Table of Content...................................................................................................................................2
1 Purpose .........................................................................................................................................3
2 Scope ............................................................................................................................................3
3 Customer Information ..................................................................................................................3
3.1 Site Information....................................................................................................................3
4 Commissioning Check List ..........................................................................................................4
4.1 FTJA Commissioning Check List ........................................................................................5
4.1.1 HW & SW Configuration ..........................................................................................5
4.1.2 Physical Lines Connection.........................................................................................5
4.1.3 ATM Cross Connections............................................................................................5
4.1.4 Check the NTP Server (IP Network Time Protocol), Neighbour Node Discovery
(NND) and the IP Routing table................................................................................................6
4.1.5 Identifications .............................................................................................................6
4.1.6 Alarms .........................................................................................................................6
4.1.7 Configuration SW Version File.................................................................................6
4.2 Node-B Commissioning Check List ....................................................................................7
4.2.1 Visual checks and inspection.....................................................................................7
4.2.2 Hardware and Software.............................................................................................7
4.2.3 Setup Parameters .......................................................................................................7
4.2.4 WCDMA Loop Test ...................................................................................................8
4.2.5 Transmitter Output Power Level .............................................................................9
4.2.6 External Alarms and Controls Tests ........................................................................9
4.2.7 Real Tilt Commissioining ..........................................................................................9
5 Flexi WCDMA Node-B COMMISSIONING Certificate of Completion .................................10
The purpose of this document is to give instructions to the network in the form of checklists for the
commissioning of the new FLEXI WCDMA NODE-B
The purpose of commissioning is:
- to prepare the FLEXI WCDMA NODE-B and the site for the integration test
- to ensure that the hardware is tested and that the hardware database is
configured according to the site specific documentation.
The purpose and the definition of main work phases are given in the following chapters. The
checklist of the work phases and the Certificate of Completion have been enclosed in this
document. The checklist is updated after each work phase. If problems occur, a Failure Report or
Site Deficiency Report is made and the number of the report is updated with regard to the
checklist.
2 Scope
The document is applied to the commissioning work by Nokia Siemens Networks. The Customer
Services for Nokia FLEXI WCDMA NODE-B. It is assumed that the installation of the exchange
has been completed and the deficiencies noticed during the installation have been corrected
3 Customer Information
Customer Name:
Site Address
Network Element:
Project Number:
COEO Number:
Initial / Extension
The Commissioning of the Network Element(s) (FTEB /Node-B system) and other agreed
scope of works have been carried out in accordance to the relevant Nokia Commissioning
Manuals and other provided document, as required, and that the attached checklist
presents a fair and true statement of completed works.
Check No 1.2.1
Completed
Point to Check
Transmission cables connected
Check No 1.2.2
Completed
Point to Check
Check that all IMA Groups are present
Check that the IMA Groups administration state is UNLOCKED
and the operational state is ENABLED
Check the differential Delay
Check No 1.2.3
Completed
Point to Check
Check traffic description exists as planned
Check that one virtual cross connect exists between Node B and
Master telecom WAM for CNBAP channel
Check virtual cross connect exists for AAL2 traffic as planned
4.1.4 Check the NTP Server (IP Network Time Protocol), Neighbour Node Discovery
(NND) and the IP Routing table
Check No 1.2.4
Completed
Point to Check
Check the FTJA public IP address
4.1.5 Identifications
Check No 1.2.5
Completed
Point to Check
Check System name
Check Location
4.1.6 Alarms
Check No 1.2.6
Completed
Point to Check
Refresh FTJA manager view
Check No 1.2.7
Completed
Point to Check
FTJA SW version file saved as
WBTS ID_FTJA_SW_yyymmdd.xml file
AXC Configuration file saved as WBTS ID_FTJA
config_yyymmdd.txt file
FTJA Configuration exported and saved as WBTS ID_FTJA
param_yyymmdd.xml file
Check No 1.3.1
Completed
Point to Check
Check the WCDMA BTS grounding
Check No 1.3.2
Completed
Point to Check
Check BTS manager’s hardware view shows all installed units.
This will only happen if hardware is all at the same software level.
Check WCDMA BTS software version and update if necessary.
Check No 1.3.3
Completed
Point to Check
Define general settings
Define TX cabling
Save BTS parameter as WBTS ID_BTScparam_yyyymmdd.xml
file
Send parameters to BTS
Save commissioning report as
WBTS ID_BTScomreport_yyyymmdd.txt file
Check the BTS status from the WCDMA BTS Manager after site
restart
Save the BTS_HW_version.txt file.
Check No 1.3.4
Completed
Point to Check
Select the Reset Test State command from the Tests menu
Select the WCDMA Loop Test command from the Tests menu
Check No 1.3.5
Completed
Point to Check
Run the BTS output power test to cell 1 (Test Model 1 & Number
of DPC 16) and type RF-power and VSWR readings into result
box.
Stop the test and change tester sensor to next cell
Check No 1.3.6
Completed
Point to Check
External Alarm Port 1: CPS Failure alarm
Check No 1.3.7
Completed
Point to Check
Real Tilt / RCU SW upgraded
Nokia Siemens Networks hereby states that the whole of supplies detailed above have been
inspected, tested and unless otherwise stated confirm to the specified requirements in the contract
or order indentified above.
Date: _______________________