Area Rank Expiry Engineer Drilling Pad Surface Location # Wells per Pad (#Drilled) Bottom hole Location (surface location) Partners 100/03-31-046-10W5M 01-06-047-11W5M Daylight Taqa Zone Cardium WI% 65% 35% April 20/2011 Exploitation Request to Survey Comments
Confidential
Revised 4/18/2012, 11:29 PM
JV Mineral Land Exploitation Agreements in Comments place Notice Notice Served Due Tie-in Point DAY GGS just to the eat of this surf location
Gross Forcasted Production Comments Initial Prod (bbl/d or mmcf/d) 6 Mo Prod (bbl/d or mmcf/d)
Operated Drills
Brazeau 1 Peter M 5 Potential locations from this site. Other potential locations are 02 and 04-31, 04-06-047-10W5M, and 13-05-047-10W5M (see attached sketch )
Brazeau
Peter M
100/04-11-046-11W5M 14-11-046-11W5M
Daylight
Cardium
Brazeau
Peter M
100/13-14-046-11W5M 14-11-046-11W5M
Daylight
Cardium
100.0%
Sept 23/2010
Constructed
10-15-04611W5M
Brazeau
Peter M
100/08-27-046-11W5M 08-28-046-11W5M
Daylight Conoco
Cardium
50% 50%
Sept 23/2010
18-Mar-11
05-27-04611W5M
licensed
Brazeau
Peter M
00/01-28-046-11W5M 01-29-046-11W5M
Daylight
Cardium
Sept 17/2010
Brazeau
Peter M
00/04-29-046-11W5M 01-29-046-11W5M
Daylight Mancal
Cardium
Sept 17/2010
Brazeau
Peter M
100/01-30-046-11W5M 01-31-046-11W5M
Daylight Mancal
Cardium
75% 25%
Sept 23/2010
Mitigation complete, amending Conocco access road agreement. Checked for status update Mitigation complete, amending Conocco access road agreement. Checked for status update Auditing package and go to 14-Feb-11 license next week. Constructed RTS to be released by land today
same surface as 01-28-046-11W5M 16-Mar-11 01-36-04612W5M Auditing package and go to license next week; 4 potential locations from this surface. They are 01-30, 02-30, 15 and 16-31-046-11W5M
Brazeau
Peter M
100/15-31-046-11W5M 15-30-046-11W5M
Daylight
Cardium
100.0%
March 07/2011
01-31 or 1530-04612W5M 01-31 or 1530-04612W5M 06-04-04711W5M up to 4 wells can be drilled from this location, 01-32, 02-32-04611W5M and 13 & 14-04-047-11W5M
Brazeau
Peter M
100/16-31-046-11W5M 15-30-046-11W5M
Daylight
Cardium
100.0%
March 07/2011
Brazeau
Peter M
100/01-32-046-11W5M 03-04-047-11W5M
Daylight
Cardium
100.0%
Sept 23/2010
Brazeau
Peter M
100/03-33-046-11W5M 02-04-047-11W5M
Daylight
Cardium
100.0%
Sept 23/2010
15-32-04611W5M
up to 4 wells can be drilled from this location, 03-33, 04-33-04611W5M and 15 & 16-04-047-11W5M
Brazeau
Peter M
100/01-25-046-12W5M 01-36-046-12W5M
Daylight
Cardium
01-36-04612W5M
Brazeau
Peter M
100/05-35-046-12W5M 05-36-046-12W5M
Cardium
60% 40%
March 23/2011
4 possible locations off of this site, they are 08-36 and 01-36-4612W5M, and 04-35-046-12W5M. Tie-in is either 01-36-46-12 W5M wellsite or 06-35-046-12W5M wellsite. 4 possible locations off of this site, they are 01-36 and 01-35-4612W5M, and 05-35-046-12W5M. Tie-in is either 01-36-46-12 W5M wellsite or 06-35-046-12W5M wellsite. 5 Potential locations from this site. DAY GGS just to the eat of this surf location DAY GGS just to the eat of this surf location 03-06-04711W5M DAY Other potential locations are 02, 03 and 04-31, and 04-06-04710W5M (see attached sketch )
Brazeau
Peter M
100/08-36-046-12W5M 05-36-046-12W5M
Cardium
60% 40%
March 23/2011
Brazeau
Peter M
100/13-05-047-10W5M 01-06-047-11W5M
Cardium
April 20/2011
Brazeau
Peter M
100/04-06-047-10W5M 01-06-047-11W5M
Cardium
April 20/2011
Other potential locations are 02, 03 and 04-31, and 13-05-04710W5M (see attached sketch )
Brazeau
Peter M
100/15-06-047-10W5M 01-6-047-10W5M
Cardium
March 23/2011.
Survey for 4 locations. Additonal wells from this site would be 16-06, 03-31 and 04-31-46-10W5M
Brazeau
Peter M
100/01-07-047-10W5M 01-12-047-11W5M
Daylight
Cardium
100.0%
March 22/2011
Brazeau
Peter M
100/01-01-047-11W5M 01-12-047-11W5M
Daylight
Cardium
100.0%
April 21/2011
Survey for 4 locations. Additonal wells from this site would be 08-07, 04-12 and 08-12-47-11W5M
Brazeau
Peter M
100/16-04-047-11W5M 01-04-047-11W5M
Daylight
Cardium
100.0%
March 23/2011.
03-06-04710W5M
Brazeau
Peter M
100/01-06-047-11W5M 05-06-47-11W5M
Daylight
Cardium
Brazeau
Peter M
100/04-06-047-11W5M 04-05-47-11W5M
Daylight
Cardium
100.0%
April 18/2011
Brazeau
Peter M
100/13-06-047-11W5m 13-05-047-11W5M
Daylight
Cardium
100.0%
Sept 23/2010
Brazeau
Peter M
100/04-08-047-11W5m 13-08-047-11W5M
Daylight Baccalieu
Cardium
Brazeau
Peter M
100/05-12-047-11W5M 01-12-047-11W5M
Daylight
Cardium
Sept 23/2010
March 23/2011
Tie-in to DAY GGS which runs through NE corner of Lsd 01-12; potential for 04-12 to drilled from this site and 01-07-47-10 and 08-07047-10W5M. confirming with Forestry. Still waiting for LOA 15-09-04711W5M
Brazeau
Peter M
100/15-16-047-11W5M 15-09-047-11W5M
Cardium
Sept 23/2010
Brazeau
Peter M
100/16-16-047-11W5M 15-09-047-11W5M
Cardium
25% Nov22/2010 confirming with Forestry. Still 50% waiting for LOA 25%
(3% GORR)
15-09-04711W5M
Brazeau
Peter M
100/01-20-047-11W5M 02-29-047-11W5M
Cardium
100.0%
March 07/2011
04-21 or 1617-04711W5M
\\vboxsrv\conversion_tmp\scratch7619\69580106.xls.ms_office
Page 1 of 26 Pages
Brazeau
Peter M
104/09-26-047-11W5M (05-26-047-11W5M)
Cardium
100.0%
Licensed
05-26 on site Keyera W.Pemb. tie-in 10-10 SA1925 05-26 on site Keyera W.Pemb. tie-in 10-10 SA1925 Keyera W.Pemb. in a regulated ungulate area, no activity after Jan 15/2011. We will 10-10 have to drill in either Q2 or Q3. SA1925
Confidential
Revised 4/18/2012, 11:29 PM
Brazeau
Peter M
100/12-27-047-11W5M (05-26-047-11W5M)
Cardium
100.0%
Licensed
Brazeau
Peter M
102/04-28-047-11W5M (05-27-047-11W5M)
Daylight
Cardium
Licensed
Brazeau
Peter M
100/15-29-047-11W5M 01-29-047-11W5M
Daylight
Cardium
Brazeau
Peter M
00/01-32-47-11W5 01-05-048-11W5M
Cardium
Brazeau
Peter M
100/14-32-047-11W5M 15-29-047-11W5M
Cardium
Brazeau
Peter M
00/03-33-47-11W5 04-04-048-11W5M
Daylight
Cardium
Currently surveying, in drafting. Waiting on Crown if we need First Nations consultation. RTS to be released by land today
03-32-04711W5M
received 6 month extension from Signalta to Oct 1/2011 for spud date.
Brazeau
Peter M
100/04-33-047-11W5 04-04-048-11W5
Daylight
Glauc
100.0%
April 06/2011
use same surface location as proposed for 03-33-04711W5M Cardium Hz well lisc 04-02-04811W5M surface location Keyera Braz.N. 16-35; SA1930, SA1931 Keyera W.Pemb. 10-10 SA1925
Brazeau
Peter M
100/02-34-047-11W5M (01-03-048-11W5M)
Daylight
Cardium
licensed
Brazeau
Peter M
00/01-36-47-11W5 01-35-047-11W5M
Daylight
Cardium
New RTS issued Aug 17/2010. This replaces 04-36. We could not get surface for this Hz well so we will drill from the other side of the section from W to E.
Brazeau
Peter M
00/08-36-47-11W5 01-35-047-11W5M
Daylight
Cardium
Keyera W.Pemb. New RTS issued Aug 17/2010. This replaces 04-36. We could not 10-10 get surface for this Hz well so we will drill from the other side of the SA1925 section from W to E. 07-02-04711W5M DAY GGS 05-06-04711W5M DAY GGS 04-03-04811W5M surface location 04-03-04811W5M surface location 12-11-04811W5M surface location 12-11-04811W5M surface location 03-32-04711W5M Keyera Braz.N. 16-35; SA1930, SA1931 Keyera Braz.N. 16-35; SA1930, SA1931 Keyera Braz.N. 16-35; SA1930, SA1931 Keyera Braz.N. 16-35; SA1930, SA1931 same proposed surface as 04-02-047-12W5M Cardium Hz.
Brazeau
Peter M
100/01-01-047-12W5M 01-02-047-12W5M
Daylight exp July 10, 2011 Daylight exp July 10, 2011 Daylight PetroBakkenn
Cardium
April 18/2011.
Brazeau
Peter M
100/04-01-047-12W5M 05-06-047-11W5M
Cardium
100% Jan 10/2011. SHOULD THIS BE DELETED (5-15% ?? GORR) 75% 25% April 20/2011 same pad as 03-33-04711W5M
Brazeau
Peter M
100/14-04-048-11W5M 04-04-048-11W5M
Cardium
Brazeau
Peter M
100/16-04-048-11W5M (15-33-047-11W5M)
Daylight PetroBakkenn
Cardium
Licensed
licensed
Brazeau
Peter M
100/05-11-048-11W5M 05-12-048-11W5M
Daylight PetroBakkenn
Cardium
75% 25%
Sept 23/2010
Brazeau
Peter M
100/13-11-048-11W5M 13-12-048-11W5M
Daylight PetroBakkenn
Cardium
75% 25%
March 7/2011
Brazeau
Peter M
102/14-32-047-11W5M 15-29-047-11W5M
Daylight
Glauc
Brazeau
Peter M
00/16-31-47-11W5 01-31-047-11W5M
Daylight
Glauc
100% April Trying to get 2nd well, Glauc (FI on 20/2011 on this lease. We will have to Signalta drill this back to back in order 12.5%) for this to happen. 100.0% Mar 3/2011 need to field truth
received 6 month extension from Signalta to Oct 1/2011 for spud date.
Brazeau
Peter M
100/01-21-047-11W5 04-21-047-11W5
Daylight
Glauc
100.0%
April 06/2011
Brazeau
Peter M
100/01-24-047-11W5 01-25-047-11W5
Daylight
Glauc
100.0%
April 06/2011
Violet Grove
Peter M
13-26-048-09W5 09-26-048-09W5
Daylight
Glauc
100.0%
April 06/2011
Surface location 09-26 same surface as Rck Creek well 1626. Surface location 01-02 same surface as Rck Creek well 0202. 01-02 satellite
13-26 well is proposed to be tied into the same P/L as 16-26 Rock Creek well.
Violet Grove
Peter M
04-02-049-09W5 01-02-049-09W5
Daylight
Glauc
100.0%
April 06/2011
04-02 well is proposed to be tied into the 01-02 Satellite into the spare riser to utilize the spare separator on site.
Violet Grove
Jennifer B
104/14-31-048-08W5 04-06-049-08W5
Daylight
Cardium
80.00% Oct 19/2010 Tie in complete. Gas rate=310 e3m3/d, Condy rate=34.8m3/d, Water=3m3/d 100.0% Sept 30/2010 Surface location 09-02. Released for license. Waiting on Alberta Environment re: Borrow pit. Received final survey plans.
Violet Grove
Jennifer B
12-02-049-09W5 09-02-049-09W5
Daylight
Cardium
Pooling 06-06 pl riser Third Party tie-in Construction completed. On production. completed at 06-06 agreements sent battery to Conoco. location 01-02 12-02 well is proposed to be tied into the 01-02 Satellite into the satellite spare riser to utilize the spare separator on site. Holding application for Sec 02-049-09 to be submitted Nov 1. 13-02 existing pipeline riser 24-Jan-11 24-Feb-11 Suncor 1634 battery (soln gas) Suncor 1634 battery (soln gas) Suncor 1634 battery (soln gas) Well to be tied in at the existing 13-02 location.
Violet Grove
Jennifer B
06-10-049-09W5 13-02-049-09W5
Daylight
Cardium
100.0%
3-Mar-11
Minnehik
Jennifer B
00/01-02-044-05W5M (01-03-044-05)
Daylight Suncor
Cardium
35% 65%
13-Mar-10
Waiting on completions
Daylight farmed out 35% WI in 35-043-05W5 & 02-044-05-W5 to Anderson w/ rolling option. Anderson to pay drill, case completion to earn 70%WI. Daylight farmed out 35% WI in 35-043-05W5 & 02-044-05-W5 to Anderson w/ rolling option. Anderson to pay drill, case completion to earn 70%WI. Daylight farmed out 35% WI in 35-043-05W5 & 02-044-05-W5 to Anderson w/ rolling option. Anderson to pay drill, case completion to earn 70%WI.
Minnehik
Jennifer B
00/04-03-044-05W5M (01-03-044-05)
Daylight Suncor
Cardium
35% 65%
13-Mar-10
Wilson Creek
Jennifer B
00/16-35-043-05W5M (09-34-044-05W5M)
Daylight Suncor
Cardium
35% 65%
13-Mar-10
Farmed out. Anderson will pay drill, case, complete for 70%WI. Expected to drill after 04-03 well. Released for license (Drilling inventory list 2011)
Willesden Green
Jennifer B
02/03-24-042-09W5M (03-25-042-09W5M)
Cardium
12-Mar-10
Holding application to be submitted to ERCB May 4. Bellatrix going to Penn West to NE by yr-end.
\\vboxsrv\conversion_tmp\scratch7619\69580106.xls.ms_office
Page 2 of 26 Pages
Willesden Green
Jennifer B
00/01-24-042-09W5M (02-25-042-09W5M)
Cardium
12-Mar-10
Confidential
Revised 4/18/2012, 11:29 PM
Pembina
Duane J
00/011-26-047-03W5M (01-34-47-3W5M)
West
Cardium
100.0%
Pembina
Duane J
02/08-01-048-03W5M (01-02-48-3W5M)
West
Cardium
81.3%
Dayligh 8-248-3
Paying compensatory Royalties to Encana. Pipeline surveyed and acquired. Pipeline being constructed to lease edge.
Pembina
Duane J
00/13-04-048-03W5M (13-03-48-3W5M)
Daylight
Cardium
36.7%
19-Oct-10
Daylight 5-348-3
Pembina
Duane J
00/04-05-048-03W5M (05-04-47-3W5M)
West
Cardium
Daylight 1333-47-3W5
Pembina
Duane J
00/05-05-048-03W5M (05-04-47-3W5M)
West
Cardium
Daylight 1333-47-3W5
Pembina
Duane J
00/09-16-048-05W5M (13-16-48-5W5M)
Daylight
Cardium
Pembina
Duane J
00/05-19-048-05W5M (05-20-48-5W5M)
Daylight Sifton
Cardium
Trying to extend Spry's 12-17 lease. Wetlands need mitigation plan. Acquired, Alberta Enviro has application Received Final Plans. This is on Crown land, working on First Nations. Scouting. Prelim in.
Spry 13-1648-5
Need Albera Environment approval. Likely will not have in time for Oct. expiry. Predetermination March 1.
Baytex 13-1748-5
May need to justify why we are not using the Zargon lease 330 m North.
Pembina
Duane J
00/16-19-048-05W5M (09-24-48-6W5M)
Daylight Sifton
Cardium
on lease
Received Compressor approval Feb 25th. 4-19 will also flow into this line. Compression will start by March 10th.
Pembina
Duane J
00/13-34-048-06W5M (13-35-49-6W5M)
West
Cardium
100.0% Jan 21/2011 Pooled and Farmed in on Owl River, WO surface which plan will be
able to acquire.
Pooling and Farmin w/ Owl River. Potential farm-n with Owl. August 30th 2011 commitment. Location changed to 13-34-48-6W5. Need to amend holding.2 possible surface locations(working on both):A)surf 13-35 B) surf 16-33. 4-10-49-6 Pipeline being surveyed. D-56 going out for multiwell facility. Pipeline surveyed.Surf Ld needs to meet adjacent landowner re horses prior to spud and regarding
pipeline.
Pembina
Duane J
00/08-10-049-06W5M (12-10-49-6W5M)
West
Cardium
100.0%
Pembina
Duane J
00/13-09-050-05W5M (13-04-50-5W5M)
Daylight
Cardium
100.0%
23-Apr-10
14-33-495W5
discussing w/ Eclipse
Farmin on Bounty, well must spud by Sept 30. Notifications sent out for downspacing July 7. Meeting landowners today.
Pembina
Aug 24 Expiry
Duane J
00/04-11-50-06W5M
Baccalieu
Ellerslie
50.0%
This is part of swap w/ Trioil. The location was previouslly licenced in 2008. 29-Oct-10 Surveyed, D-56 out and acquire.
Pembina
Duane J
00/14-15-050-06W5M (14-10-50-6W5M)
Daylight
Cardium
100.0%
Pembina
Duane J
00/09-21-050-06W5M (09-20-50-6W5M)
Daylight
Cardium
Pembina
Duane J
00/01-26-050-06W5M (01-27-50-6W5M)
Daylight
Cardium
100.0%
23-Apr-10
licensed. Pipeline released, issue of multiwell battery. Daylight to set up meeting with landowner Licensed on hold pending 1326 results.
5-28
Pipeline surveyed to 5-28, landowner signed, w.o. 3rd parties. Surface land to set up a mtg residents on Multiwell applic. Need a holding already 2
wells in quarter.
Pembina
Duane J
Cardium
66.67% 33.33%
20-Apr-10
Licensed, Waiting on 8-29. Multiwell issue. Daylight to set up meeting with landowner. final survey in. Land owners signed, waiting on 3rd parties. W.O. Crown EFR. Offset landowner issue Licensed, NE 15 has expired need to change BH if we drill. Pipeline acquired.ON HOLDMORICHAEL DEAL
Pembina
Pembina
Duane J
00/09-26-049-05W5M (09-35-49-5W5M)
Daylight
Cardium
100.0%
Eclipse 8-3549-5
Duane J
Cardium
100.0%
Eclipse 2-450-5
Morichal/Eclipse, January 13, 2011 expiry. Need to move Buck Mountain Co-op line, north edge of lease. Pipeline surveyed. Lands expired need to change Down Hole Location Morichal/Eclipse, needing holding for SE/4 of section 2, Need approval from royalty owner to pool. Pipeline surveyed.
Pembina
Duane J
00/15-02-050-05W5M (09-35-49-5W5M)
Daylight
Cardium
100.0%
final survey in. Land owners signed, waiting on 3rd parties. D-56 Expires Dec. 14.ON HOLDMORICHAEL DEAL
Eclipse 8-3549-5
Pembina
Duane J
00/13-03-050-05W5M (13-34-49-5W5M)
Daylight
Cardium
100.0%
Pembina
Duane J
00/14-10-050-05W5M (14-3-50-5W5M)
Daylight
Cardium
100.0%
Pembina
Duane J
Nisku
100.0%
Finals in. preparing docs. Acquired, need to correct docs.ON HOLD-MORICHAEL DEAL Received section 17, June 2011 expiry. Final plans in. Acquired. W.O 3rd parties.Location On hold RTS Circulating to scout surface location for Nisku. Rocky Rapids. RTS Circulating to scout surface location for Nisku.
Eclipse 13-3449-5
Morichal/Eclipse
Eclipse 14-350-5
Section 8(1)(h) until October 31, 2011. Pipeline has been scouted to 16-5-50-6W5 pad. Scout to Easyford
Pembina
Duane J
Nisku
62.5%
Section 8(1)(h) until October 31, 2011. Pipeline has been scouted to 16-5-50-6W5 pad. Scout to Easyford
Pembina
Duane J
Nisku
95.0%
13-2-50-6W5
Pembina
Duane J
1-7-50-6W5
Daylight
Nisku
75.0%
16-5
Pembina
Aug 24 2011 Expiry Aug 24 2011 Expiry Dec 10, 2011 Expiry
Duane J
Nisku
100.0%
13-11-506W5 pad
Pembina
Duane J
102/04-22-50-6W5 (SE/4-21-50-6W5)
Daylight
Nisku
100.0%
Pembina
Duane J
100/11-23-50-6W5 (127-50-6W5)
Daylight
Nisku
60.0%
PembinaWarburg
Megan M
00/05-21-047-03W5M (04-22-047-03W5M)
Daylight
04-22-04703W5
\\vboxsrv\conversion_tmp\scratch7619\69580106.xls.ms_office
Page 3 of 26 Pages
PembinaWarburg
Megan M
00/04-21-047-03W5M (04-22-047-03W5M)
Daylight
04-22-04703W5
Confidential
Revised 4/18/2012, 11:29 PM
PembinaWarburg
Megan M
00/13-16-047-03W5M (12-15-047-03W5M)
Daylight
04-22-04703W5
PembinaWarburg
Megan M
00/12-16-047-03W5M (12-15-047-03W5M)
Daylight
licensed. Waiting on partner approval. Construction complete Replaces 02/10-21 well. Received Final plans
04-22-04703W5
PembinaWarburg
Megan M
00/11-22-047-03W5M (11-21-047-03W5M)
Daylight
93.8% Jan19/2011
04-22-04703W5
PembinaWarburg
Megan M
00/14-22-047-03W5M (11-21-047-03W5M)
Daylight
04-22-04703W5
PembinaWarburg
Megan M
00/07-26-047-03W5M (08-23-047-03W5M)
Daylight
93.8%
December 14/2010
04-22-04703W5
PembinaWarburg
Megan M
00/05-35-047-03W5M (06-27-047-03W5M)
Daylight
93.8%
December 14/2010
04-22-04703W5
PembinaWarburg
Megan M
93.8%
December 14/2010
04-22-04703W5
PembinaWarburg
Megan M
00/03-11-047-03W5M (01-14-047-03W5M)
Daylight
59.0%
December 14/2010
04-22-04703W5
Operated Workovers
Operated Abandonments
Priority Area Area Exploitation Engineer Bottom hole Location (surface location) Partners WI% 100.0% received Permit. Not Economic will not construct at this time. Request to Survey Comments Notice Served Notice Due Comment s Tie-in Point 16-14-05006W5M Cardium sweet oil gathering system tie-in to Crossfire Battery. Production and Facilities to sit down and go through AFE estimate prior to issueing the AFE. Losey has sent the ERCB a letter of concern. Tie-in of our sour Nisku well at 09-21-050-06W5M. It will follow the same routing as our existing lines will for the Cardium. Need to reissue D-56. ERCB will allow 4-27 to be a sour satellite and a sweet battery. Third Party tie-in Tie into pipeline. Waiting on land. Estimated on stream end of agreements sent March. to Conoco. Cardium sweet oil gathering system tie-in to Crossfire Battery. Tie-in of our sour Nisku well at 09-21-05006W5M. It will follow the same Tie into pipeline. Waiting on land. Estimated on stream end of March. Cardium sweet oil gathering system tie-in to Crossfire Battery. Tie-in of our sour Nisku well at 09-21-05006W5M. It will follow the same Tie into pipeline. Waiting on land. Estimated on stream end of March. Mineral Land Exploitation JV Agreements in place Comments Comments Comments
Operated Tie-ins
Pembina DJ 06-23-050-06W5M to 16- Daylight 14-050-06W5M
Pembina
DJ
100.0%
Land released March 4. Permit is in at the board, nonroutine. Fuel line approved. Construction completed, handed over to operations
16-14-05006W5M
Violet Grove
JB
PembinaWarburg
MM
12-15-047-03W5 to 0422-047-03W5
Daylight
Wk of Feb 21/2010
Operated Facilities
Brazeau JB 09-34-047-11W5 Daylight 100.0% Brazeau pipeline flow reversal. Part A-Completed. Initiated Part B. Pipeline (line loop) completed. Pipeline flow reversal project. Part A construction in progress. Acquiring land for pipeline line loop (15-09 to 04-21). Pipeline flow reversal project. Part A construction in progress. land Acquiring for pipeline line loop (15-09 to 04-21). Daylight 100.0% Compressor moved to 12-12. Construction on hold. Compressor to be installed to handle solution gas from Cardium wells and Rock Creek wells. Production will go to Blaze Gas Plant. Compressor to be installed to handle solution gas from Cardium Install wells 3000meters of 4" pipeline and 3" fuel gas pipeline to bring Pipeline flow reversal project. Part A construction in progress. land Acquiring for pipeline line loop (15-09 to 04-21). Compressor to be installed to handle solution gas from Cardium Install wells 3000meters of 4" pipeline and 3" fuel gas pipeline to bring
Brazeau
JB
15-09-047-11W5 to 0421-047-11W5M
Daylight
100.0%
Brazeau
12-12-048-10W5
Brazeau
12-34-047-11W5
Daylight
100.0%
Install 3000meters of 4" pipeline and 3" fuel gas pipeline to bring to bring emulsion from 07-05, 12-05, 16-36, 12-36, 13-36 wells from the 12-31-47-10W5 location to 10-26-47-11W5 location.
Brazeau
08-21-047-11W5
Daylight
100.0%
SWB and Tie-in. Kick off Mar 14/2011 and ten days to construct. Construction completed. Handed over to operations.
Brazeau
06-29-47-11W5
Daylight
100.0%
Brazeau
05-27-47-11W5
Daylight
100.0%
Construction in progress. Estimated to be complete end of March 25. Booster compressor install. On hold.
300HP compressor install c/w blowcase. 300HP compressor install c/w blowcase. D-56 out to Broker, notifications should go out this week. Land gathering
300HP compressor install c/w blowcase. 300HP compressor install c/w blowcase. D-56 out to Broker, notifications should go out this week. Land gathering
Brazeau
12-31-47-11W5
Daylight
100.0%
Easyford
PM/ED
13-34-049-08W5M
Daylight
100.0%
Violet Grove
MW
16-29-048-09W5M
Daylight
100.0%
Easyford line heater install. Notificationd should go out this wk 700m radius. Received objection, submit non-routine this wk or next. Butane blending project and trucked in unloading facilities. Should start up March 15/2011. Battery upgrade - Group Sep. Possible Butane Blending. Recylinder the 8-7 comp.
D-56 out to Broker, notifications should go out this week. Land gathering chronology for release for license.
Reviewing if we can relicense pipelines to higher H2S. Reviewing if we can relicense pipelines to higherpipelines to higher H2S. Reviewing if we can relicense H2S.
Crossfire
DJ
13-02-50-6W5
Daylight
100.0%
\\vboxsrv\conversion_tmp\scratch7619\69580106.xls.ms_office
Page 4 of 26 Pages
Pembina Glauconitic
Exploitation Surface Location # Wells per Pad (#Drilled) 3 0 2 0 Bottom hole Location (surface location) Partners 100/04-33-047-11W5M 04-04-048-11W5M 102/14-32-047-11W5M 15-29-047-11W5M Daylight Daylight Zone Glauc Glauc WI% 100.0% April 06/2011 Trying to get 2nd well, Glauc on to lease. well, Glauc 100% April 20/2011 Tryingthisget 2ndCurrently (FI on on this lease. We will have to Signalta drill this back to back in order 12.5%) for this to happen. 100.0% Mar 3/2011 need to field truth Request to Survey Comments Notice Served
Mineral Land
Exploitation
Gross Forcasted Production Initial Prod (bbl/d or mmcf/d) 6 Mo Prod (bbl/d or mmcf/d)
Operated Drills
1 1 must spud by Oct 1, 2011 Peter M Peter M 04-04-048-11W5M 15-29-047-11W5M received 6 month extension from Signalta to Oct 1/2011 for spud date.
15-30-047-11W5M
5 0
00/16-31-47-11W5 15-30-047-11W5M
Daylight
Glauc
01-25-047-11W5
1 0
100/01-24-047-11W5 01-25-047-11W5
Daylight
Glauc
04-21-047-11W5
2 1
100/01-21-047-11W5 04-21-047-11W5
Daylight
Glauc
Peter M 1 Peter M 1
09-26-048-09W5
2 1
13-26-048-09W5 09-26-048-09W5
Daylight
Glauc
100.0% April 06/2011 Surface location 09-26 same surface as Rck Creek well 1626. 100.0% April 06/2011 Surface location 01-02 same surface as Rck Creek well 0202. 01-02 satellite
13-26 well is proposed to be tied into the same P/L as 16-26 Rock Creek well.
01-02-049-09W5
2 1
04-02-049-09W5 01-02-049-09W5
Daylight
Glauc
04-02 well is proposed to be tied into the 01-02 Satellite into the spare riser to utilize the spare separator on site.
\\vboxsrv\conversion_tmp\scratch7619\69580106.xls.ms_office
BRAZEAU CARDIUM
Gross Forcasted Production Exploitation # Wells per Pad (#Drilled) 0 5 Bottom hole Location (surface location) Partners 100/03-31-046-10W5M 01-06-047-10W5M Daylight Taqa Zone Cardium WI% 65% 35% April 20/2011 5 Potential locations from this site. 4 potential locations from this site. Constructed Request to Comments Survey Mineral Land Comments Notice Due Exploitation JV Agreements in place Tie-in Point DAY GGS just to the eat of this surf location Other potential locations are 02 and 04-31, 04-06047-10W5M, and 13-05047-10W5M (see attached sketch ) will 13-14-046-11W5M come from the same pad. Lidar Oct 12/2010 Comments Initial Prod (bbl/d or mmcf/d) 6 Mo Prod (bbl/d or mmcf/d)
Surface Location
Notice Served
Operated Drills 1
Peter M
01-06-047-10W5M
Peter M
14-11-046-11W5M
0 4
100/04-11-046-11W5M 14-11-046-11W5M
Daylight
Cardium
100.0%
Mar 23/2011
Peter M
14-11-046-11W5M
0 4
100/13-14-046-11W5M 14-11-046-11W5M
Daylight
Cardium
100.0%
Sept 23/2010
10-15-046-11W5M
Peter M
08-28-046-11W5M
1 2
100/01-27-046-11W5M 08-28-046-11W5M
Daylight Conoco
Cardium
50% 50%
Sept 23/2010
Peter M
01-29-046-11W5M
0 2
00/01-28-046-11W5M 01-29-046-11W5M
Daylight
Cardium
Sept 17/2010
Peter M
01-29-046-11W5M
0 2
00/04-29-046-11W5M 01-29-046-11W5M
Daylight Mancal
Cardium
Sept 17/2010
Peter M
15-30-046-11W5M
0 4
100/01-30-046-11W5M 15-30-046-11W5M
Daylight Mancal
Cardium
75% 25%
Sept 23/2010
Peter M
15-30-046-11W5M
0 4
100/02-30-046-11W5M 15-30-046-11W5M
Daylight Mancal
Cardium
75% 25%
n/a
Waiting until 16-Feb-11 18-Mar-11 after break up to complete. Mitigation complete, amending Conocco access road Mitigation complete, amending Conocco access Auditingroad 14-Feb-11 16-Mar-11 package and go to license next week. Constructed
05-27-046-11W5M
licensed
same surface as 01-28046-11W5M 01-36-046-12W5M liscensed, 4 potential wells from this location; need to do RTS. 4 potential wells from this location
Peter M
15-30-046-11W5M
0 4
100/15-31-046-11W5M 15-30-046-11W5M
Daylight
Cardium
100.0%
March 07/2011
RTS to be released by land today RTS to be released by land today 5 Potential locations from this site. 5 Potential locations from this site. 4 potential locations from this site 5 Potential locations from this site.
01-31 or 15-30-04612W5M
Peter M
15-30-046-11W5M
0 4
100/16-31-046-11W5M 15-30-046-11W5M
Daylight
Cardium
100.0%
March 07/2011
01-31 or 15-30-04612W5M
Peter M
01-06-047-10W5M
0 5
100/13-05-047-10W5M 01-06-047-11W5M
Cardium
April 20/2011
DAY GGS just to the eat of this surf location DAY GGS just to the eat of this surf location DAY GGS just to the eat of this surf location 03-06-047-10W5M
Peter M
01-06-047-10W5M
0 5
100/04-06-047-10W5M 01-06-047-10W5M
Cardium
April 20/2011
Peter M
01-12-047-11W5M
0 5
100/01-07-047-10W5M 01-12-047-11W5M
Cardium
March 22/2011
Other potential locations are 02, 03 and 04-31, and 04-06-047-10W5M (see attached sketch ) Other potential locations are 02, 03 and 04-31, and 13-05-047-10W5M (see attached sketch ) Survey for 4 locations. Additonal wells from this site would be 08-07, 0412 and 08-12-47-11W5M
Peter M
01-12-047-11W5M
0 5
100/01-01-047-11W5M 01-12-047-11W5M
Daylight
Cardium
100.0%
April 21/2011
Peter M
01-04-047-11W5M
1 4
100/15-04-047-11W5M 01-04-047-11W5M
Daylight
Cardium
100.0%
n/a
03-06-047-10W5M
Peter M
01-04-047-11W5M
1 4
100/16-04-047-11W5M 01-04-047-11W5M
Daylight
Cardium
100.0%
March 23/2011.
03-06-047-10W5M
drilled from same site as existing well at 03-33046-11W5M. Need to do RTS. drilled from same site as existing well at 03-33046-11W5M Tie-in to DAY GGS which runs through NE corner of Lsd 01-12; potential for 04-12 to drilled from this site and 01-07-47-10 received 6 month extension from Signalta to Oct 1/2011 for spud date. Drilling Glauc Hz from here too.
\\vboxsrv\conversion_tmp\scratch7619\69580106.xls.ms_office
Peter M
01-12-047-11W5M
0 5
100/05-12-047-11W5M 01-12-047-11W5M
Daylight
Cardium
100.0%
March 23/2011
Peter M
15-29-047-11W5M
100/14-32-047-11W5M 15-29-047-11W5M
Daylight
Cardium
Sept 23/2010
03-32-047-11W5M
Peter M
01-35-047-11W5M
0 2
00/01-36-47-11W5 01-35-047-11W5M
Daylight
Cardium
100.0%
Aug 17/2010
Peter M
01-35-047-11W5M
0 2
00/08-36-47-11W5 01-35-047-11W5M
Daylight
Cardium
100.0%
Aug 17/2010
New RTS issued Aug 17/2010. This replaces 04-36. We could not get surface for this Hz well so we will drill from the New RTS issued Aug
Peter M
05-12-048-11W5M
100/05-11-048-11W5M 05-12-048-11W5M
75% 25%
Sept 23/2010
Peter M
13-12-048-11W5M
100/13-11-048-11W5M 13-12-048-11W5M
75% 25%
March 7/2011
17/2010. This replaces 04-36. We could not get surface for this Hz well 12-11-048-11W5M Keyera Braz.N. so we will drill from the licensed surface location 16-35; SA1930, SA1931 12-11-048-11W5M Keyera Braz.N. surface location 16-35; SA1930, SA1931
Operated Workovers
Operated Abandonments Priority Area Area Exploitation Engineer Bottom hole Location (surface location) Partners Operated Tie-ins Pembina DJ 06-23-050-06W5M to 16- Daylight 14-050-06W5M WI% 100.0% received Permit. Not Economic will not construct at Land released March 4. Permit is in at the board, Construction completed, handed over to operations Request to Comments Survey Mineral Land Notice Served Notice Due Exploitation JV Agreements in place Comments Tie-in Point 16-14-050-06W5M Cardium sweet oil gathering system tie-in to Crossfire Battery. Production and Facilities to sit down and go 16-14-050-06W5M Tie-in of our sour Nisku well at 09-21-05006W5M. It will follow the same routing as our Third Party tie- existing pipeline. for the Tie into lines will Waiting in agreements on land. Estimated on sent to stream end of March. Conoco. Cardium sweet oil gathering system tie-in to Crossfire Battery. Tie-in of our sour Nisku well at 09-21-05006W5M. It will follow the same Tie into pipeline. Waiting on land. Estimated on stream end of March. Cardium sweet oil gathering system tie-in to Crossfire Battery. Tie-in of our sour Nisku well at 09-21-05006W5M. It will follow the same Tie into pipeline. Waiting on land. Estimated on stream end of March. Comments Comments Comments
Pembina
DJ
Daylight
100.0%
Violet Grove
JB
Daylight
80.00%
Oct 19/2010
PembinaWarburg
MM
12-15-047-03W5 to 0422-047-03W5
Daylight
Wk of Feb 21/2010
final package received. Audit completed. Brazeau pipeline flow reversal. Part ACompleted. Pipeline (line loop) completed. Compressor moved to 1212. Construction on hold. Pipeline interconnect. Construction on hold. SWB and Tie-in. Kick off Mar 14/2011 and ten days to Construction completed. Handed over to operations. Construction in progress. Estimated to be complete end of Pipeline flow reversal project. Part A construction in progress. Acquiring land for pipeline line loop (15-09 Acquiring land for pipeline line loop (15-09 to 04-21). Compressor to be installed to handle solution gas from Cardium wells and Rock Creek wells. Production Install 3000meters of 4" pipeline and 3" fuel gas pipeline to bring to bring emulsion from 07-05, 1205, 16-36, 12-36, 13-36
JB
09-34-047-11W5
Daylight
100.0%
Brazeau
JB
15-09-047-11W5 to 0421-047-11W5M
Daylight
100.0%
Pipeline flow reversal project. Part A construction in progress. Acquiring land for pipeline line loop (15-09 to 04-21). Compressor to be installed to handle solution gas from Cardium wells Install 3000meters of 4" pipeline and 3" fuel gas pipeline to bring
Pipeline flow reversal project. Part A construction in progress. Acquiring land for pipeline line loop (15-09 to 04-21). Compressor to be installed to handle solution gas from Cardium wells Install 3000meters of 4" pipeline and 3" fuel gas pipeline to bring
Brazeau
12-12-048-10W5
Daylight
100.0%
Brazeau
12-34-047-11W5
Daylight
100.0%
Brazeau
08-21-047-11W5
Daylight
100.0%
Brazeau
06-29-47-11W5
Daylight
100.0%
Brazeau
05-27-47-11W5
Daylight
100.0%
\\vboxsrv\conversion_tmp\scratch7619\69580106.xls.ms_office
Brazeau
12-31-47-11W5
Daylight
100.0%
Booster compressor install. On hold. Easyford line heater install. Notificationd should go out this wk Butane blending project and trucked in unloading Battery upgrade Group Sep. Possible Butane Blending. Recylinder the 8-7 comp.
300HP compressor install c/w blowcase. D-56 out to Broker, notifications should go out this week. Land gathering
300HP compressor install c/w blowcase. D-56 out to Broker, notifications should go out this week. Land gathering
Easyford
PM/ED
13-34-049-08W5M
Daylight
100.0%
D-56 out to Broker, notifications should go out this week. Land gathering chronology for release for license.
Violet Grove
MW
16-29-048-09W5M
Daylight
100.0%
Reviewing if we can relicense pipelines to can relicense we can relicense pipelines to higher H2S. Reviewing if we higher H2S.if pipelines to higher H2S. Reviewing
Crossfire
DJ
13-02-50-6W5
Daylight
100.0%
\\vboxsrv\conversion_tmp\scratch7619\69580106.xls.ms_office
Gross Forcasted Production Exploitation # Wells per Pad (#Drilled) 2 Bottom hole Location (surface location) Partners 00/09-16-048-05W5M (13-16-48-5W5M) Daylight Zone Cardium WI% 75.0% Oct 7/2010 Trying to extend Spry's 12-17 lease. Wetlands need 50% Jan 7/2011 mitigation Received 50% Final Plans. This is on Crown land, 50% Jan 7/2011 working on Scouting. 50% Prelim in. Request to Comments Survey Mineral Land Comments Notice Due Exploitation JV Agreements in place Tie-in Point Spry 13-16-48-5 Need Albera Environment approval. Likely will not have in time for Oct. expiry. Predetermination sent in March 1. May need to justify why we are not using the Zargon lease 330 m North. Comments Initial Prod (bbl/d or mmcf/d) 6 Mo Prod (bbl/d or mmcf/d)
Surface Location
Notice Served
Duane J
13-16-48-5
Duane J
5-20-48-5
00/05-19-048-05W5M (05-20-48-5W5M)
Daylight Sifton
Cardium
Baytex 13-17-48-5
Duane J
9-24-48-5
2 (1)
00/16-19-048-05W5M (09-24-48-6W5M)
Daylight Sifton
Cardium
on lease
Aug 30 commitme nt
Duane J
16-33-48-6
00/16-34-048-06W5M (16-33-49-6W5M)
West
Cardium
100.0%
Jan 21/2011
Pooling and Farmin w/ Owl River. August 30th 2011 commitment. Location changed to 1634-48-6W5. 4-10-49-6 Pipeline being surveyed. D-56 going out for multiwell facility. Pipeline surveyed.Surf Ld needs to meet adjacent landowner re horses prior to spud.
Duane J
12-10-49-6
2 (1)
00/08-10-049-06W5M (12-10-49-6W5M)
West
Cardium
100.0%
\\vboxsrv\conversion_tmp\scratch7619\69580106.xls.ms_office
Operated Workovers
Operated Abandonments Priority Area Area Exploitation Engineer Bottom hole Location (surface location) Partners Operated Tie-ins Pembina DJ 06-23-050-06W5M to 16- Daylight 14-050-06W5M WI% 100.0% received Permit. Not Economic will not construct at Request to Comments Survey Mineral Land Notice Served Notice Due Exploitation JV Agreements in place Comments Tie-in Point 16-14-050-06W5M Cardium sweet oil Cardium sweet Cardium sweet gathering system tie-in to oil gathering oil gathering Crossfire Battery. system tie-in to system tie-in to Production and Facilities Crossfire Crossfire to sit down and go Battery. Battery. \\vboxsrv\conversion_tmp\scratch7619\69580106.xls.ms_office Comments Comments Comments
Pembina
DJ
Daylight
100.0%
Violet Grove
JB
Daylight
80.00%
Oct 19/2010
Land released March 4. Permit is in at the board, Construction completed, handed over to operations
16-14-050-06W5M
Tie-in of our sour Nisku well at 09-21-05006W5M. It will follow the same routing as our Third Party tie- existing pipeline. for the Tie into lines will in agreements Waiting on land. sent to Estimated on stream end Conoco. of March.
PembinaWarburg
MM
12-15-047-03W5 to 0422-047-03W5
Daylight
Wk of Feb 21/2010
final package received. Audit completed. Brazeau pipeline flow reversal. Part ACompleted. Pipeline (line loop) completed. Pipeline flow reversal project. Part A construction in progress. Acquiring land for pipeline line loop (15-09 Acquiring land for pipeline line loop (15-09 to 04-21). Compressor to be installed to handle solution gas from Cardium wells and Rock Creek 3000meters of 4" Install wells. Production pipeline and 3" fuel gas pipeline to bring to bring emulsion from 07-05, 1205, 16-36, 12-36, 13-36
Tie-in of our sour Nisku well at 09-21-05006W5M. It will follow the same Tie into pipeline. Waiting on land. Estimated on stream end of March.
Tie-in of our sour Nisku well at 09-21-05006W5M. It will follow the same Tie into pipeline. Waiting on land. Estimated on stream end of March.
JB
09-34-047-11W5
Daylight
100.0%
Brazeau
JB
15-09-047-11W5 to 0421-047-11W5M
Daylight
100.0%
for pipeline line for pipeline line loop (15-09 to loop (15-09 to 04-21). 04-21). Compressor to be installed to handle solution gas from Cardium wells Install 3000meters of 4" pipeline and 3" fuel gas pipeline to bring Compressor to be installed to handle solution gas from Cardium wells Install 3000meters of 4" pipeline and 3" fuel gas pipeline to bring
Brazeau
12-12-048-10W5
Daylight
100.0%
Brazeau
12-34-047-11W5
Daylight
100.0%
Brazeau
08-21-047-11W5
Daylight
100.0%
Brazeau
06-29-47-11W5
Daylight
100.0%
SWB and Tie-in. Kick off Mar 14/2011 and ten days to Construction completed. Handed over to operations. Construction in progress. Estimated to be complete end of Booster compressor install. On hold.
Brazeau
05-27-47-11W5
Daylight
100.0%
300HP compressor install c/w blowcase. 300HP compressor install c/w blowcase. D-56 out to Broker, notifications should go out this week. Land gathering
300HP compressor install c/w blowcase. 300HP compressor install c/w blowcase. D-56 out to Broker, notifications should go out this week. Land gathering
Brazeau
12-31-47-11W5
Daylight
100.0%
Easyford
PM/ED
13-34-049-08W5M
Daylight
100.0%
Violet Grove
MW
16-29-048-09W5M
Daylight
100.0%
Easyford line heater install. Notificationd should go out this wk Butane blending project and trucked in unloading Battery upgrade Group Sep. Possible Butane Blending. Recylinder the 8-7 comp.
D-56 out to Broker, notifications should go out this week. Land gathering chronology for release for license.
Reviewing if we can relicense pipelines tocan relicense we can relicense pipelines to higher H2S. Reviewing if we Reviewing if pipelines to higher H2S. higher H2S.
Crossfire
DJ
13-02-50-6W5
Daylight
100.0%
\\vboxsrv\conversion_tmp\scratch7619\69580106.xls.ms_office
TOMAHAWK CARDIUM
Gross Forcasted Production Exploitation # Wells per Pad (#Drilled) 2 (1) Bottom hole Location (surface location) Partners 00/13-09-050-05W5M (13-04-50-5W5M) Daylight Zone Cardium WI% 100.0% 23-Apr-10 Ready to go to license. Waiting on 14-9 results. ON This HOLD is part of swap w/ Trioil. The location was previouslly Surveyed, D56 out and acquire. licensed. Pipeline released, issue of multiwell Licensed on hold pending 13-26 results. Licensed, Waiting on 829. Multiwell issue. Daylight to final survey in. Land owners signed, waiting on Licensed, NE 15 has expired need to change BH if we final survey in. Land owners signed, waiting in. Finals on preparing docs. Acquired, need to Received section 17, June 2011 expiry. Final plans in. Request to Comments Survey Mineral Land Comments Notice Due Exploitation JV Agreements in place Tie-in Point 14-33-49-5W5 discussing w/ Pending results of the 14Eclipse 09 well, Farmin on Bounty. Ellerslie location from an existing West location that has expired. Gravel pit surface owner. Preparing docs for revised surveyed. 5-28 Pipeline surveyed to 528, landowner signed, w.o. 3rd parties. Surface land to set up a mtg residents on Multiwellof the 13Pending results applic. 26 well Comments Initial Prod (bbl/d or mmcf/d) 6 Mo Prod (bbl/d or mmcf/d)
Surface Location
Notice Served
Operated Drills 3
Duane J
13-4-50-5
1 Aug 24 Expiry
Duane J
4-11-50-6
00/04-11-50-06W5M
Baccalieu
Ellerslie
50.0%
Duane J
14-10-50-6
00/14-15-050-06W5M (14-10-50-6W5M)
Daylight
Cardium
100.0% 29-Oct-10
Duane J
9-20-50-6
3 (1)
00/09-21-050-06W5M (09-20-50-6W5M)
Daylight
Cardium
Duane J
1-27-50-6
2 (1)
00/01-26-050-06W5M (01-27-50-6W5M)
Daylight
Cardium
100.0% 23-Apr-10
Duane J
9-20-50-6
3 (1)
Cardium
Duane J
9-35-49-5
00/09-26-049-05W5M (09-35-49-5W5M)
Daylight
Cardium
Eclipse 8-35-49-5
Duane J
1-4-50-5
Cardium
100.0%
Oct 14/2010
Eclipse 2-4-50-5
Duane J
9-35-49-5
00/15-02-050-05W5M (09-35-49-5W5M)
Daylight
Cardium
Eclipse 8-35-49-5
Duane J
13-34-49-5
00/13-03-050-05W5M (13-34-49-5W5M)
Daylight
Cardium
Eclipse 13-34-49-5
Morichal/Eclipse, January 13, 2011 expiry. Need to move Buck Mountain Co-op line, north edge of lease. Morichal/Eclipse, needing holding for SE/4 of section 2, Need approval from royalty owner to pool. Pipeline Morichal/Eclipse
Duane J
14-3-50-5
00/14-10-050-05W5M (14-3-50-5W5M)
Daylight
Cardium
100.0%
Oct 29/2010
Eclipse 14-3-50-5
\\vboxsrv\conversion_tmp\scratch7619\69580106.xls.ms_office
Operated Workovers
Operated Abandonments Priority Area Area Exploitation Engineer Bottom hole Location (surface location) Partners Operated Tie-ins Pembina DJ 06-23-050-06W5M to 16- Daylight 14-050-06W5M WI% 100.0% received Permit. Not Economic will not construct at Land released March 4. Permit is in at the board, Construction completed, handed over to operations Request to Comments Survey Mineral Land Notice Served Notice Due Exploitation JV Agreements in place Comments Tie-in Point 16-14-050-06W5M Cardium sweet oil gathering system tie-in to Crossfire Battery. Production and Facilities to sit down and go 16-14-050-06W5M Tie-in of our sour Nisku well at 09-21-05006W5M. It will follow the same routing as our Third Party tie- existing pipeline. for the Tie into lines will in agreements Waiting on land. sent to Estimated on stream end Conoco. of March. Cardium sweet oil gathering system tie-in to Crossfire Battery. Tie-in of our sour Nisku well at 09-21-05006W5M. It will follow the same Tie into Cardium sweet oil gathering system tie-in to Crossfire Battery. Tie-in of our sour Nisku well at 09-21-05006W5M. It will follow the same Tie into Comments Comments Comments
Pembina
DJ
Daylight
100.0%
Violet Grove
JB
Daylight
80.00%
Oct 19/2010
pipeline. pipeline. Waiting on Waiting on land. land. Estimated on Estimated on stream end of stream end of \\vboxsrv\conversion_tmp\scratch7619\69580106.xls.ms_office March. March.
PembinaWarburg
MM
12-15-047-03W5 to 0422-047-03W5
Daylight
Wk of Feb 21/2010
final package received. Audit completed. Brazeau pipeline flow reversal. Part ACompleted. Pipeline (line loop) completed. Compressor moved to 1212. Construction on hold. Pipeline interconnect. Construction on hold. SWB and Tie-in. Kick off Mar 14/2011 and ten days to Construction completed. Handed over to operations. Construction in progress. Estimated to be complete end of March Booster compressor install. On hold. Easyford line heater install. Notificationd should go out this wk Butane blending project and trucked in unloading Battery upgrade Group Sep. Possible Butane Blending. Recylinder the 8-7 comp. Pipeline flow reversal project. Part A construction in progress. Acquiring land for pipeline line loop (15-09 Acquiring land for pipeline line loop (15-09 to 04-21). Compressor to be installed to handle solution gas from Cardium wells and Rock Creek wells. Production Install 3000meters of 4" pipeline and 3" fuel gas pipeline to bring to bring emulsion from 07-05, 1205, 16-36, 12-36, 13-36 Pipeline flow reversal project. Part A construction in progress. Acquiring land for pipeline line loop (15-09 to 04-21). Compressor to be installed to handle solution gas from Cardium wells Install 3000meters of 4" pipeline and 3" fuel gas pipeline to bring Pipeline flow reversal project. Part A construction in progress. Acquiring land for pipeline line loop (15-09 to 04-21). Compressor to be installed to handle solution gas from Cardium wells Install 3000meters of 4" pipeline and 3" fuel gas pipeline to bring
JB
09-34-047-11W5
Daylight
100.0%
Brazeau
JB
15-09-047-11W5 to 0421-047-11W5M
Daylight
100.0%
Brazeau
12-12-048-10W5
Daylight
100.0%
Brazeau
12-34-047-11W5
Daylight
100.0%
Brazeau
08-21-047-11W5
Daylight
100.0%
Brazeau
06-29-47-11W5
Daylight
100.0%
Brazeau
05-27-47-11W5
Daylight
100.0%
300HP compressor install c/w blowcase. 300HP compressor install c/w blowcase. D-56 out to Broker, notifications should go out this week. Land gathering
300HP compressor install c/w blowcase. 300HP compressor install c/w blowcase. D-56 out to Broker, notifications should go out this week. Land gathering
Brazeau
12-31-47-11W5
Daylight
100.0%
Easyford
PM/ED
13-34-049-08W5M
Daylight
100.0%
D-56 out to Broker, notifications should go out this week. Land gathering chronology for release for license.
Violet Grove
MW
16-29-048-09W5M
Daylight
100.0%
Reviewing if we can relicense pipelines to can relicense we can relicense pipelines to higher H2S. Reviewing if we higher H2S. pipelines to higher H2S. Reviewing if
Crossfire
DJ
13-02-50-6W5
Daylight
100.0%
\\vboxsrv\conversion_tmp\scratch7619\69580106.xls.ms_office
WARBURG CARDIUM
Gross Forcasted Production Exploitation # Wells per Pad (#Drilled) 2 (1) Bottom hole Location (surface location) Partners 00/011-26-047-03W5M (01-34-47-3W5M) West Zone Cardium WI% 100.0% licensed. On hold trying to farm out. Licensed, Constructed with 1-1-48-3 Compensati on issues. Waiting on landowner who has Surveyed, need to acquire 56wks Surveyed, need to acquire 56wks On lease Request to Comments Survey Mineral Land Comments Notice Due Exploitation JV Agreements in place Tie-in Point Paying compensatory Royalties to Canpar. Comments Initial Prod (bbl/d or mmcf/d) 6 Mo Prod (bbl/d or mmcf/d)
Surface Location
Notice Served
Operated Drills 1
Duane J
1-34-47-3
Duane J
1-2-48-3
2(1)
02/08-01-048-03W5M (01-02-48-3W5M)
West
Cardium
81.3%
Duane J
13-4-48-3
00/13-04-048-03W5M (13-03-48-3W5M)
Daylight
Cardium
36.7% 19-Oct-10
Daylight 5-3-48-3
Paying compensatory Royalties to Encana. 1-1 should take care of offset obligation. Acquiring, Spry has licensed a 13-4 location. Land looking into. Paying compensatory Royalties.
Duane J
5-4-47-3
2 (0)
00/04-05-048-03W5M (05-04-47-3W5M)
West
Cardium
100.0%
Dec 16/2010
Daylight 13-33-473W5
Duane J
5-4-47-3
2(0)
00/05-05-048-03W5M (05-04-47-3W5M)
West
Cardium
100.0%
Dec 16/2010
Daylight 13-33-473W5
\\vboxsrv\conversion_tmp\scratch7619\69580106.xls.ms_office
Operated Workovers
Operated Abandonments Priority Area Area Exploitation Engineer Bottom hole Location (surface location) Partners Operated Tie-ins Pembina DJ 06-23-050-06W5M to 16- Daylight 14-050-06W5M WI% 100.0% received Permit. Not Economic will not construct at Land released March 4. Permit is in at the board, Construction completed, handed over to operations Request to Comments Survey Mineral Land Notice Served Notice Due Exploitation JV Agreements in place Comments Tie-in Point 16-14-050-06W5M Cardium sweet oil gathering system tie-in to Crossfire Battery. Production and Facilities to sit down and go 16-14-050-06W5M Tie-in of our sour Nisku well at 09-21-05006W5M. It will follow the same routing as our Third Party tie- existing pipeline. for the Tie into lines will in agreements Waiting on land. sent to Estimated on stream end Conoco. of March. Cardium sweet oil gathering system tie-in to Crossfire Battery. Tie-in of our sour Nisku well at 09-21-05006W5M. It will follow the same Tie into pipeline. Waiting on land. Estimated on stream end of March. Cardium sweet oil gathering system tie-in to Crossfire Battery. Tie-in of our sour Nisku well at 09-21-05006W5M. It will follow the same Tie into pipeline. Waiting on land. Estimated on stream end of March. Comments Comments Comments
Pembina
DJ
Daylight
100.0%
Violet Grove
JB
Daylight
80.00%
Oct 19/2010
PembinaWarburg
MM
12-15-047-03W5 to 0422-047-03W5
Daylight
Wk of Feb 21/2010
final package received. Audit completed. Brazeau pipeline flow reversal. Part ACompleted. Pipeline (line loop) completed. Pipeline flow reversal project. Part A construction in progress. Acquiring land for pipeline line loop (15-09 Acquiring land for pipeline line loop (15-09 to 04-21). Compressor to be installed to handle solution gas from Cardium wells and Rock Creek 3000meters of 4" Install wells. Production pipeline and 3" fuel gas pipeline to bring to bring emulsion from 07-05, 1205, 16-36, 12-36, 13-36
JB
09-34-047-11W5
Daylight
100.0%
Brazeau
JB
15-09-047-11W5 to 0421-047-11W5M
Daylight
100.0%
for pipeline line for pipeline line loop (15-09 to loop (15-09 to 04-21). 04-21). Compressor to be installed to handle solution gas from Cardium wells Install 3000meters of 4" pipeline and 3" fuel gas pipeline to bring Compressor to be installed to handle solution gas from Cardium wells Install 3000meters of 4" pipeline and 3" fuel gas pipeline to bring
Brazeau
12-12-048-10W5
Daylight
100.0%
Brazeau
12-34-047-11W5
Daylight
100.0%
Brazeau
08-21-047-11W5
Daylight
100.0%
Brazeau
06-29-47-11W5
Daylight
100.0%
SWB and Tie-in. Kick off Mar 14/2011 and ten days to Construction completed. Handed over to operations. Construction in progress. Estimated to be complete end of Booster compressor install. On hold.
Brazeau
05-27-47-11W5
Daylight
100.0%
300HP compressor install c/w blowcase. 300HP compressor install c/w blowcase. D-56 out to Broker, notifications should go out this week. Land gathering
300HP compressor install c/w blowcase. 300HP compressor install c/w blowcase. D-56 out to Broker, notifications should go out this week. Land gathering
Brazeau
12-31-47-11W5
Daylight
100.0%
Easyford
PM/ED
13-34-049-08W5M
Daylight
100.0%
Violet Grove
MW
16-29-048-09W5M
Daylight
100.0%
Easyford line heater install. Notificationd should go out this wk Butane blending project and trucked in unloading
D-56 out to Broker, notifications should go out this week. Land gathering chronology for release for license.
\\vboxsrv\conversion_tmp\scratch7619\69580106.xls.ms_office
Crossfire
DJ
13-02-50-6W5
Daylight
100.0%
Battery upgrade Group Sep. Possible Butane Blending. Recylinder the 8-7 comp.
Reviewing if we can relicense pipelines tocan relicense we can relicense pipelines to higher H2S. Reviewing if we Reviewing if pipelines to higher H2S. higher H2S.
\\vboxsrv\conversion_tmp\scratch7619\69580106.xls.ms_office
ROCK CREEK
Gross Forcasted Production Exploitation # Wells per Pad (#Drilled) Bottom hole Location (surface location) Partners 100/12-02-049-09W5 (09-02-049-09W5) 100/06-10-049-09W5 (13-02-049-09W5) 100/04-17-047-11W5 (04-16-047-11W5) Taqa 50%
PNG to base Jurrasic. Taqa 50% PNG to base Nisku.
Surface Location
Request to Comments Survey Zone WI% 100.0% Sept 20/2010 March 3/2011 April 19/2011 Released for license
Notice Served
Exploitation
JV Agreements in place Comments Initial Prod (bbl/d or mmcf/d) 6 Mo Prod (bbl/d or mmcf/d)
Tie-in Point Waiting on Alberta Environment re: borrow pit First Nations Consultation, EFR
Operated Drills 1
JB
JB
100.0%
JB
50.0%
Violet Grove Satellite 01-02 Existing Daylight 13-02 pipeline riser. Existing Daylight 04-16 pipeline riser. Existing Daylight 10-30 pipeline riser. Existing NuVista 10-10 pipeline riser. TBD
5-10 mmcf/d
3-5 mmcf/d
JB
100/15-19-047-11W5 (10-30-047-11W5)
100.0%
April 19/2011
3-5mmcf/d
1-3 mmcf/d
JB
100/02-10-048-13W5 (103/10-10-048-13W5)
100.0%
April 18/2011
3-5mmcf/d
1-3 mmcf/d
JB
100/14-26-048-09W5 (03-26-048-09W5)
JB
NE1/4 PNG below base Cardium SE1/4 PNG below base Cardium
100.0%
April 18/2011
3-5mmcf/d
1-3 mmcf/d
100.0%
TBD
3-5mmcf/d
1-3 mmcf/d
\\vboxsrv\conversion_tmp\scratch7619\69580106.xls.ms_office
Partners
Request to Survey
Comments
Notice Served
Comments
Operated Drills
1 Megan M
00/12-16-047-03W5M
(12-15-047-03W5M)
Megan M
04-22-047-03W5M
2 (0)
00/04-21-047-03W5M
(04-22-047-03W5M)
Megan M
11-21-047-03W5M
2 (0)
00/14-22-047-03W5M
(11-21-047-03W5M)
Megan M
2 (0)
00/05-35-047-03W5M
(06-27-047-03W5M)
Megan M
1 (0)
00/03-11-047-03W5M
(01-14-047-03W5M)
Megan M
08-23-047-03W5M
1 (0)
00/07-26-047-03W5M
(08-23-047-03W5M)
Megan M
04-22-047-03W5M
2 (0)
00/05-21-047-03W5M
(04-22-047-03W5M)
Megan M
12-15-047-03W5M
2 (0)
00/13-16-047-03W5M
(12-15-047-03W5M)
Megan M
11-21-047-03W5M
2 (0)
00/11-22-047-03W5M
(11-21-047-03W5M)
Megan M
2 (0)
00/03-35-047-03W5M (627-047-03W5M)
Megan M
02-08-047-03W5M
2 (0)
00/01-05-047-03W5M
(02-08-047-03W5M)
Daylight Advantage Edna Bolin Daylight Advantage Edna Bolin Daylight Advantage Edna Bolin Daylight Advantage Edna Bolin Daylight Advantage Penn West Daylight Advantage Edna Bolin Daylight Advantage Edna Bolin Daylight Advantage Edna Bolin Daylight Advantage Edna Bolin Daylight Advantage Edna Bolin Daylight
Belly River Belly River Belly River Belly River Belly River Belly River Belly River Belly River Belly River Belly River Belly River
93.84% 5.87% 0.29% 93.84% 5.87% 0.29% 93.84% 5.87% 0.29% 93.84% 5.87% 0.29% 58.55% 25.08% 16.37% 93.84% 5.87% 0.29% 93.84% 5.87% 0.29% 93.84% 5.87% 0.29% 93.84% 5.87% 0.29% 93.84% 5.87% 0.29% 100.0%
licensed. Waiting on partner approval. Construction complete Licensed. Waiting on Partner approval. Replaces 15-21 well. Aquiring, working on D56.
75
75
75
December 14/2010 December 14/2010 December 14/2010 September 22/2010 September 22/2010 Jan19/2011
137
75
137
75
137
75
137
75
137
75
December 14/2010
September 13/2010
75
75
Location On Hold. 01-05 was the primary target. Have an approved 2 wells/qrt holding on the section. Location On Hold. Have an approved 2 wells/qrt holding on the section
Section 4 or 9?
Megan M
02-08-047-03W5M
2 (0)
00/02-05-047-03W5M
(02-08-047-03W5M)
Daylight
Belly River
100.0%
September 13/2010
Section 4 or 9?
high likelihood that the reservoir is in the oil-water transition zone, or wet. high likelihood that the reservoir is in the oil-water transition zone, or wet.
137
75
137
75
WARBURG CARDIUM
Exploitation
Partners Operated Drills 1 Duane J 1-34-473 2 (1) 00/011- West 26-04703W5M (01-34473W5M) 02/08-01- West 04803W5M (01-02483W5M)
Zone Cardium
WI% 100.0%
Duane J 1-2-48-3
2(1)
Cardium
81.3%
Duane J 13-4-483
Cardium
36.7%
Duane J 5-4-47-3
2 (0)
Duane J 5-4-47-3
2(0)
Cardium
100.0%
Cardium
100.0%
URG CARDIUM
Mineral Land Exploitation JV Comments Agreem Comme ents in nts place
Request to Survey
Comme nts
Notice Due
Tie-in Point Paying compens atory Royalties to Canpar. Paying compens atory Royalties to Encana. 1-1 should take care of offset obligatio n. Acquiring , Spry has licensed a 13-4 location. Land looking into.
On lease
19-Oct-10 Compen sation issues. Waiting on landown er who has Dean Mathison as lawyer
Daylight 5-3-48-3
Daylight 13-33-473W5
Daylight 13-33-473W5
Gross Forcasted Production Initial 6 Mo Prod Prod (bbl/d or (bbl/d or mmcf/d) mmcf/d)