Advance Comment Sheet

Document: KPOC-KBB-S-MEZ012-C01-00001 P&ID Rev 0C

Date: 04 August 2023

No KPOC’s Comments NOV (Turcomp) Respond Status


.
1 Chemical injection point usually NOV is following the typical symbol for
requires access fitting, which is treated chemical injection based on other P&IDs.
as SP item. Please check with process See examples below:
whether SP item tagging is to be
assigned or not, instead of "CI2". KPOC-KBB-PRO-PID-11-11003:

KPOC-KBB-PRO-PID-43-43004:

Legend also shows the same symbol as


snapshot below:

KPOC to confirm whether as to maintain


CI2 or update the chemical injection point
to SP item. If the chemical injection point is
to be tagged as SP item, KPOC to provide
the sequential/tag number.
2 Please provide SP item tag number for KPOC to advise SP item tag number based
SP-XXXX. on the KPOC database
3 Missing line number for all KPOC to advise line tag number based on
new/modification piping. Please assign the KPOC database
line number complete with sequence
number instead of "43XXXX".
4 KPOC to advise SP item tag number based
on the KPOC database

5 KPOC to advise RO item tag number based


on the KPOC database