This document provides a progress monitoring report for a fire data center installation project in Kuningan from January to June. It shows the percentage of work completed each month for various parts of the project, including fire alarm detection systems, aspirating smoke detection systems, and public address systems on different floors of the building. Many areas were still facing delays in materials delivery and obtaining necessary permits during this period.
This document provides a progress monitoring report for a fire data center installation project in Kuningan from January to June. It shows the percentage of work completed each month for various parts of the project, including fire alarm detection systems, aspirating smoke detection systems, and public address systems on different floors of the building. Many areas were still facing delays in materials delivery and obtaining necessary permits during this period.
This document provides a progress monitoring report for a fire data center installation project in Kuningan from January to June. It shows the percentage of work completed each month for various parts of the project, including fire alarm detection systems, aspirating smoke detection systems, and public address systems on different floors of the building. Many areas were still facing delays in materials delivery and obtaining necessary permits during this period.
PROYEK JASA INSTALLASI FIRE DATA CENTER JANUARI FEBRUARI MARET APRIL MEI JUNI NO. URAIAN PEKERJAAN % KONDISI 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 I JASA FIRE ALARM ,ASD,PA D FIRE ALARM DETECTION SYSTEM INSTALLASI MAIN EQUIPMENT 10,19 2,55 2,55 2,55 2,55 Main Equipment Belum Dikirim Basement Floor 0,72 0,18 0,18 0,18 0,18 Material masih banyak belum terkirim dan Izin terkendala Ground Floor 3,11 0,78 0,78 0,78 0,78 Area masih banyak Material Lain Mezzanine Floor 2,32 0,58 0,58 0,58 0,58 Material utama belum terkirim 1st Floor - High Level 2,41 0,48 0,48 0,48 0,48 0,48 Material masih banyak belum terkirim dan Izin terkendala 1st Floor - Low Level 1,18 0,30 0,30 0,30 0,30 Material masih banyak belum terkirim dan Izin terkendala 2nd ~ 4th Floor - High Level 3,52 0,44 0,44 0,44 0,44 0,44 0,44 0,44 0,44 Lantai 3 sudah selesai, 4 & 5 belum ada izin 5th Floor - High Level 1,25 0,42 0,42 0,42 Belum Ada izin Roof Floor 0,94 0,47 0,47 Ram belum jadi Any Others Work Ground Floor 0,16 0,04 0,04 0,04 0,04 Additional -Basement Floor 1,43 0,36 0,36 0,36 0,36 Additional -Ground Floor 5,61 1,40 1,40 1,40 1,40 Material masih banyak belum terkirim dan Izin terkendala Additional - Mezzanine Floor 3,11 0,78 0,78 0,78 0,78 Material masih banyak belum terkirim dan Izin terkendala Additional - 1ST Floor-HIGH LEVEL 4,44 1,11 1,11 1,11 1,11 Material masih banyak belum terkirim dan Izin terkendala Additional - 1ST Floor-LOW LEVEL 1,18 0,30 0,30 0,30 0,30 Material masih banyak belum terkirim dan Izin terkendala Additional - 2nd ~ 4th Floor-HIGH LEVEL 5,77 0,72 0,72 0,72 0,72 0,72 0,72 0,72 0,72 Material masih banyak belum terkirim dan Izin terkendala Additional - 5TH Floor-HIGH LEVEL 2,01 0,67 0,67 0,67 Material masih banyak belum terkirim dan Izin terkendala Additional - 2nd ~ 5th Floor - Low Level - 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 Material masih banyak belum terkirim dan Izin terkendala Additional -Roof Floor 2,37 1,19 1,19 Material masih banyak belum terkirim dan Izin terkendala Additional -PLN ROOM A 0,31 0,16 0,16 E ASPIRATING SMOKE DETECTION SYSTEM GROUND FLOOR ASD PANEL 0,06 0,02 0,02 0,02 0,02 Belum ada izin mengerjakan INSTALLATION SERVICE Ground Floor 0,59 0,20 0,20 0,20 Belum ada izin mengerjakan 1st Floor 6,64 1,11 1,11 1,11 1,11 1,11 1,11 Belum ada izin mengerjakan Sundries 0,05 0,05 Belum ada izin mengerjakan Any Others Work - Ground Floor 0,09 0,03 0,03 0,03 Belum ada izin mengerjakan 1st Floor 0,47 0,16 0,16 0,16 Belum ada izin mengerjakan H PUBLIC ADDRESS SYSTEM MAIN EQUIPMENT PUBLIC ADDRESS 0,92 0,23 0,23 0,23 0,23 Basement Flooor 0,18 0,05 0,05 0,05 0,05 Installasi Closed namun Material utama belum terkirim Ground Flooor 0,76 0,19 0,19 0,19 0,19 Masih terdapat banyak barang kontraktor lain Mezzanine Flooor 0,40 0,10 0,10 0,10 0,10 Masih terdapat banyak barang kontraktor lain 1st Floor 0,48 0,12 0,12 0,12 0,12 2nd ~ 5th Floor 0,14 0,03 0,03 0,03 0,03 Lt 4 sampai 5 Belum ada Izin Roof Floor 0,15 0,04 0,04 0,04 0,04 Ram belum jadi Any Others Work - 2nd ~ 5th Floor 0,05 0,03 0,03 Lt 4 sampai 5 Belum ada Izin Roof Floor 2,34 0,39 0,39 0,39 0,39 0,39 0,39 Ram belum jadi II JASA FIRE SUPPRESSION SYSTEM F GAS SUPPRESSION SYSTEM Main Equipment Ground Floor 1,58 0,26 0,26 0,26 0,26 0,26 0,26 Diganti menggunakan Foam 1st Floor (Tx, UPS, Battery Room) 11,07 1,11 1,11 1,11 1,11 1,11 1,11 1,11 1,11 1,11 1,11 Overlapping dengan Raised Floor dan terkendala material Kosong serta penambahan Kerja SOW 1st Floor (Data Hall) 0,41 0,07 0,07 0,07 0,07 0,07 0,07 Overlapping dengan Raised Floor dan terkendala material Kosong serta penambahan Kerja SOW Fixtures & Installation (Pipework & Cabling Points) Ground Floor 0,63 0,16 0,16 0,16 0,16 Diganti menggunakan Foam 1st Floor (Tx, UPS, Battery Room) 2,72 0,34 0,34 0,34 0,34 0,34 0,34 0,34 0,34 Overlapping dengan Raised Floor dan terkendala material Kosong serta penambahan Kerja SOW 1st Floor (Data Hall) 12,77 1,28 1,28 1,28 1,28 1,28 1,28 1,28 1,28 1,28 1,28 Overlapping dengan Raised Floor dan terkendala material Kosong serta penambahan Kerja SOW Sundries 0,02 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 Overlapping dengan Raised Floor dan terkendala material Kosong serta penambahan Kerja SOW III PRELEMINARY & MATERIAL BANTU 3,48 0,25 0,25 0,25 0,25 0,25 0,25 0,25 0,25 0,25 0,25 0,25 0,25 0,25 0,25 IV MOB & DEMOB 1,98 0,09 0,09 0,09 0,09 0,09 0,09 0,09 0,09 0,09 0,09 0,09 0,09 0,09 0,09 0,09 0,09 0,09 0,09 0,09 0,09 0,09 0,09 0,09