Professional Documents
Culture Documents
For Publication - GPN - Gis Substations Project 14.07.2023
For Publication - GPN - Gis Substations Project 14.07.2023
Republic of Mauritius
Gas Insulated Switchgear Substations Project
1. The Central Electricity Board has received a loan from the African Development Bank to
finance the Gas Insulated Switchgear (GIS) Substations Project.
Undertake the necessary network expansion investments that will enhance the reliability of the
Mauritius national grid and permit the installation, interconnection, and absorption by the
national power system of the envisaged additional renewable energy (RE) generating facilities.
This is in alignment with the Government of Mauritius’s ambitious target of integrating 60% of
RE in the energy mix by 2030. Accordingly, the implementation of the project will enhance
system reliability and stability whilst permitting the expansion and connection of endogenous RE
that in turn would allow the displacement of power generation based on imported thermal energy.
These would be the main benefits of the project by allowing Mauritius to continue its path of
energy transition in the direction of integrating 60% of RE in the electricity generation mix by
2030.
Procurement of Works shall be done using the Open Competitive Bidding-International (OCB-I)
method. The acquisition of Consulting Services for the Supervising Engineer shall be done
through Single Source Selection method.
4. Procurement of Works and the acquisition of Consulting Services will be in accordance with
the Procurement Policy for Bank Group Funded Operations dated October 2015 and following
the provisions stated in the Financing Agreement. Bidding documents are expected to be
available in July 2023.
5. Interested bidders may obtain further information, and should confirm their interest, by
contacting:
Attn: Chairman Tender Committee
Central Electricity Board
PO Box 134 Rue du Savoir,
Ebene Cybercity
Ebene 72201 Mauritius
+230 404-2000
ctc@ceb.intnet.mu