Time Frame/Schedule
Status of Compliance
for the Implementation
Mitigation/Enhancement Cost of Mitigating with
Potential Impacts Monitoring Parameter of
Measures Measure Mitigation/Enhancement
Mitigation/Enhancement
Measures
Measures
A. Environment
□ Cutting of trees □ Acquisition of tree □ Presence of permit □ Prior to SP planning □ On-going compliance
cutting permit □ Prior to SP □ Complied
□ Compliance with implementation □ Included in the POW
conditions in secured □ As reflected in the □ Others ____________
permits POW
□ Others ___________
B. Social
□ Minimal □ Conduct of separate □ Attendance Sheet □ Prior to SP planning □ On-going compliance
participation of consultation with IP □ Minutes of Meeting □ Prior to SP □ Complied
IPs/Difficulty in groups □ Others ________ implementation □ Included in the POW
ensuring IPs’ □ Ensure IP □ As reflected in the □ Others ____________
participation membership in the POW
expanded □ Others ____________
M/BDRRMC
□ Proposed project □ Repair: Technical □ Signed and □ Prior to SP planning □ On-going compliance
for construction design includes approved technical □ Prior to SP □ Complied
or repair is retrofitting of the design implementation □ Included in the POW
located in a high proposed structure □ Appropriate □ As reflected in the □ Others ____________
risk or no build (not just restoration to clearances/permits POW
zone areas former design) are in place □ Others ____________
□ Construction: □ Prepared and
Mitigation measures is posted disaster
considered in the contingency/evacu
design ation plan
CBIM 2021 Form 21
Environmental and Social Management Plan
□ Disaster
contingency/evacuatio
n plan is prepared and
posted
□ No dwelling is strictly
enforced
□ Appropriate
clearances/permits
are acquired
□ Possible land □ Execute agreement □ Signed and □ Prior to SP planning □ On-going compliance
conflict between the Project, notarized □ Prior to SP □ Complied
owner and LGU agreement implementation □ Included in the POW
□ Secure LARR □ Signed and □ As reflected in the □ Others ____________
CBIM 2021 Form 21
Environmental and Social Management Plan
Prepared by:
Assisted by:
Noted: