Purpose:
Purpose of QTB to Familiarized construction team to installation requirements of Duct
Insulation
Installation
Duct joints shall be sealed prior to insulation
Factory-made air ducts and faced insulations intended for installation on the exterior
of ducts shall be legibly printed with the name of the manufacturer, the thermal
resistance (R) value at installed thickness, and the flame-spread index and smoke
developed index of the composite material.