You are on page 1of 21

Petrojam

Kingston, Jamaica
Remote Field Inspection Report
E-5
Virgin Naphtha Splitter Feed / Naphtha Hydrofiner Feed
Exchanger
October 18, 2021
Report Prepared by
Bradford Dozier
bdozier@techcorr.com

Report Submitted to
Brian Case
Brian.Case@petrojam.com

Eddy Current Remote Field Near Field IRIS


Testing Testing Testing Testing
Petrojam October 18, 2021
Kingston, Jamaica
Remote Field Inspection Report
E-5 Virgin Naphtha Splitter Feed / Naphtha
Hydrofiner Feed Exchanger
Inspected By: Bradford Dozier Level IIA

—TABLE OF CONTENTS—

REMOTE FIELD INSPECTION REPORT

1. WORK SCOPE

2. TEST RESULTS

3. OBSERVATIONS

4. RESULTS MAP(s) (Optional Plug and 3-D Maps)

5. ORIENTATION and OBSERVATION PHOTOGRAPHS

6. REMOTE FIELD-TESTING METHOD

7. TEST PARAMETERS

8. EQUIPMENT and TUBE DATA

9. CALIBRATION DATA

APPENDIX

a. Tube Test Data

b. Calibration Graphics

c. Analysis Graphics

d. Standard of Care and Disclaimer

e. Contact Us

Preface
This report has been formatted to present all findings prior to any other content. Supporting content will follow the test
results.
Petrojam October 18, 2021
Kingston, Jamaica
Remote Field Inspection Report
E-5 Virgin Naphtha Splitter Feed / Naphtha
Hydrofiner Feed Exchanger
Inspected By: Bradford Dozier Level IIA

REMOTE FIELD INSPECTION REPORT


1. WORK SCOPE
Tech Corr Inspection’s Tubular Group performed Remote Field Testing (RFT) on the E-5
Virgin Naphtha Splitter Feed / Naphtha Hydrofiner Feed Exchanger for Petrojam located
in Kingston, Jamaica on October 18, 2021.

2. TEST RESULTS
97.80% of the tubes were tested. Most of the tubes did not have any relevant defect
indications. One tube was found to have a 56% wall loss indication in an isolated area
near the floating tubesheet. The rest of the tubes with indications had minor to moderate
general corrosion type indications found in random areas along the length of the tubes.
Obstructions due to unknown reasons. Remote field testing (RFT) cannot detect most
flaws at the tubesheets or baffles.
Indications that represent: # of tubes:
Total Number of Tubes (Straight Sections in U-Bend Tubes) 273
Total Number Tubes / Sections Tested 267
No Discernable Defects Detected (NDD) 161 N
10% to 19% wall loss / Minor 84 1
20% to 29% wall loss / Moderate 17 2
30% to 39% wall loss / Moderate 3 3
40% to 49% wall loss / Moderate 1 4
50% to 59% wall loss / Severe 1 5
60% to 69% wall loss / Severe 0 6
70% to Through Wall Hole (TWH) / Severe 0 7
Obstructed tubes in the Test Pattern No Test (OBS) 5
Mechanically Plugged Tubes No Test (PLG) 1 ▲

Results of Tubes Tested

NDD
10% to 19%
20% to 29%
30% to 39%
40% to 49%
50% to 59%
60% to 69%
70% to TWH
Petrojam October 18, 2021
Kingston, Jamaica
Remote Field Inspection Report
E-5 Virgin Naphtha Splitter Feed / Naphtha
Hydrofiner Feed Exchanger
Inspected By: Bradford Dozier Level IIA

Limitations: The Remote Field Test (RFT) examination method, typically has an
accuracy of + or - 10%, with a maximum tolerance of 19.99%. This accuracy can be
effected by the limitations encountered. When performing any electromagnetic
examination, it is important to understand the variations in the test system and test
specimen, as well as the parameters that effect data output. The following is a list of
some of the forms of variation that are commonly encountered that may have an effect
on the data generated when performing a Remote Field Test.
Tube Cleanliness Localized Permeability Electrical Noise / Interference
Probe Fill Factor Magnetic Deposits Geometry
Dented Area Tubesheet Area Composition Changes
Bulged Area Tube Support Area Temperature Changes
Edge Effect Residual Magnetism Conductivity Changes

3. OBSERVATIONS
Previous Tube Test: Previous inspection in 2018 reported one indication to 55% wall loss.
Tubesheet TS1 (test end): No relevant visual indications.
Tubesheet TS2: No relevant visual indications.
Baffles: N/A in shell
Tube O.D.: N/A in shell
Tube I.D.: Scale. Tube end Damage
Shell: N/A
Other:

4. RESULTS MAP (Following Page)


E-5 RFT Results
VN Splitter Feed / NH Feed Exchanger 97.80% of the tubes were tested.
Most of the tubes did not have any
relevant defect indications. One tube
1 N N N N N N N 1, 7 was found to have a 56% wall loss
indication in an isolated area near the
floating tubesheet. The rest of the
N N N N N N N N N N N 1 tubes with indications had minor to
moderate general corrosion type
N N N N 1 1 1 1 N N N N N 1 indications found in random areas
along the length of the tubes.
N N N 1 1 N N N N N N O N N N N Obstructions due to unknown
reasons. Remote field testing (RFT)
5 N N N N N 1 1 N 2 1 1 N N 1 1 1 5, 16 cannot detect most flaws at the
tubesheets or baffles.
1 N N N N N 1 1 1 1 N 1 1 1 N N N 2
1 1 1 1 1 2 3 2 1 1 2 2 1 1 1 1 1 1 LEGEND KEY

DESCRIPTION SYMBOL QTY


1 1 O 2 1 1 1 1 2 1 1 2 2 1 1 1 2 1 TOTAL HOLES 273(100%)
TOTAL TESTED 267(97.80%)
1 1 5 4 2 1 1 3 1 2 1 2 2 2 3 2 NDD N 161(58.97%)
10-19.9% 1 84(30.77%)
20-29.9% 2 17(6.23%)
10 1 1 1 1 N N N 1 1 1 1 1 1 1 1 1 1 O 10, 18 30-39.9% 3 3(1.10%)
40-49.9% 4 1(0.37%)
N N N N N N N N N N N N N N N 1 N N 50-59.9% 5 1(0.37%)
60-69.9% 6 0(0%)
N 1 N N N N N N N 1 1 N N N N 1 N N 70%-THRU WALL 7 0(0%)
OBS-NO DATA O 5(1.83%)
1 1 N N N N N N N N 1 1 N N N N N PLUGGED 1(0.37%)

N N N N N N N N N N N N N N N N
15 N N N N N N N N N N N N N N N 1 15, 16
N N 1 1 1 N N N N N N N N N www.TechCorr.com
Company: Petrojam
N O N 1 1 N N N N N N O Location: Kingston Jamaica
Unit:
18 1 N N N N N N N 18, 8 Equip.Number: E-5
Service: VN Splitter Feed / NH Feed Exchanger
Material: SA-179
Stationary End Size: 3/4"x.083"x240"
Inspection Type: RFT
Analyst: Bradford Dozier
Date: 10/18/2021
Petrojam October 18, 2021
Kingston, Jamaica
Remote Field Inspection Report
E-5 Virgin Naphtha Splitter Feed / Naphtha
Hydrofiner Feed Exchanger
Inspected By: Bradford Dozier Level IIA

5. ORIENTATION and OBSERVATION PHOTOGRAPHS

Orientation Photograph (TS1)

Row 1
Tube 1
Petrojam October 18, 2021
Kingston, Jamaica
Remote Field Inspection Report
E-5 Virgin Naphtha Splitter Feed / Naphtha
Hydrofiner Feed Exchanger
Inspected By: Bradford Dozier Level IIA

Observation Photographs
Exchanger Overview

Condition of tube end damage and tubesheet.


Petrojam October 18, 2021
Kingston, Jamaica
Remote Field Inspection Report
E-5 Virgin Naphtha Splitter Feed / Naphtha
Hydrofiner Feed Exchanger
Inspected By: Bradford Dozier Level IIA

6. REMOTE FIELD TESTING METHOD


Remote Field Testing (RFT) is the second most commonly used tube examination method. This
technique is performed on ferromagnetic materials, such as, Carbon Steel, 400 Series Stainless,
Duplex 2205, Chrome-Moly. The Remote Field technique is an electromagnetic examination
which utilizes the “through wall transmission effect” to produce a resultant field that is affected by
anomalies and is measured two to three tube diameters away from the AC excitation source
without the requirement of any tube magnetization or magnetic saturation. The purpose of this
application is to detect I.D. and O.D. degradation such as corrosion, erosion, pitting, fretting and
gradual wall loss generally found in ferromagnetic tubing.

The Remote Field Technique is an


electromagnetic examination, which utilizes a
through-transmission process. The resultant field
is affected by either ID or OD tube wall
anomalies. RFT signal measurements are made
a few tube diameters away from the AC exciter.

A pair of pick-up coils located in the remote field


zone measures the resultant field to give both a
differential and an absolute signal. The signal
phase and amplitude information is used to
determine defect depth and volume. Because of
this configuration, RFT does not differentiate
between ID and OD flaws. Dual driver probes as
shown here reduce the blind spot created by the
support plate.

Remote Field Test (RFT) Method – Applications


• Examination of Ferromagnetic Tubing.
• Can detect and size corrosion, erosion, pitting, fretting, wearing, or a combination
of these.
• Can detect and size wearing (wall loss) at baffle or support locations of defects
25% or greater.
• Can examine low fin and skip fin tubing.
• Can examine tubes from 5/8” to 3” in diameter.
• Can examine tubing that has been coated with non-conductive coating.
Petrojam October 18, 2021
Kingston, Jamaica
Remote Field Inspection Report
E-5 Virgin Naphtha Splitter Feed / Naphtha
Hydrofiner Feed Exchanger
Inspected By: Bradford Dozier Level IIA

8. EQUIPMENT and TUBE DATA

Plant: Petrojam
Unit / Area: Crude
Equipment Number: E-5
Virgin Naphtha Splitter Feed / Naphtha Hydrofiner
Service:
Feed Exchanger
Built: N/A. Re-tubed sometime after 2014
National Board Number: N/A
Serial Number: N/A
Tube Material: SA-179
Type of Equipment: Shell and Tube Heat Exchanger
Tube Bundle: Floating
Bundle Orientation: Horizontal
Tube Type: Straight
Tube Surface: Prime
Joint Type: Rolled
Total Tubes in Exchanger: 273
Type of Test: Remote Field (RFT)
Total Tubes Tested: 267
Inspection End (TS1): Stationary Tubesheet
Row Orientation: Top to bottom
Tube Orientation: Left to right
Tube OD: .75”
Tube Wall Thickness: .083”
Tube Length: 240”
Tubes Mechanically Plugged: 1

The tube material type and dimensions as necessary to perform the test are provided by the client.
Inaccurate tube data will affect the final results and quantifications.

Tube data is recorded while testing and analyzed post testing with results documented in a tubesheet tube
map format and data sheets giving indication types, quantifications, and locations presented in this report.
Petrojam October 18, 2021
Kingston, Jamaica
Remote Field Inspection Report
E-5 Virgin Naphtha Splitter Feed / Naphtha
Hydrofiner Feed Exchanger
Inspected By: Bradford Dozier Level IIA

9. CALIBRATION DATA

Personnel
TechCorr utilizes highly trained and qualified personnel. Quality begins with TechCorr
maintaining personnel specialized in tube examinations. TechCorr personnel have been
through formal and specific classroom training, have received supervised On-The-Job training
hours and have been tested and qualified through TechCorr's extensive Quality Control
Program, which surpasses the American Society of Non-Destructive Testing's ASNT-TC-1A.
The equipment operator is required to pass extensive "mock bundle" tests, that are establish in
the industry for qualifying personnel prior to performing work in that plant or facility. Once in the
field, the equipment operator will acquire the data and have it analyzed within 48hrs by a Level
II Data Analyst. A preliminary report will then be issued representing the tubes and defects
depths found in the tubes. Formal reports will then follow within 1 day or less from the
completion of the analysis.

Analyst: Bradford Dozier Level IIA*


Acquisition: Diego Gamarra Level II*
Technician: Cristopher Surjan
*ASNT Recommended Practice No.: SNT –TC-1A
Acquisition Instruments
TechCorr utilizes some of the most state of the art examination equipment on the
market today. Some of the equipment used, is as follows: Eddyfi™ Ectane 2 system.
This is a very diversified system, which has the capabilities to perform Eddy Current
Testing (ECT), Remote Field Testing (RFT), Near Field Testing (NFT), Internal Rotating
Inspection System (IRIS) and Magnetic Flux Leakage (MFL) all in one system. Some of
the key features of this system include:
• Examination Data Storage.
This system allows data to be recorded and saved. This data, can then be
recalled for later inquiries.
• 4 simultaneous frequencies per input.
This feature allows inspection speeds up to 2 m/s with 4 frequencies on absolute
and differential channels, without signal distortion.
• Electronic probe balancing.
No separate external reference probe is required for absolute channel operation.
• 4 ECT inputs and up to 64 multiplexed channels.
The Ectane 2™ can support a large number of ECT channels to perform array
probe inspections. Compared to single-channel inspection, the array probe
technology allows faster and easier surface coverage.
Petrojam October 18, 2021
Kingston, Jamaica
Remote Field Inspection Report
E-5 Virgin Naphtha Splitter Feed / Naphtha
Hydrofiner Feed Exchanger
Inspected By: Bradford Dozier Level IIA

Manufacture Model Serial Number Calibration Expiration


Tester: Eddyfi Ectane II 1426902 June 15, 2022
Fill Factor Poly Length
Probe (1): Corestar CD-500 DE/LF 0087-0817 73% 50’
Probe (2):
Poly (1): N/A
Poly (2): N/A

Calibration Standard(s)
Type Material Dimension Serial Number
Standard 1: Multipurpose RFT SA-214 C/S 3/4” x .083” RFT 21-211
Standard 2:
Test Instrument Settings
Frequency Drive Amplitude Differential Gain Absolute Gain
Frequency 1: 600 Hz X KHz 4 Volts 65 dB 56 dB
Frequency 2: 500 Hz X KHz 4 Volts 65 dB 56 dB
Frequency 3: Hz KHz
Frequency 4: Hz KHz
Mix Freq. 1: N/A KHz N/A N/A
Mix Freq. 2: N/A KHz N/A N/A
Sample Rate: 400 Hz Acquisition Mode Differential and Absolute
Bandwidth: 22 Hz Probe Type Bobbin/Conventional
Filter Cut Off Diff: 10 Hz Order 4 Scan Direction Pulling out
Filter Cut Off Abs: 10 Hz Order 4 Max Scan Speed 1’ per sec.

Applicable Code
ASTM-RFT-E2096-00. Standard Practice for In Situ Examination of Ferromagnetic Heat
Exchanger Tubes Using Remote Field Testing.
Petrojam October 18, 2021
Kingston, Jamaica
Remote Field Inspection Report
E-5 Virgin Naphtha Splitter Feed / Naphtha
Hydrofiner Feed Exchanger
Inspected By: Bradford Dozier Level IIA

APPENDIX

Appendix A

TUBE TEST DATA


TechCorr USA, LLC E-5-RFT Petrojam
Bradford Dozier VN Splitter Feed / NH Feed Exchanger-Stationary End Kingston Jamaica
10/18/2021 SA-179 -3/4"x.083"x240"

% Wall Nominal Actual Wall Remaining


Row Tube Loss Wall Loss Wall Location Relative to TS1 COMMENT
1 1 0% 0.083 0.000 0.083 0.0 No Defects Detected
1 2 0% 0.083 0.000 0.083 0.0 No Defects Detected
1 3 0% 0.083 0.000 0.083 0.0 No Defects Detected
1 4 0% 0.083 0.000 0.083 0.0 No Defects Detected
1 5 0% 0.083 0.000 0.083 0.0 No Defects Detected
1 6 0% 0.083 0.000 0.083 0.0 No Defects Detected
1 7 0% 0.083 0.000 0.083 0.0 No Defects Detected
2 1 0% 0.083 0.000 0.083 0.0 No Defects Detected
2 2 0% 0.083 0.000 0.083 0.0 No Defects Detected
2 3 0% 0.083 0.000 0.083 0.0 No Defects Detected
2 4 0% 0.083 0.000 0.083 0.0 No Defects Detected
2 5 0% 0.083 0.000 0.083 0.0 No Defects Detected
2 6 0% 0.083 0.000 0.083 0.0 No Defects Detected
2 7 0% 0.083 0.000 0.083 0.0 No Defects Detected
2 8 0% 0.083 0.000 0.083 0.0 No Defects Detected
2 9 0% 0.083 0.000 0.083 0.0 No Defects Detected
2 10 0% 0.083 0.000 0.083 0.0 No Defects Detected
2 11 0% 0.083 0.000 0.083 0.0 No Defects Detected
2 12 14.9% 0.083 0.012 0.071 146.527 General Corrosion and Pitting
3 1 0% 0.083 0.000 0.083 0.0 No Defects Detected
3 2 0% 0.083 0.000 0.083 0.0 No Defects Detected
3 3 0% 0.083 0.000 0.083 0.0 No Defects Detected
3 4 0% 0.083 0.000 0.083 0.0 No Defects Detected
3 5 18.1% 0.083 0.015 0.068 164.55 General Corrosion and Pitting
3 6 17.4% 0.083 0.014 0.069 59.587 General Corrosion and Pitting
3 7 16.6% 0.083 0.014 0.069 47.775 General Corrosion and Pitting
3 8 14.8% 0.083 0.012 0.071 161.535 General Corrosion and Pitting
3 9 0% 0.083 0.000 0.083 0.0 No Defects Detected
3 10 0% 0.083 0.000 0.083 0.0 No Defects Detected
3 11 0% 0.083 0.000 0.083 0.0 No Defects Detected
3 12 0% 0.083 0.000 0.083 0.0 No Defects Detected
3 13 0% 0.083 0.000 0.083 0.0 No Defects Detected
3 14 13.3% 0.083 0.011 0.072 50.047 General Corrosion and Pitting
4 1 0% 0.083 0.000 0.083 0.0 No Defects Detected
4 2 0% 0.083 0.000 0.083 0.0 No Defects Detected
4 3 0% 0.083 0.000 0.083 0.0 No Defects Detected
4 4 15.8% 0.083 0.013 0.070 142.433 General Corrosion and Pitting
4 5 17.3% 0.083 0.014 0.069 127.965 General Corrosion and Pitting
4 6 0% 0.083 0.000 0.083 0.0 No Defects Detected

Page 1 - Defect Tube Map, E-5


TechCorr USA, LLC E-5-RFT Petrojam
Bradford Dozier VN Splitter Feed / NH Feed Exchanger-Stationary End Kingston Jamaica
10/18/2021 SA-179 -3/4"x.083"x240"

% Wall Nominal Actual Wall Remaining


Row Tube Loss Wall Loss Wall Location Relative to TS1 COMMENT
4 7 0% 0.083 0.000 0.083 0.0 No Defects Detected
4 8 0% 0.083 0.000 0.083 0.0 No Defects Detected
4 9 0% 0.083 0.000 0.083 0.0 No Defects Detected
4 10 0% 0.083 0.000 0.083 0.0 No Defects Detected
4 11 0% 0.083 0.000 0.083 0.0 No Defects Detected
4 12 0.083 0.0 Obstructed (Not Insp)
4 13 0% 0.083 0.000 0.083 0.0 No Defects Detected
4 14 0% 0.083 0.000 0.083 0.0 No Defects Detected
4 15 0% 0.083 0.000 0.083 0.0 No Defects Detected
4 16 0% 0.083 0.000 0.083 0.0 No Defects Detected
5 1 0% 0.083 0.000 0.083 0.0 No Defects Detected
5 2 0% 0.083 0.000 0.083 0.0 No Defects Detected
5 3 0% 0.083 0.000 0.083 0.0 No Defects Detected
5 4 0% 0.083 0.000 0.083 0.0 No Defects Detected
5 5 0% 0.083 0.000 0.083 0.0 No Defects Detected
5 6 10.4% 0.083 0.009 0.074 219.773 General Corrosion and Pitting
5 7 10.3% 0.083 0.009 0.074 214.983 General Corrosion and Pitting
5 8 0% 0.083 0.000 0.083 0.0 No Defects Detected
5 9 26.6% 0.083 0.022 0.061 20.299 Random Pitting
5 10 16.3% 0.083 0.014 0.069 25.294 General Corrosion and Pitting
5 11 13.1% 0.083 0.011 0.072 226.16 General Corrosion and Pitting
5 12 0% 0.083 0.000 0.083 0.0 No Defects Detected
5 13 0% 0.083 0.000 0.083 0.0 No Defects Detected
5 14 10.2% 0.083 0.008 0.075 224.938 General Corrosion and Pitting
5 15 11.9% 0.083 0.010 0.073 18.174 General Corrosion and Pitting
5 16 13.5% 0.083 0.011 0.072 193.125 Random Pitting
6 1 11.9% 0.083 0.010 0.073 176.01 Random Pitting
6 2 0% 0.083 0.000 0.083 0.0 No Defects Detected
6 3 0% 0.083 0.000 0.083 0.0 No Defects Detected
6 4 0% 0.083 0.000 0.083 0.0 No Defects Detected
6 5 0% 0.083 0.000 0.083 0.0 No Defects Detected
6 6 0% 0.083 0.000 0.083 0.0 No Defects Detected
6 7 14.3% 0.083 0.012 0.071 199.904 General Corrosion and Pitting
6 8 17.9% 0.083 0.015 0.068 218.077 General Corrosion and Pitting
6 9 17.5% 0.083 0.015 0.068 213.956 General Corrosion and Pitting
6 10 13.3% 0.083 0.011 0.072 232.148 General Corrosion and Pitting
6 11 0% 0.083 0.000 0.083 0.0 No Defects Detected
6 12 10.4% 0.083 0.009 0.074 14.167 General Corrosion and Pitting
6 13 18.3% 0.083 0.015 0.068 124.328 General Corrosion and Pitting

Page 2 - Defect Tube Map, E-5


TechCorr USA, LLC E-5-RFT Petrojam
Bradford Dozier VN Splitter Feed / NH Feed Exchanger-Stationary End Kingston Jamaica
10/18/2021 SA-179 -3/4"x.083"x240"

% Wall Nominal Actual Wall Remaining


Row Tube Loss Wall Loss Wall Location Relative to TS1 COMMENT
6 14 12.6% 0.083 0.010 0.073 21.887 General Corrosion and Pitting
6 15 0% 0.083 0.000 0.083 0.0 No Defects Detected
6 16 0% 0.083 0.000 0.083 0.0 No Defects Detected
6 17 0% 0.083 0.000 0.083 0.0 No Defects Detected
6 18 27.6% 0.083 0.023 0.060 151.035 General Corrosion and Pitting
7 1 13.5% 0.083 0.011 0.072 136.635 General Corrosion and Pitting
7 2 16.4% 0.083 0.014 0.069 135.684 General Corrosion and Pitting
7 3 13.8% 0.083 0.011 0.072 194.843 General Corrosion and Pitting
7 4 15.8% 0.083 0.013 0.070 217.898 General Corrosion and Pitting
7 5 18.9% 0.083 0.016 0.067 215.264 General Corrosion and Pitting
7 6 23.8% 0.083 0.020 0.063 78.634 General Corrosion and Pitting
7 7 35.4% 0.083 0.029 0.054 22.996 General Corrosion and Pitting
7 8 21.5% 0.083 0.018 0.065 212.16 General Corrosion and Pitting
7 9 19.4% 0.083 0.016 0.067 229.477 General Corrosion and Pitting
7 10 19.8% 0.083 0.016 0.067 16.862 General Corrosion and Pitting
7 11 21.4% 0.083 0.018 0.065 223.226 General Corrosion and Pitting
7 12 22.3% 0.083 0.019 0.064 16.981 General Corrosion and Pitting
7 13 19.7% 0.083 0.016 0.067 17.924 General Corrosion and Pitting
7 14 18% 0.083 0.015 0.068 109.41 General Corrosion and Pitting
7 15 15.6% 0.083 0.013 0.070 23.931 General Corrosion and Pitting
7 16 15.2% 0.083 0.013 0.070 217.689 General Corrosion and Pitting
7 17 15.3% 0.083 0.013 0.070 226.753 General Corrosion and Pitting
7 18 18.4% 0.083 0.015 0.068 232.103 General Corrosion and Pitting
8 1 11.6% 0.083 0.010 0.073 229.762 General Corrosion and Pitting
8 2 12.7% 0.083 0.011 0.072 217.008 General Corrosion and Pitting
8 3 0.083 0.0 Obstructed (Not Insp)
8 4 20.7% 0.083 0.017 0.066 231.045 General Corrosion and Pitting
8 5 19.8% 0.083 0.016 0.067 229.965 General Corrosion and Pitting
8 6 19.7% 0.083 0.016 0.067 217.77 General Corrosion and Pitting
8 7 17.1% 0.083 0.014 0.069 103.306 General Corrosion and Pitting
8 8 14.8% 0.083 0.012 0.071 148.178 General Corrosion and Pitting
8 9 21.1% 0.083 0.018 0.065 36.021 General Corrosion and Pitting
8 10 12.8% 0.083 0.011 0.072 73.01 General Corrosion and Pitting
8 11 12.3% 0.083 0.010 0.073 26.432 General Corrosion and Pitting
8 12 20.5% 0.083 0.017 0.066 23.873 General Corrosion and Pitting
8 13 25.5% 0.083 0.021 0.062 132.473 General Corrosion and Pitting
8 14 19.6% 0.083 0.016 0.067 41.107 General Corrosion and Pitting
8 15 19.7% 0.083 0.016 0.067 132.698 General Corrosion and Pitting
8 16 14.8% 0.083 0.012 0.071 229.223 General Corrosion and Pitting

Page 3 - Defect Tube Map, E-5


TechCorr USA, LLC E-5-RFT Petrojam
Bradford Dozier VN Splitter Feed / NH Feed Exchanger-Stationary End Kingston Jamaica
10/18/2021 SA-179 -3/4"x.083"x240"

% Wall Nominal Actual Wall Remaining


Row Tube Loss Wall Loss Wall Location Relative to TS1 COMMENT
8 17 20.3% 0.083 0.017 0.066 229.065 General Corrosion and Pitting
8 18 16.6% 0.083 0.014 0.069 222.058 General Corrosion and Pitting
9 1 18.4% 0.083 0.015 0.068 12.948 General Corrosion and Pitting
9 2 16.5% 0.083 0.014 0.069 213.717 General Corrosion and Pitting
9 3 56.1% 0.083 0.047 0.036 213.01 General Corrosion and Pitting
9 4 45.3% 0.083 0.038 0.045 229.38 General Corrosion and Pitting
9 5 22.4% 0.083 0.019 0.064 193.136 General Corrosion and Pitting
9 6 19.2% 0.083 0.016 0.067 221.379 General Corrosion and Pitting
9 7 17.7% 0.083 0.015 0.068 217.33 General Corrosion and Pitting
9 8 31.1% 0.083 0.026 0.057 27.42 General Corrosion and Pitting
9 9 16.2% 0.083 0.013 0.070 133.89 General Corrosion and Pitting
9 10 21.6% 0.083 0.018 0.065 230.82 General Corrosion and Pitting
9 11 19.2% 0.083 0.016 0.067 222.611 General Corrosion and Pitting
9 12 20% 0.083 0.017 0.066 219.983 General Corrosion and Pitting
9 13 25.8% 0.083 0.021 0.062 232.238 General Corrosion and Pitting
9 14 25.9% 0.083 0.021 0.062 226.365 General Corrosion and Pitting
9 15 31.2% 0.083 0.026 0.057 204.461 General Corrosion and Pitting
9 16 25.1% 0.083 0.021 0.062 203.742 General Corrosion and Pitting
10 1 17.7% 0.083 0.015 0.068 155.963 General Corrosion and Pitting
10 2 12% 0.083 0.010 0.073 41.892 General Corrosion and Pitting
10 3 12.8% 0.083 0.011 0.072 124.717 General Corrosion and Pitting
10 4 10.1% 0.083 0.008 0.075 228.075 General Corrosion and Pitting
10 5 0% 0.083 0.000 0.083 0.0 No Defects Detected
10 6 0% 0.083 0.000 0.083 0.0 No Defects Detected
10 7 0% 0.083 0.000 0.083 0.0 No Defects Detected
10 8 13.6% 0.083 0.011 0.072 212.574 General Corrosion and Pitting
10 9 11.2% 0.083 0.009 0.074 219.435 General Corrosion and Pitting
10 10 11.1% 0.083 0.009 0.074 227.684 General Corrosion and Pitting
10 11 11.5% 0.083 0.010 0.073 225.218 General Corrosion and Pitting
10 12 10.2% 0.083 0.008 0.075 220.626 General Corrosion and Pitting
10 13 12.9% 0.083 0.011 0.072 231.9 General Corrosion and Pitting
10 14 17.2% 0.083 0.014 0.069 225.323 General Corrosion and Pitting
10 15 15.1% 0.083 0.013 0.070 231.63 General Corrosion and Pitting
10 16 10.6% 0.083 0.009 0.074 13.201 General Corrosion and Pitting
10 17 18.3% 0.083 0.015 0.068 224.905 General Corrosion and Pitting
10 18 0.083 0.0 Obstructed (Not Insp)
11 1 0% 0.083 0.000 0.083 0.0 No Defects Detected
11 2 0% 0.083 0.000 0.083 0.0 No Defects Detected
11 3 0% 0.083 0.000 0.083 0.0 No Defects Detected

Page 4 - Defect Tube Map, E-5


TechCorr USA, LLC E-5-RFT Petrojam
Bradford Dozier VN Splitter Feed / NH Feed Exchanger-Stationary End Kingston Jamaica
10/18/2021 SA-179 -3/4"x.083"x240"

% Wall Nominal Actual Wall Remaining


Row Tube Loss Wall Loss Wall Location Relative to TS1 COMMENT
11 4 0% 0.083 0.000 0.083 0.0 No Defects Detected
11 5 0% 0.083 0.000 0.083 0.0 No Defects Detected
11 6 0% 0.083 0.000 0.083 0.0 No Defects Detected
11 7 0% 0.083 0.000 0.083 0.0 No Defects Detected
11 8 0% 0.083 0.000 0.083 0.0 No Defects Detected
11 9 0% 0.083 0.000 0.083 0.0 No Defects Detected
11 10 0% 0.083 0.000 0.083 0.0 No Defects Detected
11 11 0% 0.083 0.000 0.083 0.0 No Defects Detected
11 12 0% 0.083 0.000 0.083 0.0 No Defects Detected
11 13 0% 0.083 0.000 0.083 0.0 No Defects Detected
11 14 0% 0.083 0.000 0.083 0.0 No Defects Detected
11 15 0% 0.083 0.000 0.083 0.0 No Defects Detected
11 16 11.5% 0.083 0.010 0.073 134.228 General Corrosion and Pitting
11 17 0% 0.083 0.000 0.083 0.0 No Defects Detected
11 18 0% 0.083 0.000 0.083 0.0 No Defects Detected
12 1 0% 0.083 0.000 0.083 0.0 No Defects Detected
12 2 13% 0.083 0.011 0.072 45.321 General Corrosion and Pitting
12 3 0% 0.083 0.000 0.083 0.0 No Defects Detected
12 4 0% 0.083 0.000 0.083 0.0 No Defects Detected
12 5 0% 0.083 0.000 0.083 0.0 No Defects Detected
12 6 0% 0.083 0.000 0.083 0.0 No Defects Detected
12 7 0% 0.083 0.000 0.083 0.0 No Defects Detected
12 8 0% 0.083 0.000 0.083 0.0 No Defects Detected
12 9 0% 0.083 0.000 0.083 0.0 No Defects Detected
12 10 14.9% 0.083 0.012 0.071 33.618 General Corrosion and Pitting
12 11 14.3% 0.083 0.012 0.071 28.994 General Corrosion and Pitting
12 12 0% 0.083 0.000 0.083 0.0 No Defects Detected
12 13 0% 0.083 0.000 0.083 0.0 No Defects Detected
12 14 0% 0.083 0.000 0.083 0.0 No Defects Detected
12 15 0% 0.083 0.000 0.083 0.0 No Defects Detected
12 16 14.9% 0.083 0.012 0.071 21.668 General Corrosion and Pitting
12 17 0% 0.083 0.000 0.083 0.0 No Defects Detected
12 18 0% 0.083 0.000 0.083 0.0 No Defects Detected
13 1 10.9% 0.083 0.009 0.074 38.724 General Corrosion and Pitting
13 2 11.5% 0.083 0.010 0.073 44.131 General Corrosion and Pitting
13 3 0% 0.083 0.000 0.083 0.0 No Defects Detected
13 4 0% 0.083 0.000 0.083 0.0 No Defects Detected
13 5 0% 0.083 0.000 0.083 0.0 No Defects Detected
13 6 0% 0.083 0.000 0.083 0.0 No Defects Detected

Page 5 - Defect Tube Map, E-5


TechCorr USA, LLC E-5-RFT Petrojam
Bradford Dozier VN Splitter Feed / NH Feed Exchanger-Stationary End Kingston Jamaica
10/18/2021 SA-179 -3/4"x.083"x240"

% Wall Nominal Actual Wall Remaining


Row Tube Loss Wall Loss Wall Location Relative to TS1 COMMENT
13 7 0% 0.083 0.000 0.083 0.0 No Defects Detected
13 8 0% 0.083 0.000 0.083 0.0 No Defects Detected
13 9 0% 0.083 0.000 0.083 0.0 No Defects Detected
13 10 0% 0.083 0.000 0.083 0.0 No Defects Detected
13 11 15.9% 0.083 0.013 0.070 22.109 General Corrosion and Pitting
13 12 14.9% 0.083 0.012 0.071 11.35 General Corrosion and Pitting
13 13 0% 0.083 0.000 0.083 0.0 No Defects Detected
13 14 0% 0.083 0.000 0.083 0.0 No Defects Detected
13 15 0% 0.083 0.000 0.083 0.0 No Defects Detected
13 16 0% 0.083 0.000 0.083 0.0 No Defects Detected
13 17 0% 0.083 0.000 0.083 0.0 No Defects Detected
13 18 0.0 Mechanical Plug
14 1 0% 0.083 0.000 0.083 0.0 No Defects Detected
14 2 0% 0.083 0.000 0.083 0.0 No Defects Detected
14 3 0% 0.083 0.000 0.083 0.0 No Defects Detected
14 4 0% 0.083 0.000 0.083 0.0 No Defects Detected
14 5 0% 0.083 0.000 0.083 0.0 No Defects Detected
14 6 0% 0.083 0.000 0.083 0.0 No Defects Detected
14 7 0% 0.083 0.000 0.083 0.0 No Defects Detected
14 8 0% 0.083 0.000 0.083 0.0 No Defects Detected
14 9 0% 0.083 0.000 0.083 0.0 No Defects Detected
14 10 0% 0.083 0.000 0.083 0.0 No Defects Detected
14 11 0% 0.083 0.000 0.083 0.0 No Defects Detected
14 12 0% 0.083 0.000 0.083 0.0 No Defects Detected
14 13 0% 0.083 0.000 0.083 0.0 No Defects Detected
14 14 0% 0.083 0.000 0.083 0.0 No Defects Detected
14 15 0% 0.083 0.000 0.083 0.0 No Defects Detected
14 16 0% 0.083 0.000 0.083 0.0 No Defects Detected
15 1 0% 0.083 0.000 0.083 0.0 No Defects Detected
15 2 0% 0.083 0.000 0.083 0.0 No Defects Detected
15 3 0% 0.083 0.000 0.083 0.0 No Defects Detected
15 4 0% 0.083 0.000 0.083 0.0 No Defects Detected
15 5 0% 0.083 0.000 0.083 0.0 No Defects Detected
15 6 0% 0.083 0.000 0.083 0.0 No Defects Detected
15 7 0% 0.083 0.000 0.083 0.0 No Defects Detected
15 8 0% 0.083 0.000 0.083 0.0 No Defects Detected
15 9 0% 0.083 0.000 0.083 0.0 No Defects Detected
15 10 0% 0.083 0.000 0.083 0.0 No Defects Detected
15 11 0% 0.083 0.000 0.083 0.0 No Defects Detected

Page 6 - Defect Tube Map, E-5


TechCorr USA, LLC E-5-RFT Petrojam
Bradford Dozier VN Splitter Feed / NH Feed Exchanger-Stationary End Kingston Jamaica
10/18/2021 SA-179 -3/4"x.083"x240"

% Wall Nominal Actual Wall Remaining


Row Tube Loss Wall Loss Wall Location Relative to TS1 COMMENT
15 12 0% 0.083 0.000 0.083 0.0 No Defects Detected
15 13 0% 0.083 0.000 0.083 0.0 No Defects Detected
15 14 0% 0.083 0.000 0.083 0.0 No Defects Detected
15 15 0% 0.083 0.000 0.083 0.0 No Defects Detected
15 16 16.5% 0.083 0.014 0.069 200.704 General Corrosion and Pitting
16 1 0% 0.083 0.000 0.083 0.0 No Defects Detected
16 2 0% 0.083 0.000 0.083 0.0 No Defects Detected
16 3 16.3% 0.083 0.014 0.069 46.903 General Corrosion and Pitting
16 4 19.4% 0.083 0.016 0.067 45.625 General Corrosion and Pitting
16 5 17.7% 0.083 0.015 0.068 42.291 General Corrosion and Pitting
16 6 0% 0.083 0.000 0.083 0.0 No Defects Detected
16 7 0% 0.083 0.000 0.083 0.0 No Defects Detected
16 8 0% 0.083 0.000 0.083 0.0 No Defects Detected
16 9 0% 0.083 0.000 0.083 0.0 No Defects Detected
16 10 0% 0.083 0.000 0.083 0.0 No Defects Detected
16 11 0% 0.083 0.000 0.083 0.0 No Defects Detected
16 12 0% 0.083 0.000 0.083 0.0 No Defects Detected
16 13 0% 0.083 0.000 0.083 0.0 No Defects Detected
16 14 0% 0.083 0.000 0.083 0.0 No Defects Detected
17 1 0% 0.083 0.000 0.083 0.0 No Defects Detected
17 2 0.083 0.0 Obstructed (Not Insp)
17 3 0% 0.083 0.000 0.083 0.0 No Defects Detected
17 4 12% 0.083 0.010 0.073 48.555 General Corrosion and Pitting
17 5 12.4% 0.083 0.010 0.073 45.123 General Corrosion and Pitting
17 6 0% 0.083 0.000 0.083 0.0 No Defects Detected
17 7 0% 0.083 0.000 0.083 0.0 No Defects Detected
17 8 0% 0.083 0.000 0.083 0.0 No Defects Detected
17 9 0% 0.083 0.000 0.083 0.0 No Defects Detected
17 10 0% 0.083 0.000 0.083 0.0 No Defects Detected
17 11 0% 0.083 0.000 0.083 0.0 No Defects Detected
17 12 0.083 0.0 Obstructed (Not Insp)
18 1 14.3% 0.083 0.012 0.071 71.816 General Corrosion and Pitting
18 2 0% 0.083 0.000 0.083 0.0 No Defects Detected
18 3 0% 0.083 0.000 0.083 0.0 No Defects Detected
18 4 0% 0.083 0.000 0.083 0.0 No Defects Detected
18 5 0% 0.083 0.000 0.083 0.0 No Defects Detected
18 6 0% 0.083 0.000 0.083 0.0 No Defects Detected
18 7 0% 0.083 0.000 0.083 0.0 No Defects Detected
18 8 0% 0.083 0.000 0.083 0.0 No Defects Detected

Page 7 - Defect Tube Map, E-5


Petrojam October 18, 2021
Kingston, Jamaica
Remote Field Inspection Report
E-5 Virgin Naphtha Splitter Feed / Naphtha
Hydrofiner Feed Exchanger
Inspected By: Bradford Dozier Level IIA

Appendix B
CALIBRATION GRAPHIC

Appendix C
Petrojam October 18, 2021
Kingston, Jamaica
Remote Field Inspection Report
E-5 Virgin Naphtha Splitter Feed / Naphtha
Hydrofiner Feed Exchanger
Inspected By: Bradford Dozier Level IIA

Appendix D
Standard of Care
In performing the services requested, TechCorr USA, LLC used the degree of care and
skill ordinarily practiced under similar conditions by others performing such services in
the same or similar locality. All procedures and reference specifications are the current
revision, at the time of the examination. Additional client procedures may be listed or
referenced, but as a minimum TechCorr USA, LLC procedures mandate the quality
level performed during this examination. No other warranties or guarantees, expressed
or implied is intended by TechCorr USA, LLC.
Disclaimer
While all efforts have been made to exercise due diligence for care and caution,
TechCorr USA, LLC cannot assume any liability for damage, leakage, loss of
containment , environmental damage, loss of production, injury (personnel and plant), or
the like associated with the subject. It is understood by all parties that the measurement
techniques used and discussed are non-invasive. As a result, the data provided may
not be indicative of the actual condition and are deductive in nature. TechCorr USA,
LLC is not liable for any misrepresentation of results or conditions. All
recommendations are based upon similar experience, standard industry standards, and
best engineering practice. This report is not to be construed as a guarantee or warranty
of the materials tested. All orders are subject to TechCorr USA, LLC Standard Terms
and Conditions, which are available upon request.

Appendix E
Contact Us
Please feel free to contact us for any questions, comments, work scheduling, planning
or quotations. Also for any changes that may be needed in the report, Client Field
Ticket(s) or invoices.
Our corporate office is located at:
1485 East Sam Houston Parkway South, Suite 160
Pasadena, Texas 77503.

Lance Schreckenbach Russ Black Vincent Summa


TechCorr USA, LLC TechCorr USA, LLC Summa Group, LLC
Tubular Division Manager Gulf Coast Operation Manager President and CEO
lances@techcorr.com rblack@techcorr.com vsumma@summagroup.com
(832) 641-9767 (713) 524-2768 (713) 524-2768

You might also like