You are on page 1of 3

Project: Rehabilitation and Construction of Distribution Centres

and Network, Pemba (Contract No: FIPAG /WASISII/W - 4/19)

Rehabilitation and Construction of Distribution


To: JV COBA/CONSULTEC Project:
Centers and Network, Pemba

Att: Francisco Gove - SRE Location: Point G

Date: 28/June/2023

REQUEST FOR INSPECTION Nr. 479

Subject: Inspection of Works/ RFI No.479

Referring the clause 7.3 a) and b), of contract - We write to request you that the works described
hereunder is ready for inspection.

We request your inspection of the following work:


 Check and verification of the formwork – in the Guitter of the Operator´s House

Location: Point G
Expected date/time: June 29, 2023; 09H00

Signed for Sinohydro Date: 28/June/2023

Date: / /2023
Received by RE

The work described above is: □APPROVED


Comments:

□ NOT APPROVED
Reasons (if not approved)

Address: Avenida da Marginal No. 856, Bairro de Costa do Sol, Maputo, Mozambique
Mobile: +258- 846368057 / 842728803; Web: http://www.sinohydro.com
E-mail: liuqing@sinohydrohenan.com/
QCP - 002
REHABILITATION AND CONSTRUCTION OF DISTRIBUTION
CENTRES AND NETWORK, PEMBA (CONTRACT Nr:
FIPAG/WASISII/W-4/19)
Check-list N° 12 - POINT G

C
Struture: Operator´s House h NFI N°361
e
Location:Operator´s House AT POINT G Date: 29/June/2023
c
Part of the struture casted: TOP SLAB k From chainage:
-
Reference Drawing n° l To chainage:

□ Fundation i □ Elevation □ Slab


s
t
ITEMS : [YES] [NO] N/A REMARKS
S
Re-bars size conform to shop Drawings T
E
Re-bars position conform the shop Drawings and spaces are properly placed L
L
Reinforcement without substance would reduce the bond. Remove the possible R loose rust, clay, scale
grease prior to place steel E
I
Respect minimum overlap length for reinforced and welded wire N
F
O
Concrete coverage for reinforcement conform the shop Drawings
R
C order to provide a firm
Re-bars rigidly fixed and spacers appropariatly and sufficiently installed in
rebar cage E
M
E
Verified by: N Checked by: Approval by Engineer
(QCI) T (SQM)
□ Approved
F
O
R Comment:
C
Date: / /2023 O Date: / /2023
N
C □ Not Approved with comment:
R
E
T
E Date: / /2023
S
T
R
U
C
T
U