NAME OF WORK :- Construction of bridge over Dhal Nallah on Bhamber Dodan Bali road At KM 2/055
(Rocker side)
SPAN :- 12.2 Mtr.
TYPE :- Single lane PSC RCC T-Beam
DECK LEVEL :- 1094 Mtr.
CLEAR CARRIAGEWAY :- 4.25 Mtr.
H.F.L. :- 1090.50 Mtr.
L.W.L. :- 1088.8 Mtr.
M.S.L. :- 1085.12 Mtr.
FOUNDING LEVEL :- 1083 Mtr.
SAFE BEARING CAPACITY:- 25 T/M2
INPUT DATA :-
Grade of conc. = M15
L* 5.15 Sup.Str.DL.React(t) 43.00
B* 7.1 MAX. L.L(t) 30.62
H* 11 Min L.L. (t) 12.58
h1* 1.2 Hmax(normal) (t) 6.91
….1….
OUTPUT DATA :-
….2….
STAB.Mt./OVT.Mt.
W 708.3868867 FOS (OVT) 3.932811 >2.00 u*W/H
H 167.4035293 FOS (SLD) 2.115806 >1.50
REST. Mt. 3281.906102 BASE PRESSURES :- Net. Mt/W
OVT. Mt. 834.493802 z 3.454909 B/2-z
NET Mt. 2447.4123 e 0.095091 W/A(1+6*e/B)+6*Mt/B*L^2
P1(T/M2) 21.74 W/A(1-6*e/B)-6*Mt/B*L^2
P2(T/M2) 17.01
MIN. LL CASE :-
W 690.3468867 FOS(OVT) 3.91 >2.00
H 166.0435293 FOS (SLD) 2.08 >1.50
REST. Mt. 3213.750982 BASE PRESSURES:-
OVT. Mt. 821.165802 z 3.465772
NET Mt. 2392.58518 e 0.084228
P1(T/M2) 20.55
P2(T/M2) 17.21
SEISMIC CASE
MAX. LL. CASE: (+ve down) (-ve upward.) FOS(OVT) 2.78 2.48 >1.50
W 730.8240512 685.9497221 FOS(SLD) 1.65 1.55 >1.25
H 220.9378585 220.9378585 Base Pressures:-
REST. Mt. 3387.313974 3281.906102 z 2.965297 2.8519507
OVT. Mt. 1220.203454 1325.611326 e 0.584703 0.6980493
NET Mt. 2167.11052 1956.294776 P1(T/M2) 30.19 30.16
P2(T/M2) 9.78 7.36
MIN. LL CASE: -(+ve down ) (-ve upward)
W
H FOS(OVT) 2.82 2.51 >1.50
RES. Mt. 712.7840512 667.9097221 FOS(SLD) 1.65 1.54 >1.25
OVT. Mt. 216.5078585 216.5078585 Base Pressures:-
NET Mt. 3319.158854 3213.750982 z 3.005636 2.8919382
1176.789454 1282.197326 e 0.544364 0.6580618
2142.3694 1931.553656 P1(T/M2) 28.79 28.76
P2(T/M2) 10.2 7.78
SEISMIC CASE:-
(+ve down) (- ve upward.)
W 645.9956461 605.421317 FOS(OVT) 3.501052 3.0471267 >1.50
H 172.3227487 172.3227487 FOS(SLD) 1.874377 1.7566494 >1.25
RES Mt 3036.740237 2939.455065 Base Pressures:-
OVT Mt 867.3793501 964.6645222 z 3.358166 3.2618451
NET Mt 2169.360887 1974.790543 e 0.191834 0.2881549
P1(T/M2) 20.53 20.59
P2 (T/M2) 14.8 12.53
….3….
SEISMIC CASE.:-
Max LL CASE:-(+ve) (-ve) STRESSES:-
W 533.5906543 488.7163251 z 1.390425 1.1043256
H 161.3244207 161.3244207 e 1.159575 1.4456744
REST. Mt. 1419.480707 1318.372835 P1(T/M2) 49.15 51.37
OVT. Mt. 677.5630041 778.6708761 P2(T/M2) -8.52 -14.16
NET Mt. 741.9177026 539.7019585
….4….
11 H*
7 h3* H.F.L. 1090.50
4
L.W.L. 1088.80
6
M.S.L. 1085.12
5
1085.50
12
11
2 b5*
13 Founding Level
0.5 h4 1083.00
3.78
b1 b2 b3 b4 b5
2.70 0.3 1.2 0.90 2
B*
7.10
L1 L1*
0.475 0.475
0.356 h6
8
10 8
10
h5* h5-h6*
8.5 8.144
11 H*
14 7
7
9
9
h4+b5*
2.5
L1* L2 L2 L1*
0.475 1.75 0.7 1.75 0.475
L
5.15
AT BASE:-
SEISMIC
P2 P1 P2
Max.LL 17.01 30.19 9.78
30.16 7.36
Min LL 17.21 28.79 10.2
28.76 7.78
Span 19.64 20.53 14.8
Dislodge 20.59 12.53
SAFE SAFE SAFE
AT M.S.L:-
Max.LL. -0.06 49.15 -8.52
51.37 -14.16
Min. LL. 0.98 44.36 -5.1
48.06 -12.16
Span 6.23 32.33 2
Dislodge 34.87 -3.63
SAFE SAFE SAFE
-14.16
Direct compressive stress
M15for 3.75 Mpa
allow. comp.stress T/ Sqm
allow. Tensile stress T/ Sqm
Y1 Y2 Y3 Y4 X Y1 Y2 Y3 Y4
T
Y1 Y2 Y3 Y4 X Y1 Y2 Y3 Y4
21.74 17.01 3.932811 2.115806 T 30.19 9.78 2.78 1.65
20.55 17.21 3.91 2.08 T 30.16 7.36 2.48 1.55
14.58 19.64 4.829247 2.374634 T 28.79 10.2 2.82 1.65
21.74 17.01 3.91 2.08 T 28.76 7.78 2.51 1.54
T 20.53 14.8 3.501052 1.874377
Y1 Y2
Y1 Y2
38.98 -0.06 X Y1 Y2
36.57 0.98 T
26.56 6.23
38.98 -0.06 X Y1 Y2
T 49.15 -8.52
T 51.37 -14.16
T 44.36 -5.1
T 48.06 -12.16
T 32.33 2
T 34.87 -3.63
51.37 -14.16