You are on page 1of 1

Barge Positioning System

Depth Indicator
Site Calibration
Site Calibration

Patimban Port Development Project (II)


Package 5: Car Terminal Construction

Date: 28/07/2023 Barge Name: CHOSUK 1 Shift : Day / Night

Distance
a 2.53 m b 11.32 m c 13.86 m

RTK Measurement Value X, Y Component Deviation


X1 822199.785 X2 822205.642 ΔX 5.857
Y1 9310480.687 Y2 9310493.314 ΔY 12.627

The Calculated Coordinate The Value Displayed on


Deviation Evaluation
Value of ③ and ④ GPS Monitor
X3 822200.854 X3' 822200.813 ΔX3 0.041134921
Y3 9310482.992 Y3' 9310483.043 ΔY3 -0.051071428
X4 822204.569 X4' 822204.511 ΔX4 0.05763925
Y4 9310491.000 Y4' 9310491.028 ΔY4 -0.028038962

Remarks / Comments :

Inspected by: Inspection Date:

Verified by: Verification Date:

Approved by: Approval Date:

ITP/CDM/08A Page 2/2