Professional Documents
Culture Documents
CPF
FITTINGS SPECIFICATION
EBS1-FPFA00-SAPI-SPMT-1023-D00
Date Sign
Code I Information only Submission - Accepted
Rejected – Major Comments – Data Provider to revise and re-submit. Work
Code R should NOT proceed in the affected areas until comments are resolved.
Comments Returned – Data provider to revise and re-submit for the further
Code C review.
Code A Accepted – Approved – No further submission required
CONTENTS
ABBREVIATIONS ................................................................................... 5
HOLDS .............................................................................................. 7
1.0 INTRODUCTION ............................................................................ 8
1.1 Project Description ............................................................................... 8
ABBREVIATIONS
Abbreviation Description
AFD Approved For Design
API American Petroleum Institute
ASME American Society of Mechanical Engineers
ASTM American Society for Testing & Materials
AYS Actual Yield Strength
B Boron
C Carbon
CLR crack length ratio
CSR crack surface ratio
CTR crack thickness ratio
Ca Calcium
CE Carbon Equivalent
Cr Chromium
CR Corrosion Resistance
CS Carbon Steel
Cu Copper
DCB Double-Cantilever-Beam
DP Dye Penetrant
H2S Hydrogen Sulphide
HAZ Heat-affected zone
HV Vickers hardness
HIC Hydrogen Induced Cracking
ID Internal Diameter
IFC Issued for Comment
ISO International Standards Organisation
ITP Inspection and Test Plan
Mn Manganese
Mo Molybdenum
MPS Manufacturing Procedure Specification
PIPELINE CORRIDOR FROM FPF TO
CPF
Abbreviation Description
MT Magnetic Test
N Nitrogen
NS Normalized, Sour Service
NACE National Association for Corrosion Engineers
Nb Niobium
NDE Non Destructive Examination
Ni Nickel
OD Outside Diameter
P Phosphorus
PSL Product Specification Level
PT Penetrant testing
PQR Procedure Qualification Record
QA/QC Quality Assurance/ Quality Control
S sulphur
SI International System of Units
Si Silicon
SIPC Sinopec International Petroleum E&P Corporation
SMYS, YSmin Specified Minimum Yield Strength
SMLS Seamless
SSC Sulphide Stress Cracking
SCC Stress Corrosion Cracking
Ti Titanium
UT Uniaxial Tensile (Test)
V Vanadium
WT Wall Thickness
% percent
PIPELINE CORRIDOR FROM FPF TO
CPF
HOLDS
HOLD
Section Description
No.
1 No Hold
PIPELINE CORRIDOR FROM FPF TO
CPF
1.0 INTRODUCTION
1.1 Project Description
China ZhenHuaOil Co., LTD. (ZhenHuaOil, hereinafter referred to as Company) holds
rights for development and production of the contract areas East Baghdad South
Oilfield (EBS Oilfield) which is located in the 14km of northeastern Baghdad, the
capital of Iraq, 70 km northwest of Ahdeb oilfield. The oilfield extends about 60km in
the NW-SE direction and 12km in the SW-NE direction. The concession of EBS oilfield
covers 658 km2.
EBS oilfield is located in the agricultural area of alluvial plain formed by Tigris and
Euphrates Rivers, 30~40m above sea level. Tigris River is close to the northern part of
the field located in an agricultural area with some villages. The transportation is
convenient, an expressway joins Baghdad and Basra passes by the oilfield.
Except for a few old wellheads, EBS oilfield is completely new to be developed.
According to preliminary development plan, EBS oilfield plans to be comprises of 134
new wellheads, 46 cluster well PADs, 2 OGMs, 1 FPF and 1 CPF. Produced water, water
injection system and also the supporting utilities and infrastructural facilities need to
be developed for the oilfield. The oil production is estimated to reach 40,000 BOPD.
For some applications, the sour oil to be conveyed may be very corrosive, containing
high values of H2S and/or CO2.The requirements shall be following this specification.
1.2 Weather and Geological Data
The Field is located in the dry and hot tropical desert climate zone. In summer (from
May to September), the temperature ranges from 38°C to 50°C. Winters are cool (from
October to April) with the temperature ranging from 2.1°C to 11°C. Winter is the main
rainy season with the average rainfall of about 100mm. Local meteorological data are
shown in the table below:
Table1.2-1 Environment Data
Item Specification
Temperature:
Max. Atmospheric Temp. 55℃
Min. Atmospheric Temp.
-5℃
Wet Bulb Temperature
PIPELINE CORRIDOR FROM FPF TO
CPF
Item Specification
Relative Humidity:
Max. (November-March) 90-100 %
Min. 10 %
Rain Fall:
Max. 200mm/year (45mm/day)
Rain Fall Season November-March
Wind:
General Direction 85%N. W.-SE
Max. recorded Wind Speed 160km/hr
Wind Speed for Design Purpose 165 km/hr @15m Height (3 seconds gust)
Agilent
Agilent Technologies Agilent Technologies
Gas Chromatography Technologies 7890B
7890B ac 7890B ac
ac
Sampling Pressure
0.84 24 5.5
(Kg/cm2)
Compounds:
PIPELINE CORRIDOR FROM FPF TO
CPF
Butanethiol 0.006 0 0
PIPELINE CORRIDOR FROM FPF TO
CPF
Diethyl sulfide 0 0 0
2-Methyl thiophene 0 0 0
Fe3+ 190 8
1.5 Definitions
CLIENT : China ZhenHuaOil Co., LTD
COMPANY : NORINCO International.
CONTRACTOR : The firm/corporation with whom the COMPANY has
entered into an agreement for the WORK, which can
be a VENDOR or a BIDDER (as the case may be)
SUB-CONTRACTOR : The firm/corporation to which the CONTRACTOR may
in turn Sub-Contract part of the WORK subject to prior
approval of the COMPANY.
WORK : All temporary and permanent work described in
CONTRACT and specifications.
VENDOR/BIDDER : The organisation awarded a Purchase Order/Contract
for supply of materials, equipment or service required
for the WORK.
MANUFACTURER : The organisation responsible for the manufacture of
the equipment (not necessarily the VENDOR/BIDDER).
WILL : Used in conjunction with an action
SHALL : Mandatory requirement
1.6 Language and Units of Measurement
All documentation exchanged on this Project shall be in the English language. Units of
measurement shall in general follow SI practise.
Preferred units of measurement are as follows:
Table 1.6-1 Units of Measurement
Square metres m2
Area Square Centimetres cm2
Square millimetres mm2
Hardness Vickers at 10 Kg
Hardness HV10
load
PIPELINE CORRIDOR FROM FPF TO
CPF
Kilogram Kg
Weight
Gram, Milligram g, mg
Metre m
Length/width Centimetre cm
Millimetre mm
Inch, Inch,
Pipe / Tubing Diameter
Millimetre mm
Degree Celsius ℃
Temperature
Degree Fahrenheit ºF
Inch Inch
Thickness Millimetre mm
Micron µm
PIPELINE CORRIDOR FROM FPF TO
CPF
ASTM A420 Standard Specification for Piping Fittings of Wrought Carbon Steel
and Alloy Steel for Low-Temperature Service
ASTM A815 Standard Specification for Wrought Ferritic,Ferritic/Austenitic,and
Martensitic Stainless Steel Piping Fittings
ASTM A923 Standard Test Methods for Detecting Detrimental Intermetallic
Phase in Duplex Austenitic/Ferritic Stainless Steels
ASTM A960 Standard Specification for Common Requirements for Wrought Steel
Piping Fittings
ASTM A961 Standard Specification for Common Requirements for Steel Flanges,
Forged Fittings, Valves, and Parts for Piping Applications
ASTM A370 Standard Test Methods and Definitions for Mechanical Testing of
Steel Products
ASTM E165 Test Method for Liquid Penetrant Examination
International Organization for Standardization (ISO)
ISO 9000 – 9004 Quality Management and Quality Assurance Standards
National Association of Corrosion Engineers (NACE)
NACE MR0175/ISO 15156 Petroleum,petrochemical,and natural gas industries-
Materials for use in H2S-containing environments in oil and gas
production
NACE TM-0177 Laboratory Testing of Metals for Resistance to Sulphide Stress
Cracking and Stress Corrosion Cracking in H2S Environments
NACE TM-0284 Evaluation of Pipeline and Pressure Vessle Steels for Resistance to
Hydrogen-Induced Cracking
Manufacturers Standardization Society of the Valve and Fittings Industry (MSS)
MSS SP-43 Wrought And Fabricated Butt-Welding Fittings For Low Pressure,
Corrosion Resistant Applications
MSS SP-53 Quality Standard for Steel Castings and Forgings for
Valves,Flanges,Fittings,and Other Piping Components. Magnetic
Particle Examination Method
MSS SP-54 Quality Standard for Steel Castings for Valves,Flanges,Fittings,and
Other Piping Components. Radiographic Examination Method
PIPELINE CORRIDOR FROM FPF TO
CPF
The final tally list, which shall accompany the materials, shall give each fittings its
unique number and the relevant heat number, weight and wall thickness to provide a
system of traceability.
A digital version of the Tally List shall be issued in a format to be agreed by COMPANY.
PIPELINE CORRIDOR FROM FPF TO
CPF
All NDE shall be performed in accordance with relevant code and standard of fittings.
Both surface and volumetric techniques shall be used to examine for:
• Surface examination
seamless pipe of material equivalent to the fitting material, and of the size and wall
thickness the fitting marking identifies.
In the event of any failure to meet the requirements of relevant code and standard as
amended by this Specification, the reason for failure shall be investigated by
VENDOR/BIDDER.
All fittings to which the failed test relates shall remain rejected and segregated until
COMPANY accepts the results of such investigation as satisfactory.
The NDE procedure(s) shall be qualified prior to commencement of production.
4.4 Mechanical Properties and Tests
Testing shall be carried out after all manufacturing process. Mechanical properties
required, and the tests to assess them, shall comply with the requirements of relevant
code and standard with the additions/changes given in the following sections.
Intergranular Corrosion Test
The intergranular corrosion test shall be taken on pipes according to ASTM A923
method C. The report shall be issued.
Hydrogen Induced Cracking Test (HIC only for sour service)
HIC test shall be performed and reported in accordance with NACE TM0284-2016 and
the requirements for sour service as detailed in clause H 7.3.1 of API 5L/ISO 3183.The
test for evaluation of resistance to hydrogen-induced cracking shall meet the following
acceptance criteria, with each ratio being the maximum permissible average for three
sections per test specimen when tested in Solution (Environment) A as per ISO 15156-
2:2015, Annex B B.5 &Table B.3:
• size — the nominal pipe size (NPS) identification number related to the end
connections shall be used
• compliance — see para. 4.4 for standard and special fitting marking
Any requirements for additional marking or for special locations or methods of marking
are subject to agreement by COMPANY.
PIPELINE CORRIDOR FROM FPF TO
CPF
• Ultrasonic Testing and Magnetic Particle Examination records for review at the
discretion of the COMPANY;
• Charts or other records of required and other tests. Test logs shall include test
data, a description of the item tested, a traceable identifying number and the
signature of the COMPANY’s inspector witnessing the test.
PIPELINE CORRIDOR FROM FPF TO
CPF
8.0 DOCUMENTATION
All documentation shall be compiled into a VENDOR/BIDDER’S record Book. The
VENDOR/BIDDER shall submit all documentation produced during the WORK as required
by this Specification, including but not limited to the following:
• Index;
• Inspection Certificates;
• Mill Certificates;
• Storage Procedures;
• Release Certificates;
• Dimensional Report;
• Inspection/Operator Certificates;
• Tally List;
• Release Notes;
• Chemical heat analysis of fitting steel for each heat giving percentages of
Carbon, Manganese, Phosphorus, Sulphur, Silicon, Magnesium, Nickel,
Chromium, Molybdenum, Copper, Vanadium, Titanium and the Carbon
Equivalent (both by CEIIW and Pcm formulas);