You are on page 1of 33
SLOPE STABILITY ANALYSIS REPORT for “Preparation of GADs of Station Builds and Rob, Structural Designs ‘of Rob, Minor Bridges, Retaining Walls, Buildings and Slope Stability Analysis at High Bank/Cutting Locations Including Geotechnical Investigation for Manikpur and Baroud Siding of SECL", Client: Indian (CH No. 3000) Port Rall & Ropeway Corporation Ltd, Bhubaneswar PreparedBy: ARCHITECTURE & ENGINEERINGCONSULTANCY SERVICES | (P)LTD.Plot No-91, Unit-9, Bhoinagar, Backside of Sahidnagar Police Station, AECS phubaneswar-751022. J Consultants ‘Slope Stability | Client: Analysis Report, ECS thsaNeswan oc.wo: | aeesyi170 Orpen ores ‘mrcwrecruneaswomeenwa [IDNs [128 daniel Sey 10 20 Tniroduction: Group General Manager, Indian Port Rail and Ropeway Corporation Ltd, Bhubaneswat| has taken up the work of “Preparation of Gads of Station Builds and Rob, Structural Designs of Rob, Minor Bridges, Retaining Walls, Building sand Slope Stability Analysis at High Bank/Cutting Locations including Geotechnical Investigation, For Manikpur And| Baroud Siding Of SECL.” Indian Port Rail and Ropeway Corporation Ltd, Bhubaneswar has ‘given the work to Architecture & Engineering Consultancy Services (P) Ld, Bhubaneswar to carry out the slope stably analysis for cutting slope related to the above| ‘mentioned construction work at chainage ie. Ch.-3000, The geotechrcal Investigation work ‘comprises of slope stability analysis of proposed cutting. From the field & laboratory tests, the| ‘subsoll condition & soll parameters are envisaged and considered for the slope stablty| analysis. [AS per the client's information & drawings, the cutting slope is checked with provided slopes. In the cuting, slope stabilly analysis with pictorial diagrams showing approximate failure surfaces are appended with ths report or ready reference Laboratory Examination and Testing: Laboratory methods in accordance with relevant standard codes of prectices are adopted to| ascertain the diferent essential characteristics of sub-soil using feld samples obtained in Course of filed investigations. The tests as under have been condusted to ascertain the parameters indicated in the test. The finding of these test are required to use in relevant Engineering Design. “The tests 26 under have been conducted to ascertain the parameters indicated in the test. ‘The finding of these test ate used later for stabiy analysis, Name of Project | Preperation OF GADs Of Son Bus hed Rob, Srrual Desars OF Rob ior Bridges, Retaring Wats. Bugs And Sepe Sablty Aoayes A! High Esncuting Leaton cng Geotechnical Inesigsion For Meni Ans 7 Barus Sing OF SEC 7 Consultant: ‘Slope Stability | Client: ‘Analysis Report prcurecrune aznoweznne [JobNos [125 Coraul taney seees ND, sna PetGRpvey laEcs ieaneswa oc.ne: | arcs/1170 ptt ube Table 4: Laboratory tests conducted ‘SLNG.[ Laboratory tests 1S Codes 1 Grain size analysis 1S: 2720(par-4)-1985 (Reslfimmed 2020) Index properties 1S: 2720(par-6)-1985 (Reafimed 2020) Field moisture content 1S: 2720(par-2)-1873 (Resffimmed 2020) 4 ‘Specific gravity |S: 2720(pat-3) (sec-1)-1980 (Reaffrmmed 2021) '5_| Shear strength Parameters | _1S2720(pan-12)-1995 (Restirmed 2021) 6 Free swell index 1S: 2720(par-40}-1077 (Reafrmed 2021) 7 Bulk density = ‘Unconfined Compressive eres 1s 9149-1979 (Reaffrred 2021) 3.0 Ground Water: The depth at which groundwater is struck during boring was carefully noted and the depth of water {able was ascertained subsequent in the completed borehole, ‘+The depth of water table inside the dled hole was measured by a ‘bell sounder’ method as per IS 6936:1973. Ater completion of cing of bore holes upto “he desired depth, the bore hole was thoroughly fished and washed by clean water. At that time care should bo taken to ensure the stably of sides of bore holes. ‘Then bore hole was measured by inceasing the probe of bell sounder with wire and ‘measuring tape, When the bell sounder touched the wate lve, was gave a “Plop' sound ‘and measured the water level by measuring tape attached with it. During dling of bore hole ground water table was investigated and was found as below. Table 1 Depth of ground water table of bore holes hainage | Max depth of exploration | Ground water table Reference om below E.G.) ‘c-3000 420 150 Note: E GL. = Existing Ground Level “Preparalion OT GADS OF Siaton Builds And Reb, Seacural Desens Minor Brages, Retaining Wal, Buldings And Sope SUbity Analyte At High Barw/Cuting Locations Incling GeoTechncal vestgaion For Mankpur ANd Beroud Siding OF SEL” “ae “Name of Project: Consultant: Slope Stability | Client: Analysis Report cSamemmsamenspers, Pettes Pe wey acs Cnitersema | coco: | aatsrze Saran ter ‘40 Properties of Sub-Strata at CH No. - 3000: 4.1. Discussion on the Engineering Properties of Soil & Rock ‘+ From E.G L to 7.5 m depth, twas seen that a medium plastic, low expansive clayey sand ‘stratum exists from which one DS was collected at 0.5 m depth and UDS were collected at 1.5 ‘mand 6.0 m depth. The fleld SPT N values were found to 15 and 23 at 1m, and 4.5 m depth respectively, ‘+ From 7.51 to 8.0 m depth, anon plastic, non expansive sity sand stratun exists from which field SPT N values were found tobe 29 at 7.5 m depth ‘+ From 8.0 mo 85 m depth, highly weathered sand stone mixed with sand stratum exists from hich core samples could not be collected, only washed out samples have been collected Whose fleld SPT N values were found tobe greater than 100, ‘+ From 9.5m to 15.0 m depth, a sand stone core stratum exists from which core samples has ‘been collected, The core recovery was varying from 9.39% to 15.0% and ROD was found to be ‘+ From 16.0 to 18.0 m depth, anon pastic, non expansive sity sand strum exists from which the field SPT N values were found to 25 and 28 at 16.0 m, and 16.5 m depth respectively + From 18.0 to 225m depth was 2oen that a meslium plas, low expansive elaysy 2and ‘stratum exists from which UDS was collected at 19.5 m depth, The field S°T N value was found 040 and 45 at 18,0 m, and 21.0 m depth respectively. ‘+ From 22.5 to 25 5m depth, itwas seen that a medium plastic, low expansive sit and clay with ‘ow compressibility stratum exists from which UDS was collected at 24.0 m depth, The fla ‘SPT N value was found to 45 m depth at 22.5 m depth. ‘+ From 22.5 m to 30.0 m depth, a highly weathered sand stone mixed wit sand stratum exists from which core samples could not be collected, only washed out samples have been collected whose field SPT N values were found tobe greater than 100, ‘+ From 30.0 to 31.5 m depth, itwas seen that a merlum plastic, lw expanse si and clay with low compressibily stratum exss from which the field SPT N value was found to 29 m depth at 30.0 m depth. ss [Namie of Project: | Preparaton OF GADs OF Siaton Buide And Rob, Seca Dens ‘Name of Project: | rpnapes, Rearing Vs, Bans td Sepe Sabily fae A Fag BenkiCutng Locations Including GecTechnical Invesigaton For Manipur Aad Baroud Sing OF SECL” } Consultant: ‘Slope Stability | Client : Analysis Report Somureneesses [eee ant hPa, Wecs reset” | coc ns |ancsr0 Orpen doer ‘From 37-5 0 345m depth, was seen hat a medium plas, low expansive dayey sand ‘stratum exists from which UDS was collected at 33.0 m depth. The feld SPT N value was found 0 36.0 m depth ‘+ From 34.5 m to 26.5 m depth, a highly weathered sand stone mixed with sand stratum exits from which core samples could not be collected, only washed out amples have been collected ‘whose field SPT N values were found tobe greater than 100 ‘+ From 36.5 m to 42.0 m depth, a sand stone core stratum exists fom which core samples has been calected. The core recovery was varying from 38.0 % to 65.0% and RQD were varying from zero to 20.0%. 5.0 Slope stability analysis of cutting: ‘At the ch-3000, the depth of cutng is 30.0 m, the cutting slope 1:15, as pr the drawing provided by the cent ‘As per the RDSO guidelines GE: G-t, the stably of cuting slope has been checked by software GEOS. 6.0 Analysis of cutting using GEOS Software: [As per the provided cross section, the total height of cutting is given a8 many layers, and full height of the cuiting is analyzed by using GEOS, software, The sofware (GEOS) fs used to perform slope stablty analysis (embankments, earth cuts, anchored retahing structures, MSE wals ete). The slip surface is considered as cicular (Bishop, Fellenis / Petterson, Janbu, Morgenstem- Price or Spencer methods) or Polygon 16.1 GEOS Softwa ‘+ In analysis, choose the initial slip surface using the coordinates of the center (x,y) and its radius by clicking onthe interface to enter three pont though which the slip surface passes. ‘+ Incohesive sols rotational sip surfaces occur most often, These are modeled using circular slip surfaces. This surfaces is used to fin the cca areas ofan analyzed slope. For non cohesive sols, an analysis using a polygonal slip surface shoul also be erformed in order 1 very the slope stabity + Alter choosing the intial sip surface, choose “Bishop* asthe analysis method and then set the ‘ype of analysis to “Optimization”. Then perform the actual vericaton by tetng on Analyze" Optimization consists of finding sp surface with the lowest stability -the critical sip, surface. The optimization of circular sip sutace in the slope stabilly program evaluates th ‘Name of Project: | Preparaicn OF GADs OF Staton Buide And: Rab Struc! Desgs OF Rob, ime of Project: | rar brages. Rearing Wns, Betdnp fd Spe Sabiny Saiea Nigh BankiCuting Locations Incuing GeeTechnica!Invesigaion For Mankpur And Baroud Sing OF SEC ns Consultant ‘Slope Stabil Client? Analysis Report ancurecrune azvoneenne [obNo: [125 Coraul taney semees eT, tek frt Pal Rey WECS tigen poc.ne: | aecs/1170 Orrin uber ‘entire slope ands very reliable. This way we will get the same real fora elial slip surface ‘even with intial sip surfaces, + The stabilty analysis for the eriical sip surface using “Bishop” evalustion method is found satisfactory if Factor of safety is found to be greater than 1.4 6.0 CONCLUSION: ‘© The slope stabity analysis has been cari out by considering folowing cases. By Using the| ‘software GeoS for cting slope (H=30.0 m) of Chalange-3000 with cuting slope of 11.5 > CASE-4: Wit fatter the top 6.0 m depth in 1V:2H with 6.0 m berm at that depth and rest (H=24.0m) ofthe depth as per the given cross-section slope in 1V:1.5H, the cutting slope i ‘stable and gives the FOS 1.41 which is greater than the minimum requirement FOS valuet.40, » CASE-2: If we consider the full depth (H=30.0m) of cuting slope as per given cross-section in 1V:1.5H then the cutting slope is not stable, the obtained FOS is determined to be 1:39 Wich is ess than the minimum requirement FOS valuet.40. & Hence the cutting section is stable for the cuting slope of 1V:2H (for ap 6.0 m depth) and| 1V1.5H (rest 30.0 m depth) with respect to the properties of sub gol as mentioned inthis repor. 7.0 SUGGESTION: However, to stable the cutting slope, folowing may be suggested: + Retaieg wa or bin val of appropiate height may be constucted athe to fhe btm peo provera suport tthe vercl dope + Etciv tpn need fo be laken io avert any eventually of gens of eutce water ao te cuting This an be aezampled by prov of catch water rane berm a, + For bale eahing wal GP, GW, SW mater shoukd be ued wih COnm er mesa can te ued opr dipaton of ground water resent bei + am aia sabe constructed at each bem of soe to protect he spe om ramet ana fe oath anage of wate. Calcment in selbe prod fr sutaca nage '* If necessary, soil nailing process may be adopted with geo-net to protect the slope and sultable’} drainage eyes be rod forthe fow of warm th pf he pe ge) +The slope sai canbe ingroved by rng because te ots the pant makes he ol tbe [Name of Project: | Preparson OF GADS OF Satan Bul An RGB STOTT Be OF Reb ae of Projec ‘Minor Bridges, Retaining Walls, Bulidings And Slope Stability Analysis At High Bancuri Lecatansreuing Geese! Inesigaion For Morar 42d i Sting OF SEC Consultant: Slope Stability — | Client. Analysis Report coerscumesarauaeg, peeNe 7b ‘nk oy ie oe Se es 8.0 CLOSURE: Iwas a great pleasure working for this project and performing this Sut-scl investigation and Cutting Slope Stability Analysis for you. Here with we are submiting this report. Please contact us for further service if required ‘Quality Control Division, ‘AECS (P) Ltd, ‘Saheed Nagar, Bhubaneswar. be : eels ra ee Sue | ae scam : 5a Pain “Name of Project: | Preparaion Of GADs OF Satin Buds Ard Rob, Sromual Designs OF Rob] Minor Bridges, Retaining Wal, Buldngs An Slope Swbity Analyte At High Bancuting Locations Incxing GeoTecnnen Investgeton For Mankpur ANd Baroud Sng OF SEC ees Conan Slope Stability | Cian? Analysis Report ARCHITECTURE seNGiNEERING | J00 No. = CONSULTANCY SERVICES [PILTD, dehanPat Rel Remy IAECS ‘rusaneswan | Doc No: ‘AECS/1170 oparatonltd Pubes Appendix-A Bore Log a, |e Baroud Siding OF SEC” - ‘ame of Project: | eprai OT GAGs Of Gato bls Aa Rob Saal DOF fe Ihe Bras Renny Wi Bogs fo Sep Sonn, Rae WF Senco Laer ey Got mtn or Monaro cane ope Saya Fp =e oe ears =F | Ay SEE on (Gd ee ‘ tds ‘ i TAL = le HAETE a ti ‘ya alt 3 3 i sulle dsl i UG Hil Lal bt hig “Naame of Project: | Peptaon OT GADe OF Sati Bais Fa Fes Sasa er is Iino Brags, Retaring Wals, Buldngs And Slope Sobity toh Bark/Cuting Locatens Including GeoTechncalInvestgeton For Manipur And ‘Batu Siig OF SECU” 4 Consuftant: Slope Stability | Client: Analysis Report Soermureemeeoes, pete A ‘aR pty eee ee fee to utr Cont. A i is “Piparaion OF GADS OF Station Buids Ard Rb, Shusural Of ‘Name of Project: | rer eges, Rearing Vials linge And Spe SDI) ih Barw/Cuting Locatens Including GeoTechncal ivestgaion For Manu And Beroud Siding OF SEL” =z Coane Slope Stability | Cini Analysis Report Sa RS oS any Lees ein [oocnn [assre (BOY mantis Appendix-B Laboratory Test Results “Name of Project | "Beparaion OT GADS OF Slaton Guide Ard Rob. Swutural Deere’ OF Rob Minor Bridges, Retaining Wals, Bulings And Slope Sabliy Anayss At High BankCuttng Locatons Including GeoTectncalInvesigeton For Menikour And Baroud Sing OF SE Consultan Slope Stability | Client: Analysis Report ‘ancnnecrune sewonecrwe [lo>Noz [128 Dae ees ne aoc ae ‘Name of Project: “Preparation OF GADE Of Siaton Buide And ROb, Stuur Designs OF RSE, |” Iinor Bridges, Retaiing Wals, Buldings And Slope Sbbity Avayis At Hh BanCuting Locatons Including GeoTectncal vestgaton For Manipur ANd Borous Siding OF SEL” “Tie Consultant “Slope Stability] cient Analysis Report ‘ancwrecrune aewowcena [IDN0: [128 ttaney semees TD, ‘kn Pet Fal Rposey ECS ThSANESWAR. oc.wo: | aBcsyii70 rr Butera ‘ABORATORY TEST RESULT OF CH30H0 ‘Name of Project: {Repu OF GAD OF San ‘Rob, Stuaura Design’ OF Rob, Retaring Wals, ies “Ans Slope Stbity Analyt At High amicutg Location ncag GesTachncal mectgen For Mankou Aed Beroud Siding OF SECL™ —— Conan Slope Stabity | Cen Analysis Report Saaieraneerats, pS — tenho Fes me iene oc: [awcsnive [(Qie) pratt nna ‘Remarks: As per table~2 of RC: 78-2014 : EL [___orermeck | Unantnd Conprathe Serg(UE8) a 7 /BirneSeon 770 z ‘Very Strong — 100 to 200 3 Seong 1 +) woaeta sean 5.50 5) Not Weak sees 5 Wear asm sn [Name of Project: | Pieeaaion OF GADS OF Sision Buds And Reb, Sisal Desig Minor Bridges, Retaiing Wats, Buldnge Ané Slope Sbblty Analysis Bank(Cuting Locstons Including GeoTechneal Investgcion For Mankpur Barous Sising OF SE ee — Conan ‘Slope Stability [Gia Analysis Report coaasemaremeeres, (Ae tent ey es ERE noc [ance Cpwatint Buarever ‘a or ‘wom ee VG; Glee (ame of Project: | Preparation Of GADs OF Station Bulls And Rob, Stustural Designs OF Rab, Name of Project: | rer enages,Retanng Wats. Buns Md Sepe Suny hraiue A Fah Bank/Cuting Lecatons incusing GeoTechnical ivestgaton For Mamkpur Aad Beroud Siding OF SEL” aT cy Slope Stabiity | Cio Aah Reger (A sseemueres Pt rehome ees eta [noc [acevo (CQO) cain err Appendix-C Calculation of Slope Stabi ‘Name of Project: “Prepralion OT GAD OF Slaton Bulls And Rob, Seusural Deans OF Rob, Minor Bridges. Retaining Wal, Buldings And Sope Stabity_ Analysis At High | Baw/Cuting Locations Inclaing GeoTechnical Invesigton For Manipur Axa Boud Siding OF SEC.” “se Contant Slope Stability | Caet> Analysis Report ‘omecrcammnetnns [EbAe [a8 Pt a geny ecs omnattaatettse®* [noc nas [acsuvo Cpt deer ‘CROSS SECTION Gow) s “Name of Project: | Prepataion OF GADs OF Siaion Builds Ard Rob Stodral Designs OF Rob] Minor Braye, Retarng Wat, Buldgs Ao Sipe Stay ars A High BasiCuting Loctore Induding Gaotecca Ivesignten Fer Ment fo Barous Siding Of SECL " 7 ae Consultants ‘Slope Stability Analysis Report Client a De Setascncsevonernve [one Za, RE oc ‘zcs/1370 ‘aie Pr a apeay rate boner Slope stability analysis Input data (epoca ah) ‘tabi onatsis Earpauake anaes ‘emo mataciogy Say cos (ASO) Baroud Siang OF ECL” "Praparaion OF GADE OF Siaion Buia And Rob, Shusural Dasigné Minor Bridges, Retaining Wals, Buldings Ard! Slope Stubity Anais AL BeniiCuttrg Locators nung GeoTechnesl vestigation For Manipur i Consultant ‘Slope Stability | Client Analysis Report emeeereamenremne, Pt Tr aay IXECS ‘rusaesvan "| poc.no: | aBcsysx70 ‘open kee merce tention Sora aT TRAASES POAT 302 aB0 F040 7 4 clayey sand a 5 sane ay wn ow compesesity sho ‘490 a0 teat © tery weathered sana stone Co 4 clay sand + 2120 “Name of Project: “Praparaion OF GAs OF Staion Buide And: Rab, Srusural Designs OF Rob. Minor Bridges. Retaining Was, Bulngs Ana Slope Stbity Anaiyess At High ‘BentiCuting Locahors Inuding GoTechnical ivestgaton For Mankovr Ana ‘Baro Sting OF SECL” ‘Slope Stal Ghent Analy J — Indian Port Rail & Rapeway i i : eer ley ih ow compenty © at weanered sn stone + & 7 yey sana 00 rey ‘Name of Project: | BanuCuting Lacstone Induing GesTecnca Ivesignon For Manipur A Sard Sig OF SECC: va ar Barous Siang OF SECL” | Preparation OF GADE OF Siaton Buide And Reb, Siudural Designs Minor Bridges, Retaining Wal, Buidngs Ard! Slope Stity Analy At BarW/Cutteg Locators Incudng GeoTechrical investiga For Mankpur APG Cosa ‘Slope Stability] Ciant Analysis Report A. stirs P= amy acs MMSE Looe nas | aecsiza tape eer = Sa TR TAT AT coyey sana? Sate tress Cometic: ‘Slope Stability | Client. Analysis Report eee | waaay oes AEE icc nee [GOD Sr 2 ae ee = he aon se area eee Results (tage of construction 1) sot = a re a= 30m z= 4994065 (mj eee ee ene ate oe Tp SS ERNST Ro wm Eimotpear on: Fo= Se? te Stange es eet neo Pacers came" ‘Slope stay ACCEPTABLE ‘ane of Pre: | Porn ADs OY Sara Ra oa ope SO eae ae a pace See a a Sela tere ar cn re A Baroud Sing O1SECL ose anes Consultants Slope Stability | Caent= Analysis Report Sesrsaarsemeas ete, nfo py ees meister [noc was [awcsrive [CGE prac rr Appendix-D "Name of Project: | Prepsralon OF GADs OF Staion Buide And Rab, Sueur Desges OF RB | Minor Bridges, Retaining Wats, Busdings And Slope Stslty Anais At High BankiCuttrg Locations Incluing GeoTechacel Investigation For Mansxpur And Baroud Sag OF SECL™ Grain Size Distribution Curve “ie Consultants ‘Slope Stability | Chent= Analysis Report a -ancrarecrune aenaneenive [0b No: 128 SlatCtaney semees PID, ian Prt al & Bperny ECs THUGRNESNAR. oc.Ne: | aecs/1170 agua Bhabaesear GRAIN SIZE DISTRIBUTION CURVES OF BRNO-30™), o 5, -wism 20m Constant ‘Slope Stability] Clent= Analysis Report mmo [bNos [28 mgs poration taanesnar ahusnvesnae "| poc.No: | ascs/1i70 |AECS Appendix-E Graphical Representation of Shear Strength Parameters (GEE “Proparaion OF GADE OF Staion Builds And Rab, Stuaural Designs OF Rob, Minor Bridges, Retaring Walls, Bulngs And Slopo Sicily Araiyas At High [BankiCuting Lecatens incuding GeoTechnical lvestgaton For Mani Ang Name of Project: ‘aroud Sing OF SECU aT Consultant ‘Slope Stability] Cient Analysis Report A comgunesa = sd Pata geay | fee enn |oc nas awsrire [CGD Sat ee (CHMosow, perro rf cot tenga Y 2 8 \ 6 ‘SHEAR STRESS ( Kg/Sq am) —> ” 8 3 NORMAL STRESS (KgiSqom) —> [Name of Project: | ‘Brean OF SADs Of Sabon Bae ‘Designs OF Rob rr Oren Retararg ils Bangs Hrd Spo Say Arayes A igh | | Baicuane Lcstone mang GecTachicl metgaton For Wank ANS L | Barovs Sting OFSECL” 57 Casta Siope Stability | Ter Analysis Report AL soins = nn tat ty cs atta” [voc ne: [awcsui0 [($) mm etre canon per co¥ email gen & ‘SHEAR STRESS ( Kg/Sqem) —> ee 0001 02 08 O04 08 NORMAL STRESS ( Kg/Sq.cm) —> a paraion OF GADs OF Staten Builds ‘Siraural Designs OF Rob Minor Bridges, Retaring Walls, Bullngs And Slopo Stbily Aalyis Al Hoh BanlCutteg Locators Incudng GeoTechricalInvestgaion For Mankpur ANG Baroud Sring Of SECL Name of Project % Conant Slope Stability Ut Apatreis Report oe ‘not a ery | Leis REE Yoocnns [anor (GE treme tre 8 2 S SHEAR STRESS ( Kg/Sq om) —> 9 0.05 01 02 03 04 | CH Nose, pEeTE 198 coal Sacm NORMAL STRESS ( Kg'Sq em) —> Preparation OF GADs OF Staion Builds And Rob, Studural Desgné OF Rob, Miner Bridges, Retring Walls, Burs And Slope Stbily Analysis At Heh BanidCutteg Locatons Indus GeoTechnical Imestgaion For Manipur AP Barous Siig OF SEC aT Consaant Slope Stability] cient Analysis Report a ‘nar Pr fa ageey acs etiadetie "Toc nae [aecsruze (wat ier (cuno-s6e, neeTu- 240M ote sem é g20 E aoe gt ey & 101 20 7 ae NORMAL STRESS ( Ko/Sqem) —> reparation OF GADs OF Slaton Buide And Rab, Sil Dasigns OF Rcb, Minor Bdge5, Retaining Wal, Bulings Ard Slope Staaty Analys At Hh BankiCuting Lacatone Incuding GeoTecnnialInvestigaion For Menke Ana Barood Sing O'S 382 Consultant: ‘Slope Stability _ | Client Analysis Report AL sagenenerees ‘hn Pt Pa geny acs manta” [oc no: [atcsre Cpa i rer ‘cuLNo-inpurru 3.0 ‘sar conte’ sqen fe ar ‘SHEAR STRESS ( Kg/Sqem) —> os oe NORMAL STRESS ( Kg/Sq.em) —> [ Name of Praject: [nto 0 Ss Sar, ae AED, SEY Ray nor Bridge, Retaining Wal, Buldings And Slope Stoaty Analysis At High | Saecunng Locstons sung Geotechnica Ivestpaon For Monkgu Ar | Berous Sing OF SECL” “397 Consaant Cents Analysis Report Serene yes, [2 — ‘oP agony ewe oo | mcsrniv0 ‘nar Lees poco: [aes Ct Appendix-F Cross-section [Nam ject | Repaaion Of GADE Of Sia, Bus Ae ab, Saal Das OF Name of Project: | ive rages, Rersrng Vien. Bulcngs And Spe Seb Araya At Hick Bawcutng Locate Incuang Geotesic Ivesigaon Fer Menkpur Ard | Baud Seong OF SECL” 3 Connon Slope Stability] iene Analysis Report Samgesunereen, (a Pt gery ees metieintee acces [ance wate iar | i | i | £ | { | , z i i \ So So 8 O) TTT, x 4 J Go alg | Name of Project: | Preparsion OF GADs OF Station Bulds Ard Reb, Studural Designs Of Rob, irr Oops, raring Vs, Blane tn Spe Sey frais A Hk EtrivcutngLacstors cud ooTecneal Pecgetn Fr Mange Ros Sree Solgorsee: Se Consultant ‘Slope Stability] lent Analysis Report ‘mowecrunesmoncenne [DobN: [128 covatttiner semaees r nin Prt ait gery ECS aman Tnoc.Nos | ancsz70 cin i Bacar ‘CROES SECTION AFTER FLATTENNG OFTHE CUTTING SLOPE EASE) EEELEBEEELEE E : | uD AMES | reparation OF GADE OF Siatan Bulls And Rob, Siusizal De ae iors OF g ‘Minar Brages, Retaning Walls, Buldings And Spo Stabity Analyse At Hi z i 3 Bani/Cuting Locators Inctdng GesTecwcal Inetigaion For Mank Beroud Seing OF SECL” aa =

You might also like