Professional Documents
Culture Documents
EG QP With Solution 22-23 Sem1 Backlog Paper
EG QP With Solution 22-23 Sem1 Backlog Paper
of Questions: 8]
SEATNo.
ITotal No. of Pages: 3
PA-4293
5924-2
F.E.Theory)
ENGINEERING GRAPHICS
(2019 Pattern) (Semester I/II) (102012)
Time:2h Hours IMax. Marks : 50
Instructions to thetdndidaies:
1)SotveIor2. 03 or Q4, Q5 or Q6, 07 or Q8.
2) Asspee suitable data, if necessary.
3) Retail allthë construction lines.
Q1) The throw of a ball from a fielder on a cricket groung reaches the wicket-
and
keeper'Sgloves, following a parabolie path. Assume the point of throw
the point of catch to be I meter above the ground.Maximum height achieved
by the ball above the ground is 31 m. Draw the path of the ball if the radial"
distance between the fielder and the-wicket-keeper is 75 m. Use suitable
scale. [8
OR
02) Draw helix of one convoláion around a cylinder when its diameter
a
OR
PT.O.
first angle method of
L4) Figure shows a pictorial view of an object. By using
section P-Q looking in the
projection draw. Sectional Front View along
dimensions in all views. [16]
direction of X, Top View and RHSVAGive
020 LES
EGPO3
GPO R3t-
149.210
100
030 R22
18
80 40 15
RHSV FV
OR
59241-2 2
mcthod ol
6) Figure show orthographic views of ar bject by first angle
161
projection. Draw its isometric view and give all the dimensions
30
R15
1 100
50
30
OR
|covec Marks
2
[8) [8]
[Marks Marks:
C
D
Q4 Q3
OR
not
Line Correct
RHSVAMarks
Correct Correct 16
Marks:
Work
Correct
Line Correct
TVAarks 6 Marks: 16
Correct
Marks
iV.4
TV:é4Marks
Sectional
+ Work
Diuhensions LHSV;
FV:6 +
Dinensions 4
) Marks Marks
Marks
[16] [16]
Marks
2
Q7 |10]
|16] 10 Marks:
Initial Position + Dimensions: 3 Marks
26 Marking correct points: 4 Marks
O30
Soln. P25 Joining points for DLS: 3 Marks
Bjoclk
Lsoinetne
Dnssim 15
4070
80
16 Marks:
Completion of Front Surface: 4 Marks, Complction of Right Surface: 4 Marks
Dimensions: 4 Marks
Completion of Top Surface: 4 Marks, Connection of three surfac:s + OR
OR
(10]
08
06 |16]
Bloc-g 16 Marks:
Completion of Front Surface: 4Marks
Completion of Top Surface: 4 Marks 10 Marks:
Completion of Left Surface: 4 Marks Initial Position + Dimensions: 4 Marks
Conncction of three surfaces +
Dimensions: 4 Marks Marking correct points: 3 Marks
Joining points for DLS: 3 Marks
pasiten
3
ore dra - give ooy