Sl KPA Status Reason for Activities & Targets Revised Revised

No review Measures / Weightage


Indicators
01 Turnover and On Going Following A. Realisation of RITES fee from following clients Realisation of 15
realisation of fees transfer from are in progress. RITES Fee and
HWD/Kolkata 1. Liasion with client MCL for realisation of RITES securing New
to Fee bill projects
ECRPO/Talcher 2. Visited various upcoming projects of
MCL/NTPC like TTPS and Hingula Silo
02 Project Specific Field 1. As CSE for Handidhua ROB and Bhubaneswari Field & office work 15
work/Design/Drawings Ph-2, assigned the work of site supervision, to be done
checking & Billing
2. Checked the design as submitted by
contractor for the above work and drawing
received from HQ
3. Involved in design mix and testing of cement,
reinforcement and concrete
03 Project specific reports 1. Prepared daily, weekly and monthly progress Progress Report 10
and Documentation reports for the above two projects preparation and
2.Prepared site appreciation report for the TTPS documentation for
during tendering stage billing purpose
3. Certify the quantity for contractor running
account bills
04 Management of 1. As Project Engineer, helped MCL in contract Help in Contract 10
Contracts with Clients management for Handidhua ROB work. Management,
and sub-consultants 2. As Project Engineer, helped Project co- Outsoucing and
engaged for coordinator in contract management for GEM operation
outsourcing activities, Bhubaneswari Ph-2 work.
including procurement 3. helped in procurement of monthly vehicle
from GEM through GEM
05 Shouldering additional Apart from project engineer’s responsibility Other work apart 5
Responsibility 1. Assisted in Topo survey, Soil investigation work from civil Work
for TTPS
2. Assisted in securing tender for TTPS from NTPC
3. Responsible for office maintenance at Talcher