You are on page 1of 5

TENDER FOR THE SUPPLY AND DELIVER TO SITE PRECAST REINFORCED CONCRETE PIPE CULVERT

TAHUN 2023
PT GLOBALINDO AGUNG LESTARI
PT UNITED AGRO INDONESIA

SUMMARY

ITEM DESCRIPTION QTY UNIT SATUAN AMOUNT


(Rp) (Rp)

Supply, deliver and unloading of pre-cast reinforced


concrete pipe culvert of well vibrated grade K225
concrete including all necessary form work and
finishing fair on all exposed surface as detailed on
drawing.

1.0 Gorong - Gorong 100


Overall dimension 120cm diameter x 1m length
x 10cm thick x 100cm internal diameter and reinforced
with 1 layer of continuous M6 wire mesh well lapped
at joint and with minimum 40mm cover, for :-
(tendere to indicate length if other than 1m)

1.1 PT GAL - Lamunti Timur Estate 100 pcs

1.2 PT GAL - Lamunti Barat Estate 100 pcs

1.3 PT GAL - Mengkatip Estate 100 pcs

1.4 PT GAL - Bakuta Estate 100 pcs

1.5 PT UAI 100 pcs

TOTAL

Overall Period days

Length of Culvert m
TENDER FOR THE SUPPLY AND DELIVER TO SITE PRECAST REINFORCED CONCRETE PIPE CULVERT
TAHUN 2023
PT GLOBALINDO AGUNG LESTARI
PT UNITED AGRO INDONESIA

ANALYSA HARGA SATUAN

Harga Satuan
No Jenis Pekerjaan Unit Qty Harga (Rp)
(Rp)

1 PEKERJAAN GORONG - GORONG 100


a DIMENSI

> PANJANG cm

> DIAMETER DALAM 100 cm

> Ketebalan cm

b COR BETON K 225 m3


>Semen zak

>Batu Split Pecah Mesin 2/3 cm m3

>Pasir m3

c BESI BETON TERPASANG U - 39


>Besi beton polos diameter 6mm Kg
>Wire Mesh - 6 mm m2
>Kawat beton / bendrat Kg

d BEKISTING m2

Total Carried Forward to Summary

Note:
1 Quantity stated shall be measured nett - all workmanship, wastages, overlapping are deemed
inclusive.
2 Trial mix and testing are deemed inclusive
TENDER FOR THE SUPPLY AND DELIVER TO SITE PRECAST REINFORCED CONCRETE PIPE CULVERT
TAHUN 2023
PT GLOBALINDO AGUNG LESTARI
PT UNITED AGRO INDONESIA

ANALYSA HARGA SATUAN

Harga Satuan
No Jenis Pekerjaan Unit Qty Harga (Rp)
(Rp)

1 PEKERJAAN GORONG - GORONG 80


a DIMENSI

> PANJANG cm

> DIAMETER DALAM 80 cm

> Ketebalan cm

b COR BETON K 225 m3


>Semen zak

>Batu Split Pecah Mesin 2/3 cm m3

>Pasir m3

c BESI BETON TERPASANG U - 39


>Besi beton polos diameter 6mm Kg
>Wire Mesh - 6 mm m2
>Kawat beton / bendrat Kg

d BEKISTING m2

Total Carried Forward to Summary

Note:
1 Quantity stated shall be measured nett - all workmanship, wastages, overlapping are deemed
inclusive.
2 Trial mix and testing are deemed inclusive
TENDER FOR THE SUPPLY AND DELIVER TO SITE PRECAST REINFORCED CONCRETE PIPE CULVERT
TAHUN 2023
PT GLOBALINDO AGUNG LESTARI
PT UNITED AGRO INDONESIA

ANALYSA HARGA SATUAN

Harga Satuan
No Jenis Pekerjaan Unit Qty Harga (Rp)
(Rp)

1 PEKERJAAN GORONG - GORONG 80


a DIMENSI

> PANJANG cm

> DIAMETER DALAM 60 cm

> Ketebalan cm

b COR BETON K 225 m3


>Semen zak

>Batu Split Pecah Mesin 2/3 cm m3

>Pasir m3

c BESI BETON TERPASANG U - 39


>Besi beton polos diameter 6mm Kg
>Wire Mesh - 6 mm m2
>Kawat beton / bendrat Kg

d BEKISTING m2

Total Carried Forward to Summary

Note:
1 Quantity stated shall be measured nett - all workmanship, wastages, overlapping are deemed
inclusive.
2 Trial mix and testing are deemed inclusive
TENDER FOR THE SUPPLY AND DELIVER TO SITE PRECAST REINFORCED CONCRETE PIPE CULVERT
TAHUN 2023
PT GLOBALINDO AGUNG LESTARI
PT UNITED AGRO INDONESIA

ANALYSA HARGA SATUAN

Harga Satuan
No Jenis Pekerjaan Unit Qty Harga (Rp)
(Rp)

1 PEKERJAAN GORONG - GORONG 80


a DIMENSI

> PANJANG cm

> DIAMETER DALAM 30 cm

> Ketebalan cm

b COR BETON K 225 m3


>Semen zak

>Batu Split Pecah Mesin 2/3 cm m3

>Pasir m3

c BESI BETON TERPASANG U - 39


>Besi beton polos diameter 6mm Kg
>Wire Mesh - 6 mm m2
>Kawat beton / bendrat Kg

d BEKISTING m2

Total Carried Forward to Summary

Note:
1 Quantity stated shall be measured nett - all workmanship, wastages, overlapping are deemed
inclusive.
2 Trial mix and testing are deemed inclusive

You might also like