You are on page 1of 1

Check List

Essential Information for Design of Hatimara Underpass


1. Location of the Underpass
(a) Zone/Circle/Division: Munshiganj Road Division.
(b) Name of the Road with Road No: Jatirpita Bongobondhu Sheikh Mujibur Rahman Road (N-8:Expressway)
(c) Name of Link Road with Link No (if any):
(d) Chainage/LRP: 4+416m
(e) Global positioning:
(i) Latitude: 243342.7694
(ii) Longitude: 2606268.4653
(iii) Google map link location: 23.5465039, 90.4856008
(f) Is the proposed Underpass located in a flash flood prone area (Yes/No). If yes, describe the nature of flash
flood: No
(g) Haor area (Yes/No): No
(h) Tidal area (Yes/No): No
2. Reference Bench Mark or datum (preferably PWD/SoB/any other suitable reference): SOB BM RL= 5.2104m
3. Cross-section of channel with chainage (at least one cross section at center line with reduced level of
channel/river bed taken at 1.50 m interval: Attached
4. Plane table map:
a) Plane table survey map of the proposed Underpass location: Attached
b) Show the location of cross road/channel/structures etc. on the plane table map falling at the approach of the
proposed Underpass (if any): Attached.
5. Is there any navigational requirement for the proposed Underpass (Yes/No). If yes, provide vertical and
horizontal clearance for the proposed Underpass: No
6. Hydrological data (with respect to meter PWD/SoB/any other suitable Bench mark)
(a) HFL: 4.815
(b) LWL: NA
(c) SHWL: NA
(d) HTL (where applicable): NA
(e) LTL (where applicable): NA

7. Information about existing Underpass (if any):


(a) Basic data:
Sl. No. Length of Total Length Height Width Top Slab Side Wall Remarks
No. of Each Vent (m) (m) (m) Thickness Thickness
Vent (m) (mm) (mm)
(i) (ii) (iii) (iv)=(ii)x(iii) (v) (vi) (vii) (viii) (ix)
- - - - - - - - -
(b) Photo(s) of existing Underpass (if any): Attached
(i) View from road side (from both ends): Attached
(ii) View from channel side (from both ends): Attached
(iii) Image of damaged portions (if any):N/A
(c) Description of the present condition of existing Underpass (if any): NA
8. Alignment of proposed Underpass (on existing alignment/up-stream/down-stream): Existing
9. Information about proposed Underpass:
Sl. No. of Length of Total Length Height Width Remarks
No. Vent Each Vent (m) (m) (m)
(m)
(i) (ii) (iii) (iv)=(ii)x(iii) (v) (vi) (vii)
1 2 8.00 16.00 5.00 7.30

N.B. All data and information must be signed/countersigned by concerned Authority.

Sub-Assistant Engineer, RHD Sub-Divisional Engineer, RHD Executive Engineer, RHD


Road Sub-Division,Munshiganj. Road Sub-Division, Munshiganj. Road Division, Munshiganj.