Building : ______________

Form No. : FMD-F-11-02.10.10.2


Date : ______________

JOCKEY PUMP PREVENTIVE MAINTENANCE CHECKLIST

Site Name : _____________________ Type / Rating : ____________________ Asset No.: __________________


Site Location : _____________________ Brand : _____________________________ Serial No.: __________________
Equipment No:

WEEKLY 2005
Temperature monitoring of Electrical Controllers (C.B., X-Former, WATT Meter) JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC
(Ideal Temperature - 40 C and below)
Week 1
Week 2
Week 3
Week 4
MONTHLY JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC
Tightening of Circuit Breaker Terminal, Contactor and Motor Terminals
Check Voltage Reading (Measure actual Voltage Reading)
Check Pilot Lamps
Check Shaft Seal (Check for Water Leak)
Check Bearing (Check For Heavy vibration)
Check Temperature of Motor
Check Rubber Coupling
Check Shaft (Check for heavy vibration and noise)
Tightening of mechanical bolts
Check the adjustment of drive motors and pumps
Check and Calibrate pressure gauge
IMPORTANT !!! Rated Amp. __________ JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC
Get the Ampere reading of MOTOR
QUARTERLY 1ST 2nd 3rd 4th
JANUARY APRIL JULY OCTOBER
Replace old Grease of all bearings (Pillow block, motors, etc.)
General Cleaning of Surroundings and Polishing of Flooring & (Replace all stained vinyl
tiles)
NOTE: Please report all damage equipment parts, and any unusual
or abnormal signs in equipment operation to your
Supervisor immediately

Prepared By: Checked By: Noted By:

________________________ _______________________ ___________________________


Maintenance-on-Duty Technical Assistant/Supervisor Property Manager

You might also like