You are on page 1of 1

VESSEL NAME

COMMISSIONING CHECK LIST Project No HULL-1266

GALLEY & PROVISION STORE EQUIPMENT Drawing No NA


Location : ASL - Singapore Date
STATUS
Chkp. No CHECK DESCRIPTION Verified Onboard
NA Remarks
(Tick - Done)

A Mechanical Check
A.1 Galley Range installation completed at Galley
A.2 Microwave installation completed at Galley
A.3 Water Boiler installation completed at Galley
A.4 waste Disposer installation completed at Galley
A.5 Refrigerator installation completed at Galley
A.6 RO & UV Water purifier installation completed at Galley
A.7 Washing Machine installation completed at laundry
A.8 Dryer Machine installation completed at laundry
A.9 Refrigerator installation completed at Provision Store
A.10 Freezer installation completed at Provision Store
C Electrical check
C.1 Cable termination & connection comply with dwg Single Line Diagram
C.2 Panel in good condition and location comply with dwg
C.3 Loop and meger test done as per QC Record
C.4 Grounding cable terminated properly
C.5 Check power cable termination at Galley Range
C.6 Check power cable termination at Microwave
C.7 Check power cable termination at water boiler
C.8 Check power cable termination at waste Disposer
C.9 Check power cable termination at Galley Refrigerator
C.10 Check power cable termination at RO &UV
C.11 Check power cable termination at Washing Machine
C.12 Check power cable termination at dryer Machine
C.13 Check power cable termination at provision store Refrigerator
C.14 Check power cable termination at provision store Freezer
C.15 Check power cable termination at Washing Machine
C.16 check completed install cable tag

Page 1 of 1