Patimban Port Development Project (II)

Package 5: Car Terminal Construction

Survey Report for Existing Benchmark Verification

Refer to RFI no. : TWWHA-PTB5-RFI-CV-23/004 Existing Benchmark

: TWWHA-PTB5-RFI-CV-23/008 Existing Benchmark Verification (Levelling Survey)

GPS Processing Result :

POINT INITIAL COORDINATE VERIFICATION DISCREPANCY


Easting Northing Easting Northing Easting Northing
(m) (m) (m) (m) (m) (m)
JICA01-A 821387.837 9308891.763 821387.840 9308891.769 0.003 0.006
JICA02 821314.525 9308918.095 821314.532 9308918.115 0.007 0.020

POINT REFERENCES COORDINATE


Easting (m) Northing (m)
JB04 821717.584 9308774.504
JB05 819075.333 9309787.954

Levelling Survey Result :

POINT INITIAL VERIFICATION DISCREPANCY


CHART CHART
DATUM DATUM LEVEL
LEVEL
(m) (m) (m)
JICA02 1.846 1.854 0.008
JB04 1.941 1.945 0.004
JB05 2.068 2.066 0.002

POINT REFERENCE
CHART
DATUM
LEVEL
(m)
JICA01-A 2.107

Existing Benchmark Verification Result :


POINT VERIFICATION RESULT
Easting Northing Chart Datum
(m) (m) (m)
JICA01-A 821387.840 9308891.769 2.107
JICA02 821314.532 9308918.115 1.854
JB04 821717.584 9308774.504 1.945
JB05 819075.333 9309787.954 2.066