IRAQ GATES CONTRACTING CO.

Inspection & Test Plan for Temporary Office Report No.


Electrical Works Sheet: 1 of 1

CABLE TRENCH AND DUCT BANK INSPECTION BEFORE CABLE PULLING


(Trench Inspection /Rout.-before Cable Laying)
TAG No: Sub-System No:

Drawing No: Rev:

From:
Service: Location
To:
Results
SL. No: Checks to be performed
ACC REJ N/A

1 Cable trench route according to layout drawing. □ □ □


2 Cable trench depth and width are correct. □ □ □
3
Cable trench sand bed as per the drawing/specification and
free from stones and foreign debris. □ □ □
4 Cable trench is clear of sharp objects and no obstructions. □ □ □
5 Duct bank location and installation is as per the drawing. □ □ □
6 Duct bank is free from any obstructions and no sharp edges. □ □ □
7
Road crossing duct bank and sleeves provided with pulling
guide ropes. □ □ □
8 Cable trench released for cable pulling. □ □ □
9
□ □ □
NOTES: REQUEST FOR INSPECTION REFERENCE
RFI NO.

IGCC CONST IGCC QC BGC


Name: Name: Name:

Signature: Signature: Signature:

Date: Date: Date:

Form No: IGCC-OPM-QUA-FMT-0091 Rev.0