ID-BKP-SOME-2009-509035-P-BKP-19-001_rev0.1
Date of comments: Sep. 07 2021
Comments performed / validated by: WIDIARTO Hermawan
Return Code is: Approved with comments

There are 2 annotations following


Contract : 4500010835
Document Number

ID-BKP-SOME-2009-509035
Summary of Appplicable WPS & PQR – Piping
Revision: 0.1 Status : IFC
Document Type : WPS System/Subsystem : N/A Discipline: QUA Date : 19 – 08 - 2021
Originator Document No : N/A Page 1 of 11

PT PERTAMINA HULU MAHAKAM

BEKAPAI 3
SURFACE FACILITIES MODIFICATION AND
DOGLEG INSTALLATION (EPCIC)

Summary of Appplicable WPS & PQR - Piping

CLASS : 1

0.1 19-Aug-2021 IFC Issued for Comment WHY IP / AU SG

Rev Date Status Revision memo Issued Checked Approved COMPANY

This document is the property of PT Pertamina Hulu Mahakam and shall not be disclosed to third parties or reproduced without permission
of the COMPANY. Electronic Filename: ID-BKP-SOME-2009-509035_rev0.1.pdf
Contract : 4500010835
Document Number

ID-BKP-SOME-2009-509035
Summary of Appplicable WPS & PQR – Piping
Revision: 0.1 Status : IFC
Document Type : WPS System/Subsystem : N/A Discipline: QUA Date : 19 – 08 - 2021
Originator Document No : N/A Page 7 of 11

2. DOCUMENT SCOPE
Purpose of this document is to describe the required inspection and testing for structure work
to deliver the Bekapai 3 Surface Facilities Modification and Dogleg Installation (EPCIC)
project. This is required in order to prove that the work is carried out properly accordingly to
the applicable Code / Specification.

3. REFERENCE DOCUMENT

3.1 Company Specification

No Document Number Document Title


Requirement For Contractor Quality
1 MHK-COMP-SPE-EP-PJC-501 Rev. 0
Management
Requirement for Contractor Quality
2 MHK-COMP-SPE-EP-PJC-503 Rev. 0
Surveillance
3 MHK-COMP-SPE-EP-PVV-0171 Rev. 0 Steel piping fabrication
Welding of pressure containing piping
4 MHK-COMP-SPE-EP-PVV-0611 Rev. 0
and equipment

3.2 International Code and Standard

No Document Number Document Title


1 ASME Sec V, Rev. 2017 Non-Destructive Examination
2 ASME B31.3Process Piping Process Piping
3 ASME Section IX Welding and Brazing Qualification
4 API 1104 Rev. 2016 Welding of Pipelines and Related Facilities
Specifications for Welding Rods,
5 ASME II Part C, Rev. 2017
Electrodes, and Filler Metals

3.3 COMPANY Supplied Document

No Document Number Document Title


Scope of Work; Minimum Contractor
1 Exhibit A
Document Requirement Schedule

3.4 Project Document

No Document Number Document Title

1 ID-BKP-SOME-2009-503001 Project Execution Plan

2 ID-BKP-SOME-2009-503005 Project Quality Plan

This document is the property of PT Pertamina Hulu Mahakam and shall not be disclosed to third parties or reproduced without permission
of the COMPANY. Electronic Filename: ID-BKP-SOME-2009-509035_rev0.1.pdf