56-57 15811
BILL OF QUANTITY
Wrapping Tyfo® Fibrwrap® Systems
I GEDUNG 1
1 Pekerjaan Persiapan
1. Mobilization/Demobilization ls 1 Rp - Rp -
2. Scaffolding/ perancah ls 1 Rp - Rp -
Subtotal Rp -
2 Perkuatan Fiber pada Balok
a. Perkuatan Balok Tumpuan
1. Grinding dan Levelling Beton m2 18.480 Rp - Rp -
2. Perkuatan dengan Fiber Carbon Fiber ex. Tyfo® SCH-41 m2 36.960 Rp - Rp -
3. Conefinement Tyfo® SHE 25A m2 15.400 Rp - Rp -
3. Application cost for dry area m2 52.360 Rp - Rp -
b. Perkuatan Balok Flexural
1. Grinding dan Levelling Beton m2 19.040 Rp - Rp -
2. Perkuatan dengan Fiber Carbon Fiber ex. Tyfo® SCH-41 m2 19.040 Rp - Rp -
3. Application cost for dry area m2 19.040 Rp - Rp -
Subtotal Rp -
Total Rp -
PPn 11% Rp -
Grand Total Rp -
Note:
56.000 SCH-41
Total 15.400 SEH-25A
0.000 pcs
T. NOVELL
MATERIAL
Tyfo® SCH-41
Tyfo® SEH-25A
Tyfo® SCH-41
Asumsi tidak ada retak
Tyfo® SCH-41
Tyfo® SEH-25A
Karawaci Office Park - Lippo Karawaci
Jl.Telp
PintuOffice:
Besar+62
Blok21H5576 3933, 15811
No. 56-57 Fax:
+62 21 5573 1270.
www.fyfeindonesia.com
Project: : Perkuatan PT. Novell
Subject: : Beam Strenghtening with Tyfo Fibrwrap Systems
Beam Strengthening
Confinement at Column
Horizontal Wrap
Height of No of Layers (horizontal
Overlapp 0.2 m (m2)
Wrapp (m) Wrapp)
SEH-25A
h v
0.5 1.0 0 15.40
SUB TOTAL 15.40
Hogging(-)
Wrap Width Wrap Width (mm) Wrap Width No. of Layer(s) No. of Layer(s) No. of Layer(s)
(mm) Left Top Middle Top (mm) Right Top Left Top Middle Top Right Top
18.48 SCH-41
18.48
Wrap Area Middle
Material Wrap Area Right (m2) Material
(m2)
10 10% 10
10 10% 0
10 10% 0
10 10% 0
10
Karawaci Office Park - Lippo Karawaci
Jl.Telp
PintuOffice:
Besar+62
Blok21H5576 3933, 15811
No. 56-57 Fax:
+62 21 5573 1270.
www.fyfeindonesia.com
Project: : Perkuatan PT. Novell
Subject: : Beam Strenghtening with Tyfo Fibrwrap Systems
Beam Strengthening
No. of Similar
No Beams ID Remark
Beams
7
rap Systems
Beam Width, b Beam Depth, Beam Length Ave Slab Thk Wrap Length
Material
(mm) D (mm) (m) (mm) Left (m)
Perkuatan
400 800 8.000 120 SCH-41 3.00
Flexural (+)
No. of No. of
No. of
Wrap Length Wrap Length Wrap Width Wrap Width Wrap Width Layer(s) Layer(s)
Layer(s) Left
Middle (m) Right (m) (mm) Left (mm) Middle (mm) Right Middle Right
Bottom
Bottom Bottom
Perkuatan PT. Novell
6.8000 3.00 400 400 400 0 1 0
Flexural (+)
Concrete
Concrete Area Concrete Area Wrap Area (m2) Wrap Area
Area (m2) Material Material
(m2) Middle (m2) Right Left (m2) Middle
Left
Flexural Wrap(+)
No. of Strip Slab Wrap Area
Ave Slab Wrap No. of Wrap Width No. of Layer(s) Concrete Area
Structure Remarks Similar Width, b Length (m2) Midle Material
Thk (mm) Length (m) Strip (m) Bottom Bottom (m2) Bottom
Slab (mm) (m) Bottom
GRAHA ANABATIC
Lantai 12
300 4.50 100 3.83 3.00 300 1 3.4 13.77 SCH-41 (Horizontal Strip)
Gudang t = 100 mm 4
300 2.50 100 2.13 5.00 300 1 3.2 12.75 SCH-41 (Vertical Strip)
200 4.50 100 3.83 3.00 200 1 2.3 48.20 SCH-41 (Horizontal Strip)
Kantor t = 100 mm 4,5 x 2,5 21
200 2.50 100 2.13 5.00 200 1 2.1 44.63 SCH-41 (Vertical Strip)
200 4.50 100 3.83 2.00 200 1 1.5 12.24 SCH-41 (Horizontal Strip)
Kantor t = 100 mm 4,5 x 1,5 8
200 1.50 100 1.28 5.00 200 1 1.3 10.20 SCH-41 (Vertical Strip)
200 2.25 100 1.91 3.00 200 1 1.1 4.59 SCH-41 (Horizontal Strip)
Kantor t = 100 mm 2,25 x 2,25 4
200 2.25 100 1.91 3.00 200 1 1.1 4.59 SCH-41 (Vertical Strip)
Koridor lt2 t = 100 300 4.50 100 3.83 2.00 300 1 2.3 13.77 SCH-41 (Horizontal Strip)
mm 4,5 x 2 6
300 2.00 100 1.70 5.00 300 1 2.6 15.30 SCH-41 (Vertical Strip)
Koridor lt2 t = 100 300 4.50 100 3.83 2.00 300 1 2.3 32.13 SCH-41 (Horizontal Strip)
mm 4,5 x 1,5 14
300 1.50 100 1.28 5.00 300 1 1.9 26.78 SCH-41 (Vertical Strip)
Koridor lt3 t = 100 300 4.50 100 3.83 2.00 300 1 2.3 16.07 SCH-41 (Horizontal Strip)
4,5 x 1,5 7
mm 300 1.50 100 1.28 5.00 300 1 1.9 13.39 SCH-41 (Vertical Strip)
300 4.50 100 3.83 2.00 300 1 2.3 18.36 SCH-41 (Horizontal Strip)
Arsip t = 100 mm 8
300 1.50 100 1.28 5.00 300 1 1.9 15.30 SCH-41 (Vertical Strip)
500 4.50 200 3.83 3.00 500 1 5.7 28.69 SCH-41 (Horizontal Strip)
Podium t = 200 mm 5
500 2.50 200 2.13 5.00 500 1 5.3 26.56 SCH-41 (Vertical Strip)
Pertemuan t = 200 500 4.50 200 3.83 3.00 500 1 5.7 143.44 SCH-41 (Horizontal Strip)
4,5 x 2,5 25
mm 500 2.50 200 2.13 5.00 500 1 5.3 132.81 SCH-41 (Vertical Strip)
Pertemuan t = 200 500 4.50 200 3.83 2.00 500 1 3.8 57.38 SCH-41 (Horizontal Strip)
mm 4,5 x 1,5 15
500 1.50 200 1.28 5.00 500 1 3.2 47.81 SCH-41 (Vertical Strip)
Subtotal 738.74 TYFO SCH-41
Hogging Wrap(+)
No. of Strip Slab Wrap Area
Ave Slab Wrap Length No. of Wrap Width No. of Layer(s) Concrete Area
Structure Remarks Similar Width, b Length (m2) Midle Material
Thk (mm) (m) Top +1 m Strip (m) Top Top (m2) Top
Slab (mm) (m) Top
GRAHA ANABATIC
Lantai 12
500 4.50 100 3.15 5.00 300 1 4.7 18.90 SCH-41 (Horizontal Strip)
Gudang t = 100 mm 4
500 2.50 100 1.75 9.00 300 1 4.7 18.90 SCH-41 (Vertical Strip)
300 4.50 100 3.15 5.00 300 1 4.7 99.23 SCH-41 (Horizontal Strip)
Kantor t = 100 mm 4,5 x 2,5 21
300 2.50 100 1.75 9.00 300 1 4.7 99.23 SCH-41 (Vertical Strip)
300 4.50 100 3.15 3.00 300 1 2.8 22.68 SCH-41 (Horizontal Strip)
Kantor t = 100 mm 4,5 x 1,5 8
300 1.50 100 1.05 9.00 300 1 2.8 22.68 SCH-41 (Vertical Strip)
300 2.25 100 1.58 5.00 300 1 2.4 9.45 SCH-41 (Horizontal Strip)
Kantor t = 100 mm 2,25 x 2,25 4
300 2.25 100 1.58 5.00 300 1 2.4 9.45 SCH-41 (Vertical Strip)
Koridor lt2 t = 100 400 4.50 100 3.15 4.00 300 1 3.8 22.68 SCH-41 (Horizontal Strip)
4,5 x 2 6
mm 400 2.00 100 1.40 9.00 300 1 3.8 22.68 SCH-41 (Vertical Strip)
Koridor lt2 t = 100 400 4.50 100 3.15 3.00 300 1 2.8 39.69 SCH-41 (Horizontal Strip)
4,5 x 1,5 14
mm 400 1.50 100 1.05 9.00 300 1 2.8 39.69 SCH-41 (Vertical Strip)
Koridor lt3 t = 100 400 4.50 100 3.15 3.00 300 1 2.8 19.85 SCH-41 (Horizontal Strip)
4,5 x 1,5 7
mm 400 1.50 100 1.05 9.00 300 1 2.8 19.85 SCH-41 (Vertical Strip)
400 4.50 100 3.15 3.00 300 1 2.8 22.68 SCH-41 (Horizontal Strip)
Arsip t = 100 mm 8
400 1.50 100 1.05 9.00 300 1 2.8 22.68 SCH-41 (Vertical Strip)
500 4.50 200 3.15 5.00 300 1 4.7 23.63 SCH-41 (Horizontal Strip)
Podium t = 200 mm 5
500 2.50 200 1.75 9.00 300 1 4.7 23.63 SCH-41 (Vertical Strip)
Pertemuan t = 200 500 4.50 200 3.15 5.00 300 1 4.7 118.13 SCH-41 (Horizontal Strip)
4,5 x 2,5 25
mm 500 2.50 200 1.75 9.00 300 1 4.7 118.13 SCH-41 (Vertical Strip)
Pertemuan t = 200 500 4.50 200 3.15 3.00 300 1 2.8 42.53 SCH-41 (Horizontal Strip)
4,5 x 1,5 15
mm 500 1.50 200 1.05 9.00 300 1 2.8 42.53 SCH-41 (Vertical Strip)
Subtotal 878.85 TYFO SCH-41