CBIM 2021 Form 21

Environmental and Social Management Plan

KALAHI-CIDSS NCDDP Additional Financing


Environment and Social Management Plan (ESMP)

Region : ______________________________ Subproject Title : ________________________________


Province : ______________________________ Subproject Total Cost : ________________________________
Municipality : ______________________________ Group : ________________________________
Barangay : ______________________________ Phase : ________________________________

Time Frame/Schedule
Status of Compliance
for the Implementation
Mitigation/Enhancement Cost of Mitigating with
Potential Impacts Monitoring Parameter of
Measures Measure Mitigation/Enhancement
Mitigation/Enhancement
Measures
Measures
A. Environment
□ Cutting of trees □ Acquisition of tree □ Presence of permit □ Prior to SP planning □ On-going compliance
cutting permit □ Prior to SP □ Complied
□ Compliance with implementation □ Included in the POW
conditions in secured □ As reflected in the □ Others ____________
permits POW
□ Others ___________

□ Soil/Land □ Implement proper □ Presence of waste □ Prior to SP planning □ On-going compliance


contamination segregation, collection segregation □ Prior to SP □ Complied
due to solid and disposal of facilities implementation □ Included in the POW
waste disposal wastes □ Identified waste □ As reflected in the □ Others ____________
□ Soil/Water/Air □ Provide bins for solid disposal sites POW
CBIM 2021 Form 21
Environmental and Social Management Plan

quality wastes □ Presence of □ Others ____________


degradation □ Strictly enforce good signage, checklists
housekeeping
practices

□ Improper □ Appropriate □ Inspection report □ Prior to SP planning □ On-going compliance


disposal of dismantling and □ Prior to SP □ Complied
waste from disposal of materials implementation □ Included in the POW
demolished from temporary □ As reflected in the □ Others ____________
structures structures POW
□ Others ____________

B. Social
□ Minimal □ Conduct of separate □ Attendance Sheet □ Prior to SP planning □ On-going compliance
participation of consultation with IP □ Minutes of Meeting □ Prior to SP □ Complied
IPs/Difficulty in groups □ Others ________ implementation □ Included in the POW
ensuring IPs’ □ Ensure IP □ As reflected in the □ Others ____________
participation membership in the POW
expanded □ Others ____________
M/BDRRMC

□ Proposed project □ Repair: Technical □ Signed and □ Prior to SP planning □ On-going compliance
for construction design includes approved technical □ Prior to SP □ Complied
or repair is retrofitting of the design implementation □ Included in the POW
located in a high proposed structure □ Appropriate □ As reflected in the □ Others ____________
risk or no build (not just restoration to clearances/permits POW
zone areas former design) are in place □ Others ____________
□ Construction: □ Prepared and
Mitigation measures is posted disaster
considered in the contingency/evacu
design ation plan
CBIM 2021 Form 21
Environmental and Social Management Plan

□ Disaster
contingency/evacuatio
n plan is prepared and
posted
□ No dwelling is strictly
enforced
□ Appropriate
clearances/permits
are acquired

□ Temporary □ Appropriate □ List of signage, list □ Prior to SP planning □ On-going compliance


structures may information of precautionary □ Prior to SP □ Complied
pose physical dissemination on measures implementation □ Included in the POW
and/or social potential hazards □ As reflected in the □ Others ____________
hazards POW
□ Others ____________

□ Increased risk to □ Provide appropriate □ Presence of □ Prior to SP planning □ On-going compliance


community/perso warning signs and signage and □ Prior to SP □ Complied
nal health and lighting lighting implementation □ Included in the POW
safety during □ Use of personal □ □ As reflected in the □ Others ____________
construction protective equipment POW
activities (PPE) during □ Others ____________
construction
□ Strict implementation
of health protocols

□ Possible land □ Execute agreement □ Signed and □ Prior to SP planning □ On-going compliance
conflict between the Project, notarized □ Prior to SP □ Complied
owner and LGU agreement implementation □ Included in the POW
□ Secure LARR □ Signed and □ As reflected in the □ Others ____________
CBIM 2021 Form 21
Environmental and Social Management Plan

document notarized LARR POW


document □ Others ____________
□ Proposed □ Mitigation measure is □ Signed and □ Prior to SP planning □ On-going compliance
subproject may considered in the notarized □ Prior to SP □ Complied
affect the technical design agreement implementation □ Included in the POW
livelihood of □ Execute agreement □ Signed and □ As reflected in the □ Others ____________
some community between the Project, notarized LARR POW
members owner and LGU document □ Others ____________
□ Secure LARR
document

Other Potential Impacts and Mitigating Measures adopted


e.g. These are context-specific
CBIM 2021 Form 21
Environmental and Social Management Plan

Instructions in accomplishing the ESMP template:


1. Check relevant items under (i) Potential Impacts, (ii) Mitigation/Enhancement Measures, (iii) Monitoring Parameter, (iv) Time
Frame/Schedule for the Implementation of Mitigation/Enhancement Measures, and (v) Status of Compliance with
Mitigation/Enhancement Measures;
2. Compute and provide the costs necessary for implementing the mitigating measure/s;

Prepared by:

_____________________________ ______________________________ ______________________________


Name and Signature of PPT Member Name and Signature of PPT Member Name and Signature of PPT Member

Assisted by:

_______________________ _______________________ ______________________ _______________________


ACT TF MCT TF ACT CEF MCT CEF

Noted:

_______________________ ______________________ _______________________ _______________________


ACT AC MCT AC BDC TWG Chairperson BDRRMC Head