MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED

CIN-U40109MP2001SGC014880, Email-mdtransco.nic.in
STATE LOAD DESPATCH CENTRE, Nayagaon, Rampur, Jabalpur vkbZ ,l vks : 9001-2008
ISO: 9001-2008
Telephone: (0761) 2970089 Fax: (0761) 2664343 e-mail sldcmpjbp@gmail.com

No.07-05/PM-68A/SEA-03.0/435 Jabalpur, dated: 07.04.2023


TO,

1. The Addl. Secy.Energy Deptt., GOMP, Bhopal 17. The Suptdg. Engineer (O&M), MPPaKVVCL, Ratlam.
2. The Chief General Manager (Non Conv), MPPMCL, 18. The Suptdg. Engineer (O&M), MPPaKVVCL, Dewas.
Regional Office, Bhopal.
3. The General Manager (Comml-Conv Energy), MPPMCL, 19. The Staff Officer to MD (MPPaKVVCL), Indore
Jabalpur.
4. The E.D. (O&M:GEN), MPPGCL, Jabalpur. 20. The Staff Officer to MD (MPPTCL), Jabalpur
5. The C.E (CS-GENCO), MPPGCL, Jabalpur 21. The Staff Officer to MD (MPPMCL), Jabalpur
6. The Chief Engineer (O&M) Hydel, MPPGCL, Jabalpur. 22. The Staff Officer to MD (MPPGCL), Jabalpur
7. The Chief Financial Officer, MPPTCL, Jabalpur . 23. The Staff Officer to MD (MPPuKVVCL), Jabalpur
8.The Chief General Manager(Comml.), (MPPuKVVCL),
24. The Staff Officer to MD (MPMKVVCL), Bhopal
Jabalpur
9. The Chief General Manager (Comml.), MPMKVVCL, 25. The General Manager (Comml.), NHDC Parisar,
Bhopal Shyamla Hills, Near Ashoka Hotel, Bhopal – 462013
10. The Chief Engineer (Comml.), O/o MD 26.The Chief Engineer (Power), NVDA, 59 Narmada Bhawan
(MPPaKVVCL), Indore Arera Hills, Bhopal – 462011
11. DGM (A/CS), O/o CFO, MPPMCL, Jabalpur. 27. The General Manager (O&M), Indira Sagar Project, NHDC
Officer Complex, Narmada Nagar, Dist. Khandwa-450119
12. The ED(CRA Cell), MPPTCL, Jabalpur. 28. The General Manager (O&M) OSP, ADM Building Urja Vihar
Siddhwarkut, Dist. Khandwa – 450554
13. The Suptdg. Engineer (O&M), MPMKVVCL, Rajgarh. 29. M/s Jaypee BINA Thermal Power Plant, Village-Sirchopi, Sub
Post Office-Agasod, Post Office-Bina, Tehsil-Bina,
District-Sagar (MP) -470113
14. The Suptdg. Engineer (O&M), MPMKVVCL, Sehore. 30. M/s BLA Powers Pvt. Ltd., Village Niwari, P.O. Khursipar, Tehsil,
Gadarwara, District-Narsinghpur-487551.
15. The Suptdg. Engineer (O&M), MPPaKVVCL, Shajapur. 31. M/s Arya Energy Ltd. E-14, 3rd Floor,Shyam Plaza,Pandri,
Raipur(CG)-492001.

16. The Suptdg. Engineer (O&M), MPPaKVVCL, Ujjain 32. M/s Biobijalee Green Power Limited, Village- Sukri, Tehsil-
Gadarwara, Distt.- Narsinghpur(MP)-487555.

Sub: Provisional State Energy Account for the month of MARCH-2023.


The provisional State Energy Account (SEA) for the month of March-2023 has been prepared as per
Madhya Pradesh Electricity Balancing & Settlement Code, 2015. In above context, the following is further
submitted for kind perusal and needful please.

i. The Energy Deptt. Govt. of Madhya Pradesh (GoMP) vide notification no. 2211/F-3-13/2016/XIII dated 21st
APRIL, 2016, has allocated all existing and future generating capacities to MPPMCL for maintaining uniform
tariff across the state. MPPMCL vide letter no. MD/126 dated 02.12.2019 has intimated to SLDC for
implementation of GoMP notification and requested to schedule power from all generating stations
including RE power and import / export from Open Access to each Discom as per forecasted demand on
day ahead / real time revision / Ex-Post Facto revisions. Further, MPPMCL issued circular no. MPPMCL/PM/8
dated 29.01.2020 mentioning that SLDC shall prepare SEA indicating the energy scheduled from generating
stations to MPPMCL and Discom wise total schedule, the schedule of Discoms shall not be linked to the
Generating Stations. Accordingly, SLDC has allocated all the power to MPPMCL w.e.f. 1st Dec 2019 and
prepared the SEA indicating the generator wise energy schedule to MPPMCL and allocated to Discoms in
proportion to their demand.

1
ii. The Plant Availability Factor (PAF), entitlement and scheduled energy has been computed and indicated in
SEA for peak and off-peak period and low / high demand seasons for State Sector Thermal Generating
Stations, IPP’s as per MPERC (Terms & Condition for determination of Generation Tariff) Regulation, 2020.
The Low demand seasons declared by SLDC as April 2022 to October 2022 & February 2023 to March 2023
and Peak hours declared by SLDC for scheduling for the month of March- 2023 is 07:00Hrs to 09:00Hrs and
18:30Hrs to 20:30Hrs.

iii. The Peak & Off-Peak entitlement and scheduled energy of ISGS considered by WRLDC and as shown in
REA of WRPC has been considered and indicated in SEA.

iv. For Inter State IPPs (M/s Jaypee Nigrie Super Thermal project, M/s Jhabua Power Limited -JV of NTPC Ltd.,
M/s MB Power (MP) Ltd. and M/s Lanco Amarkantak Power Ltd.), it has been discussed and decided with
WRLDC / WRPC to consider the Peak and Off-Peak period of MP for these IPPs as their tariff is determined
by MPERC. Accordingly, these IPPs were requested to submit their DC to WRLDC as per peak hours
declared by MP. The DC submitted by the IPPs and as shown in REA have been considered and indicated in
SEA. The scheduled energy of these IPPs have also been indicated in SEA as per Peak and Off-Peak hours
of MP.
v. The Energy Department, GoMP, Bhopal vide notification no. F-3/13/2016/XIII dated 19.06.2019 has revised
and enhanced the share of generation capacity allocated to the MP State from Rajghat Interstate Hydel
Power Station from 22.50MW (50%) to 26.85MW (59.68%) w.e.f. 01.04.2000. Accordingly, revised
allocation of 59.68% for MP has been considered as MPPGCL injection from Rajghat HPS. As per CERC
order, 25% Share of UP in Rajghat HPS is being scheduled from 08-Sep-2012. As per agreement of Long
Term Access between Central Transmission Utility of India Limited and Uttar Pradesh Power Corporation
Limited on dated 22nd July 2021 for 6.9MW transfer of power from Rajghat (45MW) HEP in MP to UPPCL,
scheduling of remaining 15.32% share of UP in Rajghat HPS has been started w.e.f. 25.07.2021.
Accordingly, excess / less drawal by MP has been computed.
vi. The schedules of MPPGCL Hydel and OSP have been replaced with actual ABT meter data. However, ABT
meter data of PGCIL meters for Pench HPS was not available therefore JMR data is taken.
vii. The injection of bilateral projects, Pench HPS (MP Share), Jawahar Sagar HPS (MP Share), Ranapratap
Sagar HPS (MP Share), Bargi Left Bank Canal Power House, ISP NVDA Canal PH JMR and adjustment of
bilateral projects is allocated to Discoms as per monthly average percentage allocation of MPPMCL.
viii. The monthly Plant Availability Factor (PAF) of Hydel Power Stations has been computed as per the
directives issued by CERC in its order dated 20.12.2016 in petition no. 40/MP/2016 filed by NHDC.
ix. MPPGCL injection of Gandhisagar, RP Sagar and Jawahar Sagar is taken on share basis. The Scheduling of
58 MW RTC power at regional periphery from Rajasthan Urja Vikas Nigam Ltd. to MPPMCL has commenced
w.e.f. 1st September 2020 under Medium Term Open Access (MTOA) as per the agreement dated
10.06.2020 between Power Grid Corporation of India Ltd. and MP Power Management Company Ltd. The
monthly energy scheduled from Rajasthan (at Rajasthan periphery) obtained from REA of NRPC has been
indicated at page no.-5. The energy drawn by MPMKVVCL from Rajasthan through 33KV Sheopur feeder is
brought to Rajasthan periphery after applying applicable losses and is indicated at page no.-5 for settlement
of energy by MPPMCL with Rajasthan.

2
x. The energy injection data of following Renewable Energy Generators (REGs) connected at 33KV level is
taken as per the data recorded in ABT meters –
(1) 14.7MW Choksi Energy Ringdod,
(2) 10MW M/s Marut Shakti Chandwasa
(3) 10MW M/s AMPL Clean Tech Pvt. Ltd
(4) 14.7MW Choksi Energy & Infra Dodar,
(5) 10MW M/s Bharat Electronics Ltd. OFI,
(6) 20MW M/s Today Clean Energy Pvt Ltd.,
(7) 14.4MW M/s Wind World IV Susner,
(8) 18MW Renew Wind Energy (AP4) Pvt. Ltd.,
(9) 29.4 MW M/s Suzlon Gujrat Wind Park Khachrod,
(10) 13.5MW HEG Ltd Tawa,
(11) 25MW M/s Walwahan Solar MP ltd,
(12) 30MW M/s Kshema Power & Infra Pvt. Ltd.
(13) 14.4MW M/s Suzlon I Sailana
(14) 15 MW M/s Suzlon II Sailana
(15) 14.1MW M/s Suzlon III Sailana
(16) 22.5MW M/s Prism Renewable Energy Pvt. Ltd.
(17) 29.4MW M/s Sudheer Project Pvt. Ltd Maxi
(18) 10MW M/s Finsurya Solar Energy.
(19) 3.8MW M/s Amhata Hydro Energy Ltd.
(20) 24MW M/s Sirmour small hydro project.
(21) 5MW M/s Designco Manufactuer & Exporter
(22) 28MW M/s Inox Wind Infra Betul
(23) 15MW M/s Giriraj Enterprise Khuchrod
(24) 15MW M/s Giriraj Afjalpur
(25) 29.4MW M/s Badoni Power Pvt. Ltd

(26) 27.3MW M/s AVP Power Infra Pvt. Ltd.


(27) 14.7MW Suzlon Sandala I Ratlam
(28) 14.7MW Suzlon Sandala II Ratlam
(29) 12MW M/s Suzlon V Ratlam
(30) 13.5 MW M/s Suzlon IV Ratlam
(31) 14.4 MW M/s Suzlon I Ratlam
(32) 15MW M/s Suzlon I Susner
(33) 15MW M/s Suzlon II Susner
(34) 30MW M/s Kshema Power & Infra Pvt. Ltd. Ghosala
(35) 30MW M/s Kshema Power & Infra Pvt. Ltd. Bherugarh
(36) 14.7MW M/s Behapur (Suzlon-I)
(37) 15MW M/s M/s Behapur (Suzlon-II)

3
However, for the rest of the RE generators data is taken as per energy injection details furnished by
respective SE (O&M)’s. Further energy injection data of Renewable Energy Generators (REGs) connected at
220/132KV level is taken as per the data recorded in ABT meters.
xi. The JMR Data of the following generators have not been made available by the respective SE(O&M)’s of
Discoms, thus energy injection data of these generators have not been shown in SEA.
1. 1.25MW M/s AGROMET INDIA.
2. 1 MW M/s ARIHANT SUNSCAN INDIA
3. 1.25 MW M/s ATUL SHARMA-II 1.25 MW BERCHHA
4. 1 MW M/s BANCO CONSTRUCTION PVT. LTD
5. 5 MW M/s DEEPAK INDUSTRIES LTD.
6. 02 MW M/s EASTMAN INTERNATIONAL (2 MW)
7. 1 MW M/s VIVASWAN HOTELS INDIA PVT LTD
8. 2.55 MW M/s FREEWINGS POWER & INFRA LTD
9. 2.5 MW M/s FRIENDS SALT WORKS & ALLIED INDUSTRIES (2.5 MW
10. 2.5 MW M/s OSWAL SALT & CHEMICAL INDUSTRIES
11. 1.5MW M/s PORWAL AUTO COMPONENET
12. 0.63 MW M/s RANJAN BEN P. CHOVTIA
13. 0.63 MW M/s SKP BEARINGS INDUSTRIES
14. 1 MW M/s VIVASWAN HOTELS INDIA PVT LTD
xii. The JMR data of 10 MW BIOBIJALEE GREEN POWER LTD. connected at 132KV Gadarwara has been
considered due to non-availability of main and check meter data.
xiii. The following ABT meters are recording data in 15 minutes’ time block on sliding window principal instead
of load survey, thus blockwise data does not match with midnight data recorded by the meters. As such,
JMR value provided by respective SE (O&M)’s has been considered.
(1) 4MW M/s Ramesh Steels (Ganjbasoda)
(2) 7MW M/s Avon Cycle Ganjbasoda
(3) 15MW M/s Suzlon-IV Agar
(4) 15MW M/s Suzlon-V (Susner-III)
(5) 15MW M/s Suzlon-III (Agar- I)
(6) 25.2MW M/s Suzlon Gujrat Wind Park Pvt. Ltd. Barod
(7) 13.75MW Suzlon Dev I Nagda Hill Dewas

xiv. The SE(O&M), Dewas vide letter no 1117/SE/DC/DWS/WS dated 11.02.2021 informed that 6.6 MW of Wind
Farm of M/s Sanwaria Energy Ltd was permanently disconnected from grid on 11.02.2021 and 1.2MW Wind
Farm of M/s Kalani Industries Ltd. was permanently disconnected from grid on 12.06.2020. Thus, the
pooling station capacity of M.P. Wind Farm Nagda Hill connected at 220KV Dewas is reduced to 7.2MW
only.
xv. Declared Capacity of BLA Power (Unit-1&2) (30% of net available capacity) for claiming of Fix charges is
indicated on page no.3. Monthly Scheduled injection of BLA Power (Unit-1&2) for contracted power and
concessional power is shown separately on page no.5 for claiming variable charges by BLA Power.
xvi. Declared Capacity of JayPee Bina TPP (65% of net available capacity) for claiming of Fix charges is
indicated on page no.3 for Unit – I&II. Monthly Scheduled energy of Bina Power for contracted power and
concessional power is shown separately on page no.5 for Unit-I&II for claiming variable charges by JayPee
Bina Power.

4
xvii. Energy drawn on 33KV feeders (3 Nos.) emanating from 220KV Sub-station Sarni and supplying power to
Coal Handling Plant of STPS as well as the Energy Consumption by ATPS on 33KV Settling Tank Feeder
shall be considered in Deviation charges of Discoms.
xviii. The energy wheeled by Maharashtra State Electricity Distribution Co. Ltd (MSEDCL) from Maharashtra to
132KV Dharni feeder through 132KV Nepanagar S/s under Short Term Open Access is indicated in SEA.
xix. 250MW NTPC Solar Power Project at Suwasara, Mandsaur is temporarily connected through double Ckts at
220KV Bhanpura-Badod Ckts of MPPTCL. MPPMCL has intimated to deduct the loss of 0.48% vide email
dated 30.06.2017 from the injection energy. Further on dated 15.09.2021, tapping of 220kv Gujarkhedi ckt
II removed from 220kv Suwasara - Badod Ckt I and line made through upto 400KV Mandsaur S/s at 23:35
hrs and on dated 17.09.202 tapping of 220kv Gujarkhedi ckt I removed from 220kv Suwasara - Badod Ckt
II and line made through upto 400KV Mandsaur S/s. However, the applicable loss deducted from the
injection data recorded at pooling station as per MPPMCL email dated 30.06.2017 till clarification from
MPPMCL is received in this regard.
xx. MPPMCL vide letter no. 05-01/254 dated 29.06.2021 has allocated 5MW power in addition to 55MW power
to MPAKVNL w.e.f. 1st July 2021. Accordingly, scheduling of power for 60MW has been done from MPPGCL
stations to MPAKVNL as per the requisition furnished by MPPMCL.
xxi. The SEA has been prepared on the basis of block-wise implemented schedules issued by
WRLDC and implemented schedules issued by SLDC for SSGS & IPPs. WRPC has not uploaded
the Ex-Post Facto schedules of SSP, KAPS & TAPS, therefore the energy indicated in the WRPC
REA has been considered and shown in SEA. The difference in scheduled energy of ISGS is
distributed block-wise to match with REA figure. WRPC has not included the URS power in
entitlement of ISGS stations, the same have been included in WRLDC entitlement and shown
in SEA.
xxii. WRPC has not included the 40 MW of power scheduled from NR to MP allocated vide NRPC
letter No. NRPC/OPR/103/02/2018/6105-6130 dated 01.06.18, 6477-6502 dated 04.06.2018
& 6588-6613 dated 08.06.18 in their REA for the month of March,2023. The same has been
included in the SEA as per the implemented schedules issued by WRLDC.
xxiii. NR Solar Power (ABCREPL_BHDL2, APMPL_BHDL, ARP1PL_BKN) scheduled to MPPMCL has
been indicated in the SEA at MP Periphery.
xxiv. The signed copy of SEA is available on SLDC website www.sldcmpindia.com under commercial section
which may please be downloaded for needful please.
xxv. All the Intra State entities are requested to check and verify the State Energy Account and
intimate the discrepancies observed if any within a period of 15days.

Superintending Engineer (LD: ABT & OA)


SLDC, MPPTCL, Jabalpur.

……

5
STATE LOAD DESPATCH CENTRE
MADHYA PRADESH POWER TRANSMISSION COMPANY LTD. JABALPUR
PROVISIONAL STATE ENERGY ACCOUNT FOR THE MONTH OF MARCH-2023
Based on MPERC Balancing & Settlement Code, 2015
DETAILS OF MONTHLY PLANT AVAILABILITY FACTOR OF SSGS & IPP
Page: A-1
No - 07-05/PM-68A/SEA-03.0/435 Dated: 07-04-23
ACTUAL MONTHLY ACTUAL COMMULATIVE PAF %
PAF % ( LOW DEMAND SEASON) ( LOW DEMAND SEASON) APR-
ACTUAL MONTHLY % ACTUAL COMMULATIVE PAF %
APR-22 TO OCT-22 &FEB-23 TO 22 TO OCT-22 &FEB-23 TO MAR-
Target MAR-23 23
] STATION
PAF %

MONTHLY PEAK OFF-PEAK YEARLY PEAK OFF-PEAK MONTHLY PEAK OFF-PEAK YEARLY PEAK OFF-PEAK

I. THERMAL
1 AMARKANTAK -III (210 MW) 85.00 100.99 100.99 100.99 78.39 78.28 78.41 100.99 100.99 100.99 72.43 72.62 72.39
2 SATPURA 70.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
3 SATPURA IV 85.00 101.64 101.64 101.64 94.34 94.40 94.33 101.64 101.64 101.64 91.96 92.04 91.94
4 SGTPS I & II 75.00 82.31 82.17 82.34 68.24 68.98 68.10 82.31 82.17 82.34 66.12 66.98 65.95
5 SGTPS III (500MW) 85.00 95.87 96.40 95.77 91.66 92.63 91.46 95.87 96.40 95.77 91.03 92.09 90.82
6 SHRI SINGAJI TPP PH-I 85.00 82.05 82.05 82.05 69.63 70.45 69.46 82.05 82.05 82.05 65.69 66.10 65.60
7 SHRI SINGAJI TPP PH-II 85.00 70.46 70.78 70.39 58.36 58.82 58.26 70.46 70.78 70.39 54.53 54.95 54.45
II. HYDEL
1 GANDHI SAGAR 85.00 46.31 - - 46.58 - - - - - - - -
2 PENCH 85.00 90.63 - - 72.77 - - - - - - - -
3 BARGI 85.00 97.78 - - 88.71 - - - - - - - -
4 BANSAGAR -I (TONS) 85.00 54.84 - - 37.08 - - - - - - - -
5 BANSAGAR-II (SILPARA) 85.00 100.00 - - 95.21 - - - - - - - -
6 BANSAGAR-III (DEOLOND) 85.00 105.00 - - 102.81 - - - - - - - -
9 BANSAGAR-IV (JHINNA) 85.00 110.00 - - 103.67 - - - - - - - -
8 BIRSINGHPUR 85.00 0.00 - - 48.66 - - - - - - - -
7 RAJGHAT 60.00 73.33 - - 65.79 - - - - - - - -
10 MADIKHEDA 85.00 105.00 - - 99.25 - - - - - - - -
III. NHDC
1 INDIRASAGAR PROJECT 87.00 89.65 - - 97.37 - - - - - - - -
2 OMKARESHWER PROJECT 90.00 93.32 - - 97.51 - - - - - - - -

IV. IPPs
1 BLA POWER (UNIT-I) 85.00 0.00 0.00 0.00 20.62 20.44 20.66 0.00 0.00 0.00 11.07 10.85 11.12
2 BLA POWER (UNIT-II) 85.00 88.48 88.71 88.43 72.21 72.20 72.22 88.48 88.71 88.43 63.09 63.02 63.11
3 JP BINA POWER 85.00 99.81 100.00 99.77 82.30 82.62 82.24 99.81 100.00 99.77 83.17 83.59 83.08
Note - The Plant Availability Factor of IPPs is computed on the basis of DC given by IPPs for contracted power.
STATE LOAD DESPATCH CENTRE
MADHYA PRADESH POWER TRANSMISSION COMPANY LTD. JABALPUR
PROVISIONAL STATE ENERGY ACCOUNT FOR THE MONTH OF MARCH-2023
SUMMARY OF GENERATION / DRAWAL OF SCHEDULED ENERGY
Page: A-2
No - 07-05/PM-68A/SEA-03.0/435 Dated: 07-04-2023

Sl.No: Particulars MPPMCL

A. SCHEDULED ENERGY OF SSGS THERMAL STATIONS 2,44,99,02,500


B. SCHEDULED ENERGY OF SSGS IPP STATIONS 14,24,30,548
C. SCHEDULED ENERGY OF SSGS HYDRO STATIONS ON ACTUAL GENERATION BASIS 17,25,79,885
D. DETAILS OF MONTHLY SCHEDULED/ACTUAL ENERGY FROM NHDC/NVDA HYDEL STATIONS 12,26,46,282
E ADJUSTMENT OF BILATRAL PROJECTS 3,27,60,793
F SCHEDULED ENERGY OF ISGS STATIONS 4,35,30,19,157
G SCHEDULED ENERGY OF ISGS STATIONS (Against RAJGARH SOLAR) 2,43,28,759
H SCHEDULED ENERGY OF INTER STATE OPEN ACCESS (BILATERAL & COLLECTIVE) -58,05,30,985
I SCHEDULED ENERGY OF INTRA STATE OPEN ACCESS 0
J ENERGY PURCHASED BY MPPMCL FROM OTHER SOURCES 40,49,12,093
TOTAL 7,12,20,49,032

Energy Schedule of Discoms Excluding Wheeling

Sl.No: State Beneficiaries TOTAL

A. MPPuKVVCL 2,22,16,47,948
B. MPMaKVVCL 2,23,69,05,793
C. MPPaKVVCL 2,66,34,95,291
D. MPAKVNL 3,69,70,000
E. WCR RAILWAY 26,81,96,906

Wheeled energy of Renewable and Open Access Customers to Discoms for computation of Deviation charges

Particulars TOTAL MPPuKVVCL MPMaKVVCL MPPaKVVCL


A. SOLAR ENERGY WHEELED THRU DISCOMS 3,86,67,530 48,63,343 1,15,40,051 2,22,64,136
B. WIND & OTHERS ENERGY WHEELED THRU DISCOM 95,21,160 4,63,301 1,19,730 89,38,129
C. INTRA STATE OPEN ACCESS CUSTOMERS ENERGY WHEELED THRU DISCOM 0 0 0 0
D. INTER STATE OPEN ACCESS CUSTOMERS ENERGY WHEELED THRU DISCOM -3,19,52,625 -1,57,56,500 -93,53,425 -68,42,700

TOTAL 1,62,36,065 -1,04,29,856 23,06,356 2,43,59,565

ALL FIGURES IN KWH UNLESS UNTIL SPECIFIED OTHERWISE


STATE LOAD DESPATCH CENTRE, JABALPUR
MADHYA PRADESH POWER TRANSMISSION COMPANY LTD. JABALPUR
PROVISIONAL STATE ENERGY ACCOUNT FOR THE MONTH OF MARCH-2023
DETAILS OF ENTITLEMENT OF MPPMCL
Page: A-3

No - 07-05/PM-68A/SEA-03.0/435 Dated: 07-04-2023


A. DETAILS OF ENTITLEMENT OF MPPMCL IN SSGS THERMAL STATIONS
Sl.No: STATION TOTAL Peak Off-Peak MPPMCL MPAKVNL

1 Amarkantak Thermal Power Station -III 14,35,92,000 2,39,32,000 11,96,60,000 14,16,87,687 19,04,313
2 SHREE SINGAJI THERMAL POWER PROJECT-I 69,04,02,500 11,48,15,000 57,55,87,500 67,20,05,150 1,83,97,350
3 SHREE SINGAJI THERMAL POWER PROJECT-II 65,21,53,250 10,93,04,000 54,28,49,250 65,21,53,250 0
4 Sanjay Gandhi Thermal Power Station -III 33,61,41,500 5,68,75,000 27,92,66,500 33,16,11,988 45,29,512
5 Sanjay Gandhi Thermal Power Station I&II 46,29,63,750 7,76,52,500 38,53,11,250 45,53,54,438 76,09,312
6 Satpura Thermal Power Station 0 0 0 0 0
7 Satpura Thermal Power Station -IV 34,59,60,000 5,76,60,000 28,83,00,000 34,14,30,488 45,29,512
TOTAL 2,63,12,13,000 44,02,38,500 2,19,09,74,500 2,59,42,43,000 3,69,70,000

B. DETAILS OF ENTITLEMENT OF MPPMCL IN SSGS IPP STATIONS


Sl.No: STATION MPPMCL Peak Off-Peak
1 M/s BLA POWER PVT. LTD. 0 0 0
2 M/s BLA POWER PVT. LTD. , UNIT-II 79,58,378 13,29,900 66,28,478
3 M/s JAYPEE BINA THERMAL POWER PLANT, UNIT-I&II 22,08,31,236 3,68,75,120 18,39,56,116
TOTAL 22,87,89,613 3,82,05,020 19,05,84,593

C. DETAILS OF ENTITLEMENT OF MPPMCL IN ISGS STATIONS


Sl.No: STATION MPPMCL Peak Off-Peak
1 ANTA_CRF 309938 - -
2 ANTA_GF 0 - -
3 ANTA_LF 5,09,312 - -
4 ANTA_RF 2,96,104 - -
5 AURY_CRF 5,64,349 - -
6 AURY_GF 0 - -
7 AURY_LF 1,66,552 - -
8 AURY_RF 5,23,956 - -
9 CHAMERA2 2,28,142 - -
10 CHAMERA3 1,24,003 - -
11 DADRI_CRF 1,03,666 - -
12 DADRI_GF 0 - -
13 DADRI_LF 19,01,431 - -
14 DADRI_RF 91,354 - -
15 DADRT2 6,84,383 - -
16 DHAULIGNGA 92,011 - -
17 DULHASTI 1,43,984 - -
18 Gadarwara NTPC 52,70,86,855 8,90,15,958 43,80,70,897
19 Gandhar Gas Power Project 7,233 0 0
20 JHAJJAR 25,91,112 - -
21 KISHANGANGA 3,95,919 - -
22 KOLDAM 1,56,478 - -
23 KOTESHWAR 2,02,843 - -
24 Kawas Gas Power Project-GAS 4,881 0 0
25 Khargone-I 40,65,94,881 6,68,43,791 33,97,51,091
26 Korba Super Thermal Power Stations 29,23,55,137 4,94,35,599 24,29,19,538
27 Korba Super Thermal Power Stations-III 4,09,78,403 68,35,632 3,41,42,771
28 LARA-I 10,36,73,827 1,73,51,230 8,63,22,597
29 Mouda Power Plant-I 9,02,299 1,46,732 7,55,567
30 Mouda Power Plant-II 10,71,418 1,78,102 8,93,316
31 NAPP 10,14,921 - -
32 NJPC 5,37,521 - -
33 PARBATI3 38,481 - -
34 RAMPUR 1,37,987 - -
STATE LOAD DESPATCH CENTRE, JABALPUR
MADHYA PRADESH POWER TRANSMISSION COMPANY LTD. JABALPUR
PROVISIONAL STATE ENERGY ACCOUNT FOR THE MONTH OF MARCH-2023
DETAILS OF ENTITLEMENT OF MPPMCL
STATION Peak Off-Peak Page: A-4
35 RAPPC 5,65,468 - -
36 RIHAND1 5,44,816 - -
37 RIHAND2 9,38,702 - -
38 RIHAND3 5,47,825 - -
39 SASAN ULTRA MEGA POWER PROJECT 86,22,85,238 14,44,76,250 71,78,08,988
40 SEWA2 2,62,861 - -
41 SINGRAULI 29,37,359 - -
42 SINGRAULI_HYDRO 10,620 - -
43 SIPAT SUPER THERMAL POWER STATION-I 19,01,69,848 3,18,43,811 15,83,26,037
44 SIPAT SUPER THERMAL POWER STATION-II 8,80,60,755 1,45,77,695 7,34,83,060
45 SOLAPUR SUPAR THERMAL POWER PLANT 20,73,73,027 3,45,75,714 17,27,97,313
46 TANDA2 38,25,281 - -
47 TEHRI 5,65,880 - -
48 UNCHAHAR1 50,31,506 - -
49 UNCHAHAR2 9,26,339 - -
50 UNCHAHAR3 4,11,013 - -
51 UNCHAHAR4 19,69,312 - -
52 URI2 0 - -
53 Vindhyachal Super Thermal Power Stations-I 25,78,32,481 4,30,24,987 21,48,07,494
54 Vindhyachal Super Thermal Power Stations-II 20,69,95,433 3,44,99,239 17,24,96,194
55 Vindhyachal Super Thermal Power Stations-III 10,07,48,956 1,69,59,712 8,37,89,244
56 Vindhyachal Super Thermal Power Stations-IV 17,96,36,663 2,99,43,771 14,96,92,892
57 Vindhyachal Super Thermal Power Stations-V 8,86,35,041 1,47,72,507 7,38,62,534
TOTAL 3,58,37,63,805 59,44,80,730 2,95,99,19,532

D. DETAILS OF DECLARED CAPACITY OF INTER STATE IPP’S FOR MPPMCL AS PER PEAK AND OFF- PEAK HOURS
OF MP
Sl.No: STATION MPPMCL Peak Off-Peak
Jhabua Power Limited - JV of NTPC Ltd ( Regulated Power
1 11,14,77,559 18391540 93086019
LTOA) PPA-1
2 JNSTPP UNIT-I ( Regulated Power LTOA) PPA-1 13,11,11,390 2,19,62,160 10,91,49,230
3 JNSTPP UNIT-II ( Regulated Power LTOA) PPA-1 2,16,48,690 37,22,700 1,79,25,990
4 MB POWER UNIT-I ( Regulated Power LTOA) PPA-1 12,37,92,188 20587500 103204687.5
5 MB POWER UNIT-II ( Regulated Power LTOA) PPA-1 11,03,50,938 18225000 92125937.5
6 Lanco Amarkantak 13,89,02,000 3,38,52,000 10,50,50,000
TOTAL 63,72,82,764 11,67,40,900 52,05,41,864

E. DETAILS OF ENTITLEMENT OF MPPMCL IN ISGS STATIONS (Against RAJGARH SOLAR)


Sl.No: STATION MPPMCL Peak Off-Peak
1 Gadarwara NTPC Power Plant 3276221 553139 2723082
2 Khargone-I 2530006 415923 2114083
3 Korba Super Thermal Power Stations 2237401 378347 1859054
4 Korba Super Thermal Power Stations-III 1010438 168553 841885
5 LARA-I_NTPC 3432668 574162 2858506
6 Mouda NTPC Power Plant-I 1568591 261367 1307224
7 Mouda NTPC Power Plant-II 2641674 440452 2201221
8 SIPAT SUPER THERMAL POWER STATION-I 4110736 688485 3422252
9 SIPAT SUPER THERMAL POWER STATION-II 1130420 187127 943293
10 SOLAPUR SUPAR THERMAL POWER PLANT 2865241 477728 2387513
11 Vindhyachal Super Thermal Power Stations-I 1822147 304080 1518067
12 Vindhyachal Super Thermal Power Stations-II 1572137 262023 1310115
13 Vindhyachal Super Thermal Power Stations-III 1012835 170502 842333
14 Vindhyachal Super Thermal Power Stations-IV 2171177 361915 1809261
15 Vindhyachal Super Thermal Power Stations-V 1074165 179027 895137
TOTAL 3,24,55,857 54,22,832 2,70,33,025
STATE LOAD DESPATCH CENTRE JABALPUR
MADHYA PRADESH POWER TRANSMISSION COMPANY LTD. JABALPUR
PROVISIONAL STATE ENERGY ACCOUNT FOR THE MONTH OF MARCH-2023
DETAILS OF MONTHLY SCHEDULED ENERGY OF MPPMCL
Page: A-5

No - 07-05/PM-68A/SEA-03.0/435 Dated: 07-04-2023


A.DETAILS OF MONTHLY SCHEDULED ENERGY OF SSGS THERMAL STATIONS
Sl.No: STATION TOTAL Peak Off-Peak MPPMCL MPAKVNL
1 Amarkantak Thermal Power Station -III 14,31,48,000 2,39,12,000 11,92,36,000 14,12,43,687 19,04,313
2 SHREE SINGAJI THERMAL POWER PROJECT-I 61,92,69,250 11,02,54,000 50,90,15,250 60,08,71,900 1,83,97,350
3 SHREE SINGAJI THERMAL POWER PROJECT-II 61,33,66,250 10,69,41,000 50,64,25,250 61,33,66,250 0
4 Sanjay Gandhi Thermal Power Station -III 33,18,09,750 5,60,34,500 27,57,75,250 32,72,80,238 45,29,512
5 Sanjay Gandhi Thermal Power Station I&II 44,96,58,000 7,66,10,250 37,30,47,750 44,20,48,688 76,09,312
6 Satpura Thermal Power Station 0 0 0 0 0
7 Satpura Thermal Power Station -IV 32,96,21,250 5,70,64,000 27,25,57,250 32,50,91,738 45,29,512
TOTAL 2,48,68,72,500 43,08,15,750 2,05,60,56,750 2,44,99,02,500 3,69,70,000
B. DETAILS OF MONTHLY SCHEDULED ENERGY OF IPPs
Sl.No: STATION MPPMCL Peak Off-Peak

1 M/s BLA POWER PVT. LTD. (30% Contracted Energy) 0 0 0


2 M/s BLA POWER PVT. LTD. (5% Concessional Energy) 0 0 0
3 M/s BLA POWER PVT. LTD. UNIT-II (30% Contracted Energy) 32,94,513 9,09,250 23,85,262
4 M/s BLA POWER PVT. LTD. UNIT-II (5% Concessional Energy) 5,95,258 1,63,432 4,31,826
5 M/s JAYPEE BINA THERMAL POWER PLANT, UNIT-I&II (65% Contracted Energy) 12,80,25,200 3,19,88,738 9,60,36,463
6 M/s JAYPEE BINA THERMAL POWER PLANT, UNIT-I&II (5% Concessional Energy) 1,05,15,578 24,27,283 80,88,295
TOTAL 14,24,30,548 3,54,88,702 10,69,41,846

C.DETAILS OF MONTHLY ACTUAL ENERGY OF SSGS HYDRO STATIONS


Sl.No: STATION MPPMCL Peak Off-Peak

1 Bansagar Hydel Power Station-I 4,22,20,454 - -


2 Bansagar Hydel Power Station-II 76,27,057 - -
3 Bansagar Hydel Power Station-III 1,28,35,456 - -
4 Bansagar Hydel Power Station-IV 1,23,69,262 - -
5 Bargi Hydel Power Station 29072090 - -
6 Birsingpur Hydel Power Station -5,952 - -
7 Gandhi Sagar Hydel Power Station ( MP Share ) 19415808 - -
8 Jawahar Sagar Hydel Power Station ( MP Share ) 1,15,89,565 - -
9 Madikheda Hydel Power Station 9144860 - -
10 Pench Hydel Power Station ( MP Share ) 8233120 - -
11 Rajghat Hydel Power Station ( MP Share ) 2913042 - -
12 Ranaprathap Sagar Hydel Power Station ( MP Share ) 17165123 - -
TOTAL 17,25,79,885 - -

D .DETAILS OF MONTHLY SCHEDULED/ACTUAL ENERGY FROM NHDC/NVDA HYDEL STATIONS


Sl.No: STATION MPPMCL Peak Off-Peak

1 Bargi Left Bank Canal Power House ( Import: 9000 , Export: 0 ) -9,000 - -
2 Indira Sagar Project 7,56,73,278 - -
3 Omkareshwar Hydel Power Station 46298424 - -
4 ISP NVDA Chandel PH ( Import: 5460, Export: 683580 ) 683580 - -
TOTAL 12,26,46,282 - -

E.ADJUSTMENT OF BILATERAL PROJECTS


Sl.No: STATION TOTAL Peak Off-Peak

1 Chambal Complex
i Excess / Less in Bilateral Projects -9920387 - -
POWER SCHEDULE UNDER MTOA FROM RAJASTHAN (At Rajasthan
ii Periphery) 43152000 - -
Chambal Complex - Energy drawal by MPMKVVCL from Rajasthan through 33KV
- -
iii Sheopur Ckt at Rajasthan peripheri. 0
iv Total Excess/Less Drawl of MP in Chambal Complex 33231613 - -
2 Excess/Less Drawl of MP in RAJGHAT -470820 - -
TOTAL 32760793 - -

ALL FIGURES IN KWH UNLESS UNTILL SPECIFIED OTHERWISE


STATE LOAD DESPATCH CENTRE JABALPUR
MADHYA PRADESH POWER TRANSMISSION COMPANY LTD. JABALPUR
PROVISIONAL STATE ENERGY ACCOUNT FOR THE MONTH OF MARCH-2023
DETAILS OF MONTHLY SCHEDULED ENERGY OF MPPMCL
No - 07-05/PM-68A/SEA-03.0/435 Page: A-6
F.DETAILS OF MONTHLY SCHEDULED ENERGY OF ISGS STATIONS
Sl.No: STATION MPPMCL Peak Off-Peak

1 ABCREPL_BHDL2 44568538 - -
2 ANTA_CRF 0 - -
3 ANTA_GF 0 - -
4 ANTA_LF 0 - -
5 ANTA_RF 0 - -
6 APMPL_BHDL 36186407 - -
7 ARP1PL_BKN 63983270 - -
8 ASIPL BARANDA 15323198 - -
9 AURY_CRF 0 - -
10 AURY_GF 0 - -
11 AURY_LF 0 - -
12 AURY_RF 0 -
14 Arinsun_RUMS 35968565 - -
13 Athena_RUMS 36881188
15 CHAMERA2 228142 - -
16 CHAMERA3 124003 - -
17 CPTTNPL 5397403 - -
18 DADRI_CRF 0 - -
19 DADRI_GF 0 - -
20 DADRI_LF 0 - -
21 DADRI_RF 0 - -
22 DADRT2 392370 - -
23 DHAULIGNGA 92011 - -
24 DULHASTI 143980 - -
25 GANDHAR GAS POWER PROJECT -RLNG 0 0 0
26 Gadarwara NTPC 234957304 37999179 196958125
27 Gandhar Gas Power Project 0 0 0
28 Gandhar Gas Power Project-NAPM 0 0 0
29 JHAJJAR 1642580 - -
30 KAWAS GAS POWER PROJECT -RLNG 0 0 0
31 KISHANGANGA 395919 - -
32 KOLDAM 156478 - -
33 KOTESHWAR 202795 - -
34 Kahalgaon Super Thermal Power Station -II 32120804 - -
35 Kakrapar Atomic Power Stations 68444298 - -
36 Kawas Gas Power Project-GAS 0 0 0
37 Kawas Gas Power Project-LIQUID 0 0 0
38 Kawas Gas Power Project-NAPM 0 0 0
39 Kawas Gas Power Project Committed Gas 0 0 0
40 Khargone-I 243604905 37881102 205723803
41 Korba Super Thermal Power Stations 280744491 46395514 234348977
42 Korba Super Thermal Power Stations-III 40934836 6835632 34099204
43 LARA-I 102906007 17351230 85554777
44 MATATILA HYDEL POWER STATION NR 2376000 - -
45 MEJA NR 1353608 226102.5 1127505
46 Mahindra RUMS 37687928 - -
47 Mouda Power Plant-I 781090 120945 660145
48 Mouda Power Plant-II 1021327 178102 843225
49 NAPP 1014921 - -
50 NJPC 537521 - -
51 PARBATI3 38481 - -
52 RAMPUR 137987 - -
53 RAPPC 565468 - -
54 RIHAND HYDEL POWER STATION NR 4506960 - -
55 RIHAND1 544773 - -
56 RIHAND2 938673 - -
57 RIHAND3 547778 - -
58 RSEJ3PL_FTG2 66647525 - -
59 SASAN ULTRA MEGA POWER PROJECT 862260945 144476094 717784851
60 SEWA2 262861 - -
61 SINGRAULI 2937208 - -
62 SINGRAULI_HYDRO 10620 - -
63 SIPAT SUPER THERMAL POWER STATION-I 190165541 31842323 158323218
64 SIPAT SUPER THERMAL POWER STATION-II 88056404 14577695 73478709
65 SOLAPUR SUPAR THERMAL POWER PLANT 134001045 19875465 114125580
66 SUJEN POWER STATION (TORRENT) 0 0 0
67 Sardar Sarovar Project 114029951 - -
68 TANDA2 3625692 - -
69 TEHRI 565880 - -
70 Tarapore atomic Power Stations 107280976 - -
71 UNCHAHAR1 4981793 - -
72 UNCHAHAR2 837943 - -
73 UNCHAHAR3 347550 - -
74 UNCHAHAR4 1764544 - -
75 URI2 0 - -
76 Vindhyachal Super Thermal Power Stations-I 256063107 42878431 213184676
77 Vindhyachal Super Thermal Power Stations-II 201590007 33174627 168415380
78 Vindhyachal Super Thermal Power Stations-III 98909126 16477996 82431130
79 Vindhyachal Super Thermal Power Stations-IV 175246879 29088058 146158821
80 Vindhyachal Super Thermal Power Stations-V 88548896 14772507 73776389
81 Jhabua Power Limited - JV of NTPC Ltd 107812823 20370263 87442560
82 M/s Jaypee Nigrie Super Thermal Power Project 187066698 31548090 155518608
83 MB POWER(MADHYA PRADESH) LTD 223706889 42240180 181466709
84 Lanco Amarkantak 138846250 33840000 105006250
TOTAL 4,35,30,19,157 62,21,49,535 3,03,64,28,641
Note:- The Peak and Off-Peak energy schedule from Inter State IPP (Sr. No. 81 to 84) is as per Peak and Off-Peak hours declared by MP.
ALL FIGURES IN KWH UNLESS UNTILL SPECIFIED OTHERWISE
STATE LOAD DESPATCH CENTRE JABALPUR
MADHYA PRADESH POWER TRANSMISSION COMPANY LTD. JABALPUR
PROVISIONAL STATE ENERGY ACCOUNT FOR THE MONTH OF MARCH-2023
DETAILS OF MONTHLY SCHEDULED ENERGY OF MPPMCL
No - 07-05/PM-68A/SEA-03.0/435 A-7
4,42,04,99,916 Dated: 07-04-2023
G.DETAILS OF MONTHLY SCHEDULED ENERGY OF ISGS STATIONS (Against RAJGARH SOLAR)
Sl.No: STATION MPPMCL Peak Off-Peak

1 Gadarwara NTPC Power Plant 7,78,640 1,04,206 6,74,434


2 Khargone-I 7,33,458 83,053 6,50,405
3 Korba Super Thermal Power Stations 21,70,146 361938 1808208
4 Korba Super Thermal Power Stations-III 10,10,298 168553 841745
5 LARA-I_NTPC 34,06,951 574162 2832789
6 Mouda NTPC Power Plant-I 8,96,000 1,12,745 7,83,255
7 Mouda NTPC Power Plant-II 14,80,288 1,92,529 12,87,759
8 SIPAT SUPER THERMAL POWER STATION-I 41,10,643 688452 3422191
9 SIPAT SUPER THERMAL POWER STATION-II 11,30,364 187127 943237
10 SOLAPUR SUPAR THERMAL POWER PLANT 10,86,083 124868 961215
11 Vindhyachal Super Thermal Power Stations-I 18,09,608 303042 1506566
12 Vindhyachal Super Thermal Power Stations-II 15,31,003 252482 1278521
13 Vindhyachal Super Thermal Power Stations-III 9,94,284 165645 828639
14 Vindhyachal Super Thermal Power Stations-IV 21,17,877 351526 1766351
15 Vindhyachal Super Thermal Power Stations-V 10,73,116 179027 894089
TOTAL 2,43,28,759 38,49,355 2,04,79,404

H.DETAILS OF MONTHLY SCHEDULED ENERGY OF INTER STATE OPEN ACCESS


Sl.No: TRANSACTION TYPE MPPMCL Peak Off-Peak

1 PURCHASE 10,52,79,389 - -
2 BANKING -26,61,57,665 - -
3 SALE -42,69,87,345 - -
4 SALE ( FROM MPPMCL TO RAILWAY) -25,34,400 - -
5 STOA AGAINST LTA ( ESSAR MAHAN) 98,69,036 - -
TOTAL -58,05,30,985 - -

I.DETAILS OF MONTHLY SCHEDULED ENERGY OF INTRA STATE OPEN ACCESS


Sl.No: TRANSACTION TYPE TOTAL MPPuKVVCL MPMaKVVCL MPPaKVVCL
1 ENERGY WHEELED TO / FROM OACs UNDER INTRA (STOA) 0
Total (Excluding Wheeling) 0

J.ENERGY PURCHASED BY MPPMCL FROM OTHER SOURCES


Sl.No: GS ID ENERGY
1 MPSOLAR 13,52,23,477
2 MPWIND 23,81,27,365
3 OTHERS 3,15,61,251
TOTAL 40,49,12,093

K.ENERGY WHEELED FROM RENEWABLE GENERATORS TO DISCOMS


Sl. No STATION TOTAL MPPuKVVCL MPMaKVVCL MPPaKVVCL

1 MPSOLAR 3,86,67,530 4863343 11540051 22264136

2 MPWIND 83,08,200 463301 119730 7725169


3 MPOTHER 12,12,960 0 0 1212960

L.ENERGY WHEELED TO RAILWAYS, OTHER STATES & INTER STATE OPEN ACCESS.
Sl.No: STATION Total AT MP PERI MPPuKVVCL MPMaKVVCL MPPaKVVCL
1 ENERGY WHEELED TO RAILWAYS UNDER (LTOA & STOA) 26,56,62,506
2 RENEWABLE ENERGY WHEELED TO OTHER STATE UNDER (LTOA) -5,16,76,333
3 ENERGY WHEELED TO / FROM OACs UNDER INTER (STOA) -15,55,85,124 -1,57,56,500 -93,53,425 -68,42,700

ALL FIGURES IN KWH UNLESS UNTILL SPECIFIED OTHERWISE


STATE LOAD DESPATCH CENTRE, JABALPUR
MADHYA PRADESH POWER TRANSMISSION COMPANY LTD. JABALPUR
PROVISIONAL STATE ENERGY ACCOUNT FOR THE MONTH OF MARCH-2023
No - 07-05/PM-68A/SEA-03.0/435 Page: A-8
TYPE OF TRANSACTION:- BANKING -26,61,57,665 Dated: 07-04-2023
Sl. No APPROVAL NUMBER MPPMCL LOI No. Trader Buyer Seller Total AT MP PERI
1 MPPMCL/OA-23/PSPCL/Mar/01 WR/2023/12826/C MADHYA PRADESH POWER MANAGEMENT CO.LTD. MPPMCL_DRWL PSPCL 1108025
2 TANGEDCO/MPPMC/05. SR/2023/2233/A MADHYA PRADESH POWER MANAGEMENT CO.LTD. TANGEDCO MPPMCL -40500000
3 MPPMCL/09/2022. SR/2023/2660/A MADHYA PRADESH POWER MANAGEMENT CO.LTD. TSSPDCL MPPMCL -186000000
4 TANGEDCO/MPPMC/06. SR/2023/2236/A MADHYA PRADESH POWER MANAGEMENT CO.LTD. TANGEDCO MPPMCL -79785010
5 MPPMC/OA-22/TANGEDCO/Mar/01 WR/2022/10228/A MADHYA PRADESH POWER MANAGEMENT CO.LTD. TANGEDCO MPPMCL 39019320

TYPE OF TRANSACTION:- PURCHASE 10,52,79,389


SL. No APPROVAL NUMBER MPPMCL LOI No. Trader Buyer Seller Total AT MP PERI
1 MPPMC/OA-23/DVC/DSTPS/2503 WR/2023/13695/C MADHYA PRADESH POWER MANAGEMENT CO.LTD. MPPMCL_DRWL DVC 982554
2 MPPMC/OA-23/DVC/DSTPS/2903 WR/2023/13828/C MADHYA PRADESH POWER MANAGEMENT CO.LTD. MPPMCL_DRWL DVC 1714669
3 MPPMC/OA-23/DVC/DSTPS/0303 WR/2023/12918/C MADHYA PRADESH POWER MANAGEMENT CO.LTD. MPPMCL_DRWL DVC 2179417
4 MPPMC/OA-23/DVC/DSTPS/0203 WR/2023/12874/C MADHYA PRADESH POWER MANAGEMENT CO.LTD. MPPMCL_DRWL DVC 2179428
5 MPPMC/OA-23/DVC/DSTPS/2003 WR/2023/13521/C MADHYA PRADESH POWER MANAGEMENT CO.LTD. MPPMCL_DRWL DVC 818811
6 MPPMC/OA-23/DVC/DSTPS/2103 WR/2023/13578/C MADHYA PRADESH POWER MANAGEMENT CO.LTD. MPPMCL_DRWL DVC 634574
7 MPPMC/OA-23/DVC/DSTPS/3003 WR/2023/13856/C MADHYA PRADESH POWER MANAGEMENT CO.LTD. MPPMCL_DRWL DVC 1714679
8 MPPMC/OA-23/DVC/DSTPS/2203 WR/2023/13602/C MADHYA PRADESH POWER MANAGEMENT CO.LTD. MPPMCL_DRWL DVC 941616
9 MPPMC/OA-23/DVC/DSTPS/0103 WR/2023/12842/C MADHYA PRADESH POWER MANAGEMENT CO.LTD. MPPMCL_DRWL DVC 2179426
10 MPPMC/OA-23/DVC/DSTPS/0503 WR/2023/12991/C MADHYA PRADESH POWER MANAGEMENT CO.LTD. MPPMCL_DRWL DVC 2178761
11 MPPMC/OA-23/DVC/DSTPS/2703 WR/2023/13765/C MADHYA PRADESH POWER MANAGEMENT CO.LTD. MPPMCL_DRWL DVC 1183935
12 MPPMC/OA-23/DVC/DSTPS/2803 WR/2023/13800/C MADHYA PRADESH POWER MANAGEMENT CO.LTD. MPPMCL_DRWL DVC 1755515
13 14679B MP_Power_Management_Co_Ltd MADHYA PRADESH POWER MANAGEMENT CO.LTD. MPPMCL_DRWL IEX 48067238
14 N/A MP_Power_Management_Co_Ltd MADHYA PRADESH POWER MANAGEMENT CO.LTD. MPPMCL_DRWL GDAM IEX 5237318
15 MPPMC/OA-23/DVC/DSTPS/2303 WR/2023/13625/C MADHYA PRADESH POWER MANAGEMENT CO.LTD. MPPMCL_DRWL DVC 1023502
16 MPPMC/OA-23/DVC/DSTPS/2802 WR/2023/12798/C MADHYA PRADESH POWER MANAGEMENT CO.LTD. MPPMCL_DRWL DVC 2179437
17 MPPMC/OA-23/DVC/DSTPS/0403 WR/2023/12959/C MADHYA PRADESH POWER MANAGEMENT CO.LTD. MPPMCL_DRWL DVC 2179453
18 MPPMC/OA-23/DVC/DSTPS/0603 WR/2023/13043/C MADHYA PRADESH POWER MANAGEMENT CO.LTD. MPPMCL_DRWL DVC 2178754
19 MPPMC/OA-23/DVC/DSTPS/2403 WR/2023/13666/C MADHYA PRADESH POWER MANAGEMENT CO.LTD. MPPMCL_DRWL DVC 1146325
20 MPPMC/OA-23/DVC/DSTPS/2603 WR/2023/13728/C MADHYA PRADESH POWER MANAGEMENT CO.LTD. MPPMCL_DRWL DVC 1183923
21 N/A WR/2023/13054/C MADHYA PRADESH POWER MANAGEMENT CO.LTD. MPPMCL_DRWL DVC 1395802
22 N/A WR/2023/13081/C MADHYA PRADESH POWER MANAGEMENT CO.LTD. MPPMCL_DRWL DVC 1089495
23 N/A WR/2023/13109/C MADHYA PRADESH POWER MANAGEMENT CO.LTD. MPPMCL_DRWL DVC 862517
24 N/A WR/2023/13136/C MADHYA PRADESH POWER MANAGEMENT CO.LTD. MPPMCL_DRWL DVC 719869
25 N/A WR/2023/13137/C MADHYA PRADESH POWER MANAGEMENT CO.LTD. MPPMCL_DRWL DVC 226978
26 N/A WR/2023/13152/C MADHYA PRADESH POWER MANAGEMENT CO.LTD. MPPMCL_DRWL DVC 2178758
27 N/A WR/2023/13185/C MADHYA PRADESH POWER MANAGEMENT CO.LTD. MPPMCL_DRWL DVC 2178758
28 N/A WR/2023/13221/C MADHYA PRADESH POWER MANAGEMENT CO.LTD. MPPMCL_DRWL DVC 2180342
29 N/A WR/2023/13259/C MADHYA PRADESH POWER MANAGEMENT CO.LTD. MPPMCL_DRWL DVC 2180342
30 N/A WR/2023/13297/D MADHYA PRADESH POWER MANAGEMENT CO.LTD. MPPMCL_DRWL DVC 2180342
31 N/A WR/2023/13339/C MADHYA PRADESH POWER MANAGEMENT CO.LTD. MPPMCL_DRWL DVC 2180342
32 N/A WR/2023/13383/C MADHYA PRADESH POWER MANAGEMENT CO.LTD. MPPMCL_DRWL DVC 1966356
33 N/A WR/2023/13415/C MADHYA PRADESH POWER MANAGEMENT CO.LTD. MPPMCL_DRWL DVC 1577181
34 N/A WR/2023/13454/C MADHYA PRADESH POWER MANAGEMENT CO.LTD. MPPMCL_DRWL DVC 1474767
35 N/A WR/2023/13497/C MADHYA PRADESH POWER MANAGEMENT CO.LTD. MPPMCL_DRWL DVC 1228207

ALL FIGURES IN KWH UNLESS UNTILL SPECIFIED OTHERWISE


STATE LOAD DESPATCH CENTRE, JABALPUR
MADHYA PRADESH POWER TRANSMISSION COMPANY LTD. JABALPUR
PROVISIONAL STATE ENERGY ACCOUNT FOR THE MONTH OF MARCH-2023

TYPE OF TRANSACTION:- STOA AGAINST LTA (ESSAR _MAHAN) 98,69,036 Page: A-9
Sl. No APPROVAL NUMBER MPPMCL LOI No. Trader Buyer Seller Total AT MP PERI
1 MPPMC/OA-23/MEL/0103 WR/2023/12841/C MADHYA PRADESH POWER MANAGEMENT CO.LTD. MPPMCL_DRWL Essar Power MP Limited 77080
2 MPPMC/OA-23/MEL3103 WR/2023/13860/C MADHYA PRADESH POWER MANAGEMENT CO.LTD. MPPMCL_DRWL Essar Power MP Limited 528252
3 MPPMC/OA-23/MEL/2903 WR/2023/13829/C MADHYA PRADESH POWER MANAGEMENT CO.LTD. MPPMCL_DRWL Essar Power MP Limited 605076
4 MPPMC/OA-23/MEL2203 WR/2023/13613/C MADHYA PRADESH POWER MANAGEMENT CO.LTD. MPPMCL_DRWL Essar Power MP Limited 251629
5 MPPMC/OA-23/MEL/2802_ WR/2023/12797/C MADHYA PRADESH POWER MANAGEMENT CO.LTD. MPPMCL_DRWL Essar Power MP Limited 520290
6 MPPMC/OA-23/MEL2703 WR/2023/13774/C MADHYA PRADESH POWER MANAGEMENT CO.LTD. MPPMCL_DRWL Essar Power MP Limited 403450
7 MPPMC/OA-23/MEL2803 WR/2023/13802/C MADHYA PRADESH POWER MANAGEMENT CO.LTD. MPPMCL_DRWL Essar Power MP Limited 614674
8 MPPMC/OA-23/MEL2303 WR/2023/13627/C MADHYA PRADESH POWER MANAGEMENT CO.LTD. MPPMCL_DRWL Essar Power MP Limited 199400
9 MPPMC/OA-23/MEL/0103_R WR/2023/12869/C MADHYA PRADESH POWER MANAGEMENT CO.LTD. MPPMCL_DRWL Essar Power MP Limited 105983
10 MPPMC/OA-23/MEL/0203 WR/2023/12873/C MADHYA PRADESH POWER MANAGEMENT CO.LTD. MPPMCL_DRWL Essar Power MP Limited 455252
11 MPPMC/OA-23/MEL/0303 WR/2023/12919/C MADHYA PRADESH POWER MANAGEMENT CO.LTD. MPPMCL_DRWL Essar Power MP Limited 409279
12 MPPMC/OA-23/MEL/0403 WR/2023/12967/C MADHYA PRADESH POWER MANAGEMENT CO.LTD. MPPMCL_DRWL Essar Power MP Limited 212092
13 MPPMC/OA-23/MEL2503R WR/2023/13696/C MADHYA PRADESH POWER MANAGEMENT CO.LTD. MPPMCL_DRWL Essar Power MP Limited 183016
14 MPPMC/OA-23/MEL2603 WR/2023/13730/C MADHYA PRADESH POWER MANAGEMENT CO.LTD. MPPMCL_DRWL Essar Power MP Limited 461052
15 MPPMC/OA-23/MEL2403 WR/2023/13668/C MADHYA PRADESH POWER MANAGEMENT CO.LTD. MPPMCL_DRWL Essar Power MP Limited 144495
16 N/A WR/2023/13174/C MADHYA PRADESH POWER MANAGEMENT CO.LTD. MPPMCL_DRWL Essar Power MP Limited 250615
17 N/A WR/2023/13203/C MADHYA PRADESH POWER MANAGEMENT CO.LTD. MPPMCL_DRWL Essar Power MP Limited 284043
18 N/A WR/2023/13209/C MADHYA PRADESH POWER MANAGEMENT CO.LTD. MPPMCL_DRWL Essar Power MP Limited 10025
19 N/A WR/2023/13243/C MADHYA PRADESH POWER MANAGEMENT CO.LTD. MPPMCL_DRWL Essar Power MP Limited 354638
20 N/A WR/2023/13267/C MADHYA PRADESH POWER MANAGEMENT CO.LTD. MPPMCL_DRWL Essar Power MP Limited 421072
21 N/A WR/2023/13309/C MADHYA PRADESH POWER MANAGEMENT CO.LTD. MPPMCL_DRWL Essar Power MP Limited 935299
22 N/A WR/2023/13340/C MADHYA PRADESH POWER MANAGEMENT CO.LTD. MPPMCL_DRWL Essar Power MP Limited 1013331
23 N/A WR/2023/13384/C MADHYA PRADESH POWER MANAGEMENT CO.LTD. MPPMCL_DRWL Essar Power MP Limited 790309
24 N/A WR/2023/13421/C MADHYA PRADESH POWER MANAGEMENT CO.LTD. MPPMCL_DRWL Essar Power MP Limited 186985
25 N/A WR/2023/13455/C MADHYA PRADESH POWER MANAGEMENT CO.LTD. MPPMCL_DRWL Essar Power MP Limited 202390
26 N/A WR/2023/13494/C MADHYA PRADESH POWER MANAGEMENT CO.LTD. MPPMCL_DRWL Essar Power MP Limited 249307

TYPE OF TRANSACTION:- POWER SCHEDULE UNDER MTOA FROM RAJASTHAN 41555794


Sl. No APPROVAL NUMBER MPPMCL LOI No. Trader Buyer Seller Total AT MP PERI
1 4,15,55,794

TYPE OF TRANSACTION:- SALE -42,69,87,345


Sl. No APPROVAL NUMBER MPPMCL LOI No. Trader Buyer Seller Total AT MP PERI

1 14679A MP_Power_Management_Co_Ltd MADHYA PRADESH POWER MANAGEMENT CO.LTD. IEX MPPMCL -426987345

TYPE OF TRANSACTION:- SALE ( FROM MPPMCL TO RAILWAY) -2534400


1 RAILWAY - IR_MPPMCL RAILWAY MPPMCL MPSEB -25,34,400

ALL FIGURES IN KWH UNLESS UNTILL SPECIFIED OTHERWISE


STATE LOAD DESPATCH CENTRE, JABALPUR
MADHYA PRADESH POWER TRANSMISSION COMPANY LTD. JABALPUR
PROVISIONAL STATE ENERGY ACCOUNT FOR THE MONTH OF MARCH-2023
TYPE OF TRANSACTION:- WHEELING -10,47,72,216 Page: A-10
Sl. No APPROVAL NUMBER MPPMCL LOI No. Trader Buyer Seller Total AT MP PERI MPPuKVVCL MPMaKVVCL MPPaKVVCL
-387525 0 0 -387525
1 FWIPL/MPL/STOA/22-23/SOLAR/MARCH23/01 Freewings_Power_&_Infra_Limited MANIKARAN POWER LTD. IEX Freewings_Power___Infra_Limited
2 NR/2023/10239/F/R/0 NR/2023/10239/F M/s JAYPEE BINA TPP HARYANA MP_SCA_JP_BINA_TPP -37080000 0 0 0

3 Ramesh Steel_March_2023 Ramesh_Steels_Pachama_Ganj_Basoda MITTAL PROSESSORS PVT. LTD. IEX Ramesh_Steels_Pachama_Ganj_Basoda -639325 0 -639325 0

-55045000 0 0 0
4 IEX/BINA/MAR/ 2023 Jaypee_Bina_Thermal_Power_Plant M/s JAYPEE BINA TPP IEX MP_SCA_JP_BINA_TPP
5 MPL/STOA/22-23/SOLAR/EASTMAN/MARCH23 Eastman_International_Tarana_Ujjain MANIKARAN POWER LTD. IEX EASTMAN_INTERNATIONAL_15MW -2352500 0 0 -2352500

-1236000 0 0 0
6 WR/2023/11198/A/R WR/2023/11198/A M/s JAYPEE BINA TPP MSEDCL MP_SCA_JP_BINA_TPP
7 WR/2023/12810/C WR/2023/12810/C IEXL TPL-Surat Discom Narmada_Sugar_Pvt_Ltd_Pondar_Salichouka -456000 -456000 0 0

8 NR/2023/10239/F/R NR/2023/10239/F M/s JAYPEE BINA TPP HARYANA MP_SCA_JP_BINA_TPP -1236000 0 0 0

9 PRIME_STEEL_PROCESSOR_9MW_March_2023 Prime_Steel_Processors_(9MW)_Sironj MITTAL PROSESSORS PVT. LTD. IEX PRIME_STEEL_PROCESSOR_9MW -1692775 0 -1692775 0

10 Prime_Steels_March_2023 Prime_Steel_Processors_Sironj MITTAL PROSESSORS PVT. LTD. IEX PRIME_STEEL_PROCESSORS -1487875 0 -1487875 0
SHREE DURGA KHANDSARI(SUGAR) MILLS,
-2967750 0 0 -2967750
11 SDKSM/POWER/2022-23/24 Shree_Durga_Khandsari_(Sugar)_Mills MENDRANA IEX Shri_Durga_Khandsari_Sugar_Mills
-200725 0 0 0
12 WR/2023/12954/C WR/2023/12954/C MANIKARAN TPL-Surat Discom MP_SCA_BLA_POWER_II

18914902 0 0 0
13 153 WR/2023/12649/F MSEDCL MP_MSEDCL_DRWL MSEDCL
14 Avon_Cycles_Sironj_March_2023 Avon_Cycles_Ltd_Sironj MITTAL PROSESSORS PVT. LTD. IEX AVON_CYCLES_LTD_7MW_SIRONJ -1291100 0 -1291100 0

15 48 Sun_Pharmaceutical_Industries_Limited OA_SUN_PHARMA IEX SUN PHARMACEUTICAL INDUSTRIES LTD -1490250 0 0 0


16 Avon_Cycles_Ganjbasoda_March-2023 Avon_Cycles_Ltd MITTAL PROSESSORS PVT. LTD. IEX AVON CYCLES LTD 7MW GANJBASODA -1060375 0 -1060375 0
17 BLA_IEX2_MAR23_098 BLA_Power_Pvt_Ltd_Unit_2_MPL BLA POWER PVT. LTD. IEX MP_SCA_BLA_POWER_II -56750 0 0 0
18 EI/SLDC/20230221 Prism_Johnson_Limited_Cement_Division M/s PRISM CEMENT LTD. UNIT I PRISM_CEMENT_I_DRWL IEX 844279 0 0 0

3020885 0 0 0
19 EI/SLDC/20230221_1 Prism_Johnson _Limited_Cement_Division_Unit_II M/s PRISM CEMENT LTD. UNIT II PRISM_CEMENT_II_DRWL IEX

20 HEG90 HEG_LTD_Tawa_Hydro_Electric_Power_Plant M/s HEG LTD. MANDIDEEP IEX HEG_TAWA -554000 0 -554000 0

21 MPL/22-23/STOA/993 WR/2023/10527/A MANIKARAN POWER LTD. TPL-Surat Discom MP_SCA_BLA_POWER_II -16789680 0 0 0


22 MPL/STOA/22-23/TIL/MARCH 2023 Trimula_Industries_Limited MANIKARAN POWER LTD. IEX OA_trimula -2124500 -2124500 0 0
23 SIMCON SOLAR_1MW_March_2023 Simcon_Solar MITTAL PROSESSORS PVT. LTD. IEX Simcon_Solar -153025 0 -153025 0

24 AVON_CYCLES_SIRONJ -2_MARCH_ 2023 Avon_Cycles_Ltd_Sironj_2 MITTAL PROSESSORS PVT. LTD. IEX AVON_CYCLES_LTD_7MW_SIRONJ -II -1221125 0 -1221125 0

25 GI_Power_March_2023 G_I_Power_Corporation_LTD_Dewas MITTAL PROSESSORS PVT. LTD. IEX GI_POWER_CORPORATION_LTD -412550 0 0 -412550

26 MPL/STOA/2022-23/HNIWLLP/MARCH 2023/SOLAR Harsh_Nirman_Infraworld_LLP MANIKARAN POWER LTD. IEX HARSH_NIRMAN_INFRAWORLD_LLP_5MW -722375 0 0 -722375

27 WCR/L/03/7568/TPA/March-23 West_Central_Railway IR_MP IR_MP_DRWL IEX 50812908 0 0 0

28 WR/2023/11198/A/R/0 WR/2023/11198/A M/s JAYPEE BINA TPP MSEDCL MP_SCA_JP_BINA_TPP -33278160 0 0 0

29 EASTMAN_INTERNATIONAL_March _2023 Eastman_International_Sironj MITTAL PROSESSORS PVT. LTD. IEX EASTMAN_INTERNATIONAL_7MW_SIRONJ -1253825 0 -1253825 0

30 NSPL/ADMIN/CE-SLDC/2022-23/008 Narmada_Sugar_Pvt_Ltd_Pondar_Salichouka M/s Narmada Sugars Pvt. Ltd IEX Narmada_Sugar_Pvt_Ltd_Pondar_Salichouka -12720000 -12720000 0 0

31 WR/2023/12845/C WR/2023/12845/C IEXL TPL-Surat Discom Narmada_Sugar_Pvt_Ltd_Pondar_Salichouka -456000 -456000 0 0

TYPE OF TRANSACTION:- WHEELING LTOA 7,56,46,266


EX-BUS Energy wheeled to Other States from Solar Power Plants -5,16,76,333
Sl. No GS ID Trader Buyer Seller Total

1 WHEELING SECI 10MW_SECI_SOLAR_BIHAR 10MW_FOCAL_TWO_SOLAR -1762553

2 WHEELING SECI 70MW_SECI_Solar_Chattishgarh 20MW_FOCAL_ONE_SOLAR -3434635

3 WHEELING SECI 15MW_SECI_Solar_Maharastra 40MW_IL_FS_Solar -2792497

4 WHEELING SECI 25MW_SECI_Solar_Goa 40MW_IL_FS_Solar -4654161

5 WHEELING SECI 70MW_SECI_Solar_Chattishgarh 50MW_Waneep_Solar -8560705

6 WHEELING SECI SEISPPL_MP SEISPPL_MP -30471783

EX-BUS Energy wheeled from Other States to M.P. Railway 127322598


Sl. No GS ID Trader Buyer Seller Total

1 RAILWAY - RAILWAY Bhartiya Rail Bijalee company ltd. 127322598

2 RAILWAY - RAILWAY JPL-2 87527000


NOTE: E-ERLDC, W-WRLDC, S-SRLDC, NE-NERLDC, N-NRLDC

ALL FIGURES IN KWH UNLESS UNTILL SPECIFIED OTHERWISE


STATE LOAD DESPATCH CENTRE, JABALPUR
MADHYA PRADESH POWER TRANSMISSION COMPANY LTD. JABALPUR
PROVISIONAL STATE ENERGY ACCOUNT FOR THE MONTH OF MARCH-2023
SCHEDULED ENERGY FOR INTRA STATE OPEN ACCESS CUSTOMERS

Page: A-11
No - 07-05/PM-68A/SEA-03.0/435 Date: 07-04-2023
TYPE OF TRANSACTION:- WHEELING 0
Sl. No APPROVAL NUMBER MPPMCL LOI No. Trader Buyer Seller Total MPPuKVVCL MPMaKVVCL MPPaKVVCL

1 - - - - - - - - -

2 - - - - - - - - -

ALL FIGURES IN KWH UNLESS UNTILL SPECIFIED OTHERWISE


STATE LOAD DESPATCH CENTRE JABALPUR
MADHYA PRADESH POWER TRANSMISSION COMPANY LTD.
PROVISIONAL STATE ENERGY ACCOUNT FOR THE MONTH OF MARCH-2023
Details of Energy Injected by Solar Power Projects

No - 07-05/PM-68A/SEA-03.0/435 DATED: 07-04-2023


QUANTUM OF ENERGY
Distribution of Energy indicated in Column (10)
DELIVERED
At 33 KV S/s
Discom level Units Purchased by Net Energy Units Imported by
Capacity Voltage Gross Generation at (Directly to At 132 KV / 220 MPPMCL under available for the Generator at
Sr.No. Name of Solar Power Projects Connected at Substation West Discom Central East Discom
in MW Level Common Metering Point Discom without KV S/s EHV Long Term wheeling. common Metering
(Kwh) Discom (Kwh) (Kwh)
using level Agreement Col.no (6 - 9) point
Transmission
Network)
1 2 3 4 5 6 7 8 9 10 11 12 13 14
PAGE A-12
1 ACME JAIPUR SOLAR POWER PVT LTD UNIT-2 RUMS REWA 250 220 220KV S/S REWA Data not made available by WRPC
2 ACME SOLAR ENERGY PVT. LTD 25 132 132KV S/S KHILCHIPUR 41,45,224 0 41,45,224 41,45,224 0 0 0 0 29,530
3 ACTIVE SOLAR LLP (DIV AGAR) 1.25 33 220KV S/S BAROD 87,760 87,760 0 0 87,760 87,760 0 0 0
4 ADHYA RENEWABLE ENERGY 2 33 132KV S/S BERCHHA 2,77,720 2,77,720 0 0 2,77,720 0 2,77,720 0 0
5 ADITYA MARINE LTD (DIV AGAR) 0.63 33 220KV S/S BAROD 30,100 30,100 0 0 30,100 30,100 0 0 0
6 ADITYA MARINE LTD. ICHHAWAR 1 33 132KV S/S ICHHAWAR 3,495 3,495 0 0 3,495 3,495 0 0 665
7 ADITYA MARINE LTD. -II (SUSNER) 0.6 33 132KV S/S SUSNER 82,880 82,880 0 0 82,880 82,880 0 0 0
8 ADORA ENERGY PVT LTD MUMBAI 2 33 220KV S/S RAJGARH BIAORA 2,48,700 2,48,700 0 2,48,700 0 0 0 0 3,645
9 AGRAWAL JEWELLERS 0.5 MW 0.5 33 220KV S/S RAJGARH BIAORA 14,130 14,130 0 0 14,130 14,130 0 0 740
10 AGROMET INDIA 1.25 33 132KV S/S MAKDON Data not made available by SE(O&M) Ujjain
11 ALFA INFRAPROP PVT LTD. (20MW) KUKSHI 20 132 132KV S/S KUKSHI 33,46,986 0 33,46,986 33,46,986 0 0 0 0 21,239
12 AMPL CLEANTECH PVT LTD (NARBHERAM VISHRAM (BHADRESH TRADING CORP. LTD.(10MW))
10 33 132KV S/S SUSNER 14,25,852 14,25,852 0 14,25,852 0 0 0 0 5,771
13 AMPL CLEANTECH PVT LTD (NARBHERAM VISHRAM 30 MW) 30 33 132KV S/S ALOT 49,79,720 49,79,720 0 49,79,720 0 0 0 0 20,737
14 ANAND LADDHA 0.2 33 132KV S/S AGAR 14,012 14,012 0 0 14,012 0 14,012 0 0
15 ANIL BAXI 0.5 33 132KV S/S MAKDON 84,720 84,720 0 0 84,720 0 84,720 0 0
16 ANKIT GEMS PVT. LTD. 1.25 33 132KV S/S SUSNER 1,25,880 1,25,880 0 0 1,25,880 1,25,880 0 0 0
17 ARIHANT SUNSCAN INDIA 1 33 132KV S/S MAKDON Data not made available by SE(O&M) Ujjain
18 ARINSUN CLEAN ENERGY PVT LTD UNIT-3 RUMS REWA 250 220 220KV S/S REWA 4,72,44,100
19 ASHA ANIL BAXI 0.85 33 132KV S/S MAKDON 1,25,820 1,25,820 0 0 1,25,820 0 1,25,820 0 0
20 ASHA ANIL BAXI 0.7 MW 0.7 33 132KV S/S TARANA 65,968 65,968 0 0 65,968 65,968 0 0 0
21 ATUL SHARMA-I 1 MW BAROD 1 33 220KV S/S BAROD 1,22,150 1,22,150 0 0 1,22,150 1,22,150 0 0 0
22 ATUL SHARMA-II 1.25 MW BERCHHA 1.25 33 132KV S/S BERCHHA Data not made available by SE(O&M) Shajapur
23 ATUL SHARMA-III 2 MW SITAMAU 2 33 132KV S/S SITAMOU 2,98,410 2,98,410 0 0 2,98,410 0 2,98,410 0 860
24 ATUL SHARMA-IV 1 MW BERCHHA 1 33 132KV S/S BERCHHA 1,47,520 1,47,520 0 0 1,47,520 1,47,520 0 0 0
25 AVENGERS SOLAR PVT LTD 12 33 132KV S/S SUWASARA 20,63,332 20,63,332 0 20,63,332 0 0 0 0 8,069
26 AVON CYCLES LIMITED 1 MW SEHORE 1 33 132KV S/S ICHHAWAR 1,52,945 1,52,945 0 0 1,52,945 1,52,945 0 0 380
27 AVON CYCLES LTD (IV),BERCHA(SHAJAPUR) 1 33 132KV S/S BERCHHA 1,41,340 1,41,340 0 0 1,41,340 0 1,41,340 0 0
28 AVON CYCLES LTD (V) 2MW BEORA 2 33 220KV S/S RAJGARH BIAORA 2,58,450 2,58,450 0 0 2,58,450 2,58,450 0 0 1,520
29 AVON CYCLES LTD 7MW SIRONJ 7 33 132KV S/S SIRONJ 13,04,101 13,04,101 0 0 0 0 0 0 4,200
30 AVON CYCLES LTD 7MW SIRONJ -II 7 33 132KV S/S SIRONJ 12,39,599 12,39,599 0 0 0 0 0 0 3,800
31 AVON CYCLES LTD. 1.25 33 220KV S/S BAROD 1,33,492 1,33,492 0 0 1,33,492 1,33,492 0 0 0
32 AVON CYCLES LTD. 7MW GANJBASODA 7 33 220KV S/S GANJBASODA 10,76,250 10,76,250 0 0 0 0 0 0 7,650
33 AVON CYCLES LTD.- III (SEHORE) 0.63 33 132KV S/S ICHHAWAR 1,05,448 1,05,448 0 0 1,05,448 0 1,05,448 0 552
34 BALAJI EDIBLES PVT LTD 1 33 132KV S/S SITAMOU 1,70,010 1,70,010 0 0 1,70,010 1,70,010 0 0 970
35 BANCO CONSTRUCTION P.L.1.5 MW (BANCO-II) 1.5 33 132KV S/S MAKDON 2,39,705 2,39,705 0 0 2,39,705 0 2,39,705 0 0
36 BANCO CONSTRUCTION PVT. LTD 1 33 132KV S/S MAKDON Data not made available by SE(O&M) Ujjain
37 BANSAL and COMPANY 1 33 132KV S/S MAKDON 1,32,760 1,32,760 0 0 1,32,760 0 1,32,760 0 0
38 BHARAT ELECTRONICS LTD GCF JABALPUR 10 33 33KV S/S SATPULA 15,70,140 15,70,140 0 0 15,70,140 0 0 15,70,140 10,650
39 BHARAT ELECTRONICS LTD OFI 10 33 220KV S/S ITARSI 16,39,228 16,39,228 0 0 16,39,228 0 16,39,228 0 9,782
40 BHARAT ELECTRONICS LTD VFJ JABALPUR 10 33 132KV S/S VFJ 15,16,412 15,16,412 0 0 15,16,412 0 0 15,16,412 9,547
41 BONATERRA GREEN HOUSES LLP. (DIV AGAR) 0.63 33 220KV S/S BAROD 95,670 95,670 0 0 95,670 95,670 0 0 0
42 CAMPUS POLYPLAST PVT LTD 0.25 33 132KV S/S MAKDON 44,134 44,134 0 0 44,134 44,134 0 0 0
43 CENTEX FABRICS 1.25 33 220KV S/S BAROD 1,93,060 1,93,060 0 0 1,93,060 1,93,060 0 0 0
44 CICAGO COMMODITIES 1 33 132KV S/S MAKDON 1,57,760 1,57,760 0 0 1,57,760 1,57,760 0 0 0
QUANTUM OF ENERGY
Distribution of Energy indicated in Column (10)
DELIVERED
At 33 KV S/s
Discom level Units Purchased by Net Energy Units Imported by
Capacity Voltage Gross Generation at (Directly to At 132 KV / 220 MPPMCL under available for the Generator at
Sr.No. Name of Solar Power Projects Connected at Substation West Discom Central East Discom
in MW Level Common Metering Point Discom without KV S/s EHV Long Term wheeling. common Metering
(Kwh) Discom (Kwh) (Kwh)
using level Agreement Col.no (6 - 9) point
Transmission
Network)
1 2 3 4 5 6 7 8 9 10 11 12 13 14

PAGE A-13
45 CLEAN SOLAR POWER (DHAR) P. LTD 30 33 132KV S/S ALOT 45,63,473 45,63,473 0 45,63,473 0 0 0 0 26,795
46 COMMERCIAL SYN BAGS LTD. 1 33 132KV S/S SITAMOU 1,72,180 1,72,180 0 0 1,72,180 1,72,180 0 0 540
47 CONVENIENT HOSPTITALS LTD. 1 33 132KV S/S SITAMOU 1,73,690 1,73,690 0 0 1,73,690 1,73,690 0 0 940
48 D.P.RAI 0.5 MW BERCHHA 0.5 33 132KV S/S BERCHHA 75,254 75,254 0 0 75,254 0 75,254 0 0
49 DEEPAK INDUSTRIES LTD. 5 33 132KV S/S AGAR Data not made available by SE(O&M) Agar
50 DEEPAK SPINNERS LTD 1 33 220KV S/S RAJGARH BIAORA 93,900 93,900 0 0 93,900 0 93,900 0 750
51 DELIGENTIA ENERGY & INFRA 25 33 132KV S/S RATANGARH 33,97,911 33,97,911 0 33,97,911 0 0 0 0 22,422
52 DESIGNCO MANUFACTURER & EXPORTER-1 5 33 132KV S/S ARNIAKALA 8,44,076 8,44,076 0 8,44,076 0 0 0 0 4,431
53 DHAR AUTOMOTIVES PVT LTD 1.25 33 132KV S/S AGAR 1,10,490 1,10,490 0 0 1,10,490 1,10,490 0 0 0
54 DHARAMPAL PREMCHAND LTD 1.25 33 132KV S/S SUSNER 1,61,320 1,61,320 0 0 1,61,320 1,61,320 0 0 0
55 DHARAMPAL PREMCHAND LTD.,SEHORE 5 33 132KV S/S ICHHAWAR 7,39,475 7,39,475 0 0 7,39,475 7,39,475 0 0 1,925
56 EASTMAN INTERNATIONAL (2 MW) 2 33 220KV S/S BAROD Data not made available by SE(O&M) Agar
57 EASTMAN INTERNATIONAL (3 MW) 3 33 132KV S/S MAKDON 4,92,270 4,92,270 0 0 4,92,270 2,95,362 1,96,908 0 0
58 EASTMAN INTERNATIONAL 15 MW TARANA 15 33 132KV S/S TARANA 22,30,002 22,30,002 0 0 0 0 0 0 0
59 EASTMAN INTERNATIONAL 7MW SIRONJ 7 33 132KV S/S SIRONJ 12,63,500 12,63,500 0 0 0 0 0 0 4,200
60 EASTMAN INTERNATIONAL MAKDON (10 MW) 10 33 132KV S/S MAKDON 14,89,300 14,89,300 0 0 14,89,300 2,53,181 12,36,119 0 0
61 EASTMAN INTERNATIONAL SEHORE 2 33 132KV S/S ICHHAWAR 0 0 0 0 0 0 0 0 0
62 EASTMAN INTERNATIONAL,4MW,GANJBASODA 4 33 220KV S/S GANJBASODA 6,54,200 6,54,200 0 0 6,54,200 3,27,100 3,27,100 0 3,120
63 EASTMAN INTERNATIONAL_4MW_MAKDON 4 33 132KV S/S MAKDON 6,13,060 6,13,060 0 0 6,13,060 3,06,530 3,06,530 0 0
64 FINSURYA SOLAR ENERGY (10MW) 10 33 132KV S/S MAKDON 17,61,541 17,61,541 0 17,61,541 0 0 0 0 7,558
65 FLOW DEVICES SYSTEMS 0.63 33 132KV S/S AGAR 90,850 90,850 0 0 90,850 0 90,850 0 0
66 FLUIDCON ENGINEERS 2 33 132KV S/S MAKDON 3,23,310 3,23,310 0 3,23,310 0 0 0 0 0

67 FOCAL ENERGY SOLAR ONE INDIA PVT LTD. (SECI) 20 132 132KV S/S SITAMOU 31,79,548 0 31,79,548 0 0 0 0 0 12,137
68 FOCAL PHOTOVOLTAIC INDIA P. LTD 10 132 132KV S/S SITAMOU 16,44,749 0 16,44,749 16,44,749 0 0 0 0 9,212
69 FOCAL RENEWABLE ENERGY TWO INDIA PVT. LTD. 10 132 132KV S/S SITAMOU 16,27,693 0 16,27,693 0 0 0 0 0 8,759
70 FREEWINGS POWER & INFRA LTD 2.55 33 132KV S/S MAKDON Data not made available by SE(O&M) Ujjain
71 FRIEND SALT WORKS & ALLIED IND. 4 MW SITAMAU 4 33 132KV S/S SITAMOU 6,43,575 6,43,575 0 0 6,43,575 6,43,575 0 0 1,470
72 FRIENDS IMPEX 1 33 132KV S/S TARANA 1,64,632 1,64,632 0 0 1,64,632 0 1,64,632 0 0
73 FRIENDS SALT & ALLIED IND. 04 MW SAI SABURI (Y0311131) 4 33 132KV S/S MAKDON 4,65,930 4,65,930 0 0 4,65,930 0 0 4,65,930 0
74 FRIENDS SALT WORKS & ALLIED INDUSTRIES (2.5 MW) 2.5 33 220KV S/S BAROD Data not made available by SE(O&M) Agar
75 FRIENDS SALT WORKS & ALLIED INDUSTRIES (PROJECT 1) SITAMAU 6 33 132KV S/S SITAMOU 9,67,175 9,67,175 0 0 9,67,175 6,12,512 3,54,663 0 2,200
76 FRIENDS SALT WORKS & ALLIED INDUSTRIES (PROJECT 2) SITAMAU 6 33 132KV S/S SITAMOU 9,15,800 9,15,800 0 0 9,15,800 5,79,976 3,35,824 0 2,375
77 FRIENDS SALT WORKS & ALLIED INDUSTRIES -2 SUSNER 5 33 132KV S/S SUSNER 4,69,680 4,69,680 0 0 4,69,680 0 4,69,680 0 0
78 FRIENDS SALT WORKS & ALLIED INDUSTRIES 2.5 MW (RAJGARH) 2.5 33 220KV S/S RAJGARH BIAORA 57,000 57,000 0 0 57,000 57,000 0 0 200
79 FRIENDS SALT WORKS & ALLIED INDUSTRIES SEHORE 6 33 132KV S/S ICHHAWAR 7,86,760 7,86,760 0 0 7,86,760 7,86,760 0 0 2,200
80 FRIENDS SALT WORKS & ALLIED INDUSTRIES, SUSNER 5 33 132KV S/S SUSNER 6,74,603 6,74,603 0 0 6,74,603 6,74,603 0 0 0
81 GARRISON ENGINEER (WEST) MES JABALPUR 1.5 33 89,880 89,880 0 0 89,880 0 0 89,880 1,570
82 GAUTAM FREIGHT P. L. 5MW TARANA (XD502163) 5 33 132KV S/S TARANA 8,21,660 8,21,660 0 0 8,21,660 8,21,660 0 0 0
83 GAUTAM FREIGHT PVT LTD 1.25 MW 1.25 33 220KV S/S RAJGARH BIAORA 97,700 97,700 0 0 97,700 97,700 0 0 600
84 GLOBUS STEEL_N_ POWER PVT LTD 20 132 132KV S/S SITAMOU 32,03,001 0 32,03,001 32,03,001 0 0 0 0 13,510
85 GTC POWER PVT. LTD. 0.63 33 132KV S/S SUSNER 79,730 79,730 0 0 79,730 79,730 0 0 0
86 GUJARAT APOLLO IND. LTD. 1 33 132KV S/S AGAR 1,47,785 1,47,785 0 0 1,47,785 1,47,785 0 0 0
87 GUJRAT AMBUJA EXPORT LTD 1 33 132KV S/S SUSNER 1,14,145 1,14,145 0 0 1,14,145 1,14,145 0 0 0
88 GUPTA SONS BHOPAL 0.5 33 220KV S/S RAJGARH BIAORA 46,990 46,990 0 0 46,990 0 46,990 0 460
89 GUPTA SONS-II BHOPAL 1.25 33 220KV S/S RAJGARH BIAORA 1,21,720 1,21,720 0 0 1,21,720 0 1,21,720 0 1,020
90 HAET ENERGIES, SUSNER 0.5 33 132KV S/S SUSNER
91 HARSH NIRMAN INFRAWORLD LLP 5 33 132KV S/S SUSNER 6,70,400 6,70,400 0 0 6,70,400 6,70,400 0 0 0
92 HARSH RENEWABLE ENERGY 0.63 33 132KV S/S BERCHHA 89,445 89,445 0 0 89,445 89,445 0 0 0
93 HIMGIRI ENERGY VENTURE 5 33 132KV S/S MAKDON 7,77,460 7,77,460 0 7,77,460 0 0 0 0 0
94 HINDUSTAN PLATINUM PVT LTD (1.25 MW) 1.25 33 220KV S/S BAROD 1,92,110 1,92,110 0 0 1,92,110 1,92,110 0 0 0
QUANTUM OF ENERGY
Distribution of Energy indicated in Column (10)
DELIVERED
At 33 KV S/s
Discom level Units Purchased by Net Energy Units Imported by
Capacity Voltage Gross Generation at (Directly to At 132 KV / 220 MPPMCL under available for the Generator at
Sr.No. Name of Solar Power Projects Connected at Substation West Discom Central East Discom
in MW Level Common Metering Point Discom without KV S/s EHV Long Term wheeling. common Metering
(Kwh) Discom (Kwh) (Kwh)
using level Agreement Col.no (6 - 9) point
Transmission
Network)
1 2 3 4 5 6 7 8 9 10 11 12 13 14

PAGE A-14
95 HINDUSTAN PLATINUM PVT LTD (2.5 MW) 2.5 33 132KV S/S AGAR 1,53,510 1,53,510 0 0 1,53,510 1,53,510 0 0 0
96 HUE GREEN ENERGY 2 33 132KV S/S MAKDON 5,52,710 5,52,710 0 0 5,52,710 2,76,355 2,76,355 0 0
97 INDRA VIDHYA POWER 0.63 33 132KV S/S AGAR 93,370 93,370 0 0 93,370 0 93,370 0 0
98 IPF-VIKRAM INDIA LTD. 1.25 33 132KV S/S AGAR 1,75,105 1,75,105 0 0 1,75,105 1,75,105 0 0 0
99 J K MINERALS 0.63 33 132KV S/S AGAR 88,180 88,180 0 0 88,180 88,180 0 0 0
100 J K MINERALS,BERCHA 1 33 132KV S/S BERCHHA 1,41,650 1,41,650 0 0 1,41,650 0 1,41,650 0 0
101 J. S. R. DEVLOPERS PVT LTD INDORE 1.25 33 220KV S/S RAJGARH BIAORA 1,23,500 1,23,500 0 1,23,500 0 0 0 0 1,400
102 JAIDEEP ISPAT & ALLOYS Pvt Ltd 3 33 132KV S/S GHATA BILLOD 3,82,775 3,82,775 0 0 3,82,775 3,82,775 0 0 3,134
103 JEHAN NUMA PALACE HOTEL PVT LTD 1 33 132KV S/S ICHHAWAR 1,53,350 1,53,350 0 0 1,53,350 0 1,53,350 0 625
104 KANDLA AGRO & CHEMICALS PVT. LTD. 2 33 132KV S/S AGAR 2,87,350 2,87,350 0 0 2,87,350 2,87,350 0 0 0
105 KRBL LIMITED GAUTAM BUSH NAGAR (UP) 5.6 33 132KV S/S AGAR 3,81,536 3,81,536 0 3,81,536 0 0 0 0 0
106 KRBL LTD (GAUTAM BUDHA NAGAR UP) 2.5 33 220KV S/S RAJGARH BIAORA 2,66,400 2,66,400 0 2,66,400 0 0 0 0 1,700
107 KRBL LTD(6.63 MW) 6.63 33 132KV S/S SUSNER 6,26,800 6,26,800 0 6,26,800 0 0 0 0 0
108 KRBLL LTD.(SEHORE) 0.27 33 132KV S/S ICHHAWAR 33,540 33,540 0 33,540 0 0 0 0 635
109 LEE VEDLA EXPORTERS & IMPORTERS 0.63 33 132KV S/S BERCHHA 88,876 88,876 0 0 88,876 0 88,876 0 0
110 MAAN ALUMINIUM LTD (SAI SABURI URJA PVT LTD) 1 33 132KV S/S MAKDON 1,41,920 1,41,920 0 0 1,41,920 1,41,920 0 0 0
111 MADE EASY EDUCATION P LTD 10 33 220KV S/S GANJBASODA 15,34,950 15,34,950 0 15,34,950 0 0 0 0 7,850
112 MAHAVIR BISCUITS PVT LTD 1.5 33 132KV S/S MAKDON 2,57,600 2,57,600 0 0 2,57,600 2,57,600 0 0 0
113 MAHINDRA RENEWABLES PVT LTD UNIT-1 RUMS REWA 250 220 220KV S/S REWA 4,72,05,500
114 MAKSON HEALTH CARE PVT LTD 1MW SITAMAU 1 33 132KV S/S SITAMOU 1,68,085 1,68,085 0 0 1,68,085 1,68,085 0 0 500
115 MAKSON HEALTHCARE P LTD-II BAROD 0.63 33 220KV S/S BAROD 74,964 74,964 0 0 74,964 74,964 0 0 0
116 MAKSON HEALTHCARE PVT LTD ICHHAWAR 0.63 33 132KV S/S ICHHAWAR 99,860 99,860 0 0 99,860 0 99,860 0 498
117 MALWA SOLAR POWER GENERATION PVT LTD (IL & FS) 40 132 220KV S/S BAROD 72,74,446 0 72,74,446 0 0 0 0 0 49,125
118 MANAS POWER & INFRA KARODIA 1 33 132KV S/S MAKDON 1,67,425 1,67,425 0 0 1,67,425 0 1,67,425 0 0
119 MANDSAUR SOLAR PV POWER PROJECT (NTPC LTD.) 250 220 220KV S/S GUJAR KHEDI 3,31,24,189 0 3,31,24,189 3,31,24,189 0 0 0 0 2,64,608
120 MOIL LTD TIRODI 2.57 33 33KV TIRODI 2,55,255 2,55,255 0 0 2,55,255 0 0 2,55,255 2,655
121 MOIL LTD UKWA 1.965 33 33KV UKWA 2,50,220 2,50,220 0 0 2,50,220 0 0 2,50,220 1,410
122 MRS. SHIMPY GARG 0.5 33 132KV S/S MAKDON 83,220 83,220 0 0 83,220 83,220 0 0 0
123 MUKESH ASSOCIATES (0.5 MW) 0.5 33 132KV S/S MAKDON 80,862 80,862 0 0 80,862 80,862 0 0 0
124 NARMADA SWITCHGEAR LIMITED -I (XB541463) 2 33 132KV S/S ICHHAWAR 2,76,220 2,76,220 0 0 2,76,220 2,76,220 0 0 810
125 NARMADA SWITCHGEAR PVT LTD -III (XB564519) 3 33 132KV S/S ICHHAWAR 3,81,345 3,81,345 0 0 3,81,345 0 3,81,345 0 960
126 NARMADA SWITCHGEAR PVT LTD-II(SEHORE) (XB564497) 2 33 132KV S/S ICHHAWAR 2,88,610 2,88,610 0 0 2,88,610 0 2,88,610 0 670
127 Natural GOLD PULSE & FLOUR MILL 1 33 220KV S/S RAJGARH BIAORA 1,51,015 1,51,015 0 0 1,51,015 1,51,015 0 0 835
128 NEEL PROPERTIES 1 33 132KV S/S SUSNER 1,45,830 1,45,830 0 1,45,830 0 0 0 0 0
129 NEEVYA SOLAR LLP 0.63 33 132KV S/S SUSNER 75,020 75,020 0 0 75,020 75,020 0 0 0
130 NEHA SHARMA 0.99 33 132KV S/S BERCHHA 1,48,310 1,48,310 0 0 1,48,310 0 1,48,310 0 0
131 NTPC LIMITED, RAJGARH (PROJECT UNDER JNSM) 50 132 220KV S/S RAJGARH BIAORA 65,26,317 0 65,26,317 65,26,317 0 0 0 0 0
132 OMEGA RENK BEARING PVT LTD 105 KW 0.105 33 132KV S/S CHAMBAL BHOPAL 13,610 13,610 0 0 13,610 0 13,610 0 440
133 OMEGA RENK BEARING PVT LTD 655 KW 0.655 33 132KV S/S CHAMBAL BHOPAL 91,780 91,780 0 0 91,780 0 91,780 0 1,220
134 OMEGA RENK BEARING PVT LTD 695 KW 0.695 33 132KV S/S CHAMBAL BHOPAL 90,040 90,040 0 0 90,040 0 90,040 0 680
135 OSWAL SALT & CHEMICAL INDUSTRIES 2.5 33 132KV S/S SUSNER Data not made available by SE(O&M) Agar
136 P C PATEL INFRA PVT LTD 1 33 132KV S/S SITAMOU 1,70,715 1,70,715 0 0 1,70,715 1,10,965 59,750 0 1,030
137 P K SOLAR POWER 2 33 132KV S/S BERCHHA 2,96,152 2,96,152 0 2,96,152 0 0 0 0 0
138 PAHARIMATA COMMODITIES 0.5 33 132KV S/S MAKDON 80,650 80,650 0 0 80,650 0 80,650 0 0
139 PEARL GREEN ENERGY PVT LTD. 1 33 132KV S/S MAKDON 1,51,540 1,51,540 0 0 1,51,540 0 1,51,540 0 0
140 PEETHAMBARA GRANITES (P) LTD 2 33 132KV S/S SITAMOU 2,98,640 2,98,640 0 0 2,98,640 1,49,320 0 1,49,320 950
141 PEETHAMBARA GRANITES (P) LTD SAI SABURI (Y0361925) 2 33 132KV S/S MAKDON 2,90,960 2,90,960 0 0 2,90,960 0 2,90,960 0 0
142 PNG SYNERGY PVT LTD,SUSNER 2 33 132KV S/S SUSNER 3,23,020 3,23,020 0 3,23,020 0 0 0 0 0
143 PORWAL AUTO COMPONENET 1.5 33 132KV S/S MAKDON Data not made available by SE(O&M) Ujjain
144 PORWAL AUTO COMPONENTS LTD. 2.55 MW 2.55 33 132KV S/S MAKDON 4,16,460 4,16,460 0 0 4,16,460 4,16,460 0 0 0
145 PRADINI SOLAR 1 33 132KV S/S TARANA 1,59,575 1,59,575 0 0 1,59,575 1,11,703 47,873 0 0
146 PRIME STEEL PROCESSORS 8MW SIRONJ 8 33 132KV S/S SIRONJ 15,03,301 15,03,301 0 0 0 0 0 0 4,400
147 PRIME STEEL PROCESSORS 9MW 9 33 132KV S/S SIRONJ 16,90,499 16,90,499 0 0 0 0 0 0 5,900
QUANTUM OF ENERGY
Distribution of Energy indicated in Column (10)
DELIVERED
At 33 KV S/s
Discom level Units Purchased by Net Energy Units Imported by
Capacity Voltage Gross Generation at (Directly to At 132 KV / 220 MPPMCL under available for the Generator at
Sr.No. Name of Solar Power Projects Connected at Substation West Discom Central East Discom
in MW Level Common Metering Point Discom without KV S/s EHV Long Term wheeling. common Metering
(Kwh) Discom (Kwh) (Kwh)
using level Agreement Col.no (6 - 9) point
Transmission
Network)
1 2 3 4 5 6 7 8 9 10 11 12 13 14

PAGE A-15
148 R SQUARE SHRI SAI BABA HOSPITALITY PVT LTD 0.5 33 220KV S/S RAJGARH BIAORA 0 0 0 0 0 0 0 0 0
149 RAJKOT(GUJRAT) SOLAR ENERGY P. LTD. 43 132 220KV S/S BAROD 78,22,218 0 78,22,218 78,22,218 0 0 0 0 42,341
150 Ramesh_Steels_Pachama_Ganj_Basoda 4 33 220KV S/S GANJBASODA 6,49,560 6,49,560 0 0 0 0 0 0 4,120
151 RANJAN BEN P. CHOVTIA 0.63 33 220KV S/S BAROD Data not made available by SE(O&M) Agar
152 RENEW CLEAN ENERGY P L 51 MW 51 132 132KV S/S KOTHIYA 0 0 0 0 0 0 0 0 0
153 RENEW SOLAR ENERGY (TN) PVT. LTD. 50 132 132KV S/S VIJAYPUR 81,11,740 0 81,11,740 81,11,740 0 0 0 0 78,420
154 SABOO INDUSTRIES 0.5 33 220KV S/S RAJGARH BIAORA 50,490 50,490 0 0 50,490 50,490 0 0 480
155 SABOO INDUSTRIES_BERCHHA 1 33 132KV S/S BERCHHA 1,48,295 1,48,295 0 0 1,48,295 0 1,48,295 0 0
156 SABOO SODIUM CHLORO LTD 1 33 220KV S/S RAJGARH BIAORA 94,710 94,710 0 0 94,710 94,710 0 0 620
157 SANPOWER SOLAR LLP 0.63 33 132KV S/S AGAR 52,535 52,535 0 0 52,535 52,535 0 0 0
158 SEATTLE POWER SOLUTIONS PVT LTD (i) (MPC 59564) 0.63 33 132KV S/S AGAR 95,090 95,090 0 0 95,090 95,090 0 0 0
159 SEATTLE POWER SOLUTIONS PVT LTD (II) (XC562297) 0.63 33 132KV S/S MAKDON 1,03,780 1,03,780 0 0 1,03,780 0 1,03,780 0 0
160 SEI Sunshine power Pvt Ltd 180 220 220KV S/S SHIVPURI 3,05,35,135 0 3,05,35,135 0 0 0 0 0 1,08,696
161 SEIL VOLTA AND SITARA 50 132 132KV S/S SITAMOU 84,46,920 0 84,46,920 84,46,920 0 0 0 0 50,690
162 SHAH FOILS LTD 4 33 220KV S/S RAJGARH BIAORA 4,30,820 4,30,820 0 0 4,30,820 2,15,410 2,15,410 0 1,430
163 SHARMA INDUSTRIES 0.63 33 132KV S/S AGAR 90,125 90,125 0 0 90,125 0 90,125 0 0
164 SHIV-VANI URJA LTD MUMBAI 2 33 220KV S/S RAJGARH BIAORA 2,34,830 2,34,830 0 2,34,830 0 0 0 0 3,200
165 SHREE TIRUPATI BALAJEE AGRO TRADING CO PVT LTD 2 33 132KV S/S TARANA 3,59,040 3,59,040 0 0 3,59,040 3,59,040 0 0 0
166 SHRI BALAJI ENTERPRISES 2 33 132KV S/S AGAR 2,31,190 2,31,190 0 0 2,31,190 2,31,190 0 0 0
167 SHRIJI POLYMERS (INDIA) LTD 1 33 132KV S/S MAKDON 1,62,275 1,62,275 0 0 1,62,275 1,62,275 0 0 0
168 SHRIJI POLYMERS (INDIA) LTD (III) 1 33 132KV S/S BERCHHA 1,48,192 1,48,192 0 0 1,48,192 1,48,192 0 0 0
169 SHRIJI POLYMERS (INDIA) LTD. -1 MW 1 33 132KV S/S AGAR 1,37,210 1,37,210 0 0 1,37,210 1,37,210 0 0 0
170 SHRIJI POLYMERS (INDIA) LTD. 1 MW BAROD 1 33 220KV S/S BAROD 1,46,360 1,46,360 0 0 1,46,360 1,46,360 0 0 0
171 SHRIJI POLYMERS (INDIA) LTD-2 MW 2 33 132KV S/S AGAR 2,72,420 2,72,420 0 0 2,72,420 2,72,420 0 0 0
172 SIMCON 1 33 220KV S/S GANJBASODA 1,56,760 1,56,760 0 0 1,56,760 0 1,56,760 0 960
173 SIMCON SOLAR SIRONJ 2 1 33 132KV S/S SIRONJ 1,48,749 1,48,749 0 0 0 0 0 0 1,150
174 SKP BEARINGS INDUSTRIES 0.63 33 132KV S/S AGAR Data not made available by SE(O&M) Agar
175 SKY POWER SOLAR INDIA PVT LTD 50 132 400 KV CHHEGAON 93,53,660 0 93,53,660 93,53,660 0 0 0 0 49,670
176 SRS ENGINEERS (DIV AGAR) 0.63 33 220KV S/S BAROD 99,690 99,690 0 0 99,690 99,690 0 0 0
177 STAR DELTA TRANSFORMERS LTD 0.5 33 220KV S/S RAJGARH BIAORA 46,950 46,950 0 0 46,950 0 46,950 0 410
178 SUN PHARMACEUTICAL INDUSTRIES LTD INTER 10 132 132KV S/S TARANA 17,85,451 0 17,85,451 0 0 0 0 0 9,101
179 SUN PHARMACEUTICAL INDUSTRIES LTD INTRA 20 132 132KV S/S TARANA 36,67,808 0 36,67,808 0 36,67,808 36,67,808 0 0 17,889
180 SUNRAYS SOLAR ENERGY SYSTEMS P. LTD 0.63 33 132KV S/S MAKDON 1,00,895 1,00,895 0 0 1,00,895 0 1,00,895 0 0
181 SURYASHAKTI ENTERPRISES 0.5 33 132KV S/S AGAR 52,170 52,170 0 0 52,170 0 52,170 0 0
182 SWAYAM SHIPPING SERVICES PVT LTD 1MW DELCHI 1 33 132KV S/S MAKDON 1,73,212 1,73,212 0 0 1,73,212 1,73,212 0 0 0
183 SYNCOM FORMULATION (I) LTD 0.75 33 220KV S/S BAROD 1,13,726 1,13,726 0 0 1,13,726 1,13,726 0 0 0
184 SYSTEMTICS ENTERPRIZE PVT LTD (DIV AGAR) 0.63 33 220KV S/S BAROD 52,970 52,970 0 0 52,970 52,970 0 0 0
185 TERAPANTH FOODS LTD 2 33 132KV S/S TARANA 3,27,230 3,27,230 0 0 3,27,230 98,169 85,080 1,43,981 0
186 THE KUTCH SALT & ALLIED IND. LTD. 2 33 132KV S/S TARANA 3,32,770 3,32,770 0 0 3,32,770 0 3,32,770 0 0
187 TODAY CLEAN ENERGY PVT LTD 20 33 220KV S/S BAROD 27,85,253 27,85,253 0 27,85,253 0 0 0 0 10,717
188 TRBEX IMPEX PVT LTD 1 33 132KV S/S BERCHHA 1,44,356 1,44,356 0 0 1,44,356 0 1,44,356 0 0
189 TRBEX IMPEX PVT LTD (3 MW) 3 33 132KV S/S SITAMOU 4,97,150 4,97,150 0 0 4,97,150 4,97,150 0 0 1,170
190 TUHINA ENTERPRISES 1 33 220KV S/S RAJGARH BIAORA 99,860 99,860 0 0 99,860 99,860 0 0 1,040
191 UJAAS ENERGY LTD (5MW) 5 33 220KV S/S BAROD 2,70,900 2,70,900 0 0 2,70,900 2,70,900 0 0 0
192 UJAAS ENERGY LTD (7MW) 7 33 220KV S/S BAROD 5,90,800 5,90,800 0 0 5,90,800 4,21,831 1,68,969 0 0
193 UJAAS ENERGY LTD 2 MW 2 33 220KV S/S RAJGARH BIAORA 96,550 96,550 0 0 96,550 48,275 48,275 0 900
194 VIJAY DHIRAJLAL GANDHI 0.5 33 132KV S/S SUSNER 43,014 43,014 0 0 43,014 43,014 0 0 0
195 VIKRAM URETHANE PVT LTD 1.25 33 132KV S/S AGAR 1,57,735 1,57,735 0 0 1,57,735 1,57,735 0 0 0
196 VIPPY INDUSTRIES LTD ICHHAWAR 1 33 132KV S/S ICHHAWAR 1,49,044 1,49,044 0 0 1,49,044 1,49,044 0 0 380
197 VIPPY INDUSTRIES PVT LTD MANDSAUR 1 33 132KV S/S SITAMOU 1,68,910 1,68,910 0 0 1,68,910 1,68,910 0 0 1,025
198 VIPPY INDUTRIES LTD-II BERCHHA 1 33 132KV S/S BERCHHA 1,40,213 1,40,213 0 0 1,40,213 1,40,213 0 0 0
199 VIPPY SPIN PRO LTD. SITAMAU 1 33 132KV S/S SITAMOU 1,71,460 1,71,460 0 0 1,71,460 1,71,460 0 0 1,055
200 VIVAAN SOLAR PVT LTD (BANCO INFRASTRUCTURE) 2.4 33 132KV S/S MAKDON 3,01,530 3,01,530 0 0 3,01,530 0 3,01,530 0 0
201 VIVASWAN HOTELS INDIA PVT LTD 1 33 132KV S/S TARANA Data not made available by SE(O&M) Ujjain
202 WAANEEP SOLAR PVT LTD 50 132 132KV S/S ICHHAWAR 80,30,016 0 80,30,016 0 0 0 0 0 40,931
203 WALWHAN SOLAR MP LTD 105 MW (OLD NAME-WELSPUN (105MW) RATANGARH (NEEMUCH)
105 132 132KV S/S RATANGARH 1,84,49,502 0 1,84,49,502 1,84,49,502 0 0 0 0 1,39,861
204 WALWHAN SOLAR MP LTD 25 MW (Old name- WELSPUN (25MW) RATANGARH (NEEMUCH)
25 33 132KV S/S RATANGARH 39,11,785 39,11,785 0 39,11,785 0 0 0 0 24,659
205 WINDSOR EXPORTS 4 MW (SEHORE) 4 33 132KV S/S ICHHAWAR 5,62,940 5,62,940 0 0 5,62,940 1,40,735 0 4,22,205 2,020
206 WINDSOR EXPORTS-II MAKDON 2 33 132KV S/S MAKDON 3,31,750 3,31,750 0 0 3,31,750 3,31,750 0 0 0
2360.06 331878457 77154254 160274603 135223477 38667530 22264136 11540051 4863343 1213671
2,360.06
1.Ramesh_Steels_Pachama_Ganj_Basoda
2.SUN PHARMACEUTICAL INDUSTRIES LTD INTER
Note : 3.FREEWINGS POWER & INFRA LTD
4.AVON CYCLES LTD. 7MW GANJBASODA
5. EASTMAN INTERNATIONAL 15 MW TARANA
6. AVON CYCLES LTD 7MW SIRONJ
Power Sold through IEX
7.PRIME STEEL PROCESSORS 8MW SIRONJ
8.EASTMAN INTERNATIONAL 7MW SIRONJ
9.AVON CYCLES LTD 7MW SIRONJ -II
10.HARSH NIRMAN INFRAWORLD LLP
11.SIMCON SOLAR SIRONJ 2
12.PRIME STEEL PROCESSOR (9MW)
1.ARINSUN CLEAN ENERGY PVT LTD UNIT-3 RUMS REWA
Scheduling of Power is done by WRLDC 2.ACME JAIPUR SOLAR POWER PVT LTD UNIT-2 RUMS REWA
3.MAHINDRA RENEWABLES PVT LTD UNIT-1 RUMS REWA
1.SEI Sunshine power Pvt Ltd
2.FOCAL ENERGY SOLAR ONE INDIA PVT LTD. (SECI)
Power Sold to other states 3.MALWA SOLAR POWER GENERATION PVT LTD (IL & FS)
4. FOCAL RENEWABLE ENERGY TWO INDIA PVT. LTD.
5.M/s WAANEEP Solar Pvt. Ltd
STATE LOAD DESPATCH CENTRE JABALPUR
MADHYA PRADESH POWER TRANSMISSION COMPANY LTD.
PROVISIONAL STATE ENERGY ACCOUNT FOR THE MONTH OF MARCH-2023
Details of Energy Injected by Wind Electric Generators
No - 07-05/PM-68A/SEA-03.0/435 DATED: 07-04-2023
QUANTUM OF ENERGY Units Net Energy Distribution of Energy indicated in Units Imported by the
At 33 KV S/s At 132 KV / 220 Purchased by available for West Central East Generator at common
Gross
Discom level KV S/s EHV MPPMCL under wheeling. Discom Discom Discom Metering point
Generation at
Sr.N Capacity Voltage (Directly to level Long Term Col.no (6 - 9) (Kwh) (Kwh) (Kwh)
Name of Wind Electric Generators Connected at Substation Common
o. in MW Level Discom without Agreement
Metering
using
Point
Transmission
Network)
1 2 3 4 5 6 7 8 9 10 11 12 13 14
PAGE A-16
1 AVP POWER INFRA PVT LTD (SONKATCHH) 27.3 33 132KV S/S SONKATCH 33,24,864 33,24,864 0 33,24,864 0 0 0 0 21,336
2 BADONI POWER PVT LTD (MAXI) 29.4 33 132KV S/S MAXI 38,55,712 38,55,712 0 38,55,712 0 0 0 0 14,654
3 BEHAPUR-1 (SUJLON-1)DALODA (MPC12456) 14.7 33 220KV S/S DALODA 10,83,388 10,83,388 0 10,83,388 0 0 0 0 17,283
4 BEHAPUR-2 (SUJLON-2)DALODA (MPC12448) 15 33 220KV S/S DALODA 11,37,850 11,37,850 0 11,37,850 0 0 0 0 15,300
5 BETUL WIND FARM 49.5 132 132KV S/S GUDGAON 60,65,098 0 60,65,098 60,65,098 0 0 0 0 8,116
6 CHIRAYU & BOX CORRUGATOR 0.45 33 132KV S/S JAORA 0 0 0 0 0 0 0 0 0
7 CHOKSI ENERGY & INFRA P L AKYADEH (MTR No.MPC74065) 7.5 33 33 KV AKHYADEH 4,88,650 4,88,650 0 4,88,650 0 0 0 0 10,450
8 CHOKSI ENERGY & INFRA P L DODAR (MTR No.Y0056963) 14.7 33 33 KV DODAR 12,29,275 12,29,275 0 12,29,275 0 0 0 0 13,325
9 CHOKSI ENERGY & INFRA P L KALUKHEDA(MTR No. Y0056946) 3 33 33 KV KALUKHEDA 89,500 89,500 0 89,500 0 0 0 0 4,300
10 CHOKSI ENERGY & INFRA P L RINGDOD (MTR No..Y0056961) 14.7 33 33 KV RIGDOD 11,72,539 11,72,539 0 11,72,539 0 0 0 0 12,558
11 CHOKSI ENERGY & INFRA PVT LTD 9 MW 9 33 220KV S/S RATLAM 2,63,100 2,63,100 0 2,63,100 0 0 0 0 7,300
12 CLEAN WIND POWER (RATLAM) PVT LTD 100 220 220KV S/S RAJGARH 1,29,61,129 0 1,29,61,129 1,29,61,129 0 0 0 0 73,348
13 D J ENERGY & UTTAR URJA 170 220 220KV S/S DALODA 1,66,35,770 0 1,66,35,770 1,66,35,770 0 0 0 0 82,720
14 DHAR WIND POWER PROJECTS PVT LTD 15 33 33KV S/S DASHERA MAIDAN 22,44,161 22,44,161 0 22,44,161 0 0 0 0 1,907
15 ENERCON (I) LTD.-I RATEDI HILL,BAGLI 15.2 33 132KV S/S CHAPDA 13,55,311 13,55,311 0 0 13,55,311 13,55,311 0 0 1,337
16 ENERCON (I) LTD.II RATEDI HILL,BAGLI 15.2 33 132KV S/S CHAPDA 12,78,198 12,78,198 0 12,78,198 0 0 0 0 2,000
17 EXTOL WIND LTD 1 33 132KV S/S JAORA 0 0 0 0 0 0 0 0 0
18 G.I. POWER 5.98 33 220KV S/S DEWAS 2,69,740 2,69,740 0 0 0 0 0 0 2,940
19 GAMESA RENEWABLE PVT LTD DEWAS 108 132 220KV S/S DEWAS 1,22,30,773 0 1,22,30,773 1,22,30,773 0 0 0 0 1,07,699
20 GAMESHA WIND TURBINE P.LTD. 150 132 220KV S/S SHAJAPUR 98,86,494 0 98,86,494 98,86,494 0 0 0 0 88,792
21 GIRIRAJ ENTERPRISES,AFJALPUR 15 33 33/11KV S/s AFJALPUR 15,90,438 15,90,438 0 15,90,438 0 0 0 0 2,960
22 GIRIRAJ ENTERPRISES,KUCHROD 15 33 33/11KV S/s KUCHDOD 15,39,284 15,39,284 0 15,39,284 0 0 0 0 3,377
23 INOX WIND INFRA BETUL 28 33 132KV S/S GUDGAON 26,21,365 26,21,365 0 26,21,365 0 0 0 0 12,878
24 INOX WIND INFRA. SER. LTD.,SHAJAPUR 190 220 220KV S/S SHAJAPUR 2,19,09,369 0 2,19,09,369 2,19,09,369 0 0 0 0 49,809
25 JAMGODRANI WIND FARMS PVT LTD DEWAS 30 33 132KV S/S SONKATCH 33,74,376 33,74,376 0 33,74,376 0 0 0 0 40,685
26 KSHEMA POWER & INFRA PVT LTD (AMBA) 174 220 132KV S/S AMBAH 2,26,00,889 0 2,26,00,889 2,26,00,889 0 0 0 0 98,885
27 KSHEMA POWER & INFRA PVT LTD (BHERUGARH) 30 33 132KV S/S BHERUGARH 33,83,622 33,83,622 0 33,83,622 0 0 0 0 5,832
28 KSHEMA POWER & INFRA PVT LTD (GHOSALA) 30 33 132KV S/S GHOSALA 36,40,679 36,40,679 0 36,40,679 0 0 0 0 5,265
29 KUKRU WIND FARMS PVT LTD 46 132 132KV S/S GUDGAON 48,78,483 0 48,78,483 48,78,483 0 0 0 0 46,152
30 M.P.WIND FARM NAGDA HILL 7.2 33 220KV S/S DEWAS 6,26,200 6,26,200 0 0 6,26,200 6,26,200 0 0 6,400
31 MARUT SHAKTI CHANDWASA 10 33 33KV CHANDWASA 5,69,804 5,69,804 0 5,69,804 0 0 0 0 8,103
32 MARUT SHAKTI NIPANIYA 230 220 220KV S/S NIPANIYA 1,82,93,326 0 1,82,93,326 1,82,93,326 0 0 0 0 1,00,773
33 MARUT_ SHAKTI_DHAMLU 6 33 33KV DHAMLU 4,20,550 4,20,550 0 4,20,550 0 0 0 0 6,650
34 NEPC India LTD. Chennai(M/s DB Corp.Bhopal) 2.25 33 132KV S/S JAORA 0 0 0 0 0 0 0 0 0
35 ORANGE BERCHA WIND POWER PVT LTD 50 132 220KV S/S BARNAGAR 60,12,461 0 60,12,461 60,12,461 0 0 0 0 51,689
36 ORANGE MAMATKHEDA WIND PVT LTD (RENEWABLE ENERGY GENERATION
100.5PVT. LTD.)
220 220KV S/S DALODA 1,07,89,207 0 1,07,89,207 1,07,89,207 0 0 0 0 17,463
37 PIONEER WINCON 1.5 MW 1.5 33 132KV S/S JAORA 0 0 0 0 0 0 0 0 0
38 PIONEER WINCON 4 MW 4 33 132KV S/S JAORA 27,500 27,500 0 27,500 0 0 0 0 4,600
39 PRISMA RENEWABLE ENERGY (DEWAS) PVT. LTD 22.5 33 132KV S/S SONKATCH 24,12,580 24,12,580 0 24,12,580 0 0 0 0 4,717
40 RATLAM WIND FARMS PVT LTD 30MW 30 33 132KV S/S JAORA 28,08,143 28,08,143 0 28,08,143 0 0 0 0 44,602
41 RENEW WIND ENERGY (AP4) PVT. LTD. 18 33 132KV S/S KHACHROD 23,34,280 23,34,280 0 23,34,280 0 0 0 0 5,139
42 RENEW WIND ENERGY (MP TWO) DALODA 28.8 33 220KV S/S DALODA 26,75,101 26,75,101 0 26,75,101 0 0 0 0 5,138
43 RENEW WIND ENERGY (MP TWO) P L 1 MALLARGARH 7.2 33 132 KVMALLARGARH 7,00,700 7,00,700 0 7,00,700 0 0 0 0 1,300
44 SARJAN REALITIES LTD (BADNAGAR) 21 132 220KV S/S BARNAGAR 28,43,308 0 28,43,308 28,43,308 0 0 0 0 17,504
45 SHANKHESWAR WIND WORLD (DHAMNAR) 15 33 33KV S/S DHAMNAR 16,06,228 16,06,228 0 16,06,228 0 0 0 0 2,288
46 SHANKHESWER WIND WORLD(NAGRI) 15 33 33KV NAGRI 15,60,252 15,60,252 0 15,60,252 0 0 0 0 2,315
QUANTUM OF ENERGY Units Net Energy Distribution of Energy indicated in Units Imported by the
At 33 KV S/s At 132 KV / 220 Purchased by available for West Central East Generator at common
Gross
Discom level KV S/s EHV MPPMCL under wheeling. Discom Discom Discom Metering point
Generation at
Sr.N Capacity Voltage (Directly to level Long Term Col.no (6 - 9) (Kwh) (Kwh) (Kwh)
Name of Wind Electric Generators Connected at Substation Common
o. in MW Level Discom without Agreement
Metering
using
Point
Transmission
Network)
1 2 3 4 5 6 7 8 9 10 11 12 13 14

Page: A-17
47 SIDHHANT WIND ENERGY LTD,MANDVI (XC529818) 15 33 33/11KV S/s MANDVI 15,25,717 15,25,717 0 15,25,717 0 0 0 0 3,102
48 SOUTHERN WINCON 6 MW 6 33 132KV S/S JAORA 2,56,100 2,56,100 0 2,56,100 0 0 0 0 5,100
49 SUDHEER PROJECTS PVT LTD MAXI 30 33 132KV S/S MAXI 34,33,735 34,33,735 0 34,33,735 0 0 0 0 5,502
50 SUDHEER PROJECTS PVT LTD,BERCHA 30 33 132KV S/S BERCHHA 31,91,808 31,91,808 0 31,91,808 0 0 0 0 6,052
51 SUZLON DEV. P. LTD.-II 1.8 33 220KV S/S DEWAS 1,72,116 1,72,116 0 59,170 1,12,946 1,12,946 0 0 3,330
52 SUZLON DEV. P.LTD.-I 13.75 33 220KV S/S DEWAS 9,20,600 9,20,600 0 2,08,150 7,12,450 7,12,450 0 0 10,550
53 SUZLON GUJRAT WIND PARK LTD (BADNAGAR) 42 132 220KV S/S BARNAGAR 58,13,623 0 58,13,623 58,13,623 0 0 0 0 22,672
54 SUZLON GUJRAT WIND PARK LTD KHACHROD 29.4 33 132KV S/S KHACHROD 41,75,604 41,75,604 0 41,75,604 0 0 0 0 20,011
55 SUZLON GUJRAT WIND PARK PVT LTD BAROD 25.2 33 220KV S/S BAROD 33,57,150 33,57,150 0 33,57,150 0 0 0 0 26,767
56 SUZLON I RATLAM 14.4 33 132KV S/S JAORA 9,95,130 9,95,130 0 9,95,130 0 0 0 0 21,403
57 SUZLON I SAILANA 14.4MW 14.4 33 132KV S/S SAILANA 13,73,417 13,73,417 0 13,73,417 0 0 0 0 14,970
58 SUZLON II RATLAM 6 33 132KV S/S JAORA 4,60,900 4,60,900 0 4,60,900 0 0 0 0 8,500
59 SUZLON II SAILANA 15MW 15 33 132KV S/S SAILANA 13,40,723 13,40,723 0 13,40,723 0 0 0 0 17,310
60 SUZLON III RATLAM 8.7 33 132KV S/S JAORA 5,08,250 5,08,250 0 5,08,250 0 0 0 0 11,850
61 SUZLON III SAILANA 14.1MW 14.1 33 132KV S/S SAILANA 10,62,379 10,62,379 0 10,62,379 0 0 0 0 16,489
62 SUZLON IV RATLAM 13.5 33 132KV S/S JAORA 8,91,100 8,91,100 0 8,91,100 0 0 0 0 17,342
63 SUZLON SANDALA I RATLAM 14.7 33 132KV S/S KHACHROD 16,59,395 16,59,395 0 16,59,395 0 0 0 0 9,154
64 SUZLON SANDALA II RATLAM 14.7 33 132KV S/S KHACHROD 14,68,100 14,68,100 0 14,68,100 0 0 0 0 9,456
65 SUZLON V RATLAM 12 33 132KV S/S JAORA 9,13,700 9,13,700 0 9,13,700 0 0 0 0 16,234
66 SUZLON-I (SUSNER I ) 15 33 132KV S/S SUSNER 10,46,350 10,46,350 0 10,46,350 0 0 0 0 21,495
67 SUZLON-II (SUSNER II) 15 33 132KV S/S SUSNER 11,37,584 11,37,584 0 11,37,584 0 0 0 0 15,157
68 SUZLON-III (AGAR I) 15 33 132KV S/S AGAR 13,22,800 13,22,800 0 13,22,800 0 0 0 0 15,800
69 SUZLON-IV (AGAR II) 15 33 132KV S/S AGAR 11,22,250 11,22,250 0 10,02,520 1,19,730 0 1,19,730 0 19,000
70 SUZLON-V (SUSNER III) 15 33 132KV S/S SUSNER 12,05,650 12,05,650 0 12,05,650 0 0 0 0 16,750
71 TIRUPATI DHAR RENEWABLE POWER PVT LTD 15 33 33 KV JAITPURA DHAR 24,03,486 24,03,486 0 24,03,486 0 0 0 0 2,097
72 WIND WORLD (INDIA) LTD., NAGDA HILL 9.6 33 132KV S/S SHANKARGARH 9,69,302 9,69,302 0 5,06,002 4,63,301 0 0 4,63,301 1,700
73 WIND WORLD (INDIA) LTD., RATADIA HILL AT BAGDI III 59.2 132 132KV S/S CHAPDA 49,18,262 0 49,18,262 0 49,18,262 49,18,262 0 0 5,302
74 WIND WORLD-I AGAR 12 33 132KV S/S AGAR 10,41,901 10,41,901 0 10,41,901 0 0 0 0 1,337
75 WIND WORLD-II AGAR 15.2 33 132KV S/S AGAR 10,79,338 10,79,338 0 10,79,338 0 0 0 0 2,100
76 WIND WORLD-III AGAR 14.4 33 132KV S/S AGAR 10,46,444 10,46,444 0 10,46,444 0 0 0 0 1,747
77 WIND WORLD-IV SUSNER 14.4 33 132KV S/S SUSNER 11,02,694 11,02,694 0 11,02,694 0 0 0 0 1,112
78 ADANI WIND ENERGY MP1 PVT. LTD 324.4 220 765KV S/S INDORE 5,34,29,300 0 0 0 0 0 0 0 0
2752.43 30,01,34,605 9,08,67,113 15,58,38,192 23,81,27,365 83,08,200 77,25,169 1,19,730 4,63,301 13,79,280
2,428.03

Power Sold through IEX 1 G.I. POWER


Note
Scheduling of Power is done by WRLDC ADANI WIND ENERGY MP1 PVT. LTD
STATE LOAD DESPATCH CENTRE JABALPUR
MADHYA PRADESH POWER TRANSMISSION COMPANY LTD.
PROVISIONAL STATE ENERGY ACCOUNT FOR THE MONTH OF MARCH-2023
Details of Energy Injected by Others Renewable Energy Generators

No - 07-05/PM-68A/SEA-03.0/435 DATED: 07-04-2023


PAGE A-18
QUANTUM OF ENERGY Units Net Energy Distribution of Energy indicated in Column Units Imported by
At 33 KV S/s At 132 KV / Purchased by available for West Discom Central East Discom the Generator at
Discom level 220 KV S/s MPPMCL wheeling. (Kwh) Discom (Kwh) (Kwh) common Metering
Gross Generation (Directly to EHV level
Sr. Capacity Voltage under Long Col.no (6- 9) point
Name of Other Renewable Energy Generators Connected at Substation at Common Discom without
No. in MW Level Term
Metering Point using Agreement
Transmission
Network)
1 2 3 4 5 6 7 8 9 10 11 12 13
1 AMHATA HYDRO ENERGY PVT LTD III 3.8 33 33/11 KV GHOGHAM 10,16,206 10,16,206 0 10,16,206 0 0 0 0 96
2 ARYA ENERGY LTD (BIOMASS) 12 132 132KV S/S KOTMA 55,74,607 0 55,74,607 55,74,607 0 0 0 0 21,859
3 ASCENT HYDRO PROJECTS LTD 2.2 33 220KV S/S BIRSINGPUR 12,12,960 12,12,960 0 0 12,12,960 12,12,960 0 0 0
4 HEG LTD. TAWA 13.5 33 220KV S/S ITARSI 5,80,649 5,80,649 0 0 0 0 0 0 13,127
5 JABALPUR MSW PVT LTD 11.5 132 132KV S/S MARHOTAL 44,96,188 0 44,96,188 44,96,188 0 0 0 0 33,388
6 MAHAKAUSHAL SUGAR & POWER INDUSTRIES LTD 12.8 33 220KV S/S NARSINGPUR 0 0 0 0 0 0 0 0 15,750
7 NARMADA SUGAR PVT LTD 30 33 132KV S/S GADARWARA 1,36,50,500 1,36,50,500 0 0 0 0 0 0 330
8 BIOBIJALEE GREEN POWER LTD. 10 132 132KV S/S GADARWARA 27,65,183 0 27,65,183 27,65,183 0 0 0 0 2,220
9 RAMNIK POWER & ALLOYS PVT LTD 6 33 132KV S/S WARASEONI 0 0 0 0 0 0 0 0 0
10 RDMC BIOGAS 1.2 33 M/S RDM CARE INDIA PARIYAT 0 0 0 0 0 0 0 0 283
11 SAS HYDEL PROJECTS PVT LTD 9.75 33 33/11KV S/S KANTI 0 0 0 0 0 0 0 0 1,894
12 SHALIVAHANA CHHINDWARA 15 132 220KV S/S CHHINDWARA 0 0 0 0 0 0 0 0 0
13 SHALIVAHANA_UMARIYA 10 132 220 KV UMARIYA 0 0 0 0 0 0 0 0 0
14 SHREE DURGA KHANDSARI(SUGAR) MILLS, MENDRANA 11 33 132KV S/S PANSEMAL 23,77,600 23,77,600 0 0 0 0 0 0 39,700
15 SIRMOUR SMALL HYDRO PROJECT PVT LTD 24 33 1,77,09,067 1,77,09,067 0 1,77,09,067 0 0 0 0 254
TOTAL 172.75 4,93,82,960 3,65,46,982 1,28,35,978 3,15,61,251 12,12,960 12,12,960 0 0 1,28,901

1.SHREE DURGA KHANDSARI(SUGAR) MILLS, MENDRANA


Power Sold through IEX 2.NARMADA SUGAR PVT LTD
Note
3.MAHAKAUSHAL SUGAR & POWER INDUSTRIES LTD
Power Sold to IEX and under Intra State STOA 1.HEG TAWA