No. NERPC/COM/REA/2019/4967-5013 02.03.2021

To
1. CMD, TSECL, Bidyut Bhawan, Agartala – 799 001
2. Director (Distribution), MePDCL, Lumjingshai, S.R. Road, Shillong – 793 001
3. Engineer-in-Chief (P&E), P&E Dept., Govt. of Mizoram, Aizawl – 796 001
4. Chief General Manager (Comml), APDCL, Bijulee Bhawan, Paltan Bazar, Guwahati – 781 001
5. Chief Engineer (WE Zone), Dept. of Power, Govt. of Arunachal Pradesh, Itanagar – 791 111
6. Managing Director, MSPDCL, Secure Office Building Complex, 3rd Floor, South Block, Near 2nd MR Gate,
Imphal – 795001
7. Chief Engineer (Power), Dept. of Power, Govt. of Nagaland, Kohima – 797 001
8. Chief Engineer, Loktak HE Project, Vidyut Vihar, Komkeirap, Manipur – 795 124
9. Executive Director (Comml.), NEEPCO Ltd., Lower New Colony, Shillong – 793 003
10. Executive Director, NERTS, POWERGRID, Lapalang, Shillong – 793 006
11. Managing Director, OTPC, 6th Floor, IFCI Tower, 61 Nehru Place, New Delhi – 110 019
12. GM (Comml.), NTPC, 3rd Floor OLIC building, Plot No.N.17/2, Nayapalli, Bhubaneshwar-12

!वषय: Feb 2021 का एबीती आधा/रत संशोिधत आर. ई. ए ।


Sub: ABT based REA for Feb 2021

महोदय,
Sir,
Feb 2021 माह का एबीती आधा/रत संशोिधत 8े:ीय उजा= लेखा (आर.ई.ए) Bक CDत आवEयक करवाई के Fलए संलIन है
। आर.ई.ए लेखा उ.पू.8े.!व.स कN वेबसाईट www.nerpc.nic.in पर भी उपलQध करा Rदया गया है ।

A copy of ABT based Regional Energy Accounting (REA) for the month of Feb 2021is
enclosed herewith for necessary action. The REA is also available on NERPC website
www.nerpc.nic.in.
संघटक अपने अवलोकन / RटWपXणयां यRद कोई हो तो आर.ई.ए के जारZ होने के 15 Rदन] के अंदर भेज द^ । यRद
संघटको से कोई प: _यवहार नहZ होता है तो जारZ Bकया गया आर.ई.ए को अंDतम माना जाएगा ।

Constituents may send their observation/ comments, if any on the same within 15
days from the date of issue of REA. In case no communication is received from constituents,
the REA as issued would be treated as final REA. This REA includes Bilateral Exchanges and
URS Adjusted Share Allocations.
संलIनक : उपरो`तानुसार
Encl.: As above.
भवद$य / Yours faithfully,

(एस. एम. आइमोल / S. M. Aimol)


!"#$%& / Director
अधी-ण अ/भयंता / Superintending Engineer
वा6ण7य / Commercial
Copy forwarded to:

1. CE (G. M.), CEA, SewaBhawan, R.K.Puram, New Delhi – 110 066.


2. E. D., NERLDC, Lower Nongrah, Dongtieh, Lapalang, Shillong - 6.
3. C.G.M (SLDC) AEGCL, Kahelipara, Guwahati.
4. Gen. Manager (Comml.), NHPC Ltd., NHPC Office complex, Sector –33, Faridabad-121003.
5. C.G.M (Commercial) APDCL, Bijulee Bhawan, Paltan Bazar, Guwahati - 781 001.
6. General Manager, Ranganadi HEP, NEEPCO, Yazlee, Ar. Pradesh
7. Project Manager, Doyang HEP, NEEPCO, Nagaland
8. Project Manager, AGBPP, NEEPCO Ltd., No. –III, Vill. Bokuloni, Dibrugarh, Assam.
9. Project Manager, AGTPP, NEEPCO Ltd., Ramchandranagar, Agartala, Tripura West- 799008.
10. Dy. G. M (Elect.), Kopili HEP, NEEPCO Ltd., Umrangso, N.C. Hills, Assam.
11. Supdt. Engr. (System Management) MeECL, Lumjingshai, Short Round Road, Shillong.
12. ED (Comml), MSPDCL, Secure Office Building Complex, 3rd Floor, South Block, Near 2nd MR Gate, Imphal – 01
13. Executive Engineer, MSLDC, P & E Dept., Chaltlang, Aizawl- 796012.
14. Supdt. Engr. Dimapur Sub-station Deptt. of Power, Govt.of Nagaland, Dimapur.
15. Dy. G. M. (Commercial) NERTS, Lower Nongrah, Dongtieh, Lapalang, Shillong - 6.
16. Dy. General Manager (ER), POWERGRID, Boring Road, Alankar Place, Patna - 800 001
17. DGM (Comml), OTPC, 6th Floor, IFCI Tower, 61 Nehru Place, New Delhi – 110 019
18. AGM (Comml.), NTPC, 3rd Floor OLIC building, Plot No.N.17/2, Nayapalli, Bhubaneshwar-12
19. AGM (Comml.), NTPC, Bongaigaon Thermal Power Project, P.O Salakati, Kokrajhar-783369
20. Addl. General Manager,Comml & Sys.Opn., TSECL,Banamalipur,Agartala.-799001.
21. Ex. Engr., SLDC, Deptt. of Power, Itanagar, Ar. Pradesh – 791 111
22. CEO, NVVNLtd., 7th Floor, Scope Complex, Lodhi Road, N.Delhi- 110 003
23. Power Trading Corpn. of India Ltd., 2nd Floor, NBCC Tower, 15-Bhikaji Cama Place, New Delhi – 66.
24. DGM (Power Trading), Adani Exports Ltd, 13 Palam Marg, Vasant Vihar, New Delhi- 110057.
25. ED, TPTCL, Block ‘A’, 34, Sant Tukaram Road, Carnac Bunder, Mumbai-400 009.
26. Member Secretary, NRPC,18-A, Shaheed Jeet Singh Marg, Katwaria Sarai, NewDelhi-110016.
27. Member Secretary, ERPC,14, Golf Club Road, Kolkata- 700 033.
28. Member Secretary, WRPC, Plot No F-3, MIDC Area, Opp Seepz, Marol, Andheri (E), Mumbai-400 093.
29. Member Secretary, SRPC, 29, Race Course Road, Bangalore- 560009.
30. Lanco Electric Utility Limited, LANCO House,141, Avenue,8, Banjara Hills, Hyderabad-500 034
31. Reliance Energy Trading Ltd., Reliance Energy Centre, Santa Cruz (E), Mumbai-400 055
32.Vice President, Indian Energy Exchange Limited, 10th Floor, B Wing, Statesman House,
Barakhamba Road, Connought Place, New Delhi - 110 001.
33. LANCO Electric Utility Ltd, Plot No 229, Udyog Vihar, Phase-1, Gurgaon, Haryana – 122 016.
34. RPTCL, Agrawal House, 2, St. George’s Gate Road, 6th Floor, Kolkata – 700 022.

(एस. एम. आइमोल / S. M. Aimol)


!"#$%& / Director
अधी-ण अ/भयंता / Superintending Engineer
वा6ण7य / Commercial
NORTH EASTERN REGIONAL POWER COMMITTEE, SHILLONG
REGIONAL ENERGY ACCOUNT FOR THE MONTH OF February-2021

RANGANADI
Sr. No. Details Units Figure
1 Installed Capacity MW 405
2 Auxiliary Energy Consumption (AUX) in % 1
3 Normative Plant Availability Factor (NAPAF) in % 88
4 Annual Design Energy (DE) GWh 1509.61 #
5 Free Energy for Home State (FEHS) in % 12
6 Annual Saleable Energy MU 1328.5272
7 Annual Fixed Charges in ₹ Cr. 272.6449 #
8 Energy Charge Rate (ECR) on ex-PP basis KWh 1.039
9 Scheduled energy (ex-bus) for the month KWh 26741000.11
10 Free Energy (ex-PP) of the month KWh 3208920.013
11 Saleable Energy (ex-PP) of the month KWh 23532080.1
12 Total Energy Charge payable for the month in ₹ 24391868.49
13 Cumulative scheduled energy including current month MWh 1332490.29
14 Plant Availability Factor achieved during the month (PAFM) in % 74.48381522
15 Cumulative Plant Availability Factor achieved upto the month in % 95.90321788
16 Capacity charge inclusive of incentive payble for the month in ₹ 88513964.18

BILLING STATEMENT
Share allocation for Capacity Charge Payble by Drawal Schedule of Billing Schedule of Energy Charge payable by
Beneficiaries
the current month (%) beneficiaries (in ₹) Beneficiaries MWH Beneficiaries MWH beneficiaries in ₹
ARUNACHAL PRADESH 18.4620 16341448.0671 4974.9241 1766.0041 1830528.3322
ASSAM 43.3280 38351330.4003 11402.0751 11402.0751 11818671.1961
HVDC BNC 0.0000 0.0000 0.0000 0.0000 0.0000
MANIPUR 8.3730 7411274.2209 2260.4434 2260.4434 2343032.8699
MEGHALAYA 11.5050 10183531.5790 3099.4059 3099.4059 3212648.5069
MIZORAM 5.7000 5045295.9583 1524.2370 1524.2370 1579927.8388
NAGALAND 5.3350 4722219.9891 1403.7785 1403.7785 1455068.1424
TRIPURA 7.2970 6458863.9663 2076.1361 2076.1361 2151991.6049
REG MEGHALAYA 0.0000
TOTAL 100.0000 88513964.1810 26741.0001 23532.0801 24391868.4913
NORTH EASTERN REGIONAL POWER COMMITTEE, SHILLONG
REGIONAL ENERGY ACCOUNT FOR THE MONTH OF February-2021

LOKTAK
Sr. No. Details Units Figure
1 Installed Capacity MW 105
2 Auxiliary Energy Consumption (AUX) in % 1.2
3 Normative Plant Availability Factor (NAPAF) in % 88
4 Annual Design Energy (DE) GWh 448 #
5 Free Energy for Home State (FEHS) in % 12
6 Annual Saleable Energy MU 394.24
7 Annual Fixed Charges in ₹ Cr. 150.2829 #
8 Energy Charge Rate (ECR) on ex-PP basis KWh 1.929
9 Scheduled energy (ex-bus) for the month KWh 32187162.89
10 Free Energy (ex-PP) of the month KWh 3862459.547
11 Saleable Energy (ex-PP) of the month KWh 28324703.34
12 Total Energy Charge payable for the month in ₹ 54642091.05
13 Cumulative scheduled energy including current month MWh 594347.4313
14 Plant Availability Factor achieved during the month (PAFM) in % 90.0258889
15 Cumulative Plant Availability Factor achieved upto the month in % 89.52597985
16 Capacity charge inclusive of incentive payble for the month in ₹ 58969776.84

BILLING STATEMENT
Share allocation for Capacity Charge Payble by Drawal Schedule of Billing Schedule of Energy Charge payable by
Beneficiaries
the current month (%) beneficiaries (in ₹) Beneficiaries MWH Beneficiaries MWH beneficiaries in ₹
ARUNACHAL PRADESH 4.9400 2913106.9761 1599.1862 1599.1862 3085041.2717
ASSAM 29.4450 17363650.7916 9439.2137 9439.2137 18209489.0713
HVDC BNC 0.0000 0.0000 0.0000 0.0000 0.0000
MANIPUR 42.5080 25066872.7407 13690.6506 9828.1910 18959877.6231
MEGHALAYA 0.0000 0.0000 0.0000 0.0000 0.0000
MIZORAM 5.0200 2960282.7975 1617.2924 1617.2924 3119970.4749
NAGALAND 6.4350 3794705.1399 2064.6527 2064.6527 3982987.5594
TRIPURA 11.6520 6871158.3978 3776.1673 3776.1673 7284725.0473
REG MEGHALAYA 0.0000
TOTAL 100.0000 58969776.8436 32187.1629 28324.7033 54642091.0477
NORTH EASTERN REGIONAL POWER COMMITTEE, SHILLONG
REGIONAL ENERGY ACCOUNT FOR THE MONTH OF February-2021

KHANDONG
Sr. No. Details Units Figure
1 Installed Capacity MW 50
2 Auxiliary Energy Consumption (AUX) in % 1.2
3 Normative Plant Availability Factor (NAPAF) in % 67
4 Annual Design Energy (DE) GWh 277.61 #
5 Free Energy for Home State (FEHS) in % 12
6 Annual Saleable Energy MU 244.2968
7 Annual Fixed Charges in ₹ Cr. 40.4858 #
8 Energy Charge Rate (ECR) on ex-PP basis KWh 1.021
9 Scheduled energy (ex-bus) for the month KWh 4261000.176
10 Free Energy (ex-PP) of the month KWh 511320.0211
11 Saleable Energy (ex-PP) of the month KWh 3749680.155
12 Total Energy Charge payable for the month in ₹ 3144794.209
13 Cumulative scheduled energy including current month MWh 59397.50062
14 Plant Availability Factor achieved during the month (PAFM) in % 77.24840949
15 Cumulative Plant Availability Factor achieved upto the month in % 30.30679532
16 Capacity charge inclusive of incentive payble for the month in ₹ 17904105.99

BILLING STATEMENT
Share allocation for Capacity Charge Payble by Drawal Schedule of Billing Schedule of Energy Charge payable by
Beneficiaries
the current month (%) beneficiaries (in ₹) Beneficiaries MWH Beneficiaries MWH beneficiaries in ₹
ARUNACHAL PRADESH 4.1940 750898.2051 183.7903 183.7903 154141.8359
ASSAM 56.2850 10077326.0555 2374.1179 2118.4579 1776715.3174
HVDC BNC 0.0000 0.0000 0.0000 0.0000 0.0000
MANIPUR 6.5550 1173614.1475 282.2580 282.2580 236725.0369
MEGHALAYA 16.9050 3026689.1173 723.2715 467.6115 392177.9876
MIZORAM 3.9400 705421.7759 167.8836 167.8836 140801.1351
NAGALAND 6.6530 1191160.1714 280.3525 280.3525 235126.9829
TRIPURA 5.4680 978996.5154 249.3264 249.3264 209105.9136
REG MEGHALAYA 0.0000
TOTAL 100.0000 17904105.9883 4261.0002 3749.6802 3144794.2094
NORTH EASTERN REGIONAL POWER COMMITTEE, SHILLONG
REGIONAL ENERGY ACCOUNT FOR THE MONTH OF February-2021

KOPILI
Sr. No. Details Units Figure
1 Installed Capacity MW 200
2 Auxiliary Energy Consumption (AUX) in % 1.2
3 Normative Plant Availability Factor (NAPAF) in % 69
4 Annual Design Energy (DE) GWh 1186.14 #
5 Free Energy for Home State (FEHS) in % 12
6 Annual Saleable Energy MU 1043.803
7 Annual Fixed Charges in ₹ Cr. 120.2764 #
8 Energy Charge Rate (ECR) on ex-PP basis KWh 0.582
9 Scheduled energy (ex-bus) for the month KWh 0
10 Free Energy (ex-PP) of the month KWh 0
11 Saleable Energy (ex-PP) of the month KWh 0
12 Total Energy Charge payable for the month in ₹ 0
13 Cumulative scheduled energy including current month MWh 0
14 Plant Availability Factor achieved during the month (PAFM) in % 0
15 Cumulative Plant Availability Factor achieved upto the month in % 0
16 Capacity charge inclusive of incentive payble for the month in ₹ 0

BILLING STATEMENT
Share allocation for Capacity Charge Payble by Drawal Schedule of Billing Schedule of Energy Charge payable by
Beneficiaries
the current month (%) beneficiaries (in ₹) Beneficiaries MWH Beneficiaries MWH beneficiaries in ₹
ARUNACHAL PRADESH 5.1910 0.0000 0.0000 0.0000 0.0000
ASSAM 53.4550 0.0000 0.0000 0.0000 0.0000
HVDC BNC 0.0000 0.0000 0.0000 0.0000 0.0000
MANIPUR 7.3950 0.0000 0.0000 0.0000 0.0000
MEGHALAYA 17.3950 0.0000 0.0000 0.0000 0.0000
MIZORAM 4.6100 0.0000 0.0000 0.0000 0.0000
NAGALAND 6.1470 0.0000 0.0000 0.0000 0.0000
TRIPURA 5.8070 0.0000 0.0000 0.0000 0.0000
REG MEGHALAYA 0.0000
TOTAL 100.0000 0.0000 0.0000 0.0000 0.0000
NORTH EASTERN REGIONAL POWER COMMITTEE, SHILLONG
REGIONAL ENERGY ACCOUNT FOR THE MONTH OF February-2021

KOPILI-2
Sr. No. Details Units Figure
1 Installed Capacity MW 25
2 Auxiliary Energy Consumption (AUX) in % 1.2
3 Normative Plant Availability Factor (NAPAF) in % 69
4 Annual Design Energy (DE) GWh 86.3 #
5 Free Energy for Home State (FEHS) in % 12
6 Annual Saleable Energy MU 75.944
7 Annual Fixed Charges in ₹ Cr. 12.2577 #
8 Energy Charge Rate (ECR) on ex-PP basis KWh 0.815
9 Scheduled energy (ex-bus) for the month KWh 0
10 Free Energy (ex-PP) of the month KWh 0
11 Saleable Energy (ex-PP) of the month KWh 0
12 Total Energy Charge payable for the month in ₹ 0
13 Cumulative scheduled energy including current month MWh 0
14 Plant Availability Factor achieved during the month (PAFM) in % 0
15 Cumulative Plant Availability Factor achieved upto the month in % 0
16 Capacity charge inclusive of incentive payble for the month in ₹ 0

BILLING STATEMENT
Share allocation for Capacity Charge Payble by Drawal Schedule of Billing Schedule of Energy Charge payable by
Beneficiaries
the current month (%) beneficiaries (in ₹) Beneficiaries MWH Beneficiaries MWH beneficiaries in ₹
ARUNACHAL PRADESH 5.9920 0.0000 0.0000 0.0000 0.0000
ASSAM 52.3550 0.0000 0.0000 0.0000 0.0000
HVDC BNC 0.0000 0.0000 0.0000 0.0000 0.0000
MANIPUR 6.9450 0.0000 0.0000 0.0000 0.0000
MEGHALAYA 13.6750 0.0000 0.0000 0.0000 0.0000
MIZORAM 6.0400 0.0000 0.0000 0.0000 0.0000
NAGALAND 5.7350 0.0000 0.0000 0.0000 0.0000
TRIPURA 9.2580 0.0000 0.0000 0.0000 0.0000
REG MEGHALAYA 0.0000
TOTAL 100.0000 0.0000 0.0000 0.0000 0.0000
NORTH EASTERN REGIONAL POWER COMMITTEE, SHILLONG
REGIONAL ENERGY ACCOUNT FOR THE MONTH OF February-2021

DOYANG
Sr. No. Details Units Figure
1 Installed Capacity MW 75
2 Auxiliary Energy Consumption (AUX) in % 1.2
3 Normative Plant Availability Factor (NAPAF) in % 70
4 Annual Design Energy (DE) GWh 227.24 #
5 Free Energy for Home State (FEHS) in % 12
6 Annual Saleable Energy MU 199.9712
7 Annual Fixed Charges in ₹ Cr. 108.4121 #
8 Energy Charge Rate (ECR) on ex-PP basis KWh 2.738
9 Scheduled energy (ex-bus) for the month KWh 5013774.984
10 Free Energy (ex-PP) of the month KWh 601652.9981
11 Saleable Energy (ex-PP) of the month KWh 4412121.986
12 Total Energy Charge payable for the month in ₹ 12105169.51
13 Cumulative scheduled energy including current month MWh 181742.1645
14 Plant Availability Factor achieved during the month (PAFM) in % 75.9253904
15 Cumulative Plant Availability Factor achieved upto the month in % 58.56384397
16 Capacity charge inclusive of incentive payble for the month in ₹ 45102635.71

BILLING STATEMENT
Share allocation for Capacity Charge Payble by Drawal Schedule of Billing Schedule of Energy Charge payable by
Beneficiaries
the current month (%) beneficiaries (in ₹) Beneficiaries MWH Beneficiaries MWH beneficiaries in ₹
ARUNACHAL PRADESH 5.6940 2568144.0771 350.2352 350.2352 960911.0245
ASSAM 56.5030 25484342.2534 2163.9850 2163.9850 5937144.2677
HVDC BNC 0.0000 0.0000 0.0000 0.0000 0.0000
MANIPUR 8.1050 3655568.6240 398.3581 398.3581 1092941.8052
MEGHALAYA 11.8150 5328876.4088 578.3525 578.3525 1586777.3851
MIZORAM 5.4100 2440052.5917 263.2233 263.2233 722183.6204
NAGALAND 5.8050 2618208.0028 897.0519 295.3989 810461.1901
TRIPURA 6.6680 3007443.7489 362.5690 362.5690 994750.2165
REG MEGHALAYA 0.0000
TOTAL 100.0000 45102635.7068 5013.7750 4412.1220 12105169.5095
NORTH EASTERN REGIONAL POWER COMMITTEE, SHILLONG
REGIONAL ENERGY ACCOUNT FOR THE MONTH OF February-2021

PARE
Sr. No. Details Units Figure
1 Installed Capacity MW 110
2 Free Energy for Home State (FEHS) in % 13
3 Scheduled energy (ex-bus) for the month KWh 10390774.9
4 Free Energy (ex-PP) of the month KWh 1350800.736
5 Saleable Energy (ex-PP) of the month KWh 9039974.16
6 Cumulative scheduled energy including current month MWh 500497.9025
7 Plant Availability Factor achieved during the month (PAFM) in % 75.0893843
8 Cumulative Plant Availability Factor achieved upto the month in % 89.96085856

BILLING STATEMENT
Beneficiaries Share allocation for Drawal Schedule of Billing Schedule of
the current month (%) Beneficiaries MWH Beneficiaries MWH

ARUNACHAL PRADESH 18.8725 1972.1285 621.3278


ASSAM 40.5100 4155.6193 4155.6193
HVDC BNC 0.0000 0.0000 0.0000
MANIPUR 8.3550 874.6960 874.6960
MEGHALAYA 13.3300 1391.6371 1391.6371
MIZORAM 5.7650 599.0282 599.0282
NAGALAND 5.4000 554.5550 554.5550
TRIPURA 7.7675 843.1108 843.1108
REG MEGHALAYA 0.0000
TOTAL 100.0000 10390.7749 9039.9742
NORTH EASTERN REGIONAL POWER COMMITTEE, SHILLONG
REGIONAL ENERGY ACCOUNT FOR THE MONTH OF February-2021

KAMENG
Sr. No. Details Units Figure
1 Installed Capacity MW 600*
2 Free Energy for Home State (FEHS) in % 12
3 Scheduled energy (ex-bus) for the month KWh 79732638.55
4 Free Energy (ex-PP) of the month KWh 9567916.626
5 Saleable Energy (ex-PP) of the month KWh 70164721.92
6 Cumulative scheduled energy including current month MWh 552437.5209
7 Plant Availability Factor achieved during the month (PAFM) in % 101.2145749
8 Cumulative Plant Availability Factor achieved upto the month in % 93.82568066

BILLING STATEMENT
Beneficiaries Share allocation for Drawal Schedule of Billing Schedule of
the current month (%) Beneficiaries MWH Beneficiaries MWH

ARUNACHAL PRADESH 13.8333 11046.7464 1478.8298


ASSAM 10.8333 8651.0663 8651.0663
HVDC BNC 0.0000 0.0000 0.0000
MANIPUR 0.0000 0.0000 0.0000
MEGHALAYA 2.5000 1996.4001 1996.4001
MIZORAM 0.0000 0.0000 0.0000
NAGALAND 1.5000 1197.8399 1197.8399
TRIPURA 0.0000 0.0000 0.0000
GOA 0.3333 0.0000 0.0000
HARYANA 2.1667 1730.2136 1730.2136
UTTAR PRADESH 9.1667 7320.1336 7320.1336
CHATTISGARH 2.1667 1730.2135 1730.2135
REG MEGHALAYA 0.0000
MERCHANT POWER 57.5000 46060.0252 46060.0252
TOTAL 100.0000 79732.6386 70164.7219

*Unit IV COD w.e.f. 12.02.2021


NORTH EASTERN REGIONAL POWER COMMITTEE, SHILLONG
REGIONAL ENERGY ACCOUNT FOR THE MONTH OF February-2021

B. THERMAL STATIONS
NORTH EASTERN REGIONAL POWER COMMITTEE, SHILLONG
REGIONAL ENERGY ACCOUNT FOR THE MONTH OF February-2021

AGBPP
Sr. No. Details Units Figure
1 Plant Availability Factor (PEAK) (PAFMp) for current month in % 74.14
2 Plant Availability Factor (OFF-PEAK) (PAFMop) for current month in % 74.81
3 Cum. Plant Availability Factor (PEAK) upto current (Cum. PAFp) for High Demand Season in % 48.79

4 Cum. Plant Availability Factor (OFF-PEAK) upto current (Cum. PAFop) for High Demand in % 49.50
Season
5 Cum. Plant Availability Factor (PEAK) upto current month (Cum. PAFp) for Low Demand in % 68.81
Season
6 Cum. Plant Availability Factor (OFF-PEAK) upto current month (Cum. PAFop) for Low in % 69.33
Demand Season
7 Normative Plant Availability Factor (NAPAF) in % 72.00
8 Plant Load Factor for current month in % 73.58
9 Cum. Plant Load Factor upto current month in % 57.68
10 NAPLF in % 85.00

BILLING STATEMENT
Schedule Energy for current Cum. Schedule Energy upto Unrequisitioned Energy for Cum. Unrequisitioned Energy upto
Beneficiaries Wt.
month (MWh) current month (MWh) current month (MWh) current month (MWh)
ARUNACHAL PRADESH 5.6940 6971.6144 55772.9103 1119.1008 28663.2713
ASSAM 56.5030 80252.9151 775884.9207 10.3962 70797.7273
HVDC BNC 0.0000 0.0000 0.0000 0.0000 0.0000
MANIPUR 8.1050 11350.0365 93603.2885 228.4685 27357.1109
MEGHALAYA 11.8150 15030.2448 155887.0825 0.0000 18070.9124
MIZORAM 5.4100 7295.0558 49159.1135 665.2236 31593.9363
NAGALAND 5.8050 8081.0606 77769.2481 165.0115 7276.2239
TRIPURA 6.6680 6750.6012 77613.1552 2723.0561 23934.5449
REG MEGHALAYA 1849.4707
TOTAL 100.0000 137580.9991 1285689.7188 4911.2566 207693.7270

RRAS(MWH)
RRAS UP 167.83
RRAS DOWN 0
NORTH EASTERN REGIONAL POWER COMMITTEE, SHILLONG
REGIONAL ENERGY ACCOUNT FOR THE MONTH OF February-2021

AGTCCPP
Sr. No. Details Units Figure
1 Plant Availability Factor (PEAK) (PAFMp) for current month in % 77.95
2 Plant Availability Factor (OFF-PEAK) (PAFMop) for current month in % 80.47
3 Cum. Plant Availability Factor (PEAK) upto current (Cum. PAFp) for High Demand Season in % 74.12

4 Cum. Plant Availability Factor (OFF-PEAK) upto current (Cum. PAFop) for High Demand in % 74.40
Season
5 Cum. Plant Availability Factor (PEAK) upto current month (Cum. PAFp) for Low Demand in % 89.99
Season
6 Cum. Plant Availability Factor (OFF-PEAK) upto current month (Cum. PAFop) for Low in % 90.96
Demand Season
7 Normative Plant Availability Factor (NAPAF) in % 85.00
8 Plant Load Factor for current month in % 75.90
9 Cum. Plant Load Factor upto current month in % 74.05
10 NAPLF in % 85.00

BILLING STATEMENT
Schedule Energy for current Cum. Schedule Energy upto Unrequisitioned Energy for Cum. Unrequisitioned Energy upto
Beneficiaries Wt.
month (MWh) current month (MWh) current month (MWh) current month (MWh)
ARUNACHAL PRADESH 6.7020 3944.7966 41677.8630 600.7625 18239.9937
ASSAM 43.7200 29506.8425 340885.7518 126.9296 60621.8646
HVDC BNC 0.0000 0.0000 0.0000 0.0000 0.0000
MANIPUR 8.2250 5603.3792 64223.6894 44.4142 9375.4135
MEGHALAYA 12.6330 7712.1405 101177.8482 24.6840 11070.3171
MIZORAM 6.0000 3780.9361 33627.1061 362.8450 20683.4617
NAGALAND 5.7370 3876.0942 47805.1551 11.2752 3322.9557
TRIPURA 16.9830 7694.4687 103037.2181 3844.7211 53042.1540
REG MEGHALAYA 934.8235
TOTAL 100.0000 63053.4813 732434.6317 5015.6317 176356.1603

RRAS(MWH)
RRAS UP 66.91
RRAS DOWN 0
NORTH EASTERN REGIONAL POWER COMMITTEE, SHILLONG
REGIONAL ENERGY ACCOUNT FOR THE MONTH OF February-2021

BGTPP
Sr. No. Details Units Figure
1 Plant Availability Factor (PEAK) (PAFMp) for current month in % 67.47
2 Plant Availability Factor (OFF-PEAK) (PAFMop) for current month in % 68.59
3 Cum. Plant Availability Factor (PEAK) upto current (Cum. PAFp) for High Demand Season in % 101.91

4 Cum. Plant Availability Factor (OFF-PEAK) upto current (Cum. PAFop) for High Demand in % 102.01
Season
5 Cum. Plant Availability Factor (PEAK) upto current month (Cum. PAFp) for Low Demand in % 92.65
Season
6 Cum. Plant Availability Factor (OFF-PEAK) upto current month (Cum. PAFop) for Low in % 92.78
Demand Season
7 Normative Plant Availability Factor (NAPAF) in % 85.00
8 Plant Load Factor for current month in % 43.79
9 Cum. Plant Load Factor upto current month in % 42.21
10 NAPLF in % 85.00

BILLING STATEMENT
Schedule Energy for current Cum. Schedule Energy upto Unrequisitioned Energy for Cum. Unrequisitioned Energy upto
Beneficiaries Wt.
month (MWh) current month (MWh) current month (MWh) current month (MWh)
ARUNACHAL PRADESH 5.1325 12724.8551 85388.9885 3225.5876 181677.2821
ASSAM 57.4200 163961.0443 2032563.3263 13402.1769 906576.8421
HVDC BNC 0.3300 705.8064 8534.1912 325.8024 8530.2200
MANIPUR 7.5050 7849.5770 138904.2005 13005.4204 245217.8420
MEGHALAYA 11.6500 0.0000 460810.2879 0.0000 133201.6489
MIZORAM 5.4150 11335.8038 68176.5998 6531.3068 216502.7268
NAGALAND 4.9300 12779.8591 179386.3483 2339.5836 72715.7802
TRIPURA 7.6175 6230.6750 113314.6015 17458.6572 283994.8602
REG MEGHALAYA 35962.2238
TOTAL 100.0000 251549.8444 3087078.5440 56288.5348 2048417.2025

RRAS(MWH)
RRAS UP 1083.61
RRAS DOWN 27477.22

SCED(MWH)
SCED UP 2567.06
SCED DOWN 12192.89
NORTH EASTERN REGIONAL POWER COMMITTEE, SHILLONG
REGIONAL ENERGY ACCOUNT FOR THE MONTH OF February-2021

PALATANA
Sr. No. Details Units Figure
1 Plant Availability Factor (PEAK) (PAFMp) for current month in % 83.98
2 Plant Availability Factor (OFF-PEAK) (PAFMop) for current month in % 84.23
3 Cum. Plant Availability Factor (PEAK) upto current (Cum. PAFp) for High Demand Season in % 87.19

4 Cum. Plant Availability Factor (OFF-PEAK) upto current (Cum. PAFop) for High Demand in % 86.25
Season
5 Cum. Plant Availability Factor (PEAK) upto current month (Cum. PAFp) for Low Demand in % 81.88
Season
6 Cum. Plant Availability Factor (OFF-PEAK) upto current month (Cum. PAFop) for Low in % 82.04
Demand Season
7 Normative Plant Availability Factor (NAPAF) in % 85.00
8 Plant Load Factor for current month in % 83.82
9 Cum. Plant Load Factor upto current month in % 81.14
10 NAPLF in % 85.00

BILLING STATEMENT
Schedule Energy for current Cum. Schedule Energy upto Unrequisitioned Energy for Cum. Unrequisitioned Energy upto
Beneficiaries Wt.
month (MWh) current month (MWh) current month (MWh) current month (MWh)
ARUNACHAL PRADESH 3.0303 11880.6102 118930.5985 165.1780 19171.0300
ASSAM 33.0579 130463.2674 1516997.6370 945.3304 37395.2895
HVDC BNC 0.0000 0.0000 0.0000 0.0000 0.0000
MANIPUR 5.7851 22829.8221 260320.5854 166.6828 11091.6273
MEGHALAYA 10.8815 42969.9625 498528.4164 311.1713 11997.1786
MIZORAM 3.0303 11776.6327 116352.4644 269.1553 25905.6339
NAGALAND 3.7190 14676.3668 168099.7168 107.0997 4096.5935
TRIPURA 26.9972 106545.0017 1239087.1183 772.0198 32755.2664
REG MEGHALAYA 0.0000
TOTAL 86.5014 341141.6635 3918316.5369 2736.6373 142412.6191
C. SHARE ALLOCATIONS % IN CS STATIONS FROM EASTERN REGION

Sl No. Farakka I & II Farakka III Kahalgaon I Kahalgaon II Talcher


1 Ar.Pradesh 0.191917 0.000000 0.191747 0.000000 0.196898
2 Assam 2.455737 0.000000 2.104847 5.093479 2.095419
3 Manipur 0.000000 0.000000 0.000000 0.000000 0.000000
4 Meghalaya 0.000000 0.000000 0.000000 0.000000 0.000000
5 Mizoram 0.141736 0.000000 0.141610 0.000000 0.141736
6 Nagaland 0.429803 0.000000 0.424460 0.000000 0.424823
Assam (NVVN Coal
7 0.091912 0.091912 0.091912 0.091912 0.091912
Power)

WEIGHTED AVERAGE ENTITLEMENT OF THE BENEFICIARIES FOR THE MONTH

Weighted Average Entitlement Weighted Average Entitlement


for the current month of ISGS in for the current month of ISGS Total Entitlement for the current month of ISGS
Beneficiaries
NER@ outside NER#

in MW in (%) in MW in (%) in MW in (%)


Ar. Pradesh 288.6158 9.8134 6.6503 2.0174 295.2661 9.0277
Assam* 1388.8624 47.2236 303.4289 92.0473 1692.2913 51.7413
Manipur 245.9927 8.3642 0.0000 0.0000 245.9927 7.5211
Meghalaya 348.6773 11.8556 0.0000 0.0000 348.6773 10.6607
Mizoram 137.5169 4.6758 4.8747 1.4788 142.3915 4.3536
Nagaland 162.1734 5.5142 14.6905 4.4565 176.8639 5.4076
Tripura 366.6964 12.4683 0.0000 0.0000 366.6964 11.2116
HVDC 2.5000 0.0850 0.0000 0.0000 2.5000 0.0764
Total 2941.0348 100.0000 329.6444 100.0000 3270.6792 100.0000
*Includes entitlement for bundling with solar power.
Note: 1. #The allocation outside NER includes 144.10 to ASSAM from Mangdechu HEP. 2. @ Kameng HEP 600 MW Allocations included. (IV Unit
w.e.f. 12.02.2021)
NORTH EASTERN REGIONAL POWER COMMITTEE, SHILLONG
BILATERAL EXCHANGES FOR THE MONTH OF February-2021

A. LONG TERM ACCESS (LTA)


Energy at Seller Periphery Energy at NER-ER Periphery Energy at Buyer Periphery
Sr. No. From TO Through (Trader) (MWh) (MWh) (MWh) Approval No.
1 Tripura_Ben Manipur_Ben AARTIIL 5700.0000 5700.0000 5492.3376 BARA_MANIPUR
2 Tripura_Ben Mizoram_Ben AARTIIL 5692.8750 5692.8750 5485.4648 BARA_MIZO
3 RAJ_SOLAR Assam_Ben SECI_Trader 2872.1075 2872.1075 2872.1075 L_NER_2017_01
4 RAJ_SOLAR Assam_Ben NVVNL 511.0150 511.0150 511.0150 L_NER_2017_02
5 Tuticorin_Mytrah Assam_Ben Tuticorin_Mytrah 5548.2300 5548.2300 5548.2300 L_NER_2019_01
6 GIWEL_SECI-II_RE Assam_Ben GIWEL_SECI-II_RE 7089.4550 7089.4550 7089.4550 L_NER_2019_02
NORTH EASTERN REGIONAL POWER COMMITTEE, SHILLONG
BILATERAL EXCHANGES FOR THE MONTH OF February-2021

B. SHORT TERM OPEN ACCESS (STOA)


Energy at Seller Periphery Energy at NER-ER Periphery Energy at Buyer Periphery
Sr. No. From TO Through (Trader) (MWh) (MWh) (MWh) Approval No.
1 KAMENG NEPAL_ER NVVNL 10500.0000 10500.0000 10115.7000 ERLDC/2021/26261/F
2 KAMENG NEPAL_ER NVVNL 350.0000 350.0000 336.7000 ERLDC/2021/26334/D
3 KAMENG NEPAL_ER NVVNL 350.0000 350.0000 336.7000 ERLDC/2021/26345/D
4 KAMENG NEPAL_ER NVVNL 350.0000 350.0000 336.7000 ERLDC/2021/26357/D
5 KAMENG NEPAL_ER NVVNL 350.0000 350.0000 336.7000 ERLDC/2021/26368/D
6 KAMENG NEPAL_ER NVVNL 350.0000 350.0000 336.7000 ERLDC/2021/26381/D
7 KAMENG NEPAL_ER NVVNL 250.0000 250.0000 240.5000 ERLDC/2021/26402/C
8 KAMENG NEPAL_ER NVVNL 350.0000 350.0000 336.7000 ERLDC/2021/26408/D
9 KAMENG NEPAL_ER NVVNL 350.0000 350.0000 336.7000 ERLDC/2021/26420/D
10 KAMENG NEPAL_ER NVVNL 150.0000 150.0000 144.3000 ERLDC/2021/26426/C
11 KAMENG NEPAL_ER NVVNL 1050.0000 1050.0000 1010.2050 ERLDC/2021/26435/D
12 BGTPP VLSEZ IEXL 52.0000 52.0000 50.0240 ERLDC/2021/26438/C
13 KAMENG NEPAL_ER NVVNL 450.0000 450.0000 432.9450 ERLDC/2021/26454/D
14 KAMENG NEPAL_ER NVVNL 50.0000 50.0000 48.1050 ERLDC/2021/26485/D
15 KAMENG NEPAL_ER NVVNL 50.0000 50.0000 48.1050 ERLDC/2021/26506/C
16 KAMENG NEPAL_ER NVVNL 1050.0000 1050.0000 1010.2050 ERLDC/2021/26519/D
17 KAMENG NEPAL_ER NVVNL 1050.0000 1050.0000 1010.2050 ERLDC/2021/26532/D
18 KAMENG NEPAL_ER NVVNL 450.0000 450.0000 434.0700 ERLDC/2021/26544/D
19 KAMENG NEPAL_ER NVVNL 450.0000 450.0000 434.0700 ERLDC/2021/26555/D
20 KAMENG NEPAL_ER NVVNL 550.0000 550.0000 530.5300 ERLDC/2021/26566/D
21 KAMENG NEPAL_ER NVVNL 650.0000 650.0000 626.9900 ERLDC/2021/26577/D
22 KAMENG NEPAL_ER NVVNL 1050.0000 1050.0000 1012.8300 ERLDC/2021/26591/C
23 KAMENG NEPAL_ER NVVNL 500.0000 500.0000 482.3000 ERLDC/2021/26602/D
24 KAMENG NEPAL_ER NVVNL 500.0000 500.0000 482.3000 ERLDC/2021/26617/D
25 KAMENG NEPAL_ER NVVNL 500.0000 500.0000 482.4500 ERLDC/2021/26624/D
26 KAMENG NEPAL_ER NVVNL 150.0000 150.0000 144.7350 ERLDC/2021/26634/D
27 KAMENG NEPAL_ER NVVNL 727.5000 727.5000 701.9648 ERLDC/2021/26647/D
28 KAMENG NEPAL_ER NVVNL 1377.5000 1377.5000 1329.1498 ERLDC/2021/26665/D
29 KAMENG NEPAL_ER NVVNL 777.5000 777.5000 750.2098 ERLDC/2021/26686/D
30 KAMENG NEPAL_ER NVVNL 557.5000 557.5000 537.9318 ERLDC/2021/26707/D
31 KAMENG NEPAL_ER NVVNL 1377.5000 1377.5000 1329.1498 ERLDC/2021/26729/D
32 HARYANA MePDCL APPCPL 29120.0000 29120.0000 28054.2080 NERLDC/2021/4119/A
33 BRPL Arunachal_Ben APPCPL 10080.0000 10080.0000 9711.0720 NERLDC/2021/4139/A
34 BRPL MePDCL KEIPL 7392.0000 7392.0000 7121.4528 NERLDC/2021/4140/A
35 HARYANA MSPDCL APPCPL 20160.0000 20160.0000 19422.1440 NERLDC/2021/4141/F
36 DBPL Assam Tubes MANIKARAN 2352.0000 2352.0000 2265.9168 NERLDC/2021/4143/F
37 PALATANA-GAS APDCL PALATANA 53760.0000 53760.0000 51792.3840 NERLDC/2021/4144/F
38 BYPL MSPDCL APPCPL 13440.0000 13440.0000 12948.0960 NERLDC/2021/4145/F
39 SEILP2 Nagaland_Ben APPCPL 6350.5150 6350.5150 6118.1779 NERLDC/2021/4146/F
40 SEILP2 Nagaland_Ben APPCPL 241.2800 241.2800 232.1114 NERLDC/2021/4148/D
41 BYPL MePDCL APPCPL 150.0000 150.0000 144.3000 NERLDC/2021/4149/D
42 BYPL MePDCL APPCPL 170.0000 170.0000 163.5400 NERLDC/2021/4150/D
43 BYPL MePDCL APPCPL 170.0000 170.0000 163.5400 NERLDC/2021/4151/D
44 BYPL MePDCL APPCPL 441.2500 441.2500 424.4825 NERLDC/2021/4152/D
45 HARYANA MePDCL KEIPL 441.2500 441.2500 424.4825 NERLDC/2021/4153/D
46 BYPL MePDCL APPCPL 441.2500 441.2500 424.5266 NERLDC/2021/4154/C
47 BYPL MePDCL APPCPL 441.2500 441.2500 424.5266 NERLDC/2021/4155/D
48 BYPL MePDCL APPCPL 441.2500 441.2500 424.5266 NERLDC/2021/4156/D
49 HARYANA MePDCL KEIPL 442.5000 442.5000 425.7293 NERLDC/2021/4157/D
50 HARYANA MePDCL KEIPL 438.7500 438.7500 422.1214 NERLDC/2021/4161/D
51 BYPL MePDCL APPCPL 442.5000 442.5000 425.7293 NERLDC/2021/4162/C
52 BYPL MePDCL APPCPL 355.0000 355.0000 342.4330 NERLDC/2021/4164/D
53 BYPL MePDCL APPCPL 662.5000 662.5000 639.0475 NERLDC/2021/4165/D
54 BYPL MePDCL APPCPL 645.0000 645.0000 622.1670 NERLDC/2021/4166/D
55 BYPL MePDCL APPCPL 407.5000 407.5000 393.1968 NERLDC/2021/4168/C
56 BYPL MePDCL APPCPL 472.5000 472.5000 455.9153 NERLDC/2021/4169/C
57 DBPL MePDCL APPCPL 645.0000 645.0000 622.3605 NERLDC/2021/4171/D
58 DBPL MePDCL APPCPL 645.0000 645.0000 622.3605 NERLDC/2021/4172/D
59 DBPL MePDCL APPCPL 645.0000 645.0000 622.3605 NERLDC/2021/4173/D
60 DBPL MePDCL APPCPL 925.0000 925.0000 892.5325 NERLDC/2021/4175/D
61 DBPL MePDCL APPCPL 1295.0000 1295.0000 1249.5455 NERLDC/2021/4176/D
62 BYPL MePDCL APPCPL 220.0000 220.0000 212.2780 NERLDC/2021/4177/D
63 MePDCL GMHRCMS APPCPL 336.0000 336.0000 323.2100 NR/2021/86665/F
64 MePDCL MSSH APPCPL 376.2300 376.2300 362.7900 NR/2021/86666/F
65 MePDCL AISHER APPCPL 386.4000 386.4000 372.9600 NR/2021/86667/F
66 MePDCL JHPL-DL APPCPL 369.6000 369.6000 356.1600 NR/2021/86668/F
67 MePDCL ABL APPCPL 343.2000 343.2000 329.9200 NR/2021/86697/F
68 MePDCL ERHPL APPCPL 157.9200 157.9200 151.2000 NR/2021/86698/F
69 MePDCL AHCSPL APPCPL 621.6000 621.6000 598.9200 NR/2021/86699/F
70 MePDCL CPIDPL APPCPL 179.7600 179.7600 173.0400 NR/2021/86700/F
71 MePDCL UHL APPCPL 215.0400 215.0400 207.2000 NR/2021/86702/F
72 MePDCL JDPL APPCPL 194.4000 194.4000 187.9200 NR/2021/86774/F
73 BGTPP BRPL IEXL 60.0000 60.0000 57.8800 NR/2021/87246/C
74 MePDCL RGCIRC APPCPL 90.0000 90.0000 86.4000 NR/2021/87259/F
75 BGTPP BRPL IEXL 120.0000 120.0000 115.7600 NR/2021/87269/C
NORTH EASTERN REGIONAL POWER COMMITTEE, SHILLONG
BILATERAL EXCHANGES FOR THE MONTH OF February-2021

B. SHORT TERM OPEN ACCESS (INTER REGION)


Energy at Seller Periphery Energy at NER-ER Periphery Energy at Buyer Periphery
Sr. No. From TO (MWh) (MWh) (MWh)
1 FSTPP I & II Arunachal_Ben 1798.7358 1798.7358 1733.0556
2 FSTPP I & II Assam_Ben 21960.0969 21960.0969 21158.5063
3 FSTPP I & II Mizoram_Ben 1327.4274 1327.4274 1278.9576
4 FSTPP I & II Nagaland_Ben 3634.7434 3634.7434 3501.9778
5 FSTPP-III Assam_Ben 184.8088 184.8088 178.1867
6 KHSTPP-I Arunachal_Ben 741.3897 741.3897 714.2535
7 KHSTPP-I Assam_Ben 8437.9012 8437.9012 8129.1148
8 KHSTPP-I Mizoram_Ben 547.9015 547.9015 527.8466
9 KHSTPP-I Nagaland_Ben 1546.9137 1546.9137 1490.2441
10 KHSTPP-II Assam_Ben 44774.2744 44774.2744 43137.3070
11 MANGDECHU Assam_Ben 13010.4925 13010.4925 12534.1318
12 TSTPP-I Arunachal_Ben 1066.4398 1066.4398 1027.6127
13 TSTPP-I Assam_Ben 11833.6693 11833.6693 11402.8243
14 TSTPP-I Mizoram_Ben 768.0095 768.0095 740.0476
15 TSTPP-I Nagaland_Ben 2219.7399 2219.7399 2138.9622
NORTH EASTERN REGIONAL POWER COMMITTEE, SHILLONG
BILATERAL EXCHANGES FOR THE MONTH OF February-2021

Collective transaction from Power Exchanges (-ve means injection; +ve means drawal)
STOA IEX PXI
Sr. No. Particular Energy at Seller Energy at NER-ER Energy at Buyer Energy at Seller Energy at NER-ER Energy at Buyer Energy at Seller Energy at NER-ER Energy at Buyer
Periphery (MWh) Periphery (MWh) Periphery (MWh) Periphery (MWh) Periphery (MWh) Periphery (MWh) Periphery (MWh) Periphery (MWh) Periphery (MWh)

1 Arunachal_Ben 0.00 0.00 -3704.50 -3704.50 0.00 0.00


2 Arunachal_Ben 10080.00 9711.10 2197.30 2116.82 0.00 0.00
3 Assam_Ben 0.00 0.00 -97595.00 -97595.00 0.00 0.00
4 Assam_Ben 56112.00 54058.34 45545.95 43876.65 0.00 0.00
5 Manipur_Ben 0.00 0.00 -17261.00 -17261.00 0.00 0.00
6 Manipur_Ben 33600.00 32370.24 871.56 839.57 0.00 0.00
7 Meghalaya_Ben -3270.15 -3270.15 0.00 0.00 0.00 0.00
8 Meghalaya_Ben 47449.50 45717.40 7765.79 7482.03 0.00 0.00
9 Mizoram_Ben 0.00 0.00 -3124.50 -3124.50 0.00 0.00
10 Mizoram_Ben 0.00 0.00 0.00 0.00 0.00 0.00
11 Nagaland_Ben 0.00 0.00 -188.25 -188.25 0.00 0.00
12 Nagaland_Ben 6591.79 6350.31 0.00 0.00 0.00 0.00
13 Tripura_Ben 0.00 0.00 -58272.00 -58272.00 0.00 0.00
14 Tripura_Ben 0.00 0.00 15.00 14.47 0.00 0.00
15 AGBPP-GAS 0.00 0.00 -4026.50 -4026.50 0.00 0.00
16 AGTCCPP-GAS 0.00 0.00 -2066.57 -2066.57 0.00 0.00
17 BGTPP -232.00 -232.00 -21043.22 -21043.22 0.00 0.00
18 DOYANG 0.00 0.00 0.00 0.00 0.00 0.00
19 KAMENG -26667.50 -26667.50 -19392.52 -19392.52 0.00 0.00
20 KHANDONG 0.00 0.00 0.00 0.00 0.00 0.00
21 KOPILI 0.00 0.00 0.00 0.00 0.00 0.00
22 KOPILI-2 0.00 0.00 0.00 0.00 0.00 0.00
23 LOKTAK 0.00 0.00 0.00 0.00 0.00 0.00
24 PALATANA-GAS -53760.00 -53760.00 -871.02 -871.02 0.00 0.00
25 PARE 0.00 0.00 0.00 0.00 0.00 0.00
26 RANGANADI 0.00 0.00 0.00 0.00 0.00 0.00
NORTH EASTERN REGIONAL POWER COMMITTEE
URS STATEMENT FOR THE MONTH OF February-2021

Generator Beneficiaries % Share as per REA % Share after URS Adjustment


AGBPP ARUNACHAL PRADESH 5.6940 5.5325
ASSAM 56.5030 56.5022
HVDC BNC 0.0000 0.0000
MANIPUR 8.1050 8.1497
MEGHALAYA 11.8150 11.8826
MIZORAM 5.4100 5.5689
NAGALAND 5.8050 5.8049
TRIPURA 6.6680 6.5592
TOTAL 100.0000 100.0000

Generator Beneficiaries % Share as per REA % Share after URS Adjustment


AGTCCPP ARUNACHAL PRADESH 6.7020 6.5828
ASSAM 43.7200 43.7259
HVDC BNC 0.0000 0.0000
MANIPUR 8.2250 8.3389
MEGHALAYA 12.6330 12.8033
MIZORAM 6.0000 6.0938
NAGALAND 5.7370 5.7374
TRIPURA 16.9830 16.7181
TOTAL 100.0000 100.0000

Generator Beneficiaries % Share as per REA % Share after URS Adjustment


BGTPP ARUNACHAL PRADESH 5.1325 5.0932
ASSAM 57.4200 57.2806
HVDC BNC 0.3300 0.3253
MANIPUR 7.5050 7.5682
MEGHALAYA 11.6500 11.6462
MIZORAM 5.4150 5.7397
NAGALAND 4.9300 4.9302
TRIPURA 7.6175 7.4165
TOTAL 100.0000 100.0000

Generator Beneficiaries % Share as per REA % Share after URS Adjustment


PALATANA ARUNACHAL PRADESH 3.0303 3.0238
ASSAM 33.0579 33.0579
HVDC BNC 0.0000 0.0000
MANIPUR 5.7851 5.7851
MEGHALAYA 10.8815 10.8880
MIZORAM 3.0303 3.0303
NAGALAND 3.7190 3.7190
TRIPURA 26.9972 26.9972
TOTAL 86.5014 86.5014