................... 77
4.2 PAD App................................................................................................................................................................................... 87

5 Power-On Commissioning................................................................................................... 89
5.1 Preparations and WebUI Login........................................................................................................................................ 89
5.2 Initial Startup Password Authentication....................................................................................................................... 93
5.3 (Optional) Cloud Service Access...................................................................................................................................... 94
5.4 Commissioning Configuration Wizard........................................................................................................................... 96
5.5 Configuring Event Notifications....................................................................................................................................... 97
5.6 Commissioning the Smart Busbar................................................................................................................................ 104
5.6.1 Smart Busbar Networking (for FusionModule2000).......................................................................................... 104
5.6.2 Setting Parameters for the General Input Unit and Power Distribution Unit............................................105
5.7 Commissioning the eLight............................................................................................................................................... 110
5.8 Commissioning the eLight (for FusionModule500/800)....................................................................................... 112
5.9 Commissioning a PDU2000............................................................................................................................................ 115
5.10 Commissioning the Cabinet Electronic Clasp Locks (for FusionModule500/800)..................................... 117

6 Feature Commissioning..................................................................................................... 121


6.1 Setting Device Performance Parameters.................................................................................................................... 121
6.2 Setting ECC800-Pro Cascading.......................................................................................................................................123
6.3 Commissioning a UIM20A Expansion Module......................................................................................................... 124
6.4 PDU2000M Binding........................................................................................................................................................... 127

Issue 02 (2023-02-15) Copyright © Huawei Digital Power Technologies Co., Ltd. v


ECC800 Data Center Controller
User Manual (ECC800-Pro V100R023C00) Contents

6.5 Commissioning Wireless Low-Power Devices........................................................................................................... 128


6.6 Access Management..........................................................................................................................................................130
6.6.1 Commissioning a Door Status Sensor (Connected to the AI/DI port on the Independent Deployment
AI_DI Unit)................................................................................................................................................................................... 130
6.6.2 Commissioning a Door Status Sensor (Connected to the AI/DI Port on the Rack Environment Unit)
......................................................................................................................................................................................................... 131
6.6.3 Commissioning a Door Status Sensor (Connected to the AI/DI Port on the UIM20A Expansion
Module)........................................................................................................................................................................................ 132
6.6.4 Commissioning the Door Status Sensor (Connected to the ECC800-Pro).................................................. 133
6.6.5 Commissioning an Access Control Device and a Cabinet Electronic Lock or Fingerprint Lock............135
6.6.6 Commissioning the Exit Button, Skylight Button, Atmosphere Light, Emergency Button, Magnetic
Lock, and Door Sensor............................................................................................................................................................. 143
6.6.7 Commissioning an Emergency Door Release Button......................................................................................... 145
6.7 Video Management........................................................................................................................................................... 145
6.7.1 Reference Documentation........................................................................................................................................... 145
6.7.2 Networking Scenarios....................................................................................................................................................146
6.7.3 Commissioning a Camera (LAN Switch Networking Scenario)...................................................................... 147
6.7.3.1 Commissioning a C3220 Camera........................................................................................................................... 147
6.7.3.2 Commissioning a C3220 Camera (SD Card Configured)............................................................................... 153
6.7.4 Commissioning a Camera (Smart ETH Gateway Networking Scenario)..................................................... 156
6.7.4.1 Commissioning a C3220 Camera........................................................................................................................... 156
6.7.4.2 Commissioning a C3220 Camera (SD Card Configured)............................................................................... 162
6.7.5 Commissioning the IVS1800........................................................................................................................................164
6.7.5.1 Setting Parameters on the IVS1800 WebUI........................................................................................................165
6.7.5.2 Setting Parameters on the iClient S100............................................................................................................... 170
6.8 Linkage Control................................................................................................................................................................... 176
6.8.1 FusionModule2000 Linkage Control.........................................................................................................................176
6.8.1.1 Fire Control Linkage....................................................................................................................................................178
6.8.1.2 High Temperature Linkage....................................................................................................................................... 180
6.8.1.3 (Optional) Commissioning an Intelligent Aisle Light..................................................................................... 180
6.8.1.4 Linking the Smoke Alarm with Skylight Open.................................................................................................. 184
6.8.1.5 High-Density Linkage................................................................................................................................................. 186
6.8.2 FusionModule500/800 Linkage Control.................................................................................................................. 188
6.8.2.1 Link Air Conditioner Fault with Emergency Fan............................................................................................... 191
6.8.2.2 Link Smoke Alarm with Cabinet Electronic Clasp Lock Open...................................................................... 192
6.8.2.3 Link Fire Control with Lock Open.......................................................................................................................... 193
6.8.3 Customizing Linkage Logic.......................................................................................................................................... 194
6.9 Infrared Remote Control Module Control and Management............................................................................. 197
6.9.1 Connecting a Communications Cable...................................................................................................................... 197
6.9.2 Setting and Adding an Infrared Remote Control Module.................................................................................197
6.9.3 Control Function of an Infrared Remote Control Module................................................................................ 199
6.10 PUE Configuration Management............................................................................................................................... 200
6.10.1 Configuring PUE Standard Mode............................................................................................................................ 202

Issue 02 (2023-02-15) Copyright © Huawei Digital Power Technologies Co., Ltd. vi


ECC800 Data Center Controller
User Manual (ECC800-Pro V100R023C00) Contents

6.10.2 Configuring PUE User-defined Mode.................................................................................................................... 203


6.10.3 Viewing the PUE........................................................................................................................................................... 205
6.10.4 Configuring Instantaneous PUE Standard Mode............................................................................................... 206
6.10.5 Configuring Instantaneous PUE User-defined Mode....................................................................................... 207
6.10.6 Viewing the Instantaneous PUE.............................................................................................................................. 209
6.11 Asset Management......................................................................................................................................................... 210
6.11.1 Commissioning the Smart U Space Manager (Connected to a Rack Environment Unit)................... 210
6.11.1.1 Determining the Position of the Smart U Space Manager.........................................................................210
6.11.1.2 Querying the U Space Use Information............................................................................................................ 211
6.11.2 Commissioning the Smart U Space Manager (Connected to a UIM20A Expansion Module)...........211
6.11.2.1 Determining the Position of the Smart U Space Manager.........................................................................212
6.11.2.2 Querying the U Space Use Information............................................................................................................ 212
6.12 Power Management........................................................................................................................................................213
6.12.1 Configuring Power Management Parameters.................................................................................................... 213
6.12.2 Setting Fault Isolation Parameters......................................................................................................................... 216
6.12.3 Viewing the Power Usage.......................................................................................................................................... 216
6.12.4 Viewing the Power Supply Links Diagram........................................................................................................... 217
6.13 Cooling Capacity Management................................................................................................................................... 219
6.13.1 (Optional) Setting iCooling Parameters............................................................................................................... 219
6.13.2 Viewing Cooling Capacity Usage Information.................................................................................................... 221
6.13.3 Viewing the Cooling Links Diagram....................................................................................................................... 221
6.13.4 Setting the Temperature Map.................................................................................................................................. 223
6.14 Facial Recognition............................................................................................................................................................ 226
6.14.1 Recording Facial Data................................................................................................................................................. 226
6.14.2 Collecting and Importing Facial Data in Offline Mode................................................................................... 227
6.14.3 Opening the Access Control System Using Facial Recognition.....................................................................228
6.14.4 Maintaining the Facial Data..................................................................................................................................... 229
6.15 Remote Management..................................................................................................................................................... 229
6.15.1 NetEco Management.................................................................................................................................................. 229
6.15.1.1 Connecting a Communications Cable................................................................................................................ 229
6.15.1.2 Setting NetEco Parameters.................................................................................................................................... 231
6.15.1.3 Creating an ECC800-Pro on the NetEco............................................................................................................ 238
6.15.1.4 Setting the Transparent Transmission Function..............................................................................................239
6.15.2 Third-party NMS Management (over SNMP).................................................................................................... 241
6.15.2.1 Connecting a Communications Cable................................................................................................................ 241
6.15.2.2 Setting SNMP Management Parameters.......................................................................................................... 242
6.15.3 Management on a Third-Party NMS and the NetEco..................................................................................... 244
6.15.3.1 Connecting Communications Cables.................................................................................................................. 244
6.15.3.2 Configuring Dual MAC Addresses and a Static Route..................................................................................244
6.15.3.3 Setting NetEco Parameters and SNMP Parameters...................................................................................... 246
6.16 Setting Other Parameters and Channel Security.................................................................................................. 249
6.17 Numbering Management for Power Distribution Devices in the FusionPower6000............................... 251

Issue 02 (2023-02-15) Copyright © Huawei Digital Power Technologies Co., Ltd. vii
ECC800 Data Center Controller
User Manual (ECC800-Pro V100R023C00) Contents

7 Maintenance.........................................................................................................................253
7.1 Routine Maintenance........................................................................................................................................................ 253
7.2 Common Faults and Troubleshooting......................................................................................................................... 254
7.3 Component Replacement................................................................................................................................................ 257
7.3.1 Replacing an ECC800-Pro Main Control Module................................................................................................. 257
7.3.2 Replacing an ECC800-Pro PSU....................................................................................................................................259
7.3.3 Replacing ECC800-Pro Antennas............................................................................................................................... 260
7.3.4 Replacing a SIM Card.................................................................................................................................................... 260

8 FAQ......................................................................................................................................... 262
8.1 How Can I View Version Information?........................................................................................................................ 262
8.2 How Can I Upgrade the ECC800-Pro Software Version?...................................................................................... 262
8.3 How Can I Set the Date and Time?............................................................................................................................. 263
8.4 How Can I Check the System Type and Set the Smart Module Name?..........................................................263
8.5 How Do I Manage WebUI Users?................................................................................................................................. 265
8.6 How Do I Create a Smart Module Plan View?......................................................................................................... 269
8.7 How Can I Set and Add Devices?.................................................................................................................................. 271
8.7.1 How Can I Set Integrated UPS Parameters (Modbus-TCP)?............................................................................ 271
8.7.2 How Can I Set and Add a UPS2000G-A (Modbus-RTU)................................................................................... 271
8.7.3 How Can I Set and Add a UPS2000G_L (Modbus-RTU)?..................................................................................273
8.7.4 How Can I Set and Add a UPS5000 (Modbus-RTU)?......................................................................................... 274
8.7.5 How Do I Set and Add a UPS5000 (Modbus-TCP)?............................................................................................ 276
8.7.6 How Can I Set and Add a PDU8000 or Integrated PDU (over Modbus-TCP)?.......................................... 276
8.7.7 How Can I Set and Add a Transformer (Modbus-RTU)?...................................................................................277
8.7.8 How Can I Set and Add an SVG-In-Power (Modbus-RTU)?............................................................................ 278
8.7.9 How Can I Set and Add an Envicool Air Conditioner (Modbus-RTU)?........................................................ 280
8.7.10 How Can I Set and Add a SmartLi (Modbus-TCP)?.......................................................................................... 282
8.7.11 How Can I Add and Set the Smart Module Actuator (Modbus-MAC)?.................................................... 282
8.7.12 How Can I Set and Add a PDU8000 (Modbus RTU)?...................................................................................... 283
8.7.13 How Can I Set and Add an rPDU?.......................................................................................................................... 285
8.7.14 How Can I Set and Add an ATS?............................................................................................................................. 288
8.7.15 How Do I Set and Add an Electricity Meter?...................................................................................................... 289
8.7.16 How Can I Set and Add a NetCol5000-A011/A025/A035/A042/A050/A065 (Modbus-TCP)?........... 291
8.7.17 How Can I Set and Add a NetCol5000-A025 (Modbus-MAC)?....................................................................292
8.7.18 How Can I Set and Add a NetCol5000-C(030, 032)/NetCol5000-C(065, 080) (over Modbus TCP)?
......................................................................................................................................................................................................... 293
8.7.19 How Can I Set and Add a NetCol5000-C030 (Modbus RTU)?......................................................................294
8.7.20 How Can I Set NetCol8000-A Parameters (Modbus-TCP)?............................................................................295
8.7.21 How Can I Set and Add an IP Device?.................................................................................................................. 296
8.7.22 How Can I Set and Add an Independent Deployment AI_DI Unit?.............................................................297
8.7.23 How Can I Set and Add a UIM20A Expansion Module (Modbus-TCP)?....................................................299
8.7.24 How Can I Set and Add a Multi-functional Sensor?........................................................................................ 300
8.7.25 How Can I Set and Add the Smoke Sensor (Connected to the AI/DI Port on the ECC800-Pro)?.....302

Issue 02 (2023-02-15) Copyright © Huawei Digital Power Technologies Co., Ltd. viii
ECC800 Data Center Controller
User Manual (ECC800-Pro V100R023C00) Contents

8.7.26 How Can I Set and Add the Smoke Sensor (Connected to the AI/DI Port on the Skylight Actuator)?
......................................................................................................................................................................................................... 304
8.7.27 How Can I Set and Add the Smoke Sensor (Connected to the AI/DI Port on the Rack Environment
Unit)?............................................................................................................................................................................................. 305
8.7.28 How Can I Set and Add the Smoke Sensor (Connected to the AI/DI Port on the UIM20A expansion
module)?.......................................................................................................................................................................................306
8.7.29 How Can I Set and Add the WLDS900 Water Sensor?.................................................................................... 307
8.7.30 How Can I Set and Add a WLDS600 Water Sensor?........................................................................................ 308
8.7.31 How Can I Set and Add an Electrode Water Sensor?...................................................................................... 310
8.7.32 How Can I Set and Add the Temperature Sensor (Connected to the AI/DI Port on the ECC800-Pro)?
......................................................................................................................................................................................................... 311
8.7.33 How Can I Set and Add the Temperature Sensor (Connected to the NTC Port on the Rack
Environment Unit)?................................................................................................................................................................... 312
8.7.34 How Can I Commission a Temperature Sensor (Connected to the NTC Port on the T/H Sensor)?
......................................................................................................................................................................................................... 313
8.7.35 How Can I Set and Add a T/H Sensor (BOM Number: 33010516)?...........................................................314
8.7.36 How Can I Set and Add the T/H Sensor (BOM Number: 02310NBS)?......................................................316
8.7.37 How Can I Set and Add a T/H Sensor (BOM Number: 02311FQG/02312PBL)?.................................... 318
8.7.38 How Can I Set and Add a Vibration Sensor?...................................................................................................... 320
8.7.39 How Can I Add an SMU11B?.................................................................................................................................... 321
8.8 How Can I Restore Factory Settings?.......................................................................................................................... 323
8.9 How Can I Install a Network Security Certificate?................................................................................................. 323
8.10 How Can I Install a Device Access Certificate?...................................................................................................... 324
8.11 How Can I Change the ECC800-Pro IP Address on the WebUI?...................................................................... 325
8.12 How Can I Configure ECC800-Pro Alarm Parameters?....................................................................................... 325
8.13 How Do I View Real-Time Monitoring, Active Alarms, Historical Alarms, Access Control Events,
Operation Logs, Security Events, and Security Logs?....................................................................................................326
8.14 How Can I Handle Alarms?.......................................................................................................................................... 327
8.15 How Can I View Performance Data?......................................................................................................................... 327
8.16 How Can I Change a Signal Name?.......................................................................................................................... 327
8.17 How Do I Export Data?.................................................................................................................................................. 328
8.18 How Do I Export or Import a Configuration File?................................................................................................ 329
8.19 How Can I Synchronize Device Parameters?.......................................................................................................... 330
8.20 What Should I Do If the ECC800-Pro WebUI Display Language Changes from Chinese to English
During Use?................................................................................................................................................................................. 331
8.21 What Should I Do If the ECC800-Pro Fails to Communicate with the UPS5000-E?................................. 331
8.22 What Should I Do if I Forget the ECC800 IP Address?........................................................................................ 331
8.23 What Should I Do If a Message Indicating Unauthorized Fingerprint Is Displayed During Fingerprint
Scanning on the Access Control Device (Fingerprint Has Been Recorded)?.........................................................332
8.24 How Can I Rectify Camera Access Restriction?..................................................................................................... 333
8.25 How Do I Set the ECC800-Pro IP Address?............................................................................................................. 333
8.26 How Do I Set the ECC800-Pro System Type?......................................................................................................... 334
8.27 How Do I Set Door Status Sensor Monitoring Parameters on the ECC800-Pro WebUI?........................ 334
8.28 How Do I Set Smoke Sensor and Water Sensor Parameters on the ECC800-Pro WebUI?.....................335

Issue 02 (2023-02-15) Copyright © Huawei Digital Power Technologies Co., Ltd. ix


ECC800 Data Center Controller
User Manual (ECC800-Pro V100R023C00) Contents

8.29 How Do I Set Device Monitoring Parameters of an NO/NC Dry Contact on the ECC800-Pro WebUI?
......................................................................................................................................................................................................... 336
8.30 How Can I Set Cooling Management Parameters on the ECC800-Pro WebUI?........................................ 337
8.31 How Can I Add Devices Accessed Through a Smart ETH Gateway to the ECC800-Pro WebUI
(Modbus-TCP)?........................................................................................................................................................................... 338
8.32 How Can I Add Devices Accessed Through a Smart ETH Gateway to the ECC800-Pro WebUI
(Modbus-MAC)?........................................................................................................................................................................ 340
8.33 How Can I Add Devices Accessed Through the ETH Converter to the ECC800-Pro WebUI?.................341
8.34 How Can I Add Devices Connected Through the ECC800-Pro COM Port to the ECC800-Pro WebUI?
......................................................................................................................................................................................................... 343
8.35 How Can I Add Devices Accessed Through the ECC800-Pro AI/DI Port to the ECC800-Pro WebUI?. 345
8.36 How Can I Add an RS485 Device Connected to the ECC800-Pro Through a UIM20A?...........................346
8.37 How Can I Add a Dry Contact Device Accessed Through a UIM20A Expansion Module to the
ECC800-Pro WebUI?..................................................................................................................................................................347
8.38 How Can I Open Doors Remotely over the ECC800-Pro WebUI?................................................................... 348
8.39 How Can I Turn On or Off Aisle Lights in the Smart Module over the ECC800-Pro WebUI?............... 349
8.40 How Can I Open Skylights Remotely over the ECC800-Pro WebUI?............................................................. 351
8.41 How Can I Turn On or Off Smart Cooling Products over the ECC800-Pro WebUI?..................................352
8.42 How Can I Open the Cabinet Electronic Lock over the ECC800-Pro WebUI?............................................. 353
8.43 How Can I Link the Smoke Alarm with the Alarm Beacon over the ECC800-Pro WebUI?.................... 354
8.44 How Can I Link the AI/DI Alarm with the Alarm Beacon over the ECC800-Pro WebUI?....................... 354
8.45 How Can I Modify Device Names over the ECC800-Pro WebUI?....................................................................355
8.46 How Can I Perform Operations on the App?......................................................................................................... 355
8.46.1 How Can I Connect to a WiFi Network?.............................................................................................................. 356
8.46.2 How Can I Prepare and Log In to the App?........................................................................................................ 356
8.46.3 How Do I Ensure that Device Positions in the Plan View Are Consistent with Actual Positions?.... 359
8.46.4 How Can I View Real-time Data?........................................................................................................................... 360
8.46.5 How Can I Export and Import Data?..................................................................................................................... 360
8.46.6 How Can I Synchronize Device Parameters?....................................................................................................... 360
8.46.7 How Can I Handle App Login Failure?.................................................................................................................. 361
8.47 How Do I Delete a Device with Communication Failure After Device Replacement?............................. 361
8.48 How Can I Change the Certificate Verification Period and Certificate Expiration Warning Time?..... 362
8.49 How Can I Revoke a Certificate?................................................................................................................................ 362
8.50 What Do I Do If a Message Is Displayed Indicating that Access Card Number Input Through Card
Swiping Fails?.............................................................................................................................................................................. 363

9 PLC Function.........................................................................................................................364
9.1 Linkage Control Introduction......................................................................................................................................... 364
9.2 Linkage Control Configuration Examples...................................................................................................................365

A Acronyms and Abbreviations........................................................................................... 368

Issue 02 (2023-02-15) Copyright © Huawei Digital Power Technologies Co., Ltd. x


ECC800 Data Center Controller
User Manual (ECC800-Pro V100R023C00) 1 Safety Information

1 Safety Information

Statement
Before transporting, storing, installing, operating, using, or maintaining the
equipment, read this document, strictly follow the instructions provided herein,
and follow all the safety instructions on the equipment and in this document. In
this document, "equipment" refers to the products, software, components, spare
parts, and/or services related to this document; "the Company" refers to the
manufacturer (producer), seller, and/or service provider of the equipment; "you"
refers to the entity that transports, stores, installs, operates, uses, and/or
maintains the equipment.

The Danger, Warning, Caution, and Notice statements described in this


document do not cover all the safety precautions. You also need to comply with
relevant international, national, or regional standards and industry practices. The
Company shall not be liable for any consequences that may arise due to
violations of safety requirements or safety standards concerning the design,
production, and usage of the equipment.

The equipment should be used in an environment that meets the design


specifications. Otherwise, the equipment may be faulty, malfunctioning, or
damaged, which is not covered under the warranty. The Company shall not be
liable for any property loss, personal injury, or even death caused thereby.

Comply with applicable laws, regulations, standards, and specifications during


transportation, storage, installation, operation, use, and maintenance.

Do not perform reverse engineering, decompilation, disassembly, adaptation,


implantation, or other derivative operations on the equipment software. Do not
study the internal implementation logic of the equipment, obtain the source code
of the equipment software, violate intellectual property rights, or disclose any of
the performance test results of the equipment software.

The Company shall not be liable for any of the following circumstances or
their consequences:

● Equipment damage due to force majeure such as earthquakes, floods,


volcanic eruptions, debris flows, lightning strikes, fires, wars, armed conflicts,
typhoons, hurricanes, tornadoes, and extreme weather conditions
● Operation beyond the conditions specified in this document

Issue 02 (2023-02-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 1


ECC800 Data Center Controller
User Manual (ECC800-Pro V100R023C00) 1 Safety Information

● Installation or use in environments that do not comply with international,


national, or regional standards
● Installation or use by unqualified personnel
● Failure to follow the operation instructions and safety precautions on the
product and in the document
● Unauthorized modifications to the product or software code or removal of the
product
● Damage caused during transportation by you or a third party authorized by
you
● Storage conditions that do not meet the requirements specified in the product
document
● Failure to comply with local laws, regulations, or related standards due to the
materials and tools prepared by you
● Damage caused by your or a third party's negligence, intentional breach,
gross negligence, or improper operations or damage not caused by the
Company

1.1 Personal Safety

DANGER

Do not work with power on during installation. Do not install or remove a cable
with power on. Transient contact between the core of the cable and the conductor
will generate electric arcs or sparks, which may cause a fire or personal injury.

DANGER

Non-standard and improper operations on the energized equipment may cause


fire or electric shocks, resulting in property damage, personal injury, or even death.

DANGER

Before operations, remove conductive objects such as watches, bracelets, bangles,


rings, and necklaces to prevent electric shocks.

DANGER

During operations, use dedicated insulated tools to prevent electric shocks or short
circuits. The insulation and voltage resistance must comply with local laws,
regulations, standards, and specifications.

Issue 02 (2023-02-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 2


ECC800 Data Center Controller
User Manual (ECC800-Pro V100R023C00) 1 Safety Information

WARNING

During operations, wear personal protective equipment such as protective


clothing, insulated shoes, goggles, safety helmets, and insulated gloves.

Figure 1-1 Personal protective equipment

General Requirements
● Do not stop protective devices. Pay attention to the warnings, cautions, and
related precautionary measures in this document and on the equipment.
● If there is a likelihood of personal injury or equipment damage during
operations, immediately stop, report the case to the supervisor, and take
feasible protective measures.
● Do not power on the equipment before it is installed or confirmed by
professionals.
● Do not touch the power supply equipment directly or with conductors such as
damp objects. Before touching any conductor surface or terminal, measure
the voltage at the contact point to ensure that there is no risk of electric
shock.
● Do not touch a running fan with your hands, components, screws, tools, or
boards. Otherwise, personal injury or equipment damage may occur.
● In the case of a fire, immediately leave the building or the equipment area
and activate the fire alarm or call emergency services. Do not enter the
affected building or equipment area under any circumstances.

Personnel Requirements
● Only professionals and trained personnel are allowed to operate the
equipment.
– Professionals: personnel who are familiar with the working principles and
structure of the equipment, trained or experienced in equipment
operations and are clear of the sources and degree of various potential
hazards in equipment installation, operation, maintenance
– Trained personnel: personnel who are trained in technology and safety,
have required experience, are aware of possible hazards on themselves in

Issue 02 (2023-02-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 3


ECC800 Data Center Controller
User Manual (ECC800-Pro V100R023C00) 1 Safety Information

certain operations, and are able to take protective measures to minimize


the hazards on themselves and other people
● Personnel who plan to install or maintain the equipment must receive
adequate training, be able to correctly perform all operations, and understand
all necessary safety precautions and local relevant standards.
● Only qualified professionals or trained personnel are allowed to install,
operate, and maintain the equipment.
● Only qualified professionals are allowed to remove safety facilities and inspect
the equipment.
● Personnel who will perform special tasks such as electrical operations,
working at heights, and operations of special equipment should possess the
required local qualifications.
● Only authorized professionals are allowed to replace the equipment or
components (including software).
● Only personnel who need to work on the equipment are allowed to access
the equipment.

1.2 Electrical Safety

DANGER

Before connecting cables, ensure that the equipment is intact. Otherwise, electric
shocks or fires may occur.

DANGER

Non-standard and improper operations may result in fire or electric shocks.

DANGER

Prevent foreign matter from entering the equipment during operations. Otherwise,
equipment damage, load power derating, power failure, or personal injury may
occur.

WARNING

For the equipment that needs to be grounded, install the ground cable first when
installing the equipment and remove the ground cable last when removing the
equipment.

Issue 02 (2023-02-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 4


ECC800 Data Center Controller
User Manual (ECC800-Pro V100R023C00) 1 Safety Information

CAUTION

Do not route cables near the air intake or exhaust vents of the equipment.

CAUTION

Do not directly connect aluminum cables to prevent electrochemical corrosion of


copper and aluminum.

CAUTION

Stay away from the equipment when preparing cables to prevent cable scraps
from entering the equipment. Cable scraps may cause sparks and result in
personal injury and equipment damage.

General Requirements
● Follow the procedures described in the document for installation, operation,
and maintenance. Do not reconstruct or alter the equipment, add
components, or change the installation sequence without permission.
● Install temporary fences or warning ropes and hang "No Entry" signs around
the operation area to keep unauthorized personnel away from the area.
● Before installing or removing power cables, turn off the switches of the
equipment and its upstream and downstream switches.
● If any liquid is detected inside the equipment, disconnect the power supply
immediately and do not use the equipment.
● Before performing operations on the equipment, check that all tools meet the
requirements and record the tools. After the operations are complete, collect
all of the tools to prevent them from being left inside the equipment.
● Before installing power cables, check that cable labels are correct and cable
terminals are insulated.
● When installing the equipment, use a torque tool of a proper measurement
range to tighten the screws. When using a wrench to tighten the screws,
ensure that the wrench does not tilt and the torque error does not exceed
10% of the specified value.
● Ensure that bolts are tightened with a torque tool and marked in red and blue
after double-check. Installation personnel mark tightened bolts in blue.
Quality inspection personnel confirm that the bolts are tightened and then
mark them in red. (The marks should cross the edges of the bolts.)

● After the installation is complete, ensure that protective cases, insulation


tubes, and other necessary items for all electrical components are in position
to avoid electric shocks.

Issue 02 (2023-02-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 5


ECC800 Data Center Controller
User Manual (ECC800-Pro V100R023C00) 1 Safety Information

● If the equipment has multiple inputs, disconnect all the inputs before
operating the equipment.
● Before maintaining a downstream electrical or power distribution device, turn
off the output switch on the power supply equipment.
● During equipment maintenance, attach "Do not switch on" labels near the
upstream and downstream switches or circuit breakers as well as warning
signs to prevent accidental connection. The equipment can be powered on
only after troubleshooting is complete.
● If fault diagnosis and troubleshooting need to be performed after power-off,
take the following safety measures: Disconnect the power supply. Check
whether the equipment is live. Install a ground cable. Hang warning signs and
set up fences.
● Check equipment connections periodically, ensuring that all screws are
securely tightened.
● Only qualified professionals can replace a damaged cable.
● Do not scrawl, damage, or block any labels or nameplates on the equipment.
Promptly replace labels that have worn out.
● Do not use solvents such as water, alcohol, or oil to clean electrical
components inside or outside of the equipment.

Grounding
● Ensure that the grounding impedance of the equipment complies with local
electrical standards.
● Ensure that the equipment is connected permanently to the protective
ground. Before operating the equipment, check its electrical connection to
ensure that it is reliably grounded.
● Ensure that the protective ground point of the equipment is reliably
connected to the ground screw of the metal enclosure (connection resistance:
≤ 0.1 ohm).
● Ensure that the ground resistance of the system for lightning protection is less
than or equal to 10 ohms.
● Do not operate the equipment in the absence of a properly installed ground
conductor.
● Do not damage the ground conductor.
● If high touch current may occur on the equipment, ground the protective
ground terminal on the equipment enclosure before connecting the power
supply; otherwise, electric shock as a result of touch current may occur.

Cabling
● When selecting, installing, and routing cables, follow local safety regulations
and rules.
● The flame spread rating of cables should meet the UL 1581 VW-1 or IEC
60332-3-22 (ZB) or higher requirements.
● When routing power cables, ensure that there is no coiling or twisting. Do not
join or weld power cables. If necessary, use a longer cable.
● Ensure that all cables are properly connected and insulated, and meet
specifications.

Issue 02 (2023-02-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 6


ECC800 Data Center Controller
User Manual (ECC800-Pro V100R023C00) 1 Safety Information

● Ensure that the slots and holes for routing cables are free from sharp edges,
and that the positions where cables are routed through pipes or cable holes
are equipped with cushion materials to prevent the cables from being
damaged by sharp edges or burrs.
● If a cable is connected to the cabinet from the top, bend the cable in a U
shape outside the cabinet and then route it into the cabinet.
● Ensure that cables of the same type are bound together neatly and straight
and that the cable sheath is intact. When routing cables of different types,
ensure that they are at least 30 mm away from each other.
● If the external conditions (such as the cable layout or ambient temperature)
change, verify the cable usage in accordance with the IEC-60364-5-52 or local
laws and regulations. For example, check that the current-carrying capacity
meets requirements.
● When routing cables, reserve at least 30 mm clearance between the cables
and heat-generating components or areas. This prevents deterioration or
damage to the cable insulation layer.
● When the temperature is low, violent impact or vibration may damage the
plastic cable sheathing. To ensure safety, comply with the following
requirements:
– Cables can be laid or installed only when the temperature is higher than
0°C. Handle cables with caution, especially at a low temperature.
– Cables stored at subzero temperatures must be stored at room
temperature for at least 24 hours before they are laid out.
● Do not perform any improper operations, for example, dropping cables
directly from a vehicle. Otherwise, the cable performance may deteriorate due
to cable damage, which affects the current-carrying capacity and temperature
rise.

ESD

NOTICE

The static electricity generated by human bodies may damage the electrostatic-
sensitive components on boards, for example, the large-scale integrated (LSI)
circuits.

● When touching the equipment and handling boards, modules with exposed
circuit boards, or application-specific integrated circuits (ASICs), observe ESD
protection regulations and wear ESD clothing and ESD gloves or a well-
grounded ESD wrist strap.

Issue 02 (2023-02-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 7


ECC800 Data Center Controller
User Manual (ECC800-Pro V100R023C00) 1 Safety Information

Figure 1-2 Wearing an ESD wrist strap

● When holding a board or a module with exposed circuit boards, hold its edge
without touching any components. Do not touch the components with bare
hands.
● Package boards or modules with ESD packaging materials before storing or
transporting them.

1.3 Environmental Requirements

DANGER

Do not expose the equipment to flammable or explosive gas or smoke. Do not


perform any operation on the equipment in such environments.

DANGER

Do not store any flammable or explosive materials in the equipment area.

DANGER

Do not place the equipment near heat sources or fire sources, such as smoke,
candles, heaters, or other heating devices. Overheat may damage the equipment
or cause a fire.

WARNING

Install the equipment in an area far away from liquids. Do not install it under
areas prone to condensation, such as under water pipes and air exhaust vents, or
areas prone to water leakage, such as air conditioner vents, ventilation vents, or
feeder windows of the equipment room. Ensure that no liquid enters the
equipment to prevent faults or short circuits.

Issue 02 (2023-02-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 8


ECC800 Data Center Controller
User Manual (ECC800-Pro V100R023C00) 1 Safety Information

WARNING

To prevent damage or fire due to high temperature, ensure that the ventilation
vents or heat dissipation systems are not obstructed or covered by other objects
while the equipment is running.

General Requirements
● Ensure that the equipment is stored in a clean, dry, and well ventilated area
with proper temperature and humidity and is protected from dust and
condensation.
● Keep the installation and operating environments of the equipment within the
allowed ranges. Otherwise, its performance and safety will be compromised.
● Do not install, use, or operate outdoor equipment and cables (including but
not limited to moving equipment, operating equipment and cables, inserting
connectors to or removing connectors from signal ports connected to outdoor
facilities, working at heights, performing outdoor installation, and opening
doors) in harsh weather conditions such as lightning, rain, snow, and level 6
or stronger wind.
● Do not install the equipment in an environment with direct sunlight, dust,
smoke, volatile or corrosive gases, infrared and other radiations, organic
solvents, or salty air.
● Do not install the equipment in an environment with conductive metal or
magnetic dust.
● Do not install the equipment in an area conducive to the growth of
microorganisms such as fungus or mildew.
● Do not install the equipment in an area with strong vibration, noise, or
electromagnetic interference.
● Ensure that the site complies with local laws, regulations, and related
standards.
● Ensure that the ground in the installation environment is solid, free from
spongy or soft soil, and not prone to subsidence. The site must not be located
in a low-lying land or an area prone to water accumulation, and the
horizontal level of the site must be above the highest water level of that area
in history.
● Before opening doors during the installation, operation, and maintenance of
the equipment, clean up any water, ice, snow, or other foreign objects on the
top of the equipment to prevent foreign objects from falling into the
equipment.
● When installing the equipment, ensure that the installation surface is solid
enough to bear the weight of the equipment.
● Ensure that the equipment room provides good heat insulation, and that the
walls and floor are dampproof.
● Install rodent guards at the door of the equipment room to prevent rodents
and insects from entering the room.
● All cable holes should be sealed. Seal the used cable holes with sealing putty.
Seal the unused cable holes with the caps delivered with the equipment. The
following figure shows the criteria for correct sealing with sealing putty.

Issue 02 (2023-02-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 9


ECC800 Data Center Controller
User Manual (ECC800-Pro V100R023C00) 1 Safety Information

● After installing the equipment, remove idle packing materials such as cartons,
foam, plastics, and cable ties from the equipment area.

1.4 Mechanical Safety

WARNING

Ensure that all necessary tools are ready and inspected by a professional
organization. Do not use tools that have signs of scratches or fail to pass the
inspection or whose inspection validity period has expired. Ensure that the tools
are secure and not overloaded.

WARNING

Before installing equipment in a cabinet, ensure that the cabinet is securely


fastened with a balanced center of gravity. Otherwise, tipping or falling cabinets
may cause bodily injury and equipment damage.

WARNING

When pulling equipment out of a cabinet, be aware of unstable or heavy objects


in the cabinet to prevent injury.

WARNING

Do not drill holes into the equipment. Doing so may affect the sealing
performance and electromagnetic containment of the equipment and damage
components or cables inside. Metal shavings from drilling may short-circuit boards
inside the equipment.

General Requirements
● Repaint any paint scratches caused during equipment transportation or
installation in a timely manner. Equipment with scratches cannot be exposed
for an extended period of time.

Issue 02 (2023-02-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 10


ECC800 Data Center Controller
User Manual (ECC800-Pro V100R023C00) 1 Safety Information

● Do not perform operations such as arc welding and cutting on the equipment
without evaluation by the Company.
● Do not install other devices on the top of the equipment without evaluation
by the Company.
● When performing operations over the top of the equipment, take measures to
protect the equipment against damage.
● Use correct tools and operate them in the correct way.

Moving Heavy Objects


● Be cautious to prevent injury when moving heavy objects.

● If multiple persons need to move a heavy object together, determine the


manpower and work division with consideration of height and other
conditions to ensure that the weight is equally distributed.
● If two persons or more move a heavy object together, ensure that the object
is lifted and landed simultaneously and moved at a uniform pace under the
supervision of one person.
● Wear personal protective gears such as protective gloves and shoes when
manually moving the equipment.
● To move an object by hand, approach to the object, squat down, and then lift
the object gently and stably by the force of the legs instead of your back. Do
not lift it suddenly or turn your body around.
● Move or lift the equipment by holding its handles or lower edges. Do not hold
the handles of modules that are installed in the equipment.
● Do not quickly lift a heavy object above your waist. Place the object on a
workbench that is half-waist high or any other appropriate place, adjust the
positions of your palms, and then lift it.
● Move a heavy object stably with balanced force at an even and low speed. Put
down the object stably and slowly to prevent any collision or drop from
scratching the surface of the equipment or damaging the components and
cables.
● When moving a heavy object, be aware of the workbench, slope, staircase,
and slippery places. When moving a heavy object through a door, ensure that
the door is wide enough to move the object and avoid bumping or injury.
● When transferring a heavy object, move your feet instead of turning your
waist around. When lifting and transferring a heavy object, ensure that your
feet point to the target direction of movement.
● When transporting the equipment using a forklift truck, ensure that the forks
are properly positioned so that the equipment does not topple. Before moving
the equipment, secure it to the forklift truck using ropes. When moving the
equipment, assign dedicated personnel to take care of it.
● Choose sea or roads in good conditions for transportation. Do not transport
batteries by railway or air. Avoid tilt or jolt during transportation.

Issue 02 (2023-02-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 11


ECC800 Data Center Controller
User Manual (ECC800-Pro V100R023C00) 1 Safety Information

● Ensure that tilt angle of the cabinet meets the requirements shown in the
figure. The tilt angle α of the packed cabinet must be less than or equal to
15°. After the cabinet is unpacked, its tilt angle α must be less than or equal
to 10°.

Drilling Holes
● Obtain consent from the customer and contractor before drilling holes.
● Wear protective equipment such as safety goggles and protective gloves when
drilling holes.
● To avoid short circuits or other risks, do not drill holes into buried pipes or
cables.
● When drilling holes, protect the equipment from shavings. After drilling, clean
up any shavings.

Issue 02 (2023-02-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 12


ECC800 Data Center Controller
User Manual (ECC800-Pro V100R023C00) 2 Overview

2 Overview

2.1 Positioning
The ECC800-Pro manages the devices in the smart module. It is intelligent, flexible
in connection, easy to maintain, and reliable. It adopts the PoE bus for expansion
and allows all intelligent monitoring devices to be deployed flexibly.

2.2 Features
● Efficient
– Supports access of wireless devices and provides communication backup,
reducing cable layout workload and enhancing reliability.
– Supports unlocking through the access card, password, fingerprint, and
facial recognition.
– Supports remote alarm notifications by SMS and email.
– Supports power supply and communication over the power over Ethernet
(PoE) bus, providing rich bandwidth resources and high communication
efficiency.
– Supports remote upgrade, fault data export, and configuration parameter
synchronization.
– Eight access control devices and four cameras can be connected to a
single smart module.
– Cascades a maximum of three ECC800-Pros. The active alarms and power
usage effectiveness (PUE) data of cascaded ECC800-Pros can be displayed
on the WebUI of one ECC800-Pro.
– Collects statistics on the instantaneous PUE and average PUE of the
smart module and displays the statistics on a dashboard and in curves, so
that you can query the energy consumption of the smart module in real
time.
– Supports the function of transparent transmission over the RS485 port, so
that southbound components can communicate with the NetEco after
accessing the ECC800-Pro.

Issue 02 (2023-02-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 13


ECC800 Data Center Controller
User Manual (ECC800-Pro V100R023C00) 2 Overview

– Allows you to modify device performance parameters and query historical


performance data.
– Supports asset management, power management, and cooling capacity
management, allowing a grasp of dynamic information about the smart
module in a timely manner, and facilitating effective management.
– Supports wizard-based startup.
● Simple
– Supports local WiFi hotspots. After you install the WiFi module at the
USB port on the ECC800-Pro, you can connect to the ECC800-Pro using
the PAD app to view the layout, resources, energy efficiency,
environment, and alarms of the smart module. This increases availability.
– The PAD app can be used to query device information in real time,
facilitating O&M.
– Supports connection of monitored NEs to the PoE bus in plug-and-play
mode for auto-discovery and auto-registration, requiring no
configuration. This feature enables fast delivery and high maintainability.
● Reliable
– Supports intelligent linkage management which allows customization of
linkage logic, implementing intelligent operation and maintenance.
– Supports dual power inputs, providing high reliability.
– Supports automatic functions such as fire extinguishing linkage and
smoke alarm linkage.
– Uses PoE ring networking to reduce fault points and improve reliability.
– Supports cabinet-level magnetic locks, door status sensors, and
temperature monitoring, providing high security.
– Connects to the NetEco and supports SNMP to implement centralized
management of multiple modules in multiple scenarios.

Issue 02 (2023-02-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 14


ECC800 Data Center Controller
User Manual (ECC800-Pro V100R023C00) 3 Device Description

3 Device Description

3.1 ECC800-Pro

3.1.1 Product Configuration


The ECC800-Pro data center controller is mainly used to monitor the devices and
environment in a data center. It consists of the power supply units (PSUs) and
main control module, which are pluggable.
You can configure the ECC800-Pro collector in the following two manners:
Configuration 1 (typical configuration): one PSU and one main control module
Configuration 2: two PSUs and one main control module.

NOTE

● In configuration 1, a PSU is installed in slot 1, and a filler panel is installed in slot 2.


● In configuration 2, PSUs are installed in slots 1 and 2.

Figure 3-1 ECC800-Pro collector in configuration 2

(1) Slot 1: PSU (2) Slot 2: PSU (3) Slot 3: main control
module

Issue 02 (2023-02-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 15


ECC800 Data Center Controller
User Manual (ECC800-Pro V100R023C00) 3 Device Description

Figure 3-2 ECC800-Pro (rear view)

(1) 53.5V DC_OUT1 (2) 53.5V DC_OUT2 (3) AC_INPUT1

(4) AC_INPUT2

Power Port
The ECC800-Pro provides four power ports, including two AC input ports
(AC_INPUT1 and AC_INPUT2) and two DC output ports (DC_OUT1 and
DC_OUT2). Table 3-1 provides the power port pin definitions.

Table 3-1 Power port pin definitions


Port Type Silk Description
Screen

DC RTN+ 48V+

RTN- 48VGND

3.1.2 Technical Specifications


Table 3-2 ECC800-Pro technical specifications
Item Specifications

Power input ● Supports one AC input or two AC inputs.


● Rated voltage: 200–240 V AC
● Rated frequency: 50 Hz/60 Hz

Power output ● Output voltage: 42–58 V DC (rated voltage: 53.5 V DC)


● Output power of two PSUs: 2000 W (200–240 V AC); 940 W
(linear derating at 85–175 V AC)
● Output power of a single PSU: 1000 W (200–240 V AC); 470
W (linear derating at 85–175 V AC)

Issue 02 (2023-02-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 16


ECC800 Data Center Controller
User Manual (ECC800-Pro V100R023C00) 3 Device Description

Item Specifications

WAN port ● Supports communication through two WAN ports with


autonegotiation of 10/100/1000 Mbit/s communication
rates.
● Connects shielded network cables to the WAN ports.

LAN port ● Supports two LAN ports, which can be connected to


southbound devices. The ports support autonegotiation of
10/100/1000 Mbit/s communications rates.
● Connects shielded network cables to the LAN ports.

RS485 serial ● Output voltage: 13–15 V DC (rated voltage: 14.5 V DC)


port ● Four RS485 ports are two-wire isolated half-duplex ports.
expansion The default communication rate is 9600 bit/s.
● COM1–COM3 ports provide 12 V DC power.
● The power supply can be switched on or off and is on by
default.

PoE expansion Supports two PoE (GE) ports for expansion of the PoE bus, and
supports network isolation and a ring network.

AI/DI ● Output voltage: 13–15 V DC (rated voltage: 14.5 V DC)


expansion ● Provides five universal AIDI ports for connecting to sensors
(RJ45) such as smoke detectors, water sensors, and NTC sensors.
AIDI_1 to AIDI_3 are full-function AI/DI ports, and AIDI_4 to
AIDI_5 are simplified AI/DI ports without type identification.
● The power supply can be switched on or off and is on by
default.

DO expansion ● Output voltage: 13–15 V DC (rated voltage: 14.5 V DC)


(RJ45) ● Supports one active DO port.
● The power supply can be switched on or off and is on by
default.

Fault isolation There are three groups of 12 V ports. Each group has a
maximum current of 660 mA, each route has a maximum
current of 800 mA, and the maximum total current is 2 A.
Group 1: AIDI_1 and DO/12V ports
Group 2: AIDI_2, COM1/AIDI_4, and COM3/12V ports
Group 3: AIDI_3 and COM2/AIDI_5 ports

Wireless Supports wireless communication that complies with IEEE


communicatio 802.15.4.
n

Issue 02 (2023-02-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 17


ECC800 Data Center Controller
User Manual (ECC800-Pro V100R023C00) 3 Device Description

Item Specifications

4G Supports the 4G module, SMS, and 3G communication, and


provides a standard SIM card slot.
1. China: 2G and 4G networks support China Unicom or China
Mobile SIM cards, and 3G networks support only China
Unicom SIM cards.
2. Outside China: Select SIM cards according to the following
wireless modes and frequency bands:
● 4G: LTE-FDD, covering frequency bands B1, B3, B5, B7,
B8, and B20; LTE-TDD, covering frequency bands B38,
B40, and B41
● 3G: WCDMA, covering frequency bands B1, B5, and B8
● 2G: GSM, covering frequency bands 900 MHz/1800 MHz
NOTE
● Ensure that the site has signal coverage before using the SIM card.
● Due to the performance limitation of the wireless module, China
Telecom SIM cards are not supported.

USB ● Supports USB 2.0 and 5 V/1 A power supply.


● After installing the WiFi module, connect it to the ECC800-
Pro using the app on the mobile phone or PAD to view the
basic information about the smart module, such as layout,
resources, energy efficiency, environment, and alarms.
● You can insert a USB flash drive to export historical data
and configuration files and import configuration files.
NOTE
This port is protected by a security mechanism.

SW button ● Restores the default IP address, factory settings, and user


information.
● Supports RF_Z (802.15.4) networking.

Table 3-3 ECC800-Pro environmental specifications


Item Specifications

Operating –20°C to +50°C


temperature

Storage temperature –40°C to +70°C

Relative humidity 5%–95% RH (non-condensing)

Altitude 0–4000 m (When the altitude is between 3000 m and


4000 m, the temperature decreases by 1°C for each
additional 200 m.)

Issue 02 (2023-02-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 18


ECC800 Data Center Controller
User Manual (ECC800-Pro V100R023C00) 3 Device Description

Table 3-4 ECC800-Pro structural specifications

Item Specifications

Dimensions (H x W x D) 43.6 mm x 442 mm x 330 mm

Weight 7.5 kg (dual PSUs + main control


module)

Color Black

Installation requirements 1 U installation space in a 19-inch


standard cabinet

Environmental protection RoHS5, REACH, WEEE

Table 3-5 ECC800-Pro RF_Z specifications

Item Specifications

RF_Z operating 2405–2480 MHz


frequency

RF_Z EIRP (max.) 8 dBm

Table 3-6 ECC800-Pro 4G specifications

Item Specifications

EIRP (max.) 23 dBm

3.1.3 Main Control Module


Figure 3-3 ECC800-Pro main control module

(1) USB (2) Status indicator (3) AIDI_1 (4) AIDI_2

(5) COM1/AIDI_4 (6) COM3/12V (7) WAN1 (8) LAN1/PoE

(9) LAN2/PoE (10) WAN2 (11) COM4/CAN (12) COM2/AIDI_5

Issue 02 (2023-02-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 19


ECC800 Data Center Controller
User Manual (ECC800-Pro V100R023C00) 3 Device Description

(13) AIDI_3 (14) DO/12V (15) RF_Z (802.15.4) (16) WLAN (reserved)

(17) 4G (18) SW button - -

NOTE

The WLAN port is reserved and cannot be connected to a WLAN antenna for WLAN
communication.

Figure 3-4 ECC800-Pro main control module (side view)

(1) SIM card slot (2) Micro-SD card slot (reserved)

NOTE

The dimensions of the SIM card are 25 mm x 15 mm.

Signal Port
The ECC800-Pro provides the following communications ports. The pins of the
RJ45 port are shown in the figure.

Figure 3-5 RJ45 port pins

There are four GE ports, that is, two WAN ports (WAN1 and WAN2) and two LAN
ports (LAN1/PoE and LAN2/PoE).

Issue 02 (2023-02-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 20


ECC800 Data Center Controller
User Manual (ECC800-Pro V100R023C00) 3 Device Description

Table 3-7 GE port pin definitions


Item Description

Pin Pin 1 GE1+


sequence
Pin 2 GE1–

Pin 3 GE2+

Pin 4 GE3+

Pin 5 GE3–

Pin 6 GE2–

Pin 7 GE4+

Pin 8 GE4–

Indicator Green Linked, steady on


indicator

Yellow ACT data communication, blinking


indicator

Table 3-8 COM1/AIDI_4 and COM2/AIDI_5 port pin definitions


Item Description

Pin Pin 1 RS485+


sequence
Pin 2 RS485–

Pin 3 12 V DC_OUT

Pin 4 RS485+

Pin 5 RS485–

Pin 6 DI–

Pin 7 DI+

Pin 8 GND

Indicator Green Power output indicator


indicator ● Steady on: The 12 V DC output is normal.
● Off: No 12 V DC output is provided.

Issue 02 (2023-02-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 21


ECC800 Data Center Controller
User Manual (ECC800-Pro V100R023C00) 3 Device Description

Table 3-9 COM3/12V port pin definitions

Item Description

Pin Pin 1 RS485+


sequence
Pin 2 RS485–

Pin 3 12 V DC_OUT

Pin 4 RS485+

Pin 5 RS485–

Pin 6 -

Pin 7 -

Pin 8 GND

Indicator Green Power output indicator


indicator ● Steady on: The 12 V DC output is normal.
● Off: No 12 V DC output is provided.

Table 3-10 COM4/CAN port pin definitions

Item Description

Pin Pin 1 RS485+


sequence
Pin 2 RS485–

Pin 3 -

Pin 4 RS485+

Pin 5 RS485–

Pin 6 -

Pin 7 CAN_H

Pin 8 CAN_L

Table 3-11 AIDI_1, AIDI_2, and AIDI_3 ports pin definitions

Item Description

Pin Pin 1 Type_1


sequence
Pin 2 Type_2

Pin 3 12 V DC

Pin 4 Type_3

Issue 02 (2023-02-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 22


ECC800 Data Center Controller
User Manual (ECC800-Pro V100R023C00) 3 Device Description

Item Description

Pin 5 Type_4

Pin 6 DI–

Pin 7 DI+

Pin 8 GND

Indicator Green Power output indicator


indicator ● Steady on: The 12 V DC output is normal.
● Off: No 12 V DC output is provided.

● Pins 1, 2, 4, and 5 identify sensor types.


● Pins 3 and 8 are power output ports.
● Pins 6 and 8 can detect current type sensors (4–20 mA). Pins 6 and 7 can
detect the output status of passive dry contact type sensors. Pins 3 and 7 can
detect temperature sensors.

Table 3-12 DO/12V port pin definitions


Item Description

Pin Pin 1 -
sequence
Pin 2 -

Pin 3 12 V DC_OUT

Pin 4 -

Pin 5 -

Pin 6 DO_OUT+

Pin 7 DO_OUT–

Pin 8 GND

Indicator Green Power output indicator


indicator ● Steady on: The 12 V DC output is normal.
● Off: No 12 V DC output is provided.

Issue 02 (2023-02-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 23


ECC800 Data Center Controller
User Manual (ECC800-Pro V100R023C00) 3 Device Description

Indicators

Table 3-13 Indicators on the ECC800-Pro main control module


Indica Color Name Status Description
tor

RUN Green Running status Steady on The power supply is normal,


indicator the program is being loaded.

Off The power supply is


abnormal.

Blinking at The software runs properly


long (the indicator blinks at 0.5
intervals Hz, on for 1s and then off
for 1s) or the ECC800-Pro
registers with the
management system
successfully.

Blinking at The ECC800-Pro does not


short register with the
intervals management system (the
indicator blinks at 5 Hz, on
for 0.1s and then off for
0.1s).

ALM Red Alarm indicator Steady on A system failure alarm is


generated.

Off The system is normal.

RF_Z Green Communication Blinking at A network is set up, and no


status indicator long node access is allowed (the
intervals indicator blinks at 0.5 Hz, on
for 1s and then off for 1s).

Blinking at A network is set up, and


super node access is allowed (the
short indicator blinks at 10 Hz, on
intervals for 0.05s and then off for
0.05s).

Issue 02 (2023-02-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 24


ECC800 Data Center Controller
User Manual (ECC800-Pro V100R023C00) 3 Device Description

SW Button

Table 3-14 SW button description


Function Operation Description Indicator Status
Description

Wireless In non-wireless network (802.15.4) The RF_Z indicator is


network RF_Z pairing mode, hold down the button blinking at super
(802.15.4) for 3s to 5s to enter the wireless short intervals.
pairing network pairing mode.

In wireless network (802.15.4) The RF_Z indicator is


pairing mode, hold down the button blinking at long
for 3s to 5s to exit the pairing mode; intervals.
or the system automatically exits the
pairing mode after 30 minutes.

Hold down the button for more than The RF_Z indicator is
8s to clear network parameters. blinking at super
short intervals.

WLAN enabling Hold down the button for 1s to Unavailable


enable WLAN.

Restoring the Hold down for 1 minute. Unavailable


default IP
address, factory
settings, and
user information

Clearing Press the button for three times None


WebUI/app user within 3s.
and SSH user NOTICE
information ● Exercise caution when performing
this operation.
● After clearance, you need to use the
preset user name and password to
log in to the WebUI. On the
password change page displayed
after the login, the passwords of all
users need to be changed.

Issue 02 (2023-02-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 25


ECC800 Data Center Controller
User Manual (ECC800-Pro V100R023C00) 3 Device Description

3.1.4 PSU

Indicators

Table 3-15 PSU indicator description

Indicator Color Name Status Description

Green Power Steady on The PSU has input power.


indicator
Off The PSU has no input power or
is faulty.

Blinking at The PSU is being queried (the


long indicator blinks at 0.5 Hz, on
intervals for 1s and then off for 1s).

Blinking at The PSU application program is


short being loaded (the indicator
intervals blinks at 4 Hz, on for 0.125s
and then off for 0.125s).

Yellow Alarm Steady on Power limiting warning due to


indicator ambient overtemperature;
shutdown alarm for protection
against ambient
overtemperature or
undertemperature

Power input overvoltage or


undervoltage protection

Reverse DC input connection

Slight current imbalance

Output overvoltage

Hibernation

Off The PSU generates no


protection alarms.

Blinking at The communication between


long the PSU and the external
intervals equipment is interrupted (the
indicator blinks at 0.5 Hz, on
for 1s and then off for 1s).

Red Fault Steady on The PSU locks out due to


indicator output overvoltage.

The PSU has no output due to


internal faults.

Off The PSU is normal.

Issue 02 (2023-02-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 26


ECC800 Data Center Controller
User Manual (ECC800-Pro V100R023C00) 3 Device Description

3.2 Southbound Device Introduction

3.2.1 UIM20A Expansion Module

Figure 3-6 Front panel of the UIM20A expansion module

(1) Indicators and button (2) COM1/AIDI_1–COM8/ (3) PoE


AIDI_8

Figure 3-7 Rear panel of the UIM20A expansion module

(1) DIP switch (reserved) (2) COM_OUT (reserved) (3) COM_IN (reserved)

Table 3-16 Structural specifications of the UIM20A expansion module

Item Specifications

Width 120 mm

Depth 200 mm

Height 43 mm

Issue 02 (2023-02-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 27


ECC800 Data Center Controller
User Manual (ECC800-Pro V100R023C00) 3 Device Description

Item Specifications

Operating –30°C~+65°C
temperature

Installation Installed in a 19-inch rack


requirement
s

Environmen RoHS5
tal
protection

Technical Specifications

Table 3-17 Technical specifications of the UIM20A expansion module

Item Specifications

Power input Supports the RS485 or PoE power supply.

COM/AIDI (RJ45) ● Supports eight RS485 or AI/DI signal inputs.


● Can connect to sensors such as the smoke sensor, water
sensor, door status sensor, and infrared sensor.
● Each port can supply power. Two RJ45 ports share one
12 V DC power supply that is controlled independently.
The maximum output current is 900 mA when the
voltage is 12 V. (COM1/AIDI_1 and COM2/AIDI_2 form a
group, COM3/AIDI_3 and COM4/AIDI_4 form a group,
COM5/AIDI_5 and COM6/AIDI_6 form a group, and
COM7/AIDI_7 and COM8/AIDI_8 form a group).
● The 12 V DC power supply can be switched on or off
and is on by default.

POE Connects to the ECC800-Pro through the PoE port.

E-label 4.0 Supported

Communications Ports
The following table describes the pin definitions for ports COM1/AIDI_1 to COM8/
AIDI_8.

Table 3-18 Pin definitions for ports COM1/AIDI_1 to COM8/AIDI_8

Item Description

Pin Pin 1 RS485+


sequence

Issue 02 (2023-02-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 28


ECC800 Data Center Controller
User Manual (ECC800-Pro V100R023C00) 3 Device Description

Item Description

Pin 2 RS485–

Pin 3 12 V

Pin 4 RS485+

Pin 5 RS485–

Pin 6 DI–

Pin 7 DI+

Pin 8 GND

The following table describes the pin definitions for the COM_IN and COM_OUT
ports.

Table 3-19 Pin definitions for the COM_IN and COM_OUT ports

Item Description

Pin Pin 1 RS485+


sequence
Pin 2 RS485–

Pin 3 12 V (input power, supplying power to the module)

Pin 4 RS485+

Pin 5 RS485–

Pin 6 -

Pin 7 -

Pin 8 GND

Indicators and Button

Table 3-20 UIM20A indicators

Indicator Status Description

RUN Steady A board application is being loaded.


on

Off The board is not running.

Blinking The ECC800-Pro is successfully registered, and the


at long software runs properly (blinking at long intervals (0.5
intervals Hz), on for 1s and then off for 1s).

Issue 02 (2023-02-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 29


ECC800 Data Center Controller
User Manual (ECC800-Pro V100R023C00) 3 Device Description

Indicator Status Description

Blinking The communication is interrupted or the ECC800-Pro is


at short unsuccessfully registered (blinking at 2.5 Hz, on for 0.2s
intervals and then off for 0.2s).

Blinking Blinking at super short intervals for 0.5s and then off for
0.5s; last 10s (blinking at super short intervals: 10 Hz,
on for 0.05s and then off for 0.05s)

ALM Steady A system fault alarm is raised.


on

Off The system is normal.

Table 3-21 BLINK button description

Function Operation Indicator Status


Description Description

Blinking Press the button for The RUN indicator blinks at super
less than 2s. short intervals for 0.5s and then off for
0.5s; last 10s (blinking at super short
intervals for 10 Hz, on for 0.05s and
then off for 0.05s).

3.2.2 Smart ETH Gateway


A smart ETH gateway allows the extension of the 53.5 V DC power supply and FE
communication for the ECC800-Pro and can be flexibly deployed in a smart
module.

Figure 3-8 Smart ETH gateway

(1) PWR_IN cascading (2) FE_1 cascading (3) PoE_1–2 ports (4) PoE_3–4 ports
power port signal port

Issue 02 (2023-02-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 30


ECC800 Data Center Controller
User Manual (ECC800-Pro V100R023C00) 3 Device Description

(5) 48V_OUT1 power (6) 48V_OUT2 power (7) FE_2 cascading (8) PWR_OUT
output port output port signal port cascading power port

(9) BLINK button (10) Status indicator

Specifications

Table 3-22 Technical specifications for a smart ETH gateway


Item Specifications

Power input PWR_IN D-type power input terminal, for power cascading, input
voltage range: 45–55 V DC
Power of a single smart ETH gateway: max (2.7 A, 48 V DC);
power of cascaded smart ETH gateways: max (25 A, 48 V DC)

Power ● PWR_OUT D-type power output terminal, for power


output cascading, output voltage range: 45–55 V DC
● 48V_OUT1 and 48V_OUT2, terminal (1 A, 48 V DC), output
voltage range: 45–55 V DC

FE port Two FE ports, RJ45 terminal with an indicator, 10/100 Mbit/s


communications rate, for the cascading between smart ETH
gateways and the communications with the host

PoE port Four PoE ports, RJ45 terminal with an indicator, 10/100 Mbit/s
communications rate, complying with IEEE 802.3, IEEE 802.3u,
IEEE 802.3af/at

BLINK If you press the BLINK button, the RUN indicator blinks
button intermittently at super short intervals (blinking at super short
intervals for 0.5s and then off for 0.5s, lasting 5 seconds in total).

Indicators

Table 3-23 Indicators on a smart ETH gateway


Indicator Color Name Status Description

PWR Green Power input Steady on The power input is


status normal.
indicator
Off There is no power input.

RUN Green Module Off The power supply is


running abnormal.
status
indicator

Issue 02 (2023-02-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 31


ECC800 Data Center Controller
User Manual (ECC800-Pro V100R023C00) 3 Device Description

Indicator Color Name Status Description

Blinking The smart ETH gateway


at long successfully registers with
intervals the ECC800-Pro and the
software runs properly
(the indicator blinks at 0.5
Hz, on for 1s and then off
for 1s).

Blinking The indicator blinks at


super short intervals for
0.5s (blinking at 10 Hz, on
for 0.05s and then off for
0.05s) and then turns off
for 0.5s. The cycle lasts for
5s.

ALM Red Alarm Steady on The PoE output current is


indicator overloaded.

Off The PoE output is normal


or not connected.

3.2.3 Access Control System


The access control system applies to the equipment rooms, aisle containment, and
cabinet doors.

3.2.3.1 Aisle Access Control System


The access control system collects and monitors data about the access of devices
and personnel to ensure access security.

Diverse access control devices such as the fingerprint and card reader with a
keypad, fingerprint and card reader, and card reader with a keypad are supported.
Note that the communication distance between an access control device and an
access actuator should be less than or equal to 5 meters.

If needed, purchase IC cards for access control devices according to the IC card
chip specifications listed in Table 3-24.

Table 3-24 IC card chip specifications

Item Specifications

Chip model S50

Chip name Mifare 1K (S50) card

Chip type Philips Mifare 1 IC S50

Operating frequency 13.56 MHz

Issue 02 (2023-02-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 32


ECC800 Data Center Controller
User Manual (ECC800-Pro V100R023C00) 3 Device Description

Item Specifications

Read/write distance 1–3 cm

Storage capacity 8 kbit, 16 partitions

The emergency button or emergency door release button is used to open a door in
emergencies.

● The emergency button can disconnect the power supply to the lock and
therefore unlock the door in case of emergency.
● In case of emergency, break the glass of the emergency door release button
to disconnect the power supply to the lock and therefore unlock the door.

3.2.3.1.1 Access Actuator


The access actuator is the control component for the aisle door in a smart module.
It connects to the ECC800-Pro controller over FE port, wireless networking
(802.15.4). It opens the magnetic lock by detecting the card swiping information
of the card reader, door open button information, and fire linkage information. It
has access right management, access event record, and alarm record functions.

Figure 3-9 Access actuator

(1) 48 V power port (2) PoE port (3) RS485 port COM2

(4) RS485 port COM1 (5) Address DIP switch (6) Status indicator

(7) BLINK button (8) WG_2 Wiegand interface (9) WG_1 Wiegand interface

Issue 02 (2023-02-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 33


ECC800 Data Center Controller
User Manual (ECC800-Pro V100R023C00) 3 Device Description

(10) AI/DI_2 dry contact (11) AI/DI_1 dry contact (12) LOCK/GND/GATE/COM door
(reserved port for linkage (reserved port for exit status sensor and magnetic lock
control or third-party fire button) port
extinguishing system dry
contacts)

Specifications

Table 3-25 Access actuator technical specifications


Item Specifications

Power input ● DC input: terminal, with an input voltage of 36 V DC–60 V DC


● PoE power supply: one PoE port that complies with
IEEE802.3at

PoE port FE communication with the rate of 10/100 Mbit/s

Wireless One wireless communication port that complies with IEEE


communicat 802.15.4, mutual backup with FE communication
ion

AI/DI port Two AI/DI ports, can connect to the fire alarm and exit button

DO/DI port ● One 12 V DC power output that controls magnetic locks,


terminal
● One DI input port for connecting to the door status switch

RS485 serial Two RS485 ports (one route) with the default communication
port rate of 9600 bit/s, physical port cascading supported (reserved
expansion function)

Wiegand Two Wiegand ports, 12 V DC card reader operating power output;


port two routes of card readers can operate at the same time.

BLINK ● Press the button for less than 1 second to start blinking.
button ● Hold down the button for 1–5 seconds to search for a network
and start networking.
● Hold down the button for more than 10 seconds to clear
network parameters.

Address DIP 4-pin address DIP switch


switch

E-label Supported

Issue 02 (2023-02-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 34


ECC800 Data Center Controller
User Manual (ECC800-Pro V100R023C00) 3 Device Description

Indicators

Table 3-26 Access actuator indicators


Indicator Color Name Status Description

PWR Green Power input status ● Steady on: The


indicator power input is
normal.
● Off: There is no
power input.

RUN Green Communication ● Off: The power is


status indicator abnormal or the
board program is
loading.
● Blinking at long
intervals: The access
actuator
successfully registers
with the ECC800-
Pro and the
software runs
properly (the
indicator blinks at
0.5 Hz, on for 1s
and then off for 1s).
● Blinking at short
intervals: The
communication fails
or the access
actuator fails to
register with the
ECC800-Pro (the
indicator blinks at 4
Hz, on for 0.125s
and then off for
0.125s).
● Blinking: The
indicator blinks at
super short intervals
for 0.5s (blinking at
10 Hz, on for 0.05s
and then off for
0.05s) and then
turns off for 0.5s.
The cycle lasts for
5s.

Issue 02 (2023-02-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 35


ECC800 Data Center Controller
User Manual (ECC800-Pro V100R023C00) 3 Device Description

Indicator Color Name Status Description

ALM Red Alarm indicator ● Steady on: A system


failure alarm is
generated.
● Off: No system
alarm is generated.

RF_Z Green Wireless ● Steady on: No


communication network parameters
status indicator exist, or a network
is to be created.
● Blinking at long
intervals: A network
is set up, and no
node access is
allowed (the
indicator blinks at
0.5 Hz, on for 1s
and then off for 1s).
● Blinking
intermittently at
super short
intervals: The access
actuator is
searching for a
network (the
indicator blinks at
super short intervals
for 0.5s and then
turns off for 0.5s).

Communications Ports
The access actuator provides one DO port (LOCK/GND) and one DI port (GATE/
COM). Table 3-27 lists the LOCK/GND/GATE/COM port pin definitions.

Table 3-27 LOCK/GND/GATE/COM port pin definitions


Item Description

LOCK/GND LOCK 12V_OUT


(control
magnetic GND GND
locks) pin
sequence

GATE/COM GATE DI1


(door

Issue 02 (2023-02-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 36


ECC800 Data Center Controller
User Manual (ECC800-Pro V100R023C00) 3 Device Description

Item Description

status) pin COM COM


sequence

3.2.3.1.2 Fingerprint and Card Reader with a Keypad

Figure 3-10 Fingerprint and card reader with a keypad

(1) Fingerprint reader (2) LED indicator

Table 3-28 Technical specifications of a fingerprint and card reader with a keypad

Item Specifications

Dimensions (L x W x H) 156 mm x 53 mm x 38 mm

Rated operating voltage 12 V DC±15%

Rated operating current 300 mA±15%

Card type supported IC card

Authorized storage A maximum of 3000 authorized users, with a


maximum of 6000 fingerprints

Communications mode RS485 and Wiegand communications ports

Table 3-29 Access control device operating status

Item Status Description

Standby LED indicator The indicator is steady


blue.

Fingerprint reader The indicator is off.

Issue 02 (2023-02-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 37


ECC800 Data Center Controller
User Manual (ECC800-Pro V100R023C00) 3 Device Description

Item Status Description

Unauthorized fingerprint LED indicator The indicator blinks blue,


collection red, blue, red, and blue
in order.

Fingerprint reader The indicator turns on


(white).

Buzzer sounds The buzzer sounds three.

Authorized fingerprint LED indicator The indicator blinks blue,


collection red, and blue in order.

Fingerprint reader The indicator turns on


(white).

Buzzer sounds The buzzer sounds once.

Card swiping LED indicator The indicator blinks blue,


red, and blue in order.

Buzzer sounds The buzzer sounds once.

3.2.3.1.3 Fingerprint and Card Reader

Figure 3-11 Fingerprint and card reader

(1) Fingerprint reader (2) LED indicator

Table 3-30 Technical specifications of a fingerprint and card reader

Item Specifications

Dimensions (L x W x H) 156 mm x 53 mm x 38 mm

Rated operating voltage 12 V DC±5%

Issue 02 (2023-02-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 38


ECC800 Data Center Controller
User Manual (ECC800-Pro V100R023C00) 3 Device Description

Item Specifications

Rated operating current 300 mA±5%

Card type supported IC card

Authorized storage A maximum of 3000 authorized users, with a


maximum of 6000 fingerprints

Communications mode RS485 and Wiegand communications ports

Table 3-31 Access control device operating status


Item Status Description

Standby LED indicator The indicator is steady


blue.

Fingerprint reader The indicator is off.

Unauthorized fingerprint LED indicator The indicator blinks blue,


collection red, blue, red, and blue
in order.

Fingerprint reader The indicator turns on


(white).

Buzzer sounds The buzzer sounds three.

Authorized fingerprint LED indicator The indicator blinks blue,


collection red, and blue in order.

Fingerprint reader The indicator turns on


(white).

Buzzer sounds The buzzer sounds once.

Card swiping LED indicator The indicator blinks blue,


red, and blue in order.

Buzzer sounds The buzzer sounds once.

Issue 02 (2023-02-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 39


ECC800 Data Center Controller
User Manual (ECC800-Pro V100R023C00) 3 Device Description

3.2.3.1.4 Card Reader with a Keypad

Figure 3-12 Card reader with a keypad

Table 3-32 Technical specifications of a card reader with a keypad

Item Specifications

Dimensions (L x W x H) 114 mm x 63 mm x 25 mm

Operating voltage Operating voltage range: 10.8–13.2 V DC; rated


voltage: 12 V DC

Operating current Static standby current: 80 mA; dynamic operating


current (card swiping, key pressing): 150 mA;
minimum input current: 12 V DC/300 mA

Communication mode Wiegand communications port

3.2.3.1.5 Magnetic Lock

Figure 3-13 Double-door magnetic lock

Issue 02 (2023-02-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 40


ECC800 Data Center Controller
User Manual (ECC800-Pro V100R023C00) 3 Device Description

Figure 3-14 Single-door magnetic lock

Figure 3-15 Sliding-door magnetic lock

(1) Magnetic lock fastener (2) Magnetic lock

(3) Magnet (4) Magnet fastener

3.2.3.2 Cabinet Access Control System


The cabinet access control system applies to cabinets in the aisle containment to
ensure data and device security.

Cabinet Electronic Lock


Features:
● An IC card can be used after being authorized using software.
● An IC card can be authorized for one lock or all locks.
● Door opening information is recorded through a network.
● The system displays the status of cabinet doors and locks in real time, the
system displays the status of cabinet doors and locks in real time and reports
the unauthorized door opening.
● The system supports remote unlocking.

Issue 02 (2023-02-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 41


ECC800 Data Center Controller
User Manual (ECC800-Pro V100R023C00) 3 Device Description

Figure 3-16 Cabinet electronic lock

Table 3-33 Cabinet electronic lock specifications

Item Specifications

Rated input voltage 12 V DC

Rated current 200–300 mA

Unlock mode Unlocking with a powered card

Card type supported IC card (operating frequency: 13.56


MHz)

Mechanically unlock Supported

Mechanical Code Lock


Features:
● The cabinet door can be opened with only the key and without the password.
● The cabinet door can be opened with only the password and without the key.
● The user can set a password.
● A password should contain at least three digits.
● The password can be reset if the user forgot it.

Figure 3-17 Mechanical code lock

Issue 02 (2023-02-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 42


ECC800 Data Center Controller
User Manual (ECC800-Pro V100R023C00) 3 Device Description

3.2.3.3 Cabinet Electronic Clasp Lock


The cabinet electronic clasp lock is used to manage access control. It can be
automatically unlocked, or manually locked and unlocked.

Figure 3-18 Cabinet electronic clasp lock

(1) LED indicator (2) DIP switch (3) RJ45 power port

Table 3-34 RJ45 port definitions


No. Pin Description Description

1 RS485+ RS485+

2 RS485– RS485–

3 +12 V power supply +12VDC

4 RS485+ RS485+

5 RS485– RS485–

6 - -

7 - -

8 Ground GND

Issue 02 (2023-02-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 43


ECC800 Data Center Controller
User Manual (ECC800-Pro V100R023C00) 3 Device Description

Table 3-35 LED indicator status


Indi Color Name Operat Status Description
cato ion
r

RUN Green Module - Blinki ● The door lock is paired


running ng with the host, and the
indicator power supply is normal:
The indicator blinks at
0.5 Hz (on for 1s and
then off for 1s).
● The door lock fails to
pair with the host: The
indicator blinks at 4 Hz
(on for 0.125s and then
off for 0.125s).

Off The power supply is


abnormal.

Press Blinki ● The indicator blinks at


SW. ng super short intervals for
interm 0.5s, and then off for
ittentl 0.5s.
y at ● The indicator blinks at
super super short intervals
short (blinking at 10 Hz, on for
interv 0.05s and then off for
als 0.05s). The cycle lasts for
5s.

ALM Red Alarm - Stead A system failure alarm is


indicator y on generated.

Off The system is normal.

3.2.4 FusionModule Actuator


The FusionModule Actuator is applied in a smart module. It controls the lighting
inside the smart module through the access control system, host instructions,
infrared linkage information (disabled by default), or lighting button, and provides
a PAD charging port. The FusionModule Actuator can also control the rotating
skylight of the aisle based on the fire alarm linkage information or the host
control information, and opens the magnetic lock when detecting the card swiping
information of the card reader, exit button information, and fire linkage
information. In addition, the FusionModule Actuator manages access rights,
records entrance and exit events, and records alarms.

Issue 02 (2023-02-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 44


ECC800 Data Center Controller
User Manual (ECC800-Pro V100R023C00) 3 Device Description

Appearance

Figure 3-19 FusionModule Actuator

(1) 48 V DC power (2) LAN port (3) RS485 ports (4) RS485 port
input port (COM1/COM2) (reserved)

(5) DIP switch (6) AC OUT power (7) Terminal cover (8) AC IN power input
output ports port

(9) Fuse (10) DO/DI ports (11) DO/12V port (12) AI/DI ports

(13) Wiegand ports (14) Spare fuse box (15) Indicators (16) BLINK button

Specifications

Table 3-36 Indicators

Item Specifications

Power Input ● AC IN: one AC input, 90 V AC to 240 V AC


● 48 V DC input: terminal, with an input voltage of 36 V DC
to 60 V DC

Power output ● AC OUT1: two AC outputs, 90 V AC to 240 V AC. The


maximum current of two outputs is 5 A.
● AC OUT2: one AC output, 90 V AC to 240 V AC. The
maximum current is 5 A.

LAN port FE communication with a communications rate of 10/100


Mbit/s

Issue 02 (2023-02-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 45


ECC800 Data Center Controller
User Manual (ECC800-Pro V100R023C00) 3 Device Description

Item Specifications

Wireless One wireless port that complies with IEEE 802.15.4, mutual
communication backup with FE communication

RS485 serial COM1/COM2: two RS485 ports (one route) with a default
port communication rate of 9600 bit/s, physical port cascading
(reserved)
COM3: southbound or northbound communication (reserved)

DO/DI port ● Access: One DO output port is used to control the power
output of the electronic door lock, and one DI input port is
used to connect to the door status switch. Both ports use
terminals.
● Skylight: One DO output port is used to control the power
output of the skylight magnetic lock, and one DI input port
is connected to the skylight open button. Both ports use
terminals.

DO/12V One DO port with 12 V DC power supply (reserved)

AI/DI port Five AI/DI ports, in which one is for detecting one door open
button, two for detecting lighting buttons, and one for
detecting fire extinguishing linkage signal. One port is
reserved.

Wiegand port Two Wiegand ports, 12 V DC card reader operating power


output; two routes of card readers can operate at the same
time.

BLINK button ● Press the button for less than 1 second to start blinking.
● Hold down the button for 1–5 seconds to search for a
network and start networking.
● Hold down the button for more than 6 seconds to clear
network parameters.

Address DIP 4-pin address DIP switch (reserved)


switch

Fuse 16 A, 250 V AC

Spare fuse box Two 16 A, 250 V AC fuses

E-label Supported

Issue 02 (2023-02-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 46


ECC800 Data Center Controller
User Manual (ECC800-Pro V100R023C00) 3 Device Description

Indicators

Table 3-37 Indicators


Indicator Color Name Status Description

Power Green Power input Steady on The power input is normal.


status
indicator Off There is no power input.

RUN Green Running Off The power is abnormal or


status the board program is
indicator loading.

Blinking at The smart module actuator


long successfully registers with
intervals the ECC800-Pro and the
software runs properly (the
indicator blinks at 0.5 Hz, on
for 1s and then off for 1s).

Blinking at The communication fails or


short the smart module actuator
intervals fails to register with the
ECC800-Pro (the indicator
blinks at 4 Hz, on for 0.125s
and then off for 0.125s).

Blinking The indicator blinks at super


short intervals for 0.5s
(blinking at 10 Hz, on for
0.05s and then off for 0.05s)
and then turns off for 0.5s.
The cycle lasts for 5s.

ALM Red Alarm Steady on A system failure alarm is


indicator generated.

Off No system alarm is


generated.

RF_Z Green Communicati Steady on No network parameters


on status exist, or a network is to be
indicator created.

Blinking at A network is set up, and no


long node access is allowed (the
intervals indicator blinks at 0.5 Hz, on
for 1s and then off for 1s).

Blinking at A network is being set up,


super short and node access is allowed
intervals (the indicator blinks at 10
Hz, on for 0.05s and then off
for 0.05s).

Issue 02 (2023-02-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 47


ECC800 Data Center Controller
User Manual (ECC800-Pro V100R023C00) 3 Device Description

Indicator Color Name Status Description

Blinking The smart module actuator


intermittent is searching for a network
ly at super (the indicator blinks at super
short short intervals for 0.5s and
intervals then turns off for 0.5s).

3.2.5 AC Actuator
The AC actuator is used in a smart module to control the lighting inside the smart
module by receiving commands from the access control system or host, infrared
linkage information (disabled by default), or signals from the light button. It also
provides a charging port for the PAD (AC OUT2).

Figure 3-20 AC actuator

(1) AC OUT2 port (2) AC OUT1 port (3) AC IN port (4) Status indicator

(5) BLINK button (6) AIDI_1 and AIDI_2 (7) COM1 and COM2 -

Issue 02 (2023-02-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 48


ECC800 Data Center Controller
User Manual (ECC800-Pro V100R023C00) 3 Device Description

Specifications

Table 3-38 AC actuator technical specifications


Item Specifications

Power input One AC input, 100 V AC to 240 V AC.

Power output ● AC OUT1: two AC outputs, 100 V AC to 240 V AC. The


maximum current of two outputs is 5 A.
● AC OUT2: one AC output, 100 V AC to 240 V AC, maximum
current: 5 A.

Wireless One wireless communication port that complies with


communication IEEE802.15.4

RS485 serial One route of dual RS485 ports, not isolated (reserved)
port

AI/DI detection Two AI/DI dry contacts, connecting to two light buttons

PAD intelligent Charging stops when the PAD battery level reaches 100%.
charging When the battery level is lower than 40% (default value,
which can be set to 30, 40, or 50), charging starts.

BLINK button ● Press the button for less than 1 second to start blinking.
● Hold down the button for 1–5 seconds to search for a
network and start networking.
● Hold down the button for more than 10 seconds to clear
network parameters.

Indicators

Table 3-39 AC actuator indicators


Indicator Color Name Status Description

Power Green Power Steady on The power input is normal.


status
indicator Off There is no power input.

RUN Green Running Off The power is abnormal or the


status board program is loading.
indicator
Blinking at The AC actuator successfully
long registers with the ECC800-Pro
intervals and the software runs properly
(the indicator blinks at 0.5 Hz,
on for 1s and then off for 1s).

Issue 02 (2023-02-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 49


ECC800 Data Center Controller
User Manual (ECC800-Pro V100R023C00) 3 Device Description

Indicator Color Name Status Description

Blinking at The communication fails or


short the AC actuator fails to
intervals register with the ECC800-Pro
(the indicator blinks at 4 Hz,
on for 0.125s and then off for
0.125s).

Blinking The indicator blinks at super


short intervals for 0.5s
(blinking at 10 Hz, on for
0.05s and then off for 0.05s)
and then turns off for 0.5s.
The cycle lasts for 5s.

ALM Red Alarm Steady on A system failure alarm is


indicator generated.

Off No system alarm is generated.

RF_Z Green Communic Steady on No network parameters exist,


ation or a network is to be created.
status
indicator Blinking at A network is set up, and no
long node access is allowed (the
intervals indicator blinks at 0.5 Hz, on
for 1s and then off for 1s).

Blinking The AC actuator is searching


intermittent for a network (the indicator
ly at super blinks at super short intervals
short for 0.5s and then turns off for
intervals 0.5s).

3.2.6 Skylight Actuator


The skylight actuator controls the rotating skylight on the aisle containment of
the smart module based on the alarm linkage information from the fire
extinguishing system or the control information from the host. The skylight
actuator supports E-labels and wireless networking (802.15.4).

Issue 02 (2023-02-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 50


ECC800 Data Center Controller
User Manual (ECC800-Pro V100R023C00) 3 Device Description

Figure 3-21 Skylight actuator

(1) LOCK/GND (2) BUTTON/GND (3) AI/DI_1 sensor (4) AI/DI_2 sensor
magnetic lock DO window open button DI input port input port
output port input port

(5) BLINK button (6) Status indicator (7) Address DIP (8) COM1 port
switch

(9) COM2 port (10) PoE port (11) 48 V power port -

Specifications

Table 3-40 Skylight actuator technical specifications

Item Specifications

Power input ● DC input: terminal, with input voltage of 36–60 V DC


● PoE input: one PoE port that complies with IEEE 802.3at

PoE port FE communication with the rate of 10/100 Mbit/s

Wireless One wireless port that complies with IEEE 802.15.4, mutual
communicatio backup with FE communication
n

AI/DI port Two AI/DI ports for detecting fire extinguishing linkage signals;
smoke detection signals also supported

DO output One 12 V DC power output for controlling the skylight


magnetic lock; driving nine skylight magnetic locks
simultaneously

DI input One DI input port for connecting to the skylight open button

Issue 02 (2023-02-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 51


ECC800 Data Center Controller
User Manual (ECC800-Pro V100R023C00) 3 Device Description

Item Specifications

BLINK button ● Press the button for less than 1 second to start blinking.
● Hold down the button for 1–5 seconds to search for a
network and start networking.
● Hold down the button for more than 10 seconds to clear
network parameters.

Address DIP 4-pin address DIP switch


switch

E-label Supported

Indicators

Table 3-41 Skylight actuator indicators


Indicator Color Name Status Description

Power Green Power input Steady on The power input is normal.


status
indicator Off There is no power input.

RUN Green Running Off The power is abnormal or


status the board program is
indicator loading.

Blinking at The skylight actuator


long successfully registers with
intervals the ECC800-Pro and the
software runs properly (the
indicator blinks at 0.5 Hz, on
for 1s and then off for 1s).

Blinking at The communication fails or


short the skylight actuator fails to
intervals register with the ECC800-Pro
(the indicator blinks at 4 Hz,
on for 0.125s and then off
for 0.125s).

Blinking The indicator blinks at super


short intervals for 0.5s
(blinking at 10 Hz, on for
0.05s and then off for 0.05s)
and then turns off for 0.5s.
The cycle lasts for 5s.

ALM Red Alarm Steady on A system failure alarm is


indicator generated.

Issue 02 (2023-02-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 52


ECC800 Data Center Controller
User Manual (ECC800-Pro V100R023C00) 3 Device Description

Indicator Color Name Status Description

Off No system alarm is


generated.

RF_Z Green Communicati Steady on No network parameters


on status exist, or a network is to be
indicator created.

Blinking at A network is set up, and no


long node access is allowed (the
intervals indicator blinks at 0.5 Hz, on
for 1s and then off for 1s).

Blinking The skylight actuator is


intermittent searching for a network (the
ly at super indicator blinks at super
short short intervals for 0.5s and
intervals then turns off for 0.5s).

Communications Ports
The skylight actuator provides one DO port (LOCK/GND) and one DI port
(BUTTON/GND). Table 3-42 lists the LOCK/GND/BUTTON/GND port pin
definitions.

Table 3-42 LOCK/GND/BUTTON/GND port pin definitions


Item Description

LOCK/GND LOCK 12V_OUT


pin
sequence GND GND

BUTTON/G BUTTON DI3


ND pin
sequence GND GND

3.2.7 Multi-Functional Sensor


A multi-functional sensor detects and monitors the temperature, humidity, smoke,
and infrared, and supports connection to the ECC800-Pro over FE or wireless
communication.

NOTE

The infrared detection function is enabled only when the intelligent lighting function is
enabled.

Issue 02 (2023-02-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 53


ECC800 Data Center Controller
User Manual (ECC800-Pro V100R023C00) 3 Device Description

Figure 3-22 Multi-functional sensor

(1) Address DIP switch (2) BLINK button (3) TEST button

(4) RF_Z indicator (5) RUN indicator (6) ALM indicator

Specifications

Table 3-43 Multi-functional sensor technical specifications

Item Specifications

Temperature –40°C to +70°C. Precision ≤ ±0.5°C (25°C).


monitoring

Humidity 0 to 100% RH. Precision ≤ ±5% RH (25°C, 20%–80% RH).


monitoring

Smoke Complies with UL217. The smoke sensor generates an alarm


monitoring when detecting 3.2% weak dust per foot.

PoE port One PoE port that complies with IEEE 802.3at

RS485 port One RS485 port is reserved.

DI input One DI input port, 12 V DC power input

BLINK button Wireless communication:


● If the sensor is not connected to the network, hold down
the button for 2s to 3s to connect the sensor to the network
in RF_Z mode.
● If the sensor is connected to the network, hold down the
button for 2s to 3s, and the RUN indicator blinks.
● Hold down the button for more than 6 seconds to clear
network parameters.

Issue 02 (2023-02-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 54


ECC800 Data Center Controller
User Manual (ECC800-Pro V100R023C00) 3 Device Description

Item Specifications

TEST button Supports the smoke sensor test.


(for testing Hold down the button for 3s to trigger a smoke alarm, and
the smoke release the button to stop the smoke alarm.
detection)

E-label Supported

Indicators

Table 3-44 Description of the indicators on the multi-functional sensor


Indicator Color Name Status Description

RUN Green Running Blinking at The multi-functional sensor


status long successfully registers with
indicator intervals the ECC800-Pro and the
software runs properly (the
indicator blinks at 0.5 Hz, on
for 1s and then off for 1s).

Blinking at The multi-functional sensor


short fails to register with the
intervals ECC800-Pro or the
communication fails (the
indicator blinks at 4 Hz, on
for 0.125s and then off for
0.125s).

Blinking The indicator blinks at super


short intervals for 0.5s
(blinking at 10 Hz, on for
0.05s and then off for 0.05s)
and then turns off for 0.5s.
The cycle lasts for 10s.

ALM Red Alarm Steady on A system failure alarm is


indicator generated.

Off No system alarm is


generated.

RF_Z Green Communicat Steady on No network parameters


ion status exist, or a network is to be
indicator created.

Blinking at A network is set up, and no


long node access is allowed (the
intervals indicator blinks at 0.5 Hz, on
for 1s and then off for 1s).

Issue 02 (2023-02-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 55


ECC800 Data Center Controller
User Manual (ECC800-Pro V100R023C00) 3 Device Description

Indicator Color Name Status Description

Blinking The multi-functional sensor


intermittentl is searching for a network
y at super (the indicator blinks at super
short short intervals for 0.5s and
intervals then turns off for 0.5s).

3.2.8 Smoke Sensor


Smoke sensors are used to detect the smoke concentration.

Figure 3-23 Smoke sensor

Table 3-45 Technical specifications of a smoke sensor

Item Specifications

Operating voltage DC12 V (9–16 V DC)

Quiescent current < 8 mA

Alarm current < 35 mA

Output mode Relay output

Output contact capacity 3 A/120 V AC or 3 A/24 V AC

Operating temperature –10ºC to +50ºC

Ambient humidity < 95% RH (non-condensing)

Dimensions Diameter: 112 mm, height: 41 mm

3.2.9 Temperature Sensor (BOM Number: 33010348)


The temperature sensor is used to measure the surface temperature.

Issue 02 (2023-02-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 56


ECC800 Data Center Controller
User Manual (ECC800-Pro V100R023C00) 3 Device Description

Figure 3-24 Temperature sensor

Table 3-46 Temperature sensor specifications

Item Specifications

Measurement range –20°C to +70°C

Measurement precision ±1°C (25°C)

Operating temperature –10°C to +55°C

Operating voltage 10–16 V DC

Storage temperature –40°C to +70°C

3.2.10 Cabinet Temperature Sensor

Figure 3-25 Cabinet temperature sensor

Table 3-47 Technical specifications of a cabinet temperature sensor

Item Specifications

Temperature detection –20°C to +70°C


range

Issue 02 (2023-02-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 57


ECC800 Data Center Controller
User Manual (ECC800-Pro V100R023C00) 3 Device Description

Item Specifications

Temperature detection ● ±1°C (≥ –10°C, < 25°C) & (> 25°C, ≤ 55°C)
tolerance ● ±2°C (≥ –20°C, < –10°C) & (> 55°C, ≤ 70°C)
● ±0.5°C (25°C)

Operating temperature –20°C to +70°C

Operating humidity 5%–95% RH

Storage temperature –40°C to +70°C

Storage humidity ≤ 95% RH, non-condensing

3.2.11 Alarm Beacon


Figure 3-26 Alarm beacon

Table 3-48 Structural specifications of an alarm beacon


Item Specifications

Dimensions (H x W x 48 mm x 124.6 mm x 73 mm
D)

Installation Mounting supported


requirements

Issue 02 (2023-02-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 58


ECC800 Data Center Controller
User Manual (ECC800-Pro V100R023C00) 3 Device Description

Item Specifications

Environmental RoHS, REACH


protection

Table 3-49 Technical specifications of an alarm beacon

Item Specifications

Power input RJ45 port; input voltage: 10–15 V DC; operating current:
≤ 300 mA

Sound pressure ≥ 108 dB/30 cm

Continuous operating ≥ 40 min


time

3.2.12 (Optional) Smart U Space Manager (52273314)


The smart U space manager is designed for IT asset management of the data
center. The system automatically detects the physical location of IT devices in the
data center, and collects IT asset codes and the information about U space usage.
The asset detection strip of the smart U space manager and the main control box
must be assembled together. Otherwise, the physical location of devices cannot be
detected.

Figure 3-27 Smart U space manager

(1) Asset detection strip (2) Asset label (3) Main control box

Table 3-50 Technical specifications of the smart U space manager

Item Specifications

Characteristic Applicable to 42 U cabinets

Communications port RS485, Modbus-RTU

Issue 02 (2023-02-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 59


ECC800 Data Center Controller
User Manual (ECC800-Pro V100R023C00) 3 Device Description

Item Specifications

Communication Rate: 9600 bit/s


Communication format: one start bit, eight data
bits, no parity bit, one stop bit

Power input 12 V DC±5% (RJ45)

Rated current and power 250 mA


consumption

Data upload port One RS485 route (two RJ45 ports)

Dimensions (mm) Main control box: 71 mm x 70 mm x 25 mm


Detection strip: 1867 mm x 18 mm x 6.5 mm (H
x W x D)

Weight ≤ 0.2 kg (main control box), ≤ 0.35 kg (asset


detection strip)

Installation mode Magnet-based installation

3.2.13 (Optional) Smart U Space Manager (52275819)

The smart U space manager is designed for IT asset management of the data
center. The system automatically detects the physical location of IT devices in the
data center, and collects IT asset codes and the information about U space usage.

Figure 3-28 Smart U space manager

(1) Asset detection strip (2) Asset label

Table 3-51 Technical specifications of the smart U space manager

Item Specifications

Characteristic Applicable to 42 U cabinets

Communications port RS485, Modbus-RTU

Issue 02 (2023-02-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 60


ECC800 Data Center Controller
User Manual (ECC800-Pro V100R023C00) 3 Device Description

Item Specifications

Communication Rate: 9600 bit/s


Communication format: one start bit, eight data
bits, no parity bit, one stop bit

Power input 12 V DC±5% (RJ45)

Rated current and power 250 mA


consumption

Data upload port RJ45 port

Dimensions (mm) Detection strip: 1867 mm x 18 mm x 6.5 mm (H


x W x D)

Weight ≤ 0.5 kg (asset detection strip)

Installation mode Magnet-based installation

3.2.14 eLight Actuator

The eLight actuator has the function of associating alarms, access authorization
status, and atmospheres.

Table 3-52 eLight functions

Light of the eLight Cause


eLight Strip Strip Light
Light Lighting
Specificati
ons

Red light Steady on The smart module raises a critical alarm.

Blinking Access authorization fails and the aisle door


for 3 cannot be opened.
seconds

Blinking The eLight fails to communicate with the ECC800-


Pro.

Orange light Steady on The smart module raises a major alarm.

Yellow light Steady on The smart module raises a minor alarm.

Gray light Steady on The smart module raises a warning.

Green light Blinking Access authorization succeeds and the door can be
for 3 opened.
seconds

Blue light Steady on Associated alarm severity is set to None.

Issue 02 (2023-02-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 61


ECC800 Data Center Controller
User Manual (ECC800-Pro V100R023C00) 3 Device Description

Light of the eLight Cause


eLight Strip Strip Light
Light Lighting
Specificati
ons

Other color Steady on The device is abnormal or cables are incorrectly


light or blinking connected to terminals R, G, and B.

Figure 3-29 eLight actuator

Table 3-53 eLight actuator technical specifications

Item Specifications

Dimensions (L x W x 112 mm x 76 mm x 35 mm
H)

Power input DC input: terminal, with the input voltage of 24 V DC

Power output AC output: terminal, with the output voltage of 120 V


AC

RS485 port (RJ45) Two RS485 ports, support cascading

Installation Install on a guide rail


requirements

Operating 4°C–40°C
temperature

Ambient humidity 5%–95% RH (non-condensing)

3.2.15 Water Sensor


A water sensor detects water on the floor in real time and generates an alarm
when water is detected.

Issue 02 (2023-02-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 62


ECC800 Data Center Controller
User Manual (ECC800-Pro V100R023C00) 3 Device Description

3.2.15.1 WLDS600 Water Sensor (BOM Number: 33010556)


The WLDS600 water sensor consists of a water leakage locator, a water leakage
location cable, an extension cable, and a conversion cable.

Figure 3-30 WLDS600 water sensor

(1) Conversion cable (2) Water leakage location (3) Terminal


cable

(4) Extension cable (5) Water leakage locator -

Table 3-54 Technical specifications of the WLDS600 water sensor

Item Specifications

Dimensions (L 70 mm x 58 mm x 86 mm
x W x H)

Power supply 9–16 V DC or 9–16 V AC

Impulse ≤ 450 mA
current

Power <2W
dissipation

Power, One RJ45 female connector


communicatio
n connector

Protocol type Modbus-RTU, 8 data bits, no parity

Issue 02 (2023-02-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 63


ECC800 Data Center Controller
User Manual (ECC800-Pro V100R023C00) 3 Device Description

Item Specifications

Baud rate, 9600 by default, baud rate and address configurable, default
address address 1, 1 stop bit

Detection 100 m (support cable connection in series)


distance

Accuracy ±0.5 m (cable length: 0–10 m)


1 m±1% (cable length: 10–100 m)

Indicator When the power supply is working properly, the green indicator
status is on. When a fault occurs, the yellow indicator is on. When
water leakage occurs, the red indicator is on.

Display The 4-digit nixie tube displays the water leakage location.

Adjustable 3 grades of sensitivity


sensitivity

Installation DIN track mounting on a wall


mode

3.2.15.2 WLDS900 Water Sensor (BOM Number: 33010352)


The WLDS900 water sensor consists of the water detection cable, water detector,
and conversion cable.

Issue 02 (2023-02-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 64


ECC800 Data Center Controller
User Manual (ECC800-Pro V100R023C00) 3 Device Description

Figure 3-31 WLDS900 water sensor

(1) Water detector (2) Conversion cable end A, connected to (3) Conversion cable
the water detector

(4) Conversion cable (5) Water detection cable end A, (6) Water detection cable
end B, connected to the connected to the conversion cable
water detection cable

Table 3-55 Technical specifications of the WLDS900 water sensor


Item Specifications

Operating 12 V DC (9–16 V DC)


voltage

Operating –20°C to +70°C


temperature

Storage –40°C to +85°C


temperature

Humidity 10%–80% RH (non-condensing)

3.2.15.3 Electrode Water Sensor (BOM Number: 33010444)


The electrode water sensor contains electrode probes and cables.

Issue 02 (2023-02-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 65


ECC800 Data Center Controller
User Manual (ECC800-Pro V100R023C00) 3 Device Description

Figure 3-32 Electrode water sensor

Table 3-56 Technical specifications of the electrode water sensor


Item Specifications

Operating –40°C to +80°C


temperature

Storage –40°C to +80°C


temperature

Service life 10 years

3.2.16 WiFi Module


The WiFi module provides WiFi signals for equipment such as PADs to interact
with the ECC800-Pro.

Figure 3-33 WiFi module

Table 3-57 Technical specifications of a WiFi module


Item Specifications

Wireless IEEE 802.11n, IEEE 802.11g, and IEEE 802.11b


standard

Issue 02 (2023-02-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 66


ECC800 Data Center Controller
User Manual (ECC800-Pro V100R023C00) 3 Device Description

Item Specifications

Network ● 11n: up to 150 Mbps


bandwidth ● 11g: up to 54 Mbps
● 11b: up to 11 Mbps

Frequency band 2.4–2.4835 GHz

Wireless 20 dBm (MAX EIRP)


transmission
power

Supported Windows 2000/XP/Vista/Linux/Win 7


operating
system

Port USB 2.0 Hi-Speed connector

Voltage range 5.0 V DC±5%

Operating –20°C to +70°C


temperature

Storage –40°C to +90°C


temperature

Relative 10%–90% RH (non-condensing)


humidity

Storage 5%–90% RH (non-condensing)


humidity

Power < 0.8 W

3.2.17 ETH Converter


The ETH converter is used to convert the Modbus–RTU protocol or CAN protocol
to the Modbus-MAC protocol for connecting to the PoE bus.

Issue 02 (2023-02-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 67


ECC800 Data Center Controller
User Manual (ECC800-Pro V100R023C00) 3 Device Description

Figure 3-34 ETH converter

(1) Status indicator (2) BLINK button (3) COM1 communications


port

(4) COM2 communications (5) 48 V power port (6) PoE port


port

Specifications

Table 3-58 ETH converter technical specifications


Item Specifications

Power ● DC input: terminal, with an input voltage of 36 V DC–60 V DC


input ● PoE power supply: one PoE port, 10/100M communication rate,
complying with IEEE802.3at

RS485/CA Provides RS485/CAN ports. The default communications rate for


N the RS485 port is 9600 bit/s, and that for the CAN port is 125
kbit/s. Both ports match the RJ45 terminal shared by RS485 and
CAN.

BLINK If you press the BLINK button, the RUN indicator blinks
button intermittently at super short intervals (blinking at super short
intervals for 0.5s and then off for 0.5s) for 10 seconds.

E-label Supported

Issue 02 (2023-02-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 68


ECC800 Data Center Controller
User Manual (ECC800-Pro V100R023C00) 3 Device Description

Indicators

Table 3-59 ETH converter indicators


Indicator Color Name Status Description

PWR Green Power input Steady on The power input is normal.


status
indicator Off There is no power input.

RUN Green Operating Off The power supply is


status abnormal.
indicator
Blinking at The ETH converter
long successfully registers with
intervals the ECC800-Pro and the
software runs properly (the
indicator blinks at 0.5 Hz, on
for 1s and then off for 1s).

Blinking at The communication fails or


short the ETH converter fails to
intervals register with the ECC800-Pro
(the indicator blinks at 4 Hz,
on for 0.125s and then off
for 0.125s).

Blinking The indicator blinks at super


short intervals for 0.5s
(blinking at 10 Hz, on for
0.05s and then off for 0.05s)
and then turns off for 0.5s.
The cycle lasts for 10s.

ALM Red Alarm Steady on A system failure alarm is


indicator generated.

Off No system alarm is


generated.

3.2.18 PAD
The PAD allows the wireless access from the data center management system. You
can monitor the equipment in the data center and environmental parameters in
real time over the app.

Issue 02 (2023-02-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 69


ECC800 Data Center Controller
User Manual (ECC800-Pro V100R023C00) 3 Device Description

Figure 3-35 PAD

Table 3-60 PAD technical specifications


Item Specifications

Touchscreen 10.1-inch, 1920 x 1200 resolution, IPS screen, and multi-


touch

Button/Port ● Touch button + power switch and volume button


● 3.5 mm stereo headphones port
● Micro SD card port
● MicroUSB port

3.2.19 T/H Sensor

3.2.19.1 T/H Sensor (BOM Number: 33010346)

Figure 3-36 Appearance

The T/H sensor uses an RJ45 connector.

Issue 02 (2023-02-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 70


ECC800 Data Center Controller
User Manual (ECC800-Pro V100R023C00) 3 Device Description

Figure 3-37 Pins of an RJ45 connector

Table 3-61 RJ45 port pin definitions


Pin Description

Pin 1 A

Pin 2 B

Pin 3 V+

Pin 4/5/6/7 Reserved

Pin 8 V–

Table 3-62 T/H sensor specifications


Item Specifications

Temperature measuring range –20°C to +70°C

Temperature precision ±1°C

Humidity measuring range 5%–95% RH

Humidity precision ±5% RH (25°C, 20%–80% RH)

Operating temperature –20°C to +70°C

Operating voltage 9–16 V DC

Storage temperature –40°C to +70°C

Output RS485

Issue 02 (2023-02-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 71


ECC800 Data Center Controller
User Manual (ECC800-Pro V100R023C00) 3 Device Description

3.2.19.2 T/H Sensor (BOM Number: 02310NBS)

Figure 3-38 Appearance

(1) Status indicator (2) RS485_IN

(3) RS485_OUT (4) Address DIP switch

The RS485 communications ports of the T/H sensor are RJ11 (6P6C) ports.

Figure 3-39 RJ11 port pins

Table 3-63 RJ11 port pin definitions

Pin Description

Pin1 or Pin2 GND

Pin 3 RS485–

Pin 4 RS485+

Pin 5 or Pin 6 12V

Table 3-64 T/H sensor specifications

Item Specifications

Temperature measuring range –20°C to +70°C

Temperature precision ±1°C

Humidity measuring range 5%–95% RH

Humidity precision ±5% RH (25°C, 20%–80% RH)

Issue 02 (2023-02-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 72


ECC800 Data Center Controller
User Manual (ECC800-Pro V100R023C00) 3 Device Description

Item Specifications

Operating temperature –20°C to +70°C

Operating voltage 9–16 V DC

Storage temperature –40°C to +70°C

Output RS485

3.2.19.3 Ambient T/H Sensor (BOM Number: 33010516)

Figure 3-40 Appearance

The T/H sensor provides RJ45 ports.

NOTE

The appearance of the T/H sensor delivered onsite may vary.

Figure 3-41 RJ45 port pins

Table 3-65 RJ45 port pin definitions


Pin Description

Pin1 or Pin4 A

Pin2 or Pin5 B

Pin 3 V+

Pin 6 or Pin 8 V–

Pin 7 Disconnected

Issue 02 (2023-02-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 73


ECC800 Data Center Controller
User Manual (ECC800-Pro V100R023C00) 3 Device Description

Table 3-66 T/H sensor specifications


Item Specifications

Temperature measuring range –20°C to +70°C

Temperature precision ±1°C

Humidity measuring range 5%–95% RH

Humidity precision ±5% RH (25°C, 20%–80% RH)

Operating temperature –20°C to +70°C

Operating voltage 9–16 V DC

Storage temperature –40°C to +70°C

Output RS485

3.2.19.4 T/H Sensor (BOM Number: 02311FQG)

Figure 3-42 Appearance

(1) RS485-OUT (2) RS485-IN (3) DIP switch (4) Button

(5) NTC1–3 (6) NTC4–6 (7) Display -

Table 3-67 T/H sensor specifications


Item Specifications

Temperature measuring range –20°C to +70°C

Temperature precision ±1°C

Humidity measuring range 5%–95% RH

Humidity precision ±5% RH (25°C, 20%–80% RH)

Issue 02 (2023-02-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 74


ECC800 Data Center Controller
User Manual (ECC800-Pro V100R023C00) 3 Device Description

Item Specifications

Operating temperature –20°C to +70°C

Operating voltage 9–16 V DC

Storage temperature –40°C to +70°C

Output RS485

3.2.19.5 T/H Sensor (BOM Number: 02312PBL)

Figure 3-43 Appearance

(1) RS485-OUT (2) RS485-IN (3) DIP switch (4) Button

(5) NTC1–3 (6) NTC4–6 (7) Display -

Table 3-68 T/H sensor specifications


Item Specifications

Temperature measuring range –20°C to +70°C

Temperature precision ±1°C

Humidity measuring range 5%–95% RH

Humidity precision ±5% RH (25°C, 20%–80% RH)

Operating temperature –20°C to +70°C

Operating voltage 9–16 V DC

Storage temperature –40°C to +70°C

Output RS485

Issue 02 (2023-02-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 75


ECC800 Data Center Controller
User Manual (ECC800-Pro V100R023C00) 3 Device Description

3.2.20 Infrared Remote Control Module


Figure 3-44 Infrared remote control module

Table 3-69 Technical specifications of the infrared remote control module


Item Specifications

Number of supported ≤4
remote control
commands

Communication Interworks with the monitoring system over


Modbus-RTU to implement remote control.
The baud rate can be 9600 bit/s.

Infrared emission ≤ 10 m
distance

Power supply 9–16 V DC

Power ≤ 350 mA

Operating temperature –10°C to +50°C

Operating humidity 5%–95% RH

IP rating IP20

Indicator Communication indicator and running indicator

Color Black

Address setting Supports Modbus address setting

Issue 02 (2023-02-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 76


ECC800 Data Center Controller
User Manual (ECC800-Pro V100R023C00) 4 UI Description

4 UI Description

4.1 WebUI
For data transmission security, the ECC800-Pro supports WebUI access through
TLS.

Figure 4-1 Home page

Issue 02 (2023-02-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 77


ECC800 Data Center Controller
User Manual (ECC800-Pro V100R023C00) 4 UI Description

WebUI Introduction

Table 4-1 WebUI introduction


Mai Second- Third-Level Function Factor Remarks
n Level Menu Menu y
Me Defau
nu lts
Restor
ationa

Ho Plan View – ● View and Yes –


me manage the
layout view of
devices.
● View the
system PUE
(including the
instantaneous
mPUE and
average PUE)
in a dashboard
and the system
trend curve. b

Active – View active No –


Alarms alarms.

Multi- – View the status of Yes This menu is displayed after a


Module each cascaded new IP address is added
Monitoringc ECC800-Pro. under System Settings >
Smart Module Cascading >
Add.

Mobile Data – View mobile data Yes This menu is displayed only
Info information, such when Mobile data control
as the connection under System Settings >
status and System Parameters is set to
wireless signal Enable.
strength.

Mo System Connected Monitor the Yes For example, in the path of


nito devices, such device running Monitoring > ECC800 >
ring as ECC800- information in Running Parameters:
Pro, ETH real time, set ● AIDI_1 sensor–AIDI_5
Converter device running sensor is Disable by
Group, and parameters, and default.
Smart ETH control the device
Gateway running. For ● IP device num is 100 by
Group example, set default.
smart cooling ● Online detection timeout
product interval is 30 by default.
parameters, delete

Issue 02 (2023-02-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 78


ECC800 Data Center Controller
User Manual (ECC800-Pro V100R023C00) 4 UI Description

Mai Second- Third-Level Function Factor Remarks


n Level Menu Menu y
Me Defau
nu lts
Restor
ationa

Power Connected devices with Yes –


Distribution devices, such communication
as the failure, and set
integrated AI/DI device
PDU, parameters.
PDU8000, and
power
distribution
unit

Aisle Connected Yes –


devices, such
as the multi-
functional
sensor group,
access
actuator
group, and
skylight
actuator
group

Cooling Connected Yes –


smart cooling
products

Cabinet IT cabinet Yes –

Qu Historical – Query historical No Alarm storage specifications:


ery Alarms alarms. ● Active alarms: 500
● Historical alarms (critical):
25,000
● Historical alarms (minor):
25,000
● Historical alarms (major):
25,000
● Historical alarms
(warning): 25,000

Issue 02 (2023-02-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 79


ECC800 Data Center Controller
User Manual (ECC800-Pro V100R023C00) 4 UI Description

Mai Second- Third-Level Function Factor Remarks


n Level Menu Menu y
Me Defau
nu lts
Restor
ationa

Performance – Query device No The storage specifications


Data performance data. vary with Statistics Mode:
● 1 min: 300 records
● 5 min: 400,000 records
● 15 min: 100 records
● 30 min: 100 records
● 1 hour: 400,000 records
● 1 day: 4000 records
● 1 week: 600 records
● 1 month: 500 records
● 1 year: 200 records
● Threshold: 100,000 records

Operation – Query operation No User operation records:


Log logs. 20,000

Access Event – Query access No –


control events.

Security – Record reported N/A –


Event intrusion security
events.

Security Log – Record security No –


logins, such as
user login,
permission
change, user
password change,
and role change.

Syst System Site Set the system Yes Smart module name is
em Parameters Configuration type, site ID, and FusionModule by default.
Sett network security System type is
ings certificate. FusionModule2000 by
default.
NOTE
If System type is General, the
ECC800-Pro is a general
collector that collects device
data and reports the data to the
northbound NMS.

Issue 02 (2023-02-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 80


ECC800 Data Center Controller
User Manual (ECC800-Pro V100R023C00) 4 UI Description

Mai Second- Third-Level Function Factor Remarks


n Level Menu Menu y
Me Defau
nu lts
Restor
ationa

Monitor IP Set the IP address No ● IP for WAN_1 is


for the monitoring 192.168.8.10 by default.
module. ● The default IP addresses of
the Primary DNS server
and Secondary DNS
server in the DNS Server
Address area are
192.168.8.10 and
192.168.8.9 respectively.
● IP for WAN_2 is
192.168.0.10 by default.

Time Set the time zone, No –


time, and date.

Mobile Data Set mobile data Yes –


parameters.

Access – Set the access No ● Access fingerprints: 3000


Managemen users and ● Access users: 1000
t permissions.

Video – Add, modify, or Yes A maximum of eight video


Managemen delete videos. mapping IP addresses can be
t recorded.

NMS NetEco Set SNMP and Yes Server IP is 192.168.8.11 by


Application NetEco default.
communications Port number is 31220 by
parameters. default.
Network port for link
establishment is WAN_1 by
default.

SNMP Yes SNMP version is SNMPv3 by


default.
SNMP port number is 161 by
default.

Issue 02 (2023-02-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 81


ECC800 Data Center Controller
User Manual (ECC800-Pro V100R023C00) 4 UI Description

Mai Second- Third-Level Function Factor Remarks


n Level Menu Menu y
Me Defau
nu lts
Restor
ationa

Transparent Set the Yes Transparent Transmission


Transmission transparent Through COM Ports is
Channel transmission Disable by default.
function of the Enable security
device and upload authentication is Enable by
the network default.
security
certificate.

Device Device Add a device, No –


Managemen Addition delete a device, or
t replace the device
Delete access security No Only devices connected
Devices certificate. through COM ports can be
deleted.

Security No –
Certification
Change

Smart – Cascade up to Yes –


Module three ECC800-Pros
Cascading through multi-
module
configuration.

PUE PUE Enable the PUE Yes PUE Function is Enable by


Configuratio Configuration function. default.
n NOTICE
If PUE function is set to Disable
(default value), the three-level
menus PUE and Instant PUE are
not displayed.

PUE Customize the Yes PUE configuration mode is


PUE configuration. Standard by default.

Instant PUE Customize the Yes Instant PUE configuration


instant PUE mode is Standard by default.
configuration.

Linkage – Set linkage Yes ● This parameter is not


Control control rules. displayed when the system
type is Robot.
● A maximum of 60 linkage
control records can be set.
● A maximum of 120 linkage
logics can be set.

Issue 02 (2023-02-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 82


ECC800 Data Center Controller
User Manual (ECC800-Pro V100R023C00) 4 UI Description

Mai Second- Third-Level Function Factor Remarks


n Level Menu Menu y
Me Defau
nu lts
Restor
ationa

Alarm Basic Alarm Set basic alarm Yes –


Parameters Parameters parameters and
alarm association
Alarm parameters. Yes –
Linkage

Performance Performance On the list of Yes –


Parameters Parameters enabled
(enable) performance
parameters, you
can disable the
performance data
statistics of a
specific device.

All View the Yes –


Configured performance data
Data for which the
statistics function
is enabled or
disabled.

Performance On the list of Yes –


parameters disabled
(disable) performance
parameters, you
can enable the
performance data
statistics of a
specific device.

Event Email Settings Set alarm Yes –


Notification notification mode
SMS Settings to be over email Yes –

Alarm and SMS. Yes –


Notification

Signal Name – Modify signal Yes –


Modify names.

WiFi – Provide functions Yes This parameter is displayed


Networking such as WiFi only when the system type is
terminal scanning Robot.
and connection.

Issue 02 (2023-02-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 83


ECC800 Data Center Controller
User Manual (ECC800-Pro V100R023C00) 4 UI Description

Mai Second- Third-Level Function Factor Remarks


n Level Menu Menu y
Me Defau
nu lts
Restor
ationa

Network IP Whitelist Add, delete, and Yes After an IP address whitelist is


Configuratio Configuration activate the IP configured, only IP addresses
n address whitelist. in the whitelist are allowed to
access the ECC WebUI.

NAT Mapping Provide the Yes The internal IP address of a


mapping function. southbound device must be
You can use this the same as the mapped
function to set IP internal IP address set on the
address mapping. ECC. Otherwise, the mapping
(For example: Set fails.
IP address
mapping for
southbound
devices to map
the IP addresses
of southbound
devices and NMS
to the same
network segment
so that the NMS
can collect data.)

Security Security Enable or disable No –


Configuratio Configuration host intrusion
n detection.
Enable or disable
the minimum
recovery system.

Safety Check Check whether No –


the encryption
protocol and
cipher suite used
by the current
function module
are secure.

Service – Start or stop a No –


Managemen service. After a
t service is stopped,
the corresponding
function becomes
ineffective.

Issue 02 (2023-02-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 84


ECC800 Data Center Controller
User Manual (ECC800-Pro V100R023C00) 4 UI Description

Mai Second- Third-Level Function Factor Remarks


n Level Menu Menu y
Me Defau
nu lts
Restor
ationa

Mai Software Software Upgrade the Yes –


nte Upgrade Upgrade software of the
nan ECC800-Pro and
ce its southbound
devices online.

Version – Query the device No –


Information version and access
package version,
such as the
software version
and hardware
version.

E-Label – Query or export E- No –


labels.

User – Manage users, No –


Managemen such as adding,
t modifying, and
deleting users.

Configuratio – Import and export No –


n File configuration files
to configure
devices quickly,
and restore
factory defaults.

Export Data – Export fault No –


information,
historical data,
and southbound
device data.

APP – Download the app No –


Obtaining installation
package by
scanning the QR
code.

Issue 02 (2023-02-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 85


ECC800 Data Center Controller
User Manual (ECC800-Pro V100R023C00) 4 UI Description

Mai Second- Third-Level Function Factor Remarks


n Level Menu Menu y
Me Defau
nu lts
Restor
ationa

Parameter – ● Synchronize No –
Sync device
parameters to
quickly import
data of
southbound
devices (such
as the multi-
functional
sensor and
skylight
actuator).
● Support device
replacement. e

Access – View access No –


Package package
Mgmt information.

Configuratio – Support the No –


n Wizardd deployment
wizard and set
simple parameters
as instructed by
the wizard.

Life Cycle – Check the service No –


life of main
devices.

● a: The factory settings can be restored only on the WebUI.


● b: If the system type is FusionModule500/800, only the intelligent power distribution scenario
is supported.
● c: Multi-Module Monitoring is displayed on the Home page only after you set Smart Module
Cascading.
● d: If the system type is FusionModule2000 or FusionModule5000, this function is unavailable.
● e: This function is supported only by some devices, such as smart cooling products and
integrated UPSs.

Issue 02 (2023-02-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 86


ECC800 Data Center Controller
User Manual (ECC800-Pro V100R023C00) 4 UI Description

4.2 PAD App


Figure 4-2 Home screen

Table 4-2 App functions

Screen Function

Home Allows you to view the layout information of the smart


module, as well as the overview of resources, energy
efficiency, environment, and alarms.

iPower Allows you to view the running status and alarm status of
all branches on the power supply and distribution links
page, and has the self-diagnosis function.

iCooling Allows you to view the cooling distribution in smart


modules and operating status of components on the
cooling link diagram page.

More Monitor Allows you to view details about devices under the
monitoring system, power distribution, aisle, cooling, and
cabinet types.

Software Allows you to upgrade the software using a USB flash drive
Upgrade or locally.

Paramet -
er Sync

iFind Allows you to modify the names and positions of devices in


the device layout diagram, and deliver a blinking command
to a device under iFind.

Issue 02 (2023-02-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 87


ECC800 Data Center Controller
User Manual (ECC800-Pro V100R023C00) 4 UI Description

Screen Function

Export Allows you to export device configuration data, current


Data configuration files, and historical data.

Import Allows you to import a configuration file.


Data

Performa Allows you to view device performance data, such as the


nce Data battery curve and battery discharge curve.

Network -
Paramet
er

Operatio -
n Log

Access -
Event

Asset Allows you to view device asset details such as electronic


Details labels of system devices and other devices.

Device Check the Software Version and Hardware Version of the


Version device.
Info

Issue 02 (2023-02-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 88


ECC800 Data Center Controller
User Manual (ECC800-Pro V100R023C00) 5 Power-On Commissioning

5 Power-On Commissioning

Prerequisites
● The hardware and cable installation check is complete for controller
components according to data center specifications and requirements.
● The device and ECC800-Pro have been powered on.
● You have obtained the ECC800-Pro IP address as well as the user name and
password used for WebUI login.
● A PC with an IP address in the same network segment as the ECC800-Pro IP
address is prepared, and the PC has connected to the WAN1 port on the
ECC800-Pro.

Context
After installing or replacing the device or ECC800-Pro, set monitoring parameters
and add the device.

5.1 Preparations and WebUI Login


Prerequisites
● Supported operating system: Windows 7 and later versions
● It is recommended that the screen resolution be 1366 x 768 or higher.
● Browser: Chrome, Firefox 32, Internet Explorer 11 or later

Procedure
Step 1 Connect a network cable between the PC network port and the WAN1 port
(protected by a security mechanism) on the ECC800-Pro.

Table 5-1 Default IP addresses for the WAN and LAN ports on the ECC800-Pro

Port Default IP Address

WAN1 192.168.8.10

Issue 02 (2023-02-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 89


ECC800 Data Center Controller
User Manual (ECC800-Pro V100R023C00) 5 Power-On Commissioning

Port Default IP Address

WAN 192.168.0.10
192.168.248.10 (FusionModule500/800)

LAN1 and LAN2 192.168.248.10

NOTICE

● In ECC800 V100R002C10 and earlier versions, the default IP address of the


WAN_1 port is 192.168.1.10.
● The WAN1 port IP address cannot be set to an IP address in any of the
following network segments: 192.168.0.x, 192.168.245.x, 192.168.246.x, and
192.168.248.x.
● IP addresses for the WAN1 and WAN2 ports should not be set in the same
network segment.
● In some customized scenarios, the default IP address for the WAN2 port is
192.168.248.10. The default value may vary.
● The WAN port supports Internet access and the LAN port supports LAN access.
Connect the PC network port to the WAN1 port or LAN port on the ECC800-Pro
based on the access network.

Step 2 Configure the PC IP address and the WAN1 IP address in the same network
segment.
If the WAN1 port IP address is 192.168.8.10, subnet mask is 255.255.255.0, and
default gateway is 192.168.8.1, set the PC IP address to 192.168.8.12, subnet mask
to 255.255.255.0, and default gateway to 192.168.8.1.
Step 3 Set LAN parameters.
NOTE

● If the ECC800-Pro connects to a LAN and a proxy server has been selected, perform Step
3.3 and Step 3.4.
● If the ECC800-Pro connects to the Internet, and the PC in a LAN accesses the Internet
over a proxy server, do not perform Step 3.3 and Step 3.4. Otherwise, you will fail to
access the ECC800-Pro.
1. Open the Internet Explorer and choose Tools > Internet Options.
2. Click the Advanced tab and select Use TLS1.2 and Use TLS1.3.
3. (Optional) Click the Connections tab and select LAN settings.
4. (Optional) On Proxy server, clear Use a proxy server for your LAN.
5. Click OK.
Step 4 Set Internet Explorer parameters.
1. When you use Internet Explorer for access, set Internet Explorer to ensure the
normal display of and operations on the WebUI. Choose Tools >
Compatibility View, and add the web access address to the compatibility
view.

Issue 02 (2023-02-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 90


ECC800 Data Center Controller
User Manual (ECC800-Pro V100R023C00) 5 Power-On Commissioning

2. Choose Tools > Internet Options > Security, and add the ECC800-Pro access
address to the list of trusted sites.

Figure 5-1 Adding an address

3. Enable file download and set the security level of the trusted site to low.

Figure 5-2 Setting parameters

Issue 02 (2023-02-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 91


ECC800 Data Center Controller
User Manual (ECC800-Pro V100R023C00) 5 Power-On Commissioning

NOTE

When switching between different versions of the ECC800-Pro on your PC, you are
advised to clear the Internet Explorer cache. Failing to do so may cause information
missing or exception after login. The following provides the details:
1. Open Internet Explorer and choose Tools > Internet Options > General.
2. Select Delete browsing history on exit and click Delete.
3. In the Delete Browsing History dialog box, select all options except Password,
and click Delete.

Step 5 Log in to the ECC800-Pro WebUI.


1. Enter https://monitoring IP address (such as https://192.168.8.10) in the
address box of the browser, and then press Enter to access the WebUI login
page.

Figure 5-3 WebUI login page

2. On the login page, enter the user name and password, and select a language.
– Preset user name: admin
– Preset password: Changeme
3. Click Log In.
NOTE

– After the first login, change the login password as prompted.


– Change the password of the user account periodically.
– Record and keep the password properly. If you forgot the password, you will be
unable to log in to the WebUI.
– When the event notification is configured and the password retrieval mode is
configured under user management, the password can be retrieved.
– An account is logged out due to timeout if no operation is performed within 10
minutes after system login.
– A maximum of three users can log in to the ECC800-Pro WebUI at the same time.

----End

Issue 02 (2023-02-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 92


ECC800 Data Center Controller
User Manual (ECC800-Pro V100R023C00) 5 Power-On Commissioning

5.2 Initial Startup Password Authentication


When the system type is FusionModule500/800, FusionModule2000, or
FusionPower6000, perform the following configurations.

Context
● The initial startup password authentication is required only during initial
power-on commissioning. If the authentication has been performed
successfully, no authentication is required afterward.
● The startup password needs to be authenticated again when you switch the
system type, restore the default settings, and restore the factory settings on
the WebUI or by pressing keys.
● If the startup password authentication is not complete, the ECC800-Pro
WebUI and app cannot be used for commissioning.

Procedure
Step 1 Authenticate the startup password on the WebUI.
1. Log in to the ECC800-Pro WebUI as an administrator.
2. Record the values of Barcode and Verify Code in the displayed Startup
Password dialog box.
3. Within 24 hours, inform the authorized service engineer of Barcode and
Verify Code or provide the QR code displayed on the screen to obtain the
password. Enter the password in the Password text box and click Submit to
complete the authentication of the startup password.

NOTICE

– The verification code is valid for 24 hours by default. After the validity
period, the verification code is automatically updated. You can also click to
update the verification code.
– Authorized service engineers can obtain the service authorization code
through the app. For details, see the Data Center Facility Deployment
Guide.

Step 2 Hold down the SW button on the ECC800-Pro for 1s to enable the WiFi function.

Issue 02 (2023-02-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 93


ECC800 Data Center Controller
User Manual (ECC800-Pro V100R023C00) 5 Power-On Commissioning

Figure 5-4 Button position

NOTE

● The preset password is Changeme. The password is valid only after you hold down the
button for the first time to enable the WiFi function. If you enable the WiFi function on
the WebUI, there is no preset password.
● After the WiFi function is enabled, the password for a mobile phone to connect to the
WiFi network is Changeme. When you log in to the app using the PAD, the system
prompts you to change the preset password.
● After you disable the WiFi hotspot function on the WebUI and press the button again,
the WiFi function is still enabled. In this case, the WiFi password is the one you changed
into last time.
● The WiFi function is disabled by default. When you enable the WiFi function, change the
WiFi password to ensure connection security.
● A password that has been used for a long time is more likely to be stolen or cracked.
The risk increases over time. Change the WiFi password periodically (recommended:
once half a year).

----End

5.3 (Optional) Cloud Service Access


When the system type is FusionModule500/800, FusionModule2000, or
FusionPower6000, perform the following configurations.

Context
● Perform this procedure only when the mobile smart management function
needs to be enabled. Otherwise, retain the default settings.
● The initial startup password has been authenticated.

Procedure
Step 1 Complete the first startup password authentication. The Cloud service access
page is displayed.

Step 2 Set Cloud service access from Disable to Enable.

Step 3 Set the Cloud service access mode. The default value is 4G. You can select FE
from the drop-down list box.

Issue 02 (2023-02-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 94


ECC800 Data Center Controller
User Manual (ECC800-Pro V100R023C00) 5 Power-On Commissioning

NOTE

● If no SIM card is installed, set Cloud service access mode to FE.


● If the Cloud service access mode is set to FE, you need to configure the IP address of
the DNS server on the ECC WebUI.

----End

Follow-up Procedure
If Cloud service access is not enabled upon the first startup, you can perform the
following procedure to enable cloud service access when needed:

Step 1 Log in to the ECC800-Pro WebUI as an administrator.


Step 2 Set Cloud service access and Network port for link setup.

Table 5-2 Parameter


Path Para Default Setting Remarks
meter Value

System Cloud Disable Set whether to connect


Settings > servic to the DC Manager
NMS e based on site
Application > access requirements.
NetEco ● Disable: Not connect
to the DC Manager.
● Enable: Connect to
the DC Manager.

Netw WAN_1 ● WAN_1: Connects to Choose


ork the management System
port system over the Settings >
for WAN1 port. System
link Parameters >
setup Monitor IP
and check
that the
parameters in
DNS Server
Address are
set.

Issue 02 (2023-02-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 95


ECC800 Data Center Controller
User Manual (ECC800-Pro V100R023C00) 5 Power-On Commissioning

Path Para Default Setting Remarks


meter Value

● 4G: Connects to the Choose


management system System
through 4G Settings >
communication. System
Parameters >
Mobile Data
and check
that Mobile
data control
is set to
Enable.

Step 3 Click Submit.

----End

5.4 Commissioning Configuration Wizard


Context
● Only administrators are entitled to perform the configuration wizard.
● Currently, commissioning wizard is provided for the following functions:
Smart Module Settings, Basic Param Settings, Add Devices, Add Sensor,
Plan View, Power Dist Settings, Temp Control Settings, Linkage Test,
Video Settings, and Access Management.

Procedure
Step 1 Log in to the ECC800-Pro WebUI as an administrator.
NOTE

The configuration wizard is displayed when you log in to the ECC800-Pro WebUI for the first
time or the system type is switched.

Step 2 Choose Maintenance > Configuration Wizard to access the parameter


configuring page for the deployment wizard.
Step 3 Configure related parameters on the page as instructed. For details, see the
function description on the left of the page.
NOTE

● In the process, click Previous, Next, and Skip as required.


● To exit before the configuration is complete, click Finish to terminate the configuration
directly.

Step 4 After configuring the parameters, click Finish.


Step 5 After confirming that the commissioning Result is normal, enter the Checker
Name and Check Date, and click Configuration Completed.

Issue 02 (2023-02-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 96


ECC800 Data Center Controller
User Manual (ECC800-Pro V100R023C00) 5 Power-On Commissioning

NOTE

To export the configuration result, click Export Check Result. The export file format is csv.

----End

5.5 Configuring Event Notifications


You can set alarm notification by email or SMS as required. Alarm notifications for
a maximum of 20 users can be received.

Prerequisites
To implement alarm notification by SMS, the following conditions must be met:

● The ECC800-Pro is configured with a 4G module and supports standard SIM


card access.
● The ECC800-Pro is connected to a network with an email server through a
WAN port. Both the Internet and local area network (LAN) are supported.
NOTE

● The prerequisite for using a SIM card is that the site has signal coverage.
● China: 2G and 4G networks support China Unicom or China Mobile SIM cards, and 3G
networks support only China Unicom SIM cards.
● Outside China: Select SIM cards according to the following RATs and frequency bands:
4G: LTE-FDD, covering frequency bands B1, B3, B5, B7, B8 and B20; LTE-TDD, covering
frequency bands B38, B40, and B41
3G: WCDMA, covering frequency bands B1, B5, and B8
2G: GSM, covering frequency bands 900 MHz and 1800 MHz

To enable alarm notification by email, choose System Settings > Service


Management and check that the status of Network Service is Start.

Procedure
Step 1 Choose System Settings > Event Notification.

Step 2 Set related outbox parameters.


1. Set related parameters in the Outbox Settings area on the Mailbox Settings
page. If the address type of the outbox is Domain name, choose System
Settings > System Parameters, and set related parameters in the DNS
Server Address area on the Monitor IP page.
NOTE

The DNS server address is provided by the local network operator.


2. Click Test to check the email sending. If an email fails to be sent, check the
outbox settings and DNS Server Address. If the email is sent successfully,
click Submit.

Issue 02 (2023-02-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 97


ECC800 Data Center Controller
User Manual (ECC800-Pro V100R023C00) 5 Power-On Commissioning

NOTICE

If Test email sending failed is displayed, check whether the receiver's email
server requires CA certificate verification. If it is required, download the CA
certificate from the receiver's email website and upload it in the Mailbox
Certificate area.

Figure 5-5 Email setting page

NOTE

If the email encryption mode is set to TLS or SSL, TLSv1.2 or a later secure version is used
by default. Exercise caution when selecting TLSv1 or an insecure TLSv1.1 version based on
service requirements.

Table 5-3 Main parameters on the outbox configuration page

Email Type Email Server Mailbox Server IP Encryption Mode Remarks


Domain Name Address and SMTP Port

Sina Mail smtp.sina.com How to obtain: Non-encryption: 25 ● The email server


1. Click Start on must comply
163 Mail smtp.163.com Non-encryption: with the
the PC, enter
25; SSL encryption: standard SMTP
cmd in Running
465 protocol to
area, and press
126 Mail smtp.126.com Enter to access Non-encryption: ensure that the
the 25; SSL encryption: email sending
administrator 465 and receiving
page. functions are
QQ Mail smtp.QQ.com SSL encryption: 465 normal.
2. Enter ping
email server ● Enter the email
Sohu Mail smtp.sohu.com Non-encryption: 25
domain name client
139 Mail smtp.139.com at the position Non-encryption: 25 authorization
of the blinking password at
Password for

Issue 02 (2023-02-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 98


ECC800 Data Center Controller
User Manual (ECC800-Pro V100R023C00) 5 Power-On Commissioning

Email Type Email Server Mailbox Server IP Encryption Mode Remarks


Domain Name Address and SMTP Port

Hotmail smtp- cursor and press TLS encryption: 587 163 Mail, 126
mail.outlook.co Enter to obtain Mail, and QQ
m email server IP Mail.
addresses. ● If the email type
189 Mail smtp.189.com Non-encryption: 25
is not in the list,
set parameters
by referring to
the help
information of
the email type.

NOTE

The preceding email addresses are for reference only (the actual parameters apply) and are
used only for configuring the email function.

Step 3 Add an email address to receive emails.


NOTE

The email address is used only for configuring the email function and is not used for other
purposes. The address is encrypted during transmission in the ECC800-Pro to ensure that
the personal data of users is fully protected.

Figure 5-6 Adding an email address to receive emails

Issue 02 (2023-02-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 99


ECC800 Data Center Controller
User Manual (ECC800-Pro V100R023C00) 5 Power-On Commissioning

NOTE

Click Test to check whether the added mailbox is available. If it is available, Successfully to
send the test email. is displayed. If it is unavailable, Failed to send the test email. is displayed.
Check whether the receiver's mailbox parameters for receiving emails are correctly set.

Step 4 Add a mobile number to receive event notifications.


NOTE

The mobile phone number is used only for configuring the SMS function and is not used for
other purposes. The phone number is encrypted during transmission in the ECC800-Pro to
ensure that the personal data of users is fully protected.

Figure 5-7 Adding a mobile number

NOTE

Click Test to check whether the added mobile phone number is available. If it is available,
Successfully to send the test short message. is displayed. If it is unavailable, Failed to send
the test short message. is displayed. Check whether the mobile phone number is correctly set.

Step 5 Set the alarm notification delay parameter and the new alarm notification
parameter.

Issue 02 (2023-02-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 100
ECC800 Data Center Controller
User Manual (ECC800-Pro V100R023C00) 5 Power-On Commissioning

Figure 5-8 Setting the alarm notification parameters

Figure 5-9 Adding alarm notifications

NOTICE

Mailbox Address in Alarm Notification can be selected after it is added in


Mailbox Settings. Mobile Phone Number can be selected after it is added in
SMS Settings.

Issue 02 (2023-02-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 101
ECC800 Data Center Controller
User Manual (ECC800-Pro V100R023C00) 5 Power-On Commissioning

Step 6 Click Confirm to access the re-authentication page. Enter Login password and
click Submit.

----End

Follow-up Procedure
To modify or delete the email parameter settings, click Modify or Delete.
If the email address fails to be set, rectify the fault based on the handling
suggestions of the error codes listed in the following table. If an error code is not
listed in the following table, provide the ECC run log and contact the customer
technical support.

Table 5-4 Mailbox error codes


Type Error Code Suggestion

Failed to 2 1. Check whether the IP address of the DNS


resolve the server is correct.
domain 2. Check whether the domain name of the
name. email server is correctly configured.
3. Check whether the network communication
between the monitoring module and the
DNS server is normal.

3 1. Try again later.


2. Check whether the domain name of the
email server is correctly configured.

5 Check whether the IP address corresponding to


the domain name of the email server is
configured.

11 1. Check whether the IP address of the DNS


server is correct.
2. Check whether the domain name of the
email server is correctly configured.

Failed to 22 1. Try again later. This issue occurs when the


connect to domain name is just configured and the
the email domain name resolution is not complete.
server. 2. Check whether the IP address of the DNS
server is correct.
3. Check whether the domain name of the
email server is correctly configured.

100 Check whether the local network cable is


properly connected and whether the network
adapter is activated. Ensure that the local
network connection is normal.

Issue 02 (2023-02-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 102
ECC800 Data Center Controller
User Manual (ECC800-Pro V100R023C00) 5 Power-On Commissioning

Type Error Code Suggestion

101 Check the firewall and router configurations


between the ECC and the email server to
ensure that the ECC communicates with the
email server properly.

110 1. Verify that the communication link between


the ECC and the email server is normal.
2. Check whether the service port of the email
server is enabled.

111 Check whether the email server is running


properly and whether the service port is
started properly.

112 Check whether the email server is running


properly.

113 Check the firewall and router configurations


between the ECC and the email server to
ensure that the ECC communicates with the
email server properly.

Failed to 1 1. Import the CA certificate that matches the


establish a email server certificate.
secure 2. Check the validity period of the certificate
connection. and replace it with a valid CA certificate.
3. Provide monitoring run logs and contact the
service center.

Failed to send 504 Check whether the outbox address matches


the test email. the user name for logging in to the email
server.

535 1. Log in to the email box of the email sender


and start the SMTP service.
2. Check whether the user name and password
for logging in to the email server are
correct.
3. Log in to the email box of the email sender
and start the third-party client license code
function.

553 Check whether the outbox address matches


the user name for logging in to the email
server.

530 On the outbox configuration page, set


Encryption mode to SSL.

Issue 02 (2023-02-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 103
ECC800 Data Center Controller
User Manual (ECC800-Pro V100R023C00) 5 Power-On Commissioning

Type Error Code Suggestion

554 1. Log in to the email server or contact the


personnel of the third-party email server to
modify the spam setting rule.
2. Provide ECC run logs and contact the service
center.

550 1. Log in to the email server or contact the


third-party email server personnel to add
the IP address to the whitelist.
2. Provide ECC run logs and contact the service
center.

421 Reduce the email sending speed or contact the


third-party email server personnel to increase
the email server configuration limit.

450 Contact the personnel of the third-party mail


server to add the sender address to the
whitelist and do not limit the sending rate.

451 Provide ECC run logs and contact the service


center to reduce the email sending frequency.

534 Log in to the sender's mailbox client and


enable the access to the insecure applications.

5.6 Commissioning the Smart Busbar

5.6.1 Smart Busbar Networking (for FusionModule2000)


Prerequisites
● Smart busbars have been connected to the ECC800-Pro.
● The FusionModule2000 plan view has been created, and the device positions
in the plan view are consistent with actual positions.

Context
By identifying the MAC address set of adjacent ports of smart busbars, the system
automatically identifies the link relationship and implements intelligent
networking of smart busbars.

Issue 02 (2023-02-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 104
ECC800 Data Center Controller
User Manual (ECC800-Pro V100R023C00) 5 Power-On Commissioning

NOTE

● The link relationship can be automatically identified only when the software version of
both the general input units and power distribution units of smart busbars is V304 or
later.
● When a dense busway connector box (equivalent to the general input unit in functions)
is used, it is connected to ports COM1–COM4 on the UIM20A expansion module. The
Modbus protocol addresses of the corresponding devices are 1–4. Devices need to be
manually added.

Procedure
Step 1 Go to the FusionModule2000 view, click Modify Device, select any general input
unit or power distribution unit, and click Automatic identification.
NOTE

You can set Power supply branch to manually change the link relationship.

Figure 5-10 Networking settings

----End

5.6.2 Setting Parameters for the General Input Unit and


Power Distribution Unit

Context
● In the smart busbar scenario, general input units and power distribution units
communicate with the ECC800-Pro using the Modbus-MAC protocol. After the
general input units and power distribution units properly connect to the
ECC800-Pro, the ECC800-Pro automatically identifies the units.
● Then, you need to set parameters for the general input units and power
distribution units; otherwise, a false alarm may be generated.

Procedure
Step 1 Set parameters for general input units on the ECC800-Pro WebUI.
1. Set parameters for general input unit 1.

Issue 02 (2023-02-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 105
ECC800 Data Center Controller
User Manual (ECC800-Pro V100R023C00) 5 Power-On Commissioning

Table 5-5 Power distribution settings for a general input unit


Path Parameter Defaul Setting
Name t
Value

Monitoring > Power Rated system 50 Set based on actual


Distribution > General frequency conditions.
Input Unit > Running
Parameters > Power Rated system 380 Set based on actual
Distribution Settings voltage conditions.

Rated system 250/40 Set based on actual


current 0/630 conditions.
NOTE NOTE
This Set this parameter to a
parameter is value consistent with the
not displayed information on the
for some nameplate of the general
general input input unit. For example, if
units. the model is
NMW-0250AC, set Rated
system current to 250 A.

System CT 250/40 Set based on actual


ratio 0/630 conditions.
NOTE For example, if Rated
This system current is 250
parameter is
A, set System CT ratio
not displayed
for some to 250.
general input
units.

Upper load 80 When the load current


current exceeds the preset
threshold value, an alarm is
generated.

Lower load 60 When the load current


current is lower than the preset
threshold value, an alarm is
generated.

System defect 20 Phase voltage ≤ Setting


volt set and no circuit breaker
off or trip alarm: An
open-phase alarm is
generated.

Issue 02 (2023-02-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 106
ECC800 Data Center Controller
User Manual (ECC800-Pro V100R023C00) 5 Power-On Commissioning

Path Parameter Defaul Setting


Name t
Value

System 120 – Line voltage > Rated


overvoltage voltage x Setting/
100: An alarm is
generated.
– Line voltage ≤ Rated
voltage x Setting/100
– 30: The alarm is
cleared.

System 85 – Line voltage ≤ Rated


undervoltage voltage x Setting/
100: An alarm is
generated.
– Line voltage > Rated
voltage x Setting/100
+ 30: The alarm is
cleared.

Overload 100 – Power system load


rate > Setting: An
alarm is generated.
– Power system load
rate ≤ Setting – 5:
The alarm is cleared.

Overfrequenc 1.5 – Current frequency >


y Rated frequency +
Setting: An
overfrequency alarm
is generated.
– Current frequency ≤
Rated frequency +
Setting: The
overfrequency alarm
is cleared.
– Current frequency ≤
Rated frequency –
Setting: An
underfrequency
alarm is generated.
– Current frequency >
Rated frequency –
Setting: The
underfrequency
alarm is cleared.

Issue 02 (2023-02-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 107
ECC800 Data Center Controller
User Manual (ECC800-Pro V100R023C00) 5 Power-On Commissioning

Path Parameter Defaul Setting


Name t
Value

Three-phase 15 Minimum three-phase


load current > Rated current
imbalance x 20%, (Maximum
current – Minimum
current)/Minimum
current > Setting: An
alarm is generated.
(Maximum current –
Minimum current)/
Minimum current ≤
Setting – 5: The alarm is
cleared.

Neutral- 45 Neutral-ground voltage


ground > Setting: An alarm is
overvoltage generated.
Neutral-ground voltage
≤ Setting – 5: The alarm
is cleared.

System 300 System current >


current shock Setting: An alarm is
protection generated.
System current ≤ Setting
– 50: The alarm is
cleared.

2. Set the parameters for other general input units in the same way or by
synchronizing parameters.
Path: Maintenance > Parameter Sync
Step 2 Set parameters for power distribution units on the ECC800-Pro WebUI.
1. (Optional) To modify the branch signal name of the power distribution unit,
choose System Settings > Signal Name Modify and access the Batch Signal
Configuration to modify the name, and then tap Submit.
2. The following is an example of how to display two branches for power
distribution unit 1.
Choose Monitoring > Power Distribution > General Input Unit > Power
Distribution Unit > Display Configuration, select Branch Information
Display corresponding to QF1 and QF2, and then tap Submit.
3. Configure the power distribution settings for power distribution unit 1.

Issue 02 (2023-02-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 108
ECC800 Data Center Controller
User Manual (ECC800-Pro V100R023C00) 5 Power-On Commissioning

Table 5-6 Power distribution settings for a power distribution unit


Path Parameter Name Defaul Description
t Value

Monitoring > Branch current shock 300 – Power system


Power protection load rate >
Distribution Setting: An alarm
> General is generated.
Input Unit > – Power system
Power load rate ≤
Distribution Setting – 50: The
Unit > alarm is cleared.
Running
Parameters > QF1 Rated current (L1) 40/63 The rated current of
Unhide All QF2 Rated current (L2) a branch is
Advanced displayed based on
NOTE
Signals > This parameter is not
the actual rated
Power displayed for some current of the
Distribution distribution units. switch of the smart
Settings busbar.

Upper load current 80 – Upper load


threshold threshold setting
< Power system
load rate <
Overload setting:
An alarm is
generated.
– Upper load
threshold setting
– 5 ≥ Power
system load rate:
The alarm is
cleared.

Lower load current 60 – Lower load


threshold threshold setting
< Power system
load rate < Upper
load threshold
setting: An alarm
is generated.
– Lower load
threshold setting
– 5 ≥ Power
system load rate:
The alarm is
cleared.

Issue 02 (2023-02-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 109
ECC800 Data Center Controller
User Manual (ECC800-Pro V100R023C00) 5 Power-On Commissioning

Path Parameter Name Defaul Description


t Value

Overload 100 – Power system


load rate >
Setting: An alarm
is generated.
– Power system
load rate ≤
Setting – 5: The
alarm is cleared.

4. Set the parameters for other power distribution units in the same way or by
synchronizing parameters.
Path: Maintenance > Parameter Sync

----End

5.7 Commissioning the eLight


If an eLight is installed, perform the following steps to configure it.

Procedure
Step 1 Ensure that the device address of the eLight actuator is the default value 2.
Toggle switches 1 to 4 of the DIP switch specify the device address in binary mode.
ON indicates 1, and OFF indicates 0.

Table 5-7 Setting a device address


Address Toggle Toggle Toggle Toggle
Switch 1 Switch 2 Switch 3 Switch 4

1 ON OFF OFF OFF

2 OFF ON OFF OFF

3 ON ON OFF OFF

4 OFF OFF ON OFF

Step 2 Check the eLight function.

Issue 02 (2023-02-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 110
ECC800 Data Center Controller
User Manual (ECC800-Pro V100R023C00) 5 Power-On Commissioning

Table 5-8 Function commissioning


Check Method Normal Connection Status

Choose Maintenance > Configuration The eLight is lit up in red, green, blue,
Wizard > Linkage Test > eLight and white in sequence for 3 seconds
Actuator Commissioning and click respectively, and then turns off.
Test.

Step 3 Set eLight parameters.


1. Log in to the ECC800-Pro WebUI as an administrator.
2. In the Smart Module View, click Modify Device. Select an eLight actuator
under Devices, drag it to the access actuator to which you want to bind the
eLight actuator, and click Exit Edit Mode.

Figure 5-11 eLight actuator position

Table 5-9 Access authorization


Access authorization Description

Access authorization fails and the Red light, blinking for 3 seconds
aisle door cannot be opened.

Access authorization succeeds and Green light, blinking for 3 seconds


the door can be opened.

Issue 02 (2023-02-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 111
ECC800 Data Center Controller
User Manual (ECC800-Pro V100R023C00) 5 Power-On Commissioning

NOTE

– The eLight actuator is automatically associated with the nearest access actuator in the
smart module view.
– If there are one access actuator and two eLight actuators in an aisle, the access
actuator is automatically associated with the two eLight actuators.

----End

Follow-up Procedure
To modify the parameters of a single eLight, do as follows:
1. Choose Monitoring > Aisle > eLight Actuator Group > eLight Actuator. The
Running Parameters page is displayed.
2. Select the Associated alarm severity as required and click Submit.

Table 5-10 Function commissioning


Item Alarm Severity Description
Selection

Associated Critical If there is a critical alarm, the


alarm severity eLight strip light turns on with a
red light.

Critical, Major If there are multiple alarms, the


eLight strip light preferentially
Critical, Major, turns on with a light
Minor corresponding to the high-
Critical, Major, severity alarm. After the high-
Minor, Warning severity alarm is cleared, the
eLight strip light turns on with a
light corresponding to the low-
severity alarm.
NOTE
● Critical: red light
● Major: orange light
● Minor: yellow light
● Warning: gray light

None The eLight strip light is steady


blue (atmosphere light).
NOTE
After you set the alarm severity, the eLight indicator is off if no alarm is generated.

5.8 Commissioning the eLight (for


FusionModule500/800)
When the system type is FusionModule500/800 and an eLight is installed, perform
the following steps to configure it.

Issue 02 (2023-02-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 112
ECC800 Data Center Controller
User Manual (ECC800-Pro V100R023C00) 5 Power-On Commissioning

Procedure
Step 1 Ensure that the device address of the eLight actuator is the default value 2.

Toggle switches 1 to 4 of the DIP switch specify the device address in binary mode.
ON indicates 1, and OFF indicates 0.

Table 5-11 Setting a device address

Address Toggle Toggle Toggle Toggle


Switch 1 Switch 2 Switch 3 Switch 4

1 ON OFF OFF OFF

2 OFF ON OFF OFF

3 ON ON OFF OFF

4 OFF OFF ON OFF

Step 2 Add an eLight.


1. Log in to the ECC800-Pro WebUI as an administrator.
2. Add an eLight.

Table 5-12 Adding an eLight

Path Parameter Setting

Choose System Device Select eLight Actuator from the


Settings > Device attribute drop-down list box.
Management and click
Add Device. The Device Type Select eLight Actuator from the
parameters for adding drop-down list box.
devices are displayed. Connect To Select ETH Converter1 from the
drop-down list box.
NOTE
In this example, the eLight actuator
is connected to ETH converter 1.

Communicati COM1/COM2
ons Port

Device Set the device address for the


Address eLight actuator based on the
actual situation.

3. Click Test Connect to check whether the eLight Actuator connects properly.
– If the connection succeeds, click Confirm. The connected devices are
displayed in the Number of connected devices list.

Issue 02 (2023-02-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 113
ECC800 Data Center Controller
User Manual (ECC800-Pro V100R023C00) 5 Power-On Commissioning

– If the connection fails, check whether the cable is properly connected to


the device, whether the device is running properly, and whether the
parameter settings are consistent with the device parameters.
Step 3 Set eLight parameters.
1. Log in to the ECC800-Pro WebUI as an administrator.
2. Choose Monitoring > Aisle > eLight Actuator Group > eLight Actuator. The
Running Parameters page is displayed.
3. Select the Associated alarm severity as required and click Submit.

Table 5-13 Function commissioning


Item Alarm Severity Description
Selection

Associated Critical If there is a critical alarm, the


alarm severity eLight strip light turns on with a
red light.

Critical, Major If there are multiple alarms, the


eLight strip light preferentially
Critical, Major, turns on with a light
Minor corresponding to the high-
Critical, Major, severity alarm. After the high-
Minor, Warning severity alarm is cleared, the
eLight strip light turns on with a
light corresponding to the low-
severity alarm.
NOTE
– Critical: red light
– Major: orange light
– Minor: yellow light
– Warning: gray light

None The eLight strip light is steady


blue (atmosphere light).
NOTE
After you set the alarm severity, the eLight indicator is off if no alarm is generated.

4. (Optional) When the eLight is connected to a cabinet, commission the cabinet


light.
– When you open the front door of the cabinet, the tube light connected at
the front door turns white.
– When you open the rear door of the cabinet, the tube light connected at
the rear door turns white.
– When the front or rear door of the cabinet is closed, the corresponding
light color is displayed based on the setting of Associated alarm
severity.

Issue 02 (2023-02-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 114
ECC800 Data Center Controller
User Manual (ECC800-Pro V100R023C00) 5 Power-On Commissioning

NOTE

The eLight can be used to commission the cabinet light only when the cabinet
electronic clasp lock or cabinet electronic lock is used, not when the mechanical
lock is used.

Step 4 If there are multiple eLights, repeat Step 1–Step 3.


----End

5.9 Commissioning a PDU2000


When the system type is FusionModule500/800 or FusionModule2000 and a
PDU2000 is installed, perform the following steps to configure it.

Prerequisites
One end of the straight-through cable has been connected to the COM port on
the PDU2000 and the other end has been connected to the COM port on the ETH
converter.

Context

Table 5-14 PDU2000 basic Information


Name Displayed on the WebUI Eleventh and Twelfth Characters in
Device Barcodea

PDU2000-M(C) FT

PDU2000-M(H) 6B

a: The barcode starts with 21 and is attached to the device.

Procedure
Step 1 Set the PDU2000 monitoring parameters.
● Set the PDU2000-M (C) monitoring parameters.
NOTE

The display of a single-phase module is used as an example.


– After the PDU2000-M (C) is powered on, the LCM displays the
initialization screen.

Figure 5-12 PDU2000-M (C) initialization screen

Issue 02 (2023-02-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 115
ECC800 Data Center Controller
User Manual (ECC800-Pro V100R023C00) 5 Power-On Commissioning

– Press MENU to enter the device communications address screen.

Figure 5-13 PDU2000-M (C) communications settings

– Press DOWN and UP to select the address to be set.


– Press MENU to confirm the settings.
NOTE

The parameter settings take effect only if you press MENU and then the
PDU2000-M (C) buzzes and restarts. If you do not press MENU, the PDU2000-M
(C) buzzes and restarts automatically after 30s and the settings are not saved.
● Set the PDU2000-M (H) monitoring parameters.
NOTE

The display of a single-phase module is used as an example.


– After the PDU2000-M (H) is powered on, press MENU. The LCM displays

.
– Press MENU again to access the device communications address screen.

Figure 5-14 PDU2000-M (H) communications settings

– Press DOWN and UP to select the address to be set.


– Press MENU to confirm the settings.
NOTE

If modification is successful, is displayed: If modification fails,

is displayed:

Step 2 Add a PDU2000.


1. Log in to the ECC800-Pro WebUI as an administrator.
2. Add a PDU2000.

Issue 02 (2023-02-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 116
ECC800 Data Center Controller
User Manual (ECC800-Pro V100R023C00) 5 Power-On Commissioning

NOTE

The PDU2000s whose addresses range from 1 to 20 can be automatically identified.


The PDU2000s whose addresses are greater than 20 must be manually added.

Table 5-15 Manually adding a PDU2000

Path Parameter Setting

Choose Device Select PDU from the drop-down list box.


System attribute
Settings >
Device Device Type Select PDU2000-M (C) or PDU2000-M (H)
Management from the drop-down list box based on the
and click Add actual device.
Device. The Connect To Select ETH Converter1 from the drop-
parameters for down list box.
adding devices
NOTE
are displayed.
In this example, the PDU2000 is connected to
ETH converter 1.

Communicat COM1/COM2
ions Port

Device Enter the actual device address of the


Address PDU2000.

3. Click Test Connect to check whether the PDU2000 connects to the ECC800-
Pro properly.
– If the connection succeeds, click Confirm. The connected devices are
displayed in the Number of connected devices list.
– If the connection fails, check whether the cable is properly connected to
the device, whether the device is running properly, and whether the
parameter settings are consistent with the device parameters.

----End

5.10 Commissioning the Cabinet Electronic Clasp Locks


(for FusionModule500/800)
If a cabinet electronic clasp lock is installed, perform the following steps to
configure it.

Prerequisites
● COM1–COM3 on the ECC800-Pro are connected to cabinet electronic clasp
locks.
● The smart module view has been deployed. The layout type is single-row
view.

Issue 02 (2023-02-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 117
ECC800 Data Center Controller
User Manual (ECC800-Pro V100R023C00) 5 Power-On Commissioning

● The cabinet door can be opened and closed properly. If the cabinet door
cannot be opened and closed properly, adjust the position of the cabinet
electronic clasp lock by performing steps 1 and 2.

Procedure
Step 1 (Optional) Check whether the cabinet door lock is leveled to 2000 (+ 3) mm. If
not, adjust it.

Step 2 (Optional) If the cabinet door still cannot be opened after step 1 is performed,
adjust the position of the cabinet electronic clasp lock by using the slotted holes
until the cabinet door can be opened and closed properly.

Step 3 Set device addresses for cabinet electronic clasp locks.


● A cabinet electronic clasp lock is installed at the front and rear doors of each
cabinet respectively. The address for the cabinet electronic clasp lock on the
front door is an odd number, and that for the cabinet electronic clasp lock on
the rear door is an even number.
● Mount the cabinet electronic clasp locks to the cabinets from left to right in
ascending order of the DIP switch addresses in the plan view. If the DIP switch
addresses are the same, mount the cabinet electronic clasp locks to the
cabinets in ascending order of the COM ports connected to the locks.
● The DIP addresses of the cabinet electronic clasp locks start from 1. Each
COM port on the ECC800-Pro supports a maximum of 12 cabinet electronic
clasp locks connected in series.
● Set a device address for a cabinet electronic clasp lock by operating the DIP
switch on the cabinet electronic clasp lock. Toggle switches 1 to 6 specify the
device address in binary mode. ON indicates 1, and OFF indicates 0.

Table 5-16 Setting device addresses

Address Toggle Toggle Toggle Toggle Toggle Toggle


Switch 1 Switch 2 Switch 3 Switch 4 Switch 5 Switch 6

1 ON OFF OFF OFF OFF OFF

2 OFF ON OFF OFF OFF OFF

3 ON ON OFF OFF OFF OFF

4 OFF OFF ON OFF OFF OFF

5 ON OFF ON OFF OFF OFF

6 OFF ON ON OFF OFF OFF

7 ON ON ON OFF OFF OFF

8 OFF OFF OFF ON OFF OFF

9 ON OFF OFF ON OFF OFF

10 OFF ON OFF ON OFF OFF

11 ON ON OFF ON OFF OFF

Issue 02 (2023-02-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 118
ECC800 Data Center Controller
User Manual (ECC800-Pro V100R023C00) 5 Power-On Commissioning

Address Toggle Toggle Toggle Toggle Toggle Toggle


Switch 1 Switch 2 Switch 3 Switch 4 Switch 5 Switch 6

12 OFF OFF ON ON OFF OFF

Step 4 Add cabinet electronic clasp locks.


1. Log in to the ECC800-Pro WebUI as an administrator.
2. Create a cabinet view in Smart Module View on the home page.
3. Add a cabinet electronic clasp lock.

Table 5-17 Adding a cabinet electronic clasp lock

Path Parameter Setting

Choose System Settings Device Cabinet Electronic Lock


> Device Management Attribute
and click Add Device.
The parameters for Device Type Cabinet Electronic Clasp Lock
adding devices are Connect To ECC800
displayed.
Communicat COM1–COM3
ions Port

Device Fill in the actual device address of


Address the cabinet electronic clasp lock.
The value range is 1–255.

4. Click Test Connect to check whether the connection between the cabinet
electronic clasp lock and the ECC800-Pro is normal.
– If the connection succeeds, click Confirm. The device connection
information is displayed in the Number of connected devices list.
– If the connection fails, check whether the device is properly connected to
the ECC800-Pro, whether the device and ECC800-Pro are running
properly, and whether the parameter settings are consistent with the
device parameters.
5. Connect the electronic clasp locks of other cabinets.
Step 5 Commission the cabinet electronic clasp locks.

Table 5-18 Function commissioning

Function Path Operation

View Choose Click the View the running information


cabinet Monitoring > Running Info about cabinet electronic clasp
electroni Cabinet > IT tab. lock 1 on the WebUI.
c clasp Cabinet101 >
lock E-LOCK1.a
informati
on

Issue 02 (2023-02-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 119
ECC800 Data Center Controller
User Manual (ECC800-Pro V100R023C00) 5 Power-On Commissioning

Function Path Operation

Change Click the Change the cabinet electronic


a cabinet Running clasp lock name.
electroni Parameters tab.
c clasp
lock
name

Remotely Choose Click the Select Open front door or Open


open a Monitoring > Controls tab. back door from the Cabinet
cabinet Cabinet > IT door control drop-down list box,
electroni Cabinet101a. and click Submit to remotely
c clasp open the door.
lock

Open Choose Monitoring > Cabinet, Select Open front door, Open
cabinet and click the Controls tab. back door, or Open all doors
electroni from the Open the door drop-
c clasp down list box, select the setting,
locks in and click Submit. The cabinet
batches electronic clasp locks unlock the
doors in batches based on the
signal value.

a: Cabinet electronic clasp lock 1 of IT cabinet 101 is used as an example.

----End

Issue 02 (2023-02-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 120
ECC800 Data Center Controller
User Manual (ECC800-Pro V100R023C00) 6 Feature Commissioning

6 Feature Commissioning

6.1 Setting Device Performance Parameters


Context
● Setting device performance parameters will affect the storage of device
performance data.
● By setting the period for collecting device performance data, you can record
the performance data of the device running status.
● If you need to change the status for Collecting Data, refer to the following
procedure.
● The storage specifications vary with Statistics Mode:
– 1 min: 300 records
– 5 min: 400,000 records
– 15 min: 100 records
– 30 min: 100 records
– 1 hour: 400,000 records
– 1 day: 4000 records
– 1 week: 600 records
– 1 month: 500 records
– 1 year: 200 records
– Threshold: 100,000 records

Procedure
Step 1 Choose System Settings > Performance Parameters. The Performance
Parameters page is displayed.

Step 2 Click the Performance Parameters(enable) tab, select a device in Device Type,
and click OK.

All enabled performance indicators are displayed in the result list.

Issue 02 (2023-02-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 121
ECC800 Data Center Controller
User Manual (ECC800-Pro V100R023C00) 6 Feature Commissioning

NOTE

If the Device Type is ECC800, the Total electrical energy of system IT load output signal
supports the Threshold/Period mode. You can select the parameter as required.

Figure 6-1 Enabled performance indicators

Step 3 You can set the status of enabled performance indicators to Disable as required.

Table 6-1 Methods for disabling performance indicators


Method Procedure

Disable one 1. Select Disable on the row of a performance indicator in the Collecting
Data column.
2. Click Submit in the lower part of the page.

Disable multiple 1. Select the performance indicators to be disabled.


on a single page 2. Click Batch Disabling on Single Page in the lower part of the page.

NOTE

If the settings are submitted successfully:

● is displayed on the row where the performance parameter is located in the Setting
Result column, and the numbers of success and failure records are displayed near
Submit.
● The disabled performance indicators are displayed on the Performance
Parameters(disable) tab page.

Step 4 On the Performance Parameters(disable) tab page, you can set the status of
disabled performance indicators to Enable as required. The operations are similar
to Step 2–Step 3.

Issue 02 (2023-02-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 122
ECC800 Data Center Controller
User Manual (ECC800-Pro V100R023C00) 6 Feature Commissioning

Step 5 Click the All Configured Data tab to view all the performance parameters
configured for the device.
----End

6.2 Setting ECC800-Pro Cascading


If multiple smart modules (≤ 3) are installed in the same room and the customer
has not deployed the NetEco, multiple ECC800-Pros can be cascaded for
management. To set the cascading function, follow the procedure in this section.

Prerequisites
Cascaded ECC800-Pros communicate with each other properly.

Context
A maximum of three ECC800-Pros can be cascaded. After the IP addresses of other
smart module ECC800-Pros in the room are added to an ECC800-Pro, their active
alarms and PUE data can be displayed and viewed.
You can click links on the cascading management page of the master ECC800-Pro
to display the login pages of the other ECC800-Pros. Then, you can log in to view
the details.

Procedure
Step 1 Log in to the ECC800-Pro WebUI as an administrator.
Step 2 Choose System Settings > Smart Module Cascading.
Step 3 Click Add. In the displayed New Smart Module Cascading dialog box, enter the
IP addresses of the ECC800-Pros to be cascaded.
Step 4 Click Confirm.
Step 5 Choose Home > Multi-Module Monitoring. The information about the cascaded
ECC800-Pros is displayed.

Figure 6-2 ECC800-Pro cascading page

Issue 02 (2023-02-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 123
ECC800 Data Center Controller
User Manual (ECC800-Pro V100R023C00) 6 Feature Commissioning

Step 6 (Optional) Click the alarm bubble in the Active alarms area in a smart module to
view the corresponding active alarm information.
Step 7 (Optional) Click the pencil icon next to a smart module name, and the Edit Smart
Module Title dialog box is displayed. Change the smart module name and click
Confirm.
Step 8 (Optional) Click Link in a smart module on the cascading page to access the
corresponding ECC800-Pro login page.
Step 9 (Optional) Filter and query the details of each alarm by smart module, device, or
alarm severity in the Active alarms area.

----End

6.3 Commissioning a UIM20A Expansion Module


Context
Devices connected through the UIM20A expansion module (UIM for short) can be
automatically or manually bound in the smart module view.

Procedure
Step 1 Log in to the ECC800-Pro WebUI as an administrator.
Step 2 Choose System Settings > Device Management, and click Auto Discover Device
to add the device. Devices connected to the UIM20A can be identified.

Table 6-2 Devices that support self-identification


Device Name Device Model

rPDU-MPDU MD-1324-2004

rPDU-PN PN1-32I10-20E4G-AV4

rPDU ZFIF-112-0800

PN1-16X18-8E-AH4W

ZZIF-130-2004

PN1-32I15-20E4G-AV4W

PDU2000-M(C) PDU2000-32-1PH-20/4-M1/CLEVER

PDU2000-M(H) PDU2000-32-1PH-20/4-M1/HPX

Smart U space manager XDUD-D100-S42U

Cabinet electronic lock DS899

Fingerprint lock CHD2100-J2ZM

T/H sensor ENR1DETA

Issue 02 (2023-02-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 124
ECC800 Data Center Controller
User Manual (ECC800-Pro V100R023C00) 6 Feature Commissioning

NOTICE

If the intelligent device does not support self-identification, perform step 5 to


manually add the device.

Step 3 Choose Home > Smart Module View and click Bind Cabinets and Devices.

Step 4 In the displayed dialog box for binding IT cabinets and devices, click Auto Bind to
bind devices.

Automatic binding is supported in one-to-one and one-to-four scenarios.

● One-to-one scenario
Each cabinet corresponds to a UIM.
Each cabinet contains two or more types of intelligent components, which can
be the rPDU-MPDU, rPDU-PN, rPDU, PDU2000-M(C), PDU2000-M(H), smart
U space manager, cabinet electronic lock, fingerprint lock, and T/H sensor.
● One-to-four scenario
Four cabinets correspond to one UIM.
In this scenario, only one type of intelligent devices is monitored in each
cabinet. The port for connecting the intelligent device to the UIM20A must
meet the physical connection rules in Table 6-3.
NOTE

– Typical intelligent devices supported in this scenario are the rPDU-MPDU, rPDU-
PN, rPDU, PDU2000-M(C), PDU2000-M(H), smart U space manager, cabinet
electronic lock, fingerprint lock, and T/H sensor.
– Each port on the UIM does not support cascading.
– The UIM must be installed in the first cabinet, and the intelligent devices in the
following three cabinets need to be connected to the first cabinet.
– If the actual number of IT cabinets is not an integral multiple of 4, connect cables
according to the rules. Idle COM ports on the UIM can be reserved.
– One UIM can connect to only one type of intelligent devices.

Table 6-3 Cable connection mode in the UIM one-to-four scenario

COM Port COM1 COM3 COM5 COM7

Connected Cabinet 1 Cabinet 2 Cabinet 3 Cabinet 4


Cabinet

COM Port COM2 COM4 COM6 COM8

Connected Cabinet 1 Cabinet 2 Cabinet 3 Cabinet 4


Cabinet

● Temperature map scenario


In the scenario where T/H sensors are connected, 32 T/H sensors are
connected to one UIM.

Issue 02 (2023-02-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 125
ECC800 Data Center Controller
User Manual (ECC800-Pro V100R023C00) 6 Feature Commissioning

NOTE

– Each COM port allows a maximum of eight T/H sensors to be cascaded.


– The addresses of the T/H sensors connected to the same COM port must be
different. Addresses 1 to 8 are supported. The addresses of T/H sensors connected
to different COM ports can be the same. In actual configuration, bind sensors to
the corresponding cabinets in sequence.
– Each cabinet can connect to only one T/H sensor, a T/H sensor is automatically
bound to the cabinet after its DIP switch is set. The LCD of the T/H sensor displays
the DIP switch address.
– One UIM connects to 32 T/H sensors. If the smart module connects to more than
32 IT cabinets, two UIMs are required for expansion. Each UIM must be installed in
the first cabinet of the corresponding IT cabinets, and the cable connection
principles remain unchanged.
– In this scenario, a UIM is not bound to the IT cabinet.
– Only the T/H sensor inside the cabinet can be connected to the UIM.

Table 6-4 Cable connection mode in a temperature map scenario


COM Port COM1 COM3 COM5 COM7

Connected T/H sensor T/H sensor T/H sensor T/H sensor


Device group group group group

COM Port COM2 COM4 COM6 COM8

Connected - - - -
Device

Step 5 (Optional) Click Add, set IT Cabinet, select a UIM and the devices connected to
each COM port of the UIM20A, and click in the Operation column to
manually bind the devices.
NOTE

If the automatic cabinet binding result is inconsistent with the actual connection or the
automatic cabinet binding function cannot be used, you need to manually bind devices.

Step 6 Click Submit.


Step 7 Hold down the BLINK button on the UIM for less than 2s. The RUN indicator on
the UIM blinks fast, and the dialog box for binding IT cabinets and devices shows
the UIM that is blinking.
NOTE

You can determine the IT cabinet that houses the UIM through indicator blinking. Then, you
can change the IT cabinet name.

Issue 02 (2023-02-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 126
ECC800 Data Center Controller
User Manual (ECC800-Pro V100R023C00) 6 Feature Commissioning

Figure 6-3 Device blinking

Step 8 (Optional) Click , change the IT cabinet name, change the UIM and the devices
connected to the COM ports of the UIM20A, and click in the Operation
column.

Step 9 (Optional) Click to delete a device binding relationship.

Step 10 Choose Home > Plan View on the ECC800-Pro WebUI, and drag the dry contact
device to the corresponding position in the Smart Module View pane based on
the actual device layout.
NOTE

Hold down the BLINK button on the UIM for less than 2s. The RUN indicator on the UIM
blinks fast, and the cabinet corresponding to the UIM blinks in the smart module view.

----End

6.4 PDU2000M Binding


Context
● A PDU2000M can be automatically identified by the ECC800-Pro. Log in to the
ECC800-Pro WebUI as an administrator, and check whether the device exists
on the Monitoring page.
● Devices connected through a PDU2000M can be manually bound on the
smart module view.
● A PDU2000M can be manually bound to a cabinet on the smart module view.
● A maximum of four PDU2000Ms can be connected to a cabinet.
● Configure the power supply branches of cabinets in the layout first.
● Use either the PDU2000M binding function or the cabinet device binding
function. Do not connect a device to both the UIM20A expansion module and
PDU2000M.

Procedure
Step 1 Log in to the ECC800-Pro WebUI as an administrator.

Issue 02 (2023-02-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 127
ECC800 Data Center Controller
User Manual (ECC800-Pro V100R023C00) 6 Feature Commissioning

Step 2 Choose System Settings > Device Management, and click Auto Discover Device.
Then, devices connected to the PDU2000M can be identified.

Table 6-5 Devices that can be automatically identified


Device Name Model

Smart U space manager XDUD-D100-S42U

Cabinet electronic lock DS899

Fingerprint lock CHD2100-J2ZM

T/H sensor ENR1DETA

Step 3 Choose Home > Plan View > PDU2000M Binding.


Step 4 Click Start Binding and hold down the Blink button on the PDU2000M for 3s. The
PDU2000M is bound to the corresponding cabinet branch.

NOTICE

● The sequence for binding PDU2000Ms to cabinets is from left to right, and that
for binding them to branches in a single cabinet is from top to bottom.
● Tap a blank branch in an IT cabinet to start binding from the branch.

Step 5 After all devices are bound, click OK.

----End

Follow-up Procedure
To manually adjust the layout, drag a PDU2000M under Unbound device on the
left to a specific branch.
● If there is a blank branch in a cabinet, you can manually drag a PDU2000M
under Unbound device on the left to the blank branch.
● If a PDU2000M is bound to a cabinet branch, you can drag a PDU2000M
under Unbound device on the left to the branch to replace the bound device.
Then the replaced device is displayed under Unbound device.
● If a PDU2000M is bound to a cabinet branch, you can drag a PDU2000M
under Unbound device on the left to the space between branch frames.
When a branch frame blinks, you can insert the device to the frame.

6.5 Commissioning Wireless Low-Power Devices


When the wireless low-power devices such as the wireless AC power failure sensor
iACSENSE, wireless temperature and humidity sensor iTEMP, wireless motion
detector iMOTION, wireless smoke sensor iSMOKE, wireless water sensor iWATER,
and wireless door status sensor iDOOR are configured, refer to the following
commissioning procedure.

Issue 02 (2023-02-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 128
ECC800 Data Center Controller
User Manual (ECC800-Pro V100R023C00) 6 Feature Commissioning

Context
● Blinking at long intervals: If the indicator is blinking at 0.5 Hz (at intervals of
2s, on for 1s and then off for 1s), communication with the host is successful.
● Blinking at short intervals: If an indicator is blinking at 4 Hz (at intervals of
0.25s, on for 0.125s and then off for 0.125s), networking is in progress.

Procedure

Step 1 Hold down the networking switch on a wireless low-power device for 8s to
delete the networking information.
Step 2 Hold down the SW button on the ECC800-Pro for 3–5 seconds to enter the
wireless networking (802.15.4) pairing state.

Step 3 Consider the device type and hold down the networking switch on the wireless
low-power device for 3s to implement networking until the indicator of the
component blinks at short intervals.
After the wireless networking (802.15.4) pairing is successful, the indicator of the
wireless low-power device blinks at long intervals.
Step 4 After all wireless low-power devices are networked (all indicators blink at long
intervals), log in to the ECC800-Pro WebUI and check whether the networking is
successful.
1. Log in to the ECC800-Pro WebUI as an administrator.
2. Choose Monitoring > Environment from the main menu. In the navigation
tree on the left, check whether the wireless low-power devices are successfully
added under Environment.

Figure 6-4 Adding a wireless low-power device

NOTE

– If a wireless low-power device fails to communicate, hold down its networking


switch for 3s to begin networking again.
– If the networking of a device fails, adjust the antenna position to ensure that the
networking is successful. Ensure that there is no blockage between the device
antenna and the ECC800 antenna.

Issue 02 (2023-02-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 129
ECC800 Data Center Controller
User Manual (ECC800-Pro V100R023C00) 6 Feature Commissioning

Figure 6-5 Antenna position

Step 5 After all wireless low-power devices are networked, hold down the SW button on
the ECC800-Pro main control module for 3–5 seconds. The RF_Z indicator on the
ECC800-Pro main control modules turns from blinking green at super short
intervals to blinking green at long intervals (blinking at 0.5 Hz, on for 1 second
and then off for 1 second). The ECC800-Pro exits the wireless networking
(802.15.4) pairing status.
NOTE

● If two or more ECC800-Pro controllers need to be networked in wireless (802.15.4)


mode, only one system can be networked at one time. During the networking, ensure
that the RF_Z indicators on the ECC800-Pro main control modules of other systems are
blinking at long intervals.
● Only one wireless low-power device can be networked at a time. After the networking is
successful, the next device can be networked.

----End

6.6 Access Management

6.6.1 Commissioning a Door Status Sensor (Connected to the


AI/DI port on the Independent Deployment AI_DI Unit)
If a door status sensor is installed, perform the following steps to configure it.

Context
● To use the AI/DI sensor, enable the corresponding AI/DI port and name the
sensor. After that, the specific alarm can be reported.
● If the sensor is prefabricated, only check its settings.
● If multiple door status sensors are connected, commission one door status
sensor first and then commission the other door status sensors in the same
way.

Procedure
Step 1 Set parameters for a door status sensor.

Issue 02 (2023-02-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 130
ECC800 Data Center Controller
User Manual (ECC800-Pro V100R023C00) 6 Feature Commissioning

NOTE

In this example, the door status sensor is connected to the AI/DI_1 port on the independent
deployment AI_DI 1.
1. Log in to the ECC800-Pro WebUI as an administrator.
2. Choose System Settings > Signal Name Modify. The Batch Signal
Configuration page is displayed.
3. Set Device Type to Independent Deployment AI_DI Unit, set Device Name
to Independent Deployment AI_DI1 Unit, and click OK.
4. On the query result tab page, set the new signal name of AI/DI_1 to Door1
and click Submit.
NOTE

Order number of door sensor name is same as cabinet.


5. Choose Monitoring > System > Independent Deployment AI_DI Unit Group
> Independent Deployment AI_DI1 Unit > Running Parameters > AI/DI_1
Port Settings.
6. Set Door1 sensor to Enable and click Submit.
7. Set Door1 sensor type to Door sensor, ensure that Door1 power supply is
Yes, and click Submit.
8. Perform the preceding operations to set parameters for ports AI/DI_2 to AI/
DI_8.
Step 2 Check the door status sensor functions.

Table 6-6 Function check


Check Method Normal Connection Status

Open the cabinet door. Door1 DI alarm is generated on the active


alarm page of the app or WebUI.

----End

6.6.2 Commissioning a Door Status Sensor (Connected to the


AI/DI Port on the Rack Environment Unit)
If a door status sensor is installed, perform the following steps to configure it.

Context
● If the sensor is prefabricated, only check its settings.
● If multiple door status sensors are connected, commission one door status
sensor first and then commission the other door status sensors in the same
way.

Procedure
Step 1 Choose Monitoring > Cabinet > IT Cabinet1 > Cabinet Collector1 > Running
Parameters, set the door status sensor parameters.

Issue 02 (2023-02-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 131
ECC800 Data Center Controller
User Manual (ECC800-Pro V100R023C00) 6 Feature Commissioning

Table 6-7 Parameter settings

Setting Object Method


area

AI/DI_1 Front 1. Choose AI/DI_1 sensor to Enable, click Submit.


Port door 2. Set AI/DI_1 sensor type to Door sensor, click Submit.
Settings status
(AI/DI_1)

AI/DI_2 Rear 1. Choose AI/DI_2 sensor to Enable, click Submit.


Port door 2. Set AI/DI_2 sensor type to Door sensor, click Submit.
Settings status
(AI/DI_2)

Step 2 Check the door status sensor functions.

Table 6-8 Function check

Check Method Normal Connection Status

Close and then open the If the alarm is enabled for the front and rear
door. doors, a cabinet door open alarm is displayed on
the active alarm screen of the app or the active
alarm page of the WebUI.

----End

6.6.3 Commissioning a Door Status Sensor (Connected to the


AI/DI Port on the UIM20A Expansion Module)
If a door status sensor is installed, perform the following steps to configure it.

Context
● To use the AI/DI sensor, enable the corresponding AI/DI port and name the
sensor. After that, the specific alarm can be reported.
● If the sensor is prefabricated, only check its settings.
● If multiple door status sensors are connected, commission one door status
sensor first and then commission the other door status sensors in the same
way.

Procedure
Step 1 Set parameters for a door status sensor.
NOTE

In this example, the door status sensor is connected to the AI/DI_1 port on the user
interface module1.
1. Log in to the ECC800-Pro WebUI as an administrator.

Issue 02 (2023-02-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 132
ECC800 Data Center Controller
User Manual (ECC800-Pro V100R023C00) 6 Feature Commissioning

2. Choose System Settings > Signal Name Modify. The Batch Signal
Configuration page is displayed.
3. Set Device Type to UIM, set Device Name to UIM1, and click OK.
4. On the query result tab page, set the new signal name of AI/DI_1 to Door1
and click Submit.
NOTE

Order number of door sensor name is same as cabinet.


5. Choose Monitoring > System > UIM Group > UIM1 > Running Parameters
> AI/DI_1 Port Settings.
6. Set Door1 sensor to Enable and click Submit.
7. Set Door1 sensor type to Door sensor, ensure that Door1 power supply is
Yes, and click Submit.
8. Perform the preceding operations to set parameters for ports AI/DI_2 to AI/
DI_8.
Step 2 Check the door status sensor functions.

Table 6-9 Function check

Check Method Normal Connection Status

Open the cabinet door. Door1 DI alarm is generated on the active


alarm page of the app or WebUI.

----End

6.6.4 Commissioning the Door Status Sensor (Connected to


the ECC800-Pro)
Context
If the sensor is preinstalled, only check its settings.

Procedure
Step 1 For a single cabinet, set the door status sensor parameters.
1. Log in to the ECC800-Pro WebUI as an administrator.
2. Choose System Settings > Signal Name Modify. The Batch Signal
Configuration page is displayed.
3. Set Device type to ECC800 and Device name to ECC800, and click OK.
4. On the query result tab page, set the new signal name of AI/DI_3 to Door1
and click Submit.
5. Choose Monitoring > System > ECC800 > Running Parameters > AI/DI_3
Port Settings.
6. Set Door1 sensor to Enable and click Submit.
7. Set Door1 sensor type to Door sensor and click Submit.

Issue 02 (2023-02-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 133
ECC800 Data Center Controller
User Manual (ECC800-Pro V100R023C00) 6 Feature Commissioning

Step 2 If there are less than or equal to two cabinets, set the door status sensor
parameters.
1. Log in to the ECC800-Pro WebUI as an administrator.
2. Choose System Settings > Signal Name Modify. The Batch Signal
Configuration page is displayed.
3. Set Device type to ECC800 and Device name to ECC800, and click OK.
4. On the query result tab page, set the new signal name of AI/DI_3 to Door1
and click Submit. Change the new signal name of AI/DI_5 to Door2 and click
Submit.
5. Choose Monitoring > System > ECC800 > Running Parameters > AI/DI_3
Port Settings.
6. Set Door1 sensor to Enable and click Submit.
7. Set Door1 sensor type to Door sensor and click Submit.
8. Choose Monitoring > System > ECC800 > Running Parameters > AI/DI_5
Port Settings.
9. Set Door2 sensor to Enable and click Submit.
10. Set Door2 sensor type to Door sensor and click Submit.

Step 3 If there are more than two cabinets, set the door status sensor parameters.
1. Set door status sensor parameters for the IT cabinet by referring to step 1.
2. Choose System Settings > Signal Name Modify. The Batch Signal
Configuration page is displayed.
3. Set Device type to UIM, set Device name to UIM1, and click OK.
4. On the query result tab page, set the new signal name of AI/DI_1 to Door2
and click Submit.
NOTE

Order number of door sensor name is same as that of the cabinet.


5. Choose Monitoring > System > UIM Group > UIM1 > Running Parameters
> AI/DI_1 Port Settings.
6. Set Door2 sensor to Enable and click Submit.
7. Set Door2 sensor type to Door sensor, ensure that Door2 power supply is
set to Yes, and click Submit.
8. Set parameters for ports AI/DI_2 to AI/DI_8 on the UIM20A expansion module
1 in the same way.

Step 4 Check the door status sensor functions.

Table 6-10 Function commissioning

Check Method Normal Connection Status

Open the cabinet door. Door1 DI alarm is generated on the active


alarm page of the app or WebUI.

----End

Issue 02 (2023-02-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 134
ECC800 Data Center Controller
User Manual (ECC800-Pro V100R023C00) 6 Feature Commissioning

6.6.5 Commissioning an Access Control Device and a Cabinet


Electronic Lock or Fingerprint Lock
If an access control device and cabinet electronic lock or fingerprint lock are
installed, perform the following steps to configure them.

Prerequisites
When the fingerprint reader is connected to the ECC800-Pro for the first time, the
permissions need to be synchronized.

Procedure
Step 1 Set the access user management and access permission management.
1. Choose System Settings > Access Management to access the access
management page. The system supports the management of various access
permissions through the access card, password, and fingerprint.
2. Click Authentication Mode and set the authorization mode for the
FusionModule Actuator or access actuator.

Select Card, Fingerprint, Card and password, Card and fingerprint,


Fingerprint and password, Card, password and fingerprint or Card,
password or fingerprint.

NOTE

– The following describes how to set the access actuator.


– Table 6-11 and Table 6-12 describe the password-related authorization modes.

Figure 6-6 Setting the authentication mode

Issue 02 (2023-02-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 135
ECC800 Data Center Controller
User Manual (ECC800-Pro V100R023C00) 6 Feature Commissioning

Table 6-11 Access actuator version and authorization portfolio


Access Card Fingerprint Card Card,
Actuator +Password +Password +Password Password, or
Version +Fingerprint Fingerprint

V139, V140, – Verificatio – Verificatio – Verificatio – Verificatio


V141, V142, n mode n mode n mode n method:
V143, V144, (irrelevant (irrelevant (in card
V145 to the to the sequence) swiping,
sequence) sequence) : Swipe password
: card : card the card > input, or
swiping swiping Enter the fingerprin
and and password t
password fingerprin and press – Password
input t #> format:
– Password – Password Fingerprin User
format: format: t ID*Passw
Password Password – Password ord#
# # format:
Password
#

V138 or – Verificatio – Verificatio – Verificatio – Not


earlier n mode n mode n mode supported
(irrelevant (irrelevant (in
to the to the sequence)
sequence) sequence) : Swipe
: card : card the card >
swiping swiping Enter the
and and password
password fingerprin and press
input t #>
– Password – Password Fingerprin
format: format: t
Password Password – Password
# # format:
Password
#

Issue 02 (2023-02-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 136
ECC800 Data Center Controller
User Manual (ECC800-Pro V100R023C00) 6 Feature Commissioning

Access Card Fingerprint Card Card,


Actuator +Password +Password +Password Password, or
Version +Fingerprint Fingerprint

V146 or later – Verificatio – Verificatio – Verificatio – Verificatio


n mode n mode n mode n method:
(irrelevant (irrelevant (irrelevant card
to the to the to the swiping,
sequence) sequence) sequence) password
: card : card : card input, or
swiping swiping swiping, fingerprin
and and password t
password fingerprin input, and – Password
input t fingerprin format:
– Password – Password t User
format: format: – Password ID*Passw
User User format: ord#
ID*Passw ID*Passw User
ord# ord# ID*Passw
ord#

Table 6-12 FusionModule Actuator version and authorization portfolio


FusionModu Card Fingerprint Card Card,
le Actuator +Password +Password +Password Password, or
Version +Fingerprint Fingerprint

V121 or – Verificatio – Verificatio – Verificatio – Verificatio


earlier n mode n mode n mode n method:
(irrelevant (irrelevant (in card
to the to the sequence) swiping,
sequence) sequence) : card password
: card : card swiping > input, or
swiping swiping password fingerprin
and and input > t
password fingerprin Fingerprin – Password
input t t format:
– Password – Password – Password User
format: format: format: ID*Passw
Password Password Password ord#
# # #

Issue 02 (2023-02-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 137
ECC800 Data Center Controller
User Manual (ECC800-Pro V100R023C00) 6 Feature Commissioning

FusionModu Card Fingerprint Card Card,


le Actuator +Password +Password +Password Password, or
Version +Fingerprint Fingerprint

V122 or later – Verificatio – Verificatio – Verificatio – Verificatio


n mode n mode n mode n method:
(irrelevant (irrelevant (irrelevant card
to the to the to the swiping,
sequence) sequence) sequence) password
: card : card : card input, or
swiping swiping swiping, fingerprin
and and password t
password fingerprin input, and – Password
input t fingerprin format:
– Password – Password t User
format: format: – Password ID*Passw
User User format: ord#
ID*Passw ID*Passw User
ord# ord# ID*Passw
ord#

NOTE

– To query the version of the access actuator or FusionModule Actuator, choose


Maintenance > Version Information and view the version in the Device Version
list.
– If an error occurs when you enter the password or user ID, press the pound key (*)
on the keyboard of the access control device to end the current access
authentication process. Then enter the password again.
– To query the user ID, log in to the ECC800-Pro WebUI as an administrator. Choose
System Settings > Access Management. In the Authorization area, view the user
ID corresponding to the user name.
3. Select the configured access actuator and click OK to complete setting the
authorization mode.
4. Click Add on the Authorization Operations tab page. The New User page is
displayed.
NOTE

The system supports a maximum of 1000 access users.


5. On the Basic Info tab page, enter User name and Employee ID.
Specify the following information on the Password tab.
– Password: Enter and confirm the password.
– Card number: The card number can be recorded directly or by swiping the
card.

▪ Record directly: Type the access card number in the text box.

▪ Record by swiping the card: Click Swipe Card and place the card on
the access control device. The card number is automatically recorded.

Issue 02 (2023-02-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 138
ECC800 Data Center Controller
User Manual (ECC800-Pro V100R023C00) 6 Feature Commissioning

– Fingerprint: On the Fingerprint tab page, select Fingerprint for Select


fingerprint reader and click Scan Fingerprint. On the Please collect
fingerprint page, click OK. Then put your finger on the fingerprint reader
to collect the fingerprint after hearing the voice prompt. After you hear a
beep sound, move your finger away and collect the fingerprint again.
NOTE

▪ Press your finger against the fingerprint sensor until touching the metal
frame.

▪ Press your finger in the correct way and wait for more than 0.5s. You need to
record each fingerprint for three times.

▪ Each access user can register a maximum of three groups of fingerprints. The
three groups of fingerprints need to be registered using different fingers. The
system supports a maximum of 3000 registered fingerprints.

▪ The fingerprint information is used only for configuring the access control
function and is not used for other purposes. The fingerprint information is
encrypted during transmission in the ECC800-Pro to ensure that the personal
data of users is fully protected.

▪ The cabinet fingerprint lock does not support access user registration. Access
users can be registered only on the aisle access control device, and the
registered information is sent to the cabinet fingerprint lock through the
ECC800-Pro.

Figure 6-7 Recording fingerprints

Figure 6-8 Adding access users

Issue 02 (2023-02-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 139
ECC800 Data Center Controller
User Manual (ECC800-Pro V100R023C00) 6 Feature Commissioning

On the Authorization Information and Term of Authorization tab pages,


select access users whose access permissions are to be set, and set
Authorized Device, Authorization Mode, Cabinet Lock, Start time, and End
time.
– Access Actuator/FusionModule actuator: Select the authorized access
actuator for the user based on the actual requirements. For example,
select Access Actuator1 on the Access Actuator tab.
– Cabinet Lock: Select the E-LOCK or Fingerprint Lock authorized for the
user.
– Term of Authorization: Set Start time and End time.

Figure 6-9 Adding access permissions

NOTE

You can authorize and delete access users in batches.


6. Click OK to complete the task of adding access management settings.
7. The devices added by the new access user are automatically synchronized to
the user. If you add or modify an access actuator or fingerprint reader, you
can manually synchronize access devices.
8. (Optional) On the Authorization Operations tab page, click Synchronize to
Device, select the modified access control devices, and click Start
Synchronization.

Issue 02 (2023-02-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 140
ECC800 Data Center Controller
User Manual (ECC800-Pro V100R023C00) 6 Feature Commissioning

Figure 6-10 Synchronizing access permissions

9. (Optional) When Synchronization Status is Synchronization completed for


the related devices, close the Synchronize Access Permission page.

Step 2 Set the card reader removal alarm.

Set Logical level configuration for reader removed based on the fingerprint
reader configured for the access control system.

● If the access control system uses a Card and password reader, choose
Monitoring > Aisle > Access Actuator Group > Access Actuator n on the
ECC800-Pro WebUI, click Running Parameters, and set Logical level
configuration for reader removed of the corresponding card reader to High
level alarm.

Table 6-13 Setting method

Cable Connection Scenario Setting Method

The card reader with a keypad is Set Logical level configuration for
connected to WG_1 port on the reader 1 removed to High level alarm.
access actuator. Logical level configuration for reader 2
removed remains as Low level alarm.

The card reader with a keypad is Set Logical level configuration for
connected to WG_2 port on the reader 2 removed to High level alarm.
access actuator. Logical level configuration for reader 1
removed remains as Low level alarm.

● If the access control system uses a Card, Card and fingerprint, or Card,
password and fingerprint reader, retain the default value Low level alarm
for Logical level configuration for reader removed.

Step 3 Check the functions of the access control device and access actuator.

Issue 02 (2023-02-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 141
ECC800 Data Center Controller
User Manual (ECC800-Pro V100R023C00) 6 Feature Commissioning

Table 6-14 Function commissioning


Check Method Normal Connection Status

Method 1: Attempt to open the door For method 1: The aisle door is opened
using the configured authentication successfully.
mode. For method 2: After you choose Query
Method 2: On the WebUI, choose > Access Event on the WebUI, you can
Monitoring > Aisle > Access Actuator view the type of this access control
Group > Access Actuator n, and click event.
Controls to open the door remotely.

Step 4 Check the functions of the cabinet electronic lock or fingerprint lock.

Table 6-15 Function commissioning


Device Check Method Normal Connection Status

Cabinet Method 1: Ensure that the For method 1: Swipe an


electronic lock cabinet door is closed, and authorized IC card, press the
attempt to open the door with lower part of the cabinet
an IC card. electronic lock when the green
Method 2: On the WebUI, indicator blinks, and open the
choose Monitoring > Cabinet cabinet electronic lock.
> IT Cabinet n > E-LOCK n, For method 2: After the
and click Controls to open the cabinet electrical lock is
door remotely. remotely opened, press the
Method 3: On the WebUI, lower part of the cabinet
choose Monitoring > Cabinet electronic lock after the green
> IT Cabinet n > E-LOCK n, indicator blinks, and open the
click Running Parameters, cabinet electronic lock. Choose
and set Door open timeout. Query > Access Event on the
WebUI. You can view the type
of this access control event.
Method 3: If the time after the
electronic lock of the cabinet
is opened exceeds the value of
Door open timeout, a Door
open time-out alarm is
generated.

Issue 02 (2023-02-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 142
ECC800 Data Center Controller
User Manual (ECC800-Pro V100R023C00) 6 Feature Commissioning

Device Check Method Normal Connection Status

Fingerprint Method 1: Ensure that the Method 1: Place an IC card or


lock cabinet door is closed, and authorized fingerprint over the
attempt to open the door with fingerprint lock. When the
an IC card or authorized indicator of the fingerprint
fingerprint. lock blinks blue, press the
Method 2: On the WebUI, lower part of the fingerprint
choose Monitoring > Cabinet lock to open it.
> IT Cabinet n > Fingerprint Method 2: When the indicator
Lock n, and click Controls to of the fingerprint lock blinks
open the door remotely. blue after remote unlocking,
Method 3: On the WebUI, press the lower part of the
choose Monitoring > Cabinet fingerprint lock to unlock it.
> IT Cabinet n > Fingerprint Choose Query > Access Event
Lock n, click Running on the WebUI. You can view
Parameters, and set Door the type of this access control
open timeout. event.
Method 3: If the time after the
fingerprint lock is opened
exceeds the value of Door
open timeout, a Door open
time-out alarm is generated.

----End

6.6.6 Commissioning the Exit Button, Skylight Button,


Atmosphere Light, Emergency Button, Magnetic Lock, and
Door Sensor
Procedure
Step 1 Check functions of the exit button.

Table 6-16 Function commissioning


Check Method Normal Connection Status

Attempt to open the door by pressing The aisle door is opened successfully.
the exit button when the aisle door is
closed.

Step 2 Check functions of the skylight button.

Issue 02 (2023-02-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 143
ECC800 Data Center Controller
User Manual (ECC800-Pro V100R023C00) 6 Feature Commissioning

Table 6-17 Function commissioning


Check Method Normal Connection Status

Attempt to open the door by pressing The skylight can be opened manually.
the skylight button when the aisle
door is closed.

Step 3 Check functions of the atmosphere light.

Table 6-18 Function commissioning


Check Method Normal Connection Status

Press the atmosphere The atmosphere light is steady blue.


light button.

Step 4 Check functions of the emergency button.

Table 6-19 Function commissioning


Check Method Normal Connection Follow-up Procedure
Status

Attempt to open the door The aisle door is You need to restore the
by pressing the emergency opened successfully. emergency button.
button when the aisle
door is closed.

Step 5 Check functions of the magnetic lock.

Table 6-20 Function commissioning


Check Method Normal Connection Troubleshooting
Status

When the aisle door is There is no door If a door open alarm is


normally closed, check open alarm on the reported when the door is
whether there is a door ECC800-Pro. closed, relocate the
open alarm on the magnetic lock and magnet
ECC800-Pro. to minimize the deviation
until the door open alarm
is cleared.

Step 6 Check the function of the door sensor.

Issue 02 (2023-02-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 144
ECC800 Data Center Controller
User Manual (ECC800-Pro V100R023C00) 6 Feature Commissioning

Table 6-21 Function commissioning

Check Method Normal Connection Status

Verify that the door sensor is connected to Choose Query > Access Event
the AI/DI Spare port on the FusionModule and check whether there is a
Actuator. Trigger the door sensor when the Door open by sensor event.
aisle door is properly closed.

----End

6.6.7 Commissioning an Emergency Door Release Button

Procedure
Step 1 Check the function of an emergency door release button.

Table 6-22 Function commissioning

Check Method Normal Connection Follow-up Procedure


Status

When the room door is The room door is opened Remove the short-circuit
properly closed, short- properly. cable from the wiring
circuit the wiring terminals NC and COM
terminals NC and COM or NO and COM on the
or NO and COM on the emergency door release
emergency door release button.
button.

----End

6.7 Video Management

6.7.1 Reference Documentation


Before commissioning a camera, prepare the following documents in addition to
this document.

Table 6-23 Commissioning documents

Component Document

C3220-10-SIU Huawei C Series SDC Product Documentation


NOTE
Log in to the technical support website, search for Huawei
C Series SDC Product Documentation, and select the
product documentation of the required version.

Issue 02 (2023-02-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 145
ECC800 Data Center Controller
User Manual (ECC800-Pro V100R023C00) 6 Feature Commissioning

Component Document

IVS1800 IVS1800 Product Documentation


NOTE
Log in to the technical support website, search for IVS1800
Product Documentation, and select the product
documentation of the required version.

iClient iClient S100 User Manual


NOTE
Log in to the HOLOWITS, search for iClient S100, and
download the user manual.

6.7.2 Networking Scenarios

Smart ETH Gateway Networking Scenario


● If there are multiple VCNs or IVS1800s for multiple smart modules, you are
advised to evenly distribute the cameras to each VCN or IVS1800.
● The number of cameras and VCNs or IVS1800s in a single smart module must
be less than 4.

Figure 6-11 Camera + VCN or IVS1800 connecting to the smart ETH gateway

NOTICE

● To ensure the normal operating of the ECC800-Pro, avoid high data traffic, such
as the concurrent display of dynamic monitoring of cameras and VCN or
IVS1800 video playback.
● To ensure the normal operating of ECC800-Pro services, you can view video
from a maximum of two cameras concurrently.

LAN Switch Networking Scenario


If there are multiple VCNs or IVS1800s for multiple smart modules, you are
advised to evenly distribute the cameras to each VCN or IVS1800.

Issue 02 (2023-02-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 146
ECC800 Data Center Controller
User Manual (ECC800-Pro V100R023C00) 6 Feature Commissioning

Figure 6-12 Camera + VCN or IVS1800 connecting to the LAN switch

6.7.3 Commissioning a Camera (LAN Switch Networking


Scenario)

NOTICE

● The parameter setting method varies according to the camera software version.
● This section is for reference only. For details, see the Huawei C series SDC
product documentation of the corresponding version.

6.7.3.1 Commissioning a C3220 Camera

Prerequisites
● If multiple cameras are connected, retain the connection of one camera and
disconnect other cameras. After commissioning the connected camera,
commission other cameras in the same way.
● The camera IP address must be unique and set to the actual value.

Procedure
Step 1 Log in to the camera WebUI.
1. Configure the PC IP address and the camera IP address in the same network
segment. Enter the camera IP address (192.168.0.120 by default) in the
address bar of Microsoft Edge and press Enter.
a. When you open Microsoft Edge for the first time, choose Settings >
Default browser, set Allow sites to be reloaded in Internet Explorer
mode (IE mode) to Allow, restart the browser, go to the Appearance
page, and click Internet Explorer mode (IE mode) button. After the
setting is complete, open Microsoft Edge again, enter the IP address in
the address bar, and click the IE mode button in the upper right corner of
the page to log in. To use the IE mode, click the IE mode button on the
toolbar.

Issue 02 (2023-02-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 147
ECC800 Data Center Controller
User Manual (ECC800-Pro V100R023C00) 6 Feature Commissioning

Figure 6-13 IE mode button

2. Set the password as prompted upon the first login. Then use the new
password to log in.
NOTE

– To prevent security risks, the system prompts you to set the password of the admin
user when you log in to the system for the first time.
– If you enter incorrect passwords for five consecutive times, the account will be
locked for 5 minutes by default.
– To prevent security risks, periodically log in to the system as the admin user, click
the drop-down list in the upper right corner, and click Change Password to change
the administrator password.

Step 2 Commission cameras and set parameters for them. For details, see the delivered
documents.
1. Preview the site situation in real time and check the camera coverage through
videos. Adjust the lens if necessary.
2. On the View tab page, click the Network/Time tab to access the Network/
Time tab page.

Figure 6-14 Setting the IP address

Issue 02 (2023-02-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 148
ECC800 Data Center Controller
User Manual (ECC800-Pro V100R023C00) 6 Feature Commissioning

Table 6-24 IP address parameters


Parameter Description

IPv4 address Method for obtaining the IP address. The options are
assignment Obtain IP address automatically and Use the
following IP address. The default value is Obtain IP
address automatically.

IPv4 address Camera IP address. This parameter is available only


when IPv4 address assignment is set to Use the
following IP address.
Enter the planned IP address, for example,
192.168.1.161. IP addresses starting with 127 are
invalid. You must enter an IP address starting with a
value that ranges from 1 to 223.

IPv4 gateway Gateway IP address of the network where the camera is


located. The default value is 192.168.0.1.

IPv4 subnet Subnet mask of the network where the camera is


mask located. The default value is 255.255.255.0.

Primary DNS Primary DNS IP address. The default value is 0.0.0.0.

Secondary DNS Secondary DNS IP address. The default value is 0.0.0.0.

3. On the View tab page, click the General tab to access the General tab page.
Select Video and set the parameters, as shown in the following figures.

Figure 6-15 Setting primary stream parameters

Issue 02 (2023-02-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 149
ECC800 Data Center Controller
User Manual (ECC800-Pro V100R023C00) 6 Feature Commissioning

Figure 6-16 Setting secondary stream 1 parameters

Table 6-25 Video stream parameters


Parameter Description

Primary stream/ Set the stream type based on the site requirements.
Secondary – Primary stream: The primary streams feature high
stream bit rate, definition, and bandwidth consumption.
They are applicable to local storage.
– Secondary stream: The secondary streams provide
smooth video, occupy small bandwidth, and are
applicable to data transmission over low-bandwidth
networks.
NOTE
SD card recording supports only primary streams.

Intelligent After intelligent encoding is enabled, a camera can


encoding automatically adapt to scenarios to reduce the bit rate
and save the storage space.
A higher intelligent encoding level indicates more
significant reduction of the bit rate, which however may
lead to image quality deterioration.

Issue 02 (2023-02-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 150
ECC800 Data Center Controller
User Manual (ECC800-Pro V100R023C00) 6 Feature Commissioning

Parameter Description

Slice This parameter is available only when you set Encoding


protocol to H.264.
Multi-slice encoding indicates that video streams are
divided into multiple segments. Each segment forms a
slice. The encoding process of each slice is independent
of each other. Therefore, the camera can encode and
decode multiple slices in parallel, improving encoding
and decoding performance. This parameter is selected
by default.

Encoding Set the coding protocol based on the site requirements.


protocol The options are as follows:
– H.264: The H.264 protocol requires relatively small
bandwidth to ensure video quality.
– MJPEG: The MJPEG protocol decodes and displays
each frame independently without referring to the
previous and next frames. This protocol has a small
compression ratio and requires large bandwidth to
ensure video quality. This protocol is suitable for
video editing.
– H.265: The H.265 protocol is bandwidth-conserving
compared with the H.264 protocol.

Encoding The options of H.264 profiles include Base profile, Main


complexity profile, and High profile. Among these profiles, the
baseline profile has the lowest encoding compression
performance and lowest requirements on hardware
decoding performance, while the high profile has the
highest.

Resolution A higher resolution indicates clearer images and higher


bandwidth consumption.

Bit rate type This parameter is available only when you set Encoding
protocol to H.264 or H.265.
The bit rate is measured by data bits transmitted in a
unit of time.
– Variable bit rate: The bit rate varies depending on
the image complexity to ensure the clarity of images
with great dynamic changes. The bit rate is low if the
image is simple or static. The variable bit rate is
recommended.
– Constant bit rate: The constant bit rate remains the
same. The upper limit of the instantaneous bit rate is
set to 110%. If the bit rate is incorrectly configured
for images with great dynamic changes, the images
will be unclear.

Issue 02 (2023-02-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 151
ECC800 Data Center Controller
User Manual (ECC800-Pro V100R023C00) 6 Feature Commissioning

Parameter Description

Max. bit rate This parameter is available only when you set Bit rate
type to Variable bit rate.
The bit rate range depends on the selected resolution.

Bit rate value Average bit rate when Bit rate type is set to Constant
bit rate.
The bit rate range depends on the selected resolution.

Bit rate control This parameter is available only when you set Bit rate
mode type to Constant bit rate. The options are as follows:
– Frame rate priority: Ensure the smoothness of the
video image.
– Image quality priority: Ensure the quality of the
video image.

Frame rate The frame rate is measured by the number of frames


displayed in a second.
A higher frame rate indicates clearer and smoother
images and higher bandwidth consumption.

Image quality This parameter is available only when you set Encoding
protocol to H.264 or H.265 and Bit rate type to
Variable bit rate.
Better image quality requires higher bandwidth.
Therefore, select proper image quality based on the site
requirements.

I-frame interval This parameter is available only when you set Encoding
protocol to H.264 or H.265.
An I frame is an intra-coded frame that represents a
fixed image independent of other picture types. Each
group of pictures (GOP) begins with this type of frame.
A smaller I-frame interval indicates better video quality
and higher bandwidth consumption.

Layered This parameter is available only when you set Encoding


encoding protocol to H.264 or H.265.
To enable layered encoding, select Layered encoding.

JPEG quality This parameter is available only when you set Encoding
protocol to MJPEG.
A larger value indicates higher image quality.

----End

Follow-up Procedure
Commission other cameras by referring to this section.

Issue 02 (2023-02-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 152
ECC800 Data Center Controller
User Manual (ECC800-Pro V100R023C00) 6 Feature Commissioning

6.7.3.2 Commissioning a C3220 Camera (SD Card Configured)

Context
● If the VCN or IVS1800 is not configured and an SD card is chosen, perform the
following procedure.
● The camera IP address must be unique and set to the actual value.

Procedure
Step 1 Log in to the Huawei camera WebUI.
1. Configure the PC IP address and the camera IP address in the same network
segment. Enter the camera IP address (192.168.0.120 by default) in the
address bar of the browser and press Enter.
2. Set the password as prompted upon the first login. Then use the new
password to log in.

Step 2 For details about how to commission the camera and set parameters, see the
documents delivered with the device or the documents obtained by referring to
the "Preparing Documentation" section.
1. Preview the site situation in real time and check the camera coverage through
videos. Adjust the lens if necessary.
2. Set IPv4 address, IPv4 subnet mask, and IPv4 gateway address to the
planned values.

Figure 6-17 Setting the IP address of the camera

3. Format the SD card.


a. Choose Settings > System Configuration > Storage Management.
b. The Storage Management page is displayed. Format the SD card.
4. Set the camera stream type and primary stream parameters. Path: Settings >
Video/Audio/Image > Video Settings.

Issue 02 (2023-02-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 153
ECC800 Data Center Controller
User Manual (ECC800-Pro V100R023C00) 6 Feature Commissioning

Figure 6-18 Setting audio and video parameters

NOTE

If longer-time video storage is required, set camera parameters according to the following
table.

Table 6-26 Camera configuration parameters

Condition Result

Encoding Resolutio Frame I-Frame Minimum Supporte


Protocol n Rate Interval Bit Rate d Video
Required Storage
Duration
(h)

H.265 1080P 25 50 1 Mbit/s 66

H.264 1080P 25 50 1 Mbit/s 66

H.265 720P 25 50 0.8 Mbit/s 75

H.264 720P 25 50 1 Mbit/s 66

H.265 720P 25 50 0.6 Mbit/s 105

Issue 02 (2023-02-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 154
ECC800 Data Center Controller
User Manual (ECC800-Pro V100R023C00) 6 Feature Commissioning

Condition Result

Encoding Resolutio Frame I-Frame Minimum Supporte


Protocol n Rate Interval Bit Rate d Video
Required Storage
Duration
(h)

H.264 720P 25 50 0.8 Mbit/s 75

5. Import the motion detection algorithm package. Search for the algorithm
package SDC-C16_9.0.0.SPC307_beh.zip on the technical support website,
download the package, and decompress it. Go back to the web system,
choose Maintenance > Software-defined Camera, and upload the algorithm
package in the Perimeter firmware area.
6. Choose Settings > Intelligent Analysis > Common Intelligence. Select
Enable, click Add, add motion detection areas, set motion detection
parameters, and click Save.
7. Configure the device alert deployment and alarm linkage policy. Choose
Service > Alarm Service > Alarm Input. Click Intelligent Alarms to access
the Motion page. On the page that is displayed, you can configure Device
Alert Deployment and Alarm Linkage Policy.

Figure 6-19 Configuring the device alert deployment

Figure 6-20 Configuring the alarm linkage policy

----End

Issue 02 (2023-02-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 155
ECC800 Data Center Controller
User Manual (ECC800-Pro V100R023C00) 6 Feature Commissioning

6.7.4 Commissioning a Camera (Smart ETH Gateway


Networking Scenario)

NOTICE

● The parameter setting method varies according to the camera software version.
● This section is for reference only. For details, see the Huawei C series SDC
product documentation of the corresponding version.

6.7.4.1 Commissioning a C3220 Camera

Prerequisites
● If multiple cameras are connected, commission one camera first and then
commission other cameras in the same way.
● The camera IP address must be unique and set to the actual value.
● The camera has connected to the smart ETH gateway and the smart ETH
gateway communicates properly with the ECC800-Pro.
● The camera software version is later than SDC 8.0.RC111.

Context
● Before commissioning the C3220 camera, set the IP address for the C3220
camera based on customer requirements.
● Configure the internal IP addresses of the camera and IVS1800 and the IP
address of the LAN port on the ECC800-Pro in the same network segment.
● Configure the external IP addresses of the camera and IVS1800 and the IP
address of the WAN1 port on the ECC800-Pro in the same network.
● Set the internal and external IP addresses as planned by the customer. The
following IP addresses are for reference only.

Table 6-27 IP address planning

Device Internal IP Address External IP Address

Camera Example: 192.168.248.50; recommended Camera external IP


range: 192.168.248.50–192.168.248.99 address
NOTE NOTE
● The IP address can be manually set to a The 192.168.246.X
value in the range of 192.168.248.50 to network segment
192.168.248.199. cannot be set.

● The ECC800-Pro automatically assigns an


IP address in the range of of
192.168.248.100 to 192.168.248.254.

Issue 02 (2023-02-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 156
ECC800 Data Center Controller
User Manual (ECC800-Pro V100R023C00) 6 Feature Commissioning

Device Internal IP Address External IP Address

IVS1800 Example: 192.168.248.50; recommended IVS1800 external IP


range: 192.168.248.50–192.168.248.99 address
NOTE NOTE
● The IP address can be manually set to a The 192.168.246.X
value in the range of 192.168.248.50 to network segment
192.168.248.199. cannot be set.

● The ECC800-Pro automatically assigns an


IP address in the range of of
192.168.248.100 to 192.168.248.254.

NOTE

The NetEco can access and manage the camera and IVS1800 only when the external IP
addresses of the camera and IVS1800 are in the same network segment as the WAN1 IP
address of the ECC800-Pro.

Procedure
Step 1 Set the IP address for the C3220 camera.
1. Use a network cable to connect the PC to the WAN1 port on the ECC800-Pro.
2. Enter https://192.168.8.10 in the address box of the browser and press Enter
to access the WebUI login page. After login, choose System Settings > Video
Management.
3. (Optional) Click Search.
NOTE

– The search timeout interval is 10s. If the search fails, a search failure message is
displayed.
– To avoid missing cameras, you can perform Search for multiple times.

4. On the found camera record, click and set the external IP address and
related parameters for the camera based on the one allocated by the network
administrator (PC IP address and camera external IP address should be in the
same network segment).
5. Click the link under Link to access and log in to the camera WebUI. Enter the
preset user name admin and the preset password HuaWei123, and click Log
In.

Issue 02 (2023-02-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 157
ECC800 Data Center Controller
User Manual (ECC800-Pro V100R023C00) 6 Feature Commissioning

Figure 6-21 Clicking the camera access link

6. Set the password as prompted upon the first login. Then use the new
password to log in.
NOTE

– To prevent security risks, the system prompts you to set the password of the admin
user when you log in to the system for the first time.
– If you enter incorrect passwords for five consecutive times, the account will be
locked for 5 minutes by default.
– To prevent security risks, periodically log in to the system as the admin user, click
the drop-down list in the upper right corner, and click Change Password to change
the administrator password.
7. Choose Settings > Network > TCP/IP, set Way to obtain IPv4 to Use the
following IP address and set an IPv4 address. The IPv4 address should be in
the range of 192.168.248.50 to 192.168.248.99.

Figure 6-22 Setting the IP address

Step 2 On the ECC800-Pro WebUI, click Add in the lower left corner of Video
Information. In the New Video Information dialog box that is displayed, enter
camera and VCN or IVS1800 information.
● Name: Enter the camera and VCN or IVS1800 names (for example, Camera1).

Issue 02 (2023-02-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 158
ECC800 Data Center Controller
User Manual (ECC800-Pro V100R023C00) 6 Feature Commissioning

● External IP: Enter the external IP address based on the customer's plan.
● Internal IP: Enter the internal IP addresses of the camera and VCN or
IVS1800, for example, 192.168.248.56.

Figure 6-23 Allocated internal IP address of the camera

● Video Type: Select the video type based on the customer's device.
● Link: Enter the external IP address of the camera (for example, https://
external IP address of the camera).
● Change IP camera ONVIF interface access password: The preset password
of ONVIF is HuaWei123, which is different from the web user password. If
you have changed the preset password for accessing the ONVIF interface of
the IP camera, enter the new password in Password. Otherwise, the ECC800-
Pro cannot collect motion detection alarms from the IP camera.

Figure 6-24 Adding video information

Issue 02 (2023-02-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 159
ECC800 Data Center Controller
User Manual (ECC800-Pro V100R023C00) 6 Feature Commissioning

Figure 6-25 Password for accessing the IP camera ONVIF interface

Step 3 After entering the video information, click Confirm.


Step 4 In the Video Information list, click the link under the Link column and go to the
camera WebUI as prompted.
Step 5 For details about how to commission the camera and set parameters, see the
documents delivered with the device or the documents obtained by referring to
the section "Preparing Documentation".
1. Preview the site situation in real time and check the camera coverage through
videos. Adjust the lens if necessary.
2. (Optional) Configure an SD card if the VCN or IVS1800 is not configured.
3. Choose Settings > Video/Audio/Image > Video, and set camera Stream
type, Primary stream, and Secondary stream 1 parameters, as shown in the
following figures.

NOTICE

Set the encoding protocol to H.265.

Issue 02 (2023-02-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 160
ECC800 Data Center Controller
User Manual (ECC800-Pro V100R023C00) 6 Feature Commissioning

Figure 6-26 Setting primary stream parameters

Issue 02 (2023-02-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 161
ECC800 Data Center Controller
User Manual (ECC800-Pro V100R023C00) 6 Feature Commissioning

Figure 6-27 Setting secondary stream 1 parameters

----End

6.7.4.2 Commissioning a C3220 Camera (SD Card Configured)

Context
● If the VCN or IVS1800 is not configured and an SD card is chosen, perform the
following procedure.
● The camera IP address must be unique and set to the actual value.

Procedure
Step 1 Log in to the Huawei camera WebUI.

Step 2 Format the SD card.


1. Choose Settings > System Configuration > Storage Management.
2. The Storage Management page is displayed. Format the SD card.

Step 3 Set the camera stream type and primary stream parameters. Path: Settings >
Video/Audio/Image > Video Settings.

Issue 02 (2023-02-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 162
ECC800 Data Center Controller
User Manual (ECC800-Pro V100R023C00) 6 Feature Commissioning

Figure 6-28 Setting audio and video parameters

NOTE

If longer-time video storage is required, set camera parameters according to the following table.

Table 6-28 Camera configuration parameters

Condition Result

Encoding Resolution Frame I-Frame Minimum Supported


Protocol Rate Interval Bit Rate Video
Required Storage
Duration
(h)

H.265 1080P 25 50 1 Mbit/s 66

H.264 1080P 25 50 1 Mbit/s 66

H.265 720P 25 50 0.8 Mbit/s 75

H.264 720P 25 50 1 Mbit/s 66

H.265 720P 25 50 0.6 Mbit/s 105

Issue 02 (2023-02-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 163
ECC800 Data Center Controller
User Manual (ECC800-Pro V100R023C00) 6 Feature Commissioning

Condition Result

Encoding Resolution Frame I-Frame Minimum Supported


Protocol Rate Interval Bit Rate Video
Required Storage
Duration
(h)

H.264 720P 25 50 0.8 Mbit/s 75

Step 4 Import the motion detection algorithm package. Search for the algorithm package
SDC-C16_9.0.0.SPC307_beh.zip on the technical support website, download the
package, and decompress it. Go back to the web system, choose Maintenance >
Software-defined Camera, and upload the algorithm package in the Perimeter
firmware area.

Step 5 Choose Settings > Intelligent Analysis > Common Intelligence. Select Enable,
click Add, add motion detection areas, set motion detection parameters, and click
Save.

Step 6 Configure the device alert deployment and alarm linkage policy. Choose Service >
Alarm Service > Alarm Input. Click Intelligent Alarms to access the Motion
page. On the page that is displayed, you can configure Device Alert Deployment
and Alarm Linkage Policy.

Figure 6-29 Configuring the device alert deployment

Figure 6-30 Configuring the alarm linkage policy

----End

6.7.5 Commissioning the IVS1800

Issue 02 (2023-02-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 164
ECC800 Data Center Controller
User Manual (ECC800-Pro V100R023C00) 6 Feature Commissioning

6.7.5.1 Setting Parameters on the IVS1800 WebUI

Context
A default IP address has been configured for the IVS1800 before delivery. Modify
the IP address based on the actual network plan.

NOTICE

● The parameter setting method varies according to the IVS1800 software


version.
● This section uses IVS1800 9.1.0 as an example to describe how to set
parameters. For details, see the IVS1800 product documentation of the
corresponding software version.

Procedure
Step 1 Check whether the network connection between the PC for logging in to the OMU
portal and the IVS1800 is normal.

If the device is just delivered or has just been restored to factory settings, ensure
that the PC for logging in to the OMU portal is directly connected to the IVS1800
and is in the same network segment as the IVS1800.

For the device that is just delivered or has just been restored to factory settings, its
network information is as follows:

● IP address: 192.168.3.111
● Subnet mask: 255.255.255.0
● Gateway address: 192.168.3.1

Step 2 Enter https://IP address:8443 in the address box, and press Enter.

In the URL, IP address indicates the IP address of the IVS1800.

Step 3 Log in to the OMU portal. Set the service system and operating system passwords
at the first login.
1. Set the password for user admin of the service system.
2. Set the password for user admin of the operating system.
3. Set the password for user root of the operating system.
4. Use the configured service system password to log in to the OMU portal
again.

Step 4 Configure disk initialization.


NOTE

Recording data can be stored only after you install and initialize the disks.
1. Choose Storage > Disks and click Forcibly Format.
2. Configure disk initialization.

Issue 02 (2023-02-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 165
ECC800 Data Center Controller
User Manual (ECC800-Pro V100R023C00) 6 Feature Commissioning

Figure 6-31 Disk initialization (RAID 5 economical configuration by default)

NOTICE

– If one or two hard disks are configured, select NON-RAID.


– If three or more hard disks are configured, confirm with the product
manager whether to configure the RAID function.

▪ To configure the RAID function, select RAID High Reliability and then
RAID5 Economical.

▪ If the RAID function is not configured, select NON-RAID.

Table 6-29 RAID mode description


Parameter Name Description

RAID High Reliability – RAID5 Recommended


Four or more hard disks are required,
and one hard disk is used as the hot
spare disk.
– RAID5 Economical
Three or more hard disks are
required, and one hard disk is used as
the hot spare disk.

Issue 02 (2023-02-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 166
ECC800 Data Center Controller
User Manual (ECC800-Pro V100R023C00) 6 Feature Commissioning

Parameter Name Description

NON-RAID – Each recording file is stored on only


one hard disk. The disk usage is high,
but the data storage reliability is
lower than that in RAID 5 mode.
– When the number of hard disks is
greater than or equal to 7, the
system automatically uses the three
hard disks with the smallest slot
numbers to form a RAID 1 group, in
which one hard disk functions as the
hot spare disk. Every four of the
remaining hard disks form a RAID 10
group. If the number of remaining
hard disks is less than 4, the disks do
not form a RAID 10 group.

Step 5 Modify the IP address for the IVS1800.


1. Choose System > Network Configuration. Set the service IP address (internal
IP address of the IVS1800), time zone, and time according to the site
requirements.

Figure 6-32 Network adapter settings (single address by default)

NOTE

Set Business IP to XXX.XXX.XXX.XXX, Subnet mask to 255.255.255.0, and Gateway IP


to XXX.XXX.XXX.XXX. The values here are examples. The actual values may vary.

Issue 02 (2023-02-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 167
ECC800 Data Center Controller
User Manual (ECC800-Pro V100R023C00) 6 Feature Commissioning

2. Change the PC IP address to an address in the network segment of the new


IVS1800 IP address, enter the IVS1800 IP address in the address box of the
Internet browser, and log in to the OMU portal system.

Step 6 Configure NAT on the IVS1800.


1. Configure the PUBLIC module.
a. Choose System > Advanced Configuration, set Module to PUBLIC, and
click Search.
b. Click Edit in the record where the value of Parameter Name is NNatIP,
set the external IP address of the IVS1800, and click Save.

Figure 6-33 Setting the external IP address of the module

c. Click Edit in the row where the value of Parameter Name is


IMGUNNatPort, and set the NAT port number of the IMGU. Ensure that
the setting is the same as the NAT mapped port number configured on
the firewall. Click Save.
d. Click Edit in the row where the value of Parameter Name is
NatRtspServerPort, and set the NAT port number of the MU. Ensure that
the setting is the same as the NAT mapped port number configured on
the firewall. Click Save.
e. Click Edit in the row where the value of Parameter Name is
NatRtspTlsServerPort, and set the NAT port number of the MU. Ensure
that the setting is the same as the NAT mapped port number configured
on the firewall. Click Save.

Figure 6-34 Setting the external IP address of the module

2. Set other parameters based on the site requirements by referring to the


preceding steps.

Issue 02 (2023-02-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 168
ECC800 Data Center Controller
User Manual (ECC800-Pro V100R023C00) 6 Feature Commissioning

Table 6-30 Parameter description


Module Parameter Name Setting
Name

PUBLIC NNatIP Northbound IP address of the


IVS1800, which must be the same as
the NAT-mapped IP address
configured on the firewall.

IMGUNNatPort NAT port number of the IVS1800


IMGU, which must be the same as
the NAT-mapped port number
configured on the firewall.
The default port number of the
IMGU before mapping is 9554.

NatRtspServerPort NAT port number of the IVS1800


MU, which must be the same as the
NAT mapped port number
configured on the firewall.
The default port number of the MU
before mapping is 554.

NatRtspTlsServerPort TLS NAT port number of the


IVS1800 MU, which must be the
same as the NAT mapped port
number configured on the firewall.
The default TLS port number of the
MU before mapping is 322.

Step 7 (Optional) Configure the IVS1800 to synchronize time with the NTP server. Choose
System > Time Configuration and configure the server time.

Table 6-31 Parameter description


Parameter Setting

The NTP clock source server Indicates whether the NTP clock
source server is specified for time
synchronization.
● Select Yes if an NTP server is
configured onsite.
● Select No If no NTP server is
configured onsite.

NTP server IP Indicates the IP address of the NTP


clock source server. After this
parameter is specified, the server
synchronizes the time to this clock
source.

Issue 02 (2023-02-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 169
ECC800 Data Center Controller
User Manual (ECC800-Pro V100R023C00) 6 Feature Commissioning

● If an NTP server is configured onsite, synchronize the time with the NTP
server.
● If no NTP server is configured onsite, manually configure the server time:
Change Timezone config and Time config based on the time of the source
server to be synchronized.
Step 8 Configure cameras to synchronize time with the IVS1800.
The camera NTP synchronization function for the server is disabled by default. The
camera NTP synchronization function needs to be enabled for the server that
connects to the camera. After the camera NTP synchronization function is enabled
on the server, cameras will automatically synchronize time with the server.
1. Log in to the OMU portal as user admin.
2. Choose System > Advanced Configuration.
3. Set Module Name to SCU and click Search.
4. In the search results, click Edit in the row where Parameter Name is NTPIPC
and set Value to 1.
5. Click Save. After the camera NTP synchronization function is enabled, the
camera, after being connected to the server, will automatically time-
synchronize with the server.

Figure 6-35 Configuring camera NTP synchronization

Step 9 Create a user.


When connecting to the IVS1800 on the NetEco, you need to log in as a non-
admin user.
1. Log in to the OMU portal as user admin.
2. Choose Users > Manage User > Add User.
NOTE

When creating a user, you can select Enable account validity period and set Valid from
and Valid to to set the account validity period for the created user.
3. Set Multi-point logins to a value greater than 2.
4. On the User List page, click Permission Settings next to the new user, select
the cameras to be browsed and queried, set other parameters, and click Save.
----End

6.7.5.2 Setting Parameters on the iClient S100

Prerequisites
● The network communication between the IVS1800 and the camera is normal.
● The network communication between the PC where the iClient S100 is
installed and the device is normal.

Issue 02 (2023-02-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 170
ECC800 Data Center Controller
User Manual (ECC800-Pro V100R023C00) 6 Feature Commissioning

NOTICE

● The parameter setting method varies according to the software version of the
iClient S100.
● This section uses iClient S100 V2.3.0 as an example to describe how to set
parameters. For details, see the iClient S100 user manual of the corresponding
software version.

Procedure
Step 1 Obtain the client installation package from the HOLOWITS.
1. Register an account, log in to the HOLOWITS (https://www.holowits.com.sg/
documentation), and enter iClient in the search box.
2. Select iClient S100 in the search result and select V2.3.0 to download the
installation package. If the installation package of the required version is
unavailable, download the latest version, install it, and commission the iClient
S100 by referring to the iClient S100 user manual of the required version.
NOTE

– Use your mobile number to register a Huawei Cloud account, complete real-name
authentication, and then log in to the HOLOWITS.
– Before installing the iClient S100, you are advised to disable the antivirus software
installed on your computer or preinstalled on the Windows operating system, to
prevent environment check failures. You can ignore any antivirus software
exception detected during the environment check.
– The check takes a few seconds.

Step 2 Right-click the client installation program and choose Run as administrator from
the shortcut menu. Select a language during the installation and click OK.

Step 3 Select an installation mode (for example, server+client) and click Next.

Two installation modes are available: server+client and client. Choose the
installation mode based on site requirements. For details, see the following table.

Table 6-32 Installation modes

Installation Scenario and Restriction


Mode

Server+Client ● An iClient S100 system requires at least one iClient S100


server.
● When only one client is required for service configuration and
operations, you only need to complete the installation in this
mode.
● In this mode, if you log in to the local iClient S100 server,
enter 127.0.0.1 as the server IP address. If you log in to other
iClient S100 servers, enter the IP address of the peer PC as
the server IP address.

Issue 02 (2023-02-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 171
ECC800 Data Center Controller
User Manual (ECC800-Pro V100R023C00) 6 Feature Commissioning

Installation Scenario and Restriction


Mode

Client ● When configuring services and performing operations on


multiple clients, select the client mode on other computers in
addition to the server+client mode on the local computer.
● Currently, one iClient S100 server can connect to a maximum
of 16 clients (including the one installed on the computer in
server+client mode).
● In this mode, enter the IP address of the iClient S100 server
after logging in, that is, the IP address of the PC where the
existing server is installed.

Step 4 Select I accept this agreement (A) and click Next.


Step 5 Set parameters such as the server port and click Next.
NOTE

● The default values of Web Port and Adms Port are 8098 and 8088 respectively.
If the ports are occupied, manually change the port number. Use a port number that is
not in use and that is not the database port number 5442 or Redis port number 6390,
21, or 80.
● Select Add exception to the firewall to prevent the Windows firewall from blocking
the program.

Step 6 Select the installation directory and click Next.


NOTE

The default installation path is C:\Program Files\iClient S100. You can also click Browse to
specify the installation path. Ensure that the selected installation path has sufficient disk
space as prompted.

Step 7 Select the path for saving the backup files and click Next.
NOTE

By default, the system scans all disks, locates the disk with the largest available space, and
creates the SecurityDBBack folder. You can also click Browse to specify the path for storing
the backup files.

Step 8 Click Install to start the installation.


Step 9 A message is displayed at the end of installation, asking whether to restart the
computer immediately (the default option is Yes). If Yes is selected, after you click
Finish, the computer automatically restarts to complete the installation.
NOTE

After the software is installed, it takes about 2 minutes to start services. Wait until all
services are started and then perform operations.

Step 10 Connect to the iClient S100.


Step 11 Start the client.
● On Windows 7, double-click the iClient S100 icon. The login page is
displayed.

Issue 02 (2023-02-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 172
ECC800 Data Center Controller
User Manual (ECC800-Pro V100R023C00) 6 Feature Commissioning

● On Windows 10, right-click the iClient S100 icon, choose Properties >
Compatibility, select Run as an administrator, and click OK. Then double-
click the iClient S100 icon. The login page is displayed.

Step 12 Log in to the iClient S100.

Figure 6-36 Logging in to the client

Table 6-33 Parameter description

Parameter Description

Chinese/ Select a display language for the iClient S100.


English

User Enter the user name and password of the administrator or a new
Name/ user.
Password For details about how to add a new user, see Comprehensive
Services > Authority Management > Adding a User in iClient
S100 User Manual.
NOTE
● You need to set the password upon the first login.

● Click to clear the password. Hold the mouse button down on


to view the current password.

Remember If you select this option, the password of the user used for the last
password login is saved.

Forgot If you have bound your account to an email address, you can
password retrieve your password using your email address.
For details about how to bind your email address, see
Comprehensive Services > Authority Management > Adding a
User in iClient S100 User Manual.
For details about how to configure the mailbox parameters, see
FAQs > Comprehensive Services > Basic Management > How
Can I Configure Support for Sending Emails? in iClient S100
User Manual.

Issue 02 (2023-02-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 173
ECC800 Data Center Controller
User Manual (ECC800-Pro V100R023C00) 6 Feature Commissioning

Parameter Description

Port Port number


NOTE
The default values of Web Port and Adms Port are 8098 and 8088
respectively.
If the ports are occupied, manually change the port number. Use a port
number that is not in use and that is not the database port number 5442
or Redis port number 6390, 21, or 80.

S100 ● Server+client installation:


Server IP – If a local server is used, the server IP address is the local IP
address 127.0.0.1.
– If you want to log in to another server, enter the IP address
of the PC where the server is located.
● Client installation:
Enter the IP address of the PC where the server to be
connected is located.
CAUTION
Ensure that the PC where the iClient S100 server is installed is started
and the network is normal. Otherwise, service operations on the client
that logs in to the server may fail.

Step 13 On the iClient S100 home page, choose Maintenance Management > Video
Device > Device List.

Step 14 Click Add in the upper right corner. You can select IP Access or Search Access.
The following table describes the parameters on the page of adding a device.

Table 6-34 Adding a device

Parameter/Button Description

Device Type Specifies the type of the device to add (IVS1800).

Name Specifies the device name.

Address Specifies the device address. The format is


xxx.xxx.xxx.xxx, for example, 192.168.1.10.

Port Specifies the device port. The default port number is


18531.

User Name ● You are advised to create a user to access the iClient
S100. For details, see 1.
After configuration, the user can directly access the
iClient S100. The iClient S100 allows the user to
change the password upon the first login.
If the user password is changed on the OMU portal,
right-click the device on the iClient S100, choose Edit
from the shortcut menu, enter the new password,
and log in to the iClient S100 again.

Issue 02 (2023-02-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 174
ECC800 Data Center Controller
User Manual (ECC800-Pro V100R023C00) 6 Feature Commissioning

Parameter/Button Description

Password ● If the default user admin (with a custom password)


logs in to the IVS1800 for the first time, the page for
changing the password is displayed. You are advised
not to use this user to log in to the iClient S100.

Step 15 Add cameras. The following describes the general process. For details, see related
sections in the IVS1800 9.1.0 Product Documentation.
1. On the iClient S100 home page, choose Maintenance Management > Video
Device > Device List > Main Devices.
2. Right-click an IVS1800 and choose Camera Access.
3. Select Auto Batch Access and click Start.
4. Set the IP address segment according to the following table.

Table 6-35 Parameter description

Parameter Setting

Drive Select HWSDK.

IP address Enter the start and end IP addresses of the camera. You are
segment advised to set the IP address segment accurately to minimize
the search time.
– The system supports multiple IP address segments
(including different VLANs).
– If you do not set the IP address segment, only cameras
whose IP addresses are in the same subnet as the IP
address of the local server can be found in the system.

5. Verify the account. Select IP Address, enter the user name and password, click
Batch Verify, and click Next.
NOTE

The user name and password are the ones used for registering the camera with the
HWSDK protocol.
6. Click Finish.

Step 16 Set the camera type.


1. Choose System Management > Devices > Device Management > Micro
Edge.
2. Select an IVS1800.
3. Right-click the camera for which you want to set the intelligent attribute and
choose Configure from the shortcut menu.
4. Choose Video Channel > Video.
5. Set the checkpoint camera type.

----End

Issue 02 (2023-02-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 175
ECC800 Data Center Controller
User Manual (ECC800-Pro V100R023C00) 6 Feature Commissioning

6.8 Linkage Control

6.8.1 FusionModule2000 Linkage Control


Prerequisites
● You have obtained the IP address of the ECC800-Pro as well as the user name
and password used for WebUI login.
● A PC with an IP address in the same subnet as that of the ECC800-Pro is
connected to the ECC800-Pro over the WAN1 port.
● Ensure that Enable linkage control function is set to Yes.

Linkage Grouping

Table 6-36 FusionModule2000 linkage grouping


Linkage Category Default Status Function

● Link smoke alarm on If a smoke alarm is raised, the


with skylight open smart module opens the skylights
● Open door/turn on and door and turns on lights by
lights if smoke default.
alarma

Link smoke alarm with off If this linkage status is set to on


air conditioner off and a smoke alarm is raised, the
smart cooling products shut down
automatically.

Intelligent lightinga off If this linkage status is set to on


and an infrared alarm is raised
when the camera detects human
motion or the door is opened as
authorized, the aisle lights turn on
automatically.

● Link fire control with off If this linkage status is set to on


skylight open and a fire occurs in the smart
● Open door/turn on module, the skylights open, lights
lights by fire turn on, and the door opens
linkagea automatically, or the smart cooling
products shut down automatically.
● Link fire control with
air conditioner off

Issue 02 (2023-02-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 176
ECC800 Data Center Controller
User Manual (ECC800-Pro V100R023C00) 6 Feature Commissioning

Linkage Category Default Status Function

Link high temperature off If this linkage status is set to on,


with skylight open the skylights open automatically
when a high temperature alarm is
raised and all smart cooling
products fail to communicate with
the ECC800-Pro.

High-density open lock off If this linkage status is set to on


if high temperature and Smart module scenario is set
to NE5000E or
FusionModule2000-S, the cabinet
electronic lock is automatically
unlocked when the average
temperature of the cold aisle is
greater than 30°C.
NOTE
Cold aisle temperature = Sum
(Temperatures measured by T/H
sensors with even Modbus addresses,
Temperatures measured by all external
NTCs connected to T/H sensors with
even Modbus addresses)/Quantity of
temperatures

High-density open lock off If this linkage status is set to on


if smoke alarm and Smart module scenario is set
to NE5000E or
FusionModule2000-S, the cabinet
electronic lock is automatically
unlocked when an AI/DI_1 smoke
alarm is generated.

Link video with lighting ● FusionModule This function is not available for
2000 smart the FusionModule2000 smart
module modular data center solution and
solution: off available for the IT data hall
● FusionDC100 module of the FusionDC1000C
0C prefabricated modular data center
prefabricated solution.
modular data
center
solution IT
data hall
module: on

a: To link Open door/turn on lights if smoke alarm, Intelligent lighting,


Open door/turn on lights by fire linkage, and Link video with lighting, set
Set light mode to Automatic on the WebUI. Choose Monitoring > Aisle > AC
Actuator Group > AC Actuator and click Running Parameters.
NOTE
When the FusionModule Actuator is configured, you need to set the parameters in a similar
way.

Issue 02 (2023-02-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 177
ECC800 Data Center Controller
User Manual (ECC800-Pro V100R023C00) 6 Feature Commissioning

6.8.1.1 Fire Control Linkage

Context
● The ECC800-Pro can generate an alarm using the multi-functional sensor or
smoke sensor in the aisle. This alarm, however, cannot be used to trigger the
customer's fire extinguishing system.
● A passive dry contact alarm signal of the customer's fire extinguishing system
can be used to achieve the following purposes: (1) Open the skylight using
the ECC800-Pro AI/DI port, so that the fire extinguishing system in the
customer's equipment room can quickly function in the aisle. (2) Enable the
aisle access control system and turn on the lighting to facilitate escape. (3)
Shut down the smart cooling product and prevent the smart cooling product
from supplying air to increase the fire.
NOTE

An active dry contact signal of the customer's fire extinguishing system cannot be
connected to the ECC800-Pro AI/DI port.
● The default status of fire control linkage is off. Set it based on the actual
situation.
● Shutting down the smart cooling product by fire linkage is used as an
example. Refer to this section for details about opening the skylight,
unlocking the aisle access control, and turning on the lighting system by fire
linkage.
● In this example, the fire controller connects to port AI/DI_3. The actual port
prevails.

Procedure
Step 1 Install cables between the fire controller and ECC800-Pro.

Figure 6-37 Installing cables between the fire controller and ECC800-Pro

Issue 02 (2023-02-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 178
ECC800 Data Center Controller
User Manual (ECC800-Pro V100R023C00) 6 Feature Commissioning

Step 2 Log in to the ECC800-Pro WebUI as an administrator.


Step 3 Choose System Settings > Linkage Control.
Step 4 Ensure that Enable linkage control function is Yes.
Step 5 On the Linkage Group tab page, set Link fire control with air conditioner off to
on.
NOTE

Select Link fire control with air conditioner off under Linkage Group. If its value is on, the
corresponding logic configurations under Linkage Logic List are available. If its value is off, the
corresponding logic configurations under Linkage Logic List are unavailable.

Step 6 Modify the AI/DI_3 signal name.


1. Log in to the ECC800-Pro WebUI as an administrator.
2. Choose System Settings > Signal Name Modify. The Batch Signal
Configuration page is displayed.
3. Set Device type to ECC800, set Device name to ECC800, and click OK.
4. On the query result tab page, set the new signal name of AI/DI_3 to Fire and
click Submit.
Step 7 Enable the AI/DI device.
1. Choose Monitoring > System > ECC800 > Running Parameters > AI/DI_3
Port Settings.
2. Set Fire sensor to Enable. Click Submit to access the AI/DI_3 setting page.
3. Select Fire sensor type and set it to Normal Open or Normal Close as
required.
NOTE

After the corresponding AI/DI device is enabled, the AI/DI device type must be
consistent with the DO state.

Table 6-37 Fire sensor NO and NC definitions


Item Definition

NO Dry contact signal for the fire sensor


abnormality alarm. Closed: alarm;
open: normal

NC Dry contact signal for the fire sensor


abnormality alarm. Closed: normal;
open: alarm

4. Click Submit.

----End

Follow-up Procedure
After the alarm has been cleared when fire control linkage or smoke alarm
linkage occurs, perform the following operations:

Issue 02 (2023-02-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 179
ECC800 Data Center Controller
User Manual (ECC800-Pro V100R023C00) 6 Feature Commissioning

● Close the skylight manually.


● Start the smart cooling products manually.
● After turning off the lights, set Set light mode of the AC actuator to
Automatic. WebUI path: Monitoring > Aisle > AC Actuator Group > AC
Actuator > Running Parameters.
NOTE

When a smart module actuator is configured, you need to set parameters for the
smart module actuator. The setting process is similar.

6.8.1.2 High Temperature Linkage

Context
● The ECC800-Pro implements high temperature linkage. If it detects high
temperature alarms by interacting with multi-functional sensors and all smart
cooling products fail to communicate with the ECC800-Pro, the ECC800-Pro
opens skylights based on the alarm status to facilitate heat dissipation.
● The default status of high temperature linkage is off. Set it based on the
actual situation.

Procedure
Step 1 Log in to the ECC800-Pro WebUI as an administrator.

Step 2 Choose System Settings > Linkage Control.

Step 3 Ensure that Enable linkage control function is Yes.

Step 4 Ensure that Link high temperature with skylight open is in on state on the
Linkage Group tab page.
NOTE

Click Link high temperature with skylight open on the Linkage Group tab page. If it is in on
state, the corresponding logic configurations on the Linkage Logic List tab page are available. If
it is in off state, the corresponding logic configurations on the Linkage Logic List tab page are
unavailable.

----End

Follow-up Procedure
After the alarm is cleared in high temperature linkage, close the skylights
manually.

6.8.1.3 (Optional) Commissioning an Intelligent Aisle Light

Prerequisites
The upstream power input circuit breaker of the AC actuator is turned on.

Issue 02 (2023-02-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 180
ECC800 Data Center Controller
User Manual (ECC800-Pro V100R023C00) 6 Feature Commissioning

Context
After the intelligent aisle lighting is set successfully, perform the following steps:
● After the door is opened using the access control system, the lighting is
turned on.
NOTE

An access control system is involved in the scenario.


● In the smart module aisle, the lighting is turned on when a camera and a
multi-functional sensor detect that someone enters.
● The lighting is turned off when the camera and the multi-functional sensor
fail to detect any person in the aisle within 10 minutes.
NOTE

When using the intelligent lighting function, pay attention to the following:
● If a foreign object is hung on the skylight ceiling of the smart module and when the foreign
object moves, the camera may mistakenly generate a motion detection alarm to change the
lighting status.
● When the human body moves, the camera generates a motion detection alarm and the
lighting is turned on. If the motion amplitude of the human body is small, the camera
cannot generate the motion detection alarm. If the lighting is turned off due to this reason,
wave to the camera and the lighting is turned on again.
● If light greatly changes outside the smart module, the camera may mistakenly generate a
motion detection alarm and the lighting is mistakenly turned on.
● If you manually turn off the lighting when you leave the smart module, the lighting will be
turned on again when the camera detects that the person leaves.
● The effective detection distance of the multi-functional sensor is 2.5 m.

Procedure
Step 1 Log in to the ECC800-Pro WebUI as an administrator.
Step 2 Choose System Settings > Linkage Control.
Step 3 Ensure that Enable linkage control function is set to Yes.
Step 4 On the Linkage Group tab page, set Intelligent lighting to on.
Step 5 Check and configure the wireless networking (802.15.4) function of the AC
actuator.
Before networking, ensure that the ECC800-Pro and AC actuator do not have
network parameters. That is, the RF_Z indicator on the ECC800-Pro blinks green at
super short intervals, and the RF_Z indicator on the AC actuator is steady green.
● If the RF_Z indicator on the ECC800-Pro does not blink green at super short
intervals, press and hold the SW button on the ECC800-Pro for 3 to 5 seconds
to enter the wireless network (802.15.4) pairing state.
● If the RF_Z indicator on the AC actuator is not steady green, hold down the
BLINK button on the AC actuator for more than 10 seconds to make the AC
actuator enter non-networking status.
1. Hold down the BLINK button on the AC actuator for 2 seconds (1–5 seconds
allowed). The RF_Z indicator on the AC actuator turns from steady green to

Issue 02 (2023-02-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 181
ECC800 Data Center Controller
User Manual (ECC800-Pro V100R023C00) 6 Feature Commissioning

blinking green intermittently at super short intervals (blinking at super short


intervals for 0.5 seconds and then off for 0.5 seconds). The component enters
the wireless network search status.
2. After the wireless networking (802.15.4) pairing succeeds, the RF_Z indicator
on the AC actuator starts to blink at long intervals.
3. After all AC actuators are networked, hold down the SW button on the
ECC800-Pro main control module for 3–5 seconds. The RF_Z indicator on the
ECC800-Pro main control modules turns from blinking green at super short
intervals to blinking green at long intervals (blinking at 0.5 Hz, on for 1
second and then off for 1 second). The ECC800-Pro exits the wireless
networking (802.15.4) pairing status.
NOTE

If two or more ECC800-Pro controllers need to be networked in wireless (802.15.4) mode,


only one system can be networked at one time. During the networking, ensure that the
RF_Z indicators on the ECC800-Pro main control modules of other systems are blinking at
long intervals.

Step 6 Set running parameters for the AC actuator.

Table 6-38 Setting AC actuator parameters

Path Operation

Monitoring > Aisle > AC Actuator Set Route 1 Control Mode to Light,
Group > AC Actuator > Running and click Submit.
Parameters
Set Route 2 Control Mode to PAD
Charging, and click Submit.
NOTE
If two AC actuators are configured, you
only need to set Route 2 Control Mode
for one AC actuator.

NOTE

When the FusionModule Actuator is configured, you need to set parameters for the
actuator. The setting process and parameters are similar.

Step 7 Check the functions of the AC actuator.

Table 6-39 Function check

Check Method Normal Connection Status

Path: Monitoring > Aisle > AC Actuator Group > The light is on.
AC Actuator
1. Choose Running Parameters, and set Set
light mode to Manual.
2. Choose Controls, select Light control, select
ON, and click Submit.

Issue 02 (2023-02-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 182
ECC800 Data Center Controller
User Manual (ECC800-Pro V100R023C00) 6 Feature Commissioning

Check Method Normal Connection Status

When the light is normal, set Set light mode to Automatic. Path: Monitoring >
Aisle > AC Actuator Group > AC Actuator. Click Running Parameters.

Step 8 Set camera parameters.


NOTE

● If the camera is connected to the smart ETH gateway, you need to set camera
parameters for intelligent lighting linkage.
● The camera checks whether there are people motions in the aisle and an infrared alarm
is generated. If so, the AC actuator turns on the lights.
● If the IP address of the camera that is automatically connected is the same as the IP
address of the camera that is manually added, the information about the camera that is
manually added is overwritten.
1. Select the actual camera type and go to the camera web page. For details, see
the section about camera commissioning.
2. Choose Settings > Network > Platform Connection > Second Protocol
Parameters. On the ONVIF and GENETEC tab pages, set platform
interconnection parameters.

Figure 6-38 Setting platform connection parameters ONVIF

Figure 6-39 Setting platform connection parameters GENETEC

Issue 02 (2023-02-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 183
ECC800 Data Center Controller
User Manual (ECC800-Pro V100R023C00) 6 Feature Commissioning

3. Choose Settings > Intelligent > Common Intelligence > Motion Detection
> Area Parameters.
4. Select Enable, click Add, add motion detection areas, set motion detection
parameters, and click Save.

Figure 6-40 Setting motion detection parameters

5. If there are multiple cameras, repeat Step 8.1 to Step 8.3.

----End

6.8.1.4 Linking the Smoke Alarm with Skylight Open

Prerequisites
● This section uses the skylight button connecting to the AI/DI_1 port on the
ECC800-Pro as an example.
● A smoke sensor has been connected to the skylight actuator, or a multi-
functional sensor has been connected to the smart ETH gateway.

Context
● If a skylight button is configured, follow the instructions provided in this
section to link the smoke alarm with skylight open.
● The ECC800-Pro supports skylight linkage. When the skylight button is
manually pressed or the smoke sensor detects smoke, a smoke alarm is raised
and the skylight is opened.

Procedure
Step 1 Log in to the ECC800-Pro WebUI as an administrator.

Step 2 Choose Monitoring > System > ECC800 > Running Parameters.

Step 3 Click AI/DI_1 Port Settings, set AI/DI_1 sensor to Enable, and click Submit.

Step 4 Set AI/DI_1 sensor type to Normal open or Normal close and click Submit.

Issue 02 (2023-02-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 184
ECC800 Data Center Controller
User Manual (ECC800-Pro V100R023C00) 6 Feature Commissioning

NOTE

If a skylight button is connected, perform Step 3 and Step 4.

Step 5 Choose Monitoring > Aisle > Skylight Actuator Group > Skylight Actuator 1 >
Running Parameters > DI1 alarm level.
NOTE

When a smart module actuator is configured, you need to set parameters for the smart
module actuator. The setting process is similar.

Step 6 Set DI1 alarm level to Low voltage alarm or High voltage alarm, and click
Submit.
NOTE

● Set DI1 alarm level to Low voltage alarm if the smoke sensor is connected over NO.
● Set DI1 alarm level to High voltage alarm if the smoke sensor is connected over NC.

Step 7 Choose System Settings > Linkage Control.


Step 8 Ensure that Enable linkage control function is Yes.
Step 9 On the Linkage Group tab page, set Link smoke alarm with skylight open to
on.
Step 10 Add a logic program.
NOTE

If a skylight button is connected, perform this step.


1. On the Linkage Group tab page, click the Link smoke alarm with skylight
open entry.
2. On the Linkage Logic List tab page, click Add.
3. Set Linkage Logic List parameters for the Link smoke alarm with skylight
open.

Figure 6-41 Link smoke alarm with skylight open logic

4. Click Submit.
Step 11 Ensure that Link smoke alarm with skylight open on the Linkage Group tab
page is on.
NOTE

Click Link smoke alarm with skylight open on the Linkage Group tab page. If it is in on state,
the corresponding logic configurations on the Linkage Logic List tab page are available. If it is
in off state, the corresponding logic configurations on the Linkage Logic List tab page are
unavailable.

Issue 02 (2023-02-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 185
ECC800 Data Center Controller
User Manual (ECC800-Pro V100R023C00) 6 Feature Commissioning

Step 12 Check the Link smoke alarm with skylight open linkage function.

Table 6-40 Function commissioning


Check Method Expected Result

When the skylight in the aisle is ● Smoke DI alarm is displayed on


closed, press the skylight button to the active alarm page of the app or
open the skylight. WebUI.

Simulate a smoky environment under ● The skylight is opened.


the smoke sensor or the multi-func
sensor.

----End

Follow-up Procedure
After Link smoke alarm with skylight open linkage is triggered and the alarm is
cleared, perform the following operations:
● Press the reset button on the smoke sensor to clear the alarm.
● Close the skylight manually.

6.8.1.5 High-Density Linkage

Prerequisites
Devices related to the high-density scenario have been connected to the ECC800-
Pro.

Context
In high-density scenarios, the system reliability and energy efficiency can be
improved.

Procedure
Step 1 Choose Home > Plan View, click Create smart module, set Layout to Single-row
dual aisle, and set Half-size cabinet qty./row and Room monitoring based on
the actual smart module scenario.

Issue 02 (2023-02-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 186
ECC800 Data Center Controller
User Manual (ECC800-Pro V100R023C00) 6 Feature Commissioning

Figure 6-42 Creating a smart module

Step 2 Click Modify Device. Drag the icons of registered devices and devices on the
cabinet list to appropriate positions in the layout to create a smart module plan
view.
Step 3 Go to the ECC running parameter page, click Unhide All Advanced Signals, and
select Other Parameters. Set Smart module scenario to NE5000E or
FusionModule2000-S and click Submit.

Figure 6-43 Setting the smart module scenario

Step 4 Go to the linkage control page and check that Enable linkage control function is
set to Yes. Set the linkage control signals in the high-density scenario to on.

Issue 02 (2023-02-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 187
ECC800 Data Center Controller
User Manual (ECC800-Pro V100R023C00) 6 Feature Commissioning

Figure 6-44 Setting linkage control in the high-density scenario

Step 5 Modify the AI/DI_1 signal name.


1. Choose System Settings > Signal Name Modify. The Batch Signal
Configuration page is displayed.
2. Set Device type to ECC800, set Device name to ECC800, and click OK.
3. On the query result tab page, set the new signal name of AI/DI_1 to Smoke
and click Submit.

Step 6 Enable the AI/DI device.


1. Choose Monitoring > System > ECC800 > Running Parameters > AI/DI_1
Port Settings.
2. Set Smoke sensor to Enable and click Submit.
3. Confirm that Smoke sensor type is automatically identified as Smoke sensor
or Smoke sensor(NC).
4. Click Unhide All Advanced Signals, and click Power Supply Parameters.
Ensure that III power supply enable(AIDI_1/DO) is set to Enable.

----End

Follow-up Procedure
After the condition for stopping high-density linkage is met, manually close the
cabinet electronic lock.

6.8.2 FusionModule500/800 Linkage Control

Prerequisites
● You have obtained the IP address of the ECC800-Pro as well as the user name
and password used for WebUI login.
● A PC with an IP address in the same subnet as that of the ECC800-Pro is
connected to the ECC800-Pro over the WAN1 port.
● Ensure that Enable linkage control function is set to Yes.

Issue 02 (2023-02-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 188
ECC800 Data Center Controller
User Manual (ECC800-Pro V100R023C00) 6 Feature Commissioning

Linkage Grouping

Table 6-41 FusionModule500/800 linkage grouping


Linkage Defa Function
Category ult
Statu
s

Link air off When this linkage status is set to on:


conditioner If all smart cooling products fail to communicate, and
fault with the aisle temperature is higher than 27°C, the
emergency fan emergency fan starts.
If all smart cooling products fail to provide the cooling
function, and the aisle temperature is higher than
27°C, the emergency fan starts.

Link off When this linkage status is set to on:


emergency ● If all smart cooling products communicate properly
ventilation but do not provide the cooling function, and the
with cabinet average temperature in the cold aisle is greater
electronic clasp than or equal to the preset value (30°C by default),
lock open the rear door of the IT cabinet automatically opens.
● If all smart cooling products fail to communicate,
and the average temperature in the cold aisle is
greater than or equal to the preset value (30°C by
default), the rear door of the IT cabinet
automatically opens.
● If the rear door of the IT cabinet is open and the
average temperature in the cold aisle is higher than
the preset value (35°C by default), the front door
of the IT cabinet automatically opens.
● If at least one smart cooling product is in cooling
mode or the average temperature in the cold aisle
is lower than the preset temperature 28°C, and at
least one cabinet door is open, the ECC800-Pro
reports a critical door open alarm, reminding the
customer to manually close the door. After the
door is closed, the alarm is cleared.
NOTE
● After the IT cabinet door automatically opens, a door
open alarm is displayed on the active alarms page of
the ECC800-Pro.
● In the Linkage Group area, click Link emergency
ventilation with cabinet electronic clasp lock open.
Click to expand the Linkage Logic List. Click
in the Operation column to modify the temperature
setting.

Issue 02 (2023-02-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 189
ECC800 Data Center Controller
User Manual (ECC800-Pro V100R023C00) 6 Feature Commissioning

Linkage Defa Function


Category ult
Statu
s

Link smoke off When this linkage status is set to on:


alarm with ● If a smoke alarm is generated, the rear cabinet
cabinet door is opened.
electronic clasp
lock open ● If the cabinet door is opened, the ECC800-Pro
generates a door open alarm. After the smoke
alarm is cleared, you need to manually close the
door. After the door is closed, the door open alarm
is cleared.
● If the emergency heat dissipation control logic
conflicts with the smoke alarm control logic, the
smoke alarm control logic takes precedence.
NOTE
If the fire extinguishing system is installed inside the
smart module, the linkage function is not enabled.

Link fire off When this linkage status is set to on:


control with ● If a fire alarm (dry contact alarm) is generated, the
cabinet rear door of the IT cabinet is opened.
electronic clasp
lock open ● If the cabinet door is opened, the ECC800-Pro
generates a door open alarm. After the fire alarm
is cleared, you need to manually close the IT
cabinet door. After the door is closed, the door
open alarm is cleared.
● If the emergency heat dissipation control logic
conflicts with the fire linkage control logic, the fire
linkage control logic takes precedence.
NOTE
If the fire extinguishing system is installed inside the
smart module, the linkage function is not enabled.

Issue 02 (2023-02-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 190
ECC800 Data Center Controller
User Manual (ECC800-Pro V100R023C00) 6 Feature Commissioning

Linkage Defa Function


Category ult
Statu
s

High humidity off When this linkage status is set to on:


and low load ● If the module power is less than or equal to 2.5 kW
linkage fan and the cold aisle temperature is less than or equal
dehumidificati to the dew point temperature, the fan
on dehumidification function is enabled.
● If the module power is greater than 3 kW or the
cold aisle temperature is greater than the dew
point temperature plus 1, the fan dehumidification
function is disabled.
NOTE
● Module power = UPS 1 output active power + UPS 2
output active power + ... + UPS n output active power
● Cold aisle temperature = Min (Temperature of the T/H
sensor whose Modbus address is 2, Temperature of
the T/H sensor whose Modbus address is 3,
Temperature of all NTCs connected to the T/H sensor
whose Modbus address is 2, Temperature of all NTCs
connected to the T/H sensor whose Modbus address is
3)
● For details about how to calculate the ambient dew
point temperature, contact technical support.

6.8.2.1 Link Air Conditioner Fault with Emergency Fan

Context
In this example, the NTC connects to port AI/DI_2. The actual port prevails.

Procedure
Step 1 Log in to the ECC800-Pro WebUI as an administrator.
Step 2 Choose System Settings > Linkage Control.
Step 3 Ensure that Enable linkage control function is Yes.
Step 4 On the Linkage Group tab page, set Link air conditioner fault with emergency
fan to on.
NOTE

Select Link air conditioner fault with emergency fan under Linkage Group. If its value is on,
the corresponding logic configurations under Linkage Logic List are available. If its value is off,
the corresponding logic configurations under Linkage Logic List are unavailable.

Step 5 Enable the AI/DI device.


1. Choose Monitoring > System > ECC800 > Running Parameters > AI/DI_2
Port Settings.

Issue 02 (2023-02-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 191
ECC800 Data Center Controller
User Manual (ECC800-Pro V100R023C00) 6 Feature Commissioning

2. Set AI/DI_2 sensor to Enable. Click Submit to access the AI/DI_2 setting
page.
3. Select AI/DI_2 sensor type and set it to NTC.
4. Click Unhide All Advanced Signals, then click Power Supply Parameters.
Ensure that I power supply enable(AIDI_2/COM1/AIDI_4/COM3) is Enable.

----End

6.8.2.2 Link Smoke Alarm with Cabinet Electronic Clasp Lock Open

Context
In this example, the smoke sensor connects to port AI/DI_1. The actual port
prevails.

Procedure
Step 1 Log in to the ECC800-Pro WebUI as an administrator.

Step 2 Choose System Settings > Linkage Control.

Step 3 Ensure that Enable linkage control function is Yes.

Step 4 On the Linkage Group tab page, set Link smoke alarm with Cabinet Electronic
Clasp lock open to on.
NOTE

Select Link smoke alarm with Cabinet Electronic Clasp lock open under Linkage Group. If its
value is on, the corresponding logic configurations under Linkage Logic List are available. If its
value is off, the corresponding logic configurations under Linkage Logic List are unavailable.

Step 5 Modify the AI/DI_1 signal name.


1. Choose System Settings > Signal Name Modify. The Batch Signal
Configuration page is displayed.
2. Set Device type to ECC800, set Device name to ECC800, and click OK.
3. On the query result tab page, set the new signal name of AI/DI_1 to Smoke
and click Submit.

Step 6 Enable the AI/DI device.


1. Choose Monitoring > System > ECC800 > Running Parameters > AI/DI_1
Port Settings.
2. Set AI/DI_1 sensor to Enable. Click Submit to access the AI/DI_1 setting
page.
3. Confirm that Smoke sensor type is automatically identified as Smoke sensor
or Smoke sensor(NC).
4. Click Unhide All Advanced Signals, then click Power Supply Parameters.
Ensure that III power supply enable(AIDI_1/DO) is Enable.

----End

Issue 02 (2023-02-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 192
ECC800 Data Center Controller
User Manual (ECC800-Pro V100R023C00) 6 Feature Commissioning

Follow-up Procedure
After the smoke alarm is cleared, you need to manually close the door. After the
door is closed, the door open alarm is cleared.

6.8.2.3 Link Fire Control with Lock Open

Context
In this example, the fire controller connects to port AI/DI_2. The actual port
prevails.

Procedure
Step 1 Log in to the ECC800-Pro WebUI as an administrator.
Step 2 Choose System Settings > Linkage Control.
Step 3 Ensure that Enable linkage control function is Yes.
Step 4 On the Linkage Group tab page, set Link fire control with Cabinet Electronic
Clasp lock open to on.
NOTE

Select Link fire control with Cabinet Electronic Clasp lock open under Linkage Group. If its
value is on, the corresponding logic configurations under Linkage Logic List are available. If its
value is off, the corresponding logic configurations under Linkage Logic List are unavailable.

Step 5 Modify the AI/DI_2 signal name.


1. Log in to the ECC800-Pro WebUI as an administrator.
2. Choose System Settings > Signal Name Modify. The Batch Signal
Configuration page is displayed.
3. Set Device type to ECC800 and Device name to ECC800, and click OK.
4. On the query result tab page, set the new signal name of AI/DI_2 to Fire and
click Submit.
Step 6 Enable the AI/DI device.
1. Choose Monitoring > System > ECC800 > Running Parameters > AI/DI_2
Port Settings.
2. Set Fire sensor to Enable. Click Submit to access the AI/DI_2 setting page.
3. Select Fire sensor type and set it to Normal Open or Normal Close as
required.
4. Click Unhide All Advanced Signals, then click Power Supply Parameters.
Ensure that I power supply enable(AIDI_2/COM1/AIDI_4/COM3) is Enable.
5. Click Submit.

----End

Follow-up Procedure
After the fire alarm is cleared, you need to manually close the IT cabinet door.
After the door is closed, the door open alarm is cleared.

Issue 02 (2023-02-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 193
ECC800 Data Center Controller
User Manual (ECC800-Pro V100R023C00) 6 Feature Commissioning

6.8.3 Customizing Linkage Logic


Different default linkage logic has been preconfigured for different system types.
To use the default linkage logic, enable the linkage group. If the default linkage
logic does not fit the application scenario, customize the linkage logic as follows.

Context
● This function can be used when the default linkage logic does not fit the
application scenario.
● This section describes how to add the logic for turning on lights when a door
is opened.
– A complete linkage logic consists of input 1, an operator, input 2, and
output. After the calculation of the specified operator is performed on
input 1 and input 2, the corresponding output action can be performed if
the calculation result is true.
– A record of linkage logic must be added to a logical group. Multiple
records of linkage logic can be added to a logical group. Multiple records
of linkage logic in a logical group jointly complete a complex linkage
control.
– Linkage logic terms are described as follows.

Table 6-42 Linkage logic terms


Level-1 Level-2 Description
Category Categor
y

Input 1/ Signal Provides some basic real-time parameters,


Input 2/ status parameters, and alarms as the input
Output data for linkage. Provides some setting
signals for linkage output.

Register For some complex logic, the operation result


needs to be temporarily stored in the register,
or the operation result temporarily stored in
the register may be used as an input of
another logic.

Constan Dedicated for input 2; used when a constant


t needs to be calculated for input 1.

Relay Dedicated for output; can be used to control


the contact status of the DO port on the
board.

Operator AND Both input 1 and input 2 meet requirements.

OR Either input 1 or input 2 meets requirements.

NOT Input 1 is invalid and input 2 is reversed.

Issue 02 (2023-02-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 194
ECC800 Data Center Controller
User Manual (ECC800-Pro V100R023C00) 6 Feature Commissioning

Level-1 Level-2 Description


Category Categor
y

> Input 1 is greater than input 2.


NOTE
Hysteresis indicates that the output action is
delayed to prevent the output action from
changing continuously due to value fluctuation.
For example, if the linkage logic "the air
conditioner starts when the temperature is higher
than 27°C and the hysteresis is 3" is configured,
the air conditioner starts when the temperature is
higher than 27°C and does not start when the
temperature drops to 24°C.

< Input 1 is smaller than input 2.

DELAY Generally, input 2 is a constant. If input 1


meets requirements, the output starts after a
delay (unit: second) of input 2.

FILTER Generally, input 2 is a constant. If input 1


meets requirements, the output starts after a
duration (unit: second) of input 2.

Procedure
Step 1 Log in to the ECC800-Pro WebUI as an administrator.
Step 2 Choose System Settings > Linkage Control.
Step 3 In the Linkage Group area, click Add, enter Turn on lights if door open, and click
OK. A linkage group is added.
Step 4 In the linkage group list, select the new linkage group and click Linkage Logic List
to expand the linkage logic list.
Step 5 In the Linkage Logic List area, click Add, set the linkage logic listed in the
following table, and click Submit.

Table 6-43 Linkage logic 1


Input 1 Operator Input 2 Output

Signal-Access OR Signal- Signal-AC


Actuator Group- FusionModule Actuator Group -
Collection-Door Actuator Group- Turn On Lights
Status Collection-Door
Status

Issue 02 (2023-02-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 195
ECC800 Data Center Controller
User Manual (ECC800-Pro V100R023C00) 6 Feature Commissioning

Figure 6-45 Linkage logic diagram

Step 6 Set Turn on lights if door open to on to make the linkage logic take effect.

----End

Related Tasks
● If the linkage logic in Table 6-43 uses a register, refer to the following
implementation.

Table 6-44 Linkage logic 2

Input 1 Operator Input 2 Output

Signal-Access OR Signal- Register-


Actuator Group- FusionModule Register29
Collection-Door Actuator Group-
Status Collection-Door
Status

Register- AND Constant-1 Signal-AC


Register29 Actuator Group-
Turn On Lights

● If the linkage logic in Table 6-44 is changed to Turn on lights 10s after door
open, refer to the following logic.

Table 6-45 Linkage logic 3

Input 1 Operator Input 2 Output

Signal-Access OR Signal- Register-


Actuator Group- FusionModule Register29
Collection-Door Actuator Group-
Status Collection-Door
Status

Register- DELAY Constant-10 Signal-AC


Register29 Actuator Group-
Turn On Lights

Issue 02 (2023-02-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 196
ECC800 Data Center Controller
User Manual (ECC800-Pro V100R023C00) 6 Feature Commissioning

6.9 Infrared Remote Control Module Control and


Management
In the FusionModule500 scenario, the automatic startup function is added for civil
smart cooling products. The infrared remote control module controls the startup
of smart cooling products through the monitoring module.

6.9.1 Connecting a Communications Cable

Procedure
Step 1 Connect the T/H sensor to the COM1 port on the ECC800-Pro using a network
cable.

Step 2 Connect the infrared remote control module to the T/H sensor using a network
cable.

----End

6.9.2 Setting and Adding an Infrared Remote Control Module

Prerequisites
● The infrared remote control module is connected to the ECC800-Pro, and both
are powered on.
● You have obtained the IP address of the ECC800-Pro as well as the user name
and password for WebUI login.
● A PC with an IP address in the same subnet as that of the ECC800-Pro is
prepared, and the PC is connected to the WAN port on the ECC800-Pro.

Context
After an infrared remote control module is replaced, you need to add the new
infrared remote control module on the ECC800-Pro WebUI.

Procedure
Step 1 Set monitoring parameters for the infrared remote control module.
1. Set the device address to 2 by setting the DIP switch on the infrared remote
control module. Table 6-46 describes how to set the DIP switch.
The DIP switch consists of toggle switches 1–5 (from left to right). Toggle
switches 1–4 specify the address of the infrared remote control module.
Toggle switch 5 specifies the address of the RS485 build-out resistor. 0
indicates OFF and 1 indicates ON. Toggle switch 5 is set to OFF.

Issue 02 (2023-02-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 197
ECC800 Data Center Controller
User Manual (ECC800-Pro V100R023C00) 6 Feature Commissioning

Table 6-46 Setting a device address


Address Toggle Toggle Toggle Toggle
Switch 1 Switch 2 Switch 3 Switch 4

1 ON OFF OFF OFF

2 OFF ON OFF OFF

NOTE

The address of the infrared remote control module is set to 2 by default.

Step 2 Add the infrared remote control module.


1. Log in to the ECC800-Pro WebUI as an administrator.
2. Click Add Device to add the infrared remote control module.

Table 6-47 Parameters for adding an infrared remote control module


Path Parameter Setting

System Device Type Select Infrared remote control module


Settings > from the drop-down list box.
Device
Manageme Connect To Select ECC800 from the drop-down list box.
nt Communicati Select COM1 from the drop-down list box.
ons Port NOTE
Connect the T/H sensor to the COM1 port on the
ECC800-Pro, and cascade the T/H sensor to the
infrared remote control module. If the T/H
sensor is connected to another port, select the
number of the connected port.

Device In this example, Device Address is set to 2.


Address Set the actual device address of the infrared
remote control module during operations.

3. Click Test Connect to check whether the infrared remote control module
connects to the ECC800-Pro properly.
a. If the connection succeeds, click Confirm.
b. If the connection fails, check whether the device is properly connected to
the ECC800-Pro, whether the device and ECC800-Pro are running
properly, and whether the parameter settings are consistent with the
device parameters.

----End

Issue 02 (2023-02-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 198
ECC800 Data Center Controller
User Manual (ECC800-Pro V100R023C00) 6 Feature Commissioning

6.9.3 Control Function of an Infrared Remote Control Module


Prerequisites
● The infrared remote control module is connected to the ECC800-Pro, and both
are powered on.
● You have obtained the IP address of the ECC800-Pro as well as the user name
and password used for WebUI login.
● You have prepared a PC with an IP address in the same network segment as
that of the ECC800-Pro, and the PC is connected to the WAN port on the
ECC800-Pro.

Context
● The infrared remote control module supports self-learning and can remotely
control the startup of the civil smart cooling product.
● The infrared remote control module can be in infrared learning state and
control code sending state. After power-on, the device is in normal operating
mode by default.

Procedure
Step 1 Set functions of the infrared remote control module on the WebUI.
1. Log in to the ECC800-Pro WebUI as an administrator.
2. Choose System Settings > Linkage Control, set Enable linkage control to
Yes, and click Submit. Set Automatic air conditioner startup to On.
3. Choose Monitoring > System > Infrared Remote Control Module.
4. On the Controls tab page, choose Learning the startup instruction, and
click Submit.
5. Direct the remote control of the smart cooling product to the infrared
receiving place on the infrared remote control module, and press the power
button once.
NOTE

If you do not press the button within 20s, the remote control of the smart cooling
product will exit the learning mode due to a timeout. You can click Learning the
startup instruction on the ECC800-Pro WebUI and start the learning mode again.
6. On the Controls tab page, choose Exiting the learning mode, and click
Submit.
7. On the Controls tab page, select Air conditioner startup and click Submit.
The re-authentication page is displayed. Enter Login Password and click
Submit.
8. Check whether the smart cooling product is powered on. If yes, the control
function is enabled. If no, rectify the faults and perform the operation again.

Issue 02 (2023-02-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 199
ECC800 Data Center Controller
User Manual (ECC800-Pro V100R023C00) 6 Feature Commissioning

NOTE

● After you perform Learning the startup instruction on the WebUI, check the indicator
status. If the indicator on the infrared remote control module blinks yellow, it indicates
that the infrared remote control module enters the infrared learning state. If the green
indicator blinks, it indicates learning success of the key code. If the indicator is steady
yellow, it indicates learning failure and you need to rectify the faults and perform
Learning the startup instruction again.
● After you perform Air conditioner startup on the WebUI, check whether the smart
cooling product starts. If it starts, the control function works; if it cannot start, rectify
the fault and perform the preceding steps again.

Step 2 (Optional) Set functions on the infrared remote control module.


1. After the device is powered on, the yellow indicator is steady on, indicating
that the device has not learned the infrared encoding. The green indicator
blinks, indicating that the device has learned the infrared encoding. The
infrared remote control module is in normal operating mode by default.
2. Press the SW button on the infrared remote control module for more than 3s.
Then the indicator blinks yellow and the infrared remote control module
enters learning operating mode.
3. Press the SW button once quickly and the infrared remote control module
enters the waiting state for learning. Direct the remote control of the smart
cooling product to the infrared receiving place on the infrared remote control
module, and press the power button once. If the green indicator blinks, it
indicates learning success of the first key code.
NOTE

The device will quit learning operating mode automatically once finish learning.
4. After the smart cooling product is shut down, direct the infrared remote
control module to the smart cooling product and press the SW button once.
5. Check whether the smart cooling product is powered on. If yes, the control
function is enabled. If no, rectify the faults and perform the operation again.

----End

6.10 PUE Configuration Management


The PUE configuration mode can be set to Standard or User-defined on the
ECC800-Pro WebUI. You can enable the PUE function and select a PUE
configuration mode based on requirements.

NOTE

If the device electrical energy cannot be collected, disable the PUE function for the scenarios
where the PUE calculation condition is not met, for example, the smart cooling product is
powered by the wall-mounted PDB.

Feature Description
● The ECC800-Pro WebUI allows you to customize the settings of the PUE,
energy consumption, instantaneous PUE, and power.
● The ECC800-Pro WebUI allows you to customize the settings of energy
consumption (PUE) and power (instantaneous PUE).

Issue 02 (2023-02-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 200
ECC800 Data Center Controller
User Manual (ECC800-Pro V100R023C00) 6 Feature Commissioning

● The app automatically synchronizes and displays the PUE, energy


consumption, instantaneous PUE, and power calculated on the ECC800-Pro
WebUI.
● The ECC800-Pro connects to the NetEco over a northbound port and
automatically uploads the calculated PUE, energy consumption, instantaneous
PUE, and power to the NetEco.

PUE Calculation Formula

Table 6-48 PUE calculation formula


Configuration PUE Calculation Method
Mode

Standard PUE = Increment in total system input electrical energy/


Increment in total electrical energy of system IT load
output

User-defined PUE = Increment in total active electrical energy of device


(total energy and input/Increment in total electrical energy of IT load output
IT energy)

User-defined (IT PUE = (Increment in total electrical energy of IT load


energy and other output + Increment in total electrical energy of other load
energy) output)/Increment in total electrical energy of IT load
output

User-defined PUE = Increment in total active electric energy of device


(total energy and input/(Increment in total active electric energy of the
other energy) device input – Increment in total electrical energy of other
load output)
NOTE
When the configuration mode is set to Standard, the ECC800-Pro can automatically
calculate the PUE of multiple devices connected in the N+1 and 2N scenarios.

Table 6-49 Instantaneous PUE calculation formula


Configuration Instantaneous PUE Calculation Method
Mode

Standard Instantaneous PUE = Total system input power/Current IT


load power

User-defined Instantaneous PUE = Total system input power/Current IT


(total power and load power
IT power)

User-defined (IT Instantaneous PUE = (Current IT load power + Other load


power and other power)/Current IT load power
power)

Issue 02 (2023-02-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 201
ECC800 Data Center Controller
User Manual (ECC800-Pro V100R023C00) 6 Feature Commissioning

Configuration Instantaneous PUE Calculation Method


Mode

User-defined Instantaneous PUE = Total system input power/(Total


(total power and system input power – Other load power)
other power)
NOTE
When the configuration mode is set to Standard, the ECC800-Pro can automatically
calculate the PUE of multiple devices connected in the N+1 and 2N scenarios.

6.10.1 Configuring PUE Standard Mode


Procedure
Step 1 Log in to the ECC800-Pro WebUI as an administrator.
Step 2 Choose System Settings > PUE Configuration > PUE Configuration .
Step 3 Set PUE function to Enable.
Step 4 Choose System Settings > PUE Configuration > PUE.
Step 5 Set PUE configuration mode to Standard, and click Submit.
Step 6 View the PUE value. Choose Query > Performance Data and select Device for
ECC800 from the drop-down list. For other searching criteria such as Performance
Data, Statistics Mode, Start time, and End Time, select the items based on
requirements and click Query. You can also view the PUE value on the dashboard
or curve chart on the home page.

----End

Example of PUE Calculation


In this example, the PUE is calculated from 17:00 to 18:00.
1. Choose Query > Performance Data.
2. Set Device to ECC800, Performance Data to Total system input electrical
energy, and Statistics Mode to Hour, set other query criteria such as Start
time and End Time as required, and click Query. Record the increment in
total system input electrical energy of the ECC800-Pro. Increment in total
system input electrical energy = 110.0 kWh – 100.0 kWh = 10.0 kWh.

Figure 6-46 Querying the total system input electrical energy

3. Set Device to ECC800, Performance Data to Total electrical energy of


system IT load output, and Statistics Mode to Hour, set other query criteria

Issue 02 (2023-02-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 202
ECC800 Data Center Controller
User Manual (ECC800-Pro V100R023C00) 6 Feature Commissioning

such as Start time and End Time as required, and click Query. Record the
increment in total electrical energy of system IT load output of the ECC800-
Pro. Increment in total electrical energy of system IT load output = 56.0 kWh
– 50.0 kWh = 6.0 kWh.

Figure 6-47 Querying the total electrical energy of system IT load output

4. Calculate the PUE of the smart module. PUE = Increment in total system input
electrical energy/Increment in total electrical energy of system IT load output
= 10.0 kWh/6.0 kWh = 1.67.

6.10.2 Configuring PUE User-defined Mode


Context
This section describes how to configure PUE for the integrated PDU connected.
The following table describes functions of configuration buttons for the PUE user-
defined mode.

Table 6-50 PUE configuration buttons


No. Button Description

1 Add Add new parameters of total energy consumption, IT energy


consumption, or other energy consumption.

2 Delete Delete configured parameters of total energy consumption,


IT energy consumption, or other energy consumption.

NOTE

This section describes how to configure the PUE user-defined mode (total energy and IT
energy). The configuration methods for other user-defined modes are similar. You can
calculate the PUE based on the PUE calculation formula.

Procedure
Step 1 Log in to the ECC800-Pro WebUI as an administrator.
Step 2 Choose System Settings > PUE Configuration > PUE Configuration .
Step 3 Set PUE function to Enable.
Step 4 Choose System Settings > PUE Configuration > PUE.
Step 5 Set PUE configuration mode to User-defined(total energy and IT energy) and
click Submit.

Issue 02 (2023-02-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 203
ECC800 Data Center Controller
User Manual (ECC800-Pro V100R023C00) 6 Feature Commissioning

1. Click Add under the Total Power Consumption Configuration area. On the
Total Power Configuration page, set Device Type to Integrated PDU and
set Device Name accordingly. Under Available Signals, select Total active
electricity energy of PDU input, click to add it to the Selected Signals,
and click Confirm.

Figure 6-48 Total power consumption configuration

2. Click Add under the IT Cabinet Power Consumption Configuration area. On


the IT Cabinet Power Consumption Configuration page, set Device Name
to Integrated PDU1. Under Available Signals, select 1QF4 electricity
energy, 1QF5 electricity energy, and 1QF6 electricity energy, add them to
the Selected Signals, and click Confirm.

Figure 6-49 IT cabinet power consumption configuration

3. Click the edit icon on the right of the Total Power Consumption
Configuration and IT Cabinet Power Consumption Configuration areas.

Issue 02 (2023-02-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 204
ECC800 Data Center Controller
User Manual (ECC800-Pro V100R023C00) 6 Feature Commissioning

Figure 6-50 Editing a multiple

NOTE

● The multiple ranges from 0.01 to 4.99, with two significant digits. The default value is
1.00.
● The multiple is configured for slightly adjusting the calculated PUE, ensuring that the
calculated PUE is as close as possible to the actual PUE.

Step 6 Calculate the PUE of the smart module. PUE = Increment in total system input
electrical energy/Increment in total electrical energy of system IT load output
NOTE

Performance data source: The ECC800-Pro obtains total electricity energy of branches from
the power distribution devices.

Step 7 You can also view the PUE in the dashboard or PUE Chart on the home page.

----End

6.10.3 Viewing the PUE


Procedure
Step 1 Log in to the ECC800-Pro WebUI as an administrator.
Step 2 Choose Home > Plan View to view real-time PUE.

Figure 6-51 Viewing real-time PUE

Step 3 Choose Query > Performance Data to view historical PUE data.
1. Choose Device, Performance data, Start time, End time, and the display
mode (table or curve) of the PUE parameter as required.
2. Click Query.

Issue 02 (2023-02-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 205
ECC800 Data Center Controller
User Manual (ECC800-Pro V100R023C00) 6 Feature Commissioning

NOTE

– The 17:00:00 data includes the data from 17:00:00 to 18:00:00.


– If the query time is between 18:00:00 and 19:00:00 and the time has not arrived at
19:00:00 yet, then the displayed time is 18:00:00 and the data includes the data
from 18:00:00 to the query time.

Figure 6-52 Viewing historical PUE data

----End

6.10.4 Configuring Instantaneous PUE Standard Mode

Procedure
Step 1 Log in to the ECC800-Pro WebUI as an administrator.

Step 2 Choose System Settings > PUE Configuration > PUE Configuration.

Step 3 Set PUE function to Enable.

Step 4 Choose System Settings > PUE Configuration > Instantaneous PUE.

Step 5 Set Instant PUE configuration mode to Standard, and click Submit.

Step 6 Set power supply and distribution parameters for IT devices based on 6.12.1
Configuring Power Management Parameters.

Step 7 View the PUE value. Choose Home > Plan View to view the instantaneous PUE
value on the dashboard on the home page.

----End

Example of Instantaneous PUE Calculation


The integrated UPS is used as an example to describe the calculation method.

1. Perform steps 1–4 to set the standard mode for the instantaneous PUE.
2. Set power supply and distribution parameters for IT cabinets by referring to
step 6.

Issue 02 (2023-02-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 206
ECC800 Data Center Controller
User Manual (ECC800-Pro V100R023C00) 6 Feature Commissioning

3. Choose Monitoring > System > Running Info and view the total system
input power and current IT load power.
4. Assume that the total system input power is 100 kW, and the current IT load
power is 90 kW. According to the instantaneous PUE calculation formula,
instantaneous PUE = Total system input power/Current IT load power =
100/90 = 1.11.

6.10.5 Configuring Instantaneous PUE User-defined Mode


Context
The following table describes functions of configuration buttons for the
instantaneous PUE user-defined mode.

Table 6-51 Configuration buttons for the instantaneous PUE


No. Button Description

1 Add Add new parameters of total power, IT power, or other


power.

2 Delete Delete the configured parameters of total power, IT power, or


other power.

NOTE

This section describes how to configure the instantaneous PUE user-defined mode (total
power and IT power). The configuration methods for other user-defined modes are similar.
You can calculate the instantaneous PUE based on the PUE calculation formula.

Procedure
Step 1 Log in to the ECC800-Pro WebUI as an administrator.
Step 2 Choose System Settings > PUE Configuration > PUE Configuration .
Step 3 Set PUE function to Enable.
Step 4 Choose System Settings > PUE Configuration > Instantaneous PUE.
Step 5 Set Instantaneous PUE configuration mode to User-defined(total power and
IT power) and click Submit.
1. Click Add under the Total Power Configuration area. On the Total Power
Configuration page, set Device Type to Integrated UPS and set Device
Name accordingly. Under Available Signals, select Ph. A output active
power, click to add it to the Selected Signals, and click Confirm.

Issue 02 (2023-02-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 207
ECC800 Data Center Controller
User Manual (ECC800-Pro V100R023C00) 6 Feature Commissioning

Figure 6-53 Total power configuration

2. Click Add under the IT Cabinet Power Configuration area. On the IT


Cabinet Power Configuration page, set Device Name to Integrated UPS.
Under Available Signals, select QF-L1, QF-L2, and QF-L3, add them to the
Selected Signals, and click Confirm.

Figure 6-54 IT cabinet power configuration

3. Click the edit icon on the right of the Total Power Configuration and IT
Cabinet Power Configuration areas.

Figure 6-55 Editing a multiple

Issue 02 (2023-02-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 208
ECC800 Data Center Controller
User Manual (ECC800-Pro V100R023C00) 6 Feature Commissioning

NOTE

● The multiple ranges from 0.01 to 4.99, with two significant digits. The default value is
1.00.
● The multiple is configured for slightly adjusting the calculated PUE, ensuring that the
calculated PUE is as close as possible to the actual PUE.

Step 6 Calculate the instantaneous PUE of the smart module. Instantaneous PUE = Total
system input power/Current IT load power.
Step 7 You can view the instantaneous PUE value on the dashboard of the home page.

----End

6.10.6 Viewing the Instantaneous PUE


Procedure
Step 1 Log in to the ECC800-Pro WebUI as an administrator.
Step 2 Choose Home > Plan View and check whether Instant is displayed on the
dashboard. If so, the value is the instantaneous PUE.

Figure 6-56 Viewing the real-time PUE

NOTICE

The instantaneous PUE is an instantaneous value and no historical statistics are


available. The curve chart displays the PUE value.

----End

Issue 02 (2023-02-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 209
ECC800 Data Center Controller
User Manual (ECC800-Pro V100R023C00) 6 Feature Commissioning

6.11 Asset Management


Figure 6-57 Asset management flowchart

6.11.1 Commissioning the Smart U Space Manager


(Connected to a Rack Environment Unit)

6.11.1.1 Determining the Position of the Smart U Space Manager


If a smart U space manager is installed, perform the following configurations.

Prerequisites
Connect the smart U space manager to the COM1 or COM2 port on the rack
environment unit.

Issue 02 (2023-02-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 210
ECC800 Data Center Controller
User Manual (ECC800-Pro V100R023C00) 6 Feature Commissioning

Procedure
Step 1 Log in to the ECC800-Pro WebUI as an administrator.

Step 2 View the position of the smart U space manager.


1. Choose Monitoring > Cabinet > IT Cabinet > Smart U Space Manager.
2. Select Running Control and click Blink. In the actual environment, you will
see that the smart U space manager blinks to ensure that the device location
in the view is consistent with that in the smart module.

Figure 6-58 Viewing the position of the smart U space manager

----End

6.11.1.2 Querying the U Space Use Information

Prerequisites
● The ECC800-Pro is connected to the NMS that supports asset management.
● The actual assets of the smart module have been allocated.

Procedure
Step 1 Log in to the ECC800-Pro WebUI as an administrator.

Step 2 Choose Home > Plan View to access the Plan View page, where you can create
or modify the views of the smart module. Drag the icon of a registered device or
device in the cabinet list to the planned position to generate the plan view.

Step 3 Choose Monitoring > Cabinet > IT Cabinet n > Smart U Space Manager1, check
U space quantity, U Space Information and so on.

----End

6.11.2 Commissioning the Smart U Space Manager


(Connected to a UIM20A Expansion Module)

Issue 02 (2023-02-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 211
ECC800 Data Center Controller
User Manual (ECC800-Pro V100R023C00) 6 Feature Commissioning

6.11.2.1 Determining the Position of the Smart U Space Manager


If a smart U space manager is installed, perform the following steps to configure
it.

Prerequisites
● Connect the smart U space manager to the COM port on the UIM20A
expansion module.
NOTE

● In a standard scenario, connect a smart U space manager to the COM6/AIDI_6 port


on the UIM20A expansion module.
● In a scenario where one UIM20A expansion module maps to four cabinets, connect
smart U space managers to the COM1/AIDI_1, COM3/AIDI_3, COM5/AIDI_5, and
COM7/AIDI_7 ports on the UIM20A expansion module. If the number of IT cabinets
is not an integer multiple of 4, according to the cable connection rules, leave the
unconnected COM ports on the UIM20A expansion module idle.
● The smart U space manager has been connected to the ECC800-Pro through
automatic discovery.

Procedure
Step 1 Log in to the ECC800-Pro WebUI as an administrator.

Step 2 View the position of the smart U space manager.


1. Choose Monitoring > Cabinet > IT Cabinet n > Smart U Space Manager.
2. Select Running Control and click Blink. In the actual environment, you will
see that the smart U space manager blinks to ensure that the device location
in the view is consistent with that in the smart module.

----End

6.11.2.2 Querying the U Space Use Information

Prerequisites
● The ECC800-Pro is connected to the NMS that supports asset management.
● The actual assets of the smart module have been allocated.

Procedure
Step 1 Log in to the ECC800-Pro WebUI as an administrator.

Step 2 Choose Home > Plan View to access the Plan View page, where you can create
or modify the views of the smart module. Drag the icon of a registered device or
device in the cabinet list to the planned position to generate the plan view.

Step 3 Choose Monitoring > Cabinet > IT Cabinet n > Smart U Space Manager1, check
U space quantity, U Space Information and so on.

----End

Issue 02 (2023-02-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 212
ECC800 Data Center Controller
User Manual (ECC800-Pro V100R023C00) 6 Feature Commissioning

6.12 Power Management

6.12.1 Configuring Power Management Parameters

Prerequisites
● Power distribution devices have been connected to the ECC800-Pro.
NOTE

The following types of power distribution devices are supported: PDU8000, integrated
UPS, integrated PDU, and smart busbar.
● The smart module plan view has been created, and the device positions in the
plan view are consistent with actual positions.

Context
IT cabinets, network cabinets, and smart cooling products support power
management. The ECC800-Pro connected to an IT cabinet is used as an example
in this section.

Procedure
Step 1 Log in to the ECC800-Pro WebUI as an administrator.

Step 2 Choose Home > Plan View > Modify Device and click Apply Power Distribution
Standard Configuration to use the default configuration to configure electricity
for devices in the smart module. The following scenarios support the function of
applying default electricity configuration:
● N+1 scenario: The system has only one PDF and works with one power supply.
● 2N non-isolation scenario: The system has only one PDF and works with dual-
power supply.
● 2N isolation scenario: The system has two PDFs and works with one power
supply.
NOTE

For details about the power distribution solution, see the power distribution wiring diagram
delivered with the product.

Step 3 Click an IT cabinet to access the Basic Configuration page.

Step 4 Check whether the branch information configured on the Power distribution
standard is consistent with the actual situation. Set power configuration
parameters based on site requirements, such as the Device Name, Cabinet
height, Power system, Number of power supplies, and Rated cabinet power.
NOTE

The settings in the following table are used as examples to describe the basic configuration.

Issue 02 (2023-02-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 213
ECC800 Data Center Controller
User Manual (ECC800-Pro V100R023C00) 6 Feature Commissioning

Table 6-52 Basic configuration


Parameter Setting Description

Device Name IT Cabinet Set based on the actual device


101 name.

Cabinet height 42 U space quantity of the


cabinet

Cabinet width 600 Width of the cabinet

Power Power system Single-phase Set single-phase or three-


Distribution phase based on the actual
Parameter power supply.
Settings
Number of 2 rPDU quantity
power
supplies

Rated cabinet 6.00 Set based on the actual rated


power power of the cabinet.

rPDU-A01 PDU80001 > Select a power distribution


1QF1(L1) device and power distribution
branch for the rPDU
numbered rPDU-A01 in the
cabinet.

rPDU-B01 PDU80001 > Select a power distribution


2QF1(L1) device and power distribution
branch for the rPDU
numbered rPDU-B01 in the
cabinet.

Branch auto-fill mode ● Ascending ● Ascending order: If the


order branch for the first cabinet
● Descendin is 1QF1(L1), 2QF1(L1), the
g order branches for subsequent
cabinets are 1QF2(L2),
2QF2(L2), and the like.
● Descending order: If the
branch for the first cabinet
is 1QF10(L1), 2QF10(L1),
the branches for
subsequent cabinets are
1QF9(L3), 2QF9(L3), and
the like.

Issue 02 (2023-02-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 214
ECC800 Data Center Controller
User Manual (ECC800-Pro V100R023C00) 6 Feature Commissioning

Figure 6-59 Power configuration

NOTE

● If Apply to all cabinets is selected, all other cabinets use this configuration.
● If Clear the power distribution configuration of all cabinets is selected, the power
distribution configuration of all cabinets will be cleared.

Step 5 Click Finish after checking that electricity has been configured for all IT cabinets,
network cabinets, and smart cooling products.
Step 6 Click Exit Edit Mode to exit the view editing page of the smart module.
Step 7 Choose Monitoring > Cabinet, and set Cabinet load factor overhigh alarm
threshold (default value: 90) on the Running Parameters page.
When the cabinet load rate in the smart module is greater than the value of
Cabinet load factor overhigh alarm threshold, an alarm is generated.

Issue 02 (2023-02-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 215
ECC800 Data Center Controller
User Manual (ECC800-Pro V100R023C00) 6 Feature Commissioning

NOTE

The alarm hysteresis is 5% by default. That is, if the cabinet load factor overhigh alarm
threshold is 90%, the raised alarm will be cleared when the load factor drops to a value smaller
than 85%.

----End

6.12.2 Setting Fault Isolation Parameters

Context
● Smart rPDU high temperature disconnection: Whenever the ECC800-Pro
detects excessive high temperature of an rPDU branch, it disconnects the
entire rPDU to protect the IT devices. Then the rPDU branch fault information
is displayed in the power supply and distribution link diagram.
● Smart rPDU overcurrent disconnection: Whenever the ECC800-Pro detects
overcurrent of an rPDU branch, it disconnects the rPDU of this branch to
protect the IT devices. Then the rPDU branch fault information is displayed in
the power supply and distribution link diagram.
NOTE

A non-intelligent rPDU does not have the fault isolation function.

Procedure
Step 1 Set the Smart rPDU auto disconnection parameters.
1. Choose Monitoring > Cabinet > Running Parameters and click Smart
Distribution Information.
2. Set rPDU auto close enable to Enabled.
3. If the user has no special requirements, choose Monitoring > Cabinet > IT
Cabinet > rPDU > Running Parameters and retain the default value of
Branch Auto Close Current Parameter.

----End

6.12.3 Viewing the Power Usage

Prerequisites
Power distribution devices have been connected to the ECC800-Pro.

Procedure
Step 1 View the power information on the ECC800-Pro WebUI.
1. Log in to the ECC800-Pro WebUI as an administrator.
2. Choose Monitoring > Cabinet to access the Electricity Information in Each
Cabinet page.
3. View the power usage information about each cabinet, such as the Current
Power (kW), Power Consumption (kWh), and Load Percentage (%).

Issue 02 (2023-02-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 216
ECC800 Data Center Controller
User Manual (ECC800-Pro V100R023C00) 6 Feature Commissioning

4. Choose Monitoring > System. In the Power Information area on the


Running Info tab page, you can view the power information about the smart
module.
5. Choose Home > Plan View. In the PUE area, you can view the transient
mPUE.
NOTE

– Transient mPUE = Total input power/Total IT power of the smart module. For example,
if a PDU8000 with the total input power of 5 kW connects to the smart module, whose
total IT power is 3.6 kW, the transient mPUE = 5 kW/3.6 kW = 1.39.
– If the power management is not configured, the PUE area in Plan View displays the
average PUE.
– Instant is displayed for an instantaneous mPUE.

Step 2 View the power information on the ECC800-Pro app.


1. Connect the PAD to the WiFi network of the corresponding ECC800-Pro in the
room.
2. Log in to the ECC800-Pro app as the administrator.
3. Choose Home > Power to view the proportion of used power for each
cabinet.
4. Choose Home > Resource > Power to view the real-time power and rated
power for the entire smart module as well as the real-time power for each
cabinet, and check whether the used power exceeds the alarm threshold.

----End

6.12.4 Viewing the Power Supply Links Diagram


Procedure
Step 1 Connect the PAD to the WiFi network of the ECC800-Pro in the room.
Step 2 Log in to the ECC800-Pro app as the administrator.
Step 3 View the power supply status of the smart module and basic information about
each device in real time to quickly locate faults.

Issue 02 (2023-02-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 217
ECC800 Data Center Controller
User Manual (ECC800-Pro V100R023C00) 6 Feature Commissioning

Figure 6-60 Power supply links

Table 6-53 Specifications of the power supply links diagram


Item Specifications

1 Two AC inputs for IT cabinets

2 Two AC inputs for smart cooling products

3 Tap to view the IT cabinets connected in real time.

4 IT cabinet (tap to view the cabinet name, current power, and status)
● Yellow: The cabinet has an alarm. Tap to view the alarm.
● Blue: The cabinet is running properly.
● Gray: The cabinet is not running.

5 rPDU
● Yellow: smart rPDU (Click to view the rPDU number, current, and
status)
● Blue or green: non-smart rPDU

6 Branch switch

7 SPD switch

Issue 02 (2023-02-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 218
ECC800 Data Center Controller
User Manual (ECC800-Pro V100R023C00) 6 Feature Commissioning

Item Specifications

8 SPD

9 Main switch

----End

6.13 Cooling Capacity Management

6.13.1 (Optional) Setting iCooling Parameters


Working Principle of the iCooling Function
The iCooling function applies to air cooled smart cooling products in the
FusionModule2000 scenario. The function of iCooling linkage is to enable smart
cooling products to quickly respond to load changes and implement on-demand
cooling. Multiple smart cooling products in a smart module and the indoor and
outdoor units of a smart cooling product can be regulated to achieve optimal
energy efficiency without hotspots.
● iCooling disabled
– For the cold aisle containment in the smart module, all IT cabinets use
the cooling capacity in the cold aisle and the temperatures inside the cold
aisle are unevenly distributed due to the uneven air flow.
– The cooling requirements of the IT cabinets can be met and partial hot
spots can be avoided only if the cooling capacity provided by the smart
cooling product matches the heat load of the corresponding IT cabinets.
● iCooling enabled
– The cold aisle is divided into multiple areas according to the smart
cooling product positions. The cooling capacity from any smart cooling
product in the areas can meet the temperature requirements of the IT
cabinets because the temperature unevenness is relatively low.
– The smart cooling products in each area quickly respond to load changes
in the areas and are regulated to achieve optimal energy efficiency.

Prerequisites for the iCooling Function


Before setting the iCooling function, the following requirements must be met:
● Determine the installation position for the cabinet temperature sensor in strict
accordance with the requirements in the installation guide.
● After installing the cabinet equipment, use filler panels to seal the vacant U
space.
● The smart module plan view has been created. The positions of devices in the
smart module plan view must be the same as their actual locations.
● All smart cooling products in the smart module need to be networked for
teamwork. For details about how to configure teamwork networking, see the

Issue 02 (2023-02-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 219
ECC800 Data Center Controller
User Manual (ECC800-Pro V100R023C00) 6 Feature Commissioning

smart cooling product user manual of the corresponding model. One smart
module has only one group. In this group, communication between the slave
and master units as well as communication between the master unit and the
ECC800-Pro is normal.
● The WebUI displays the Enable iCooling page only for smart cooling products
that support the iCooling function.
● The scenario is dual-row cold aisle containment and the following conditions
are met:
– Smart cooling product should be placed face to face.
– The smart module is configured with an integrated UPS or integrated
PDU. Electricity has been configured for IT cabinets, network cabinets,
and smart cooling products. The ECC800-Pro collects statistics on IT
branch power information, which is mapped to IT cabinets and network
cabinets.
– Rack environment units or UIM20A expansion module and cabinet-level
temperature sensors are installed for IT cabinets or network cabinets. The
ECC800-Pro can monitor the temperature of each cabinet.
– At least one cold-aisle temperature and humidity sensor is installed for
each smart cooling product, and each smart cooling product can detect
the sensor readings.

Procedure
Step 1 Log in to the ECC800-Pro WebUI as an administrator.
Step 2 If the iCooling function needs to be used, choose Monitoring > Cooling >
Running Parameters. On the iCooling parameter setting page, set Enable
iCooling to Yes and click Submit to finish the iCooling function setting.
Step 3 Set the iCooling temperature set point and humidity setpoint according to the
actual environment.

Figure 6-61 Setting the temperature and humidity setpoints

Issue 02 (2023-02-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 220
ECC800 Data Center Controller
User Manual (ECC800-Pro V100R023C00) 6 Feature Commissioning

NOTE

● When iCooling is enabled, smart cooling products enter the iCooling teamwork control
mode.
● The temperature and humidity refer to the values at the air intake vents of the IT
cabinets.
● After iCooling linkage is enabled, if the preceding conditions are not met, the smart
cooling product automatically exits the iCooling teamwork mode and enters the
standalone mode. To view Team work status, choose Monitoring > Cooling >
NetCol5000 > Running Info > Status Information.
● When iCooling is enabled, the T/H threshold can only be set on the ECC800-Pro WebUI.
● When iCooling is disabled, smart cooling products enter the intelligent teamwork
control mode (teamwork control of smart cooling products).

Step 4 Choose Monitoring > Cooling > Running Parameters to access the Temperature
and Humidity Parameters page. Check whether Temperature and humidity
control type is Cold-aisle.

----End

6.13.2 Viewing Cooling Capacity Usage Information

Prerequisites
Smart cooling products have been connected to the ECC800-Pro.

Procedure
Step 1 Connect the PAD to the WiFi network of the corresponding ECC800-Pro in the
room.

Step 2 Log in to the ECC800-Pro app as the administrator.

Step 3 Choose Home > Temp.. The view displays the temperature distribution map of
each cabinet.

Step 4 Choose Home > Resource Consump > Cooling, view the real-time cooling
capacity and maximum cooling capacity of the smart module as well as the real-
time cooling capacity of each cabinet, and check whether the cooling capacity
exceeds the alarm threshold.

----End

6.13.3 Viewing the Cooling Links Diagram

Context
When the air cooled smart cooling products are connected to the ECC800-Pro, you
can view the cooling link diagram.

Procedure
Step 1 Log in to the ECC800-Pro WebUI as an administrator.

Issue 02 (2023-02-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 221
ECC800 Data Center Controller
User Manual (ECC800-Pro V100R023C00) 6 Feature Commissioning

Step 2 Choose Monitoring > Cooling > Running Parameters to access the Running
Parameters page. Set Number of redundant smart cooling products and Local
yearly highest temperature as required and tap Submit.

Figure 6-62 Setting running parameters

Step 3 Use the PAD to connect to the WiFi network of the ECC800-Pro in the room.
Step 4 Log in to the ECC800-Pro app as the administrator.
Step 5 View the cooling distribution information.

Figure 6-63 Cooling links diagram

Table 6-54 Specifications of the cooling links diagram


No. Specifications

1 Air outlet temperature of the smart cooling product

2 Return air temperature of the smart cooling product

3 Smart cooling product status


● Blue: The smart cooling product is running.
● Gray: The smart cooling product is not running.

Issue 02 (2023-02-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 222
ECC800 Data Center Controller
User Manual (ECC800-Pro V100R023C00) 6 Feature Commissioning

No. Specifications

4 Alarm status (The alarm icon is displayed based on the alarm severity
of the smart cooling product. You can tap the smart cooling product to
view the alarm.)

5 Temperature and humidity inside the aisle

Step 6 Tap the corresponding smart cooling product to check the operating status and
working mode of each component in the smart cooling product.

Figure 6-64 Links for a single smart cooling product

Table 6-55 Specifications of the link diagram for a single smart cooling product

Item Specifications

1 Smart cooling product appearance

2 Alarm (tap to view specific alarms)

3 Internal fan

4 Condensate pipe (yellow: high temperature)

5 Return air temperature and humidity of the smart cooling product

6 Refrigerant status

7 Air outlet temperature of the smart cooling product

----End

6.13.4 Setting the Temperature Map


If the temperature map function is configured, follow the instructions provided in
this section to commission it.

Issue 02 (2023-02-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 223
ECC800 Data Center Controller
User Manual (ECC800-Pro V100R023C00) 6 Feature Commissioning

Prerequisites
1. Cables to the NTC and T/H sensors have been connected.

Figure 6-65 Wiring diagram for the temperature map function

(1) UIM20A expansion (2) T/H sensor (3) Temperature sensor


module

NOTE

● Sensors NTC1 to NTC6 are installed in the following positions of the cabinet
respectively: upper part of the front door, middle part of the front door, lower part
of the front door, upper part of the rear door, middle part of the rear door, and
lower part of the rear door.
● A maximum of eight T/H sensors can be cascaded to each COM port.
● A T/H sensor can be connected only to the COM1, COM3, COM5, or COM7 port on
the UIM20A expansion module.

Context
The BOM number of T/H sensors is 02311FQG or 02312PBL.

Procedure
Step 1 Set the T/H sensor device address.

Set the T/H sensor device address through the DIP switch on the T/H sensor.

Toggle switches 1–6 are used to set device addresses, toggle switch 7 is reserved,
and toggle switch 8 is used to switch the temperature unit.

Issue 02 (2023-02-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 224
ECC800 Data Center Controller
User Manual (ECC800-Pro V100R023C00) 6 Feature Commissioning

Device addresses are set in binary coding format in the range of 1–63. The first bit
is the least significant bit, and the sixth bit is the most significant bit. ON indicates
1, and OFF indicates 0.

Figure 6-66 T/H sensor DIP switch

NOTE

● In the smart module view on the ECC800-Pro WebUI, cabinets are arranged from left to
right and from top to bottom according to T/H sensor addresses 1 to 8.
● Each COM port on the UIM20A expansion module allows a maximum of eight T/H
sensors to be cascaded. Each UIM20A expansion module supports a maximum of 32 T/H
sensors.
● The addresses of the T/H sensors connected to the same COM port must be different.
Addresses 1 to 8 are supported. The addresses of UIM20A expansion modules connected
to different COM ports can be the same. In actual configuration, bind sensors to the
corresponding cabinets in sequence.
● If the number of IT cabinets connected to the smart module is greater than 32, two
UIMs are required. Each UIM must be placed in the first cabinet of the corresponding IT
cabinets. The cable connection principles are the same.
● Set the T/H sensor addresses onsite based on the layout in the smart module view.

Step 2 Add the T/H sensor.


1. Log in to the ECC800-Pro WebUI as an administrator.
2. Add the T/H sensor.
Choose System Settings > Device Management and click Auto Discover
Device to add the T/H sensor. The device connection information is displayed.

Figure 6-67 Device connection

Step 3 Bind the T/H sensor to the cabinet referring to 6.3 Commissioning a UIM20A
Expansion Module.

Issue 02 (2023-02-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 225
ECC800 Data Center Controller
User Manual (ECC800-Pro V100R023C00) 6 Feature Commissioning

Step 4 Check functions of the T/H sensor.

Table 6-56 Function commissioning


Check Method Normal Connection Status

Check the running Choose Monitoring > Cabinet > IT Cabinet n > T/H
information about the Sensor n > Running Info, and check the current T/H
T/H sensor on the and NTC information of the cabinet.
WebUI.

Set T/H sensor alarm Choose Monitoring > Cabinet > IT Cabinet n > T/H
thresholds. Sensor n > Running Parameters, and set High
temperature alarm threshold, Low temperature
alarm threshold, High humidity alarm threshold, and
Low humidity alarm threshold as required.
NOTE
The default values of High temperature alarm threshold,
Low temperature alarm threshold, High humidity alarm
threshold, and Low humidity alarm threshold are 30.0°C,
5.0°C, 85.0% RH, and 15.0% RH, respectively.

----End

6.14 Facial Recognition

6.14.1 Recording Facial Data


Procedure
1. Log in to the ECC800-Pro app as the administrator.

2. On the main screen of the app, tap . On the displayed Edit page, select
Face Account Management. After reading the message, tap OK.
3. Click Add to start recording facial data.
NOTE

The facial data is used only for configuring the facial recognition function and is not
used for other purposes. The facial data is encrypted during transmission to ensure
that the personal data of users is fully protected.

Issue 02 (2023-02-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 226
ECC800 Data Center Controller
User Manual (ECC800-Pro V100R023C00) 6 Feature Commissioning

Figure 6-68 Recording facial data

Table 6-57 Facial data to be recorded


Item Function

1 Tap this icon to start recording facial data.

2 Select the access actuator associated with the facial data.

3 Select the user associated with the facial data.

4. Tap OK.

6.14.2 Collecting and Importing Facial Data in Offline Mode

Context
You can collect facial data and import the collected facial data to other devices in
offline mode for facial recognition.

Procedure
Step 1 Collect facial data in offline mode.
1. Log in to the ECC800-Pro app as the administrator.
2. On the login screen of the app, tap Settings and select Face Info Collection
to collect facial data.
3. In the Face Info Collection dialog box, set Please enter nickname and
Please enter encryption password for the facial data, and tap OK.

Issue 02 (2023-02-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 227
ECC800 Data Center Controller
User Manual (ECC800-Pro V100R023C00) 6 Feature Commissioning

4. The Message dialog box displays Success and the path for storing facial data.
5. Tap Cancel to complete data collection, or tap Share to share the collected
data to other devices.

Step 2 Import facial data in offline mode.


1. Log in to the ECC800-Pro app as the administrator.

2. On the main screen of the app, tap to go to the Settings screen.


Select Face Account Management, read the message, and tap OK. The Face
Account Management screen is displayed.
3. Tap Add to go to the Add screen.
4. Tap Import and select the facial file that has been collected.
5. In the Message dialog box, enter the encryption password of the facial file.
6. Tap OK. The facial data is recorded.

Step 3 Associate the facial data.


1. Select an access actuator and a user to associate with the facial data.
2. Tap OK.

----End

6.14.3 Opening the Access Control System Using Facial


Recognition

Prerequisites
Facial data has been recorded and bound to the access actuator.

Procedure
Method 1: When you open the access control system for the first time, tap

on the ECC800-Pro app login screen and align the face with the
green circle on the screen. After facial recognition is successful, log in to the app
as an administrator to open the access control system at the same time.

NOTE

After you log in to the system using facial recognition, the system uses facial recognition
for user authentication the next time by default.

Method 2: Tap in the upper-left corner of the ECC800-Pro app


home screen and align the face with the green circle on the screen. After facial
recognition is successful, log in to the app as an administrator to open the access
control system at the same time.

Issue 02 (2023-02-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 228
ECC800 Data Center Controller
User Manual (ECC800-Pro V100R023C00) 6 Feature Commissioning

6.14.4 Maintaining the Facial Data


Prerequisites
The facial data has been recorded.

Procedure
Step 1 Use the PAD to connect to the WiFi network of the ECC800-Pro in the room.
Step 2 Log in to the ECC800-Pro app as the administrator.

Step 3 On the app home screen, tap . On the displayed Settings screen, select Face
Account Management.

Table 6-58 Facial recognition management functions


Operation Purpose

Modify the access actuator associated


Tap . with the user.

Delete the facial data.


Tap .

Step 4 Tap OK.

----End

6.15 Remote Management

6.15.1 NetEco Management


Two NetEco management systems can be connected at the same time. This
section uses NetEco 1 as an example.

6.15.1.1 Connecting a Communications Cable

Networking Through the WAN Port


Step 1 Connect the communications cable to the WAN1 port on the ECC800-Pro.

Issue 02 (2023-02-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 229
ECC800 Data Center Controller
User Manual (ECC800-Pro V100R023C00) 6 Feature Commissioning

Figure 6-69 Connecting a communications cable

----End

4G Networking
4G communication can be used to access the NetEco management system that
has a public IP address.

Step 1 Loosen the screws on both sides of the panel of the ECC800-Pro main control
module.
Step 2 Pull the handles on both sides of the panel of the ECC800-Pro main control
module to remove the module.

Figure 6-70 Removing the ECC800-Pro main control module

Step 3 Install the SIM card.


NOTE

The monthly traffic of the SIM card is not less than the total traffic of all networked
devices. It is recommended that the monthly traffic of the SIM card be greater than or
equal to the total number of networked devices multiplied by 20 MB.

Step 4 Insert the ECC800-Pro main control module into the slot.
Step 5 Tighten the screws on both sides of the panel of the ECC800-Pro main control
module.
Step 6 Install a 4G antenna.

Issue 02 (2023-02-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 230
ECC800 Data Center Controller
User Manual (ECC800-Pro V100R023C00) 6 Feature Commissioning

Figure 6-71 Installing a 4G antenna

----End

6.15.1.2 Setting NetEco Parameters

Context
Choose System Settings > Service Management and check that the status of
Network Service is Start.

Procedure
Step 1 Apply for a fixed IP address or management system domain name/DNS server
address from the network administrator of the equipment room.

Step 2 Set ECC800-Pro communications parameters.


● (WAN port networking) On the ECC800-Pro WebUI, set the IP address, subnet
mask, and default gateway, and click Submit.

Table 6-59 IP parameters

Path Parameter Default Value Setting

System Settings IP address – WAN_1: Set this


> System 192.168.8.10 parameter based
Parameters > – WAN_2: on the IP address
Monitor IP > 192.168.0.10 assigned by the
WAN_n network
administrator.

Subnet mask 255.255.255.0 Set this


parameter based
on the subnet
mask assigned
by the network
administrator.

Issue 02 (2023-02-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 231
ECC800 Data Center Controller
User Manual (ECC800-Pro V100R023C00) 6 Feature Commissioning

Path Parameter Default Value Setting

Default gateway – WAN_1: Set this


192.168.8.1 parameter based
– WAN_2: on the default
192.168.0.1 gateway address
assigned by the
network
administrator.

● (4G networking) Set mobile data parameters on the ECC800-Pro WebUI.

Table 6-60 Mobile data


Path Parameter Default Value Setting

Choose System Mobile data Disable Set this


Settings > control parameter to
System Enable and click
Parameters > Submit.
Mobile Data.

Step 3 Set management system communications parameters on the ECC800-Pro WebUI.


NOTE

● If two NetEco management systems are connected at the same time, choose System
Settings > NMS Application > Select NetEco > NetEco Name and select NetEco2
Enable.
● The address type among management system parameters can be IPv4 or domain name.
– If the address type is set to IPv4, refer to Table 6-61.
– If the address type is set to the domain name, refer to Table 6-62.

Table 6-61 Management system parameters (IPv4)


Path Parameter Default Value Setting

System Settings Cloud service Disable Set whether to


> NMS access connect to the
Application > iManager-M
NetEco > based on site
NetEco1 requirements.
Communication ● Disable: Not
Parameters connect to the
iManager-M.
● Enable:
Connect to the
iManager-M.

Issue 02 (2023-02-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 232
ECC800 Data Center Controller
User Manual (ECC800-Pro V100R023C00) 6 Feature Commissioning

Path Parameter Default Value Setting

Server IP 192.168.8.11 IP address of the


primary
management
system server
NOTE
The management
system IP address
and the ECC800-
Pro IP address
must be
configured in the
same network to
ensure normal
connection
between the
management
system and the
ECC800-Pro.

Standby server IP 192.168.0.1 Set this parameter


NOTE to the IP address
This parameter is of the standby
displayed when management
Enable standby system server.
server IP next to
Server IP is
selected.

Port number 31220 31220

Issue 02 (2023-02-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 233
ECC800 Data Center Controller
User Manual (ECC800-Pro V100R023C00) 6 Feature Commissioning

Path Parameter Default Value Setting

Network port for WAN_1 ● WAN_1:


link setup Connects to
the
management
system over
the WAN1
port.
● WAN_2:
Connects to
the
management
system over
the WAN2
port.
● WAN_1/
WAN_2: Both
the WAN1 and
WAN2 ports
are connected
to the
management
system. The
WAN1 or
WAN2 port is
automatically
selected based
on the real-
time network
connection.
NOTE
If this
parameter is
set to WAN_1/
WAN_2, the IP
address for
connecting to
the
management
system is not
fixed.
Therefore, the
IP address is
displayed as
0.0.0.0,
indicating auto
adaptation.
● 4G: Connects
to the
management
system
through 4G

Issue 02 (2023-02-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 234
ECC800 Data Center Controller
User Manual (ECC800-Pro V100R023C00) 6 Feature Commissioning

Path Parameter Default Value Setting

communication
.

Table 6-62 Management system parameters (domain name)


Path Parameter Default Value Setting

System Settings Cloud service Disable Set whether to


> NMS access connect to the
Application > iManager-M
NetEco > based on site
NetEco1 requirements.
Communication ● Disable: Not
Parameters connect to the
iManager-M.
● Enable:
Connect to the
iManager-M.

NetEco domain dcim.opowercloud Domain name of


name .huawei.com the management
system

Port number 31220 31220

Issue 02 (2023-02-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 235
ECC800 Data Center Controller
User Manual (ECC800-Pro V100R023C00) 6 Feature Commissioning

Path Parameter Default Value Setting

Network port for WAN_1 ● WAN_1:


link setup Connects to
the
management
system over
the WAN1
port.
● WAN_2:
Connects to
the
management
system over
the WAN2
port.
● WAN_1/
WAN_2: Both
the WAN1 and
WAN2 ports
are connected
to the
management
system. The
WAN1 or
WAN2 port is
automatically
selected based
on the real-
time network
connection.
NOTE
If this
parameter is
set to WAN_1/
WAN_2, the IP
address for
connecting to
the
management
system is not
fixed.
Therefore, the
IP address is
displayed as
0.0.0.0,
indicating auto
adaptation.
● 4G: Connects
to the
management
system through
4G

Issue 02 (2023-02-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 236
ECC800 Data Center Controller
User Manual (ECC800-Pro V100R023C00) 6 Feature Commissioning

Path Parameter Default Value Setting

communication
.
NOTICE
If Cloud service
access is set to
Enable, set
Network port for
link setup to
WAN_1 or 4G
based on the
access mode.

System Settings Primary DNS 192.168.8.10 Preferred IP


> System server address of the
Parameters > DNS server
Monitor IP > DNS
server IP Secondary DNS 192.168.8.9 Standby IP
server address of the
DNS server

Step 4 Set the authentication password on the ECC800-Pro WebUI.

Table 6-63 Setting the authentication password

Path Parameter Default Value Setting

System Settings Authentication Modifyme_123 Set this parameter


> NMS password based on
Application > customer
NetEco > Set requirements.
NetEco1 NOTE
Authentication Requirements for
Password setting passwords:
a–z, A–Z, 0–9, ~!
@#^*_={}:,./?-`
$ (8–32 characters
that include at
least three of the
following types:
digits, lowercase
letters, uppercase
letters, and special
characters)

Confirm – –
authentication
password

Step 5 Click Submit.

----End

Issue 02 (2023-02-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 237
ECC800 Data Center Controller
User Manual (ECC800-Pro V100R023C00) 6 Feature Commissioning

6.15.1.3 Creating an ECC800-Pro on the NetEco

Prerequisites
● You have logged in to the NetEco client by web browser.
● You have created a smart module in Data Center Planning.

Context
For detailed operations, see iMaster NetEco Device Installation and Commissioning
Guide of the corresponding version.

Procedure
1. Log in to the NetEco client.
2. On the main menu, choose Device Management > Configuration >
Planning Configuration.
3. Choose the smart module where you want to create a device from the
navigation tree on the left.

4. Click in the upper-left corner of the toolbar.


5. Click Access in the Operation column. The Device Integration dialog box is
displayed.
6. In the Device Integration dialog box, add the ECC800 to the specified smart
module.

Figure 6-72 Adding an ECC800-Pro device to the smart module

Issue 02 (2023-02-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 238
ECC800 Data Center Controller
User Manual (ECC800-Pro V100R023C00) 6 Feature Commissioning

NOTE

Click OK, and you can view the task information, including Type, Device Name,
Management Domain, Progress, Status, Start Time, End Time, and Detailed
Information in the displayed window.

6.15.1.4 Setting the Transparent Transmission Function

Context
● Using the transparent transmission function, the NMS can directly manage
southbound components that are not monitored by the ECC800-Pro.
● In this example, the COM2 port of the ECC800-Pro is used for transparent
transmission.

Procedure
Step 1 Log in to the ECC800-Pro WebUI as an administrator.
Step 2 Choose System Settings > NMS Application > Transparent Transmission
Channel.
Step 3 Set COM2(Port:3212) to Enable and click Submit.

Figure 6-73 Transparent transmission channel

Table 6-64 Mapping between ECC800-Pro ports and port numbers


COM Port COM1 COM2 COM3 COM4

Port Number 3211 3212 3213 3214

If a device is connected to a COM port on the UIM20A expansion module or


PDU2000M, the port number is displayed on the WebUI after transparent
transmission is enabled for the COM port and the configuration is saved. For
example, the port number of COM1 on UIM1 is 3215 in Figure 6-73.

Issue 02 (2023-02-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 239
ECC800 Data Center Controller
User Manual (ECC800-Pro V100R023C00) 6 Feature Commissioning

NOTICE

● An ECC800-Pro can connect to a maximum of four UIM20A expansion modules


with the transparent transmission function.
● A UIM20A expansion module provides a maximum of eight COM ports with the
transparent transmission function.
● Each PDU2000M provides a maximum of four COM ports for transparent
transmission.
● Devices that support transparent transmission can be connected using the
UIM20A expansion module or PDU2000M. The UIM20A and PDU2000M cannot
coexist in transparent transmission scenarios.

● If the port is set for the first time, you are prompted to set an authentication
password. On the Set Authentication Password tab page, set
Authentication password and Confirm authentication password and click
Submit.
NOTE

Enable security Authentication is set to Enable by default. If so, an authentication


password must be set. If Enable security Authentication is set to Disable, there is no
need to set an authentication password but this is risky.
● If the port has been used, you will be prompted that the transparent
transmission function cannot be enabled and you need to select an idle port.

Step 4 Log in to the NetEco WebUI as an administrator.

Step 5 Choose Device Management > Configuration > Planning Configuration.

Step 6 Choose the management domain where you want to create a device from the
navigation tree on the left.
NOTE

● Ensure that the ECC800-Pro connected to the device has been synchronized to the
NetEco.
● Ensure that the management domain to add the device is the management domain or
sub-management domain of the ECC800-Pro.

Step 7 (Optional) If the management domain is a rack, click the management domain
and choose Design under . The page for adding a device is displayed.
Otherwise, skip this step.

Step 8 In the lower-left corner of the page, click the Device tab.

Step 9 In the Device area, select Sensor from the drop-down list box.

In this example, a Polymer temperature and humidity (T/H) sensor is added in the
equipment room of the root node. Select the device to be added and drag its icon
to the management domain.

Step 10 Click the device. In the device parameter area on the right, set device parameters.
● IP Address indicates the ECC800-Pro login IP address.
● Port indicates the ECC800-Pro COM2 port (3212).

Issue 02 (2023-02-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 240
ECC800 Data Center Controller
User Manual (ECC800-Pro V100R023C00) 6 Feature Commissioning

● Device Address indicates the Polymer T/H sensor address.

Step 11 Click on the toolbar to save the device information.


Step 12 On the main menu, choose Device Management > Configuration > Device
Integration.
Step 13 In the navigation tree on the left, choose Transparent Transmission Channel
Management.
Step 14 Click Modify after selecting the IP address of the ECC800-Pro connected to the
NMS.
Step 15 In the Modify dialog box, set Connection Mode.

Table 6-65 Connection modes


Connection Mode Description

Compatible ● On the ECC800-Pro WebUI, set Enable Security


Authentication to Disable.
● In transparent transmission channel management
settings, the compatibility mode has security
risks. You are advised to select the security
protocol mode.

Security protocol Enter the authentication password set on the


ECC800-Pro WebUI.

Step 16 After the setting is complete, click OK.

----End

6.15.2 Third-party NMS Management (over SNMP)

6.15.2.1 Connecting a Communications Cable

Procedure
Step 1 Connect a communications cable to the WAN1 port on the ECC800-Pro.

Figure 6-74 Connecting a communications cable

----End

Issue 02 (2023-02-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 241
ECC800 Data Center Controller
User Manual (ECC800-Pro V100R023C00) 6 Feature Commissioning

6.15.2.2 Setting SNMP Management Parameters

Prerequisites
Before setting SNMP parameters, obtain the information listed as follows from the
NMS.

Table 6-66 Information obtained from the NMS


Item Default Description
Value

SNMP version SNMPv3 SNMP version and port number used by the
ECC800-Pro and NMS. The SNMP versions
SNMP port number 161 include SNMPv1, SNMPv2c, and SNMPv3.

● Read community - If you use SNMPv1 or SNMPv2c, enter the


name read and write community names that comply
● Write with the NMS. Otherwise, the ECC800-Pro will
community not connect to the NMS. The read community
name name must be different from the write
community name.

● User name - To enhance the security, you need a user


● MD5/SHA name and password for authentication if you
password use SNMPv3. After the authentication
succeeds, the ECC800-Pro can communicate
● DES/AES with the NMS.
password

Trap target address - IP address of the NMS server.

Trap port 162 Port defined by the user.

Context
● SNMPv3 parameters should be set before connecting the ECC800-Pro to the
NMS. These parameters are required for setting up the ECC800-Pro on the
NMS.
● SNMPv1 and SNMPv2c are insecure. Therefore, SNMPv3 is recommended.
This section uses SNMPv3 as an example.

Procedure
Step 1 Apply to the equipment room network administrator for a fixed IP address.
Step 2 Set the IP address, subnet mask, and default gateway on the ECC800-Pro WebUI.

Issue 02 (2023-02-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 242
ECC800 Data Center Controller
User Manual (ECC800-Pro V100R023C00) 6 Feature Commissioning

Table 6-67 IP parameters


Path Parameter Default Setting
Value

System IP 192.168.8.1 Set this parameter based on the IP


Settings > 0 address assigned by the network
System administrator.
Parameter
s> Subnet 255.255.25 Set this parameter based on the
Monitor IP mask 5.0 subnet mask assigned by the network
> WAN_1 administrator.

Default 192.168.8.1 Set this parameter based on the


gateway default gateway address assigned by
the network administrator.

Step 3 Set SNMP parameters.


1. Choose System Settings > NMS Application > SNMP.
2. Set SNMP Version to SNMPv3 and set SNMP port number to the required
port number or retain its default value 161.
3. Click Submit under SNMP.
4. Click Add under SNMPv3.
5. Set User name, set Authentication protocol to SHA or MD5, set Privacy
protocol to AES or DES, and specify MD5/SHA password, Confirm MD5/SHA
password, DES/AES password, and Confirm DES/AES password.
NOTE

– Set User name, MD5/SHA password, and DES/AES password to any character
strings that meet the system requirements. Note that MD5/SHA password and
DES/AES password must be set to different values. Record the settings.
– MD5 and DES are insecure protocols. Therefore, you are advised to set
Authentication protocol to SHA or set Privacy protocol to AES.
6. Set Password validity period and Advance expiration notification (days).
7. After setting the parameters, click Confirm.
8. Click Add under SNMP Trap.
9. Set Trap target address and Trap port, set SNMP version to SNMPv3, and
specify SNMPv3 user name. Set Trap target address to the IP address of the
NMS server and set Trap port to the port defined by the user.
10. After setting the parameters, click Confirm.
11. Click Export in the Mib File pane, export the MIB file, and send it to the
development engineers of the NMS.

----End

Issue 02 (2023-02-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 243
ECC800 Data Center Controller
User Manual (ECC800-Pro V100R023C00) 6 Feature Commissioning

6.15.3 Management on a Third-Party NMS and the NetEco

Context
This section describes the configuration required if dual NMSs are used for
management. In this example, an SNMP-based NMS is connected to the WAN1
port and the NetEco is connected to the WAN2 port.

6.15.3.1 Connecting Communications Cables


Step 1 Connect network cables to the WAN1 and WAN2 ports on the ECC800-Pro.
NOTE

● If dual NMSs are used for management, connect the NetEco and an SNMP-based third-
party NMS to the WAN1 and WAN2 ports, respectively. Users then can access the
respective management systems through the ports.
● Two SNMP-based NMSs cannot be connected to the WAN1 and WAN2 ports at the
same time.
● Connect the WAN1 port to the NetEco or an SNMP-based NMS based on the actual
scenario.
● The dual-NMS function is supported only in SmartDC V100R021C10SPC210 and later
versions.

Figure 6-75 Connecting communications cables

----End

6.15.3.2 Configuring Dual MAC Addresses and a Static Route

Context
● The ECC800-Pro can be accessed through two WAN ports. By default, the
MAC addresses of the WAN1 and WAN2 ports are the same. The ECC800-Pro
also provides a method for resetting the MAC address of the WAN2 port to
ensure that the MAC addresses of the WAN1 and WAN2 ports are different.
● The WAN1 port of the ECC800-Pro supports cross-route communication. By
default, the WAN2 port supports only straight-through communication. The
ECC800-Pro allows you to configure a static route for the WAN2 port to
support cross-route communication.

Issue 02 (2023-02-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 244
ECC800 Data Center Controller
User Manual (ECC800-Pro V100R023C00) 6 Feature Commissioning

Procedure
Step 1 Log in to the ECC800-Pro WebUI as an administrator.
Step 2 Choose Monitoring > System > ECC800 > Controls > Reset WAN2 network
adapter.
Step 3 Click Submit.

Figure 6-76 Resetting the WAN2 network adapter

NOTE

There is a low probability that the random algorithm causes the MAC address conflict
between the WAN1 and WAN2 ports. If the conflict occurs, you need to reset the WAN2
network adapter.

Step 4 Choose System Settings > System Parameters > Monitor IP.
Step 5 (Optional) In the Static Route Configuration area, enter the WAN2 destination
address and click Submit.
NOTE

● Static Route Configuration is used only for cross-route data communication of the
WAN2 port.
● After the ECC800-Pro is restarted or the WAN2 network adapter is reset, the WAN2
static route address is not affected.
● Incorrect static route configuration may cause a network interruption. Configure the
static route under the guidance of professional network engineers.

Issue 02 (2023-02-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 245
ECC800 Data Center Controller
User Manual (ECC800-Pro V100R023C00) 6 Feature Commissioning

Figure 6-77 Static route configuration for the WAN2 port

----End

6.15.3.3 Setting NetEco Parameters and SNMP Parameters

Context
● This section describes how to configure dual NMSs if the WAN1 port is
connected to an SNMP-based third-party NMS and the WAN2 port is
connected to the NetEco.
● Choose System Settings > Service Management and check that the status of
Network Service is Start.
● Before connecting the ECC800-Pro to a third-party NMS, you need to set
SNMP parameters, which are required for creating the ECC800-Pro on the
NMS.
● SNMPv1 and SNMPv2c are insecure. Therefore, SNMPv3 is recommended.
This section uses SNMPv3 as an example.
NOTE

The WAN2 port does not support cross-route access to an SNMP-based third-party
NMS.

Procedure
Step 1 Log in to the ECC800-Pro WebUI as an administrator.
Step 2 Set the IP address, subnet mask, and default gateway for the WAN2 port on the
ECC800-Pro WebUI.

Issue 02 (2023-02-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 246
ECC800 Data Center Controller
User Manual (ECC800-Pro V100R023C00) 6 Feature Commissioning

Table 6-68 IP parameters


Path Param Default Value Setting
eter

System IP ● WAN_2: 192.168.0.10 Set this parameter


Settings > based on the IP
System address assigned by
Parameter the network
s> administrator.
Monitor IP
> WAN_2 Subnet ● WAN_2: 255.255.255.0 Set this parameter
mask based on the subnet
mask assigned by the
network administrator.

Default ● WAN_2: 192.168.0.1 Set this parameter


gatewa based on the default
y gateway address
assigned by the
network administrator.

Step 3 Set the NetEco communication parameters and authentication password on the
ECC800-Pro WebUI.

Table 6-69 NetEco parameters


Path Parameter Default Setting
Value

System Cloud service Disable Set whether to connect to the


Settings > access iManager-M based on site
NMS requirements.
Application ● Disable: Not connect to the
> NetEco > iManager-M.
NetEco1
Communicat ● Enable: Connect to the
ion iManager-M.
Parameters Server IP 192.168.8.1 IP address of the primary NetEco
1 server
NOTE
The NetEco IP address and the
ECC800-Pro IP address must be
configured in the same network to
ensure normal connection between
the NetEco and the ECC800-Pro.

Standby 192.168.0.1 Set an IP address for the standby


server IP NetEco server.

Port number 31220 31220

Issue 02 (2023-02-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 247
ECC800 Data Center Controller
User Manual (ECC800-Pro V100R023C00) 6 Feature Commissioning

Path Parameter Default Setting


Value

Network port WAN_1 WAN_2: Connects to the NetEco


for link setup using the WAN2 port.
NOTE
When the WAN1 port is used to
connect to the NetEco, select WAN_1
as the network port for link setup.

Table 6-70 Setting the authentication password


Path Parameter Default Setting
Value

System Authenticatio Modifyme Set this parameter based on


Settings > n password _123 customer requirements.
NMS NOTE
Application Requirements for setting passwords:
> NetEco > a–z, A–Z, 0–9, ~!@#^*_={}:,./?-`$ (8–32
Set characters that include at least three
of the following types: digits,
Authenticati
lowercase letters, uppercase letters,
on Password and special characters)

Confirm - -
authenticatio
n password

Step 4 Click Submit.


Step 5 Create the ECC800-Pro and configure the transparent transmission function on the
NetEco by referring to 6.15.1.3 Creating an ECC800-Pro on the NetEco and
6.15.1.4 Setting the Transparent Transmission Function.
Step 6 Set the IP address, subnet mask, and default gateway for the WAN1 port on the
ECC800-Pro WebUI.

Table 6-71 IP
Path Parameter Default Setting
Value

System IP 192.168.8.1 Set this parameter based on the IP


Settings > 0 address assigned by the network
System administrator.
Parameter
s> Subnet 255.255.255 Set this parameter based on the
Monitor IP mask .0 subnet mask assigned by the network
> WAN_1 administrator.

Issue 02 (2023-02-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 248
ECC800 Data Center Controller
User Manual (ECC800-Pro V100R023C00) 6 Feature Commissioning

Path Parameter Default Setting


Value

Default 192.168.8.1 Set this parameter based on the


gateway default gateway address assigned by
the network administrator.

Step 7 Set SNMP parameters.


1. Choose System Settings > NMS Application > SNMP.
2. Set SNMP Version to SNMPv3 and set SNMP port number to the required
port number or retain its default value 161.
3. Click Submit under SNMP.
4. Click Add under SNMPv3.
5. Set User Name, set Authentication Protocol to SHA or MD5, set Privacy
Protocol to AES or DES, and specify MD5/SHA password, Confirm MD5/SHA
password, DES/AES password, and Confirm DES/AES password.
6. Set Password validity period and Advance Warning Before Password
Expires.
7. After setting the parameters, click Confirm.
8. Click Add under SNMP Trap.
9. Set Trap Target Address to the IP address of the NMS server, Trap Port to the
port defined by the user, and SNMP Version to SNMPv3, and specify
SNMPv3 User Name.
10. After setting the parameters, click Confirm.
11. Click Export in the Mib File pane, export the MIB file, and send it to the
development engineers of the NMS.

----End

6.16 Setting Other Parameters and Channel Security


Choose Monitoring > System > ECC800 > Running Parameters > Unhide All
Advanced Signals > Other Parameters.

Table 6-72 Other parameters

Signal Signal Value Description


Name

Synchronize Enable/Disable Whether to synchronize the


system time system time to devices that
to device support time synchronization.
After this function is enabled, the
ECC synchronizes time parameters
to devices that support time
synchronization every 4 hours.

Issue 02 (2023-02-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 249
ECC800 Data Center Controller
User Manual (ECC800-Pro V100R023C00) 6 Feature Commissioning

Signal Signal Value Description


Name

Communicat Displayed/Not displayed Indicates whether to display the


ion port communication port status of the
status access actuator, skylight actuator,
FusionModule Actuator, and multi-
functional sensor.

Alarm Enable/Disable Indicates whether to use the alarm


convergence convergence function. After this
enable function is enabled, only root
alarms are reported.

Key update 30–1095 days Set the interval for automatically


interval updating the key.

SNMP Enable/Disable Indicates whether to use the


SNMP communication port.

Transparent Enable/Disable Indicates whether to use the


transmission transparent transmission channel
channel port port.

SSH Enable/Disable Indicates whether to enable login


to the ECC over SSH.

Cascading Enable/Disable Indicates whether to use the


port cascading port.

Smart Others/NE5000E/ Under the system type


module FusionModule2000-S FusionModule2000, related
scenario configurations and functions can
be preset based on the smart
module scenario.

Manually Yes The system provides the automatic


updating a key update function. Manual
key update is required only if the key
is disclosed. Select the parameter
and click Submit.

Onvif https Enable/Disable Indicates whether to enable


ONVIF HTTPS. The default value is
Disable. Before setting this
parameter to Enable, ensure that
all ONVIF devices connected
support the ONVIF HTTPS function
and have the function enabled.

Choose Monitoring > System > ECC800 > Running Parameters > Unhide All
Advanced Signals > Channel Security Configuration.

Issue 02 (2023-02-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 250
ECC800 Data Center Controller
User Manual (ECC800-Pro V100R023C00) 6 Feature Commissioning

NOTE

● In general security configuration, all signals are disabled by default.

Table 6-73 Channel security configuration


Signal Name Signal Value Description

NetEco encryption Enable/Disable Indicates whether to use the


algorithm CBC encryption algorithm with the CBC
mode when connecting to the
NetEco.

Transparent Enable/Disable Indicates whether to use the


transmission encryption algorithm with the CBC
encryption algorithm mode during transparent
CBC transmission.

Web channel TLS1.1 Enable/Disable Indicates whether to use the


insecure TLS1.1 protocol when
logging in to the WebUI or app.

TCP channel TLS1.1 Enable/Disable Indicates whether to use the


insecure TLS1.1 protocol when
connecting to a southbound TCP
device.

NOTE

Since TLS1.1 has security risks, you are recommended to use a version later than TLS1.1.

6.17 Numbering Management for Power Distribution


Devices in the FusionPower6000
Prerequisites
● The system type is changed to FusionPower6000.
● Power distribution devices have been connected to the ECC800-Pro.
● The FusionPower6000 plan view has been created, and the device positions in
the plan view are consistent with actual positions.

Context
In parallel mode, the UPSs and feeder cabinets in the same parallel group must
have the same group number and be numbered in sequence. The power supply
and distribution link diagram can be generated on the PAD app based on the
group number and intra-group numbers.

Issue 02 (2023-02-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 251
ECC800 Data Center Controller
User Manual (ECC800-Pro V100R023C00) 6 Feature Commissioning

NOTICE

After you use the one-click layout and manual view adjustment method to set the
layout of the FusionPower6000, the group number and intra-group numbers of
some UPSs and feeder cabinets may not meet the expectation. In this case, you
need to adjust their group number and intra-group numbers based on the actual
device locations.

The group number and intra-group numbers of some UPSs and feeder cabinets
may be different from the actual ones. You need to adjust the group number and
intra-group numbers based on the actual device positions. The setting rules are as
follows:
● If the transformer is on the left, the group numbers of UPSs and feeder
cabinets in different parallel groups start from 1 from left to right, and the
intra-group numbers of devices in the same group start from 1 from left to
right.
● If the transformer is on the right, the group numbers of UPSs and feeder
cabinets in different parallel groups start from 1 from right to left, and the
intra-group numbers of devices in the same group start from 1 from right to
left.
● If the switches of feeder cabinets are directly powered by the utility power
supply, the group number of the feeder cabinets is 128.
● For a UPS5000-H, only Parallel Number can be set. For a feeder cabinet,
Group Number and Intra-group Number can be set.

Procedure
Step 1 Log in to the ECC800-Pro WebUI as an administrator.
Step 2 Choose Home > Plan View. The FusionPower6000 view is displayed.
Step 3 Click Modify Device, click to select a UPS and feeder cabinet, set Parallel
Number for the UPS, and set Group Number and Intra-group Number for the
feeder cabinet based on the setting rules.

----End

Follow-up Procedure
View the power supply and distribution link diagram of the FusionPower6000 on
the PAD app. If the device sequence in the link diagram is inconsistent with the
actual physical device positions, adjust the device No. accordingly.

Issue 02 (2023-02-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 252
ECC800 Data Center Controller
User Manual (ECC800-Pro V100R023C00) 7 Maintenance

7 Maintenance

7.1 Routine Maintenance


Table 7-1 Routine maintenance for the PSU in the ECC800-Pro
Check Item Expected Result Troubleshooting

AC input Input voltage: 200–240 V If the input voltage is abnormal,


AC check the power grid and input
Frequency: 45–66 Hz cable connection.

Output Output voltage: 53.5 V DC If the output voltage is abnormal,


voltage (tolerance ±5%) check the load power and cable
connection.

Indicator The indicator is steady Check the output voltage and


green. A fault occurs if it determine whether the PSU is
is red. faulty. If the PSU is faulty, replace it.

Fan No abnormal noise is If abnormal noise is generated,


generated. clean the fan.

Operating ● Ambient temperature: If the temperature or humidity is


environment –20°C to +50°C abnormal, check the smart cooling
● Humidity: 0-95% RH product status.
(non-condensing)

Cable The cable connection is Secure loose cables.


connection secure.

Cables are not damaged. Replace damaged cables.

Issue 02 (2023-02-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 253
ECC800 Data Center Controller
User Manual (ECC800-Pro V100R023C00) 7 Maintenance

Table 7-2 Routine maintenance for the main control module in the ECC800-Pro

Check Item Expected Result Troubleshooting

Indicator The green indicator is If the indicator is off or any


steady on or blinking. abnormal condition occurs, see
common faults and troubleshooting
to rectify the fault.

Network The green indicator is If the indicator status is abnormal,


port steady on, and the yellow check the network cable connection.
indicator indicator is blinking.

Operating ● Ambient temperature: If the humidity or temperature is


environment –20°C to +50°C abnormal, check the smart cooling
● Humidity: 5–95% RH product status.
(non-condensing)

Cable The cable connection is Secure loose cables.


connection secure.

Cables are not damaged. Replace damaged cables.

7.2 Common Faults and Troubleshooting


Table 7-3 Common faults and troubleshooting for PSUs

Symptom Possible Cause Measure

The PWR indicator There is no AC input. Check whether the AC


(green) is off. input is abnormal.

The PSU is faulty. Replace the PSU.

The ALM indicator Over temperature ● The ambient


(yellow) is steady on. protection is triggered. temperature exceeds
the upper threshold,
and the cooling
capacity of the smart
cooling product needs
to be increased.
● The air channel is
obstructed and needs
to be unblocked.

AC input overvoltage or Check whether the AC


undervoltage protection input is abnormal.
is triggered.

The ALM indicator Communication with the 1. Clean the connector


(yellow) is blinking. PSU is interrupted. in the rear of the
faulty PSU.

Issue 02 (2023-02-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 254
ECC800 Data Center Controller
User Manual (ECC800-Pro V100R023C00) 7 Maintenance

Symptom Possible Cause Measure

Communication with the 2. If the fault persists,


main control module is replace the ECC800-
interrupted. Pro subrack.

The ALM indicator (red) Output overvoltage If the PSU is locked out,
is steady on. protection is triggered. disconnect the AC input
from the PSU, and then
power on the PSU again
after the indicator turns
off. If the fault persists,
replace the PSU.

There is no output due Replace the faulty PSU.


to a PSU fault.

Table 7-4 Common faults and troubleshooting for the main control module
Symptom Possible Cause Measure

The RUN indicator (green) There is no AC input. If the green indicators on


is off. PSUs are steady on, the
power input to the
system is normal.
Otherwise, rectify power
grid faults.

The main control Reinstall the main


module is faulty or not control module. If the
securely installed. fault persists, replace the
main control module.

The RUN indicator (green) The main control Register the main control
is blinking at 5 Hz. module does not module with the NetEco.
register with the
NetEco.

RJ45 power output The corresponding Energize corresponding


indicators turn off power ports have no power ports over the
(involved ports: AIDI_1 - output. WebUI or NMS.
AIDI_5, COM1-COM4, and
DO). The corresponding Check whether the
power ports are short- connected load is short-
circuited. circuited. If yes, eliminate
the short circuit.

The ALM indicator (red) is An alarm is generated. View active alarms on


steady on. the WebUI and clear
them one by one.

Issue 02 (2023-02-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 255
ECC800 Data Center Controller
User Manual (ECC800-Pro V100R023C00) 7 Maintenance

Table 7-5 Common faults and troubleshooting for UIM20A expansion module
Symptom Possible Cause Measure

The RUN indicator is off. The contact between the Check whether the cable
independent deployment connection between the
AI_DI unit and the ECC800-Pro and the
ECC800-Pro is abnormal, UIM20A expansion
or the independent module is normal and
deployment AI_DI unit is whether the board is
faulty. faulty.

The RUN indicator is Communication between Check whether the cable


blinking at short the independent connection between the
intervals (2.5 Hz, on for deployment AI_DI unit ECC800-Pro and the
0.2s and then off for and the main control UIM20A expansion
0.2s). module is interrupted. module is normal,
whether the board is
faulty, and whether the
UIM20A expansion
module is added on the
ECC800-Pro WebUI.

The ALM indicator is on. An alarm whose default Check and clear the
severity is major exists. alarm.

Table 7-6 Common faults and troubleshooting for the independent deployment
AI_DI unit
Symptom Possible Cause Measure

The PWR indicator is off. The independent Check whether the board
deployment AI_DI unit is is faulty and whether the
faulty or the power to cable connection
the independent between the ECC800-Pro
deployment AI_DI unit is and independent
abnormal. deployment AI_DI unit is
normal.

The RUN indicator is off. The contact between the Check whether the
independent deployment independent deployment
AI_DI unit and the AI_DI unit is faulty and
ECC800-Pro is abnormal, whether the cable
or the independent connection between the
deployment AI_DI unit is ECC800-Pro and
faulty. independent deployment
AI_DI unit is normal.

Issue 02 (2023-02-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 256
ECC800 Data Center Controller
User Manual (ECC800-Pro V100R023C00) 7 Maintenance

Symptom Possible Cause Measure

The RUN indicator is Communication between Check whether the cable


blinking at short the independent connection between the
intervals (on for 0.125s deployment AI_DI unit ECC800-Pro and
and then off for 0.125s). and the main control independent deployment
module is interrupted. AI_DI unit is normal,
whether the independent
deployment AI_DI unit is
faulty, and whether the
independent deployment
AI_DI unit is added on
the ECC800-Pro WebUI.

The ALM indicator is on. An alarm whose default Check and clear the
severity is major exists. alarm.

7.3 Component Replacement

7.3.1 Replacing an ECC800-Pro Main Control Module


Prerequisites

NOTICE

● The ECC800-Pro main control module is hot-swappable.


● Before disconnecting cables from the ECC800-Pro main control module, label
the cables based on the corresponding ports.

● Tools: ESD wrist strap, ESD gloves, Phillips screwdriver, label, marker
● Materials: a new undamaged and undeformed ECC800-Pro main control
module of the appropriate model

Procedure
Step 1 Log in to the ECC800-Pro WebUI as an administrator.
Step 2 Use the Back Up Current Settings function to record the ECC800-Pro
configuration information or manually record the information.
Path: Maintenance > Configuration File > Back Up Current Settings

Issue 02 (2023-02-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 257
ECC800 Data Center Controller
User Manual (ECC800-Pro V100R023C00) 7 Maintenance

NOTE

If the main control module is damaged, you may fail to log in to the ECC800-Pro. In this case,
you cannot back up the settings.
The following information cannot be backed up: monitoring module IP address parameters,
smart module certificate, management system certificate, management system second-
challenge password, time configuration parameters, access user management, access permission
management, device access certificate, logs, and user configuration information.

Step 3 Label each cable and antenna based on the corresponding ports on the ECC800-
Pro main control module.
Step 4 Remove cables, USB flash drive, USB-to-WiFi module, and antennas from the
ECC800-Pro main control module.
Step 5 Loosen the screws on both sides of the ECC800-Pro main control module and pull
the handles on both sides of the ECC800-Pro main control module to remove the
main control module.

Figure 7-1 Removing the ECC800-Pro main control module

Step 6 (Optional) Remove the SIM card from the corresponding slots of the ECC800-Pro
main control module.
Step 7 (Optional) Install the removed SIM card in the corresponding slot of the new
ECC800-Pro main control module.

Figure 7-2 Installing a SIM card

Step 8 Install the spare ECC800-Pro main control module in the ECC800-Pro subrack and
tighten the screws on both sides of the ECC800-Pro main control module.
Step 9 Connect the communications cables and antennas to the ECC800-Pro main control
module.

Issue 02 (2023-02-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 258
ECC800 Data Center Controller
User Manual (ECC800-Pro V100R023C00) 7 Maintenance

Step 10 Choose Maintenance > Configuration File and import the backup configuration
file, or set parameters for the devices that connect to the ECC800-Pro to ensure
normal communication.

----End

7.3.2 Replacing an ECC800-Pro PSU


Prerequisites

DANGER

Do not touch the terminals in the rear of a removed PSU to avoid electric shocks.

● Tool: insulation gloves


● Materials: a reserved undamaged and undeformed PSU of the appropriate
model

Context
The PSU is hot-swappable.

Procedure
Step 1 Push the locking latch on the PSU leftwards, and pull the handle outwards to
remove the PSU from the subrack.

Figure 7-3 Removing a PSU

Step 2 Gently push the reserved PSU into the subrack along guide rails, and push the
locking latch rightwards to secure the handle.

Figure 7-4 Installing a PSU

----End

Issue 02 (2023-02-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 259
ECC800 Data Center Controller
User Manual (ECC800-Pro V100R023C00) 7 Maintenance

7.3.3 Replacing ECC800-Pro Antennas

Prerequisites
● Tools: ESD wrist strap, ESD gloves
● Materials: Spare ECC800-Pro antennas of the same model are available and
functional.

Procedure
Step 1 Remove the 4G antenna cables or RF_Z antenna cables connected to the ports on
the ECC800-Pro, as shown in Figure 7-5.

Figure 7-5 Removing antennas

Step 2 Install the spare 4G antenna cables or RF_Z antenna cables in the original
positions and connect them to the ECC800-Pro.

----End

7.3.4 Replacing a SIM Card

Prerequisites
● Tools: ESD wrist strap, ESD gloves
● Materials: A spare SIM card of the same model is available and functional.

Procedure
Step 1 Record the position of the signal cable connected to the ECC800-Pro main control
module panel, and then disconnect the signal cable.

Step 2 Loosen the screws on both sides of the ECC800-Pro main control module.

Step 3 Pull the handles on both sides of the ECC800-Pro main control module, and to
remove the main control module.

Issue 02 (2023-02-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 260
ECC800 Data Center Controller
User Manual (ECC800-Pro V100R023C00) 7 Maintenance

Figure 7-6 Removing the ECC800-Pro main control module

Step 4 Remove the SIM card from the card slot.

Figure 7-7 Removing a SIM card

Step 5 Insert the spare SIM card into the card slot.

Figure 7-8 Installing a SIM card

Step 6 Install the ECC800-Pro main control module in the card slot.
Step 7 Tighten the screws on both sides of the ECC800-Pro main control module.
Step 8 Reconnect signal cables to the ECC800-Pro main control module panel based on
the recorded information.

----End

Issue 02 (2023-02-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 261
ECC800 Data Center Controller
User Manual (ECC800-Pro V100R023C00) 8 FAQ

8 FAQ

8.1 How Can I View Version Information?


Procedure
Step 1 Log in to the ECC800-Pro WebUI as an administrator.

Step 2 Click in the upper right corner of the home page and view the ECC800-Pro
version information.
Step 3 Choose Maintenance > Version Information and view the version information of
ECC800-Pro and connected device.

----End

8.2 How Can I Upgrade the ECC800-Pro Software


Version?
Procedure
Step 1 Go to the WebUI login page. Enter the user name and password to log in to the
ECC800-Pro home page.
Step 2 Download the .zip upgrade package from the Huawei enterprise or carrier website.
After the decompression, choose Maintenance > System Upgrade on the
ECC800-Pro WebUI, click Select File, and select the decompressed .tar.gz file
package to upload.
Step 3 Click Upload on the right of Select File. The upload takes about 1 to 3 minutes.
When the system displays the "Uploaded successfully." message, the file is
uploaded successfully. Click OK.

Issue 02 (2023-02-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 262
ECC800 Data Center Controller
User Manual (ECC800-Pro V100R023C00) 8 FAQ

NOTE

● After the upgrade file is uploaded successfully, the WebUI lists the components and
versions that can be upgraded using the upgrade file.
● The ECC800-Pro upgrade package includes the ECC800-Pro software upgrade program
and Board Support Package (BSP) software upgrade program.

Step 4 Set Device Type to ECC800 and click Local Upgrade. When a message is
displayed, click OK to confirm the upgrade or click Cancel to cancel the upgrade.
Step 5 After the monitoring software is upgraded successfully, a message is displayed,
indicating that the monitoring module has been upgraded successfully and is
restarting.
NOTE

● After the ECC800-Pro software or BSP software is upgraded successfully, the ECC800-Pro
system will restart. After the restart is complete, log in to the WebUI again.
● Protocols and algorithms are embedded in the software package and do not need to be
configured. After the software package is installed, all functions are available.

----End

8.3 How Can I Set the Date and Time?


Procedure
Step 1 Choose System Settings > System Parameters > Time.
Step 2 Set the time zone, date, and time, or click Obtain Local Time. Then, click Submit.
Step 3 (Optional) If you want to use the NTP server for time synchronization, select NTP
server sync. Set NTP primary server IP, Whether the NTP master server is
authenticated, Key ID, and Key, and click Test to check whether the test is
successful. Set NTP backup server IP, Whether the NTP backup server is
authenticated, Key ID, and Key, and click Test to check whether the test is
successful. Enter Port number and Sync interval (min), and click Submit.

----End

8.4 How Can I Check the System Type and Set the
Smart Module Name?
Context
● System type: Select an option based on the actual project type. The following
table lists the supported system types and their application scenarios.

Table 8-1 System types

System Type Application Scenario

Robot Robot scenario

Issue 02 (2023-02-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 263
ECC800 Data Center Controller
User Manual (ECC800-Pro V100R023C00) 8 FAQ

System Type Application Scenario

FusionModule5000 FusionModule5000 smart module


scenario

FusionModule2000 FusionModule2000 smart module


scenario; ECC800-Pro used in the
data hall module of a prefabricated
module data center

FusionModule500/800 FusionModule500/800 scenario

FusionModule1000A FDC AIO scenario

General Customized AIO scenario. As no


layout is set for this type, you can
select this type if no layout is
required on the network
management system.

FusionPower6000 FusionPower6000 scenario; low-


voltage switchgear used in the
PowerPOD of FDC

● Site ID: Alarms of devices under monitoring in the site are sent to the
specified mobile phone numbers of maintenance engineers by SMS. After
Smart module name is changed, the new site ID will be displayed in the
short message content (for example, XXX device communication interruption)
so that maintenance engineers will know the site where the fault has
occurred.

Procedure
Step 1 Choose System Settings > System Parameters > Site Configuration, and check
whether System Type is consistent with the type of the smart module.
(Optional) If the system type is inconsistent with the type of the smart module,
perform the following operations. The system type FusionModule2000 is used as
an example.

NOTE

● By default, the system type displayed on the WebUI is the system type selected last
time. Change the system type as required.
● If the system type is changed, the monitoring software will restart and you can log in to
the WebUI again after 3 minutes.
1. Select FusionModule2000 from the System type drop-down list box.
2. Click Submit in the System Type area.

Issue 02 (2023-02-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 264
ECC800 Data Center Controller
User Manual (ECC800-Pro V100R023C00) 8 FAQ

Figure 8-1 Setting the system type

3. Go to the Re-authentication page, enter the login user name and password,
and click Submit.
Step 2 Choose System Settings > System Parameters > Site Configuration, modify
Smart module name, and click Submit in the Site ID area.

----End

8.5 How Do I Manage WebUI Users?


Context
User rights are classified into administrator, operator, and engineer. Users with
different rights have different operation rights on the system.
● Administrator: The user name is admin and the password is Changeme by
default. The administrator has the highest rights, including the rights for user
management, browsing and modifying all parameters in the system, software
upgrade, and data import and export.
● Operator: has only the browse right but no rights for user management,
system setting, version upgrade, running parameters, smart module plan view
editing, and internal fault information exporting.
● Engineer: has administrator rights except user management.

Procedure
Step 1 Change the login password.
1. Log in to the ECC800-Pro WebUI as an administrator.
2. Choose Maintenance > User Management. The user management page is
displayed.
3. Choose the user to be modified and click Modify. Reset the login password on
the displayed page.

Issue 02 (2023-02-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 265
ECC800 Data Center Controller
User Manual (ECC800-Pro V100R023C00) 8 FAQ

Figure 8-2 Changing the login password

4. Modify Advance expiration notification (days) and Timeout Interval for


the password.
5. Determine whether to enable multi-factor authentication based on user
requirements.
6. Select a notification mode if Multi-factor Authentication is set to Enable.

Issue 02 (2023-02-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 266
ECC800 Data Center Controller
User Manual (ECC800-Pro V100R023C00) 8 FAQ

Figure 8-3 Modifying parameters

NOTICE

– Select Email for Notify By, set Mailbox Address, and click Test. After the
test is successful, you can obtain a verification code using the email
address.
You need to choose System Settings > Event Notification > Mailbox
Settings and set the email address first.
– Select Short message for Notify By, set Mobile Phone Number, and click
Test. After the test is successful, you can obtain a verification code by SMS.

Step 2 Add a WebUI user.


1. Choose Maintenance > User Management. The user management page is
displayed.
2. Click Add.
3. Specify User name, Password, Confirm password, Password validity period,
Advance expiration notification (days), and Timeout Interval for the new
user of the ECC800-Pro, select appropriate values from the Access right and
Login source drop-down list boxes, and click Confirm.

Issue 02 (2023-02-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 267
ECC800 Data Center Controller
User Manual (ECC800-Pro V100R023C00) 8 FAQ

NOTE

– On the user management page, you can modify, delete, lock, and unlock a user.
– The value of Advance expiration notification (days) must not be greater than
the value of Password validity period.
– You can choose the password retrieval mode as required, either by email or SMS or
by both.
– The WebUI supports a maximum of 16 users and a maximum of 3 concurrent
online users.

----End

Follow-up Procedure
If you forgot the password, perform the following steps:

1. Click Forgot password.

Figure 8-4 Clicking Forgot password

2. Specify the user name. Enter the verification code.

Figure 8-5 Retrieving a password

3. Click Next to retrieve the password.

Issue 02 (2023-02-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 268
ECC800 Data Center Controller
User Manual (ECC800-Pro V100R023C00) 8 FAQ

8.6 How Do I Create a Smart Module Plan View?


Prerequisites
To create a smart module plan view, it is recommended that you obtain or draw
the planned layout of the smart modular data center before the creation.

Procedure
Step 1 Choose Home > Plan View and click Create smart module in Smart Module
View. The Modify Basic Config dialog box is displayed. Set the layout and device
quantity in Layout and Half-size cabinet qty./row based on the actual smart
module scenario.
● If Room monitoring is set to No, draw a smart module view.
● If Room monitoring is set to Yes, draw equipment room view and smart
module view.

Step 2 Click OK. The page for editing the smart module plan view is displayed.
● Drag the icons of registered devices (for example, the access actuator) and
devices on the cabinet list to appropriate positions in the layout, click a device
icon, modify the value of Device Name in the displayed Basic Configuration
dialog box.
● Click One-Click Layout. The power distribution devices, IT cabinets, and
smart cooling products on the cabinet list are automatically arranged in the
view. The icons of other registered devices (for example, the access actuator)
and devices on the cabinet list need to be manually arranged.
NOTE

– If the locations of devices automatically deployed are inconsistent with their actual
locations, you can manually adjust them.
– The general input unit and power distribution unit support one-click layout only
when the versions are the same, ring networking is used, and cables are connected
based on the standard scenario in the corresponding user manual. If the version of
the general input unit and power distribution unit is earlier than V306B001D01, a
maximum of 20 devices can form a ring network. If the version of the general
input unit and power distribution unit is V306B001D01 or later, a maximum of 104
devices can form a ring network.
– If both room-level and smart module access actuators exist, modify the value of
Device Name to distinguish them.
– The value of Device Name for the power distribution unit should be consistent
with its label, for example, NMW A 01.
– Click Exit Edit Mode to create a smart module plan view.

Step 3 There are multiple same device icons on the editing page. If you cannot determine
the positions of communications devices such as the access actuator, general input
unit, and power distribution unit, hold down the BLINK button on a device such as
a smart ETH gateway for less than 1s to report the blinking status to the ECC800-
Pro. The corresponding device icon in the WebUI plan view blinks. Check that the
device positions and types in the plan view are consistent with the actual situation
by delivering the blinking command.

Issue 02 (2023-02-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 269
ECC800 Data Center Controller
User Manual (ECC800-Pro V100R023C00) 8 FAQ

NOTE

● Drag a device in the WebUI plan view. The RUN indicator on the corresponding device
blinks intermittently at super short intervals.
● If a room-level access control device and camera exist, drag them to the equipment
room view.
● Choose Home > Plan View, and click the camera icon in Create smart module to go to
the camera WebUI.

Figure 8-6 Example plan view without room monitoring

Figure 8-7 Example plan view with room monitoring

----End

Follow-up Procedure
To modify the smart module plan view, perform the following steps:

1. Choose Home > Plan View.


2. Click Modify Device in Smart Module View. The Devices is displayed.
3. Drag registered devices (for example, the camera) to the appropriate
positions in the layout diagram and click Exit Edit Mode. The smart module
plan view is updated.
4. Click or to adjust the smart module layout view if there are excessive
half-sized cabinets in each row.

Issue 02 (2023-02-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 270
ECC800 Data Center Controller
User Manual (ECC800-Pro V100R023C00) 8 FAQ

8.7 How Can I Set and Add Devices?

8.7.1 How Can I Set Integrated UPS Parameters (Modbus-


TCP)?

Prerequisites
One end of the straight-through cable has been connected to the FE port on the
integrated UPS, and the other end has been connected to the PoE port on the
smart ETH gateway.

Procedure
Step 1 Start the integrated UPS, and tap System Info on the LCD.

Step 2 Choose System Info > Settings, enter the user name admin and password

000001, and tap . In the displayed dialog box for confirming the password,
tap Confirm.
NOTE

If you enter incorrect passwords for five consecutive times, you will be locked out for 5
minutes.

Step 3 Choose Settings > Communication, and set IP address assign to


Automatic(DHCP).

Step 4 Tap to go back to the main menu screen.


NOTE

After setting parameters for the integrated UPS, the ECC800-Pro discovers the access from
the integrated UPS automatically.

----End

8.7.2 How Can I Set and Add a UPS2000G-A (Modbus-RTU)

Prerequisites
One end of the straight-through cable has been connected to the COM_1 or
COM_2 port on the Modbus expansion card of the UPS2000G-A, and the other
end has been connected to the COM port on the ETH converter.

Procedure
Step 1 Set monitoring parameters for the UPS2000G-A.
● Set monitoring parameters for UPS2000G-A-(1 kVA–3 kVA).

Issue 02 (2023-02-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 271
ECC800 Data Center Controller
User Manual (ECC800-Pro V100R023C00) 8 FAQ

NOTE

Operate the DIP switch SW1 on the optional Modbus card to set the UPS2000G-A device
address. Toggle switches 1 to 8 of DIP switch SW1 specify the device address in binary
mode. ON indicates 1, and OFF indicates 0.

Table 8-2 Setting a device address

Devic Toggl Toggl Toggl Toggl Toggl Toggl Toggl Toggl


e e e e e e e e e
Addre Switc Switc Switc Switc Switc Switc Switc Switc
ss h1 h2 h3 h4 h5 h6 h7 h8

1 ON OFF OFF OFF OFF OFF OFF OFF

2 OFF ON OFF OFF OFF OFF OFF OFF

3 ON ON OFF OFF OFF OFF OFF OFF

4 OFF OFF ON OFF OFF OFF OFF OFF

● Set monitoring parameters for UPS2000G-A-(6 kVA–20 kVA).


NOTE

Operate the DIP switch S2 on the optional Modbus card to set the UPS2000G-A device
address. Toggle switches 1 to 8 of DIP switch S2 specify the device address in binary mode.
ON indicates 0, and OFF indicates 1.

Table 8-3 Setting a device address

Devic Toggl Toggl Toggl Toggl Toggl Toggl Toggl Toggl


e e e e e e e e e
Addre Switc Switc Switc Switc Switc Switc Switc Switc
ss h1 h2 h3 h4 h5 h6 h7 h8

1 OFF ON ON ON ON ON ON ON

2 ON OFF ON ON ON ON ON ON

3 OFF OFF ON ON ON ON ON ON

4 ON ON OFF ON ON ON ON ON

Step 2 Add a UPS2000G-A.


1. Log in to the ECC800-Pro WebUI as an administrator.
2. Add a UPS2000G-A.

Table 8-4 Adding a UPS2000G-A

Path Parameter Setting

Choose Device Select UPS from the drop-down list box.


System attribute

Issue 02 (2023-02-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 272
ECC800 Data Center Controller
User Manual (ECC800-Pro V100R023C00) 8 FAQ

Path Parameter Setting

Settings > Device Type Select UPS2000G-A from the drop-down


Device list box.
Management
and click Add Connect To Select ECC800 from the drop-down list
Device. The box.
parameters Communicati Select COM2 from the drop-down list box.
for adding ons Port NOTE
devices are
The setting example indicates that the
displayed. UPS2000G-A is connected to the COM2 port on
the ECC800-Pro. If the UPS2000G-A is
connected to another port, select the number of
the connected port.

Device In this example, Device Address is set to 1.


Address During actual configuration, set the device
address for the UPS2000G-A based on the
actual situation.

3. Click Test Connect to check whether the UPS2000G-A connects to the


ECC800-Pro properly.
– If the connection succeeds, click Confirm. The connected devices are
displayed in the Number of connected devices list.
– If the connection fails, check whether the UPS2000G is properly
connected to the ECC800-Pro, whether the UPS2000G and ECC800-Pro
are running properly, and whether the parameter settings are consistent
with the UPS2000G parameters.
NOTE

The section describes how to add a UPS2000G-A in a single UPS scenario. In a parallel UPS
scenario, if the common communications address of the Modbus card is added to the
ECC800-Pro, all UPS2000G-As can be connected to the ECC800-Pro.

----End

8.7.3 How Can I Set and Add a UPS2000G_L (Modbus-RTU)?


Prerequisites
One end of the straight-through cable has been connected to the CAN
communications port on the rear panel of the UPS2000G_L, and the other end has
been connected to the COM port on the ECC800-Pro or ETH converter.

Procedure
Step 1 Set the communications address parameters for the UPS2000G_L.
NOTE

For details, see the UPS2000-G-6KRTLL User Manual.

Step 2 Add a UPS2000G_L.

Issue 02 (2023-02-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 273
ECC800 Data Center Controller
User Manual (ECC800-Pro V100R023C00) 8 FAQ

1. Log in to the ECC800-Pro WebUI as an administrator.


2. Add a UPS2000G_L.

Table 8-5 Adding a UPS2000G_L

Path Parameter Setting

Choose Device Select UPS from the drop-down list box.


System attribute
Settings >
Device Device type Select UPS2000G_L from the drop-down
Management list box.
and click Add Connect To Select ECC800 from the drop-down list
Device. box.

Communicati Select COM2 from the drop-down list box.


ons Port NOTE
The setting example indicates that the
UPS2000G_L is connected to the COM2 port on
the ECC800-Pro. If the UPS2000G_L is
connected to another port, select the number of
the connected port.

Device In this example, Device Address is set to 1.


Address During actual configuration, set the device
address for the UPS2000G_L based on the
actual situation.

3. Click Test Connect to check whether the UPS2000G_L connects to the


ECC800-Pro properly.
– If the UPS2000G_L connects to the ECC800-Pro successfully, click
Confirm. The connected devices are displayed in the Number of
connected devices list.
– If the connection fails, check whether the device is properly connected to
the ECC800-Pro, whether the device and ECC800-Pro are running
properly, and whether the parameter settings are consistent with the
device parameters.

----End

8.7.4 How Can I Set and Add a UPS5000 (Modbus-RTU)?

Prerequisites
● One end of the straight-through cable has been connected to the RS485 port
on the UPS5000 monitoring module, and the other end has been connected
to the COM port on the ETH converter.
● When connecting devices, you are advised to add devices one by one and
ensure that the view is consistent with the real object. If all devices have been
added and powered on, only the BLINK function of the ETH converter can be
used to identify the mapping between the UPS5000 and ETH converter.

Issue 02 (2023-02-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 274
ECC800 Data Center Controller
User Manual (ECC800-Pro V100R023C00) 8 FAQ

Procedure
Step 1 Set the UPS5000 monitoring parameters.
1. On the displayed screen after UPS5000 startup, tap System Info.
2. Choose System Info > Settings, enter the user name admin and password

000001, and tap .


3. Tap Comm. Settings > RS485 Settings. On the RS485 communication
settings screen, set Address based on the actual plan and set Baud rate to
9600.

Step 2 Add a UPS5000.


1. Log in to the ECC800-Pro WebUI as an administrator.
2. Add a UPS5000.

Table 8-6 Adding a UPS5000


Path Parameter Setting

Choose Device Select UPS from the drop-down list box.


System attribute
Settings >
Device Device Type Select UPS5000 from the drop-down list
Management box.
and click Add Connect To Select ETH Converter n from the drop-
Device. The down list box.
parameters
for adding Communicati Select COM1/COM2 from the drop-down
devices are ons Port list box.
displayed.
Device Enter the actual communication address of
Address the UPS5000.

3. Click Test Connect to check whether the UPS5000 is properly connected to


the ECC800-Pro.
– If the connection succeeds, click Confirm. The connected devices are
displayed in the Number of connected devices list.
– If the connection fails, check whether the device is properly connected to
the ECC800-Pro, whether the device and ECC800-Pro are running
properly, and whether the parameter settings are consistent with the
device parameters.
4. Choose Monitoring > System > ETH Converter Group > ETH Converter n >
Running Parameters and set Device name to ETH Converter n_Device
name.

----End

Issue 02 (2023-02-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 275
ECC800 Data Center Controller
User Manual (ECC800-Pro V100R023C00) 8 FAQ

8.7.5 How Do I Set and Add a UPS5000 (Modbus-TCP)?


Prerequisites
One end of the straight-through cable has been connected to the FE port on the
UPS5000 and the other end has been connected to the PoE port on the smart ETH
gateway.

Procedure
Step 1 Set the UPS5000 monitoring parameters.
1. Enter the UPS5000 home screen and tap System Info.
2. Choose System Info > Settings, enter the user name admin and password

000001, and tap .


3. Tap Comm. Settings and choose IP Settings. Set IP address allocation to
Automatic (DHCP) on the displayed communication settings screen and the
UPS5000 is discovered by ECC800-Pro automatically and is connected to the
ECC800-Pro.
NOTE

On the ModbusTCP Settings screen, set ModbusTCP encryption to Enable.

----End

8.7.6 How Can I Set and Add a PDU8000 or Integrated PDU


(over Modbus-TCP)?
Prerequisites
One end of the straight-through cable has been connected to the FE port on the
PDU8000 or integrated PDU, and the other end has been connected to the PoE
port on the smart ETH gateway.

Context
The method of connecting the PDU8000 to the ECC800-Pro is the same as that for
the integrated PDU. Connecting the integrated PDU to the ECC800-Pro by
following the instructions in this section.

Procedure
Step 1 Set the PDU8000 monitoring parameters.
1. Enter the PDU8000 home screen and tap System Info.
2. Choose System Info > Settings, enter the user name admin and password

000001, and tap .


3. Tap Communication to set IP address assign to Automatic(DHCP) on the
displayed communication settings screen and the PDU8000 is discovered by
ECC800-Pro automatically and is connected to the ECC800-Pro.

Issue 02 (2023-02-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 276
ECC800 Data Center Controller
User Manual (ECC800-Pro V100R023C00) 8 FAQ

NOTE

– On the Communication screen, set SSL to Enable.


– If the PDU is a modular precision PDU, set modbusTCPcertification to Disable on
the Communication screen.

----End

8.7.7 How Can I Set and Add a Transformer (Modbus-RTU)?

Prerequisites
One end of the RS485 cable has been connected to ports 19 and 20 on the
transformer temperature controller, and the other end has been connected to the
COM port on the ECC800-Pro.

Procedure
Step 1 Set the communications address for the transformer LCD.

Procedure Button Display Description Range

1 SET Enter the /


function
operation
state.

2 SET / /

3 Communicati /
ons address
setting
password

4 SET Communicati /
ons address

5 SET 1: address /

6 Set this 1–247


parameter as
required.

7 SET The temperature controller exits the


communication address setting state and
returns to the temperature display state.

Step 2 Add a transformer.


1. Log in to the ECC800-Pro WebUI as an administrator.
2. Add a transformer.

Issue 02 (2023-02-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 277
ECC800 Data Center Controller
User Manual (ECC800-Pro V100R023C00) 8 FAQ

Table 8-7 Adding a transformer

Path Parameter Setting

Choose Device Select Transformer from the drop-down


System attribute list box.
Settings >
Device Device Type Select Transformer_LD-B10 from the
Management drop-down list box.
and click Add Connect To Select ECC800 from the drop-down list
Device. The box.
parameters
for adding Communicati Select COM1 from the drop-down list box.
devices are ons Port
displayed.
Device In this example, Device Address is set to 1.
Address During actual configuration, set the device
address for the transformer based on the
actual situation.

3. Click Test Connect to check whether the transformer is properly connected to


the ECC800-Pro.
– If the connection succeeds, click Confirm. The connected devices are
displayed in the Number of connected devices list.
– If the connection fails, check whether the device is properly connected to
the ECC800-Pro, whether the device and ECC800-Pro are running
properly, and whether the parameter settings are consistent with the
device parameters.

----End

8.7.8 How Can I Set and Add an SVG-In-Power (Modbus-RTU)?


Prerequisites
One end of the straight-through cable has been connected to pins 4 and 9 of the
COM port on the SVG display, and the other end has been connected to the COM
port on the ECC800-Pro.

NOTE

Pin 4 defines 485+, and pin 9 defines 485–.

Procedure
Step 1 Set SVG display parameters.
1. Tap Expert Setting. On the displayed SVG communication settings screen, set
ID to 1 and Baud to 9600.
NOTE

ID is the communication address, ranging from 1 to 255. This operation uses 1 as an


example.

Issue 02 (2023-02-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 278
ECC800 Data Center Controller
User Manual (ECC800-Pro V100R023C00) 8 FAQ

Figure 8-8 Setting SVG parameters

Step 2 Add an SVG.


1. Log in to the ECC800-Pro WebUI as an administrator.
2. Add an SVG.

Table 8-8 Adding an SVG


Path Parameter Setting

Choose Device Select PDU from the drop-down list box.


System attribute
Settings >
Device Device Type Select SVG-In-Power from the drop-down
Management list box.
and click Add Connect To Select ECC800 from the drop-down list
Device. The box.
parameters
for adding Communicati Select COM2 from the drop-down list box.
devices are ons Port
displayed.
Device In this example, Device Address is set to 1.
Address During actual configuration, set the device
address for the SVG based on the actual
situation.

3. Click Test Connect to check whether the SVG connects to the ECC800-Pro
properly.
– If the connection succeeds, click Confirm. The connected devices are
displayed in the Number of connected devices list.
– If the connection fails, check whether the device is properly connected to
the ECC800-Pro, whether the device and ECC800-Pro are running
properly, and whether the parameter settings are consistent with the
device parameters.

----End

Issue 02 (2023-02-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 279
ECC800 Data Center Controller
User Manual (ECC800-Pro V100R023C00) 8 FAQ

8.7.9 How Can I Set and Add an Envicool Air Conditioner


(Modbus-RTU)?
Prerequisites
One end of the straight-through cable has been connected to terminals 1 and 2
on the air conditioner electric control box, and the other end has been connected
to the COM/AIDI port on the ECC800-Pro collector or UIM20A.
(Optional) One end of the straight-through cable has been connected to terminals
7 and 8 on the air conditioner electric control box, and the other end has been
connected to the COM/AIDI port on the ECC800-Pro collector or UIM20A.

NOTE

● Terminals 1 and 2 of the air conditioner electric control box are RS485+ and RS485–,
respectively. Terminals 7 and 8 are Boolean dry contacts, which are polarity insensitive.
● Cables need to be connected to both the Envicool CRU and IFX terminal.

Procedure
Step 1 Set monitoring parameters for the air conditioner.
1. On the home screen of the air conditioner, click SetPoint, enter the password
8866, and click OK.
2. On the air conditioner parameter setting page, set MonAddr to 1.
Step 2 Add an Envicool air conditioner (Modbus-RTU).
1. Log in to the ECC800-Pro WebUI as an administrator.
2. Add an Envicool air conditioner.

Table 8-9 Adding an Envicool CRU


Path Parameter Setting

Choose Device Select Air Conditioner from the drop-


System attribute down list box.
Settings >
Device Device Type Select ENVICOOL-CRU from the drop-
Management down list box.
and click Add Connect To Select ECC800 from the drop-down list
Device. box.
NOTE
If the other end of the straight-through cable is
connected to the COM port on the UIM20A,
select UIM.

Issue 02 (2023-02-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 280
ECC800 Data Center Controller
User Manual (ECC800-Pro V100R023C00) 8 FAQ

Path Parameter Setting

Communicati Select COM1 from the drop-down list box.


ons Port NOTE
The setting example indicates that the Envicool
CRU is connected to the COM1 port on the
ECC800-Pro. If the Envicool CRU is connected to
another port, select the number of the
connected port.

Device In this example, Device Address is set to 1.


Address During actual configuration, set the device
address for the air conditioner based on
the actual situation.

Table 8-10 Adding an Envicool IFX terminal


Path Parameter Setting

Choose Device Select Air Conditioner from the drop-


System attribute down list box.
Settings >
Device Device Type Select Envicool-IFX Terminal from the
Management drop-down list.
and click Add Connect To Select ECC800 from the drop-down list
Device. box.
NOTE
If the other end of the straight-through cable is
connected to the COM port on the UIM20A,
select UIM.

Communicati Select COM2 from the drop-down list box.


ons Port NOTE
The setting example indicates that the Envicool
IFX terminal is connected to the COM2 port on
the ECC800-Pro. If the Envicool IFX terminal is
connected to another port, select the number of
the connected port.

Device In this example, Device Address is set to 1.


Address During actual configuration, set the device
address for the air conditioner based on
the actual situation.

3. Click Test Connect to check whether the Envicool air conditioner is properly
connected to the ECC800-Pro.
– If the connection succeeds, click Confirm. The connected devices are
displayed in the Number of connected devices list.
– If the connection fails, check whether the device is properly connected to
the ECC800-Pro, whether the device and ECC800-Pro are running

Issue 02 (2023-02-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 281
ECC800 Data Center Controller
User Manual (ECC800-Pro V100R023C00) 8 FAQ

properly, and whether the parameter settings are consistent with the
device parameters.

----End

8.7.10 How Can I Set and Add a SmartLi (Modbus-TCP)?


Prerequisites
One end of the straight-through cable has been connected to the FE port on the
SmartLi and the other end has been connected to the PoE port on the smart ETH
gateway.

Procedure
Step 1 Set SmartLi monitoring parameters.
1. On the home screen of the SmartLi, tap System Info.
2. Choose System Info > Settings, enter the user name admin and password

000001, and tap .


3. Tap Communication to set IP address assign to Automatic(DHCP) on the
displayed communication settings screen and the SmartLi is discovered by
ECC800-Pro automatically and is connected to the ECC800-Pro.

----End

8.7.11 How Can I Add and Set the Smart Module Actuator
(Modbus-MAC)?
Prerequisites
One end of the straight-through cable has been connected to the LAN port on the
smart module actuator, and the other end has been connected to the PoE port on
the smart ETH gateway.

Procedure
Step 1 Log in to the ECC800-Pro WebUI as an administrator.
Step 2 Open the aisle door.
NOTE

The following describes how to remotely open a door.

Issue 02 (2023-02-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 282
ECC800 Data Center Controller
User Manual (ECC800-Pro V100R023C00) 8 FAQ

Table 8-11 Remote door opening


Path Setting

Monitoring > Aisle > Select Remote door opening and click Submit
Smart Module Actuator
Group > Smart Module
Actuator n > Controls

CAUTION

● Remotely opening the door may open the smart module door, and this may
pose security risks. Exercise caution when performing this operation.
● Remotely opening the skylight may open the smart module skylight, and this
may pose security risks. Exercise caution when performing this operation.

----End

8.7.12 How Can I Set and Add a PDU8000 (Modbus RTU)?


Prerequisites
One end of the straight-through cable has been connected to the COM port on
the PDU8000, and the other end has been connected to the COM port on the
ECC800-Pro collector or ETH converter.

Procedure
Step 1 Set the PDU8000 monitoring parameters.
1. Enter the PDU8000 home screen and tap System Info.
2. Choose System Info > Settings, enter the user name admin and password

000001, and tap . In the displayed dialog box for confirming the
password, tap Confirm.
3. Tap Communication to access the PDU8000 communication settings screen
and set IP address assign to Manual. Set Serial port baud rate to 9600, and
Serial port address to 1.

Issue 02 (2023-02-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 283
ECC800 Data Center Controller
User Manual (ECC800-Pro V100R023C00) 8 FAQ

Figure 8-9 PDU8000 communication settings screen

Step 2 Add a PDU8000 (Modbus-RTU).


1. Log in to the ECC800-Pro WebUI as an administrator.
2. Add a PDU8000.

Table 8-12 Adding a PDU8000


Path Parameter Setting

Choose Device Select PDU from the drop-down list box.


System attribute
Settings >
Device Device Type Select PDU8000 from the drop-down list
Management box.
and click Add Connect To Select ECC800 from the drop-down list
Device. The box.
parameters
for adding Communicati Select COM1 from the drop-down list box.
devices are ons Port NOTE
displayed. The setting example indicates that the
PDU8000 is connected to the COM1 port on the
ECC800-Pro. If the PDU8000 is connected to
another port, select the number of the
connected port.

Device In this example, Device Address is set to 1.


Address During actual configuration, set the device
address for the PDU8000 based on the
actual situation.

3. Click Test Connect to check whether the PDU8000 is properly connected to


the ECC800-Pro.
– If the connection succeeds, click Confirm. The connected devices are
displayed in the Number of connected devices list.

Issue 02 (2023-02-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 284
ECC800 Data Center Controller
User Manual (ECC800-Pro V100R023C00) 8 FAQ

– If the connection fails, check whether the device is properly connected to


the ECC800-Pro, whether the device and ECC800-Pro are running
properly, and whether the parameter settings are consistent with the
device parameters.

----End

8.7.13 How Can I Set and Add an rPDU?

Prerequisites
One end of the straight-through cable has been connected to the COM, SER, or
RS485 port on the rPDU, and the other end has been connected to the COM port
on the ECC800-Pro collector, UIM20A expansion module, or ETH converter.

Context

Table 8-13 rPDU basic information

Model Name Displayed on the Eleventh and Twelfth


WebUI Characters in Device
Barcodea

PDU2000-32-1PH-20/4- PDU2000-M(C) FT
M1/CLEVER

PDU2000-32-1PH-20/4- PDU2000-M(H) 6B
M1/HPX

MD-1324-2004 rPDU-MPDU FT

PN1-32I10-20E4G-AV4 rPDU-PN 6B

ZFIF-112-0800 rPDU FT

PN1-16X18-8E-AH4W 6B

ZZIF-130-2004 FT

PN1-32I15-20E4G-AV4W 6B

a: The barcode starts with 21 and is attached to the device.

The PDU2000-M(C) and PDU2000-M(H) are used as examples.

Procedure
Step 1 Set the PDU2000 monitoring parameters.
● Set the PDU2000-M (C) monitoring parameters.
NOTE

The display of a single-phase module is used as an example.

Issue 02 (2023-02-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 285
ECC800 Data Center Controller
User Manual (ECC800-Pro V100R023C00) 8 FAQ

– After the PDU2000-M (C) is powered on, the LCM displays the
initialization screen.

Figure 8-10 PDU2000-M (C) initialization screen

– Press MENU to enter the device communications address screen.

Figure 8-11 PDU2000-M (C) communications settings

– Press the DOWN and UP buttons to select the address to be set.


– Press MENU to confirm the settings.
NOTE

The parameter settings take effect only if you press MENU and then the
PDU2000-M (C) buzzes and restarts. If you do not press MENU, the PDU2000-M
(C) buzzes and restarts automatically after 30s and the settings are not saved.
● Set the PDU2000-M (H) monitoring parameters.
NOTE

The display of a single-phase module is used as an example.


– After the PDU2000-M (H) is powered on, press MENU. The LCM displays

.
– Press MENU again to access the device communications address screen.

Figure 8-12 PDU2000-M (H) communications settings

– Press DOWN and UP to select the address to be set.


– Press MENU to confirm the settings.

Issue 02 (2023-02-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 286
ECC800 Data Center Controller
User Manual (ECC800-Pro V100R023C00) 8 FAQ

NOTE

If modification is successful, is displayed: If modification fails,

is displayed:

Step 2 Add a PDU2000.


1. Log in to the ECC800-Pro WebUI as an administrator.
2. Add a PDU2000.

Table 8-14 Adding a PDU2000


Path Parameter Setting

Choose Device Select PDU from the drop-down list box.


System attribute
Settings >
Device Device Type Select PDU2000-M (C) or PDU2000-M
Management (H) from the drop-down list box based on
and click Add the actual device.
Device. The Connect To Select ECC800 from the drop-down list
parameters box.
for adding
devices are Communicati Select COM1 from the drop-down list box.
displayed. ons Port NOTE
The setting example indicates that the
PDU2000 is connected to the COM1 port on the
ECC800-Pro. If the PDU2000 is connected to
another port, select the number of the
connected port.

Device Enter the actual device address of the


Address PDU2000.

3. Click Test Connect to check whether the PDU2000 is properly connected to


the ECC800-Pro.
– If the connection succeeds, click Confirm. The connected devices are
displayed in the Number of connected devices list.
– If the connection fails, check whether the device is properly connected to
the ECC800-Pro, whether the device and ECC800-Pro are running
properly, and whether the parameter settings are consistent with the
device parameters.

----End

Issue 02 (2023-02-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 287
ECC800 Data Center Controller
User Manual (ECC800-Pro V100R023C00) 8 FAQ

8.7.14 How Can I Set and Add an ATS?

Prerequisites
One end of the straight-through cable has been connected to the COM port on
the ATS, and the other end has been connected to the COM port on the ECC800-
Pro or ETH converter.

Context
The ATS (ABB) model is OMD800.

Procedure

Step 1 Set the ATS device address. On the ATS display panel, tap , choose Device
Configuration > Modbus and set the device address.
NOTE

● The ATS device address is 1 by default.


● The preset password is 0001 for the ATS display panel.

Step 2 Add an ATS.


1. Log in to the ECC800-Pro WebUI as an administrator.
2. Add an ATS.

Table 8-15 Adding an ATS

Path Parameter Setting

Choose Device Select ATS from the drop-down list box.


System attribute
Settings >
Device Device Type Select ATS from the drop-down list box.
Management Connect To Select ECC800 from the drop-down list
and click Add box.
Device. The
parameters Communicati Select COM1 from the drop-down list box.
for adding ons Port NOTE
devices are The setting example indicates that the ATS is
displayed. connected to the COM1 port on the ECC800-
Pro. If the ATS is connected to another port,
select the number of the connected port.

Device In this example, Device Address is set to 1.


Address During actual configuration, set the device
address for the ATS based on the actual
situation.

3. Click Test Connect to check whether the ATS is properly connected to the
ECC800-Pro.

Issue 02 (2023-02-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 288
ECC800 Data Center Controller
User Manual (ECC800-Pro V100R023C00) 8 FAQ

– If the connection succeeds, click Confirm. The connected devices are


displayed in the Number of connected devices list.
– If the connection fails, check whether the device is properly connected to
the ECC800-Pro, whether the device and ECC800-Pro are running
properly, and whether the parameter settings are consistent with the
device parameters.

----End

8.7.15 How Do I Set and Add an Electricity Meter?


Prerequisites
● The RS485 communications cable of the electricity meter is correctly
connected.
● The electricity meter is working properly.
● Communications parameters have been correctly set for the electricity meter.
If the communications parameters of the electricity meter cannot be set
based on the recommended values in the following table, modify the
communications parameters for the COM port on the ECC, UIM, or ETH
converter that connects to the electricity meter to ensure that the parameters
are consistent with the communications parameters of the electricity meter.
Parameter Default Default Default Recommend
Settings for Settings for Settings for ed Values
the COM the COM the COM for the
Port on the Port on the Port on the Electricity
ECC UIM ETH Meter
Converter

Menu Path Monitoring Monitoring Monitoring For details,


> System > > System > > System > see the
ECC800 > UIM > ETH electricity
Running Running Converter > meter
Parameters Parameters Running manual.
> Unhide All > Unhide All Parameters
Advanced Advanced
Signals > Signals >
COM Port COM Port
Parameters Parameters

Baud rate 9600 9600

Data bit 8 8

Stop bit 1 1

Parity None None

Context
The supported electricity meter models are subject to change due to product
upgrade. The actual UI may vary.

Issue 02 (2023-02-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 289
ECC800 Data Center Controller
User Manual (ECC800-Pro V100R023C00) 8 FAQ

Figure 8-13 Electricity meter models

Procedure
Step 1 Log in to the ECC800-Pro WebUI as an administrator.
Step 2 Add an electricity meter.

Table 8-16 Adding an electricity meter


Path Parameter Setting

Choose System Device attribute Select Electricity Meter from the


Settings > Device drop-down list box.
Management
and click Add Device Type Set this parameter based on the
Device. The connected device model.
parameters for Connect To Set this parameter based on the
adding devices connection position.
are displayed.
Communications Set this parameter based on the
Port connected port.

Device Address Set this parameter based on the


communications address of the
electricity meter.

Step 3 Click Test Connect to check whether the electricity meter is properly connected to
the ECC800-Pro.
● If the connection succeeds, click Confirm. The device connection information
is displayed in the Number of connected devices list.
● If the connection fails, check whether the device is properly connected to the
ECC800-Pro, whether the device and ECC800-Pro are running properly, and
whether the parameter settings are consistent with the device parameters.

----End

Issue 02 (2023-02-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 290
ECC800 Data Center Controller
User Manual (ECC800-Pro V100R023C00) 8 FAQ

8.7.16 How Can I Set and Add a NetCol5000-A011/A025/A035/


A042/A050/A065 (Modbus-TCP)?
Prerequisites
One end of the straight-through cable has been connected to the FE_1 port on the
NetCol5000-A011/A025/A035/A042/A050/A065 main control board, and the other
end has been connected to the PoE port on the smart ETH gateway.

Context
The following describes how to set and add a NetCol5000-A042.

Procedure
Step 1 Set NetCol5000-A042 monitoring parameters.
1. Enter the NetCol5000-A042 home screen, tap Settings, choose the user name
admin, and enter the password 000001. After login, the settings screen of the
NetCol5000-A042 is displayed.
2. Choose Comm Settings > LAN IP Settings, set LAN IP assigning mode to
Automatic (DHCP), and click Submit.
3. Choose Settings > Comm Settings > Modbus Settings, and set Connection
mode to Server and client, Server encryption to Enable.
NOTE

After the NetCol5000-A042 parameters are set, the ECC800-Pro can automatically identify
the automatic access of the NetCol5000-A042.

Step 2 Set the running parameters and control parameters for the NetCol5000-A042 on
the WebUI.
1. Log in to the ECC800-Pro WebUI as an administrator.
2. Choose Monitoring > Cooling > NetCol5000-A0421.
NOTE

1 in NetCol5000-A0421 is variable and subject to change with the smart cooling


product model and connection sequence. The displayed value prevails.
3. On the Running Parameters tab page, set smart cooling product running
parameters.
4. On the Controls tab page, set the smart cooling product control parameters
(such as on/off control parameters).

CAUTION

After the smart cooling product is shut down, the temperature of the smart
module increases and data running is affected. Exercise caution when
performing this operation.

----End

Issue 02 (2023-02-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 291
ECC800 Data Center Controller
User Manual (ECC800-Pro V100R023C00) 8 FAQ

8.7.17 How Can I Set and Add a NetCol5000-A025 (Modbus-


MAC)?
Prerequisites
One end of the straight-through cable has been connected to the FE_1 port on the
NetCol5000-A025 main control board, and the other end has been connected to
the PoE port on the ETH converter.

Procedure
Step 1 Set NetCol5000-A025 monitoring parameters.
1. Enter the NetCol5000-A025 home page, click Settings, choose the user name
admin, and enter password 000001. After login, the settings screen of the
NetCol5000-A025 is displayed.
2. Choose Comm Settings > LAN IP Settings, set LAN IP assigning mode to
Automatic (DHCP), and click Submit.
3. Choose Settings > Comm Settings > Modbus Settings, and set Connection
mode to Server and client, Server encryption to Enable.
NOTE

After the NetCol5000-A025 parameters are set, the ECC800-Pro can automatically identify
the automatic access of the NetCol5000-A025.

Step 2 Set the running parameters and control parameters for the 25 kW smart cooling
product on the ECC800-Pro WebUI.
1. Log in to the ECC800-Pro WebUI as an administrator.
2. Choose Monitoring > Cooling > NetCol5000-A0251.
NOTE

– 1 in NetCol5000-A0251 is variable and subject to change with the smart cooling


product model and connection sequence. The displayed value prevails.
3. On the Running Parameters tab page, set running parameters.
4. On the Controls tab page, set the smart cooling product control parameters
(such as on/off control parameters).

CAUTION

After the smart cooling product is shut down, the temperature of the smart
module increases and data running is affected. Exercise caution when
performing this operation.

----End

Issue 02 (2023-02-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 292
ECC800 Data Center Controller
User Manual (ECC800-Pro V100R023C00) 8 FAQ

8.7.18 How Can I Set and Add a NetCol5000-C(030, 032)/


NetCol5000-C(065, 080) (over Modbus TCP)?
Prerequisites
One end of the straight-through cable has been connected to the FE_IN port on
the main control board of the NetCol5000-C (030, 032)/NetCol5000-C (065, 080),
and the other end has been connected to the POE port on the smart ETH gateway.

Context
The following describes how to set and add a NetCol5000-C(030, 032).

Procedure
Step 1 Set NetCol5000-C(030, 032) monitoring parameters.
1. Enter the NetCol5000-C(030, 032) home page, click Settings, choose user
name admin and enter password 000001. After login, the settings screen of
the NetCol5000-C(030, 032) is displayed.
2. Choose Settings > Comm Settings > LAN IP Settings, set LAN IP assigning
mode to Automatic(DHCP), and tap Submit.
3. Choose Settings > Comm Settings > Modbus Settings, and set Connection
mode to Server and client, Server encryption to Enable.
NOTE

● After setting parameters for the NetCol5000-C(030, 032), the ECC800-Pro discovers the
smart cooling product automatically.
● The earlier version has Protocol setting on the screen. The actual screen may vary.

Step 2 Set the running parameters and control parameters for the NetCol5000-C(030,
032) on the WebUI.
1. Log in to the ECC800-Pro WebUI as an administrator.
2. Choose Monitoring > Cooling > NetCol5000-C0301.
NOTE

1 in NetCol5000-C0301 is variable and subject to change with the smart cooling


product model and connection sequence. The displayed value may vary.
3. On the Running Parameters tab page, set smart cooling product running
parameters.
4. On the Controls tab page, set the smart cooling product control parameters
(such as on/off control parameters).

CAUTION

After the smart cooling product is shut down, the temperature of the smart
module increases and data running is affected. Exercise caution when
performing this operation.

----End

Issue 02 (2023-02-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 293
ECC800 Data Center Controller
User Manual (ECC800-Pro V100R023C00) 8 FAQ

8.7.19 How Can I Set and Add a NetCol5000-C030 (Modbus


RTU)?
Prerequisites
One end of the straight-through cable has been connected to the J73
communications port on the NetCol5000-C030 main control board, and the other
end has been connected to the COM port on the ECC800-Pro collector or ETH
converter.

Procedure
Step 1 Set NetCol5000-C030 monitoring parameters.
1. Enter the NetCol5000-C030 home page, click Settings, choose the user name
Admin and enter password 000001. After login, the settings screen of the
NetCol5000-C030 is displayed.
2. Choose Settings > Comm Settings > Modbus Settings, choose Baud rate to
9600 and set Comm address to 1.
NOTE

The earlier version has Protocol setting on the screen. The actual screen prevails.

Step 2 Add a NetCol5000-C030.


1. Log in to the ECC800-Pro WebUI as an administrator.
2. Add a NetCol5000-C030.

Table 8-17 Adding a NetCol5000-C030

Path Parameter Setting

Choose Device Select Air Conditioner from the drop-


System attribute down list box.
Settings >
Device Device Type Select NetCol5000-C from the drop-down
Management list box.
and click Add Connect To Select ECC800 from the drop-down list
Device. The box.
parameters
for adding Communicati Select COM1 from the drop-down list box.
devices are ons Port NOTE
displayed. The setting example indicates that the
NetCol5000-C is connected to the COM1 port
on the ECC800-Pro. If the NetCol5000-C is
connected to another port, select the number of
the connected port.

Device In this example, Device Address is set to 1.


Address During actual configuration, set the device
address for the NetCol5000-C based on the
actual situation.

Issue 02 (2023-02-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 294
ECC800 Data Center Controller
User Manual (ECC800-Pro V100R023C00) 8 FAQ

3. Click Test Connect to check whether the NetCol5000-C030 connects to the


ECC800-Pro properly.
– If the NetCol5000-C030 connects to the ECC800-Pro successfully, click
Confirm. The connected devices are displayed in the Number of
connected devices list.
– If the connection fails, check whether the NetCol5000-C030 is properly
connected to the ECC800-Pro, whether the NetCol5000-C030 and
ECC800-Pro are running properly, and whether the parameter settings are
consistent with the NetCol5000-C030 parameters.
Step 3 Set the running parameters and control parameters for the NetCol5000-C030 on
the WebUI.
1. Log in to the ECC800-Pro WebUI as an administrator.
2. Choose Monitoring > Cooling > NetCol5000-C0301.
NOTE

1 in NetCol5000-C0301 is variable and subject to change with the smart cooling


product model and connection sequence. The displayed value prevails.
3. On the Running Parameters tab page, set smart cooling product running
parameters.
4. On the Controls tab page, set the smart cooling product control parameters
(such as on/off control parameters).

CAUTION

After the smart cooling product is shut down, the temperature of the smart
module increases and data running is affected. Exercise caution when
performing this operation.

----End

8.7.20 How Can I Set NetCol8000-A Parameters (Modbus-


TCP)?
Prerequisites
One end of the straight-through cable has been connected to the FE port on the
NetCol8000-A main control board, and the other end has been connected to the
LAN port on the ECC800-Pro, PoE port on the smart ETH gateway, or PoE port on
the smart busbar.

Procedure
Step 1 Set NetCol8000-A monitoring parameters.
1. Enter the NetCol8000-A home screen, tap Settings, choose the user name
admin and enter the password 000001. After login, the settings screen of the
NetCol8000-A is displayed.
2. Choose Settings > Comm Settings > LAN IP Settings, set LAN IP assigning
mode to Automatic(DHCP), and tap Submit.

Issue 02 (2023-02-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 295
ECC800 Data Center Controller
User Manual (ECC800-Pro V100R023C00) 8 FAQ

3. Choose Settings > Comm Settings > Modbus Settings, and set Connection
mode to Server and client, Server encryption to Enable.
NOTE

After the NetCol8000-A parameters are set, the ECC800-Pro can automatically identify the
NetCol8000-A.

Step 2 Set the running parameters and control parameters for the NetCol8000-A on the
WebUI.
1. Log in to the ECC800-Pro WebUI as an administrator.
2. Choose Monitoring > Cooling > NetCol8000-A1.
NOTE

1 in NetCol8000-A1 is variable and subject to change with the smart cooling product
model and connection sequence. The displayed value may vary.
3. On the Running Parameters tab page, set smart cooling product running
parameters.
4. On the Controls tab page, set the smart cooling product control parameters
(such as on/off control parameters).

CAUTION

After the smart cooling product is shut down, the temperature of the smart
module increases and data running is affected. Exercise caution when
performing this operation.

----End

8.7.21 How Can I Set and Add an IP Device?

Prerequisites
● An IP device is connected to the ECC800-Pro over a switch. The device and
ECC800-Pro have been powered on.
● You have obtained the IP address of the IP device.

Context
● IP devices, such as ATMs, are devices with IP attributes in equipment room or
site. By adding an IP device, you connect the device to the ECC800-Pro in the
same network so that the ECC800-Pro monitors the device status. If the IP
device is offline, the ECC800-Pro will report a disconnection alarm on its
WebUI.
NOTE

In the LAN scenario, the IP devices and the ECC800-Pro must be in the same network.
● Following is a procedure example about how to add five IP devices with the
online detection timeout interval being 29 seconds.

Issue 02 (2023-02-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 296
ECC800 Data Center Controller
User Manual (ECC800-Pro V100R023C00) 8 FAQ

Procedure
Step 1 Log in to the ECC800-Pro WebUI as an administrator.

Step 2 Choose Monitoring > System > ECC800 > Running Parameters.

Step 3 Click Unhide All Advanced Signals, on the IP Device Detection Parameters tab
page, set Online detection timeout interval to 29. The value range is 10 to 60
seconds. Click Submit.
NOTE

Online detection timeout interval is 30 by default, which means that the ECC800-Pro
determines that the communication with the device is interrupted if the device has no
response within 30 seconds.

Step 4 Set IP device num to 5. The value range is 0 to 100.

Step 5 Click Submit. The IP Device 1-5 tab page is displayed.

Step 6 On the IP Device 1-5 tab page, set Enable online detection IP device 1 to
Enable.

Step 7 Click Submit.

Step 8 Specify IP device 1 address.


NOTE

● Set IP device 1 address to the IP address of IP device 1. For example, set IP device 1
address to 192.168.2.137.
● Add other IP devices in the same way.

Step 9 Click Submit.

Step 10 (Optional) If you need to change the name of an IP device, perform the following
steps:
1. Choose System Settings > Signal Name Modify. The Batch Signal
Configuration page is displayed.
2. Set Device type to ECC800, set Device name to ECC800, and click OK.
3. On the query result tab page, set the new signal name of IP device 1 to XXX
and click Submit.

----End

8.7.22 How Can I Set and Add an Independent Deployment


AI_DI Unit?

Prerequisites
One end of the straight-through cable has been connected to the COM_IN port on
the independent deployment AI_DI unit, and the other end has been connected to
the COM port on the ECC800-Pro collector or ETH converter.

Issue 02 (2023-02-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 297
ECC800 Data Center Controller
User Manual (ECC800-Pro V100R023C00) 8 FAQ

Procedure
Step 1 Set monitoring parameters for the independent deployment AI_DI unit.

Set the address of the independent deployment AI_DI unit to 1 or 2 by setting its
DIP switch.

The DIP switch consists of toggle switches 1–4 (from left to right). Toggle switches
1–3 specify the address of the independent deployment AI_DI unit. Toggle switch 4
specifies the address of the RS485 build-out resistor. 1 indicates ON, and 0
indicates OFF.

NOTE

The device address for the independent deployment AI_DI unit can only be set to 1 or 2.

Table 8-18 Setting device addresses

Address Toggle Switch 1 Toggle Switch 2 Toggle Switch 3

1 OFF ON ON

2 ON OFF ON

NOTE

If the signal quality is poor due to signal reflection caused by long communications cables
(longer than 50 m), set toggle switch 4 to ON for the furthest independent deployment AI_DI
unit. After the DIP switch settings are modified, power off and restart the independent
deployment AI_DI unit for the new settings to take effect.

Step 2 Add an independent deployment AI_DI unit.


1. Log in to the ECC800-Pro WebUI as an administrator.
2. Add an independent deployment AI_DI unit.

Table 8-19 Adding an independent deployment AI_DI unit

Path Parameter Setting

Choose Device Select Faraway AIDI from the drop-down


System Attribute list box.
Settings >
Device Device Type Select Independent Deployment AI_DI
Management Unit from the drop-down list box.
and click Add Connect To Select ECC800 from the drop-down list box.
Device. The
parameters
for adding
devices are
displayed.

Issue 02 (2023-02-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 298
ECC800 Data Center Controller
User Manual (ECC800-Pro V100R023C00) 8 FAQ

Path Parameter Setting

Communica Select COM3 from the drop-down list box.


tions Port NOTE
The setting example indicates that the
independent deployment AI_DI unit is connected
to the COM3 port on the ECC800-Pro. If the
independent deployment AI_DI unit is connected
to another port, set the COM port to the ECC800-
Pro port connected to the independent
deployment AI_DI unit.

Device In this example, Device Address is set to 1.


Address During actual configuration, set the device
address for the independent deployment
AI_DI unit based on the actual situation.

3. Click Test Connect to check whether the independent deployment AI_DI unit
connects to the ECC800-Pro properly.
a. If the connection succeeds, click Confirm. The device connection
information is displayed in the Number of connected devices list.
b. If the connection fails, check whether the device is properly connected to
the ECC800-Pro, whether the device and ECC800-Pro are running
properly, and whether the parameter settings are consistent with the
device parameters.

----End

8.7.23 How Can I Set and Add a UIM20A Expansion Module


(Modbus-TCP)?

Prerequisites
Connect one end of a network cable to the PoE port on the UIM20A expansion
module and the other end to the LAN port on the ECC800-Pro or the PoE port on
the smart ETH gateway.

NOTE

Cascading of UIM20A expansion modules is not supported.

Context
The UIM20A expansion module supports self-discovery and does not need to set
parameters.

Procedure
Step 1 Set the running parameters and control parameters for the UIM20A expansion
module on the WebUI.
1. Log in to the ECC800-Pro WebUI as an administrator.

Issue 02 (2023-02-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 299
ECC800 Data Center Controller
User Manual (ECC800-Pro V100R023C00) 8 FAQ

2. Choose Monitoring > System > UIM Group > UIMn.


3. On the Running Parameters tab page, set UIM20A expansion module
running parameters.
4. On the Controls tab page, set the UIM20A expansion module control
parameters.

----End

8.7.24 How Can I Set and Add a Multi-functional Sensor?


If a multi-functional sensor is installed, perform the following steps to configure it.

Prerequisites
One end of the straight-through cable has been connected to the PoE port on the
multi-functional sensor, and the other end has been connected to the PoE port on
the smart ETH converter.

Procedure
Step 1 Set multi-functional sensor parameters.
On the WebUI, choose Monitoring > Aisle > Multi-Func Sensor Group > Multi-
Func Sensor1 > Running Parameters, ensure that Smoke enable and Temp
enable are set to Enable, set High temperature alarm threshold and other
parameters as required, and then click Submit.

NOTE

If multiple multi-functional sensors are connected, commission one multi-functional sensor


first and then commission the other multi-functional sensors in the same way.

Step 2 Check the functions of the multi-functional sensor.

Table 8-20 Function commissioning


Check Method Normal Connection Status

Temperature and humidity You can view the current ambient temperature
detection: View the running and humidity.
information about the multi-
functional sensor on the
WebUI.

Issue 02 (2023-02-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 300
ECC800 Data Center Controller
User Manual (ECC800-Pro V100R023C00) 8 FAQ

Check Method Normal Connection Status

Smoke detection: Simulate a ● Start counting time immediately when smoke


smoky environment. is entering the hole. After about 30 seconds,
Smoke generation methods: the red ALM indicator turns on, and the app
Generate smoke. Place the or WebUI displays a smoke alarm.
paper 5–10 cm away from ● Some time later after the smoke is dispersed,
the smoke compartment, the red ALM indicator turns off and the
and let smoke enter the smoke alarm disappears.
smoke compartment through
the hole in the side of the
multi-functional sensor.
Smoke dispersing method:
Send clean air to the smoke
compartment through the
hole in the side of the multi-
functional sensor.
CAUTION
● Do not generate open
flame, and ensure that
smoke does not damage
any device.
● When testing the smoke
detection function of the
multi-functional sensor, do
not start the smart cooling
product or fan, because the
air from the smart cooling
product or fan will interfere
with the smoke, and
therefore affect the
detection result.
● After the commissioning is
complete, clean up dust.

Issue 02 (2023-02-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 301
ECC800 Data Center Controller
User Manual (ECC800-Pro V100R023C00) 8 FAQ

Figure 8-14 Detecting smoke

(1) Smoke compartment (2) ALM indicator

----End

8.7.25 How Can I Set and Add the Smoke Sensor (Connected
to the AI/DI Port on the ECC800-Pro)?
If a smoke sensor is installed, perform the following steps to configure it.

Prerequisites
● Connecting Cables to the Smoke Sensor (NC):
The smoke sensor has been connected to the AI/DI port on the ECC800-Pro
collector using a network cable.
Short-circuit core wires 1 and 8 on the other end of the network cable, and
connect the network cable to the cable delivered with the smoke sensor. The
following table describes the cable connection.

Table 8-21 Smoke sensor cable connection

Wire of the Network Cable Smoke Sensor Cable

Core wire 1 (orange-white), core GND (black)


wire 8 (brown)

Core wire 3 (green-white) +12 V (red)

Core wire 6 (green) Normally closed end (yellow)

Core wire 7 (brown-white) Common end (green)

Issue 02 (2023-02-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 302
ECC800 Data Center Controller
User Manual (ECC800-Pro V100R023C00) 8 FAQ

Wire of the Network Cable Smoke Sensor Cable

None (reserved; no connection Normally open end (blue)


needed and to be insulated)

● Connecting Cables to the Smoke Sensor:


One end of the network cable has been stripped, core wires 1 (orange-white),
5 (white-blue) and 8 (brown) have been short-circuited, core wires 6 (green)
and 7 (brown-white) have been connected to the cable delivered with the
smoke sensor, and the other end of the network cable has been connected to
the AI/DI port on the ECC800-Pro.

Context
● If the sensor is prefabricated, only check its settings.
● The actual value prevails. Only the method of the parameter settings is
described.

Procedure
Step 1 Set smoke sensor parameters.
NOTE

In this example, the smoke sensor is connected to the AI/DI_2 port on the ECC800-Pro.
1. Log in to the ECC800-Pro WebUI as an administrator.
2. Choose System Settings > Signal Name Modify. The Batch Signal
Configuration page is displayed.
3. Set Device type to ECC800, set Device name to ECC800, and click OK.
4. On the query result tab page, set the new signal name of AI/DI_2 to Smoke
and click Submit.
5. Choose Monitoring > System > ECC800 > Running Parameters > AI/DI_2
Port Settings.
6. Set Smoke sensor to Enable and click Submit.
7. Confirm that Smoke sensor type is automatically identified as Smoke sensor
or Smoke sensor(NC).
8. Click Unhide All Advanced Signals, then click Power Supply Parameters.
Ensure that I power supply enable(AIDI_2/COM1/AIDI_4/COM3) is Enable.
Step 2 Check the monitoring functions of smoke sensor.

Issue 02 (2023-02-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 303
ECC800 Data Center Controller
User Manual (ECC800-Pro V100R023C00) 8 FAQ

Table 8-22 Function check

Check Method Normal Connection Status Alarm Clearance Method

Simulate a Smoke DI alarm is displayed ● If Smoke sensor type is


smoky on the active alarm page of Smoke Sensor, power off
environment the app or WebUI. and reset the smoke
under the smoke sensor to clear the alarm.
sensor. ● If Smoke sensor type is
set to Smoke
Sensor(NC), press the
reset button of the smoke
sensor to clear the alarm.

----End

8.7.26 How Can I Set and Add the Smoke Sensor (Connected
to the AI/DI Port on the Skylight Actuator)?
If a smoke sensor is installed, perform the following steps to configure it.

Prerequisites
The smoke sensor has been connected to the AI/DI port on the skylight actuator
using a network cable.

To connect the cable for the smoke sensor, perform the following steps:

Short-circuit core wires 1 and 8 on the other end of the network cable, and
connect the network cable to the cable delivered with the smoke sensor. The
following table describes the cable connection.

Table 8-23 Smoke sensor cable connection

Wire of the Network Cable Smoke Sensor Cable

Core wire 1 (orange-white), core wire GND (black)


8 (brown)

Core wire 3 (green-white) +12 V (red)

Core wire 6 (green) Normally closed end (yellow)

Core wire 7 (brown-white) Common end (green)

None (reserved; no connection needed Normally open end (blue)


and to be insulated)

Context
● If the sensor is prefabricated, only check its settings.

Issue 02 (2023-02-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 304
ECC800 Data Center Controller
User Manual (ECC800-Pro V100R023C00) 8 FAQ

● The actual value prevails. Only the method of the parameter settings is
described.

Procedure
Step 1 Set smoke sensor parameters.
NOTE

In this example, the smoke sensor is connected to the AI/DI_1 port on the skylight actuator.
1. Log in to the ECC800-Pro WebUI as an administrator.
2. Choose Monitoring > Aisle > Skylight Actuator Group > Skylight Actuator
1 > Running Parameters > DI1 alarm level.
3. Set DI1 alarm level to Low voltage alarm or High voltage alarm, and click
Submit.
NOTE

– Set DI1 alarm level to Low voltage alarm if the smoke sensor is connected over
NO.
– Set DI1 alarm level to High voltage alarm if the smoke sensor is connected over
NC.

Step 2 Check the monitoring functions of smoke sensor.

Table 8-24 Function check

Check Method Normal Connection Status Alarm Clearance Method

Simulate a DI1_smoke alarm is Press the reset button on the


smoky displayed on the active smoke sensor to clear the
environment alarm page of the app or alarm.
under the smoke WebUI.
sensor.

----End

8.7.27 How Can I Set and Add the Smoke Sensor (Connected
to the AI/DI Port on the Rack Environment Unit)?
If a smoke sensor is installed, perform the following steps to configure it.

Prerequisites
One end of the network cable has been stripped, core wires 1, 5 and 8 have been
short-circuited, core wires 6 and 7 have been connected to the cable delivered
with the smoke sensor, and the other end of the network cable has been
connected to the AI/DI port on the rack environment unit.

Context
● If the sensor is prefabricated, only check its settings.

Issue 02 (2023-02-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 305
ECC800 Data Center Controller
User Manual (ECC800-Pro V100R023C00) 8 FAQ

● The actual value prevails. Only the method of the parameter settings is
described.

Procedure
Step 1 Set smoke sensor parameters.
NOTE

In this example, the smoke sensor is connected to the AI/DI_1 port on the rack environment
unit.
1. Log in to the ECC800-Pro WebUI as an administrator.
2. Choose Monitoring > Cabinet > IT Cabinet n > Cabinet Collector n >
Running Parameters.
3. In AI/DI_1 Port Settings area, set AI/DI_1 sensor to Enable, and click
Submit.
4. Set AI/DI_1 sensor type to Smoke sensor, and click Submit.

Step 2 Check the monitoring functions of smoke sensor.

Table 8-25 Function check

Check Method Normal Connection Status Alarm Clearance Method

Simulate a Smoke sensor status(AI/ If Smoke sensor type is


smoky DI_1) is displayed on the Smoke Sensor, power off
environment active alarm page of the app and reset the smoke sensor
under the smoke or WebUI. to clear the alarm.
sensor.

----End

8.7.28 How Can I Set and Add the Smoke Sensor (Connected
to the AI/DI Port on the UIM20A expansion module)?
If a smoke sensor is installed, perform the following steps to configure it.

Prerequisites
One end of the network cable has been stripped, core wires 1, 5, and 8 have been
short-circuited, core wires 6 and 7 have been connected to the cable delivered
with the smoke sensor, and the other end of the network cable has been
connected to the AI/DI port on the UIM20A expansion module.

Context
● If the sensor is prefabricated, only check its settings.
● The actual value prevails. Only the method of the parameter settings is
described.

Issue 02 (2023-02-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 306
ECC800 Data Center Controller
User Manual (ECC800-Pro V100R023C00) 8 FAQ

Procedure
Step 1 Set smoke sensor parameters.
NOTE

In this example, the smoke sensor is connected to the AI/DI_1 port on the UIM20A
expansion module.
1. Log in to the ECC800-Pro WebUI as an administrator.
2. Choose Monitoring > System > UIM Group> UIM n > Running Parameters.
3. In AI/DI_1 Port Settings area, set AI/DI_1 sensor to Enable, click Submit.
4. Set AI/DI_1 sensor type to Smoke sensor, click Submit.

Step 2 Check the monitoring functions of smoke sensor.

Table 8-26 Function check

Check Method Normal Connection Status Alarm Clearance Method

Simulate a Smoke sensor status(AI/ If Smoke sensor type is


smoky DI_1) is displayed on the Smoke Sensor, power off
environment active alarm page of the app and reset the smoke sensor
under the smoke or WebUI. to clear the alarm.
sensor.

----End

8.7.29 How Can I Set and Add the WLDS900 Water Sensor?
If a water sensor is installed, perform the following steps to configure it.

Prerequisites
One end of the straight-through cable has been connected to the RJ45 port on the
WLDS900 water sensor, and the other end has been connected to the AI/DI port
on the ECC800-Pro.

Context
● To use the AI/DI sensor, enable the corresponding AI/DI port and name the
sensor. The specific alarm then can be reported.
● If the sensor is prefabricated, only check its settings.
● The actual value may vary. Only the method of the parameter settings is
described.

Procedure
Step 1 Set water sensor parameters.

Issue 02 (2023-02-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 307
ECC800 Data Center Controller
User Manual (ECC800-Pro V100R023C00) 8 FAQ

NOTE

● In this example, the water sensor is connected to the AI/DI_1 port on the ECC800-Pro.
● The default alarm severity of the AI/DI port is Minor. If you want to change the alarm
severity, see How Can I Configure ECC800-Pro Alarm Parameters.
1. Log in to the ECC800-Pro WebUI as an administrator.
2. Choose System Settings > Signal Name Modify. The Batch Signal
Configuration page is displayed.
3. Set Device type to ECC800, set Device name to ECC800, and click OK.
4. On the query result tab page, set the new signal name of AI/DI_1 to Leak
and click Submit.
5. Choose Monitoring > System > ECC800 > Running Parameters > AI/DI_1
Port Settings.
6. Set Leak sensor to Enable and click Submit.
7. Confirm that Leak sensor type is automatically identified as Leak
sensor(Rope).
8. Click Unhide All Advanced Signals, then click Power Supply Parameters.
Ensure that III power supply enable(AIDI_1/DO) is Yes.

Step 2 Check functions of water sensors.

Table 8-27 Function check

Check Method Normal Connection Alarm Clearance


Status Method

Immerse the water Leak DI alarm is Wipe dry the water


detection cable in water. generated on the active detection cable. The
alarm screen of the app alarm disappears
or on the WebUI. automatically.

----End

8.7.30 How Can I Set and Add a WLDS600 Water Sensor?


If a water sensor is installed, perform the following steps to configure it.

Prerequisites
One end of the straight-through cable has been connected to the RJ45 port on the
WLDS600 water sensor, and the other end has been connected to the energized
COM port on the ECC800-Pro.

Procedure
Step 1 The default communications address 1 of the water sensor is used for connecting
to the ECC800-Pro.

Step 2 Log in to the ECC800-Pro WebUI as an administrator.

Issue 02 (2023-02-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 308
ECC800 Data Center Controller
User Manual (ECC800-Pro V100R023C00) 8 FAQ

Step 3 Add the water sensor.

Table 8-28 Adding the water sensor


Path Parameter Setting

Choose Device Select Sensor from the drop-down list box.


System attribute
Settings >
Device Device Type Select Water Sensor from the drop-down list
Management box.
and click Add Connect To Select ECC800 from the drop-down list box.
Device. The
parameters for Communicatio Select COM1 from the drop-down list box.
adding devices ns Port NOTE
are displayed. The setting example indicates that the water
sensor is connected to the COM1 port on the
ECC800-Pro. If the water sensor is connected to
another port, select the number of the connected
port.

Device Address In this example, Device Address is set to 1.


During actual configuration, set the device
address for the water sensor based on the
actual situation.

Step 4 Click Test Connect to check whether the water sensor connects to the ECC800-Pro
properly.
● If the water sensor connects to the ECC800-Pro successfully, click Confirm.
The connected devices are displayed in the Number of connected devices
list.
● If the connection fails, check whether the water sensor is properly connected
to the ECC800-Pro, whether the water sensor and ECC800-Pro are running
properly, and whether the parameter settings are consistent with the water
sensor parameters.
Step 5 Set water sensor parameters.
1. Log in to the ECC800-Pro WebUI as an administrator.
2. Choose Monitoring > System > Water Sensor > Running Parameters.
3. Set the parameters based on actual conditions, and click Submit.
Step 6 Check functions of water sensors.

Issue 02 (2023-02-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 309
ECC800 Data Center Controller
User Manual (ECC800-Pro V100R023C00) 8 FAQ

Table 8-29 Function check

Check Method Normal Connection Status Alarm Clearance Method

Immerse the ● Choose Monitoring > Wipe dry the water detection
water detection System > Water Sensor > cable. The alarm disappears
cable in water. Running Info. Check that automatically.
Leakage status is Alarm
and Distance from the
leakage point is greater
than or equal to 0 m.
● Choose Home > Active
Alarms. Check that a
water sensor alarm is
generated.

----End

8.7.31 How Can I Set and Add an Electrode Water Sensor?


If a water sensor is installed, perform the following steps to configure it.

Prerequisites
One end of the network cable has been stripped, core wires 7 and 8 have been
connected to the cable delivered with the electrode water sensor, and the other
end of the network cable has been connected to the AI/DI port on the rack
environment unit.

Context
● To use the AI/DI sensor, enable the corresponding AI/DI port and name the
sensor. The specific alarm then can be reported.
● If the sensor is prefabricated, only check its settings.
● The actual value prevails. Only the method of the parameter settings is
described.

Procedure
Step 1 Set water sensor parameters.
NOTE

In this example, the water sensor is connected to the AI/DI_5 port on the ECC800-Pro.
1. Log in to the ECC800-Pro WebUI as an administrator.
2. Choose System Settings > Signal Name Modify. The Batch Signal
Configuration page is displayed.
3. Set Device type to ECC800, set Device name to ECC800, and click OK.
4. On the query result tab page, set the new signal name of AI/DI_5 to Leak
and click Submit.

Issue 02 (2023-02-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 310
ECC800 Data Center Controller
User Manual (ECC800-Pro V100R023C00) 8 FAQ

5. Choose Monitoring > System > ECC800 > Running Parameters > AI/DI_5
Port Settings.
6. Set Leak sensor to Enable and click Submit.
7. Confirm that Leak sensor type is automatically identified as Leak
sensor(Electroc).
8. Click Unhide All Advanced Signals, and click Power Supply Parameters.
Ensure that II power supply enable(AIDI_3/COM2/AIDI_5) is Yes.

Step 2 Check functions of water sensors.

Table 8-30 Function check

Check Method Normal Connection Status Alarm Clearance Method

Immerse the two Leak DI alarm is generated Wipe dry the two contacts of
contacts of the on the active alarm screen of the water sensor. The alarm
electrode water the app or on the WebUI. disappears automatically.
sensor in water.

----End

8.7.32 How Can I Set and Add the Temperature Sensor


(Connected to the AI/DI Port on the ECC800-Pro)?
If a temperature sensor is installed, perform the following steps to configure it.

Prerequisites
One end of the straight-through cable has been connected to the RJ45 port on the
temperature sensor, and the other end has been connected to the AI/DI port on
the ECC800-Pro.

Context
● If the sensor is prefabricated, only check its settings.
● The actual value prevails. Only the method of the parameter settings is
described.
● If multiple temperature sensors are connected, commission them one by one.

Procedure
Step 1 Set temperature sensor parameters.
NOTE

In this example, the temperature sensor is connected to the AI/DI_2 port on the ECC800-
Pro.
1. Log in to the ECC800-Pro WebUI as an administrator.
2. Choose System Settings > Signal Name Modify. The Batch Signal
Configuration page is displayed.

Issue 02 (2023-02-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 311
ECC800 Data Center Controller
User Manual (ECC800-Pro V100R023C00) 8 FAQ

3. Set Device type to ECC800, set Device name to ECC800, and click OK.
4. On the query result tab page, set the new signal name of AI/DI_2 to
Temperature and click Submit.
5. Choose Monitoring > System > ECC800 > Running Parameters > AI/DI_2
Port Settings.
6. Set Temperature sensor to Enable and click Submit.
7. Confirm that Temperature sensor type is automatically identified as NTC.
Ensure that Temperature power supply is Yes.
8. Click Unhide All Advanced Signals, then click Power Supply Parameters.
Ensure that I power supply enable(AIDI_2/COM1/AIDI_4/COM3) is Enable.

Step 2 Check the monitoring functions of the temperature sensor.

Table 8-31 Function check

Check Method Normal Connection Status

View the operating You can view the current cabinet temperature.
information about the
temperature sensor on the
WebUI.

----End

8.7.33 How Can I Set and Add the Temperature Sensor


(Connected to the NTC Port on the Rack Environment Unit)?
If a temperature sensor is installed, perform the following steps to configure it.

Prerequisites
One end of the straight-through cable has been connected to the RJ45 port on the
temperature sensor, and the other end has been connected to the NTC port on the
rack environment unit.

Procedure
Step 1 The temperature sensor supports self-discovery and does not need to set
parameters.

Step 2 Check the monitoring functions of the temperature sensor.

Table 8-32 Function check

Check Method Normal Connection Status

Path: Monitoring > Cabinet You can view the current cabinet temperature.
> IT Cabinet n > Cabinet
Collector n

Issue 02 (2023-02-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 312
ECC800 Data Center Controller
User Manual (ECC800-Pro V100R023C00) 8 FAQ

----End

8.7.34 How Can I Commission a Temperature Sensor


(Connected to the NTC Port on the T/H Sensor)?
If a temperature sensor is installed, perform the following steps to configure it.

Prerequisites
Cables have been connected to the NTC, T/H sensor, and UIM20A expansion
module.

Figure 8-15 Wiring diagram

(1) UIM20A expansion module (2) T/H sensor (3) Temperature sensor

Procedure
Step 1 The NTC port on the T/H sensor connected to the temperature sensor supports
automatic identification. Therefore, you do not need to set parameters.

Step 2 Add the T/H sensor.


1. Log in to the ECC800-Pro WebUI as an administrator.
2. Add the T/H sensor.

Choose System Settings > Device Management and click Auto Discover
Device to add the T/H sensor. The device connection information is displayed.

Issue 02 (2023-02-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 313
ECC800 Data Center Controller
User Manual (ECC800-Pro V100R023C00) 8 FAQ

Figure 8-16 Device connection

Step 3 Check the monitoring functions of the temperature sensor.

Table 8-33 Function commissioning

Check Method Normal Connection Status

Path: Monitoring > You can view the current cabinet temperature.
Cabinet> IT Cabinet n > T/H
sensor n

----End

8.7.35 How Can I Set and Add a T/H Sensor (BOM Number:
33010516)?
If a T/H sensor is installed, perform the following steps to configure it.

Prerequisites
One end of the straight-through cable has been connected to the RS485_IN port
on the T/H sensor, and the other end has been connected to the COM port on the
ECC800-Pro or the UIM20A expansion module.

Context
This section describes how to set and add a T/H sensor by using the COM port on
the ECC800-Pro as an example.

Procedure
Step 1 Set the T/H sensor device address.

Set the T/H sensor device address through the DIP switch on the T/H sensor.

Toggle switches 1 to 6 of the DIP switch specify the device address in binary mode.
ON indicates 1, and OFF indicates 0.

Table 8-34 Setting a device address

Address Toggle Toggle Toggle Toggle Toggle Toggle


Switch 1 Switch 2 Switch 3 Switch 4 Switch 5 Switch 6

1 ON OFF OFF OFF OFF OFF

2 OFF ON OFF OFF OFF OFF

3 ON ON OFF OFF OFF OFF

Issue 02 (2023-02-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 314
ECC800 Data Center Controller
User Manual (ECC800-Pro V100R023C00) 8 FAQ

Address Toggle Toggle Toggle Toggle Toggle Toggle


Switch 1 Switch 2 Switch 3 Switch 4 Switch 5 Switch 6

4 OFF OFF ON OFF OFF OFF

Step 2 Add a T/H sensor.


1. Log in to the ECC800-Pro WebUI as an administrator.
2. Add a T/H sensor.

Table 8-35 Adding a T/H sensor

Path Parameter Setting

Choose Device Select Sensor from the drop-down list box.


System attribute
Settings >
Device Device Type Select T/H sensor from the drop-down list
Management box.
and click Add Connect To Select ECC800 from the drop-down list box.
Device. The
parameters Communica Select COM3 from the drop-down list box.
for adding tions Port NOTE
devices are The setting example indicates that the T/H sensor
displayed. is connected to the COM3 port on the ECC800-
Pro. If the T/H sensor is connected to another
port, select the number of the connected port.

Device In this example, Device Address is set to 1.


Address During actual configuration, set the device
address for the T/H sensor based on the
actual situation.

3. Click Test Connect to check whether the T/H sensor connects to the ECC800-
Pro properly.
– If the connection succeeds, click Confirm. The connected devices are
displayed in the Number of connected devices list.
– If the connection fails, check whether the device is properly connected to
the ECC800-Pro, whether the device and ECC800-Pro are running
properly, and whether the parameter settings are consistent with the
device parameters.

Step 3 Check functions of the T/H sensor.

Table 8-36 Function commissioning

Check Method Normal Connection Status

Check the running Choose Monitoring > Aisle > T/H Sensor Group
information about the T/H > T/H Sensorn > Running Info, and check the
sensor on the WebUI. current T/H information of the cabinet.

Issue 02 (2023-02-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 315
ECC800 Data Center Controller
User Manual (ECC800-Pro V100R023C00) 8 FAQ

Check Method Normal Connection Status

Set T/H sensor alarm Choose Monitoring > Aisle > T/H Sensor Group
thresholds. > T/H Sensorn > Running Parameters, and set
High temperature alarm threshold, Low
temperature alarm threshold, and High
humidity alarm threshold, Low humidity
alarm threshold as required.
NOTE
The default values of High temperature alarm
threshold, Low temperature alarm threshold, High
humidity alarm threshold, and Low humidity alarm
threshold are 30.0°C, 5.0°C, 85.0% RH, and 15.0%
RH, respectively.

----End

8.7.36 How Can I Set and Add the T/H Sensor (BOM Number:
02310NBS)?
If a T/H sensor is installed, perform the following steps to configure it.

Prerequisites
One end of the straight-through cable has been connected to the RS485_IN port
on the T/H sensor, and the other end has been connected to the COM port on the
ECC800-Pro or the UIM20A expansion module.

Context
This section describes how to set and add a T/H sensor by using the COM port on
the ECC800-Pro as an example.

Procedure
Step 1 Set the T/H sensor device address.

Set the T/H sensor device address through the DIP switch on the T/H sensor.

Toggle switches 1 to 6 of the DIP switch specify the device address in binary mode.
ON indicates 1, and OFF indicates 0.

Table 8-37 Setting a device address

Address Toggle Toggle Toggle Toggle Toggle Toggle


Switch 1 Switch 2 Switch 3 Switch 4 Switch 5 Switch 6

1 ON OFF OFF OFF OFF OFF

2 OFF ON OFF OFF OFF OFF

3 ON ON OFF OFF OFF OFF

Issue 02 (2023-02-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 316
ECC800 Data Center Controller
User Manual (ECC800-Pro V100R023C00) 8 FAQ

Address Toggle Toggle Toggle Toggle Toggle Toggle


Switch 1 Switch 2 Switch 3 Switch 4 Switch 5 Switch 6

4 OFF OFF ON OFF OFF OFF

Step 2 Add a T/H sensor.


1. Log in to the ECC800-Pro WebUI as an administrator.
2. Add a T/H sensor.

Table 8-38 Adding a T/H sensor

Path Parameter Setting

Choose Device Select Sensor from the drop-down list box.


System attribute
Settings >
Device Device Type Select T/H sensor from the drop-down list
Management box.
and click Add Connect To Select ECC800 from the drop-down list box.
Device. The
parameters Communica Select COM3 from the drop-down list box.
for adding tions Port NOTE
devices are The setting example indicates that the T/H sensor
displayed. is connected to the COM3 port on the ECC800-
Pro. If the T/H sensor is connected to another
port, select the number of the connected port.

Device In this example, Device Address is set to 1.


Address During actual configuration, set the device
address for the T/H sensor based on the
actual situation.

3. Click Test Connect to check whether the T/H sensor connects to the ECC800-
Pro properly.
– If the T/H sensor connects to the ECC800-Pro successfully, click Confirm.
The connected devices are displayed in the Number of connected
devices list.
– If the connection fails, check whether the T/H sensor is properly
connected to the ECC800-Pro, whether the T/H sensor and ECC800-Pro
are running properly, and whether the parameter settings are consistent
with the T/H sensor parameters.
Step 3 Check functions of the T/H sensor.

Table 8-39 Function check

Check Method Normal Connection Status

Check the running Choose Monitoring > Aisle > T/H Sensor Group
information about the T/H > T/H Sensorn > Running Info, and check the
sensor on the WebUI. current T/H information of the cabinet.

Issue 02 (2023-02-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 317
ECC800 Data Center Controller
User Manual (ECC800-Pro V100R023C00) 8 FAQ

Check Method Normal Connection Status

Set T/H sensor alarm Choose Monitoring > Aisle > T/H Sensor Group
thresholds. > T/H Sensorn > Running Parameters, and set
High temperature alarm threshold, Low
temperature alarm threshold, High humidity
alarm threshold and Low humidity alarm
threshold as required.
NOTE
The default values of High temperature alarm
threshold, Low temperature alarm threshold, High
humidity alarm threshold, and Low humidity alarm
threshold are 30.0°C, 5.0°C, 85.0% RH and 15.0% RH
respectively.

----End

8.7.37 How Can I Set and Add a T/H Sensor (BOM Number:
02311FQG/02312PBL)?
Prerequisites
One end of the straight-through cable has been connected to the RS485_IN port
on the T/H sensor, and the other end has been connected to the COM port on the
ECC800-Pro or the UIM20A expansion module.

Context
This section describes how to set and add a T/H sensor by using the COM port on
the ECC800-Pro as an example.

Procedure
Step 1 Set the T/H sensor device address.
Set the T/H sensor device address through the DIP switch on the T/H sensor.
Toggle switches 1–6 are used to set device addresses, toggle switch 7 is reserved,
and toggle switch 8 is used to switch the temperature unit.
Device addresses are set in binary encoding format in the range of 1–63. The first
bit is the least significant bit, and the sixth bit is the most significant bit. ON
indicates 1, and OFF indicates 0.

Issue 02 (2023-02-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 318
ECC800 Data Center Controller
User Manual (ECC800-Pro V100R023C00) 8 FAQ

Figure 8-17 T/H sensor DIP switch

Step 2 Add a T/H sensor.


1. Log in to the ECC800-Pro WebUI as an administrator.
2. Add a T/H sensor.

Table 8-40 Adding a T/H sensor

Path Parameter Setting

Choose Device Select Sensor from the drop-down list box.


System attribute
Settings >
Device Device Type Select T/H sensor from the drop-down list
Manageme box.
nt and click Connect To Select ECC800 from the drop-down list box.
Add Device.
The Communicatio Select COM3 from the drop-down list box.
parameters ns Port NOTE
for adding The setting example indicates that the T/H
devices are sensor is connected to the COM3 port on the
displayed. ECC800-Pro. If the T/H sensor is connected to
another port, select the number of the
connected port.

Device In this example, Device Address is set to 1.


Address During actual configuration, set the device
address for the T/H sensor based on the
actual situation.

3. Click Test Connect to check whether the T/H sensor connects to the ECC800-
Pro properly.
– If the T/H sensor connects to the ECC800-Pro successfully, click Confirm.
The connected devices are displayed in the Number of connected
devices list.
– If the connection fails, check whether the T/H sensor is properly
connected to the ECC800-Pro, whether the T/H sensor and ECC800-Pro
are running properly, and whether the parameter settings are consistent
with the T/H sensor parameters.

Issue 02 (2023-02-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 319
ECC800 Data Center Controller
User Manual (ECC800-Pro V100R023C00) 8 FAQ

Step 3 Check functions of the T/H sensor.

Table 8-41 Function commissioning


Check Method Normal Connection Status

Check the running Choose Monitoring > Aisle > T/H Sensor Group
information about the T/H > T/H Sensorn > Running Info, and check the
sensor on the WebUI. current T/H and NTC information of the cabinet.

Set T/H sensor alarm Choose Monitoring > Aisle > T/H Sensor Group
thresholds. > T/H Sensorn > Running Parameters, and set
High temperature alarm threshold, Low
temperature alarm threshold, High humidity
alarm threshold, Low humidity alarm
threshold, NTC1-6 high temperature alarm
threshold and NTC1-6 low temperature alarm
threshold as required.
NOTE
The default values of High temperature alarm
threshold, Low temperature alarm threshold, High
humidity alarm threshold, Low humidity alarm
threshold, NTC1-6 high temperature alarm
threshold and NTC1-6 low temperature alarm
threshold are 30.0°C, 5.0°C, 85.0% RH, 15.0% RH,
45°C and 10°C respectively.

----End

8.7.38 How Can I Set and Add a Vibration Sensor?


Prerequisites
One end of the straight-through cable has been connected to the RS485_IN port
on the vibration sensor, and the other end has been connected to the COM port
on the ECC800-Pro or the UIM20A expansion module.

Context
This section describes how to set and add a vibration sensor by using the COM
port on the ECC800-Pro as an example.

Procedure
Step 1 Log in to the ECC800-Pro WebUI as an administrator.
Step 2 Add a vibration sensor. For details, see the following table.

Issue 02 (2023-02-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 320
ECC800 Data Center Controller
User Manual (ECC800-Pro V100R023C00) 8 FAQ

Table 8-42 Adding a vibration sensor

Path Parameter Setting

Choose System Device Select Sensor from the drop-down list box.
Settings > attribute
Device
Management Device Type Select Vibration Sensor from the drop-down
and click Add list box.
Device. The Communicat Select COM3 from the drop-down list box.
parameters for ions Port NOTE
adding devices
The setting example indicates that the vibration
are displayed. sensor is connected to the COM3 port on the
ECC800-Pro. If the T/H sensor is connected to
another port, select the number of the connected
port.

Device 1
Address

Step 3 Click Test Connect to check whether the vibration sensor connects to the ECC800-
Pro properly.
● If the connection succeeds, click Add Device. The device connection
information is displayed in the Number of connected devices list.
● If the connection fails, check whether the device is properly connected to the
ECC800-Pro, whether the device and ECC800-Pro are running properly, and
whether the parameter settings are consistent with the device parameters.

Step 4 Check the functions of the vibration sensor.

Table 8-43 Function commissioning

Check Method Normal Connection Status

View the operating Choose Monitoring > Vibration Sensor Group


information about the > Vibration Sensor n > Running Information.
vibration sensor on the You can view the peak intensity of the X, Y, and
WebUI. Z axes.

----End

8.7.39 How Can I Add an SMU11B?

Prerequisites
One end of the straight-through cable has been connected to the COM port on
the SMU11B and the other end has been connected to the COM port on the
ECC800-Pro or ETH converter.

Issue 02 (2023-02-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 321
ECC800 Data Center Controller
User Manual (ECC800-Pro V100R023C00) 8 FAQ

Procedure
Step 1 Ensure that the PC IP address is in the same network segment as the SMU IP
address.

For example, if the SMU has an IP address of 192.168.0.10, a subnet mask of


255.255.255.0, and a default gateway of 192.168.0.1, set the IP address to
192.168.0.11, subnet mask to 255.255.255.0, and default gateway to 192.168.0.1
on the PC.

Step 2 Enter https://SMU IP address (for example, https://192.168.0.10) in the address


box of the browser, and then press Enter to access the WebUI login page.
NOTE

The default user name is admin and the preset password is Changeme.

Step 3 Choose System Settings > Serial Port and set Communication Address as
planned.

Step 4 Add an SMU11B.


1. Log in to the ECC800-Pro WebUI as an administrator.
2. Add a device.

Figure 8-18 Adding a device

Parameter Setting

Device Type Set this parameter to SMU11B.

Connect To Set this parameter to ECC800.

Communications Set this parameter to the number of the port


Port connected to the device. For example, if the SMU11B is
connected to the COM2 port on the ECC800-Pro, set
this parameter to COM2.

Device Address Set this parameter to the communications address of


the SMU11B.

3. Click Test Connect to check whether the SMU11B is properly connected to


the ECC800-Pro.
– If the connection succeeds, click Confirm. The device connection
information is displayed in the Number of connected devices list.
– If the connection fails, check whether the device is properly connected to
the ECC800-Pro, whether the device and ECC800-Pro are running

Issue 02 (2023-02-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 322
ECC800 Data Center Controller
User Manual (ECC800-Pro V100R023C00) 8 FAQ

properly, and whether the parameter settings are consistent with the
device parameters.

----End

8.8 How Can I Restore Factory Settings?


Context

NOTICE

Restoring factory settings will restore parameters to their default values. Back up
data before performing this operation. Perform this operation with caution.

Procedure
Step 1 Log in to the ECC800-Pro WebUI as an administrator.

Step 2 Choose Maintenance > Configuration File and click Restore Factory Settings.

Step 3 Enter the password currently used for logging in to the WebUI and click Submit.

----End

8.9 How Can I Install a Network Security Certificate?


Context
● You have copied a network security certificate and its key you obtained to the
PC.
● Install a network security certificate if a security certificate problem message
is displayed when you attempt to log in to the ECC800-Pro WebUI.
● You need to apply to an organization authorized by the customer for a
network security certificate and its key with the ECC800-Pro IP address or
domain name. This section describes how to import the certificate and key.

Procedure
Step 1 Log in to the ECC800-Pro WebUI as an administrator.

Step 2 Upload a network security certificate.


1. Choose System Settings > System Parameters > Site Configuration.
2. Select a certificate format from the drop-down list box in the Network
Security Certificate area.
3. Click Select File on the right of Select a network security certificate.
4. Select the network security certificate to be imported from the PC and click
Upload.

Issue 02 (2023-02-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 323
ECC800 Data Center Controller
User Manual (ECC800-Pro V100R023C00) 8 FAQ

5. Click Select File on the right of Select a network security certificate key.
6. Select the network security certificate key to be imported from the PC and
click Upload.
7. (Optional) If the network security certificate is encrypted, select If an
encrypted private key is imported, enter the password for decryption, and
specify Key cryptography and Confirm key cryptography.
8. Click Submit in the Network Security Certificate area.

----End

8.10 How Can I Install a Device Access Certificate?


Context
● You have obtained a device access certificate and the certificate key and have
copied the certificate and key file to the PC.
● A preset certificate is provided for the ECC800-Pro and its connected devices.
If a higher security level is required, replace the certificate both on the
ECC800-Pro and the devices.
● You need to apply for a device access certificate from an organization
authorized by the customer, and replace the original certificate on the devices
and ECC800-Pro.
● This section describes how to import a certificate to the ECC800-Pro. For
details about how to import a certificate to devices, see the operation manual
of the devices.

Procedure
Step 1 Log in to the ECC800-Pro WebUI as an administrator.

Step 2 Choose System Settings > Device Management > Security Certificate Change.

Step 3 Click Select File on the right of Upload CA certificate file.

Step 4 Select the certificate to be imported from the PC and click Upload.

Step 5 Click Select File on the right of Upload local certificate file.

Step 6 Select the certificate to be imported from the PC and click Upload.

Step 7 Click Select File on the right of Upload key file.

Step 8 Select the key file to be imported from the PC and click Upload.

Step 9 Specify Key cryptography and Confirm key cryptography.

Step 10 Click Submit.

----End

Issue 02 (2023-02-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 324
ECC800 Data Center Controller
User Manual (ECC800-Pro V100R023C00) 8 FAQ

8.11 How Can I Change the ECC800-Pro IP Address on


the WebUI?
Context
You have obtained the IP address, subnet mask, and default gateway information
planned for the ECC800-Pro.

Procedure
Step 1 Log in to the ECC800-Pro WebUI as an administrator.
Step 2 Choose System Settings > System Parameters > Monitor IP and change the IP,
subnet mask, and default gateway information for the ECC800-Pro as planned.
Step 3 Click Submit.
Step 4 In the displayed Setting succeeded. Log in again. dialog box, click OK.

----End

8.12 How Can I Configure ECC800-Pro Alarm


Parameters?
Context
● You can set parameters under Enable Alarm, Severity, Output Dry Contact
and Loudspeaker based on requirements.
– When Enable Alarm is set to Disable for an alarm, the ECC800-Pro will
not show this alarm.
– You can set Severity to Critical, Major, Minor, or Warning as required.
– After an alarm and a DO output are associated over Output Dry
Contact, the device connected to the DO port will act if the alarm is
generated.
– If an alarm is associated with the loudspeaker and Loudspeaker is set to
Yes, the loudspeaker produces sound when the alarm is generated.
● You can modify alarm parameters in batches over Batch Setting.
● The setting methods for different alarms are the same. This section describes
how to set the Operation log full alarm for the ECC800-Pro.

Procedure
Step 1 Log in to the ECC800-Pro WebUI as an administrator.
Step 2 Choose System Settings > Alarm Parameters.
Step 3 On the Basic Alarm Parameters page, choose ECC800 from the Select a device
type drop-down list box, choose the ECC800 to be set from the Device name
drop-down list box, and then click Confirm.

Issue 02 (2023-02-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 325
ECC800 Data Center Controller
User Manual (ECC800-Pro V100R023C00) 8 FAQ

Step 4 Set Enable Alarm to Enable or Disable for Operation log full as required. Set
Severity to Critical, Major, Minor, or Warning as required.
NOTE

To modify Enable Alarm or Severity in batches, click Batch Setting in the left corner of
the Basic Alm Para page, and choose ECC800 from the Select a device type drop-down
list box. Set Destination Parameter of Enable Alarm or Source Parameter and
Destination Parameter of Severity, and click OK.

Step 5 Enter the Alarm Linkage page. Select Device Type for ECC800, select Device
Type or Device for Linkage Type, and click Confirm.
Step 6 (Optional) If you select Device for Linkage type, select ECC800 for Device name.
Step 7 Click Select in the Output Dry Contact column corresponding to Operation log
full as required, select Yes or No for DO, and click OK.
Step 8 Click Select in the Loudspeaker column corresponding to Operation log full as
required, set Loudspeaker to Yes or No, and click OK.

----End

8.13 How Do I View Real-Time Monitoring, Active


Alarms, Historical Alarms, Access Control Events,
Operation Logs, Security Events, and Security Logs?
Procedure
Step 1 Log in to the ECC800-Pro WebUI as an administrator.
Step 2 Click Monitoring, select the target device, and select Running Info to view the
real-time data of the device.
Step 3 Choose Home > Active Alarms to view the active alarms of the ECC800-Pro. Click
Details in the Alarm Details area to view alarm details of devices.
Step 4 Choose Query to view the historical alarms, access control events, operation logs,
security events, and security logs of the device.
1. To view historical alarms, choose Query > Historical Alarms. Set Device,
Start time, End time, Sort mode, and Sorting By, and click Query.
2. To view access events, choose Query > Access Event.
3. To view operation logs, choose Query > Operation Log.
4. To view security events, choose Query > Security Event.
5. To view security logs, choose Query > Security Log.

----End

Issue 02 (2023-02-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 326
ECC800 Data Center Controller
User Manual (ECC800-Pro V100R023C00) 8 FAQ

8.14 How Can I Handle Alarms?


Procedure
Step 1 Log in to the ECC800-Pro WebUI.
Step 2 Choose Home > Active Alarms and view active alarms.
Step 3 Select an alarm to be acknowledged and click Confirm.
Step 4 Handle an alarm based on the alarm information.
Step 5 Select an alarm to be cleared and click Clear Alarm.
NOTE

The cleared alarm is displayed in the historical alarm list.

----End

8.15 How Can I View Performance Data?


Procedure
Step 1 Log in to the ECC800-Pro WebUI as an administrator.
Step 2 Choose Query > Performance Data.
Step 3 Set Device, Performance Data, Statistics Mode, Start time, and End Time, and
click Query.
NOTE

The query result can be displayed in Table or Curve mode.

----End

8.16 How Can I Change a Signal Name?


Context
● In this example, the smoke sensor is connected to the AI/DI_3 port on the
ECC800-Pro.
● The following procedure describes how to change the signal name of AI/DI_3.
Other signal names can be changed in a similar way.

Procedure
Step 1 Log in to the ECC800-Pro WebUI as an administrator.
Step 2 Choose System Settings > Signal Name Modify. The Batch Signal
Configuration page is displayed.

Issue 02 (2023-02-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 327
ECC800 Data Center Controller
User Manual (ECC800-Pro V100R023C00) 8 FAQ

Step 3 Set Device type to ECC800, set Device name to ECC800, and click OK.
Step 4 On the query result tab page, set the new signal name of AI/DI_3 to Smoke and
click Submit.
Step 5 Choose Monitoring > System > ECC800 > Running Parameters > AI/DI_3 Port
Settings. Check that the signal name of AI/DI_3 has been changed to Smoke.
NOTE

After the signal name is changed, the original name in the alarm, collection, and settings is
changed accordingly.

----End

8.17 How Do I Export Data?


Context
● Export fault information: You can export fault information from the system
for viewing and analyzing fault causes.
● Export historical data: You can export historical alarms, active alarms,
performance data, operation logs, and access events of the system for viewing
and analyzing events.
● Export local data of southbound devices: You can export device data from the
system.
● If Encryption password is selected, the exported data package will be
encrypted, and you need to enter the encryption password to decompress the
data package. To ensure data security, you are advised to select Encryption
password.
● Alarms generated during upgrade package export and upload cannot be
viewed on the ECC800-Pro. To ensure that the UPS runs safely, you are
advised to arrange an O&M engineer onsite to check the real-time alarms of
the UPS during the operation. If any exception occurs, rectify it promptly.

Procedure
Step 1 Log in to the ECC800-Pro WebUI as an administrator.
Step 2 Choose Maintenance > Export Data.
Step 3 (Optional) Select Encryption password and enter an encryption password.
NOTE

Record the password, which is required for decompressing the data package.

Step 4 Set export parameters and export the data to the PC or a USB flash drive.

Issue 02 (2023-02-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 328
ECC800 Data Center Controller
User Manual (ECC800-Pro V100R023C00) 8 FAQ

Figure 8-19 Exporting data

NOTE

● Data can be exported from the integrated PDU, integrated UPS, smart cooling product,
and other devices that have the local data storage function.
● If a USB flash drive is inserted, click Export Fault Info to USB, Export Historical Data
to USB, or Export Local Data of Southbound Devices to USB to export the data to the
USB flash drive.

----End

8.18 How Do I Export or Import a Configuration File?


Context
You can export parameter configurations for ECC800-Pro_1 to a PC. If ECC800-
Pro_2 needs the same parameter configurations, import the configuration file to
ECC800-Pro_2.

NOTICE

● Before importing the configurations, ensure that the devices connected to


ECC800-Pro_2 have been added and that the type and number of devices
connected to ECC800-Pro_2 are the same as those connected to ECC800-Pro_1.
● Configuration file import and export are not applicable to the monitoring
module IP address parameters, smart module certificate, NetEco certificate,
NetEco second-challenge password, time configuration parameters, access user
management, access permission management, device access certificate, logs, or
user configuration information such as notification email and SMS message,
user-defined PUE, and instantaneous PUE.

Procedure
Step 1 Log in to the ECC800-Pro_1 WebUI as an administrator.

Step 2 Choose Maintenance > Configuration File.

Issue 02 (2023-02-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 329
ECC800 Data Center Controller
User Manual (ECC800-Pro V100R023C00) 8 FAQ

Step 3 Export a configuration file.


1. Specify Configuration file encryption password.
NOTE

Record the password for importing a configuration file.


2. Click Back Up Current Settings.
Step 4 Import a configuration file.

NOTICE

● Before importing the configuration file, ensure that the current system type is
the same as the system type when the configuration file is exported.
● The ECC800-Pro_2 will restart after you import the configuration file.

1. Log in to the ECC800-Pro_2 WebUI as an administrator.


2. Choose Maintenance > Configuration File.
3. Specify Configuration file decryption password.
4. Click Select File on the right of Import configuration file.
5. Select the configuration file to be imported, and click Upload.

----End

8.19 How Can I Synchronize Device Parameters?


Context
● Do not delete the source devices before replacing devices.
● After replacing devices, you can choose to synchronize configured device
parameters to the target devices.
● Source device: device before replacement
● Target device: device after replacement

Procedure
Step 1 Log in to the ECC800-Pro WebUI as an administrator.
Step 2 Choose Maintenance > Parameter Sync.
Step 3 Select a value from the Device type drop-down list box.
Step 4 Specify source device and target device, click Submit.

NOTICE

If communication between the ECC800-Pro and the device is interrupted during


parameter synchronization, the synchronization fails. Ensure that the ECC800-Pro
and the device communicate properly and synchronize parameters again.

Issue 02 (2023-02-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 330
ECC800 Data Center Controller
User Manual (ECC800-Pro V100R023C00) 8 FAQ

NOTE

The source device can be a device that communicates properly or fails to communicate, but the
target device must be a device that communicates properly.

----End

8.20 What Should I Do If the ECC800-Pro WebUI


Display Language Changes from Chinese to English
During Use?
Context
Cause: The browser cookies are deleted.

Procedure
Step 1 Manually refresh the browser page.
----End

8.21 What Should I Do If the ECC800-Pro Fails to


Communicate with the UPS5000-E?
Procedure
Step 1 Tap System Info on the LCD after the UPS is started.
Step 2 Choose System Info > Settings, enter the user name and password, and tap

.
NOTE

The preset user name is admin and the preset password is 000001.

Step 3 Choose Settings > Advanced and set Modbus TCP encryption to Disable.
----End

8.22 What Should I Do if I Forget the ECC800 IP


Address?
Procedure
Step 1 If the ECC800 has been connected to the NMS, you can query the IP address on
the NMS.
Step 2 If the ECC800 is not connected to the NMS, hold down the SW button on the
ECC800 for 1 minute to restore the default IP address (192.168.8.10).

Issue 02 (2023-02-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 331
ECC800 Data Center Controller
User Manual (ECC800-Pro V100R023C00) 8 FAQ

WARNING

Holding down the SW button for 1 minute will restore factory settings and clear
user information. Exercise caution when performing this operation.

Figure 8-20 SW button

----End

8.23 What Should I Do If a Message Indicating


Unauthorized Fingerprint Is Displayed During
Fingerprint Scanning on the Access Control Device
(Fingerprint Has Been Recorded)?
Procedure
Step 1 Ensure that no obstacles exist in front of the fingerprint, and then scan the
fingerprint on the access control device again.

Step 2 If the message is still displayed after you perform Step 1, synchronize the
fingerprint information.
1. Choose System Settings > Access Management. On the Authorization
Operations tab page, click Synchronize to Device, select the device for
synchronizing fingerprint information, and click Start Synchronization.
2. After the Synchronization Status of the device becomes Synchronized, close
the Synchronize Access Permission page.
3. Scan the fingerprint on the access control device again.

Step 3 If the message indicating unauthorized fingerprint is still displayed after you
perform Step 1 and Step 2, you need to record the user's fingerprint again.
1. Choose System Settings > Access Management.
2. Select the involved user and record the fingerprint again.

----End

Issue 02 (2023-02-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 332
ECC800 Data Center Controller
User Manual (ECC800-Pro V100R023C00) 8 FAQ

8.24 How Can I Rectify Camera Access Restriction?


Prerequisites
If Huawei S12700 series switch is used, refer to this section to rectify the fault. For
more information, consult network engineers.

Context
The camera is inaccessible after the MAC address and IP address are bound in
network configuration.

Procedure
Step 1 Configure the free-rule MAC address using the free-rule configuration method so
that users can access the network without authentication. For details, see the
authentication free-rule in the latest S12700 documentation.

----End

8.25 How Do I Set the ECC800-Pro IP Address?


Before connecting the ECC800-Pro to the NetEco, configure the IP address, subnet
mask, and default gateway for the ECC800-Pro.

Prerequisites
● You have obtained the IP address (192.168.8.10 by default) of the ECC800-Pro.
● The browser (Internet Explorer 11 or later, Firefox, or Chrome) for logging in
to the ECC800-Pro WebUI is available.
● You have installed hardware for the ECC800-Pro and powered it on.
● A PC with an IP address in the same subnet as that of the ECC800-Pro is
connected to the ECC800-Pro over a LAN switch.
● You have obtained the IP address, subnet mask, and default gateway planned
for the ECC800-Pro.

Context
A unified IP address (192.168.8.10) is configured for all ECC800-Pros before
delivery. Reconfigure an IP address for the ECC800-Pro as required to ensure
normal communication with a server.

Procedure
Step 1 Log in to the ECC800-Pro WebUI as an administrator.
Step 2 Choose System Settings > System Parameters > Monitor IP, and change the IP
address, subnet mask, and default gateway of the ECC800-Pro based on the
parameters planned for the ECC800-Pro collector.

Issue 02 (2023-02-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 333
ECC800 Data Center Controller
User Manual (ECC800-Pro V100R023C00) 8 FAQ

Step 3 Click Submit.


----End

8.26 How Do I Set the ECC800-Pro System Type?


Prerequisites
● You have obtained the IP address (192.168.8.10 by default) of the ECC800-Pro.
● The browser (Internet Explorer 11 or later, Firefox, or Chrome) for logging in
to the ECC800-Pro WebUI is available.
● You have installed hardware for the ECC800-Pro and powered it on.
● A PC with an IP address in the same subnet as that of the ECC800-Pro is
connected to the ECC800-Pro over a LAN switch.
● You have obtained the IP address, subnet mask, and default gateway planned
for the ECC800-Pro.

Context
When connecting the ECC800-Pro outside the smart module to the management
system, you need to set the system type to General.

Procedure
Step 1 Log in to the ECC800-Pro WebUI as an administrator.
Step 2 Choose System Settings > System Parameters > Site Configuration, set System
type to General, and click Submit.

Figure 8-21 Setting the system type

----End

8.27 How Do I Set Door Status Sensor Monitoring


Parameters on the ECC800-Pro WebUI?
Prerequisites
● You have obtained the IP address, and login user name and password for the
ECC800-Pro collector.
● A PC with an IP address in the same subnet as that of the ECC800-Pro is
connected to the ECC800-Pro over a LAN switch.

Issue 02 (2023-02-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 334
ECC800 Data Center Controller
User Manual (ECC800-Pro V100R023C00) 8 FAQ

Context
● This section describes how to set monitoring parameters for the door status
sensor when it is connected to the AI/DI_1 port on the ECC800-Pro. Set the
parameters based on the actually connected port.
● After connecting a door status sensor to an AI/DI port on the ECC800-Pro, set
monitoring parameters for the door status sensor on the ECC800-Pro WebUI.

Procedure
Step 1 Log in to the WebUI of the ECC800-Pro collector.
Step 2 Choose Monitoring > System > ECC800 > Running Parameters > AI/DI_1 Port
Settings.
Step 3 Set AI/DI_1 to Enable.
Step 4 Click Submit.
Step 5 Select Door sensor from the AI/DI_1 sensor type drop-down list box.

Figure 8-22 Setting a sensor type for a dry contact

Step 6 Click Unhide All Advanced Signals, and click Power Supply Parameters. Ensure
that III power supply enable(AIDI_1/DO) is set to Enable.
Step 7 Click Submit.
----End

8.28 How Do I Set Smoke Sensor and Water Sensor


Parameters on the ECC800-Pro WebUI?
Prerequisites
● You have obtained the IP address, and login user name and password for the
ECC800-Pro collector.
● A PC with an IP address in the same subnet as that of the ECC800-Pro is
connected to the ECC800-Pro over a LAN switch.

Context
● This section describes how to set monitoring parameters for the smoke sensor
or water sensor when the sensor is connected to the AI/DI_1 port on the
ECC800-Pro. Set the parameters based on the actually connected port.
● A smoke sensor or water leakage sensor is a self-identification device. After a
smoke sensor or water leakage sensor is connected to the AI/DI port of an
ECC800-Pro collector, the sensor type is automatically identified and you do
not need to manually set AI/DI Sensor Type on the WebUI.

Issue 02 (2023-02-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 335
ECC800 Data Center Controller
User Manual (ECC800-Pro V100R023C00) 8 FAQ

● After connecting a smoke sensor or water sensor to an AI/DI port on the


ECC800-Pro, set monitoring parameters for the smoke sensor or water sensor
on the ECC800-Pro WebUI.

Procedure
Step 1 Log in to the WebUI of the ECC800-Pro collector.
Step 2 Choose Monitoring > System > ECC800 > Running Parameters > AI/DI_1 Port
Settings.
Step 3 Set AI/DI_1 to Enable.
Step 4 Click Submit.
Step 5 Check whether AI/DI_1 sensor type is automatically identified. The following uses
Smoke sensor as an example.

Figure 8-23 Setting a sensor type for a dry contact

Step 6 Click Unhide All Advanced Signals, and click Power Supply Parameters. Ensure
that III power supply enable(AIDI_1/DO) is set to Enable.
Step 7 Click Submit.

----End

8.29 How Do I Set Device Monitoring Parameters of an


NO/NC Dry Contact on the ECC800-Pro WebUI?
Prerequisites
● You have obtained the IP address, and login user name and password for the
ECC800-Pro collector.
● A PC with an IP address in the same subnet as that of the ECC800-Pro is
connected to the ECC800-Pro over a LAN switch.

Context
● An NO or NC dry contact is a device whose normal status signal is open (or
closed) and whose alarm signal is closed (or open), such as a skylight
controller.
● This section describes how to set monitoring parameters for the skylight
controller when it is connected to the AI/DI_1 port on the ECC800-Pro. Set the
parameters based on the actually connected port.
● After a normally open (NO) or normally closed (NC) dry contact device is
connected to an AI/DI port on the ECC800-Pro, you need to set monitoring
parameters for the NO or NC dry contact device on the ECC800-Pro WebUI.

Issue 02 (2023-02-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 336
ECC800 Data Center Controller
User Manual (ECC800-Pro V100R023C00) 8 FAQ

Procedure
Step 1 Log in to the WebUI of the ECC800-Pro collector.
Step 2 Choose Monitoring > System > ECC800 > Running Parameters > AI/DI_1 Port
Settings.
Step 3 Set AI/DI_1 to Enable.
Step 4 Click Submit.
Step 5 Select NO or NC for AI/DI_1 Sensor Type from the drop-down list.

Figure 8-24 Setting the sensor type of a dry contact

NOTE

● NO: indicates a normally open dry contact. The dry contact will report an alarm in the closed
state.
● NC: indicates a normally closed dry contact. The dry contact will report an alarm in the open
state.

Step 6 Click Unhide All Advanced Signals, and click Power Supply Parameters. Ensure
that III power supply enable(AIDI_1/DO) is set to Enable.
Step 7 Click Submit.

----End

8.30 How Can I Set Cooling Management Parameters


on the ECC800-Pro WebUI?
The cooling capacity of the chilled water smart cooling products in the smart
module can be managed by collecting the running parameters of the chilled water
smart cooling products and using the smart module electricity management
function.

Prerequisites
● The communication between the management system and the chiller plant
control device connected to the LAN switch is normal.
● The management system communicates properly with the ECC800-Pro and
the smart cooling product connected to the ECC800-Pro.
● Power management has been configured for the smart cooling product
connected to the ECC800-Pro, and the IT cabinet power statistics are correct.
● The number of smart cooling products (number of started smart cooling
products) with the valid maximum cooling capacity received by the ECC800-

Issue 02 (2023-02-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 337
ECC800 Data Center Controller
User Manual (ECC800-Pro V100R023C00) 8 FAQ

Pro is greater than or equal to the Number of running smart cooling


products in this group in Teamwork settings of smart cooling products.

Procedure
Step 1 Log in to the ECC800-Pro WebUI as an administrator.
Step 2 Choose Monitoring > Cooling > Running Parameters to access the Temperature
and Humidity Parameters page. Set Temperature and humidity control type as
required and click Submit.
Step 3 Choose Monitoring > Cooling > Running Parameters. In the Cooling Capacity
Management area, set the parameters related to cooling capacity management
for the water cooled smart cooling product, such as the target cooling load rate
and recommended supply water temperature statistics cycle.

Figure 8-25 Cooling Capacity Management

----End

8.31 How Can I Add Devices Accessed Through a Smart


ETH Gateway to the ECC800-Pro WebUI (Modbus-TCP)?
Prerequisites
The device supports DHCP.

Issue 02 (2023-02-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 338
ECC800 Data Center Controller
User Manual (ECC800-Pro V100R023C00) 8 FAQ

Context

Figure 8-26 Networking scenario

Procedure
Step 1 Ensure that the device communication mode has been set to DHCP.
Step 2 Log in to the ECC800-Pro WebUI as an administrator, and check whether the
device exists on the Monitoring page.
● If the device exists and communication status is normal, the device has
accessed the ECC800-Pro successfully.

Figure 8-27 Device accessed the ECC800-Pro

● If the device does not exist, check that the cable is properly connected
between the device and the ECC800-Pro, the ECC800-Pro is operating
properly, and communications parameters are set correctly.
----End

Follow-up Procedure
Choose Home > Plan View on the ECC800-Pro WebUI, and drag the device to the
corresponding position in the Smart Module View pane based on the actual
device layout.

Issue 02 (2023-02-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 339
ECC800 Data Center Controller
User Manual (ECC800-Pro V100R023C00) 8 FAQ

8.32 How Can I Add Devices Accessed Through a Smart


ETH Gateway to the ECC800-Pro WebUI (Modbus-
MAC)?
Context
The device that supports Modbus-MAC can be automatically identified by the
ECC800-Pro.

Figure 8-28 Networking scenario

Procedure
Step 1 Connect the WiFi converter (for example) to the smart ETH gateway based on the
networking scenario.
Step 2 Log in to the ECC800-Pro WebUI as an administrator, and check whether the
device exists on the Monitoring page.
● If the device exists and communication status is normal, the device has
accessed the ECC800-Pro successfully.
● If the device does not exist, check that the cable is properly connected
between the device and the ECC800-Pro and that the device and ECC800-Pro
are operating properly.

----End

Issue 02 (2023-02-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 340
ECC800 Data Center Controller
User Manual (ECC800-Pro V100R023C00) 8 FAQ

Follow-up Procedure
Choose Home > Plan View on the ECC800-Pro WebUI, and drag the device to the
corresponding position in the Smart Module View pane based on the actual
device layout.

8.33 How Can I Add Devices Accessed Through the ETH


Converter to the ECC800-Pro WebUI?
Context

Figure 8-29 Networking scenario

Procedure
Step 1 Set communications parameters on the device.

Issue 02 (2023-02-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 341
ECC800 Data Center Controller
User Manual (ECC800-Pro V100R023C00) 8 FAQ

Table 8-44 Description of communications parameters to be set on a device


Parameter Recommended Value

Baud rate This section uses 9600 as an example. Set this


parameter based on site requirements.
NOTE
For certain devices, this parameter does not need to be set.

Communications This section uses 1 as an example. Set this parameter


address based on site requirements.

Step 2 Add the device to the ECC800-Pro WebUI.


1. Log in to the ECC800-Pro WebUI as an administrator.
2. Add the device.

Table 8-45 Parameter description for adding a device


Path Parameter Setting

Choose Device Select the device attribute to be accessed


System attribute from the drop-down list box.
Settings >
Device Device Type Select the device type to be accessed from
Management the drop-down list box.
and click Add Connect To Select the corresponding ETH converter
Device. The from the drop-down list box.
parameters
NOTE
for adding
Use the blinking function of the ETH converter
devices are to identify the mapping between the device and
displayed. the ETH converter.

Communicati COM1/COM2
ons Port

Device This section uses 1 as an example. In


Address practice, set this parameter to be the same
as the communications address for the
device.

3. Click Test Connect to check whether the device connects to the ECC800-Pro
properly.
– If the connection succeeds, click Confirm. The connected devices are
displayed in the Number of connected devices list.
– If the connection fails, check whether the device is properly connected to
the ECC800-Pro, whether the device and ECC800-Pro are running
properly, and whether the parameter settings are consistent with the
device parameters.

Issue 02 (2023-02-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 342
ECC800 Data Center Controller
User Manual (ECC800-Pro V100R023C00) 8 FAQ

4. Choose Monitoring > System > ETH Converter Group > ETH Converter n >
Running Parameters and set Device name to ETH Converter n_Device
name.

----End

Follow-up Procedure
Choose Home > Plan View on the ECC800-Pro WebUI, and drag the device to the
corresponding position in the Smart Module View pane based on the actual
device layout.

8.34 How Can I Add Devices Connected Through the


ECC800-Pro COM Port to the ECC800-Pro WebUI?
Prerequisites
● This section uses a device connected to the COM1 port on the ECC800-Pro as
an example.
● If a dry contact or RS485 device is connected through a COM port, check the
RJ45 pin sequence of the device connected.

Context

Figure 8-30 Networking scenario

Procedure
Step 1 Set communications parameters on the device.

Issue 02 (2023-02-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 343
ECC800 Data Center Controller
User Manual (ECC800-Pro V100R023C00) 8 FAQ

Table 8-46 Setting communication parameters on the device

Parameter Recommended Value

Baud rate This section uses 9600 as an example. Set this


parameter based on site requirements.
NOTE
For certain devices, this parameter does not need to be set.

Communications This section uses 1 as an example. Set this parameter


address based on site requirements.

Step 2 Add the device to the ECC800-Pro WebUI.


1. Log in to the ECC800-Pro WebUI as an administrator.
2. Add the device.

Table 8-47 Parameter description for adding a device

Path Parameter Setting

Choose Device Select the device attribute to be accessed


System attribute from the drop-down list box.
Settings >
Device Device Type Select the device type to be accessed from
Management the drop-down list box.
and click Add Connect To Select ECC800 from the drop-down list
Device. The box.
parameters
for adding Communicati Select COM1 from the drop-down list box.
devices are ons Port NOTE
displayed. The setting example indicates that the device
connects to the COM1 port on the ECC800-Pro.
If the device connects to another port, enter the
number of the connected port.

Device This section uses 1 as an example. In


Address practice, set this parameter to be the same
as the communications address for the
device.

3. Click Test Connect to check whether the device connects to the ECC800-Pro
properly.
– If the connection succeeds, click Confirm. The connected devices are
displayed in the Number of connected devices list.
– If the connection fails, check whether the device is properly connected to
the ECC800-Pro, whether the device and ECC800-Pro are running
properly, and whether the parameter settings are consistent with the
device parameters.

----End

Issue 02 (2023-02-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 344
ECC800 Data Center Controller
User Manual (ECC800-Pro V100R023C00) 8 FAQ

Follow-up Procedure
Choose Home > Plan View on the ECC800-Pro WebUI, and drag the device to the
corresponding position in the Smart Module View pane based on the actual
device layout.

8.35 How Can I Add Devices Accessed Through the


ECC800-Pro AI/DI Port to the ECC800-Pro WebUI?
Prerequisites
This section uses the device connecting to the AI/DI_3 port on the ECC800-Pro as
an example.

Context

Figure 8-31 Networking scenario

The AI/DI_1, AI/DI_2, and AI/DI_3 ports on the ECC800-Pro can be automatically
identified by devices, but the AI/DI_4 and AI/DI_5 ports cannot be automatically
identified.

Procedure
Step 1 Log in to the ECC800-Pro WebUI as an administrator.

Step 2 Add the device.

Table 8-48 Parameter description for adding a device

Path Parameter Setting

Monitoring > AI/DI_3 Select Enable and click Submit


System > ECC800 sensor
> Running
Parameters > AI/

Issue 02 (2023-02-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 345
ECC800 Data Center Controller
User Manual (ECC800-Pro V100R023C00) 8 FAQ

Path Parameter Setting

DI_3 Port AI/DI_3 Select the type of the device to be accessed


Settings sensor type from the drop-down list box.
NOTE NOTE
The setting Devices except the normally open devices,
example indicates normally closed devices, door status switch, and
that the device water sensor (electrode-type) can be
connects to the automatically identified after they are
AI/DI_3 port on connected.
the ECC800-Pro. If
the device
connects to
another port,
enter the number
of the connected
port.

Monitoring > II power The default value is Enable.


System > ECC800 supply
> Running enable(AIDI_
Parameters, click 3/COM2/
Unhide All AIDI_5)
Advanced
Signals, click
Power Supply
Parameters.

Step 3 After setting all mandatory parameters, click Submit.

----End

Follow-up Procedure
Choose Home > Plan View on the ECC800-Pro WebUI, and drag the device to the
corresponding position in the Smart Module View pane based on the actual
device layout.

8.36 How Can I Add an RS485 Device Connected to the


ECC800-Pro Through a UIM20A?
Prerequisites
This section uses the device (such as a T/H sensor, rPDU, cabinet electronic lock,
and U-bit manager) connecting to the COM1 port on the UIM20A expansion
module as an example.

Procedure
Step 1 Set communications parameters on the device.

Issue 02 (2023-02-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 346
ECC800 Data Center Controller
User Manual (ECC800-Pro V100R023C00) 8 FAQ

Table 8-49 Description of communications parameters to be set on a device

Parameter Recommended Value

Baud rate This section uses 9600 as an example. Set this


parameter based on site requirements.
NOTE
For certain devices, this parameter does not need to be set.

Communications This section uses 1 as an example. Set this parameter


address based on site requirements.

Step 2 Add the device to the ECC800-Pro WebUI.


1. Log in to the ECC800-Pro WebUI as an administrator.
2. Add the device.

Choose System Settings > Device Management and click Auto Discover
Device to add the device. The device connection information is displayed.

Figure 8-32 Device connection

----End

8.37 How Can I Add a Dry Contact Device Accessed


Through a UIM20A Expansion Module to the ECC800-
Pro WebUI?
Prerequisites
This section uses the device (such as a door status sensor) connected to the AI/
DI_3 port on the UIM20A expansion module as an example.

Context
Each UIM20A expansion module supports a maximum of eight dry contact
devices. If one smart module has multiple UIMs, a maximum of 48 dry contact
devices can be connected.

Procedure
Step 1 Log in to the ECC800-Pro WebUI as an administrator.

Step 2 Add the device.

Issue 02 (2023-02-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 347
ECC800 Data Center Controller
User Manual (ECC800-Pro V100R023C00) 8 FAQ

Table 8-50 Adding a device

Path Parameter Setting

Monitoring > AI/DI_3 Select Enable and click Submit


System > UIM sensor
Group > UIM1 >
AI/DI_3 Port AI/DI_3 Select the type of the device to be accessed
Settings sensor type from the drop-down list box.
NOTE
The setting
example indicates
that the device
connects to the
AI/DI_3 port on
the UIM1. If the
device connects to
another port,
enter the number
of the connected
port.

Monitoring > II power The default value is Enable.


System > UIM supply
Group > UIM1 > enable(COM
Running 3/AIDI_3/
Parameters, click COM4/
Unhide All AIDI_4)
Advanced
Signals, and then
Power Supply
Parameters.

Step 3 After setting all mandatory parameters, click Submit.

----End

Follow-up Procedure
Choose Home > Plan View on the ECC800-Pro WebUI, and drag the dry contact
device to the corresponding position in the Smart Module View pane based on
the actual device layout.

8.38 How Can I Open Doors Remotely over the ECC800-


Pro WebUI?
Context
If O&M personnel need to enter a smart module but do not take an access cord or
forget the password, you can open the door remotely over the ECC800-Pro WebUI.

Issue 02 (2023-02-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 348
ECC800 Data Center Controller
User Manual (ECC800-Pro V100R023C00) 8 FAQ

Procedure
Step 1 Log in to the ECC800-Pro WebUI as an administrator.
Step 2 Open the aisle door.

Table 8-51 Opening a door remotely

Path Setting

Monitoring > Aisle > Select Remote door opening and click Submit
Access Actuator Group >
Access Actuator n >
Controls

CAUTION

● Remotely opening the door may open the smart module door, and this may
pose security risks. Exercise caution when performing this operation.
● When a smart module actuator is configured, you need to set parameters for
the smart module actuator. The setting process is similar.

----End

Example
The following figure shows how to remotely open the aisle door controlled by
access actuator 1.

Figure 8-33 Opening a door remotely

8.39 How Can I Turn On or Off Aisle Lights in the


Smart Module over the ECC800-Pro WebUI?
Context
● If O&M personnel forget to turn off lights when exiting the data center, you
can remotely turn off the lights over the ECC800-Pro WebUI.

Issue 02 (2023-02-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 349
ECC800 Data Center Controller
User Manual (ECC800-Pro V100R023C00) 8 FAQ

● When the local light button is faulty or lights cannot be turned on through a
linkage, you can remotely turn on the lights over the ECC800-Pro WebUI.

Procedure
Step 1 Log in to the ECC800-Pro WebUI as an administrator.

Step 2 Turn on or off aisle lights.

Table 8-52 Turning on or off aisle lights

Path Setting

Monitoring > Aisle > AC Set Route 1 control mode to Light.


Actuator Group > AC Set Set light mode to Manual.
Actuator n > Running
Parameters

Monitoring > Aisle > AC Select Remote open scuttle, select ON or OFF as
Actuator Group > AC required, and click Submit.
Actuator n > Controls

----End

Example
The following figure shows how to turn on or off the lights controlled by AC
actuator 2.

Figure 8-34 Turning on or off aisle lights

Follow-up Procedure
Set Set light mode to Automatic.

CAUTION

When a smart module actuator is configured, you need to set parameters for the
smart module actuator. The setting process is similar.

Issue 02 (2023-02-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 350
ECC800 Data Center Controller
User Manual (ECC800-Pro V100R023C00) 8 FAQ

8.40 How Can I Open Skylights Remotely over the


ECC800-Pro WebUI?
Context
You can open skylights over the ECC800-Pro WebUI in emergencies.

Procedure
Step 1 Log in to the ECC800-Pro WebUI as an administrator.
Step 2 Open skylights.

Table 8-53 Opening skylights


Path Setting

Monitoring > Aisle > Select Remote open scuttle and click Submit
Skylight Actuator Group >
Skylight Actuator n >
Controls

CAUTION

● Remotely opening the skylight may open the smart module skylight, and this
may pose security risks. Exercise caution when performing this operation.
● When a smart module actuator is configured, you need to set parameters for
the smart module actuator. The setting process is similar.

----End

Example
The following figure shows how to open the skylights controlled by skylight
actuator 1.

Figure 8-35 Opening skylights

Issue 02 (2023-02-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 351
ECC800 Data Center Controller
User Manual (ECC800-Pro V100R023C00) 8 FAQ

Follow-up Procedure
After the maintenance is complete, O&M personnel need to close the skylights in
the smart module manually.

8.41 How Can I Turn On or Off Smart Cooling Products


over the ECC800-Pro WebUI?
Context
You can turn on or off smart cooling products over the ECC800-Pro WebUI in
emergencies.

Procedure
Step 1 Log in to the ECC800-Pro WebUI as an administrator.
Step 2 Turn on or off smart cooling products.

Table 8-54 Turning on or off smart cooling products


Path Setting

Monitoring > Cooling > Select On/Off control, select ON or OFF as


NetCol n > Controls required, and click Submit.

----End

Example
The following figure shows how to turn on or off the NetCol5000-A025.

Figure 8-36 Turning on or off smart cooling products

Issue 02 (2023-02-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 352
ECC800 Data Center Controller
User Manual (ECC800-Pro V100R023C00) 8 FAQ

8.42 How Can I Open the Cabinet Electronic Lock over


the ECC800-Pro WebUI?
Context
When O&M personnel need to open a cabinet for maintenance, you can open the
cabinet electronic lock over the ECC800-Pro WebUI.

Procedure
Step 1 Log in to the ECC800-Pro WebUI as an administrator.
Step 2 Open the cabinet electronic lock.

Table 8-55 Opening a cabinet electronic lock


Path Operation

Monitoring > Cabinet > IT Select Remote and click Submit.


Cabinet n > E-LOCK n

----End

Example
The following figure shows how to open electronic lock 1 for IT cabinet 1.

Figure 8-37 Opening a cabinet electronic lock

Follow-up Procedure
After the maintenance is complete, O&M personnel need to close the cabinet door
manually.

Issue 02 (2023-02-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 353
ECC800 Data Center Controller
User Manual (ECC800-Pro V100R023C00) 8 FAQ

8.43 How Can I Link the Smoke Alarm with the Alarm
Beacon over the ECC800-Pro WebUI?
Prerequisites
The alarm beacon is connected to the DO port on the ECC800-Pro.

Context
After the smoke alarm is linked with the alarm beacon, if smoke is detected inside
the smart module, the alarm beacon connecting to the corresponding DO port will
generate an audible and visual alarm.

Procedure
Step 1 Choose System Settings > Alarm Parameter > Alarm Linkage.

Step 2 Select Multi-Func Sensor for Device Type, select Device Type or Device for
Linkage type, and click Confirm.
NOTE

Select Multi-Func Sensor n from the Device Name list if you have selected Device for
Linkage type, and click Confirm.

Step 3 Click Select in the Output Dry Contact list for Smoke alarm. On the Set Dry
Contact Outputs(Multi-Func Sensor) page, set DO to Yes and click OK.

Step 4 Click Select in the loudspeaker list for Smoke alarm. On the Please set the
sound(Multi-Func Sensor) page, set loudspeaker to Yes and click OK.

----End

8.44 How Can I Link the AI/DI Alarm with the Alarm
Beacon over the ECC800-Pro WebUI?
Prerequisites
The alarm beacon is connected to the DO port on the ECC800-Pro.

Context
After the AI/DI alarm is linked with the alarm beacon, if smoke is detected inside
the smart module, the alarm beacon connecting to the corresponding DO port will
generate an audible and visual alarm.

This section describes how to set an alarm linkage by linking output dry contact of
the smoke DI alarm on the AI/DI_1 sensor to the DO port.

Issue 02 (2023-02-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 354
ECC800 Data Center Controller
User Manual (ECC800-Pro V100R023C00) 8 FAQ

Procedure
Step 1 Choose System Settings > Alarm Parameter > Alarm Linkage.

Step 2 Select ECC800 for Device type, select Device Type or Device for Linkage type,
and click Confirm.
NOTE

Select ECC800 from the Device name list if you have selected Device for Linkage type,
and click Confirm.

Step 3 Click Select in the Output Dry Contact list for AI/DI_1 DI alarm. On the Set Dry
Contact Outputs(ECC800) page, set DO to Yes and click OK.

Step 4 Click Select in the loudspeaker list for AI/DI_1 DI alarm. On the Please set the
sound(ECC800) page, set loudspeaker to Yes and click OK.

----End

8.45 How Can I Modify Device Names over the ECC800-


Pro WebUI?
Context
● When a device name does not correspond to the actual location or needs
optimizing, you can modify the device name over the ECC800-Pro WebUI.
● The following describes how to modify the name of the smart ETH gateway.

Procedure
Step 1 Log in to the ECC800-Pro WebUI as an administrator.

Step 2 Modify the device name.

Table 8-56 Modifying a device name

Path Setting

Monitoring > System > Select Device name, enter the new name in the
Smart ETH Gateway text box as planned, and click Submit.
Group > Smart ETH
Gateway 1 > Running
Parameters

----End

8.46 How Can I Perform Operations on the App?

Issue 02 (2023-02-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 355
ECC800 Data Center Controller
User Manual (ECC800-Pro V100R023C00) 8 FAQ

8.46.1 How Can I Connect to a WiFi Network?


Procedure
Step 1 Connecting to a WiFi network.
Insert a WiFi module into the USB port on the ECC800-Pro.

Figure 8-38 Installing a WiFi module

----End

8.46.2 How Can I Prepare and Log In to the App?

Prerequisites
App operating environment requirements:
● The mobile device runs Android 6.0 or later and the operating system is not
rooted.
● The mobile device has sufficient battery reserve.
● You have obtained the IP address of the ECC800-Pro as well as the user name
and password for WebUI login.

Procedure
Step 1 Download and install the FusionModule app from Huawei AppGallery.
NOTE

Before the installation, ensure that the PAD is connected to the Internet and the network is
running properly.
● Huawei AppGallery installed on the PAD
Log in to the Huawei AppGallery client, search for FusionModule, and tap
Install. Huawei AppGallery is preinstalled on Huawei PAD by default.

Issue 02 (2023-02-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 356
ECC800 Data Center Controller
User Manual (ECC800-Pro V100R023C00) 8 FAQ

● Huawei AppGallery not installed on the PAD

Table 8-57 Operation methods for the scenario where Huawei AppGallery is
not installed on the PAD
Method Procedure Installation
Verification

Install the app from 1. Log in to Huawei Check that the app icon
the Huawei AppGallery (https://
AppGallery official appgallery.huawei.co
website. m/), search for exists on the
FusionModule, and tap PAD desktop.
Install.
2. In the Tip dialog box,
tap Install AppGallery.
3. The Huawei AppGallery
installation file is
displayed on the
screen. Download and
install the Huawei
AppGallery as
prompted.
4. On the Huawei
AppGallery client,
search for
FusionModule, and tap
Install.

Step 2 Hold down the SW button on the ECC800-Pro for 1s to enable the WiFi function.

Figure 8-39 Button position

Issue 02 (2023-02-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 357
ECC800 Data Center Controller
User Manual (ECC800-Pro V100R023C00) 8 FAQ

NOTE

● The preset password is Changeme. The password is valid only after you hold down the
button for the first time to enable the WiFi function. If you enable the WiFi function on
the WebUI, there is no preset password.
● After WiFi is enabled by pressing the button, the app prompts the user to change the
preset password when logging in on the PAD.
● After you disable the WiFi hotspot function on the WebUI and press the button again,
the WiFi function is still enabled. In this case, the WiFi password is the one you changed
into last time.
● The WiFi function is disabled by default. When you enable the WiFi function, change the
WiFi password to ensure connection security.
● A password that has been used for a long time is more likely to be stolen or cracked.
The risk increases over time. Change the WiFi password periodically (recommended:
once half a year).

Step 3 (Optional) Enable the WiFi function on the ECC800-Pro WebUI.


1. Log in to the ECC800-Pro WebUI as an administrator.
2. Choose Monitoring > System > WiFi Converter and click WiFi
Management.
3. Set Enable WiFi to Enable and click Submit.
4. If this is the first time you enable the WiFi function, set WiFi Password and
click OK.
5. Enter the password currently used for logging in to the WebUI and click
Submit.
6. Specify WiFi SSID and WiFi Password and click Submit to change the SSID
and password.
NOTE

– If you have set a password when enabling WiFi for the first time, you do not need
to set the password again.
– The WiFi function is disabled by default. When you enable the WiFi function,
change the WiFi password to ensure connection security.
– A password that has been used for a long time is more likely to be stolen or
cracked. The risk increases over time. Change the WiFi password periodically
(recommended: once half a year).
7. Enter the password currently used for logging in to the WebUI and click
Submit.

Step 4 Log in to the app.


1. Start the app, choose Settings > Network Connection on the login screen,
select WiFi SSID specified on the WebUI, and enter the value of WiFi
Password specified on the WebUI for login.
2. On the login screen, choose Settings > Communication IP Settings, and
ensure that the IP address is 192.168.245.10.
3. The user name and password for logging in to the app are the same as those
for logging in to the ECC800-Pro WebUI. Specify the user name and password,
and tap Login.

Issue 02 (2023-02-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 358
ECC800 Data Center Controller
User Manual (ECC800-Pro V100R023C00) 8 FAQ

NOTE

– After the first login, change the preset password in time to ensure system access
security.
– A password that has been used for a long time is more likely to be stolen or cracked.
The risk increases over time. Change the password once every three months.
– It is recommended that you use different user accounts to log in to the ECC800-Pro
WebUI and app concurrently. Otherwise, either of them will be logged out.

----End

8.46.3 How Do I Ensure that Device Positions in the Plan View


Are Consistent with Actual Positions?

Prerequisites
The smart module plan view has been created, and the device positions in the
plan view are consistent with actual positions.

Context
The rack environment unit is used as an example.

Procedure
Step 1 Log in to the ECC800-Pro app as an administrator.

Step 2 Choose Home > More > iFind.

Step 3 Tap Cabinet Collector n Blink to deliver a blinking command. The corresponding
device in the smart module blinks. Check that the device positions and types in the
plan view are consistent with the actual situation by delivering the blinking
command.

Figure 8-40 Rack environment unit blinking

----End

Issue 02 (2023-02-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 359
ECC800 Data Center Controller
User Manual (ECC800-Pro V100R023C00) 8 FAQ

8.46.4 How Can I View Real-time Data?

Procedure
Step 1 Log in to the ECC800-Pro app as an administrator.

Step 2 To view the smart module data center layout, tap Home.

Step 3 To view active alarms and historical alarms, choose Alarms > Active Alarms or
Alarms > Historical Alarms.

Step 4 Choose More to view network parameters, operation logs, asset details, and
version information.

----End

8.46.5 How Can I Export and Import Data?

Procedure
Step 1 Log in to the ECC800-Pro app as an administrator.

Step 2 Export device configuration data or historical data.


1. Choose More > Export Data.
2. Select Local or USB from the Select export location drop-down list box.
3. (Optional) Select Select the encryption mode and enter an encryption
password.
4. Select a value from the drop-down list box in the Export Device
Configuration Data or Export Historical Data area.
5. Tap Export.

Step 3 Export the current configuration file.


1. Choose More > Export Data.
2. Enter the encryption password and click Export.

Step 4 Import data.


1. Choose More > Import Data.
2. Select Local or USB from the Select import location drop-down list box.
3. The configuration file is encrypted, enter the password in the Decryption
Password text box.
4. Select a configuration file and tap Import.
NOTE

The ECC800-Pro will restart after you import the configuration file.

----End

8.46.6 How Can I Synchronize Device Parameters?

Issue 02 (2023-02-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 360
ECC800 Data Center Controller
User Manual (ECC800-Pro V100R023C00) 8 FAQ

Context
After a device is replaced, you can synchronize the parameters of the original
device to the new device.

Procedure
Step 1 Log in to the ECC800-Pro app as an administrator.

Step 2 Choose Parameter Sync.

Step 3 Select the source device and target device.


● Source device: device before replacement
● Target device: device after replacement

Step 4 Tap Submit.

----End

8.46.7 How Can I Handle App Login Failure?

Context
If the message The IP is already used is displayed when you attempt to log in to
the PAD app, perform the operations in this section to handle the issue.

Procedure
Step 1 If you have obtained the user name and password used in the previous successful
login, perform the following operations:
1. Check that the PAD connects to the ECC800-Pro over WiFi properly.
2. Use the obtained user name and password to log in to the app and exit.
3. Use the user name and password that previously failed the login to log in to
the app again.

Step 2 If you have not obtained the user name and password used in a previous
successful login, perform the following operations:
1. Close the app and wait for about 22 to 23 minutes.
2. Log in as the current user.

----End

8.47 How Do I Delete a Device with Communication


Failure After Device Replacement?
1. After replacing components, log in to the WebUI and choose Maintenance >
Parameter Sync to access the parameter synchronization page.
2. Click Device type and select the component type from the drop-down list.

Issue 02 (2023-02-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 361
ECC800 Data Center Controller
User Manual (ECC800-Pro V100R023C00) 8 FAQ

3. Select the failure device in Source Device, select the reserved device in Target
Device, and click Submit to synchronize the configuration parameters of the
failure device to the reserved device.
4. Choose System Settings > Device Management > Device Deletion, select a
device type from the Select drop-down list box, select the device to be
deleted from Devices, click Delete, and then add the new device to the smart
module view.

8.48 How Can I Change the Certificate Verification


Period and Certificate Expiration Warning Time?
Context
The certificate verification period must be shorter than the certificate expiration
warning time.

Procedure
1. Log in to the ECC800-Pro WebUI as an administrator.
2. Choose Monitoring > System > Running Parameters and select Unhide All
Advanced Signals.
3. On the Other Parameters tab page, select Certificate verification period or
Certificate expiration warning time.
4. Change the Signal Value for Certificate verification period or Certificate
expiration warning time.
5. Click Submit.

8.49 How Can I Revoke a Certificate?


Certificates include the SMTP certificate, NMS certificate, transparent transmission
certificate, ONVIF certificate, ModbusTCP certificate, cascading certificate, and
southbound model synchronization certificate. This section describes how to
revoke an SMTP certificate.

Procedure
Step 1 Log in to the ECC800-Pro WebUI as an administrator.
Step 2 Choose System Settings > Event Notification > Mailbox Settings. In the
Revocation list area, select the certificate to be revoked and upload it.

----End

Issue 02 (2023-02-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 362
ECC800 Data Center Controller
User Manual (ECC800-Pro V100R023C00) 8 FAQ

8.50 What Do I Do If a Message Is Displayed Indicating


that Access Card Number Input Through Card Swiping
Fails?
Context
Choose System Settings > Access Management > Add > Authorization
Operations. If you fail to enter a card number on the New User page by swiping
the card on the card reader, perform the following steps to rectify the fault.

Procedure
Step 1 Click Swipe Card on the New User page and ensure that the card is swiped within
30 seconds.

NOTICE

If you do not swipe the card within 30 seconds, an input failure message is
displayed.

Step 2 If the system displays an input failure message after you perform Step 1, check
whether there is a duplicate input.
1. Choose System Settings > Access Management.
2. View the entered card number on the Authorization Operations tab page.
3. Ensure that the card number entered is different from an existing one.

----End

Issue 02 (2023-02-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 363
ECC800 Data Center Controller
User Manual (ECC800-Pro V100R023C00) 9 PLC Function

9 PLC Function

9.1 Linkage Control Introduction


The ECC800-Pro provides the linkage control function. You can set logic rules and
control the DO output signal by collecting the signal value.
You can select signals (such as the AI/DI device status signals) and perform logic
operations such as AND, OR, NOT, GREATER THAN, LESS THAN, DELAY, and
FILTER. The operation result can be provided to the dry contact to meet the site
control requirements.

Logic Parameters
The following are the inputs, operators, and outputs for linkage control logic
programs:
● Inputs:
– Sample: such as AI/DI device signals
– Alarm: such as AI/DI alarm signals
– Constant
– Register: A register can combine multiple levels of logic programs.
● Operators:
– AND: The output is valid if both inputs are valid.
– OR: The output is valid if either input is valid.
– NOT: The output is the inverse value of the input signal or constant.
– >: The output is active if the input is greater than the constant.
– <: The output is active if the input is less than the constant.
– DELAY: The output of the input signal or constant is delayed and the
output is constant.
– FILTER: The output is active if the input reaches the constant.
● Outputs:
– Outputs are associated with dry contact outputs and can be used for
generating alarms or controlling devices.

Issue 02 (2023-02-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 364
ECC800 Data Center Controller
User Manual (ECC800-Pro V100R023C00) 9 PLC Function

– Register: A register can combine multiple levels of logic programs.


– Alarm: The operation result is generated as a new alarm.

Feature Description
The linkage control configuration is concise and easy to operate. You can perform
the following operations:

● Configure linkage control logic programs on the WebUI for display.


● Import or export configuration files.
● Restore the default linkage control configuration by one click.

The following are descriptions of the WebUI:

● Basic Parameters: The configurations of the linkage control logic programs


are valid if Enable linkage control function is set to Yes.
● Linkage group: You can configure Linkage groups by type.
● Linkage Logical List: You can configure logic program lines.
● Import and Export: You can import or export configuration files to generate
logic program lines in batches.
● Restore configuration: You can click Restore Factory Defaults to restore the
default linkage control configurations.

9.2 Linkage Control Configuration Examples


Context

NOTICE

● Linkage control does not need to be configured onsite and its default
configuration applies. Before adding or modifying linkage control linkage logic,
consult the technical support.
● When you do not know how to rectify the incorrect linkage control
configuration or want to synchronize the linkage control configuration from
another ECC800-Pro, use the linkage control configuration import and export
function.

● The ECC800-Pro supports fire control linkage and high temperature linkage
control. For example, the ECC800-Pro can implement fire linkage by detecting
fire alarms through the fire controller and opening the skylight, opening the
aisle door, and shutting down the smart cooling product based on the alarm
status.
● The following describes how to configure the linkage control linkage, using
Link fire control with skylight open as an example.
● In this example, the fire controller connects to port AI/DI_1. The actual port
may vary.

Issue 02 (2023-02-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 365
ECC800 Data Center Controller
User Manual (ECC800-Pro V100R023C00) 9 PLC Function

Procedure
Step 1 Log in to the ECC800-Pro WebUI as an administrator.

Step 2 Choose System Settings > Linkage Control.

Step 3 Ensure that Enable linkage control function is Yes.

Step 4 Add or edit a linkage group name.


1. On the Linkage Group tab page, click Add.
2. In the displayed Add Logical Group dialog box, set Group name to Link fire
control with skylight open.
3. Click OK.
NOTE

For details about how to add or edit a linkage group name for high temperature linkage control,
see Step 4.

Step 5 Add or edit a logic program.


1. Select the edited linkage group name on the Linkage Group tab page.

2. On the Linkage Logic List tab page, click Add or the edit icon .
3. Click Submit.
● Set Linkage Logic List parameters for Link fire control with skylight open.

Figure 9-1 Setting parameters for Linkage Logic List

● Set Linkage Logic List parameters for Link high temperature with skylight
open.
NOTE

When adding high temperature linkage control, ensure that all smart cooling products fail
to communicate with the ECC800-Pro. If smart cooling products communicate properly,
cooling can be automatically implemented when the smart cooling products are at high
temperature. Opening the skylights may cause the cooling effect to fail.

Figure 9-2 Parameters for connecting to the temperature sensor

Issue 02 (2023-02-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 366
ECC800 Data Center Controller
User Manual (ECC800-Pro V100R023C00) 9 PLC Function

Figure 9-3 Parameters for connecting to the T/H sensor

Step 6 On the Linkage Group tab page, change the status of the group to be enabled
from off to on.

----End

Follow-up Procedure
You can use the configuration file import and export function to export the
linkage control linkage rules configured for an ECC800-Pro to a local PC and then
import the rules to another ECC800-Pro. This function achieves quick configuration
for the linkage control.

Issue 02 (2023-02-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 367
ECC800 Data Center Controller
User Manual (ECC800-Pro V100R023C00) A Acronyms and Abbreviations

A Acronyms and Abbreviations

A
AC alternating current
AES Advanced Encryption Standard
AI analog input
APP application

B
BCB battery control I/O board

C
COM component object model

D
DC direct current
DES Data Encryption Standard
DI digital input
DO digital output

E
ECC Energy Control Center
ESN equipment serial number
ETH Ethernet

F
FE fast Ethernet

Issue 02 (2023-02-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 368
ECC800 Data Center Controller
User Manual (ECC800-Pro V100R023C00) A Acronyms and Abbreviations

G Gigabit Ethernet
GE

I
IC integrated circuit
iCooling iCooling
IEEE Institute of Electrical and Electronics Engineers
IP Internet protocol
IT Internet technology

L
LED light emitting diode

M
MTBF mean time between failures
MTTR mean time to repair
MAC media access control
MD5 message digest algorithm
MIB management information base

N
NAT network address translation
NetEco iManager NetEco data center infrastructure
management system
NTC negative temperature coefficient
NO normally open
NC normally closed

P
PDU power distribution unit
PoE power over Ethernet
PSU power supply unit
PUE power usage effectiveness

R
RF radio frequency

Issue 02 (2023-02-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 369
ECC800 Data Center Controller
User Manual (ECC800-Pro V100R023C00) A Acronyms and Abbreviations

RH relative humidity
RJ registered jack
RoHS Restriction of Hazardous Substances

S
SD secure digital
SHA Secure Hash Algorithms
SIM subscriber identity module
SMS short message service
SMTP Simple Mail Transfer Protocol
SNMP Simple Network Management Protocol
SSL Secure Sockets Layer
SSID service set identifier

T
TLS Transport Layer Security

U
UPS uninterruptible power system
USB universal serial bus

V
VCN video cloud node

W
WiFi wireless fidelity
WPS WiFi Protected Setup

Issue 02 (2023-02-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 370

You might also like