QUALITY TRAINING/TOOLBOX Ref.

No: SAC-MYP-QA-(P4)-QTB-
1878
KING SALMAN INTERNATIONAL COMPLEX FOR MARITIME
INDUSTRIES AND SERVICES (MYP)
Date: 10-March-2022
25-00053,0004,0005, 0006, 0007/
6600042823 (IK) PAGE 1 OF 3

Topic: Refrigerant Piping Support Installation

Location:
SEPCO LAYDOWN

Attachment I: Attendance List

Attachment II: Overview of QTB

Attachment II: Photos

Prepared By Name Signature Date

HVAC QC Inspector ASAD LAAB DIN 10-March-2022


Attendance Sheet

QUALITY TRAINING/TOOLBOX KING


Ref. No: SAC-MYP-QA-(P4)-QTB-
SALMAN INTERNATIONAL COMPLEX FOR MARITIME INDUSTRIES 1878
AND SERVICES (MYP)

25-00053,0004,0005, 0006, 0007/ Date: 10-March-2022


6600042823 (IK)
PAGE 2 OF 3

No. Name Discipline Job Position Signature

10

11

12

13

14

15

16

17
QUALITY TRAINING/TOOLBOX KING
Ref. No: SAC-MYP-QA-(P4)-QTB-
SALMAN INTERNATIONAL COMPLEX FOR MARITIME INDUSTRIES 1878
AND SERVICES (MYP)

25-00053,0004,0005, 0006, 0007/ Date: 10-March-2022


6600042823 (IK)
PAGE 3 0F 3

Purpose:
Purpose of QTB to Familiarized construction team to installation requirements of
Refrigerant Piping Supports
Installation
 Refrigerant piping placed underground shall be protected against corrosion.
 Supports for refrigeration piping shall be non-combustible.
 Refrigerant piping and tubing shall be securely fastened to a permanent support
within 6 feet (1.8 m) following the first bend in such tubing from the compressor and
within 2 feet (610 mm) of each subsequent bend or angle
 Refrigerant piping and tubing shall be supported at points not more than 15 feet
(4570 mm) apart.
 Refrigerant piping and joints shall be exposed to view for visual inspection and
acceptance by the company representative prior to being covered or enclosed.

Attached Photos: -