2023 07 25 - Daily Report - PT - Jel
2023 07 25 - Daily Report - PT - Jel
Subcontractor : PT. JURONG ENGINEERING LESTARI Report No : 7:00 18:00 1:00 Rest = 1H
Work Activity : FIT-UP, WELDING, WRAPPING & HOLIDAY TEST, POST Today Work : 10:00 Hour
INDICATOR VALVE INSTALLATION AND WRAPPING
1. WORK DESCRIPTION
Korea Local Non- Foreigner Previ. Today Accum. Korea Local Non- Foreigner Previ. Today Accum.
No Direct Local No Direct Local
M F M F M F M F M F M F M F M F M F M F M F M F M F M F
12 28 -
13 - - 74 - - - - - 27,505 - 74 - 27,579 -
4. EQUIPMENT (ED)
No Item Capacity Unit Previ. Today Accum. No Item Capacity Unit Preavi Today Accum.
1 CRAWLER CRANE 180T Unit 198 0 198 11 MOBILE CRANE 200 TON 60 0 60
2 TRUCK MOUNTER CRANE 10T Unit 285 1 286 12
3 HILUX - PICKUP 1 Unit 300 1 301 13
4 SUMP PUMP 2 INCH 1025 2 1,027 14
5 GENERATOR SET 25 KVA 445 1 446 15
6 GENERATOR SET 150 KVA 309 1 310 16
7 DRY OVEN 50 KG 544 2 546 17
8 DRY OVEN 100 KG 401 2 403 18
9 GENERATOR SET 300 KVA 291 1 292
Total 4,100 12 4,112
10 MOBILE CRANE 50 TON 242 1 243
5. QUANTITY
NO Description Total Quantity Unit Previous Today Acum Plan Tomorrow Progress % Remarks
AREA 101 / 6" ; AREA 102 / 4" , 6" ; AREA 104 / 16", 46" ; AREA 105 / 6" ; AREA 106 /
1 FIT UP 39,092 DI 40,475 96 40,571 58 103.78% 6"
CW 9,059 DI 9,444 0 9,444 0 104.25%
SW 13,456 DI 12,824 46 12,870 0 95.65%
FW 5,154 DI 4,762 34 4,796 0 93.05%
OTHER 11,423 DI 13,445 16 13,461 58 117.84%
2 WELDING 39,092 DI 39,302 52 39,354 72 100.67% AREA 101 / 6" ; AREA 103 / 4" ; AREA 104 / 30" ; AREA 106 / 6"
3 WRAPPING 39,092 DI 30,653 152 30,805 152 78.80% AREA 103 / 4", 20", 24" ; AREA 106 / 4"
TOTAL
TEMPERATURE (℃)
7:00 - 8:00
8:00 - 9:00
9:00 - 10:00
10:00 - 11:00 D
A
11:00 - 12:00 Y
12:00 - 13:00
13:00 - 14:00 O
F
14:00 - 15:00 F
15:00 - 16:00
16:00 - 17:00
17:00 - 18:00
18:00 - 19:00
19:00 - 20:00
20:00 - 21:00
21:00 - 22:00
22:00 - 23:00
23:00 - 23:59
0:00 - 1:00
1:00 - 2:00
2:00 - 3:00
3:00 - 4:00
4:00 - 5:00
5:00 - 6:00
6:00 - 7:00
Weather
Heavy Rain
Rain
Cloudy
PROJECT : LOTTE INDONESIA NEW ETHYLENE COMPLEX Project
DATE : July 25, 2023
HOLIDAY TEST ACTIVITY LINE 1U31-CWR-90012-02 JOINT NO.10 HOLIDAY TEST ACTIVITY 1U31-OWS-90303-01 JOINT NO 2,3,4,5,6,7