You are on page 1of 33

Proforma C

PRADHAN MANTRI GRAM SADAK YOJANA ( PMGSY)


CHECK LIST FOR P.I.U. & S.T.A.
( For Indvidual Bridge works with length more than15 m )
(To be filled by PIU)

1. Location : 4+950 State: Maharashtra District : Gadchiroli Block : AHERI

2. Package No :-

3. Name of the Road : From MARPALLI To REGULWAHI

4. Total Length of Road (Km) - 9.800 Km

5. Name of Proposed Bridge (if any) Bridge in Km. 4+950 Across Nallah

6. Length of Proposed Bridge (Excluding Approaches) 16.97 Mtr

7. Width of Bridge in m : 12.00 m

8. Through Route/ Link Route Nos as per Core Network. :


(i) Is the road a part of core network : 
Yes / No
if Yes, Sl No. of road CN-I : Sl No. of Road CN -VI :
If Yes Through Route/ Link Route No. T- or L-

(ii) Name of the benefitted Habitation (s) (to be cross Sr.No. Name of Village Population
checked with CN-VI) with population 1 Kohka 0

Total 0

9. Whether the Road proposal was sanctioned earlier : Yes / No

(i) If Yes, please mention the Phase, MoRD Sanction letter No and Date of sanction :
Phase :

Length 6.000 Km Chainage : From


(ii) Cost of the Road work sanctioned : Rs : Lakhs

(iii) Whether any CD/ Causeway was Sanctioned at or nearby location with the road No
proposal and whether the same was constructed or not (if yes, the details thereof with chainage :

(iv) Whether the roadwork has been completed or in progress and likely date of completion :

(v) If not, How the connectivity and movement of traffic was ensured : ------ N.A.

(vi) Reasons for not proposing the Bridge at the time of submission of Road proposal :
10. Estimated Cost (Rs. In Lakhs) Item Total Cost (Rs in Lakhs) Cost per m
Approaches 0.00 0.00
Bridge Super
21.71 1.28
Structure
Foundation 10.70 0.63
Others 29.39 1.73
Total 60.50 3.57
MoRD Share 45.38 State Share 15.13
(MoRD share and State share to be calculated as per the norms of MoRD/NRRDA)

11. INDEX MAP (not to scale) : Attached Saperately

12 Typical Sketch of proposed bridge showing schematic arrangement of spans (Attached Saperately)

13. Typical Photographs of proposed Bridge Location. (Attached Saperately)

14. Type of Proposed Bridge :


(I) 
Submersible Structures like Vented Causeway or Submersible Bridge
(ii) Box Culvert
(iii) 
Bridge With RCC Piers and Abutments /PCC Pier & Abutment

a. Type of foundation

Open / Raft /Well / Pile / Any other
b. Bearing Capacity at Foundation Level 20 t/m2 (Sand)
c. Arrangement of Spans
Total Span 16.97 No. of Vents 2 Clear Span of Vent 8.00 m
(Right Angle Crossing)
d. Critical Levels Road Top Level (RTL) 89.630 mtrs.
Average Ground Level (AGL) 86.560 mtrs.
Nalla Bed Level (NBL) 86.430 mtrs.
Ordinary Flood Level (OFL) 87.970 mtrs.
Foundation Level (FL) 84.954 mtrs.
Ht.of Bridge h= (RTL-NBL) 3.200 mtrs.
Ht. of Bridge H=(RTL-FL) 4.677 mtrs.
e. Catchment Area
(Catchment area should be based on Hydrological Survey or from Toposheet)
Catchment area served 11.11 Sq. Km
Heaviest Rainfall 1000 mm/hr
Basis of Design Discharge 100.41 Cumecs
Waterway required 48.10 mtr.
Waterway provided 16.00 mtr.

f. Scour Depth (m) d= m


Max 4.50 m
15. Cost Details Cost Rs.
A] General Costs
Cost of Preparation of DPR (Limited to 1 % of Total cost of Bridge) 5516915000
B] Bridge Components
Description of Components Quantity Cost Rs. Grade of
Concrete
Foundations 155.02 7270.50 M-20
Abutments 115.24 7177.50 M-20

Pipe Railing / Parapet
Deck Slab
49.14
119.13
1564.70
9000.10 M-25
Piers 37.40 7177.50 M-20

Wearing Course

Wing Walls / Solid Return 254.31
12.02
7177.50
9018.40
M-20
M-30
Joints 40.08 766.10
Drainage

Bearings- Elastomeric or Roller Bearing or Tar Paper Bearing 25.20 16.000
Earthwork (including for foundation) 321.71 156.70
C] Road Component (for Approaches/ Bridge)
Granular Sub base
Soil + Aggregate Mix
WBM Grade-II
WBM Grade-III
Prime Coat
Tack Coat
Surface Dressing
Seal Coat
D] Protection works 19.68 1613.75
E] Road Logo, other Road Furniture 1.08 4872.00
Other (Filter Media) 57.54 1613.75
Total Cost of the Project (Rs) 5516915.00
Rs. FIFTY FIVE LAKHS SIXTEEN THOUSANDS NINE HUNDRED
Total Cost of the Project (Rs) (In Words)
FIFTEEN ONLY

16. Five Year Routine Maintenance


Year Cost in Lakhs % Cost
I 16550.75 0.30
II 24826.12 0.45
III 33101.49 0.60
IV 41376.86 0.75
V 49642.28 0.90
Total Maintenance 165497.50 3.00

17. Whether the Bridge has Geometrics as per latest Circular of NRRDA.:

Yes/ No

18. Whether the Cost etimates are as per standerd data analysis and S.S.R.
19. Sources and the Lead distances of Materials are as under

Yes/ No

Lead Lead
Material Source Material Source
Distance Distance
Earth Local 9.00 Cement Allapali 80.00
Murum (Subgrade) Local 10.00 Emulsion
Aggregate NANDORI 235.00 Bitumen
Sand Local 15.00 Steel Allapali 80.00

This is to Certified that,


1. Span details of bridge tallies with DPR & data uploaded on omms.nic.in. & there is no deviation.
2. Information furnished herewith is true to the best of my knowledge.
3. Total cost of the project, State share & MoRD share worked out by PIU is justified.
4. The proposal of bridge is missing bridge proposal on sanctioned road & in the same stretch as it was sanctioend in

DPR Prepared By DPR Checked by Checked & recommended

Assitant Engineer Executive Engineer Suprintending Engineer


PMGSY, MRRDA Dn, Gadchiroli PMGSY, MRRDA Division, Gadchiroli PMGSY, MRRDA Division, Gadchiroli

Co-ordinator STA :
VNIT, Nagpur
To be filled by State Technical Agency

Name of the STA : Vishvesaraya National Institute of Technology, Nagpur

Name of Road : MARPALLI To REGULWAHI

Name of Bridge (if any) : Bridge in Km. 4+950 Across Nallah

20. Is the proposed work is for CD/Causeway of any length or brigde with span excluding approaches less Yes/ No
STAs need not clear such proposals

21 Is the Proposal entered on the OMMS : Yes/ No


(Data entries to be verified by STA before Clicking the Propopsal)

m
a. Span of Bridge on web: 16.97 m. b. Span of Bridge As per DPR 17.0 .

* Span of bridge: C/C distance along the centre line of the bridge between inner faces of dirt walls.

c. Whether type of foundation & resting strata as per survey report justified to be safe Yes/ No

d. Whether Hydraulic design is checked & found to be adequete as per site requirements Yes/ No

e. Whether RCC designs are checked and found to be economical & safe. Yes/ No

f. Whether the provisions made by PIU are sufficient & essential from economy point of view. Yes/ No

22 If the Proposal is for a Bridge for which Road was already Sanctioned
If Yes, Have you verified and satisfied yourself with all the items listed at Sr. No. 8, by PIU Yes / No
Have you satisfied yourself that the road is a part of Core Network Yes / No

23 Are you satisfied with the following


Engineering Surveys (L section, X sections must be verified) Yes / No
Soil/ Material Investigation Yes / No
Hydraulic Studies. Yes / No
( Catchment for structures to be verified from topo sheet. Location and requirement of structures to be

24 Is the design of the following elements as per relevant I S/ IRC codes /


Foundations / Abutments / Piers / Deck Slab / Wing Walls / Box Return Yes / No

25 Does the Estimation Conform to Standard Rate Analysis and SoR generated for Yes / No
the current Phase for PMGSY works and a copy of SoR provided to STA

26 Does the proposal have provisions for Yes / No


PMGSY Logo Sign Boards and Information Board

27 Whether STA and Superintendent Engineer have visited the site? If Yes, Date of Visit : Yes / No
Kindly indicate whether the program of visit was informed to NRRDA for prior approval ? Dt. __________
28 Secific Remarks, if any, by STA
(Specific remarks of STA about the overall Bridge Project are necessary on each DPR)

29. Certificates:
Certified that the proposal of bridge is checked & found to be it is missing bridge on sanctioned road & in the same

Certified that the Design and Estimation for the Proposed bridge are based on the latest Circular of NRRDA:vide

Certified that the Design and Estimation for the Proposed bridge are based on the data and SSR provided by PIU
Engineers . The Proposal after final Correction is entered on the OMMS.The Propasal may be considered for

Technical Scrutiny at STA done by:


Signature Signature Co-ordinator STA:
Name Shri. A.D. Wasudeo Name Signature
Date Date Name Shri. V.S. Landge
Date
GOVERNMENT OF MAHARASHTRA

MAHARASHTRA RURAL ROAD DEVELOPMENT ASSOCIATION

DETAILED PROJECT REPORT


For Construction of Submersible Bridge on Rural Roads
Under PMGSY for Rural Road Connectivity

LOCATION OF BRIDGE IN KM :- 4+950


NAME OF ROAD :- MDR-25 TO CHANDRA ROAD
NAME OF BLOCK :- AHERI
NAME OF DISTRICT :- GADCHIROLI
PACKAGE NO. :- MH-10144
ROUTE NO. :- LR-045

Total Project Cost (Rs.) :- 69.08 Lacs

Prepared By :
KHAIRA & ASSOCIATES
532-533, Corporate Zone, 5th Floor Ashima Mall, Hoshangabad Road, Bhopal (M.P.)
TEL:- (0755)-4053276, E-mail Id :- khairamprrda@yahoo.co.in
ESTIMATE

Division :- P.M.G.S.Y M.R.R.D.A. DIVISION, GADCHIROLI

Sub Division :-

Sanctioned Estimate No. :- P.M.G.S.Y. 2016-17

Fund Head PRADHAN MANTRI GRAM SADAK YOJANA (PMGSY)


:- (L.W.E.)

Major Head :-

Service Head :-

Departmental Head :-

ESTIMATE FRAMED IN THE OFFICE OF THE EXECUTIVE ENGINEER, P.M.G.S.Y. M.R.R.D.A. DIVISION, GADCHIROLI FOR
THE PROBABLE EXPENSES THAT WILL BE INCURED IN CONSTRUCTION OF SUBMERSIBLE / NON SUBMERSIBLE
BRIDGE ACROSS NALA IN
4+950 KM OF MDR-25 TO CHANDRA ROAD

Amount Rs. 69.08 /Lacs

Administrative Approval Under :-

Technically Sanctioned Under :-

Estimate Prepared By :-

Estimate Checked By :-

GENERAL DESCRIPTION
( Attached Separately)

Deputy Engineer Executive Engineer


[PMGSY] MRRDA, [PMGSY] MRRDA,
Gadchiroli Gadchiroli
PRADHAN MANTRI GRAM SADAK YOJNA (PMGSY)

CONSTRUCTION OF SUBMERSIBLE MAJOR BRIDGE ACROSS NALA IN KM 4+950 ON MDR-25 TO CHANDRA


ROAD IN AHERI TALUKA OF DISTRICT GADCHIROLI (LR-045)

GENERAL ABSTRACT

S.No. Description of Item Amount Cost


in Rs. Lacs
1 COST OF BRIDGE WORK 16 METRE Rs. 6050429.00 60.50 Lacs

TOTAL COST Rs. 6050429.00 60.50 Lacs


3 Add for Provision of GST @12% Rs. 726051.00 7.26 Lacs

For Royalty Charges Rs. 107114.69 1.07 Lacs

4 Cost of Preparation of D.P.R. @ 2180/- Per Metre Rs. 24000.00 0.24 Lacs

GRAND TOTAL Rs. 6907594.69 69.08 Lacs

Rs. 69.08 /- Lacs

Maintanence Cost Rs. 423530.00 Lacs

Deputy Engineer Executive Engineer


[PMGSY] MRRDA, [PMGSY] MRRDA,
Gadchiroli Gadchiroli
GENERAL REPORT AND SPECIFICATIONS

NAME OF WORK - CONSTRUCTION OF SUBMERSIBLE MAJOR BRIDGE ACROSS NALA IN KM 4+950 ON MDR-25 TO
CHANDRA ROAD IN AHERI TALUKA OF DISTRICT GADCHIROLI (LR-045)

PROPOSAL - Proposed 2 Span of 8.00M C/c submercible major bridge with open foundation at right
angle crossing.

ESTIMATED COST - Rs. 69.08 Lacs

NECESSITY - The proposed rural road link (LR-045) in block Aheri is serving the population
having existing cart track portion.
This is a rural road connecting rural habitation to near by market center, health center and
education center etc. it is necessary to construct bridge on this road to give all whether
connectivity to unconnected habitations.

ALIGNMENT - District Gadchiroli is affected by Left Wing Extremists (LWE). The road passes through
forest area . Required land width is available and there is no need of additional land
acquision.

EXISTING STATUS- Rural Link No. [LR-045] is having total length 2.2 KM.
There is unbridged crossing in KM 4+950.

PROPOSAL - A. BRIDGE :

The following provisions are made for bridge.

1- Excavation for foundation

2- Annular Space filling in Rock foundation is proposed.

3- CC M-25 Grade for foundation.

4- A.C. UPVC Pipe for weep holes

5- PCC M-20 for Pier & Abutment.

6- CC M-20 Grade for RCC Pier, Abutment Cap.

7- CC M-25 Grade for RCC Slab.

8- CC-M-15 Grade for Kerb, Ballast Wall and Returns.

9- CC M-30 Grade for Wearing Course.

10- TMT Steel for reinforcement.

11- Steel Railing is proposed.

DESIGN : The design is based as per IRC SP-13-2015, for design and specifications of bridge.
MATERIAL- The following Material required for construction of the road are locally available and will be

arranged by the contractor from the approved quarries and suppliers or the department.

S.No Material Source


1 Crusher Broken Metal Nanduri
2 Hand Broken Metal Gomalkouda
3 Local available Course Sand River
4 Fine Sand River
5 Murum Local
9 Cement Allapali
10 Steel Allapalli
11 R.C.C. Pipe Gadchiroli

RATES - Rates adopted for the estimates are based on the (P.M.G.S.Y. LWE) " Schedule of Rates
(SOR)" 2017 for District Gadchiroli (MH). w.e.f from January 2017.

Specifications and code practice laid down by Indian Road Congress publications SP-20
SPECIFICATIONS -
and guideline " Rural Road Manual " SP-20 (2002) have been reffered for DPR
preparation & "SP-72 (2015) have been reffered for design of Flexible Pavement.

Deputy Engineer Executive Engineer


[PMGSY] MRRDA, [PMGSY] MRRDA,
Gadchiroli Gadchiroli
COST ESTIMATE FOR BRIDGE
IN KM 4+950
PRADHAN MANTRI GRAM SADAK YOJANA (PMGSY)

COST ESTIMATE FOR CONSTRUCTION OF BRIDGE


CONSTRUCTION OF SUBMERSIBLE MAJOR BRIDGE ACROSS NALA IN KM 4+950 ON MDR-25 TO CHANDRA ROAD IN AHERI TALUKA OF
DISTRICT GADCHIROLI (LR-045)
2 SPAN OF 8 M SLAB Right Angle Crossing
BRIDGE IN 4+950 Km. PACKAGE :- MH-10144 BLOCK :- AHERI DISTRICT :- GADCHIROLI

Sr. Description of Item No. Length Bredth Depth Quantity Unit Rate Amount

A) EXCAVATION
1 Earthwork in excavation for structures as per
drawing and technical specifications Clause
305.1 including setting out, construction of
shoring and bracing, removal of stumps and
other deleterious material and disposal upto a
lead of 50m, dressing of sides and bottom and
backfilling in trenches with excavated suitable
material. (Item No. 11.1 (I) (i) / P.No. 43)
AVERAGE G.L. FOR ABUTMENT
( 86.505 86.625 86.562 86.551 86.562
86.552 )/6
86.560
AVERAGE G.L. FOR PIER
( 86.432 86.430 86.428 86.431

)/4
86.430

AVERAGE G.L. FOR SOLID RETURN


( 86.562 86.458
)/2
86.510
I) Ordinary Soil
86.560 - 85.107 1.453
FOR ABUTMENT 2 12.300 3.673 1.453 131.242

86.430 - 84.800 1.630


FOR PIER 1 12.300 3.129 1.630 62.743

86.510 - 84.632 1.878


FOR SOLID RETURN 4 2.985 3.274 1.878 73.414

FOR TOE WALL 1 - 33.528 1.620 54.315

Total Qty 321.714 Cum 156.70 50413.00

2 I) Ordinary Rock
a) Upto 3.00m Depth
85.107 - 85.107 0.000
FOR ABUTMENT 2 12.300 3.920 0.000 0.000

84.800 - 84.800 0.000


FOR PIER 1 12.300 3.129 0.000 0.000

84.632 - 84.632 0.000


FOR SOLID RETURN 4 2.985 3.274 0.000 0.000

Total Qty 0.000 Cum 473.20 0.00

3 Dewatering including diversion of stream,


providing cofferdams, bunds, etc. as may be
necessary for foundation and other parts of the
work and bailing out water during and after
excavation as required. (Item No. 11.1(A) / P.No.
44)

I) FOR ABUTMENT Qty. as per Item No. 4 131.242

Total Qty 131.242 Cum 102.00 13387.00


II) FOR PIER Qty. as per Item No. 4 62.743

Total Qty 62.743 Cum 492.55 30904.00

III) FOR RETURN Qty. as per Item No. 4 73.414

Total Qty 73.414 Cum 47.00 3450.00


B) FOUNDATION
4 Providing concrete for plain cement concrete
M-10 in foundations complete as per drawings
and Technical Specification Clauses 802, 803,
1202 and 1203. (Item No. 11.4 (I) (ii) / P.No. 45)
LEVELLING COURSE
FOR SOLID RETURN 4 2.885 3.174 0.100 3.663
FOR ABUTMENT 2 12.200 3.573 0.100 8.718
FOR PIER 1 12.200 3.029 0.100 3.695
FOR APPROACH SLAB 2 12.000 0.080

Total Qty 16.076 Cum 7270.50 116881.00


5 Providing concrete for plain cement concrete M-
15 in foundations complete as per drawings and
Technical Specification Clauses 802, 803, 1202
and 1203. (Item No. 11.4 (ii) (i) / P.No. 45)
FOR SOLID RETURN 4 2.685 2.974 0.400 12.776
FOR ABUTMENT 2 12.000 3.373 0.400 32.381
FOR PIER 1 12.000 2.829 0.900 30.553
FOR TOE WALL 1 33.528 1.680 56.326
FOR APPROACH SLAB 2 12.000 3.600 0.080 6.912

Total Qty 138.948 Cum 6862.40 953520.00


6 Filling annular space around footing in rock as
per Technical Specification Clause No.1203.4.3.
(Item No. 11.3 / P.No. 44)
FOR ANNULAR FILLING - PIER 2 12.300 3.129 0.000 0.000
DEDUCT 2 12.200 0.320 + 0.160 - 0.000

FOR ANNULAR FILLING - ABUTMENT 2 12.300 2.178 0.000 0.000

Total Qty 0.000 Cum 6861.15 0.00


C) SUBSTRUCTURE
7 Providing and laying P.C.C. M-20 Grade cement
concrete in substructure complete as per
drawings and technical specification Clause 802,
804, 805, 806, 807, 1202 and 1204 (Item No. 12.5
(I) (i)/ P.No. 47)
FOR ABUTMENT 2 12.000 3.118 + 0.740 0.482 22.315
2
2 12.000 3.118 + 0.740 0.401 18.565
2
2 12.000 3.118 0.900 67.349

2 12.000 0.790 + 0.000 0.740 7.015


2
FOR PIER

p 2
At 10.771 0.900 + /4 x 0.90 10.330

p 2
Ab 10.771 1.229 + /4 x 1.23 14.420

p 2
Am 10.771 1.065 + /4 x 1.06 12.360

1 ( H / 6 ) x ( At+ Ab + 4 x Am )

1 3.03 /6x ( 10.330 14.420


+ 4 x 12.360 ) = 37.404
FOR SOLID RETURN 4 2.685 1.100 + 3.938 0.482 13.040
2
4 2.685 0.500 3.938 21.147

4 2.685 1.100 + 3.938 0.401 10.849


2
4 2.685 0.000 + 0.791 1.100 0.000
2

RIDING RETURNS 4 0.662 0.485 + 3.743 0.500 2.799


2
4 0.400 x 3.743 0.500 2.994

Total Qty 203.477 Cum 8451.90 1719771.00

8 Providing and laying R.C.C. M-20 in substructure


complet as per drawing and technical
specifications Clauses 802, 804, 805, 806, 807,
1202 and 1204 (Item No. 12.5 (III) / P.No. 47)

FOR PIER CAP 1 Area at Top 10.771 1.106 11.914


FOR ABUTMENT CAP 2 Area at Top 12.000 0.214 5.130
BALLAST WALL 2 Area at Top 12.000 0.204 4.896
BRACKET 2 Area at Top 12.000 0.054 1.296
APPROACH SLAB 2 3.500 12.000 0.300 25.200
RCC STOPPER ON D/s SIDE 0 1.020 0.285 + 0.510 0.430 0.000
2
Total Qty 48.436 Cum 8451.90 409376.00
9 Supplying fitting, and placing TMT bar
reinforcement (Fe 415) in substructure
complete as per drawing and technical
spcifications Clauses 1002, 1005, 1010 and 1202
(Item No. 12.7 P.No. 48)

FOR ABUTMENT
Front Side 2 12.000 4.314 103.530
Back Side 2 11.000 3.986 40.295
4 2.398 0.900 + 1.382 10.944
2
4 0.401 2.398 / 2 1.923
4 0.740 1.783 + 2.57 6.447
2
4 0.400 3.373 5.397

FOR PIER 2 10.771 1.424 30.682


SEMI CIRCULAR SHAPE
S = π * (r1 + r2) * s = π * (r1 + r2) * √((r1 - r2)2 + h2) 3.1429 3.049 0.615 + 0.450 10.202

FOR SOLID RETURN


Back face 4 2.685 x 4.779 51.323
Front face 4 2.685 x 5.021 53.926
Side face 4 0.400 x 0.400 0.640

FOR RIDING RETURN 8 2.114 + 1.497 28.890

344.199 Sqm
SURFACE REINFORCEMENT @ 5 Kg /Sqm 344.20 x 5.00 1.721 MT
1000

CAP @ 80 Kg/ Cu.m. 48.44 x 80.00 3.875 MT


1000
APPROACH SLAB @ 80 Kg/Cu. M 25.200 x 80 2.016 MT
1000
Total Qty 7.612 MT 56305.35 428596.00
10 Providing and laying filter media with granular
crushed aggregates as per specifications to a
thickness of not less than 600 mm with smaller
size towards the soil and bigger size towards the
wall and providing over the entire surface behind
abutment , wing wall , return wall to the full
height compacted to firm condition complete as
per drawing and technical specification Clause
1204.3.8 (Item No. 12.11 / P.No. 48)
FLEXIBLE STONE MAT (900 mm Thick ) 0 3.445 4.300 0.900 0.000
FILTER MEDIA BEHIND ABUTMENT (600mm Th.) 2 12.000 0.600 1.857 26.745
FILTER MEDIA IN SOLID RETURN (600 mm Th.) 4 2.685 0.600 4.779 30.794
STONE MAT FOR PITCHING (200 MM THK.) 1 98.390 0.200 19.678
77.217 Cum 1613.75 124609.00
11 Backfilling behind abutment, wing wall and return
wall complete as per drawings and technical
specification Clause 1204.3.8 (Item No. 12.10 /
P.No. 48)
Backfilling in Solid Return 4 1.62 0.468 + 0.170 2.685 11.092
Backfilling in Abutment 2 1.62 0.468 + 0.214 12.000 26.492
Deduction of Filter media 2 1.62 5.370 + 10.800 0.600 -31.434
Total Qty 6.149 Cum 2687.70 16526.00

12 Providing weepholes in plain concrete abutment,


wing wall, return wall with 100 mm dia AC pipe
extending through the full width of the structures
with slope of 1(v) :20(h) towards drawing face
complete as per drawing and technical
specification Clauses 614, 709, 1204.3.7 (Item
No. 12.9 (a) / P.No. 48)
Area
FOR ABUTMENT 2 0.75 12 x 2.015 36
FOR RETURN 4 0.75 2.685 x 2 16
FOR RIDING RETURN 4 0.75 2.114 6
Total Qty 59 Nos. 197.10 11574.00
D) SUPERSTRUCTURE
13 Providing and laying reinforced cement concrete
M-25 in superstructure as per drawing and
technical specifications Clauses 800, 1205.4 and
1205.5 (Item No. 13.1 (II) / P.No. 50)
FOR R.C.C SLAB
2 8.485 0.660 + 0.510 6.000 59.565
2
2 8.485 0.660 + 0.510 6.000 59.565
2
APPROACH SLAB 2 12.000 3.500 0.300 25.200

Total Qty. 119.130 Cum 9000.10 1072182.00


14 Providing and laying cement concrete Wearing
Course M-30 grade Excluding reinforcement
complete as per drawing and technical
specifications Clauses 800 and 1206.3 (Item
No. 13.5/ P.No. 51)

WEARING COAT 2 8.485 10.90 0.065 12.023

Total Qty. 12.023 Cum 9018.40 108428.00

15 Providing and laying reinforced cement concrete


M-20 in superstructure as per drawing and
Technical Specifications Clauses 800, 1205.4
and 1205.5 (Item No. 13.1 (I) (iii) / P.No. 50)

BALLAST WALL 0 5.950 0.300 0.655 0.000 Cum 8451.90 0.00

KERBS 0.06 Cum / Rmt. 2 24.570 0.060 2.948 Cum 8451.90 24916.00
16 Supplying fitting, and placing TMT bar
reinforcement in superstructure complete as per
drawing and technical spcifications Clauses
1002,1010 and 1202 (Item No. 13.3 P.No. 50)

SLAB @ 105 Kg/ Cum. 105.00 x 119.130 12.509


1000
80.00 x 25.200 2.016
APPROACH SLAB@ 80Kg/Cum. 1000
BALLAST WALL @ 80 Kg/ Cum. 80.00 x 0.000 0.000
1000

KERB @ 5.43 Kg / Rmt. 2 5.43 x 24.570 0.267


1000

WEARING COAT @ 50 Kg / Cum 0 50.00 x 12.023 0.000


1000

Total Qty. 14.792 MT 57641.75 852637.00

17 Providing and fixing in position railing consisting


of IS Rolled steel joist posts designation IS MB
100 (100 x 75) at 2.5 m interval and three rows of
50 mm dia steel pipes ( light ) including fixing in
position on bridge deck complete as per drawing
and technical specification Clause 1208.2 (Item
No. 13.8 / P.No. 51)
2 24.570 49.140 Rmt 1564.70 76889.00
18 Providing tar paper bearing of approved quality
in proper size etc. complete. (Item No. 13.16 (V) /
P.No. 51)
BETWEEN SLAB AND CAP
ABOVE ABUTMENT 2 12.000 0.600 14.400
ABOVE PIER 1 12.000 0.900 10.800
Total Qty 25.200 Sqm 16.00 403.00

19 Expansion Joint with 25mm thick bituminous pad


(Item No. 13.16 (II-A) P.No. 51)

BETWEEN SLAB & ABUTMENT 3 12.000 0.660 23.760

BETWEEN RETURNS 4 x 3.600 x 0.800 11.520

4 x 0.600 x 4.000 4.800


2
Total Qty 40.080 Sqm 766.10 30705.00

20 Providing and fixing Granite / Marble tablet of


15mm to 18mm thickness, including making
groove in wall / concrete surface filling joints with
slurry, curing, polishing, rounding edges, as
required cleaning etc. complete. of size and
description as per detailed drawings including
embosseing & fitting in 1:2 C.M. border. (Item
No. 12.15/ P.No. 48)
For Name Plate Showing Details of Bridge 1 1.200 0.900 1.080
Total Qty 1.080 Sqm 4872.00 5262.00

BRIDGE IN 4+950 Km. TOTAL COST ` 6050429.00


Add for Provision of GST @ 6% 363026.00
GRAND TOTAL COST RS. 6413455.00

Deputy Engineer Executive Engineer


PMGSY, MRRDA, PMGSY, MRRDA,
Gadchiroli Gadchiroli
LEAD STATEMENT & RATE
ANALYSIS
PRADHAN MANTRI GRAM SADAK YOJNA (PMGSY)
LEAD STATEMENT

CONSTRUCTION OF SUBMERSIBLE MAJOR BRIDGE ACROSS NALA IN KM 4+950 ON MDR-25 TO CHANDRA ROAD IN AHERI TALUKA OF DISTRICT GADCHIROLI (LR-045)
BRIDGE IN 4+950 Km.

Sr. No. Material Source Loading Unloading Haulage Lead Density Base
in Km Rate
1 2 3 4 5 6 7 8=3+4
+ ( 5 x 7)
1 CRUSHER BROKEN METAL 54.50 27.30 1536.00 204.00 1.75 2769.80
Nanduri
2 HAND BROKEN METAL 54.50 27.30 717.60 80.00 1.75 1337.60
Gomalkouda
3 LOCAL AVAILABLE SAND 27.30 14.30 225.60 15.00 1.60 402.56
River
4 SAND 27.30 14.30 225.60 15.00 1.60 402.56
River
5 EARTHWORK FOR SHOULDER 168.00 9.00 1.60 268.80
Local
6 MURUM 27.30 14.30 343.20 29.00 1.67 614.74
Local 343.20 29.00 1.67 573.14
4 CRUSHER BROKEN METAL (QUARRY TO PLANT) 54.50 27.30 1536.00 204.00 1.75 2769.80
BT Plant
5 BITUMEN ( MUMBAI REFINERY TO PLANT @ WADHOLI )
Heating & Unloading 9651.60 1149.00 -- 9651.60
Mumbai
6 BITUMEN ( MUMBAI REFINERY TO WORK SITE ) Heating & Unloading 10281.60 1224.00 -- 10281.60
Mumbai
7 BITUMEN MIX MATERIAL ( PLANT TO WORK SITE ) 546.00 65.00 2.20 1201.20
8 CEMENT 181.30 181.30 385.20 34.00 -- 747.80
Allapali
9 STEEL 196.30 196.30 385.20 34.00 -- 777.80
Allapalli
10 R.C.C. PIPE 69.69 55.04 1305.00 169.00 -- 1429.73
Gadchiroli

Deputy Engineer Executive Engineer


[PMGSY] MRRDA, [PMGSY] MRRDA,
Gadchiroli Gadchiroli
PRADHAN MANTRI GRAM SADAK YOJNA (PMGSY)
FORMAT F - 8
RATE ANALYSIS - CROSS DRAINAGE WORK
Sr. Description of Item Quantity Unit Rate Amount Final Rate
1 Earthwork in excavation for structures as per drawing and technical
specifications Clause 305.1 including setting out, construction of shoring
and bracing, removal of stumps and other deleterious material and
disposal upto a lead of 50m, dressing of sides and bottom and backfilling
in trenches with excavated suitable material. (Item No. 11.1 (I) (i) / P.No.
43)
193.00
Deduct 6% for GST Rs. -36.31
1) Ordinary Soil (i) Upto 3m depth Total Rs. 156.69 156.70 /Cum

2 Earthwork in excavation for foundation of structures upto 3 m depth as


per drawing and technical specification Clause 1104 including setting
out, construction of shoring and bracing, removal of stumps and other
deleterious matter, dressing of sides and bottom and backfilling with
approved material. (Item No. 9.1 / P.No. 36)
(II) Ordinary rock (not requiring blasting) 503.40
Deduct 6% for GST Rs. -30.20
Upto 3 m depth Total Rs. 473.20 473.20 /Cum

3 Dewatering including diversion of stream, providing cofferdams, bunds,


etc. as may be necessary for foundation and other parts of the work and
bailing out water during and after excavation as required. (Item No.
11.1(A) (A) / P.No. 44)

A) For Open Foundation Rate as per S.O.R. Rs. 108.50


Deduct 6% for GST Rs. -6.51
A1) For Abutment , ii) Medium Dewatering Total 101.99 102.00 /Cum

Rate as per S.O.R. Rs. 524.00


Deduct 6% for GST Rs. -31.44
A2) For Pier , ii) Medium Dewatering Total 492.56 492.55 /Cum

Rate as per S.O.R. Rs. 50.00


Deduct 6% for GST Rs. -3.00
A3) For Return , ii) Medium Dewatering Total 47.00 47.00 /Cum

4 Providing concrete for plain cement concrete M-10 in open foundations


complete as per drawings and Technical Specification Clauses 802, 803,
1202 and 1203. (Item No. 11.4 (I) (ii) / P.No. 45) (By using OPC 43
Grade Cement)
I) PCC Grade M-10 (i) Nominal Mix 1:3:6
( Rate as per Item No. 11.4, of Chapter 11 ) Rs. 4695.40
Add for Transportation of Metal 0.960 Cum 2769.80 2659.01
Add for Transportation of Sand 0.480 Cum 402.56 193.23
Add for Transportation of Cement 0.250 M.T. 747.80 186.95
7734.59
Deduct 6% for GST Rs. -464.08
Total Rs. 7270.51 7270.50 /Cum

5 Providing concrete for plain cement concrete M-15 in open foundations


complete as per drawings and Technical Specification Clauses 802, 803,
1202 and 1203. (Item No. 11.4 (I) (ii) / P.No. 45) (By using OPC 43
Grade Cement)
II) PCC Grade M-15 (i) Nominal mix (1:2.5:5)
( Rate as per Item No. 11.4, of Chapter 11 ) Rate as per S.O.R. Rs. Rs. 4685.70
Add for Transportation of Metal 0.800 Cum 2769.80 2215.84
Add for Transportation of Sand 0.480 Cum 402.56 193.23
Add for Transportation of Cement 0.275 M.T. 747.80 205.65
7300.42
Deduct 6% for GST Rs. -438.03
Total Rs. 6862.39 6862.40 /Cum

6 Filling annular space around footing in rock as per Technical


Specification Clause No. 1203.4.3. (Item No. 11.3 / P.No. 44)
P.C.C Grade M-15 Rate as per S.O.R. Rs. 4684.40
Add for Transportation of Metal 0.800 Cum 2769.80 2215.84
Add for Transportation of Sand 0.480 Cum 402.56 193.23
Add for Transportation of Cement 0.275 M.T. 747.80 205.65
7299.12
Deduct 6% for GST Rs. -437.95
Total Rs. 6861.17 6861.15 /Cum
7 Plain/reinforced cement concrete in substructure complete as per
drawings and technical specification Clauses 802, 804, 805, 806, 807,
1202 ans 1204
I. P.C.C grade M 15
(i) Nominal mix (1:2.5:5)
(Rates as per Item No. 11.4 (I) (ii) / P.No. 45) Rate as per S.O.R. Rs. 5020.90
Add for Transportation of Metal 0.800 Cum 2769.80 2215.84
Add for Transportation of Sand 0.480 Cum 402.56 193.23
Add for Transportation of Cement 0.275 M.T. 747.80 205.65
7635.62
Deduct 6% for GST Rs. -458.14
Total Rs. 7177.48 7177.50 /Cum

8 Providing and laying reinforced cement concrete in superstructure as per


drawing and technical specifications Clauses 800, 1205.4 and 1205.5
(Item No. 13.1 (i)/ P.No. 50)
For Height Upto 5m
I) RCC Grade M-20 (i) Nominal Mix 1:1.5:3 ) Rate as per S.O.R. Rs. 6055.70
Add for Transportation of Metal 0.900 Cum 2769.80 2492.82
Add for Transportation of Sand 0.450 Cum 402.56 181.15
Add for Transportation of Cement 0.350 M.T. 747.80 261.73
8991.40
Deduct 6% for GST Rs. -539.48
Total Rs. 8451.92 8451.90 /Cum

9 Supplying, fitting and placing HYSD bar reinforcement (Fe 415) in


substructrue complete as per drawings and technical specification
Clauses 1002, 1005, 1010 & 1202
HYSD Bar Reinforcement for Sub-structure
(Rates for Item No. 12.8 / P.No. 55) Rate as per S.O.R. Rs. 59082.60
Add for Transportation of Steel 1.05 M.T. 777.80 816.69
59899.29
Deduct 6% for GST Rs. -3593.96
Total Rs. 56305.33 56305.35 /M.T.
10 Providing and laying filter media with granular crushed aggregates as per
specifications to a thickness of not less than 600 mm with smaller size
towards the soil and bigger size towards the wall and providing over the
entire surface behind abutment, wing wall, return wall to the full height
compacted to firm condition complete as per drawing and technical
specification Clause 1204.3.8 (Item No. 12.11 / P.No. 48)
Rate as per S.O.R. Rs. 1233.70
Add for Transportation 1.200 Cum 402.56 483.07
1716.77
Deduct 6% for GST Rs. -103.01
Total Rs. 1613.76 1613.75 /Cum

11 Backfilling behind abutment, wing wall and return wall complete as per
drawings and technical specification Clause 1204.3.8 (Item No. 12.10 (I) /
P.No. 48)
Sandy Material Rate as per S.O.R. Rs. 2376.20
Add for Transportation of Sand 1.200 Cum 402.56 483.07
2859.27
Deduct 6% for GST Rs. -171.56
Total Rs. 2687.71 2687.70 /Cum

12 I) Providing weepholes in brick masonry/stone masonry, plain/reinforced


concrete abutment, wing wall, return wall with 100 mm dia AC pipe
extending through the full width of the structures with slope of 1(V):20(H)
towards drawing face complete as per drawing and technical
specification Clauses 614, 709, 1204.3.7 (i) P.V.C.. pipe 100 mm Dia
(Item No. 12.9 / P.No. 48 ) 209.70
Deduct 6% for GST Rs. -12.58
PVC PIPE Rate as per S.O.R. Rs. 197.12 197.10 RMT.
13 Providing and laying reinforced cement concrete in superstructure as per
drawing and technical specifications Clauses 800, 1205.4 and 1205.5

II. R.C.C M 25
For Height Upto 5m
I) RCC Grade M-25 Rate as per S.O.R. Rs. 6601.50
Add for Transportation of Metal 0.900 Cum 2769.80 2492.82
Add for Transportation of Sand 0.450 Cum 402.56 181.15
Add for Transportation of Cement 0.400 M.T. 747.80 299.12
9574.59
Deduct 6% for GST Rs. -574.48
Total Rs. 9000.11 9000.10 /Cum

14 Providing and laying cement concrete Wearing Course M-30 grade


Excluding reinforcement complete as per drawing and technical
specifications Clauses 800 and 1206.3 (Item No. 13.5/ P.No. 51)
RCC Grade M-30 Rate as per S.O.R. Rs. 6598.50
Add for Transportation of Metal 0.900 Cum 2769.80 2492.82
Add for Transportation of Sand 0.450 Cum 402.56 181.15
Add for Transportation of Cement 0.430 M.T. 747.80 321.55
9594.02
Deduct 6% for GST Rs. -575.64
Total Rs. 9018.38 9018.40 /Cum

15 Supplying, fitting, and placing HYSD bar reinforcement in superstructure


complete as per drawing and technical specifications Clauses 1002,
1010 and 1202 (Item No. 13.2 P.No. 50)
For Superstructure Rate as per S.O.R. Rs. 60504.30
Add for Transportation of Steel 1.05 M.T. 777.80 816.69
61320.99
Deduct 6% for GST Rs. -3679.26
Total Rs. 57641.73 57641.75 /M.T.

16 Providing and fixing in position pipe railing consisting of IS Rolled steel


joist posts designation IS MB 100 (100x50) at 2.5 m interval and three
rows of 50 mm dia steel pipes (light) including fixing in position on bridge
deck complete as per drawing and technical specifications Clause
1208.2 (Item No. 13.8/ P.No. 51) Rate as per S.O.R. Rs. 1664.60
Deduct 6% for GST Rs. -99.88
Total 1564.72 1564.70 /Cum

17 Providing tar paper bearing of approved quality in proper size etc.


complete. (Item No. 13.16 (V) / P.No. 51) Rate as per S.O.R. Rs. 17.00
Deduct 6% for GST Rs. -1.02
Total 15.98 16.00 /Sqm

18 Expansion Joint with 25mm thick bituminous pad (Item No. 13.16 (II-A)
P.No. 51)
Rate as per S.O.R. Rs. 815.00
Deduct 6% for GST Rs. -48.90
Total 766.10 766.10 /Sqm

19 Providing and fixing Granite / Marble tablet of 15mm to 18mm


thickness, including making groove in wall / concrete surface filling joints
with slurry, curing, polishing, rounding edges, as required cleaning etc.
complete. of size and description as per detailed drawings including
embosseing & fitting in 1:2 C.M. border. (Item No. 12.15/ P.No. 48)

Rate as per S.O.R. Rs. 5183.00


Deduct 6% for GST Rs. -310.98
Total 4872.02 4872.00 /Sqm

Deputy Engineer Executive Engineer


[PMGSY] MRRDA, [PMGSY] MRRDA,
Gadchiroli Gadchiroli
PRADHAN MANTRI GRAM SADAK YOJANA (PMGSY)
ROYALTY STATEMENT
Sr. Description of Item Material Quantity as per Composition Quantity for Rate UNIT Amount
item per CUM Royalty
CUM CUM CUM Rs. Rs.

BRIDGE PROPER

1 CC M-10, Levelling Course Sand 138.95 0.48 138.95 143.34 Cu.m 19916.88

2 CC M-15, Cross Toe Wall, Abutment, Pier & Solid Sand


Return 342.43 0.48 342.43 143.34 Cu.m 49083.32

4 CC M-20,Cap Sand 48.44 0.45 48.44 143.34 Cu.m 6942.82

5 CC M-25, Solid Slab Sand 119.13 0.48 119.13 143.34 Cu.m 17076.09

6 Annular Filling in Foundations Sand 0.00 1.20 0.00 143.34 Cu.m 0.00

7 Providing & Laying Filter Media Sand 57.54 1.20 57.54 143.34 Cu.m 8247.64

8 Back filling in Abutment, Return Sand 6.15 1.20 6.15 143.34 Cu.m 881.36

9 Pitching on Side Slopes Sand 19.68 1.20 19.68 143.34 Cu.m 2820.64

10 Bituminous Concrete, Wearing Coat Sand 12.02 0.48 12.02 143.34 Cu.m 1723.38

11 CC M-25, Ballast wall & Kerb Sand 2.948 0.48 2.95 143.34 Cu.m 422.57

107114.69
Say in Lakh 1.07

Deputy Engineer Executive Engineer


[PMGSY] MRRDA, [PMGSY] MRRDA,
Gadchiroli Gadchiroli
PHOTOGRAPHS OF BRIDGE AT SITE

Chainage
1 1
0.000 Km

Chainage
2 2
0.000 Km
At Chainage
3 3
U/S Side

At Chainage
4 4
D/S Side