You are on page 1of 4

QUALITY TRAINING/TOOLBOX Ref.

No: SAC-MYP-QA-(P4)-QTB-
1880
KING SALMAN INTERNATIONAL COMPLEX FOR MARITIME
INDUSTRIES AND SERVICES (MYP)
Date: 10-March-2022
25-00053,0004,0005, 0006, 0007/
6600042823 (IK) PAGE 1 OF 3

Topic: Mechanical Board Insulation Installation

Location:
SEPCO LAYDOWN

Attachment I: Attendance List

Attachment II: Overview of QTB

Attachment II: Photos

Prepared By Name Signature Date

HVAC QC Inspector ASAD LAAB DIN 10-March-2022


Attendance Sheet

QUALITY TRAINING/TOOLBOX KING


Ref. No: SAC-MYP-QA-(P4)-QTB-
SALMAN INTERNATIONAL COMPLEX FOR MARITIME INDUSTRIES 1880
AND SERVICES (MYP)

25-00053,0004,0005, 0006, 0007/ Date: 10-March-2022


6600042823 (IK)
PAGE 2 OF 3

No. Name Discipline Job Position Signature

10

11

12

13

14

15

16

17
QUALITY TRAINING/TOOLBOX KING
Ref. No: SAC-MYP-QA-(P4)-QTB-
SALMAN INTERNATIONAL COMPLEX FOR MARITIME INDUSTRIES 1880
AND SERVICES (MYP)

25-00053,0004,0005, 0006, 0007/ Date: 10-March-2022


6600042823 (IK)
PAGE 3 0F 3

Purpose:
Purpose of QTB to Familiarized construction team to installation requirements of Duct
Insulation
Installation
 Duct joints shall be sealed prior to insulation

 Insulation installed indoors shall be protected from mechanical damage by an


approved and acceptable method.

 Insulation installed or exposed outdoors shall be metal cladded or protected by an


approved and acceptable method from moisture and sunlight degradation.

 Factory-made air ducts and faced insulations intended for installation on the exterior
of ducts shall be legibly printed with the name of the manufacturer, the thermal
resistance (R) value at installed thickness, and the flame-spread index and smoke
developed index of the composite material.

Attached Photos: -