You are on page 1of 5
ASL Vessel Safety Co-ordination Committee (VSCC) Meeting Minutes as of oA a wnt tacos ‘eaten Teds Oe om wa "Zones ‘Bunkering / Transferring of Ot Ballasting/De-Balating HP Washing! Hydro Jetting ‘Get Blasting poe ree onerc | 0800 | 1800 | Zone 6, BKE 6 Power Tootin / Chipping Boiler Works | Firing Of Boller Popping Test Tank Cleaning Reps Maen iy Sen Actuation Oya Syst Using ofr le LiguéMtrogen Chemical Cerin! Usage Testing Of Non-routind{ General Load Testing Radiography Works VAL Handling of Pressurzed containers {Gas cylinders Extinguisher Et) (CO2 Ss Using OF Glue! Chock fast Turning OF Propeller shaft! Rudder ap Bomenting.cl Valves & Pipelines ing Of Drain Pl Openi Closing and z ae Shpederal PS ek Manhole Covers Dismanting Mesiying Scanned with CamScanner SSL Vessel Safety Co-ordination Committee (VSCC) Meeting Minutes as of 24/04/2023 — a cee Teas — ag i= is = AS = = 7200 | Bk 5.8.Engin rom Pafom deck, man deck, ae algo 200 ‘Aster’ oer mater, Charmas soy he meng a 2808 Tes oe hel wrk res aated ne ata Sere at vo teoents ton mccsons oust ba ane tl beer os Sonate Stare nie teas ware Ha Wopbos been aed on Signature f Nowe af ‘Chairman (HSE Officer'Supervisor) al Scanned with CamScanner &SL Vessel Safety Co-ordination Committee (VSCC) Meeting ATTENDANCE Vessel / Project Name: H1266 Date: 25/04/2023, Time: 09:30Hrs. SIN Trade Name | Sign ; M2590" | TimeEnd | Designation Name Sign 1. | Hut Nuruzzaman Xena 0: 2. | Hull ‘SSundaram ae 3.__| Piping Shohag 547] — [iqroo 14. | Piping Reddy y 5. | Paining Vicor 6. Electrical ‘Naung ot (7-60 T.__| Carpentry 8. | Commissioning 9. | Mechanical 10. awec 1. [HSE Malai To of 12. i 8. 14. SIN |) Company. Name | sign [Manpower | ine rna | Contact Number ene, a Yu Hup Seng (Hull) | Zoshim (85733444, 2. | Nanyang (Hull) Raizul 1077762 3. STM (Scaffold) Faruk Cy |0Z 91923609 4. | Faras (Hull) pow Seed 5._| Apex (Painting) Ramu 6. deneric (Painting) | K Thiru 7.__| Hitech (Elect) _| Selvaraiu os Too [QQaaa ye 8. ‘Sun Hai (Piping) Nur Hossain olf [700 | 82693¢20 o - Contin joy igo n ni 11. 12. OWNER CONTRACTOR SUPERVISOR SIN | Company Name | Sign [Ma2po*ETTise Ena! Contact Number is ses 2. eT 3. c 4. 5. a 6 7 ne Signature: Name Name Mala Secretary (ASE Officer/Supervisor) “ALL ACCIDENTS ARE PREVENTABLE” Scanned with CamScanner SSL vesset Safety Co-ordination Committee (VSCC) Meeting Minutes as of 24/04/2023 Weseer cae Toeaton “Tosa Oate wesing Re Tne vie “Zone "stoaz023, Wn Myint Zaw Pat Monowar/ Mala Mechanical ‘Sundaram Zaman Rec Soh Marienanoe Nat ‘owac: fous VSCC mecting ationdance ist [ Need do clear al unwanied vert nk a main deck punp fom ‘Qveoadrutish sip at man deck ood to replace ning d3y co not acs at open a6 ies l work mus 0 od Disconctcuting th om hose while not us | 190732_| Nyang_[ Zoe(B) Bock 7 Fabrication of BKOT AO | 0605 a 2 [20728 “ASLYHS | Fateaton waste, obicaion of Boos ones Kons Zk | 0805 S| Yn72t ASH | Bock 2 ertoal 4035, uth up woting ring pe Feat 7.04 | 3004 4 f07a| ASL Hat Ground rea 20ecfbrcabn ook no and ober os ens ZL4 | 0805 [0728] ASL vst Be zoe, nartoe uch up meng 704 0308 [130731 | ASL ul | Man dct engne room 131038, stares Toondaton nla Hod | 050 7 | is0723—| ASL Hal | Zonef6) Bx 5 Fabraton of BTS ‘04 | 3008 [fret] ASL Hat | Ene oom f- 121030, fundabn insta wing wing — 16.04 | 2804 30725 | ASL tat Pang room wai trk P= 301033, ch up weding orig ao] 2104 | Cnet 30727 [ASL ul | Pup oon vod tank St = 301033. ouch up weg nding Zot | 7204 | exanedl i] 130735 | ASL Hl | Vad space pti oom 2537 manhole ntl and acess ating Ho | 3004 42] 130733 | ASL Hu] 8K ,2¥- 01030 ps, eecton nt plato deck and engin oon foudalon Ba ae fone 7. 13462) | ASL-Ppng_| Png workshop one B pipes and sigpot fabrication “122506 | ASL Ping | Pom dock 1030, ital poe peneaion and senor 1208-2508 18 | f3624 | ASL Ping | Eran toon F125 sta pge peneaon and supports 1208 | 2508 AS. | Man 6-1 38, sal pp pnetaion nd weling, gindng— 1904 | 0205 [SUN | Paton deck 10030 instal pe pnetaton and weling ing aoe oe Cana “FSLPeing_| Sip etal 8 o 10, tal vos ppespenetabon 1308 | 2608 SUN Png worst labreton and weg, wot | 05 7ASLPipeg_| Engine roo vod tank 16 to 30 nal pe penebabon and suppor 908-2508 ASL-Pipng_| Pi dak vod space CB 10, tal ppe pereaton ard spas Zot [258 [ASCP Geoud tea tne bk 721082, sal pie and supgors Zot | 508 “ASL Pam dck vod spce S F770 30, sal pg penetaton snd pps Za | 508 Rm “ASP A void nk 6 stl pe penebon and supa 2401 | 30 : aE is Scanned with CamScanner SL Vessel Safety Co-ordination Committee (VSCC) Meeting Minutes as of 24/04/2023 Vesser astcaree Toeation Todays Date ‘Westng Wo. i266 Na Zone’) 25042023 7 735188_|_AcTech | Engine rom platform deck 5 1 0, instal evel sensors Fanges Trot | 5008 435196_| H-Tech | Old CNG workshop fabrication electical racket 1704 | 3004 5 733085__| —H-Tech | Engine room foor fr 151030, instal he adder suppor coaming 2004 | 0305 38_[ 133087 [H-Teon | MELO sump tankfr~ 191025 instal level swich fange 2404 | 3004 Work in Confined 1 STLO nk eras] ASL-YHS, Hot work 19042023 | 25042023, 5 2 | Vor space (purer oom) — | 67569 | ASL-YHS Hot work 24047023 | 30042023, 3._| Erne room vod tak C cams | ASL png Hot work 19042003 | 25042023 4 | Paton decid space S| 64206 | ASLPoing Hol work 20047023 | 26042003, pa | Porn deck vod space C | 64207 | ASL Png Hot work zo047023 | 26042003, 6_| Avo tank erase _| _ ASL-Ping Hot work 24047073 | 30042023, zi 3 aie fo| Efe weid Spe it feck 12_| Purproon 9 ener llr painting too4zies | 25062103 a pe rs 7s z : ¢ T. 8. Hot works Hot works Hot works Hotwors, Hotworks | Painting / Blasting Block 1.2 extemal S Hotworks ne room pafom deck Paning [Bi 9. { Engine com H Paning [Bl 10) Pressure Testing: Incompatible Work Processes: Hazardous Activities Trade Time

You might also like