1 2.46 2.439 2.471 2.455 0.963 4.9 0.809 -0.500 0.348 22m 17.62 32.2 PSC T beam
2 3.5 3.486 3.547 3.516 1.683(assumed) 5.6 0.8 -0.28 0.638 49m 18.5 16.6+24.6+16.6 RCC T Beam
4.962 4.990 1.683 8.6(Road -0.65 0.111 5.274,3.373,-0.726 16m 5*24.6+1*24.6(nala)+18.6+12.58(road) RCC T Beam
3 4.833 5.147 location) +24.6*3+18.6+18.6(nala)+24.6
5.17 2.067 1.534 10m 25.7
66m(includin
4 7.27 7.241 7.299 7.270 2.511 6.3 -0.108 1.764 4.679,3.95,### g both side 27 18.6+24.6+14.166 RCC T Beam
road)
5 11.43 11.422 11.444 11.433 2.194 5.6 2.1 -1.226 ###,2.449,-1.554 18m 21.6 RCC T Beam
6 12.04 12.028 12.045 12.037 2.194(assumed) 5.2 1.8 0.262 10m 16.6 RCC T Beam
7 15.35 15.341 15.358 15.349 1.435 4.5 0.75 0.195 8.5m 16.60 RCC T Beam
8 16.5 16.468 16.536 16.502 1.233 5.1 0.8 -1.892 60.m 21.6 21.6+24.6+21.6 RCC T Beam
9 17.5 17.499 17.515 17.507 1.575 4.5 1.034 -1.072 2.502,,###,-0.772 13.5m 16.6 RCC T Beam
Structure List (from Bifurcation point to GATE-1)
10 0.45 0.427 0.484 0.455 1.295 5.1 0.5 -0.366 50m 7 16.6+24.6+16.6 RCC T Beam
11 1.55 1.547 1.563 1.555 0.953 4.5 0.7 -0.223 13m 16 16.6 RCC T Beam
Structure List (from Bifurcation point to GATE-2)
46m(nala+ro
12 2.5 2.431 2.488 2.459 2.069 5.8 0.8 -1.491 19.15 16.6+24.6+16.6 RCC T Beam
ad)
12.58+24.6*5+14.6+12.58(Road)
8.6(Bridge RCC T Beam+RCC Solid
13 3.7 3.604 3.739 3.671 1.875 and Road) 0.685 -1 48m 30 +14.6+14.6(River)+24.6(River) Slab
+14.6(River)+24.6*4+12.58
Bridge List as per available survey data from New Horizon
Approax
Br No. Chainage Proposed span(c/c of exp gap) Type of structure
8*32.242(viaduct)+63.5+9*32.242
ROB 1.45 PSC T beam+Bow String
viaduct
0.6
12 2.5 16.6+24.6+16.6 RCC T Beam
3.2
15 3.4 12.58 RCC Solid Slab
12.58+24.6*5+14.6+12.58(Road)
13 3.7 +14.6+14.6(River)+24.6(River) RCC T Beam+RCC Solid Slab
+14.6(River)+24.6*4+12.58