SAUDI ARAMCO CONSORTIUM INSPECTION CHECKLIST SACIC NUMBER DATE APPROVED QR NUMBER
EQUIPMENT ID NUMBER(S) EQUIPMENT DESCRIPTION EQPT CODE SYSTEM ID. PLANT NO.
LAYOUT DRAWING NUMBER REV. NO. PURCHASE ORDER NUMBER EC / PMCC / MCC NO.
SCHEDULED INSPECTION DATE & TIME ACTUAL INSPECTION DATE & TIME QUANTITY INSP. MH's SPENT TRAVEL TIME
SAUDI ARAMCO USE ONLY
SAC TIP NUMBER SAC ACTIVITY NUMBER WORK PERMIT REQUIRED?
ITEM
ACCEPTANCE CRITERIA REFERENCE PASS FAIL N/A RE-INSP DATE
No.
Project
Any material used shall be new and unused, procured / manufactured by
specification RE-
A1 the Contractor and shall be in accordance with the required specification
631005 Appendix
with regard to quality and dimensions.
B. Para 3
A 3.0 mm (wet) thick coating of vapor seal mastic shall be applied to the Project
surface of the insulation as soon as possible after erection. Whilst this specification RE-
A2
coat is still wet, glass cloth shall be laid over the surface and embedded in 631005 Appendix
the mastic B. Para 3
Project
Care shall be taken to ensure that the glass cloth is laid smooth and free
specification RE-
A3 from wrinkles, and that no pockets of air are trapped beneath the surface.
631005 Appendix
At junctions in the glass cloth, the overlap shall not be less than 75 mm.
B. Para 3
Project
A second 3 mm thick coat of mastic shall be applied after approximately
specification RE-
A4 twelve hours. When dry this coating shall be a minimum of 1.50 mm thick.
631005 Appendix
B. Para 3
Project
Care must be taken, however to ensure that the individual coats are not
specification RE-
A5 greater than 3 mm thick (especially in corners), otherwise some cracking
631005 Appendix
of dried coat may result.
B. Para 3
The total dry film thickness of vapor seal shall not be less than 2.5 mm. Project
The mastic shall not be applied over wet insulation or until the adhesive is specification RE-
A6
dry. During this drying time the insulation shall be protected from the 631005 Appendix
weather by covering it suitably with tarpaulin or similar means. B. Para 3
Project
Where joints have been left uninsulated, a complete vapor seal as
specification RE-
A7 specified above shall be applied to the exposed end of the insulation and
631005 Appendix
flashed weather tight on to the metal.
B. Para 3
Project
If in-situ method of foaming is to be employed, cavities have to be specification RE-
A8
checked for humidity and presence of any condensate water or rain water. 631005 Appendix
B. Para 3
To avoid humidity inside the sheet metal jacketing the foaming shall be Project
done immediately after fitting of the jacketing. A sufficient number of specification RE-
A9
ventilation and filling holes must be drilled for foaming purpose which has 631005 Appendix
to be weather protected immediately after completion. B. Para 3
STANDARD CUT OFF MAY 31 2016 REV.2
SAUDI ARAMCO CONSORTIUM INSPECTION CHECKLIST SACIC NUMBER DATE APPROVED QR NUMBER
Project
Instructions and recommendations of insulation and vapor barrier specification RE-
A11
manufacturers shall be followed. 631005
Para 3.3
REMARKS:
REFERENCE DOCUMENTS:
1. Project Specification RE-631005 SPECIFICATION FOR INSULATION