Work Breakdown Structure

1 Avignon Baseball Stadium


1.1 Site
1.1.1 Clear Site
1.1.2 Demolish Building
1.1.3 Remove Debris
1.2 Substructure
1.2.1 Excavation
1.2.2 Foundation
1.2.3 Footing
1.2.4 Soil filling
1.3 Superstructure
1.3.1 Columns
1.3.2 Beam/Truss
1.3.3 Slab
1.3.4 Luxury Box
1.3.5 Exterior wall
1.3.6 Interior wall
1.3.7 Floor Finish
1.3.8 Paint Finish
1.3.9 Tile Finish
1.3.10 Metallic Cladding finish
1.4 Playground
1.4.1 Leveling
1.4.2 Boundaries
1.4.3 Grass
1.4.4 Scoreboard
1.5 Electrical
1.5.1 Cabling
1.5.2 Equipment
1.5.3 Lights
1.6 Mechanical
1.6.1 Building Envelope
1.6.2 Roof supports
1.6.3 Roof Tracks
1.6.4 Roof Panels
1.7 Inspection
1.7.1 Inspect
1.7.2 Rework
1.7.3 Final Inspection