PROGRAM OF WORKS
Item No. Description Unit Quantity Unit Cost Total Cost Percentage
AGGREGATE SUB-BASE
200 Cu.m. 135.00 1,117.01 150,796.35 75.59%
COURSE
Submitted By:
SGM CONSTRUCTION
`
PROJECT NAME: REHABILITATION/MAINTENANCE OF ROAD @
March 14, 2023
BARANGAY NUEVA VISTA-ALVENDA ROAD (BOUNDARY)
BILL OF QUANTITIES
(Columns (1), (2), (3) and (4) are to be filled up by the Procuring Entity ) (Column (5) & (6) are to be filled up by the bidder)
Submitted By:
SGM CONSTRUCTION
`
PROJECT NAME: REHABILITATION/MAINTENANCE OF ROAD @ BARANGAY
March 14, 2023
NUEVA VISTA-ALVENDA ROAD (BOUNDARY)
DETAILED ESTIMATES
B) Equipment:
1 Road Grader for 1 day @P 13,300.00 = P 13,300.00
1 Road Roller for 1 day @P 13,300.00 = P 13,300.00
26,600.00
C) Labor:
1 Foreman for 1 day @P 600.00 = P 600.00
2 Labor for 1 day @P 350.00 = P 700.00
1,300.00
Indirect Cost:
OCM = P 4,185.00
PROFIT = P 2,790.00
Tax/VAT = P 4,185.00
11,160.00
B) Equipment:
1 Dumptruck for 1 day @P 11,360.00 = P 11,360.00
1 Road Grader for 1 day @P 13,300.00 = P 13,300.00
1 Road Roller for 1 day @P 13,300.00 = P 13,300.00
37,960.00
C) Labor:
1 Foreman for 1 day @P 600.00 = P 600.00
2 Labor for 1 day @P 350.00 = P 700.00
1,300.00
Indirect Cost:
OCM = P 16,156.77
PROFIT = P 10,771.18
Tax/VAT = P 16,156.77
43,084.72
B) Equipment:
C) Labor:
1 Foreman for 1 day @P 600.00 = P 600.00
4 Labor for 1 day @P 350.00 = P 1,400.00
2,000.00
Indirect Cost:
OCM = P 1,032.75
PROFIT = P 688.50
Tax/VAT = P 1,032.75
2,754.00
Submitted By:
SGM CONSTRUCTION
PROJECT NAME: REHABILITATION/MAINTENANCE OF ROAD @ BARANGAY NUEVA VISTA-ALVENDA ROAD
(BOUNDARY) March 14, 2023
ACCOMPLISHMENT
25.00% 25.00% 25.00% 25.00%
CASH FLOW
49,873.84 49,873.84 49,873.84 49,873.84
CUMULATIVE ACCOMPLISHMENT
25.00% 50.00% 75.00% 100.00%
Submitted By:
SGM CONSTRUCTION
PROJECT NAME: REHABILITATION/MAINTENANCE OF ROAD @ BARANGAY NUEVA VISTA-
March 14, 2023
ALVENDA ROAD (BOUNDARY)
LOCATION: NUEVA VISTA, DON VICTORIANO, MISAMIS OCCIDENTAL
Project Manager 1
Project Engineer 1
Materials Engineer 1
Construction Foreman 1
Operator 2
Driver 1
Laborers 8
TOTAL 15
Submitted By:
SGM CONSTRUCTION
PROJECT NAME: REHABILITATION/MAINTENANCE OF ROAD @ BARANGAY March 14, 2023
NUEVA VISTA-ALVENDA ROAD (BOUNDARY)
LOCATION: NUEVA VISTA, DON VICTORIANO, MISAMIS OCCIDENTAL
Road Roller 1
Road Grader 1
TOTAL 3
Submitted By:
SGM CONSTRUCTION
PROJECT NAME: REHABILITATION/MAINTENANCE OF ROAD @ BARANGAY
March 14, 2023
NUEVA VISTA-ALVENDA ROAD (BOUNDARY)
LOCATION: NUEVA VISTA, DON VICTORIANO, MISAMIS OCCIDENTAL
Item No. Description Unit Quantity Unit Cost Total Cost Percentage 2 days 2 days 2.5 days
AGGREGATE SUB-BASE
200 Cu.m. 135.00 1,117.01 150,796.35 75.59% 37.79% 37.79%
COURSE
SPL 1 TARPAULIN unit 1.0 9,639.00 9,639.00 4.83% 1.61% 1.61% 1.61%
50 DAYS
500(3) 50 DAYS
III
B.5 311(1)
103(1)A B.9
V
5 DAYS
102(2)
B.8(1)
Submitted By:
SGM CONSTRUCTION