Pages which have been revised are outlined below, together with the Highlights of the
Revision
--------------------------------------------------------------------------------------
CH/SE/SU C REASON FOR CHANGE EFFECTIVITY
PAGES
--------------------------------------------------------------------------------------
CHAPTER 24
__________
24-HIGHLIGHTS Page 1 of 3
REVISION NO. 31 Aug 01/11
SYR
--------------------------------------------------------------------------------------
CH/SE/SU C REASON FOR CHANGE EFFECTIVITY
PAGES
--------------------------------------------------------------------------------------
24-HIGHLIGHTS Page 2 of 3
REVISION NO. 31 Aug 01/11
SYR
--------------------------------------------------------------------------------------
CH/SE/SU C REASON FOR CHANGE EFFECTIVITY
PAGES
--------------------------------------------------------------------------------------
24-HIGHLIGHTS Page 3 of 3
REVISION NO. 31 Aug 01/11
SYR
CHAPTER 24
__________
ELECTRICAL POWER
24-L.E.P. Page 1
Aug 01/11
SYR
CH/SE/SU C PAGE DATE CH/SE/SU C PAGE DATE CH/SE/SU C PAGE DATE
24-L.E.P. Page 2
Aug 01/11
SYR
CH/SE/SU C PAGE DATE CH/SE/SU C PAGE DATE CH/SE/SU C PAGE DATE
24-L.E.P. Page 3
Aug 01/11
SYR
CH/SE/SU C PAGE DATE CH/SE/SU C PAGE DATE CH/SE/SU C PAGE DATE
24-L.E.P. Page 4
Aug 01/11
SYR
CH/SE/SU C PAGE DATE CH/SE/SU C PAGE DATE CH/SE/SU C PAGE DATE
24-L.E.P. Page 5
Aug 01/11
SYR
CH/SE/SU C PAGE DATE CH/SE/SU C PAGE DATE CH/SE/SU C PAGE DATE
24-L.E.P. Page 6
Aug 01/11
SYR
CH/SE/SU C PAGE DATE CH/SE/SU C PAGE DATE CH/SE/SU C PAGE DATE
24-L.E.P. Page 7
Aug 01/11
SYR
CH/SE/SU C PAGE DATE CH/SE/SU C PAGE DATE CH/SE/SU C PAGE DATE
24-L.E.P. Page 8
Aug 01/11
SYR
CH/SE/SU C PAGE DATE CH/SE/SU C PAGE DATE CH/SE/SU C PAGE DATE
24-L.E.P. Page 9
Aug 01/11
SYR
CH/SE/SU C PAGE DATE CH/SE/SU C PAGE DATE CH/SE/SU C PAGE DATE
24-L.E.P. Page 10
Aug 01/11
SYR
CH/SE/SU C PAGE DATE CH/SE/SU C PAGE DATE CH/SE/SU C PAGE DATE
24-L.E.P. Page 11
Aug 01/11
SYR
CH/SE/SU C PAGE DATE CH/SE/SU C PAGE DATE CH/SE/SU C PAGE DATE
24-L.E.P. Page 12
Aug 01/11
SYR
CHAPTER 24
__________
ELECTRICAL POWER
TABLE OF CONTENTS
_________________
_______
SUBJECT ________
CH/SE/SU C
_ PAGE ___________
____ EFFECTIVITY
ELECTRICAL POWER - GENERAL
__________________________ 24-00-00
DESCRIPTION AND OPERATION 1 ALL
General 1 ALL
Generation 1 ALL
General Arrangement of the 1 ALL
Distribution Network
Component Location 2 ALL
Main Component Location 2 ALL
System Description 13 ALL
AC Generation and Distribution 13 ALL
DC Generation and Distribution 18 ALL
Power Supply Via the External 20 ALL
Power Receptacle
Controls and Indications Related 21 ALL
to Electrical Generation and
Distribution
MAINT BUS Switch 22 ALL
Central Warning System 22 ALL
Centralized Fault Display System 22 ALL
(CFDS)
___________________________
ELECTRICAL POWER - GENERAL 24-00-00
ADJUSTMENT/TEST 501 ALL
Integrity Test of the Electrical 501 ALL
Power
___________________________
ELECTRICAL POWER - GENERAL 24-00-00
INSPECTION/CHECK 601 ALL
General - Inspection/Check of the 601 ALL
Electrical Circuits and Equipment
Opening and Closing of all Circuit 605 ALL
Breakers with Electrical Circuits
De-Energized
_____________
AC GENERATION 24-20-00
DESCRIPTION AND OPERATION 1 ALL
General 1 ALL
Component Location 2 ALL
Spare Fuse 5 ALL
______________
AC GENERATION 24-20-00
DEACTIVATION/REACTIVATION 401 ALL
Check of the AC Main Generation 401 ALL
24-CONTENTS Page 1
Nov 01/10
R
SYR
CHAPTER 24
__________
ELECTRICAL POWER
TABLE OF CONTENTS
_________________
_______
SUBJECT CH/SE/SU
________ C
_ PAGE ___________
____ EFFECTIVITY
Maintenance Condition
Refer to the MMEL TASK: 401 ALL
24-22-01-A)
RAT Extension Control - Check of 409 ALL
the RAT Manual Extension
Refer to the MMEL TASK: 409 ALL
24-24-02-A)
Reactivation of the RAT Extension 415 ALL
Control
Refer to the MMEL TASK: 415 ALL
24-24-02-A)
24-CONTENTS Page 2
May 01/11
R
SYR
CHAPTER 24
__________
ELECTRICAL POWER
TABLE OF CONTENTS
_________________
SUBJECT
_______ CH/SE/SU
________ C
_ PAGE ___________
____ EFFECTIVITY
24-CONTENTS Page 3
Nov 01/10
R
SYR
CHAPTER 24
__________
ELECTRICAL POWER
TABLE OF CONTENTS
_________________
_______
SUBJECT CH/SE/SU
________ C
_ PAGE ___________
____ EFFECTIVITY
Check of the Electrical Circuits
THERMOCOUPLE - IDG OIL TEMPERATURE 24-21-15
REMOVAL/INSTALLATION 401 ALL
Removal of the IDG Oil Temperature 401 ALL
Thermocouple (4015KS)
Installation of the IDG Oil 405 ALL
Temperature Thermocouple (4015KS)
COUPLING - QAD, IDG 24-21-41
REMOVAL/INSTALLATION 401 ALL
Removal of the Quick Attach/Detach 401 ALL
(QAD) Adapter of the IDG (4000XU)
Installation of the Quick 406 ALL
Attach/Detach (QAD) Adapter of the
IDG (4000XU)
COUPLING - QAD, IDG 24-21-41
INSPECTION/CHECK 601 ALL
Torque Check of the Quick 601 ALL
Attach-Detach (QAD) Adapter
Tension-Bolt
IDG OIL COOLER - FUEL COOLED 24-21-42
REMOVAL/INSTALLATION 401 ALL
Removal of the Fuel-Cooled IDG 401 ALL
Oil-Cooler
Installation of the Fuel-Cooled 409 ALL
IDG Oil-Cooler
IDG OIL COOLER - FUEL COOLED 24-21-42
CLEANING/PAINTING 701 ALL
Cleaning of the Fuel Cooled IDG 701 ALL
Oil Cooler
IDG - CABLES 24-21-43
REMOVAL/INSTALLATION 401 ALL
Removal of the IDG Cables 401 ALL
Installation of the IDG Cables 407 ALL
TUBING - IDG COOLER OIL 24-21-49
REMOVAL/INSTALLATION 401 ALL
Removal of the Tubings - IDG 401 ALL
Cooling Oil
Installation of the Tubing - IDG 407 ALL
Cooler Oil
TUBING - IDG COOLER OIL 24-21-49
INSPECTION/CHECK 601 ALL
General Check of the IDG Oil 601 ALL
Cooling Tubes
GENERATOR - INTEGRATED DRIVE (IDG) 24-21-51
REMOVAL/INSTALLATION 401 ALL
Removal of the Integrated Drive 401 ALL
24-CONTENTS Page 4
May 01/11
R
SYR
CHAPTER 24
__________
ELECTRICAL POWER
TABLE OF CONTENTS
_________________
_______
SUBJECT CH/SE/SU
________ C
_ PAGE ___________
____ EFFECTIVITY
Generator -IDG 1(2), (4000XU)
Installation of the Integrated 413 ALL
Drive Generator -IDG 1(2),
(4000XU)
Removal of the IDG Oil Filter(s) 427 ALL
Installation of the IDG Oil 431 ALL
Filter(s)
GENERATOR - INTEGRATED DRIVE (IDG) 24-21-51
INSPECTION/CHECK 601 ALL
Check of the Oil Level and Filter 601 ALL
Differential Pressure Indicator
(DPI)
Check IDG Oil Filter Differential 603 ALL
Pressure Indicator (DPI)
24-CONTENTS Page 5
Nov 01/10
R
SYR
CHAPTER 24
__________
ELECTRICAL POWER
TABLE OF CONTENTS
_________________
_______
SUBJECT CH/SE/SU
________ C
_ PAGE ___________
____ EFFECTIVITY
42XU4)
Installation of the AC Current 408 ALL
Transformers (42XU1, 42XU2, 42XU3,
42XU4)
Removal of the AC Current 420 ALL
Transformers (41XU1, 41XU2)
Installation of the AC Current 424 ALL
Transformers (41XU1, 41XU2)
SENSOR - TDC AC 24-22-18
REMOVAL/INSTALLATION 401 ALL
Removal of the TDC AC Sensor 1(2) 401 ALL
(50XU1, 50XU2)
Installation of the TDC AC Sensor 404 ALL
1(2) (50XU1, 50XU2)
ELECTRICAL GENERATION INTERFACE UNIT 24-22-33
(EGIU)
REMOVAL/INSTALLATION 401 ALL
Removal of the EGIU-1(2) (22XU1, 401 ALL
22XU2)
Installation of the EGIU-1(2) 405 ALL
(22XU1, 22XU2)
CONTROL UNIT - GENERATOR (GCU) 24-22-34
REMOVAL/INSTALLATION 401 ALL
Removal of the GCU-1(2) (1XU1, 401 ALL
1XU2)
Installation of the GCU-1(2) 405 ALL
(1XU1, 1XU2)
MODULE - LIGHTNING PROTECTION 24-22-51
REMOVAL/INSTALLATION 401 ALL
Removal of the Lightning 401 ALL
Protection Modules (19XU1, 19XU2)
Installation of the Lightning 404 ALL
Protection Modules (19XU1, 19XU2)
MODULE - LIGHTNING PROTECTION 24-22-51
INSPECTION/CHECK 601 ALL
Check of the Lightning Protection 601 ALL
Modules (19XU1, 19XU2)
CONTACTOR 24-22-55
REMOVAL/INSTALLATION 401 ALL
Removal of the Contactors (9XU1, 401 ALL
9XU2, 11XU1, 11XU2)
Installation of the Contactors 405 ALL
(9XU1, 9XU2, 11XU1, 11XU2)
24-CONTENTS Page 6
Nov 01/10
R
SYR
CHAPTER 24
__________
ELECTRICAL POWER
TABLE OF CONTENTS
_________________
_______
SUBJECT CH/SE/SU
________ C
_ ____ ___________
PAGE EFFECTIVITY
General 1 ALL
Component Location 1 ALL
System Description 1 ALL
Component Description 1 ALL
APU Generator 1 ALL
Generator Control Unit (GCU) 7 ALL
Electrical Generation Interface 7 ALL
Unit (EGIU)
Power Contactor 7 ALL
Current Transformer (CT) 7 ALL
Operation/Control and Indicating 9 ALL
APU Generator Control 9 ALL
24-CONTENTS Page 7
May 01/11
R
SYR
CHAPTER 24
__________
ELECTRICAL POWER
TABLE OF CONTENTS
_________________
_______
SUBJECT CH/SE/SU
________ C
_ PAGE ___________
____ EFFECTIVITY
8XS
Installation of the APU Generator 422 ALL
8XS with the Minilift Hoist
CONTACTOR 24-23-55
REMOVAL/INSTALLATION 401 ALL
Removal of the APU GLC (3XS) 401 ALL
Installation of the APU GLC (3XS) 406 ALL
24-CONTENTS Page 8
Nov 01/10
R
SYR
CHAPTER 24
__________
ELECTRICAL POWER
TABLE OF CONTENTS
_________________
_______
SUBJECT ________
CH/SE/SU C
_ PAGE ___________
____ EFFECTIVITY
CONTACTOR 24-24-55
REMOVAL/INSTALLATION 401 ALL
Removal of the Emergency Generator 401 ALL
Line Contactor (EMER GLC) (2XE)
Installation of the Emergency 405 ALL
Generator Line Contactor (EMER
GLC) (2XE)
Removal of the AC ESS BUS 408 ALL
Contactor (15XE)
Installation of the AC ESS BUS 412 ALL
Contactor (15XE)
24-CONTENTS Page 9
Nov 01/10
R
SYR
CHAPTER 24
__________
ELECTRICAL POWER
TABLE OF CONTENTS
_________________
_______
SUBJECT CH/SE/SU
________ C
_ ____ ___________
PAGE EFFECTIVITY
Operational Test of the Manual and 504 003-099,
Automatic Galley and Bus Shedding
24-CONTENTS Page 10
Nov 01/10
R
SYR
CHAPTER 24
__________
ELECTRICAL POWER
TABLE OF CONTENTS
_________________
_______
SUBJECT CH/SE/SU
________ C
_ ____ ___________
PAGE EFFECTIVITY
REMOVAL/INSTALLATION 401 ALL
Removal of the Static Inverter 401 ALL
Contactor (2XB)
Installation of the Static 405 ALL
Inverter Contactor (2XB)
_____________
DC GENERATION 24-30-00
DESCRIPTION AND OPERATION 1 ALL
General 1 ALL
In Normal Configuration 1 001-002,
Loss of the Transformer 1 001-002,
Rectifier 1 (TR1)
In Normal Configuration 1 003-099,
Loss of the Transformer 2 003-099,
Rectifier 1 (TR1)
Loss of the Transformer 2 001-002,
Rectifier 2 (TR2)
Loss of the Transformer 2 003-099,
Rectifier 2 (TR2)
Loss of the TR1 and TR2 2 ALL
Component Location 11 ALL
Spare Fuses 14 ALL
BITE Test 14 ALL
______________
DC GENERATION 24-30-00
DEACTIVATION/REACTIVATION 401 ALL
Perform a Charging Cycle on the 401 ALL
Battery Associated With the
Operative Battery Charge Limiter
(BCL)
Refer to the MMEL TASK: 401 ALL
24-38-02-A)
Reactivation of the Battery Charge 405 ALL
Limiter 1(2)
Refer to the MMEL TASK: 405 ALL
24-38-02-A)
Deactivation of the Transformer 406 ALL
Rectifier TR2 (1PU2)
Refer to the MMEL TASK: 406 ALL
24-32-01-B)
Reactivation of the Transformer 409 ALL
Rectifier TR2 (1PU2)
Refer to the MMEL TASK: 409 ALL
24-32-01-B)
24-CONTENTS Page 11
Nov 01/10
R
SYR
CHAPTER 24
__________
ELECTRICAL POWER
TABLE OF CONTENTS
_________________
SUBJECT
_______ CH/SE/SU
________ C
_ PAGE ___________
____ EFFECTIVITY
______________
DC GENERATION 24-30-00
ADJUSTMENT/TEST 501 ALL
Operational Test of the Emergency 501 ALL
Generation System with One Normal
Transformer Rectifier (TR) Failed
24-CONTENTS Page 12
Nov 01/10
R
SYR
CHAPTER 24
__________
ELECTRICAL POWER
TABLE OF CONTENTS
_________________
_______
SUBJECT CH/SE/SU
________ C
_ ____ ___________
PAGE EFFECTIVITY
Component Location 1 ALL
Component Desccription 1 ALL
Essential TR 1 ALL
Characteristics of the Essential 1 ALL
TR
Operation/Control and Indicating 1 ALL
Reset of the Protection of the 4 ALL
TR
24-CONTENTS Page 13
Nov 01/10
R
SYR
CHAPTER 24
__________
ELECTRICAL POWER
TABLE OF CONTENTS
_________________
SUBJECT
_______ CH/SE/SU
________ C
_ PAGE ___________
____ EFFECTIVITY
24-CONTENTS Page 14
Nov 01/10
R
SYR
CHAPTER 24
__________
ELECTRICAL POWER
TABLE OF CONTENTS
_________________
_______
SUBJECT CH/SE/SU
________ C
_ PAGE ___________
____ EFFECTIVITY
(2PB1, 2PB2)
CHARGE LIMITER - BATTERY (BCL) 24-38-34
REMOVAL/INSTALLATION 401 ALL
Removal of the Battery Charge 401 ALL
Limiter (BCL) (1PB1, 1PB2)
Installation of the Battery Charge 404 ALL
Limiter (BCL) (1PB1, 1PB2)
BATTERY 24-38-51
REMOVAL/INSTALLATION 401 ALL
Removal of the Batteries (2PB1, 401 ALL
2PB2)
Installation of the Batteries 407 ALL
(2PB1, 2PB2)
BATTERY 24-38-51
INSPECTION/CHECK 601 ALL
Removal of the Batteries 1 and 2 601 ALL
for Restoration
SHUNT - BATTERY 24-38-54
REMOVAL/INSTALLATION 401 ALL
Removal of the Battery Shunt 401 ALL
(3PB1, 3PB2)
Installation of the Battery Shunt 405 ALL
(3PB1, 3PB2)
CONTACTOR 24-38-55
REMOVAL/INSTALLATION 401 ALL
Removal of the Battery Line 401 ALL
Contactor (6PB1, 6PB2)
Installation of the Battery Line 405 ALL
Contactor (6PB1, 6PB2)
______________
EXTERNAL POWER 24-40-00
DESCRIPTION AND OPERATION 1 ALL
General 1 ALL
Component Location 1 ALL
24-CONTENTS Page 15
Aug 01/11
R
SYR
CHAPTER 24
__________
ELECTRICAL POWER
TABLE OF CONTENTS
_________________
SUBJECT
_______ CH/SE/SU
________ C
_ ____ ___________
PAGE EFFECTIVITY
Control and Indicating Circuits 11 ALL
- Controls and Indicating in the
Cockpit
Control and Indicating Circuits 12 ALL
- Indicating in the External
Power Receptacle Housing
Communications 12 ALL
Automatic Periodic Test 22 ALL
24-CONTENTS Page 16
Aug 01/11
R
SYR
CHAPTER 24
__________
ELECTRICAL POWER
TABLE OF CONTENTS
_________________
_______
SUBJECT CH/SE/SU
________ C
_ PAGE ___________
____ EFFECTIVITY
Control Unit (GPCU) (1XG)
RECEPTACLE - EXTERNAL POWER 24-41-51
REMOVAL/INSTALLATION 401 ALL
Removal of the External Power 401 ALL
Receptacle (20XG)
Installation of the External Power 405 ALL
Receptacle (20XG)
CONTACTOR 24-41-55
REMOVAL/INSTALLATION 401 ALL
Removal of the External Power 401 ALL
Contactor (EPC)
Installation of the External Power 405 ALL
Contactor (EPC)
24-CONTENTS Page 17
Aug 01/11
R
SYR
CHAPTER 24
__________
ELECTRICAL POWER
TABLE OF CONTENTS
_________________
_______
SUBJECT CH/SE/SU
________ C
_ ____ ___________
PAGE EFFECTIVITY
Installation of the DC Service Bus 405 ALL
Ground Supply Contactor (3PX)
_______________________________
AC ELECTRICAL LOAD DISTRIBUTION 24-50-00
DESCRIPTION AND OPERATION 1 ALL
General 1 ALL
Component Location 1 ALL
Component Location 1 ALL
Spare Fuses 12 ALL
System Description 12 ALL
Interface 23 ALL
Circuit Breakers Panels 23 ALL
Configuration of Circuit 36 ALL
Breakers
Circuit Breakers Data Tables by 39 ALL
Circuit - AIR CONDITIONNING
system
Circuit Breakers Data Tables by 40 ALL
Circuit - AUTO FLIGHT system
Circuit Breakers Data Tables by 40 ALL
Circuit - COMMUNICATION system
Circuit Breakers Data Tables by 42 ALL
Circuit - ELECTRICAL POWER
system
Circuit Breakers Data Tables by 45 ALL
Circuit - EQUIPMENT/FURNISHINGS
system
Circuit Breakers Data Tables by 45 ALL
Circuit - FIRE PROTECTION system
Circuit Breakers Data Tables by 46 ALL
Circuit - FLIGHT CONTROLS system
Circuit Breakers Data Tables by 47 ALL
Circuit - FUEL system
Circuit Breakers Data Tables by 48 ALL
Circuit - HYDRAULIC POWER system
Circuit Breakers Data Tables by 49 ALL
Circuit - ICE AND RAIN
PROTECTION system
Circuit Breakers Data Tables by 50 ALL
Circuit - INDICATING RECORDING
system
Circuit Breakers Data Tables by 51 ALL
Circuit - LANDING GEAR system
Circuit Breakers Data Tables by 52 ALL
Circuit - LIGHTS system
Circuit Breakers Data Tables by 54 ALL
24-CONTENTS Page 18
Aug 01/11
R
SYR
CHAPTER 24
__________
ELECTRICAL POWER
TABLE OF CONTENTS
_________________
SUBJECT
_______ CH/SE/SU
________ C
_ PAGE ___________
____ EFFECTIVITY
Circuit - NAVIGATION system
Circuit Breakers Data Tables by 55 ALL
Circuit - OXYGEN system
Circuit Breakers Data Tables by 55 ALL
Circuit - PNEUMATIC system
Circuit Breakers Data Tables by 55 ALL
Circuit - WATER/WASTE system
Circuit Breakers Data Tables by 56 ALL
Circuit - INFORMATION system
Circuit Breakers Data Tables by 56 ALL
Circuit - AIRBORNE AUXILIARY
POWER system
Circuit Breakers Data Tables by 56 ALL
Circuit - DOORS System
Circuit Breakers Data Tables by 56 ALL
Circuit - ENGINE system
Clipped CB Data Table 57 ALL
Operation/Control and Indicating 58 ALL
Reset of the Circuit Breaker 58 ALL
________________________________
AC ELECTRICAL LOAD DISTRIBUTION 24-50-00
DEACTIVATION/REACTIVATION 401 ALL
Deactivation of the C/B TRIPPED 401 ALL
Warning on the Upper ECAM DU
Refer to the MMEL TASK: 401 ALL
24-09-02-A)
Reactivation of the C/B TRIPPED 405 ALL
Warning on the Upper ECAM DU
Refer to the MMEL TASK: 405 ALL
24-09-02-A)
24-CONTENTS Page 19
Aug 01/11
R
SYR
CHAPTER 24
__________
ELECTRICAL POWER
TABLE OF CONTENTS
_________________
_______
SUBJECT CH/SE/SU
________ C
_ PAGE ___________
____ EFFECTIVITY
Normal Supply Contactor (12XN)
Installation of the AC Service Bus 405 ALL
Normal Supply Contactor (12XN)
Removal of the Contactor (27XN) 409 003-099,
Installation of the Contactor 413 003-099,
(27XN)
24-CONTENTS Page 20
Aug 01/11
R
SYR
CHAPTER 24
__________
ELECTRICAL POWER
TABLE OF CONTENTS
_________________
SUBJECT
_______ CH/SE/SU
________ C
_ PAGE ___________
____ EFFECTIVITY
24-26-01-B)
Reactivation of the Galley Supply 410 ALL
System
Refer to the MMEL TASK: 410 ALL
24-26-02-A)
_______________________________
DC ELECTRICAL LOAD DISTRIBUTION 24-60-00
DESCRIPTION AND OPERATION 1 ALL
General 1 ALL
Component Location 1 ALL
Spare Fuse If fuse 6PH1 melts, 2 ALL
you can replace it by a spare 80
A fuse located, in the cockpit,
behind the pilot seat, at the
top on the left
System Description 2 ALL
24-CONTENTS Page 21
Aug 01/11
R
SYR
CHAPTER 24
__________
ELECTRICAL POWER
TABLE OF CONTENTS
_________________
_______
SUBJECT CH/SE/SU
________ C
_ ____ ___________
PAGE EFFECTIVITY
REMOVAL/INSTALLATION 401 ALL
Removal of the DC Service Bus 401 ALL
Normal Supply Contactor (8PN)
Installation of the DC Service Bus 405 ALL
Normal Supply Contactor (8PN)
Removal of the Contactor (10PN) 409 003-099,
Installation of the Contactor 413 003-099,
(10PN)
24-CONTENTS Page 22
Aug 01/11
R
SYR
CHAPTER 24
__________
ELECTRICAL POWER
TABLE OF CONTENTS
_________________
_______
SUBJECT CH/SE/SU
________ C
_ ____ ___________
PAGE EFFECTIVITY
Inspection of the End Fittings of 617 ALL
Electrical Conduits in the Wing
Tip
Inspection of the End Fittings of 623 ALL
Electrical Conduits in Wing
Outboard Trailing -Edge
Inspection of the End Fittings of 633 ALL
Electrical Conduits in the Air
Conditioning Compartment
Inspection of the End Fittings of 641 ALL
electrical Conduits in Vertical
Stabilizer Trailing-Edge
Inspection of the End Fittings of 647 ALL
Electrical Conduits in the
Fuselage Tail Area
Inspection of the End Fittings of 654 ALL
Electrical Conduits in Trimmable
Horizontal Stabilizer (THS)
Inspection of the End Fittings of 660 ALL
Electrical Conduits in Vertical
Stabilizer Leading-Edge
Inspection of the End Fittings of 666 ALL
Electrical Conduits in Flap Track
No. 2 Fairing
Inspection of the End Fittings of 672 ALL
Electrical Conduits in the Main
Landing Gear (MLG) Well and False
Spar Box
Inspection of tne End Fittings of 680 ALL
Electrical Conduits in the Dry Bay
(Outboard)
General Visual Inspection of 685 ALL
Elements Fitted on the Following
Harnesses: 405VB to 409VB (LH
side) and 400VB to 404VB (RH side)
General Visual Inspection of 690 ALL
Elements Fitted on the Following
Harnesses: 4202VB, 4204VB
General Visual Inspection of 694 ALL
Elements Fitted on the Following
Harnesses: 4202VB, 4204VB
General Visual Inspection of 698 ALL
Elements Fitted on the Following
Harnesses: 4202VB, 4204VB
Check that Connector is Correctly A602 ALL
Tightened by Measurement of the
24-CONTENTS Page 23
Aug 01/11
R
SYR
CHAPTER 24
__________
ELECTRICAL POWER
TABLE OF CONTENTS
_________________
_______
SUBJECT CH/SE/SU
________ C
_ PAGE ___________
____ EFFECTIVITY
Resistance with a Loop Tester
Detailed Inspection of the Bonding A607 ALL
Leads Installed on the Movable
Surfaces
General Visual Inspection of G and A621 ALL
P Routes Installed in the Tail
Cone and APU Accessory Compartment
(EWIS)
Detailed Inspection of EWIS A624 ALL
Installed in the Upper Forward
Pylon (EWIS)
Detailed Inspection of EWIS in the A630 ALL
Fan and Accessory Gear Box (EWIS)
Detailed Inspection of EWIS A635 ALL
Installed in the Hot Section
(EWIS)
General Visual Inspection of EWIS A640 ALL
installed in the Wing Center Box
(EWIS)
General Visual Inspection of EWIS A644 ALL
Installed in the Forward Avionic
Compartment (EWIS)
General Visual Inspection of 90VU, A649 ALL
108VU and 109VU in the Forward
Avionic Compartment (EWIS)
Detailed Inspection of G, E and P A653 ALL
Routes in the Forward Avionic
Compartment (EWIS)
General Visual Inspection of EWIS A655 ALL
of the 2000VU (EWIS)
General Visual Inspection of A658 ALL
105VU, 106VU, 103VU, 107VU and
70VU Installed in the Lateral
Avionic Compartment (EWIS)
General Visual Inspection of G A662 ALL
Route(s) Installed at FR47 (EWIS)
General Visual Inspection of EWIS A667 ALL
Installed in the Rear Avionic
Compartment (EWIS)
Detailed Inspection of G, E and P A672 ALL
Routes Installed in the Rear
Avionic Compartment (EWIS)
General Visual Inspection of 63VU, A675 ALL
80VU, 187VU and 188VU Installed in
the Rear Avionic Compartment
(EWIS)
24-CONTENTS Page 24
Aug 01/11
R
SYR
CHAPTER 24
__________
ELECTRICAL POWER
TABLE OF CONTENTS
_________________
_______
SUBJECT CH/SE/SU
________ C
_ ____ ___________
PAGE EFFECTIVITY
General Visual Inspection of EWIS A679 ALL
of the 49VU and the 120VU (EWIS)
General Visual Inspection of EWIS A683 ALL
Between Seat and A/C Installed in
the Forward Passenger Compartment
(EWIS)
General Visual Inspection of All G A687 ALL
and P Routes Installed in the
Forward Passenger
Overhead-Compartment (EWIS)
General Visual Inspection of EWIS A693 ALL
Connections Between Seats and A/C
Installed in the Center Passenger
Compartment (EWIS)
General Visual Inspection of EWIS A697 ALL
connections Between Seats and A/C
Installed in the Aft Passenger
Compartment (EWIS)
General Visual Inspection of EWIS B601 ALL
Connections Between Seats and A/C
Installed in the Aft Cabin Utility
(EWIS)
General Visual Inspection of G and B605 ALL
P Routes Installed in the Center
Passenger Overhead Compartment
(EWIS)
General Visual Inspection of G and B611 ALL
P Routes Installed in the Aft
Passenger Overhead-Compartment
(EWIS)
General Visual Inspection of G and B617 ALL
P Routes Installed in the Aft
Cabin Overhead-Compartment (EWIS)
General Visual Inspection of P B622 ALL
Route Installed in the Aft Cabin
Utility-Area (EWIS)
General Visual Inspection of EWIS B628 ALL
of 2001VU (EWIS)
General Visual Inspection of All B631 ALL
Exposed EWIS Within the Wing Fuel
Tank (EWIS)
General Visual Inspection of All B639 ALL
Exposed EWIS Within the Vent Surge
Tank (EWIS)
General Visual Inspection of All B645 ALL
Exposed EWIS Within Dry Bay
24-CONTENTS Page 25
Aug 01/11
R
SYR
CHAPTER 24
__________
ELECTRICAL POWER
TABLE OF CONTENTS
_________________
_______
SUBJECT CH/SE/SU
________ C
_ PAGE ___________
____ EFFECTIVITY
(Outboard)(EWIS)
General Visual Inspection of P B651 ALL
Route Pump Feeder EWIS (EWIS)
General Visual Inspection of G, E B655 ALL
and P Routes Installed in the
Forward Cargo Compartment (EWIS)
General Visual Inspection of P B659 ALL
Route(s) Installed in the Aft
Cargo Compartment (EWIS)
General Visual Inspection of EWIS B663 ALL
Installed in the Lateral Avionic
Compartment (EWIS)
Detailed Inspection of G, E and P B667 ALL
Routes Installed in the Lateral
Avionic Compartment (EWIS)
Visual Inspection of EWIS B670 ALL
Installed in the Forward Pylon
After an Engine Bleed Leak (EWIS)
General Visual Inspection of EWIS B675 ALL
Installed in the Keel Beam Area of
MLG-Well and Hydraulic Compartment
(EWIS)
General Visual Inspection of P B678 ALL
Routes Installed in Bulk Cargo
Compartment (EWIS)
General Visual Inspection of G B682 ALL
Routes Installed in
Inboard-Fixed-Leading Edge
Structure (EWIS)
24-CONTENTS Page 26
Aug 01/11
R
SYR
CHAPTER 24
__________
ELECTRICAL POWER
TABLE OF CONTENTS
_________________
_______
SUBJECT CH/SE/SU
________ C
_ PAGE ___________
____ EFFECTIVITY
Forward Passenger Overhead
Compartment (Only If
Contaminated)(EWIS)
Cleaning of EWIS Installed in the 729 ALL
Forward Cabin Utility-Area (Only
If Contaminated)(EWIS)
Cleaning of EWIS Installed in the 735 ALL
Center Passenger
Overhead-Compartment (Only If
Contaminated)(EWIS)
Cleaning of EWIS Installed in the 741 ALL
Forward Cabin Overhead-Compartment
(Only If Contaminated)(EWIS)
Cleaning of EWIS Installed in the 747 ALL
Rear Avionic Compartment (Only If
Contaminated)(EWIS)
Cleaning of EWIS Installed in the 751 ALL
Zone Under Cabin Floor (Only If
Contaminated)(EWIS)
Cleaning of EWIS Installed in the 754 ALL
Cockpit (Only If
Contaminated)(EWIS)
Cleaning of EWIS Installed in 49VU 758 ALL
and 120VU (Only If
Contaminated)(EWIS)
Cleaning of EWIS Installed in the 762 ALL
Aft Passenger Compartment (Only If
Contaminated)(EWIS)
Cleaning of EWIS Installed in the 768 ALL
Aft Passenger Overhead-Compartment
(Only If Contaminated)(EWIS)
Cleaning of EWIS Installed in the 774 ALL
Aft Cabin Utility-Area (Only If
Contaminated)(EWIS)
Cleaning of EWIS Installed in the 780 ALL
Aft Cabin Overhead-Compartment
(Only IF Contaminated)(EWIS)
Cleaning of EWIS Installed in the 786 ALL
Underfloor Bay of Forward Cargo
Compartment (Only If
Contaminated)(EWIS)
Cleaning of EWIS Installed in the 791 ALL
Forward Cargo Compartment (Only IF
Contaminated)(EWIS)
Cleaning of EWIS Installed in the 795 ALL
Aft Cargo Compartment (Only IF
24-CONTENTS Page 27
Aug 01/11
R
SYR
CHAPTER 24
__________
ELECTRICAL POWER
TABLE OF CONTENTS
_________________
_______
SUBJECT CH/SE/SU
________ C
_ PAGE ___________
____ EFFECTIVITY
Contaminated)(EWIS)
Cleaning of EWIS Installed in the 799 ALL
Air Conditioning Compartment and
Fairings (Only If
Contaminated)(EWIS)
Cleaning of EWIS Installed in the A705 ALL
Bay Behind FWD Cargo Compartment
(Only If Contaminated)(EWIS)
Cleaning of EWIS Installed in the A709 ALL
Bulk Cargo Compartment (Only If
Contaminated)(EWIS)
Cleaning of EWIS Installed in the A713 ALL
Lateral Avionic Compartment (Only
If contaminated)(EWIS)
24-CONTENTS Page 28
Aug 01/11
R
SYR
ELECTRICAL POWER - GENERAL - DESCRIPTION AND OPERATION
______________________________________________________
1. General
_______
A. Generation
Two Integrated Drive Generators (IDG) normally supply the aircraft
electrical power in flight ; each engine drives one generator.
The APU drives a third, auxiliary, generator (APU GEN) which can replace
either main generator (GEN 1 or GEN 2).
The generators supply the distribution network with alternating current.
Two Transformer Rectifiers (TR) supply, in normal configuration, the
distribution network with direct current. In the event of major failure,
a constant-speed hydraulic motor drives an emergency generator (CSM/G) to
supply the systems required for aircraft control.
On the ground, an electrical Ground Power Unit (GPU) can supply the
aircraft. The APU GEN can also be an independant power source.
EFF :
ALL 24-00-00
Page 1
Feb 01/99
SYR
The TR 2 powered from the AC BUS 2 supplies the Direct Current Bus 2 (DC
BUS 2) through its contactor.
In case of loss of the TR 1 or the TR 2, a third Essential Transformer
Rectifier (ESS TR) powered from the AC BUS 1, supplies through its
contactor:
- the DC ESS BUS,
- the DC SHED ESS BUS.
In certain failure configurations, the AC ESS BUS and the AC SHED ESS BUS
plus, via the ESS TR, the DC ESS BUS and the DC SHED ESS BUS can be
supplied by:
- the AC BUS 2 if the AC BUS 1 is lost,
- the CSM/G more especially in emergency configuration or smoke emergency
configuration.
Two sheddable AC and DC busbars are powered respectively by the GLC 2 and
the TR 2 and controlled by two contactors. These AC busbars are
automatically shedded in the single generator configuration and the DC
busbars in the single generator and single TR configurations.
R 2. __________________
Component Location
EFF :
ALL 24-00-00
Page 2
Nov 01/04
SYR
Electrical Power - General Schematic
Figure 001
R
EFF :
001-002, 24-00-00
Page 3/4
Feb 01/99
SYR
R Electrical Power - General Schematic
R Figure 001A
R
EFF :
003-099, 24-00-00
Page 5/6
Feb 01/99
R
SYR
Electrical Power - Component Location
Figure 002
EFF :
ALL 24-00-00
Page 7
Feb 01/99
R
SYR
INTENTIONALLY BLANK
24-00-00
Page 8
Feb 01/99
R
SYR
Control and Indicating - Component Location
Figure 003
R
EFF :
001-002, 24-00-00
Page 9/10
Feb 01/99
R
SYR
R Control and Indicating - Component Location
Figure 003A
EFF :
003-099, 24-00-00
Page 11/12
Nov 01/00
SYR
**ON A/C ALL
-------------------------------------------------------------------------------
FIN | FUNCTIONAL DESIGNATION | PANEL|ZONE|ACCESS | ATA
| | | | DOOR | REF.
-------------------------------------------------------------------------------
1PE TR-ESS 125 812 24-34-51
3XB STAT INV 126 822 24-28-51
1XE CONTROL UNIT-CSM/G 125 812 24-24-34
8XE CSM/G 148 734 24-24-51
1XG GPCU 92VU 121 811 24-41-34
20XG RCPT-EXT PWR 120 121AL 24-41-51
1XS GCU-APU 91VU 121 811 24-23-34
8XS GEN-APU 310 24-23-51
1XU1 GCU-1 91VU 121 811 24-22-34
1XU2 GCU-2 91VU 121 811 24-22-34
22XU1 EGIU-1 95VU 123 811 24-22-33
22XU2 EGIU-2 96VU 123 811 24-22-33
4000XU IDG 430 24-21-51
R 3. __________________
System Description
R (1) Generation
EFF :
ALL 24-00-00
Page 13
Nov 01/10
SYR
AC Generation and Distribution - Schematic
Figure 004
EFF :
ALL 24-00-00
Page 14
Feb 01/99
R
SYR
(b) Main Generator, APU GEN and Generator Control Unit (GCU)
Each generator is controlled, via a GCU, by a GEN pushbutton
switch located on the ELEC panel on the overhead panel.
The leading particulars of the generator are:
- nominal power: 90 KVA at the POR,
- voltage: 115 V/200 V, three-phase, 400 Hz.
The main functions of the GCU are:
- to regulate the generator voltage by the field current,
- to protect the network and the generator by control of the
associated GLC and the generator field current,
- to provide BITE information to the Ground Power Control Unit
(GPCU),
- to control the warnings associated with the corresponding
channel.
Each GCU includes a BITE and self monitoring system which:
- analyzes most of the faults that affect the channel,
- memorizes the corresponding data in a non-volatile memory.
In addition the lower ECAM display unit receives the electrical
parameters and warnings dealing with the channel concerned.
R This data transmission is effected via the Electrical Generation
R Interface Unit (EGIU).
EFF :
ALL 24-00-00
Page 15
Nov 01/10
SYR
R (e) CSM/G and CSM/G control unit
R Loss of the AC BUS 1 and AC BUS 2 automatically controls the RAT
R and the CSM/G.
R The MAN ON guarded pushbutton switch located on the EMER ELEC PWR
R panel on the cockpit overhead panel serves to manually control
R the RAT and the CSM/G. This control is redundant with the
R automatic RAT deployment logic.
R The CSM/G control unit enables full control of the CSM/G.
R The leading particulars are :
R - Nominal Power : 5KVA at POR
R - Voltage : 115/200VAC, three-phase, 400 Hz.
R The main functions of the control unit are :
R - to control the servo-valve excitation for speed regulation
R - to control the generator voltage by regulation of the field
R current
R - to protect the network and the generator by control of the
R associated GLC and the generator field current
R - to limit the power delivered at low aircraft speed by
R limitation of the field current (with respect to the RAT
R characteristics).
R The EMER GEN TEST guarded pushbutton switch on the EMER ELEC PWR
R panel allows to test the CSM/G on the ground, with the Blue
R electric pump running.
EFF :
ALL 24-00-00
Page 16
Nov 01/10
SYR
The GCU 1 or GCU 2 enables closure of the BTC 1 or BTC 2 if no
undervoltage condition and no GLC welded failure occurred (Ref:
24-22-00).
The networks 1 and 2 are supplied in priority order:
- by the corresponding generator,
- by the ground power unit,
- by the APU GEN,
- or by the other generator.
NOTE : Locking of the two BTCs and isolation of the two channels is
____
possible by action on the BUS TIE pushbutton switch; this
control is located on the ELEC panel on the cockpit overhead
panel.
R (3) Distribution
R The alternating current distribution network comprises three
R independent parts.
R The network 1 mainly comprises the AC BUS 1, the AC ESS BUS and the
R AC SHED ESS BUS which are three-phase, 115 V/400 Hz busses.
R The AC BUS 1 supplies the essential busses in series.
R The AC BUS 1 and the AC ESS BUS also deliver 26 V/400 Hz power supply
R through their 115/26 V transformer.
R In the event of AC BUS 1 loss, AC ESS BUS and the AC SHED ESS BUS can
R be manually restored by the transfer of power supply directly from
R the AC BUS 2. It is possible to perform the transfer by action on the
R AC ESS FEED pushbutton switch on the ELEC panel, after illumination
R of the FAULT legend.
R In the event of AC BUS 1 and AC BUS 2 loss (emergency configuration),
R the AC ESS BUS and AC SHED ESS BUS are restored on the CSM/G when the
R RAT hydraulic power is available.
When landing gear is extended, AC ESS BUS and AC STAT INV BUS are
supplied by battery 1 via the static inverter.
The network 2 includes the AC BUS 2 which is a three-phase, 115 V/400
Hz bus.
It also delivers 26 V/400 Hz power supply through a 115/26 V
transformer.
NOTE : To carry out ground service operations (Ref. Para. C.), the
____
external power receptacle provides independent and direct
supply to a part of the network 2.
EFF :
ALL 24-00-00
Page 17
Nov 01/10
SYR
R B. DC Generation and Distribution
R
R (Ref. Fig. 005)
R (a) TR
R Each TR transforms the three-phase alternating current into
R direct current (28VDC).
R 1
_ TR1 and TR2
R Upon energization, the two normal TRs operate and supply the
R DC network via a contactor controlled by the internal TR
R logic.
R In case of failure, the TR sends a FAULT signal to the CFDS
R for maintenance purposes.
R 2
_ Essential TR
R Upon energization, the essential TR operates and supplies the
R DC network via a contactor. To reset the TR push the TR RST
pushbutton switch 15PU located on the relay box 103VU.In
addition,the TR sends its electrical parameters to the lower
R ECAM display unit. In addition, the TR sends its electrical
R parameters to the lower ECAM display unit.
R (b) Batteries
R Each of the two batteries has a nominal 23 AH capacity and a 24
R VDC voltage. The main functions of the batteries are:
R - to start the APU in flight and on the ground,
R - to supply the essential network in some configurations.
R A BCL controls each battery contactor when the BAT pushbutton
R switch is in the AUTO configuration.
R In addition, each BCL includes a BITE and a self monitoring
R system which analyzes internal and peripherical fault
R information. Initiation of the test is possible via the CFDS or
R at each power up on ground.
R Each BCL delivers electrical parameters and warnings concerning
R each battery to the lower ECAM display unit.
R
EFF :
ALL 24-00-00
Page 18
Nov 01/10
SYR
DC Generation and Distribution - Schematic
Figure 005
EFF :
ALL 24-00-00
Page 19
Nov 01/10
R
SYR
R (2) Distribution
R The direct current distribution network is divided into two parts.
R The network 1 comprises the DC BUS 1, the DC BAT BUS, the DC ESS BUS
R and the DC SHED ESS BUS. The TR 1 supplies the network 1.
R The network 2 comprises the DC BUS 2. The TR 2 supplies the network
R 2.
R In the event of TR 1 loss, the TR 2 automatically restores supply to
R the DC BUS 1 and the DC BAT BUS. The DC ESS BUS and the DC SHED ESS
R BUS are automatically transferred to the ESS TR.
R The AC BUS 1 supplies the ESS TR.
R The TR 2 loss leads to the symmetrical recovery of the DC BUS 2 from
R the TR 1 and the same transfer for the DC ESS BUS and the DC SHED ESS
R BUS.
R In the event of TR 1 and TR 2 loss (DC BUS 1 and 2 loss), the DC ESS
R BUS and the DC SHED ESS BUS are supplied from the ESS TR.
In case of loss of AC BUS 1 and AC BUS 2 (emergency configuration),
DC ESS BUS and DC SHED ESS BUS are recovered by the CSM/G (via the
ESS TR) when the RAT hydraulic generation is available.
When landing gear is extented, DC ESS BUS only is supplied by battery
2.
EFF :
ALL 24-00-00
Page 20
Nov 01/10
SYR
R
4. __________________________________________________________________________
Controls and Indications Related to Electrical Generation and Distribution
EFF :
ALL 24-00-00
Page 21
Nov 01/10
SYR
A. MAINT BUS Switch
EFF :
ALL 24-00-00
Page 22
Nov 01/10
R
SYR
The emergency GCU and the three TRs are connected to the CFDIU by a
discrete link: it is thus possible to know only the status of these
systems (OK or faulty) during SYSTEM REPORT/TEST sequence.
NOTE : The GCU1, the GCU2 and the APU GCU are continuously monitored by
____
the GPCU.
The GPCU can then transmit to the CFDIU all the failure messages
corresponding to the failure codes recorded by these GCUs and the
GPCU.
R
EFF :
ALL 24-00-00
Page 23
Nov 01/10
SYR
R Lower ECAM Display Unit - ELEC Page
Figure 006 (SHEET 1)
EFF :
ALL 24-00-00
Page 24
May 01/07
SYR
R Lower ECAM Display Unit - ELEC Page
Figure 006 (SHEET 2)
EFF :
ALL 24-00-00
Page 25
May 01/07
SYR
ELECTRICAL POWER - GENERAL - ADJUSTMENT/TEST
____________________________________________
TASK 24-00-00-710-003
1. __________________
Reason for the Job
2. ______________________
Job Set-up Information
A. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
Subtask 24-00-00-860-056
A. Aircraft Configuration
(2) Do the EIS start procedure (Upper ECAM DU and lower ECAM DU only)
(Ref. TASK 31-60-00-860-001).
(3) On the ECAM control panel, push the ELEC key (on the lower ECAM DU,
the ELEC page comes into view).
(4) On the MCDU, get the system REPORT/TEST/ELEC page (Ref. TASK 31-32-
00-860-004).
R (5) Make sure that the AC ESS FEED, BUS TIE and GALLEY pushbutton
R switches are pushed.
EFF :
ALL 24-00-00
Page 501
Nov 01/10
SYR
R Subtask 24-00-00-865-061
R -------------------------------------------------------------------------------
R PANEL DESIGNATION IDENT. LOCATION
R -------------------------------------------------------------------------------
R 49VU SDAC/1 AND 2/28VDC/ESS BUS 12WV F05
R 106VU DC BUS/1 AND 2/MONG 68WV C03
EFF :
ALL 24-00-00
Page 502
Nov 01/02
SYR
4. Procedure
_________
Subtask 24-00-00-710-050
-------------------------------------------------------------------------------
R | ACTION | RESULT |
-------------------------------------------------------------------------------
1. On the ELEC control panel 35VU: On the ELEC control panel 35VU:
- Release the EXT POWER pushbutton - The AVAIL legend of the EXT POWER
switch. pushbutton switch comes on.
R - Release the BAT 1 and BAT 2 - The battery voltmeters show a value
R pushbutton switches. higher than 25 volts.
2. On the EMER ELEC PWR section of Wait until the PFD and the upper ECAM
the panel 21VU: DU images come into view.
- Open the guard, push and hold
the EMER GEN TEST pushbutton
switch.
3. On the ECAM control panel: On the upper ECAM DU, on the ELEC page:
- Push and hold the ELEC key. - The STAT INV indications come into
view (115V, 400Hz).
- The BAT indications come into view
(24V, 20A) (values are given for
information).
EFF :
ALL 24-00-00
Page 503
Aug 01/11
SYR
Subtask 24-00-00-710-051
-------------------------------------------------------------------------------
R | ACTION | RESULT |
-------------------------------------------------------------------------------
Subtask 24-00-00-710-052
-------------------------------------------------------------------------------
R | ACTION | RESULT |
-------------------------------------------------------------------------------
1. On the ELEC control panel 35VU: On the ELEC control panel 35VU:
- push the EXT POWER pushbutton - the AVAIL legend of the EXT POWER
switch. pushbutton switch goes off.
2. On the panel 122VU: On the lower ECAM DU, on the ELEC page:
- open the circuit breaker 17XN1. - the AC1 busbar indication comes on
amber
- the DC2 busbar energizes the DC BAT
busbar
- the ESS TR busbar energizes the DC
ESS busbar.
3. On the panel 122VU: On the lower ECAM DU, on the ELEC page:
- close the circuit breaker 17XN1. - the AC1 busbar indication becomes
green
- the DC1 busbar energizes the DC BAT
busbar
- the ESS TR busbar energizes the DC
ESS busbar.
EFF :
ALL 24-00-00
Page 504
Aug 01/11
SYR
-------------------------------------------------------------------------------
| ACTION | RESULT |
-------------------------------------------------------------------------------
On the upper ECAM DU:
- the AC BUS1 FAULT warning goes out of
view.
4. On the panel 123VU: On the lower ECAM DU, on the ELEC page:
- open then close the circuit - the DC1 busbar energizes the DC ESS
breaker 1XC. busbar.
5. On the panel 122VU: On the lower ECAM DU, on the ELEC page:
- open the circuit breaker 17XN2. - the AC2 busbar indication comes on
amber.
6. On the panel 122VU: On the lower ECAM DU, on the ELEC page:
- close the circuit breaker 17XN2. - the AC2 busbar indication becomes
green.
Subtask 24-00-00-710-053
-------------------------------------------------------------------------------
R | ACTION | RESULT |
-------------------------------------------------------------------------------
1. On the panel 123VU: On the lower ECAM DU, on the ELEC page:
- open the circuit breaker 1XC. - the AC ESS busbar indication comes on
amber
- the SHED indication comes into view
under the AC ESS busbar indication.
EFF :
ALL 24-00-00
Page 505
Aug 01/11
SYR
-------------------------------------------------------------------------------
| ACTION | RESULT |
-------------------------------------------------------------------------------
- the FAULT legend of the AC ESS FEED
pushbutton switch comes on.
2. On the ELEC control panel 35VU: On the ELEC control panel 35VU:
- release the AC ESS FEED - the FAULT legend of the AC ESS FEED
pushbutton switch. pusbutton switch goes off and the
ALTN legend comes on.
EFF :
ALL 24-00-00
Page 506
Aug 01/11
R
SYR
-------------------------------------------------------------------------------
| ACTION | RESULT |
-------------------------------------------------------------------------------
- the AC ESS BUS FAULT warning goes out
of view.
6. On the ELEC control panel 35VU: On the ELEC control panel 35VU:
- push the AC ESS FEED pushbutton - the ALTN legend of the AC ESS FEED
switch. pushbutton switch goes off.
Subtask 24-00-00-710-054
E. Loss of the Electrical Network with the BUS TIE Pushbutton Switch
-------------------------------------------------------------------------------
R | ACTION | RESULT |
-------------------------------------------------------------------------------
1. On the ELEC control panel 35VU: On the ELEC control panel 35VU:
R - Release the BUS TIE pushbutton - The OFF legend of the BUS TIE
R switch. pushbutton switch comes on.
2. On the ELEC control panel 35VU: On the ELEC control panel 35VU:
R - Push the BUS TIE pushbutton - The OFF legend of the BUS TIE
R switch. pushbutton switch goes off.
EFF :
ALL 24-00-00
Page 507
Aug 01/11
SYR
Subtask 24-00-00-710-055
-------------------------------------------------------------------------------
R | ACTION | RESULT |
-------------------------------------------------------------------------------
1. On the panel 122VU: On the lower ECAM DU, on the ELEC page:
- open the circuit breaker 7XA. - the GALLEY SHED indication comes into
view.
2. On the panel 122VU: On the lower ECAM DU, on the ELEC page:
- close the circuit breaker 7XA. - the GALLEY SHED indication goes out
of view.
3. On the ELEC control panel 35VU: On the lower ECAM DU, on the ELEC page:
- release the GALLEY pushbutton - the GALLEY SHED indication comes into
switch. view.
4. On the ELEC control panel 35VU: On the lower ECAM DU, on the ELEC page:
- push the GALLEY pushbutton - the GALLEY SHED indication goes out
switch. of view.
Subtask 24-00-00-710-056
NOTE : This test is for the system 1. For the other system(s), use the
____
indications between parentheses.
-------------------------------------------------------------------------------
R | ACTION | RESULT |
-------------------------------------------------------------------------------
1. On the panel 122VU: On the lower ECAM DU, on the ELEC page:
- open the circuit breaker 3PU1 - no change.
(3PU2).
2. On the panel 125VU (124VU): On the lower ECAM DU, on the ELEC page:
R - Open the circuit breaker 4PU1 - The TR1 (2) stops to energize the DC1
R (4PU2). (2) busbar
R - The DC1 (2) busbar indication stays
R amber for 5 seconds
R - The TR1 (2) voltage parameter is
R between 29V and 31V.
EFF :
ALL 24-00-00
Page 508
Aug 01/11
SYR
-------------------------------------------------------------------------------
| ACTION | RESULT |
-------------------------------------------------------------------------------
R - The TR1 (2) current parameter is less
R than 5A.
R - The DC2 (1) busbar energizes the DC1
R (2) busbar through the DC BAT busbar
R - The ESS TR energizes the DC ESS
R busbar.
5. On the panel 125VU: On the lower ECAM DU, on the ELEC page:
R - Open then close the circuit - The DC1 busbar energizes the DC ESS
R breaker 1XC. busbar.
6. On the panel 123VU: On the lower ECAM DU, on the ELEC page:
R - Open the circuit breaker 2PU1 - The TR1 (2) stops to energize the DC1
R (2). (2) busbar
R - The DC1 (2) busbar indication stays
R amber for 5 seconds
R
EFF :
ALL 24-00-00
Page 509
Aug 01/11
SYR
-------------------------------------------------------------------------------
| ACTION | RESULT |
-------------------------------------------------------------------------------
R - The TR1 (2) voltage parameter is
R approximately 0V.
R - The TR1 (2) current parameter is less
R than 5A.
R - The DC2 (1) busbar energizes the DC1
R (2) busbar through the DC BAT busbar
R - The ESS TR energizes the DC ESS
R busbar.
7. On the panel 123VU: On the lower ECAM DU, on the ELEC page:
R - Close the circuit breaker 2PU1 - The TR1 (2) voltage parameter is
R (2). between 29V and 31V.
R - The TR1 (2) current parameter is less
R than 5A.
R
9. On the panel 125VU: On the lower ECAM DU, on the ELEC page:
R - Open then close the circuit - The DC1 busbar energizes the DC ESS
R breaker 1XC. busbar.
10. On the panel 122VU: On the lower ECAM DU, on the ELEC page:
EFF :
ALL 24-00-00
Page 510
Aug 01/11
SYR
-------------------------------------------------------------------------------
| ACTION | RESULT |
-------------------------------------------------------------------------------
R - Open the circuit breaker 9PC. - The DC2 busbar energizes the DC BAT
R busbar (the DC1 busbar stops to
R energize The DC BAT busbar)
R - The ESS TR energizes the DC ESS
R busbar.
11. On the control panel 122VU: On the lower ECAM DU, on the ELEC page:
R - Close the circuit breaker 9PC. - The DC1 busbar energizes the DC BAT
R busbar
R - The ESS TR energizes the DC ESS
R busbar.
12. On the panel 125VU: On the lower ECAM DU, on the ELEC page:
R - Open then close the circuit - The DC1 busbar energizes the DC ESS
R breaker 1XC. busbar.
Subtask 24-00-00-710-057
-------------------------------------------------------------------------------
R | ACTION | RESULT |
-------------------------------------------------------------------------------
1. On the panels 106VU and 49VU: On the lower ECAM DU, on the ELEC page:
- open the circuit breakers 68WV - the DC ESS busbar indication comes on
and 12WV. amber.
2. On the panels 106VU and 49VU: On the lower ECAM DU, on the ELEC page:
- close the circuit breakers 68WV - the DC ESS busbar indication becomes
and 12WV. green.
EFF :
ALL 24-00-00
Page 511
Aug 01/11
SYR
Subtask 24-00-00-710-058
-------------------------------------------------------------------------------
R | ACTION | RESULT |
-------------------------------------------------------------------------------
2. On the ELEC control panel 35VU: On the lower ECAM DU, on the ELEC page:
R - Release then push the BAT1 - The green line between the DC BAT
R pusbutton switch. busbar and the BAT1 indications come
R into view
R - The load current is < 150A then
R decreases
R - The green line goes out of view when
R the load current is < 4A.
3. On the ELEC control panel 35VU: On the lower ECAM DU, on the ELEC page:
R - Release then push the BAT2 - The green line between the DC BAT
R pushbutton switch. busbar and the BAT2 indications comes
R into view
R - The load current is < 150A then
R decreases
R - The green line goes out of view when
R the load current is < 4A.
4. On the ELEC control panel 35VU: On the ELEC control panel 35VU:
R - Release the BAT1 and BAT2 - The OFF legend of the BAT1 and BAT2
R pusbutton switches. pushbutton switches comes on.
EFF :
ALL 24-00-00
Page 512
Aug 01/11
SYR
-------------------------------------------------------------------------------
| ACTION | RESULT |
-------------------------------------------------------------------------------
R - The AC ESS and the DC ESS busbar
R indications come on green.
R - The SHED indication comes into view
R under the AC ESS and the DC ESS
R busbar indications
R - The STAT INV indication is shown
R white
R - The STAT INV parameters (115V, 400Hz)
R are shown green.
On the EMER ELEC PWR control panel The normal electrical network is
21VU: energized again.
R - Release the EMER GEN TEST On the ELEC control panel 35VU:
R pushbutton switch. - The OFF legend of the BAT1 and BAT2
R pushbutton switches goes off.
6. On the MCDU:
R - Push the line key adjacent to
R the RETURN indication until the
R CFDS menu page comes into view.
5. Close-up
________
Subtask 24-00-00-860-057
EFF :
ALL 24-00-00
Page 513
Aug 01/11
SYR
ELECTRICAL POWER - GENERAL - INSPECTION/CHECK
_____________________________________________
TASK 24-00-00-200-003
1. __________________
Reason for the Job
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
R
No specific warning notice
R No specific 2 ACCESS PLATFORM 2M (6 FT) - ADJUSTABLE
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
EFF :
ALL 24-00-00
Page 601
May 01/11
SYR
3. __________
Job Set-up
Subtask 24-00-00-860-055
(1) In the cockpit, put a warning notice in position to tell persons not
to operate the pushbutton switches on the panels 35VU, 211VU and
115VU.
(2) Put a warning notice on the door 121AL to tell persons not to connect
the external power receptacle.
Subtask 24-00-00-941-057
R (1) Put the ACCESS PLATFORM 2M (6 FT) - ADJUSTABLE at the doors 811, 812
and 822 of the electronics compartment and at the door 121AL which
gives access to the external power receptacle.
Subtask 24-00-00-010-051
C. Get Access
4. Procedure
_________
Subtask 24-00-00-210-065
A. Fast Inspection
EFF :
ALL 24-00-00
Page 602
May 01/11
SYR
(2) Check the condition of all wiring (for signs of ageing, alteration,
overheating, scaling and deformation which can cause a decrease of
wiring performance).
Subtask 24-00-00-210-066
B. Detailed Inspection
(2) Components
(a) Remove dust with a vacuum cleaner and clean other dirt if
necessary.
(3) Wiring
EFF :
ALL 24-00-00
Page 603
May 01/11
SYR
(d) Do a check of the condition of electrical connector protections
in the hydraulics compartment.
Subtask 24-00-00-020-053
Subtask 24-00-00-420-053
(1) Install removed components and put back all equipment in operating
condition.
5. Close-up
________
Subtask 24-00-00-410-057
Subtask 24-00-00-410-058
B. Close Access
Subtask 24-00-00-942-054
EFF :
ALL 24-00-00
Page 604
May 01/11
R
SYR
TASK 24-00-00-200-004
1. __________________
Reason for the Job
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
Subtask 24-00-00-860-058
(1) In the cockpit, put a warning notice in position to tell persons not
to operate the pushbutton switches on the panels 35VU, 211VU and
115VU.
(2) Put a warning notice in position on the door 121AL to tell persons
not to connect the external power receptacle.
EFF :
ALL 24-00-00
Page 605
May 01/08
SYR
(3) Make sure the aircraft electrical circuits are de-energized
(Ref. TASK 24-41-00-862-002).
4. Procedure
_________
Subtask 24-00-00-210-067
NOTE : Open and close the circuit breakers with the aircraft electrical
____
circuit de-energized.
R 5. Close-up
________
R Subtask 24-00-00-750-050
R Subtask 24-00-00-942-055
R (1) Make sure that the work area is clean and clear of tool(s) and other
R items.
EFF :
ALL 24-00-00
Page 606
May 01/08
SYR
AC GENERATION - DESCRIPTION AND OPERATION
_________________________________________
1. General
_______
EFF :
ALL 24-20-00
Page 1
Nov 01/04
SYR
R **ON A/C ALL
2. __________________
Component Location
-------------------------------------------------------------------------------
FIN | FUNCTIONAL DESIGNATION | PANEL|ZONE|ACCESS | ATA
| | | | DOOR | REF.
-------------------------------------------------------------------------------
2XA P/BSW-ELEC/GALLEY 35VU 210 831 24-26-00
2XB CNTOR-STAT INV 105VU 126 822 24-28-55
3XB STAT INV 126 822 24-28-51
3XC CNTOR-AC ESS BUS SWITCHING 106VU 125 812 24-25-55
11XC P/BSW-ELEC/AC ESS FEED 35VU 210 831 24-25-00
1XE CONTROL UNIT-CSM/G 125 812 24-24-34
8XE CSM/G 148 734 24-24-51
14XE ANN-EMER ELEC PWR/RAT/&/EMER GEN 21VU 211 831 24-24-00
15XE CNTOR-AC ESS BUS SWITCHING 106VU 125 812 24-24-55
23XE P/BSW-EMER ELEC PWR/EMER GEN TEST 21VU 211 831 24-24-00
24XE P/BSW-EMER ELEC PWR/MAN ON 21VU 211 831 24-24-00
1XS GCU-APU 91VU 121 811 24-23-34
2XS P/BSW-ELEC/APU GEN 35VU 210 831 24-23-00
3XS GLC-APU 120VU 212 831 24-23-55
8XS GEN-APU 310 24-23-51
42XS CT-AC, APU GEN 120VU 212 831 24-23-00
5XT P/BSW-ELEC/IDG 1 35VU 210 831 24-21-00
6XT P/BSW-ELEC/IDG 2 35VU 210 831 24-21-00
1XU1 GCU-1 91VU 121 811 24-22-34
1XU2 GCU-2 91VU 121 811 24-22-34
3XU1 P/BSW-ELEC/GEN 1 35VU 210 831 24-22-00
3XU2 P/BSW-ELEC/GEN 2 35VU 210 831 24-22-00
9XU1 GLC-1 120VU 212 831 24-22-55
9XU2 GLC-2 120VU 212 831 24-22-55
11XU1 BTC-1 120VU 212 831 24-22-55
11XU2 BTC-2 120VU 212 831 24-22-55
13XU P/BSW-EMER ELEC PWR/SMOKE DRILL 21VU 211 831 24-22-00
22XU1 EGIU-1 95VU 123 811 24-22-33
22XU2 EGIU-2 96VU 123 811 24-22-33
41XU1 CT-AC, 1 131 831 24-22-00
41XU2 CT-AC, 2 133 831 24-22-00
42XU1 CT-AC, 1 120VU 212 831 24-22-00
42XU2 CT-AC, 2 120VU 212 831 24-22-00
42XU3 CT-AC, 1 120VU 212 831 24-22-00
42XU4 CT-AC, 2 120VU 212 831 24-22-00
50XU1 SENSOR-TDC AC, 1 103VU 126 822 24-22-18
EFF :
ALL 24-20-00
Page 2
Feb 01/99
SYR
Main Components - Component Location
Figure 001
EFF :
ALL 24-20-00
Page 3
Feb 01/99
R
SYR
Main Components - Component Location
Figure 002
EFF :
ALL 24-20-00
Page 4
Feb 01/99
R
SYR
-------------------------------------------------------------------------------
FIN | FUNCTIONAL DESIGNATION | PANEL|ZONE|ACCESS | ATA
| | | | DOOR | REF.
-------------------------------------------------------------------------------
50XU2 SENSOR-TDC AC, 2 103VU 126 822 24-22-18
4000XU IDG 430 24-21-51
-------------------------------------------------------------------------------
FIN I FUNCTIONAL DESIGNATION I PANELIZONEIACCESS I ATA
I I I I DOOR I REF.
-------------------------------------------------------------------------------
5XB HOLDER-FUSE 105VU 126 822 24-28-00
5XB1 FUSE-AC STAT INV BUS SPLY 105VU 126 822 24-28-00
2XE GLC-EMER 106VU 125 812 24-24-55
A. Spare Fuse
EFF :
ALL 24-20-00
Page 5
Feb 01/99
R
SYR
Spare Fuse - Component Location
Figure 003
EFF :
ALL 24-20-00
Page 6
Feb 01/99
SYR
AC GENERATION - DEACTIVATION/REACTIVATION
_________________________________________
TASK 24-20-00-040-001
CAUTION : MAKE SURE THAT THE IDG DOES NOT OPERATE FOR MORE THAN 50 HOURS IN THE
_______
DISCONNECTED MODE.
- IF THE IDG OPERATES FOR 50 HOURS IN THE DISCONNECTED MODE, IT WILL
BE NECESSARY TO :
- REPLACE THE IDG.
- SEND THE REMOVED IDG FOR A SHOP INSPECTION. THERE IS A RISK OF
DAMAGE TO THE BALL BEARING ASSEMBLY ON THE IMPUT SHAFT.
1. __________________
Reason for the Job
2. ______________________
Job Set-up Information
A. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
EFF :
ALL 24-20-00
Page 401
May 01/11
SYR
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
Subtask 24-20-00-860-050
(2) Do the EIS start procedure (Upper ECAM DU and lower ECAM DU only)
(Ref. TASK 31-60-00-860-001).
4. Procedure
_________
Subtask 24-20-00-040-051-A
(2) On the lower ECAM display unit, make sure that the ENG 1(2) FADEC
message does not come into view on the STATUS page.
(a) If the message comes into view for the engine with the IDG in
operation:
- Make sure that none of the messages that follow come into view:
. ACOC OIL TEMP TC/HC/EEC
. IDG OIL TEMP TC/HC/EEC
. ACOC AIR MOD VLV/HC/EEC
. FUEL DIV RET VLV/HC/EEC
. HMS FUEL OVTMP
. HMS ENG OIL OVTMP
. HMS IDG OIL OVTMP
. HMS IDG OVTMP W/RECIRC
. FUEL DIV RET VLV/EEC
EFF :
ALL 24-20-00
Page 402
May 01/09
R
SYR
Subtask 24-20-00-710-050
B. Do this test:
-------------------------------------------------------------------------------
R | ACTION | RESULT |
-------------------------------------------------------------------------------
4. On the MCDU:
- push the line key adjacent to
the RETURN indication until the
ENG menu page comes into view.
7. On the MCDU:
- push the MCDU MENU mode key.
Subtask 24-20-00-210-053
(1) If you do a regular monitoring of the APU oil consumption, make sure
that the APU oil quantity is sufficient for the flight:
EFF :
ALL 24-20-00
Page 403
May 01/11
SYR
Oil Consumption of the APU GTCP 36-300
Figure 401/TASK 24-20-00-991-002
EFF :
ALL 24-20-00
Page 404
May 01/11
R
SYR
- For the APS 3200
(Ref. Fig. 402/TASK 24-20-00-991-003)
or
- For the 131-9(A)
(Ref. Fig. 403/TASK 24-20-00-991-004)
(a) Make sure that APU LOW OIL LEVEL indication is not shown:
1
_ Do the EIS start procedure (Upper ECAM DU and lower ECAM DU
only)
(Ref. TASK 31-60-00-860-001).
2
_ On the ECAM control panel, push the APU key (on the lower ECAM
DU, the APU page comes into view).
3
_ Make sure that the APU LOW OIL LEVEL indication is not shown.
4
_ Do the EIS stop procedure
(Ref. TASK 31-60-00-860-002).
1
_ Start and operate the APU:
2
_ During APU operation:
- Do a check for oil smell in the passenger compartement.
- Do a check for white smoke from the APU exhaust.
3
_ Stop the APU:
EFF :
ALL 24-20-00
Page 405
May 01/11
R
SYR
R Oil Consumption of the APU APS 3200
R Figure 402/TASK 24-20-00-991-003
EFF :
ALL 24-20-00
Page 406
May 01/07
SYR
R Oil Consumption of the APU 131-9(A)
R Figure 403/TASK 24-20-00-991-004
EFF :
ALL 24-20-00
Page 407
May 01/07
SYR
(c) Make sure that the APU oil is at maximum level:
NOTE : During the oil level check, make sure that there is no
____
external oil leakage in the APU compartement.
5. Close-up
________
Subtask 24-20-00-860-051
EFF :
ALL 24-20-00
Page 408
May 01/11
R
SYR
TASK 24-20-00-040-002
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
WARNING : MAKE SURE THAT THE CONTROLS AGREE WITH THE POSITION OF THE ITEMS THEY
_______
OPERATE BEFORE YOU PRESSURIZE A HYDRAULIC SYSTEM.
1. __________________
Reason for the Job
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
EFF :
ALL 24-20-00
Page 409
May 01/11
SYR
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
Subtask 24-20-00-860-053
Subtask 24-20-00-010-050
R (1) Put an ACCESS PLATFORM 2M (6 FT) - ADJUSTABLE at the access door 812
of the avionics compartment.
EFF :
ALL 24-20-00
Page 410
May 01/11
SYR
Subtask 24-20-00-865-050
-------------------------------------------------------------------------------
PANEL DESIGNATION IDENT. LOCATION
-------------------------------------------------------------------------------
106VU CSM/G /EV/MAN/SPLY 6XE B04
4. Procedure
_________
WARNING : MAKE SURE THAT THE RAT TRAVEL RANGE IS CLEAR BEFORE YOU
_______
EXTEND/RETRACT THE RAT.
Subtask 24-20-00-710-053
R (1) Do the extension of the Ram Air Turbine (RAT) on the ground
R (Ref. TASK 29-22-00-869-001).
R
Subtask 24-20-00-710-054
R (1) Do the retraction of the Ram Air Turbine (RAT) on the ground
R (Ref. TASK 29-22-00-869-002).
R
R
EFF :
ALL 24-20-00
Page 411
May 01/11
SYR
RAT Control
Figure 404/TASK 24-20-00-991-001
R
EFF :
001-003, 24-20-00
Page 412
May 01/11
SYR
RAT control
Figure 404A/TASK 24-20-00-991-001-A
R
EFF :
004-099, 24-20-00
Page 413
May 01/11
SYR
5. Close-up
________
Subtask 24-20-00-860-052
Subtask 24-20-00-410-050
B. Close Access
R
EFF :
ALL 24-20-00
Page 414
May 01/11
SYR
TASK 24-20-00-440-002
1. __________________
Reason for the Job
2. ______________________
Job Set-up Information
A. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
R 3. __________
Job Set-up
R Subtask 24-20-00-860-056
R A. Not Applicable
4. Procedure
_________
Subtask 24-20-00-810-051
Subtask 24-20-00-710-055
B. Do the operational test of the RAT automatic extension (Ref. TASK 29-22-
00-710-001).
5. Close-up
________
Subtask 24-20-00-860-055
A. Make sure that the work area is clean and clear of tool(s) and other
items.
EFF :
ALL 24-20-00
Page 415
Aug 01/11
SYR
INTEGRATED DRIVE GENERATOR SYSTEM (IDG, GCU) - DESCRIPTION AND OPERATION
________________________________________________________________________
1. _______
General
Each engine (HP rotor) drives its associated Integrated Drive Generator
(IDG) through the accessory gearbox. The drive speed varies according to the
engine rating.
The IDG provides a 115/200VAC, 3-phase, 400 Hz AC supply.
The IDG has two parts: the Constant-Speed Drive (CSD) and the generator.
The hydromechanical Constant-Speed Drive (CSD) drives the AC generator at
constant speed.
2. __________________
Component Location
-------------------------------------------------------------------------------
FIN | FUNCTIONAL DESIGNATION | PANEL|ZONE|ACCESS | ATA
| | | | DOOR | REF.
-------------------------------------------------------------------------------
5XT P/BSW-ELEC/IDG 1 35VU 210 831 24-21-00
6XT P/BSW-ELEC/IDG 2 35VU 210 831 24-21-00
4000XU IDG 430 24-21-51
4015KS THERMOCOUPLE-IDG OIL TEMPERATURE 410 24-21-15
6003EM FCOC 435 437AL 79-21-43
3. __________________
System Description
(1) The IDG converts the variable-speed shaft power directly into
constant frequency 400 Hz AC electrical power.
The Constant Speed Drive (CSD), in the IDG, drives the AC generator
at constant speed.
Thus, the AC generator produces constant frequency power.
EFF :
ALL 24-21-00
Page 1
May 01/06
R
SYR
R IDG Location in Nacelle
Figure 001
EFF :
ALL 24-21-00
Page 2
May 01/06
SYR
R IDG Attachment to the Gearbox
R Figure 002
EFF :
ALL 24-21-00
Page 3
Nov 01/02
SYR
R ELEC Control Panel - Location
Figure 003
EFF :
ALL 24-21-00
Page 4
Nov 01/02
SYR
R Fuel-Cooled IDG Oil Cooler and Cables - Location
R Figure 004
EFF :
ALL 24-21-00
Page 5
Nov 01/02
SYR
B. Fuel-Cooled IDG Oil Cooler
(1) The fuel-cooled IDG oil cooler cools the IDG oil and limits the IDG
inlet temperature. As the oil goes through the oil cooler, heat is
transferred from the oil to the fuel. Then the cooled oil returns to
the IDG.
4. ____________
Power Supply
A. Circuit Breakers
-------------------------------------------------------------------------------
PANEL DESIGNATION IDENT. LOCATION
-------------------------------------------------------------------------------
122VU ELEC/IDG2/DISC 2XT T25
122VU ELEC/IDG1/DISC 1XT T24
5. Interface
_________
Each GCU receives the following signals from its dedicated IDG:
- oil inlet temperature,
- oil outlet temperature,
- low oil pressure,
EFF :
ALL 24-21-00
Page 6
Nov 01/07
SYR
R - PMG 3 phase output voltage,
R - CT 3 phase signal.
R 6. Description
___________
(2) Maintenance
- oil replenishing
- oil drainage
- oil level check
- filter
- disconnect reset handle.
(3) Inspection
- Differential Pressure Indicator (DPI) of the oil filter on the IDG
oil-out line.
EFF :
ALL 24-21-00
Page 7
May 01/05
SYR
R IDG - Interface Accessories
R Figure 005
EFF :
ALL 24-21-00
Page 8
Nov 01/02
SYR
B. Quick Attach Detach (QAD) Adapter
The IDG is installed on the engine gearbox pad. It is attached to the
gearbox by means of a QAD adapter with a tension bolt.
C. Drive
A mechanical epicyclic differential-gear transmits power to the generator
of the IDG.
The speed of mechanically-coupled twin hydraulic-sub-assemblies modify
the differential-gear output speed. Each sub-assembly consists of a
hydraulic swashplate pump/motor: one with a fixed and the other with a
variable swash angle.
The input shaft has a shear neck. Its primary duty is to protect the
engine gearbox. But it is also used to protect the IDG against damage.
D. Generator
The generator is a three-stage assembly which has three machines
connected in cascade.
The first machine (Pilot Exciter (PE)) is a twelve-pole Permanent Magnet
Generator (PMG).
Its rotor is constructed of small Rare Earth Cobalt magnets. The output
from the PE stator winding:
- has a generator excitation function,
- provides power for other components of the electrical system (supply of
the GCU, EGIU and the external relays and contactors).The generator is
thus self-flashing and self-sufficient.
The second machine (Main Exciter (ME)), ten-pole stator, receives its
field excitation from the pilot exciter via the voltage regulator in the
GCU: this creates a stationary field. Rotating diodes rectify the three
phase output of the main exciter rotor. The resulting DC current feeds
the third machine (main alternator) rotor winding.
Thus, the main alternator receives excitation for the rotating salient
four-pole field from the rectified output of the main exciter.
The main alternator has a three-phase star-connected stator winding. The
three phases and star point neutral are taken to the generator output
terminal block.
The generator is designed for use with an external voltage regulator
which is part of the GCU.
The GCU:
- rectifies the output of the pilot exciter,
- regulates the excitation current to the main exciter field winding.
EFF :
ALL 24-21-00
Page 9
May 01/05
R
SYR
IDG - Speed Regulation Loop
Figure 006
EFF :
ALL 24-21-00
Page 10
May 01/05
R
SYR
The IDG generator contains three shielded toroidal current-transformers
combined into one assembly. The current transformers provide outputs
proportional to the current in the links connecting the neutral ends of
the main stator windings to the neutral terminal. They are designed for
use in conjunction with the differential feeder current protection
circuit in the GCU. The secondary windings of these transformers are
connected to the IDG electrical connector A (refer to paragraph E below).
R
R E. Electrical Connectors
R (Ref. Fig. 007)
R There are three differently-sized electrical connectors on the IDG.
R (1) Connector A
R
R The following internal components are connected to it:
R - the Main Exciter (ME)
R - three current transformers
R - the disconnect solenoid.
R (2) Connector B
R
R The following internal component are connected to it:
R - the PMG stator
R - the oil-in and oil-out temperature bulbs
R - the input speed sensor.
R (3) Connector C
R
R Only one internal component is connected to it:
R - the charge pressure switch.
EFF :
ALL 24-21-00
Page 11
May 01/05
SYR
IDG - Internal Schematic
Figure 007
EFF :
ALL 24-21-00
Page 12
May 01/05
R
SYR
R IDG Oil System - Schematic
R Figure 008
EFF :
ALL 24-21-00
Page 13
Nov 01/02
SYR
It thus provides regulated supply pressures to:
- the differential hydraulic units,
- the control piston,
- the generator,
- the governor,
- the various lubrication and cooling nozzles.
The oil filter has a Differential Pressure Indicator (DPI) to show
when it is necessary to replace the filter element. The sensing
device for the differential pressure is automatically neutralized
during cold oil running conditions: this avoids spurious indications
due to high oil viscosity. Similarly, a cooler by passvalve is fitted
in the IDG.
When pressure rises, the valve opens so the cooler is bypassed during
cold oil operation.
A scavenge pump relief-valve limits the supply pressure of the
scavenge system.
A vent valve releases internal case pressure if necessary.
EFF :
ALL 24-21-00
Page 14
May 01/05
SYR
R (5) Disconnect reset handle
R
R A mechanical reset handle is fitted to the IDG.
R The handle enables the drive to be reconnected while the engine is
R shut down and stationary on the ground.
(1) The terminals on each end of the IDG feeder cables are different. On
one end, they connect to the IDG, while on the other end they connect
to the aircraft pylon electrical-connector.
(1) All six IDG oil-cooler tubes are rigid metal tubes. The tubes which
attach to the fuel-cooled IDG oil cooler have a three-bolt flange
connection at one end. The three-bolt flange connections have an
alignment boss and a groove for the installation of a seal ring. All
the other ends of the tubes have the usual (male or female) flareless
tube connections. Three of the tubes are 0.625in. in diameter and
three are 0.75in. in diameter. Four of the tubes also have support
brackets attached to them: two tubes have one bracket each and two
tubes have three brackets each.
EFF :
ALL 24-21-00
Page 15
May 01/05
SYR
R 7. ________________________________
Operation/Control and Indicating
An oil temperature sensor monitors the oil inlet temperature and an other
one, the oil outlet temperature.
The second provides ADVISORY oil temperature and oil overheat detection.
A pressure switch operates in the event of a low charge oil pressure.
In case of:
- abnormally low oil-pressure or,
- IDG oil overheat (outlet temperature > or = 185 ⁰C),
the warnings are provided to the cockpit (FAULT legend on the
corresponding IDG pushbutton switch, MASTER CAUT light, single chime
and messages on the ECAM upper display unit and ECAM lower display
unit.
(Ref. Fig. 010, 011, 012)
The oil outlet temperature is displayed on the ELEC page on the lower
ECAM display unit.
R NOTE : When the oil temperature reaches a predetermined value (147 ⁰C) ,
____
R an advisory mode is available on the lower ECAM display unit.
D. Disconnection
(Ref. Fig. 013)
To disconnect a faulty IDG, it is necessary to open the safety guard and
push the ELEC/IDG pushbutton switch.
When the IDG is disconnected, the white OFF legend of the ELEC/IDG
pushbutton switch comes on.
EFF :
ALL 24-21-00
Page 16
May 01/05
SYR
IDG System - Generator Drive Control and Indicating
Figure 009
R
EFF :
ALL 24-21-00
Page 17
May 01/05
SYR
R IDG 1 Oil Low Pressure - Upper and Lower ECAM Display Units
R Figure 010 (SHEET 1)
EFF :
ALL 24-21-00
Page 18
Nov 01/02
SYR
R IDG 1 Oil Low Pressure - Upper and Lower ECAM Display Units
R Figure 010 (SHEET 2)
EFF :
ALL 24-21-00
Page 19
Nov 01/02
SYR
IDG 1 Oil Overheat Advisory - Upper and Lower ECAM Display Units
R Figure 011 (SHEET 1)
EFF :
ALL 24-21-00
Page 20
May 01/03
SYR
IDG 1 Oil Overheat Advisory - Upper and Lower ECAM Display Units
R Figure 011 (SHEET 2)
EFF :
ALL 24-21-00
Page 21
May 01/03
SYR
IDG 1 Oil Overheat - Upper and Lower ECAM Display Units
R Figure 012 (SHEET 1)
EFF :
ALL 24-21-00
Page 22
May 01/03
SYR
IDG 1 Oil Overheat - Upper and Lower ECAM Display Units
R Figure 012 (SHEET 2)
EFF :
ALL 24-21-00
Page 23
May 01/03
SYR
IDG 1 Disconnect - Lower ECAM Display Unit
Figure 013
EFF :
ALL 24-21-00
Page 24
May 01/05
R
SYR
The DISC indication is also displayed on the ELEC page on the lower ECAM
display unit.
NOTE : The system can only be reconnected on the ground with the related
____
engine shut down.
F. Oil Filter
A clogged filter indication is provided by a local visual differential
pressure indicator (DPI). The indicator is installed opposite the drive
end of the IDG.
R
EFF :
ALL 24-21-00
Page 25
May 01/05
SYR
INTEGRATED DRIVE GENERATOR SYSTEM (IDG, GCU) - MAINTENANCE PRACTICES
____________________________________________________________________
TASK 24-21-00-600-040
1. __________________
Reason for the Job
Preservation of the IDG prevents corrosion and deterioration when the IDG is
in storage for a short period (less than two years).
The preservation procedure will give maximum protection to the IDG. You must
do it in clean and dry conditions.
2. ______________________
Job Set-up Information
A. Consumable Materials
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
EFF :
ALL 24-21-00
Page 201
May 01/10
SYR
3. __________
Job Set-up
Subtask 24-21-00-010-094
4. Procedure
_________
Subtask 24-21-00-620-050
A. IDG Preservation
(a) Apply adhesive tape on the input spline, the O-ring, the input
seal area and the valves that are on the periphery of the input
pad. Do not remove the input flange, gasket or screws.
(5) Replace the IDG filter (Ref. TASK 24-21-51-000-011) and (Ref. TASK
24-21-51-400-011).
(7) Start the engine to make sure that oil flows through the IDG and the
external circuit (Ref. TASK 71-00-00-710-043).
EFF :
ALL 24-21-00
Page 202
May 01/10
SYR
(8) Open the drains of the input pad seal to drain unwanted fluids
(condensation water or remaining engine washing fluids).
Subtask 24-21-00-630-050
B. Return to Service
(1) Do a visual inspection of all the external surfaces of the IDG for
damage.
(3) Replace the filter (Ref. TASK 24-21-51-000-011) and (Ref. TASK 24-21-
51-400-011).
(5) Start the engine to make sure that the IDG operates correctly
(Ref. TASK 71-00-00-710-043).
5. Close-up
________
Subtask 24-21-00-410-093
A. Close Access
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
R
EFF :
ALL 24-21-00
Page 203
May 01/10
SYR
R (3) Remove the warning notice(s).
EFF :
ALL 24-21-00
Page 204
May 01/10
SYR
INTEGRATED DRIVE GENERATOR SYSTEM (IDG, GCU) - SERVICING
________________________________________________________
TASK 24-21-00-612-044
WARNING : BE CAREFUL WHEN YOU WORK ON THE ENGINE COMPONENTS IMMEDIATELY AFTER
_______
THE ENGINE IS SHUTDOWN. THE ENGINE COMPONENTS CAN STAY HOT FOR UP TO
ONE HOUR.
CAUTION : USE ONLY NEW CANS OF OIL WHEN YOU FILL THE IDG WITH OIL OR ADD OIL TO
_______
THE IDG.
THE CONTAMINATION IN OIL THAT STAYS IN OPEN CANS CAN CAUSE FAST
DETERIORATION OF THE OIL AND WILL DECREASE THE LIFE OF THE IDG.
CAUTION : DO NOT USE SOLVENTS THAT CONTAIN CHLORINE TO CLEAN THE EQUIPMENT
_______
(PUMP, HOSES, TANK AND FUNNEL) USED TO FILL THE IDG WITH OIL.
CHLORINE CONTAMINATION OF THE OIL CAN CAUSE FAST DETERIORATION OF THE
OIL AND WILL DECREASE THE LIFE OF THE IDG.
1. __________________
Reason for the Job
R You must do this procedure to clean the IDG and the external lines.
EFF :
ALL 24-21-00
Page 301
May 01/02
SYR
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
B. Consumable Materials
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
C. Expendable Parts
-------------------------------------------------------------------------------
FIG.ITEM |DESIGNATION |IPC-CSN
-------------------------------------------------------------------------------
EFF :
ALL 24-21-00
Page 302
Nov 01/09
SYR
D. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
Subtask 24-21-00-861-061
Subtask 24-21-00-941-061
B. Safety Precautions
(a) Put a warning notice in position to tell persons not to start the
engine.
(2) Make sure that the engine 1(2) shutdown occurred not less than 5
minutes before you do this procedure.
(a) Make sure that the ON legend of the ENG/FADEC GND PWR/1(2)
pushbutton switch is off.
EFF :
ALL 24-21-00
Page 303
Aug 01/11
R
SYR
Subtask 24-21-00-010-067
4. Procedure
_________
Subtask 24-21-00-864-052
R WARNING : POINT THE OVERFLOW DRAIN HOSE INTO A CONTAINER WHEN YOU CONNECT
_______
R THE HOSE TO THE OVERFLOW DRAIN HALF-COUPLING. THIS WILL PREVENT
BURNS FROM THE HOT OIL SPRAY. HOT OIL CAN CAUSE BURNS TO EYES
AND SKIN.
CAUTION : DO NOT USE DEVICES OTHER THAN THE APPROVED OVERFLOW DRAIN-HOSE
_______
FITTING. HARD METAL OBJECTS SUCH AS SCREWDRIVERS CAN CAUSE
R DAMAGE TO THE OVERFLOW DRAIN HALF-COUPLING SEAT.
R CAUTION : MAKE SURE YOU CONNECT THE HOSE OF THE OVERFLOW DRAIN HALF-
_______
R COUPLING CORRECTLY. THIS HOSE LETS THE OIL IN THE IDG DRAIN TO
THE CORRECT LEVEL. IF THERE IS TOO MUCH OIL IN THE IDG THE IDG
WILL BECOME TOO HOT.
(1) Put a container 5.7 l (1.5 USgal) (9) below the IDG (7).
R (2) Remove the dust cap (3) from the overflow drain half-coupling (5).
(3) Put the end of the overflow drain hose (8) of the TANK - ENGINE OIL
FILLING UP in the container (9).
R (a) Connect the overflow drain hose (8) of the TANK - ENGINE OIL
R FILLING UP to the overflow drain half-coupling (5).
NOTE : Some oil can come out of the overflow drain hose (8) of
____
the TANK - ENGINE OIL FILLING UP when you connect it.
EFF :
ALL 24-21-00
Page 304
Aug 01/11
SYR
R Servicing of IDG after Oil Chemical Contamination
Figure 301/TASK 24-21-00-991-900
EFF :
ALL 24-21-00
Page 305
May 01/00
SYR
Subtask 24-21-00-680-053
WARNING : WEAR GOGGLES WHEN YOU REMOVE OR INSTALL THE LOCKWIRE. CUT,
_______
REMOVE AND DISCARD THE LOCKWIRE AS YOU DO THE TASK. LOOSE
LOCKWIRE CAN CUT OR BLIND YOU.
(1) Cut and remove the lockwire from the case drain plug (1).
Subtask 24-21-00-920-054
C. Replace the IDG oil filter (Ref. TASK 24-21-51-000-011) and (Ref. TASK
24-21-51-400-011).
Subtask 24-21-00-640-054
D. Lubricate the new O-ring (2) with OILS (Material No. 03-002).
Subtask 24-21-00-420-058
(1) Install the new O-ring (2) on the case drain plug (1).
(3) TORQUE the case drain plug (1) to between 55 and 75 lbf.in (0.62 and
0.84 m.daN).
(4) Safety the case drain plug (1) with lockwire (Material No. V02-119).
EFF :
ALL 24-21-00
Page 306
Aug 01/11
R
SYR
Subtask 24-21-00-612-054
NOTE : The AMM 20-34-00 gives a list of oil brand names approved for the
____
IDG.
(1) Remove the dust cap (4) from the pressure fill half-coupling (6).
(2) Connect the pressure fill hose (10) of the TANK - ENGINE OIL FILLING
UP to the pressure fill half-coupling (6).
(3) Fill the IDG with filtered OILS (Material No. 03-002) at a maximum
pressure of 35 psi (2.41 bar).
(4) Stop the filling procedure when the quantity of oil collected from
the overflow drain hose (8) of the TANK - ENGINE OIL FILLING UP is
0.95 l (0.25 USgal) minimum.
Subtask 24-21-00-020-076
(1) Disconnect the pressure fill hose (10) of the TANK - ENGINE OIL
FILLING UP from the pressure fill half-coupling (6).
(2) Install the dust cap (4) on the pressure fill half-coupling (6).
(3) When only drops of oil come out of the overflow drain hose (8) of the
TANK - ENGINE OIL FILLING UP , disconnect the hose (8).
(4) Install the dust cap (3) on the overflow drain half-coupling (5).
EFF :
ALL 24-21-00
Page 307
Aug 01/11
R
SYR
Subtask 24-21-00-710-057
(1) Start the related engine (Ref. TASK 71-00-00-710-043) until the oil
temperature of the IDG is 175 deg.F (80 deg.C).
NOTE : You can read the oil temperature on the ELEC page of the lower
____
ECAM DU.
Subtask 24-21-00-680-054
Subtask 24-21-00-612-062
K. Fill the IDG with oil or add oil to the IDG after a level check
(Ref. TASK 12-13-24-612-011).
5. Close-up
________
Subtask 24-21-00-410-067
A. Close Access
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
Subtask 24-21-00-862-060
EFF :
ALL 24-21-00
Page 308
May 01/11
R
SYR
TASK 24-21-00-612-044- 01
Servicing of the IDG after Oil Chemical Contamination and Extension of the
Oil-Filter Differential-Pressure Indicator (DPI)
WARNING : BE CAREFUL WHEN YOU WORK ON THE ENGINE COMPONENTS IMMEDIATELY AFTER
_______
THE ENGINE IS SHUTDOWN. THE ENGINE COMPONENTS CAN STAY HOT FOR UP TO
ONE HOUR.
CAUTION : USE ONLY NEW CANS OF OIL WHEN YOU FILL THE IDG WITH OIL OR ADD OIL TO
_______
THE IDG.
THE CONTAMINATION IN OIL THAT STAYS IN OPEN CANS CAN CAUSE FAST
DETERIORATION OF THE OIL AND WILL DECREASE THE LIFE OF THE IDG.
CAUTION : DO NOT USE SOLVENTS THAT CONTAIN CHLORINE TO CLEAN THE EQUIPMENT
_______
(PUMP, HOSES, TANK AND FUNNEL) USED TO FILL THE IDG WITH OIL.
CHLORINE CONTAMINATION OF THE OIL CAN CAUSE FAST DETERIORATION OF THE
OIL AND WILL DECREASE THE LIFE OF THE IDG.
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
EFF :
ALL 24-21-00
Page 309
May 01/10
R
SYR
B. Consumable Materials
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
C. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
Subtask 24-21-00-861-057
EFF :
ALL 24-21-00
Page 310
May 01/10
SYR
Subtask 24-21-00-941-062
B. Safety Precautions
(a) Put a warning notice in position to tell persons not to start the
engine.
(2) Make sure that the engine 1(2) shutdown occurred not less than 5
minutes before you do this procedure.
(a) Make sure that the ON legend of the ENG/FADEC GND PWR/1(2)
pushbutton switch is off.
Subtask 24-21-00-010-068
4. Procedure
_________
Subtask 24-21-00-020-060
EFF :
ALL 24-21-00
Page 311
Nov 01/10
R
SYR
INTENTIONALLY BLANK
R
24-21-00
Page 312
May 01/10
SYR
R Servicing of the IDG after Oil Contamination and with the DPI Out
Figure 302/TASK 24-21-00-991-909
EFF :
ALL 24-21-00
Page 313
Feb 01/00
SYR
Subtask 24-21-00-420-064
(2) Do not connect the oil-in tube (2) to the oil-in port (3) at this
time.
Subtask 24-21-00-612-059
NOTE : Approximately 1.5 USgal (5.7 l) of oil will flow into the
____
container.
(1) Put the end of the IDG oil-in tube (2) in a container 5.7 l (1.5
USgal).
R (2) Remove the dust cap (4) from the pressure fill half-coupling (1).
R (3) Connect the pressure fill hose (5) of the TANK - ENGINE OIL FILLING
R UP to the pressure fill half-coupling (1).
(4) Use a pump to fill the IDG with filtered OILS (Material No. 03-002)
until:
- the color of the oil that flows from the IDG oil-in line (2) is the
same as the color of the oil that you put into the IDG,
- or until you collect 3.8 l (1.0038 USgal) to 5.7 l (1.5057 USgal)
of oil from the oil-in line (2).
EFF :
ALL 24-21-00
Page 314
May 01/11
SYR
Subtask 24-21-00-420-060
CAUTION : USE TWO WRENCHES TO HOLD THE FITTINGS WHEN YOU TORQUE THE
_______
OIL-IN AND OIL-OUT LINES.
IF NOT YOU CAN TRANSMIT TOO MUCH TORQUE TO THE IDG FITTINGS AND
CAUSE DAMAGE TO THE IDG BOSSES.
(1) Connect the IDG oil-in line (2) to the oil-in port (3). Use two
wrenches, one to hold and the other to TORQUE the IDG oil-in line (2)
to between 844 and 945 lbf.in (9.53 and 10.67 m.daN).
Subtask 24-21-00-612-060
E. Fill the IDG with oil or add oil into IDG after a level check (Ref. TASK
12-13-24-612-011).
5. Close-up
________
Subtask 24-21-00-410-068
A. Close Access
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
Subtask 24-21-00-862-057
EFF :
ALL 24-21-00
Page 315
May 01/10
R
SYR
TASK 24-21-00-920-041
WARNING : BE CAREFUL WHEN YOU WORK ON THE ENGINE COMPONENTS IMMEDIATELY AFTER
_______
THE ENGINE IS SHUTDOWN. THE ENGINE COMPONENTS CAN STAY HOT FOR UP TO
ONE HOUR.
CAUTION : USE ONLY NEW CANS OF OIL WHEN YOU FILL THE IDG WITH OIL OR ADD OIL TO
_______
THE IDG.
THE CONTAMINATION IN OIL THAT STAYS IN OPEN CANS CAN CAUSE FAST
DETERIORATION OF THE OIL AND WILL DECREASE THE LIFE OF THE IDG.
CAUTION : DO NOT USE SOLVENTS THAT CONTAIN CHLORINE TO CLEAN THE EQUIPMENT
_______
(PUMP, HOSES, TANK AND FUNNEL) USED TO FILL THE IDG WITH OIL.
CHLORINE CONTAMINATION OF THE OIL CAN CAUSE FAST DETERIORATION OF THE
OIL AND WILL DECREASE THE LIFE OF THE IDG.
1. __________________
Reason for the Job
EFF :
ALL 24-21-00
Page 316
Nov 01/06
SYR
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
B. Consumable Materials
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
C. Expendable Parts
-------------------------------------------------------------------------------
FIG.ITEM |DESIGNATION |IPC-CSN
-------------------------------------------------------------------------------
EFF :
ALL 24-21-00
Page 317
Nov 01/09
SYR
D. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
Subtask 24-21-00-861-054
Subtask 24-21-00-941-052
B. Safety Precautions
(a) Put a warning notice in position to tell persons not to start the
engine.
(2) Make sure that the engine 1(2) shutdown occurred not less than 5
minutes before you do this procedure.
(a) Make sure that the ON legend of the ENG/FADEC GND PWR/1(2)
pushbutton switch is off.
EFF :
ALL 24-21-00
Page 318
May 01/10
SYR
Subtask 24-21-00-010-059
4. Procedure
_________
Subtask 24-21-00-864-057
R WARNING : POINT THE OVERFLOW DRAIN HOSE INTO A CONTAINER WHEN YOU CONNECT
_______
R THE HOSE TO THE OVERFLOW DRAIN HALF-COUPLING. THIS WILL PREVENT
BURNS FROM THE HOT OIL SPRAY. HOT OIL CAN CAUSE BURNS TO EYES
AND SKIN.
CAUTION : DO NOT USE DEVICES OTHER THAN THE APPROVED OVERFLOW DRAIN-HOSE
_______
FITTING. HARD METAL OBJECTS SUCH AS SCREWDRIVERS CAN CAUSE
R DAMAGE TO THE OVERFLOW DRAIN HALF-COUPLING SEAT.
(1) Put a container 5.7 l (1.5 USgal) (14) below the IDG.
R (2) Remove the dust cap (3) from the overflow drain half-coupling (5).
(3) Put the end of the overflow drain hose (13) of the TANK - ENGINE OIL
FILLING UP in the container (14).
R (a) Connect the overflow drain hose (13) of the TANK - ENGINE OIL
R FILLING UP to the overflow drain half-coupling (5).
NOTE : Some oil can come out of the overflow drain hose (13) of
____
the TANK - ENGINE OIL FILLING UP when you connect it.
EFF :
ALL 24-21-00
Page 319
Aug 01/11
SYR
R IDG Oil Filter
Figure 303/TASK 24-21-00-991-910- 12 (SHEET 1)
EFF :
ALL 24-21-00
Page 320
Nov 01/10
SYR
R IDG Oil Filter
Figure 303/TASK 24-21-00-991-910- 22 (SHEET 2)
EFF :
ALL 24-21-00
Page 321
Nov 01/10
SYR
Subtask 24-21-00-680-056
WARNING : WEAR GOGGLES WHEN YOU REMOVE OR INSTALL THE LOCKWIRE. CUT,
_______
REMOVE AND DISCARD THE LOCKWIRE AS YOU DO THE TASK. LOOSE
LOCKWIRE CAN CUT OR BLIND YOU.
(1) Cut and remove the lockwire from the case drain plug (1).
NOTE : If the drained oil has a fuel odor, do the servicing of the
____
IDG after oil chemical contamination (Ref. TASK 24-21-00-612-
044).
If you think that the condition of the drained oil is not
correct, do a sampling of the IDG oil for anlysis (Ref. TASK
12-32-24-281-001).
Subtask 24-21-00-020-052
WARNING : WEAR GOGGLES WHEN YOU REMOVE OR INSTALL THE LOCKWIRE. CUT,
_______
REMOVE AND DISCARD THE LOCKWIRE AS YOU DO THE TASK. LOOSE
LOCKWIRE CAN CUT OR BLIND YOU.
(1) Cut and remove the lockwire from the filter cover (7).
NOTE : Put a container 5.7 l (1.5 USgal) below the filter cavity.
____
(3) Remove and discard the O-ring (8) from the filter cover (7).
(5) Remove and discard the O-ring (10) from the filter element (9).
EFF :
ALL 24-21-00
Page 322
May 01/02
SYR
Subtask 24-21-00-210-054
Subtask 24-21-00-640-052
R (1) Lubricate the new O-ring (10) with OILS (Material No. 03-002).
R (2) Lubricate the new O-ring (8) with OILS (Material No. 03-002).
R (3) Lubricate the new O-ring (2) with OILS (Material No. 03-002).
Subtask 24-21-00-420-067
R WARNING : WEAR GOGGLES WHEN YOU REMOVE OR INSTALL THE LOCKWIRE. CUT,
_______
R REMOVE AND DISCARD THE LOCKWIRE AS YOU DO THE TASK. LOOSE
R LOCKWIRE CAN CUT OR BLIND YOU.
(1) Install the new O-ring (2) on the case drain plug (1).
(3) TORQUE the case drain plug (1) to between 55 and 75 lbf.in (0.62 and
0.84 m.daN).
(4) Safety the case drain plug (1) with Lockwire (Material No. V02-119).
Subtask 24-21-00-420-051
R WARNING : WEAR GOGGLES WHEN YOU REMOVE OR INSTALL THE LOCKWIRE. CUT,
_______
R REMOVE AND DISCARD THE LOCKWIRE AS YOU DO THE TASK. LOOSE
R LOCKWIRE CAN CUT OR BLIND YOU.
EFF :
ALL 24-21-00
Page 323
May 01/02
SYR
CAUTION : MAKE SURE THE COMPONENTS ARE SEATED IN THE IDG SCAVENGE FILTER
_______
CAVITY BEFORE YOU INSTALL THE FILTER COVER. DO NOT TIGHTEN THE
FILTER COVER SCREWS TO FORCE THE FILTER COMPONENTS INTO THE
HOUSING.
(1) Install the new O-ring (10) on the filter element (9).
(2) Install the new O-ring (8) on the filter cover (7).
(3) Remove the blanking plug from the filter cavity port.
(4) Put the new filter element (9) in the filter cavity.
(6) TORQUE the filter cover (7) to between 13 and 15 lbf.ft (1.76 and
2.03 m.daN).
(7) Safety the filter cover (7) with Lockwire (Material No. V02-119).
Subtask 24-21-00-612-051
R (1) Remove the dust cap (4) from the pressure fill half-coupling (6).
R (2) Connect the pressure fill hose (11) of the TANK - ENGINE OIL FILLING
R UP to the pressure fill half-coupling (6).
(3) Fill the IDG with filtered OILS (Material No. 03-002) at a maximum
pressure of 35 psi (2.41 bar).
NOTE : The AMM 20-34-00 gives a list of oil brand names approved for
____
the IDG.
(4) Stop the filling procedure when the quantity of oil collected from
the overflow drain hose (13) of the TANK - ENGINE OIL FILLING UP is
0.95 l (0.25 USgal) minimum.
EFF :
ALL 24-21-00
Page 324
May 01/11
SYR
Subtask 24-21-00-020-074
R (1) Disconnect the pressure fill hose (11) of the TANK - ENGINE OIL
R FILLING UP from the pressure fill half-coupling (6).
R (2) Install the dust cap (4) on the pressure fill half-coupling (6).
(3) When only drops of oil come out of the overflow drain hose (13) of
the TANK - ENGINE OIL FILLING UP , disconnect the hose (13).
R (4) Install the dust cap (3) on the overflow drain half-coupling (5).
Subtask 24-21-00-710-063
Subtask 24-21-00-210-055
NOTE : Before you do a check of the oil level, we recommend that you do
____
dry motoring for two minutes (Ref. TASK 71-00-00-710-045).
Alternatively, you can do the check after an engine start at
minimum idle (Ref. TASK 71-00-00-710-043). This is to make sure
you get maximum filling of the external oil system.
CAUTION : IF YOU DRY-MOTOR THE ENGINE, MAKE SURE THAT THE OIL LEVEL
_______
IS STABLE BEFORE YOU DO THE INSPECTION. IN AMBIENT AIR
TEMPERATURES OF LESS THAN 20⁰C, THE OIL LEVEL WILL BECOME
STABLE ONLY AFTER 30 MINUTES. THUS THE LEVEL INDICATIONS ON
THE SIGHTGLASS WILL NOT BE CORRECT BEFORE THE END OF THIS
PERIOD. IF YOU ADD OIL WHEN IT IS NOT NECESSARY, THERE IS A
RISK THAT YOU WILL CAUSE FAILURE OF THE IDG.
EFF :
ALL 24-21-00
Page 325
May 01/11
SYR
- if the oil level is above the green band, do the steps 4.A. and
4.J. again.
(a) Let the oil in the IDG become stable for 5 minutes.
R NOTE : If the oil level is below the middle of the green band, we
____
R recommend that you do the top up.
- if the oil level is below the green band, do the steps 4.A.,
4.H. and 4.J. again,
- if the oil level above the yellow band, do the steps 4.A. and
4.J. again.
5. Close-up
________
Subtask 24-21-00-410-059
A. Close Access
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
Subtask 24-21-00-862-054
EFF :
ALL 24-21-00
Page 326
May 01/10
SYR
TASK 24-21-00-612-047
WARNING : BE CAREFUL WHEN YOU WORK ON THE ENGINE COMPONENTS IMMEDIATELY AFTER
_______
THE ENGINE IS SHUTDOWN. THE ENGINE COMPONENTS CAN STAY HOT FOR UP TO
ONE HOUR.
CAUTION : USE ONLY NEW CANS OF OIL WHEN YOU FILL THE IDG WITH OIL OR ADD OIL TO
_______
THE IDG.
THE CONTAMINATION IN OIL THAT STAYS IN OPEN CANS CAN CAUSE FAST
DETERIORATION OF THE OIL AND WILL DECREASE THE LIFE OF THE IDG.
CAUTION : DO NOT USE SOLVENTS THAT CONTAIN CHLORINE TO CLEAN THE EQUIPMENT
_______
(PUMP, HOSES, TANK AND FUNNEL) USED TO FILL THE IDG WITH OIL.
CHLORINE CONTAMINATION OF THE OIL CAN CAUSE FAST DETERIORATION OF THE
OIL AND WILL DECREASE THE LIFE OF THE IDG.
1. __________________
Reason for the Job
You must do this procedure to flush the IDG and the external lines with a
new type of oil.
EFF :
ALL 24-21-00
Page 327
Nov 01/09
R
SYR
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
B. Consumable Materials
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
C. Expendable Parts
-------------------------------------------------------------------------------
FIG.ITEM |DESIGNATION |IPC-CSN
-------------------------------------------------------------------------------
EFF :
ALL 24-21-00
Page 328
May 01/10
SYR
D. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
Subtask 24-21-00-861-064
Subtask 24-21-00-941-072
B. Safety Precautions
(a) Put a warning notice in position to tell persons not to start the
engine.
(2) Make sure that the engine 1(2) shutdown occurred not less than 5
minutes before you do this procedure.
(a) Make sure that the ON legend of the ENG/FADEC GND PWR/1(2)
pushbutton switch is off.
EFF :
ALL 24-21-00
Page 329
Aug 01/11
R
SYR
Subtask 24-21-00-010-082
4. Procedure
_________
Subtask 24-21-00-864-060
R WARNING : POINT THE OVERFLOW DRAIN HOSE INTO A CONTAINER WHEN YOU CONNECT
_______
R THE HOSE TO THE OVERFLOW DRAIN HALF-COUPLING. THIS WILL PREVENT
BURNS FROM THE HOT OIL SPRAY. HOT OIL CAN CAUSE BURNS TO EYES
AND SKIN.
CAUTION : DO NOT USE DEVICES OTHER THAN THE APPROVED OVERFLOW DRAIN-HOSE
_______
FITTING. HARD METAL OBJECTS SUCH AS SCREWDRIVERS CAN CAUSE
R DAMAGE TO THE OVERFLOW DRAIN HALF-COUPLING SEAT.
R CAUTION : MAKE SURE YOU CONNECT THE HOSE OF THE OVERFLOW DRAIN HALF-
_______
R COUPLING CORRECTLY. THIS HOSE LETS THE OIL IN THE IDG DRAIN TO
THE CORRECT LEVEL. IF THERE IS TOO MUCH OIL IN THE IDG THE IDG
WILL BECOME TOO HOT.
(1) Put a container 5.7 l (1.5 USgal) (9) below the IDG (7).
R (2) Remove the dust cap (3) from the overflow drain half-coupling (5).
(3) Put the end of the overflow drain hose (8) of the TANK - ENGINE OIL
FILLING UP in the container (9).
R (a) Connect the overflow drain hose (8) of the TANK - ENGINE OIL
R FILLING UP to the overflow drain half-coupling (5).
NOTE : Some oil can come out of the overflow drain hose (8) of
____
the TANK - ENGINE OIL FILLING UP when you connect it.
EFF :
ALL 24-21-00
Page 330
Aug 01/11
SYR
R Oil Type Change - IDG
R Figure 304/TASK 24-21-00-991-911
EFF :
ALL 24-21-00
Page 331
Feb 01/00
SYR
Subtask 24-21-00-680-063
WARNING : WEAR GOGGLES WHEN YOU REMOVE OR INSTALL THE LOCKWIRE. CUT,
_______
REMOVE AND DISCARD THE LOCKWIRE AS YOU DO THE TASK. LOOSE
LOCKWIRE CAN CUT OR BLIND YOU.
(1) Cut and remove the lockwire from the case drain plug (1).
Subtask 24-21-00-920-057
C. Replace the IDG oil filter(s) (Ref. TASK 24-21-51-000-011) and (Ref. TASK
24-21-51-400-011).
Subtask 24-21-00-612-081
NOTE : Approximately 3.8 l (1 USgal) of oil will flow into the container.
____
R (1) Remove the dust cap (4) from the pressure fill half-coupling (6).
R (2) Connect the pressure fill hose (10) of the TANK - ENGINE OIL FILLING
R UP to the pressure fill half-coupling (6).
(3) Use a pump to fill the IDG with filtered OILS (Material No. 03-002)
until:
- the color of the oil that flows from the case drain is the same as
the color of the oil that you put into the IDG,
- or until you collect 3.8 l (1 USgal) of oil from the case drain.
Subtask 24-21-00-640-059
E. Lubricate the new O-ring (2) with OILS (Material No. 03-002).
EFF :
ALL 24-21-00
Page 332
May 01/11
SYR
Subtask 24-21-00-420-078
(1) Install the new O-ring (2) on the case drain plug (1).
(3) TORQUE the case drain plug (1) to between 55 and 75 lbf.in (0.62 and
0.84 m.daN).
R (4) Safety the case drain plug (1) with lockwire (Material No. V02-119).
Subtask 24-21-00-612-082
G. Fill the IDG with oil or add oil to the IDG after a level check
(Ref. TASK 12-13-24-612-011).
Subtask 24-21-00-720-056
H. Do dry motoring (Ref. TASK 71-00-00-710-045) and make sure that there are
no oil leaks at the cover of the IDG oil filter.
Subtask 24-21-00-210-076
(1) Let the oil in the IDG become stable for 5 minutes.
EFF :
ALL 24-21-00
Page 333
May 01/10
SYR
Subtask 24-21-00-210-077
(1) Let the oil at or near the top of the IDG become stable for 5
minutes.
5. Close-up
________
Subtask 24-21-00-410-081
A. Close Access
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
Subtask 24-21-00-862-063
EFF :
ALL 24-21-00
Page 334
May 01/10
R
SYR
INTEGRATED DRIVE GENERATOR SYSTEM (IDG, GCU) - ADJUSTMENT/TEST
______________________________________________________________
TASK 24-21-00-710-042
Operational Test of the IDG Disconnect and Reconnect (Reset) Function - Engine
Static
WARNING : BE CAREFUL WHEN YOU WORK ON THE ENGINE COMPONENTS IMMEDIATELY AFTER
_______
THE ENGINE IS SHUTDOWN. THE ENGINE COMPONENTS CAN STAY HOT FOR UP TO
ONE HOUR.
1. __________________
Reason for the Job
R NOTE : There is an alternative method for this procedure. For the other
____
R method, refer to (Ref. TASK 24-21-00-720-042).
2. ______________________
Job Set-up Information
A. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
Subtask 24-21-00-861-051
(2) Do the EIS start procedure (Upper ECAM DU and lower ECAM DU only)
(Ref. TASK 31-60-00-860-001)
EFF :
ALL 24-21-00
Page 501
May 01/11
SYR
(3) On the ECAM control panel, push the ELEC key to get the ELEC page.
Subtask 24-21-00-010-051
Subtask 24-21-00-865-054
-------------------------------------------------------------------------------
PANEL DESIGNATION IDENT. LOCATION
-------------------------------------------------------------------------------
122VU ELEC/IDG2/DISC 2XT T25
122VU ELEC/IDG1/DISC 1XT T24
Subtask 24-21-00-865-055
D. Make sure that this(these) circuit breaker(s) is(are) open, safetied and
tagged
-------------------------------------------------------------------------------
PANEL DESIGNATION IDENT. LOCATION
-------------------------------------------------------------------------------
122VU ELEC/GCU/2 2XU2 T27
122VU ELEC/GCU/1 2XU1 T26
4. Procedure
_________
CAUTION : ENGAGE THE IDG DISCONNECT MECHANISM WITH THE DISCONNECT RESET RING
_______
BEFORE YOU START THE ENGINE. IF NOT YOU WILL CAUSE DAMAGE TO THE
DOG TEETH, AT ENGINE START.
CAUTION : DO NOT PUSH THE IDG DISCONNECT PUSHBUTTON SWITCH FOR MORE THAN 3
_______
SECONDS.
THERE MUST BE AT LEAST 60 SECONDS BETWEEN TWO OPERATIONS OF THE
SWITCH.
THIS IS TO PREVENT DAMAGE TO THE DISCONNECT SOLENOID WHICH WILL
BECOME TOO HOT.
EFF :
ALL 24-21-00
Page 502
May 01/11
R
SYR
Subtask 24-21-00-710-051
NOTE : This test is for the system 1. For the other system(s), use the
____
indications between the parentheses.
-------------------------------------------------------------------------------
R | ACTION | RESULT |
-------------------------------------------------------------------------------
NOTE : Make sure that the CFDS message IDG 1(2) DISCONNECT goes out of view
____
after the first engine start.
EFF :
ALL 24-21-00
Page 503
May 01/11
SYR
-------------------------------------------------------------------------------
| ACTION | RESULT |
-------------------------------------------------------------------------------
NOTE : When you do the first engine start, make sure that the related engine
____
electrical-generation system operates correctly.
5. Close-up
________
Subtask 24-21-00-410-051
Subtask 24-21-00-865-056
B. Remove the safety clip(s) and the tag(s) and close this(these) circuit
breaker(s):
2XU1, 2XU2
Subtask 24-21-00-862-051
EFF :
ALL 24-21-00
Page 504
May 01/11
R
SYR
TASK 24-21-00-730-041
WARNING : BE CAREFUL WHEN YOU WORK ON THE ENGINE COMPONENTS IMMEDIATELY AFTER
_______
THE ENGINE IS SHUTDOWN. THE ENGINE COMPONENTS CAN STAY HOT FOR UP TO
ONE HOUR.
1. __________________
Reason for the Job
Make sure that the steady-state operating frequency of the IDG is between
390 and 410 Hz.
If the frequency of the IDG is out of the specified limits, but is between
380 and 420 Hz, the display of the IDG frequency on the ECAM ELEC page
becomes amber. Adjust the frequency as given in the procedure that follows.
If the frequency of the IDG is out of the limits 380 - 420 Hz, replace the
IDG.
R NOTE : The adjustment of the frequency is permitted only one time each
____
R 400FH. If you adjust the governor, make an entry in the aircraft
R technical logbook.
2. ______________________
Job Set-up Information
A. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
Subtask 24-21-00-010-057
EFF :
ALL 24-21-00
Page 505
May 01/03
SYR
Subtask 24-21-00-860-057
(2) Do the EIS start procedure (Upper ECAM DU and lower ECAM DU only)
(Ref. TASK 31-60-00-860-001).
Subtask 24-21-00-865-058
-------------------------------------------------------------------------------
PANEL DESIGNATION IDENT. LOCATION
-------------------------------------------------------------------------------
FOR 1000EM1
122VU ELEC/IDG1/DISC 1XT T24
FOR 1000EM2
122VU ELEC/IDG2/DISC 2XT T25
4. Procedure
_________
Subtask 24-21-00-730-051
WARNING : WEAR GOGGLES WHEN YOU REMOVE OR INSTALL THE LOCKWIRE. CUT,
_______
REMOVE AND DISCARD THE LOCKWIRE AS YOU DO THE TASK. LOOSE
LOCKWIRE CAN CUT OR BLIND YOU.
CAUTION : DO NOT ADJUST THE GOVERNOR MORE THAN 1 TIME EACH 400 FH. IF YOU
_______
ADJUST THE GOVERNOR, MAKE AN ENTRY IN THE AIRCRAFT TECHNICAL
LOGBOOK.
EFF :
ALL 24-21-00
Page 506
Feb 01/00
R
SYR
Governor Adjustment Screw - IDG
Figure 501/TASK 24-21-00-991-921
EFF :
ALL 24-21-00
Page 507
May 01/98
SYR
-------------------------------------------------------------------------------
R | ACTION | RESULT |
-------------------------------------------------------------------------------
EFF :
ALL 24-21-00
Page 508
May 01/11
SYR
5. Close-up
________
Subtask 24-21-00-860-056
Subtask 24-21-00-410-057
EFF :
ALL 24-21-00
Page 509
Aug 01/98
R
SYR
TASK 24-21-00-720-042
R Operational Test of the IDG Disconnect and Reconnect (Reset) Function - Engine
R in Operation
R WARNING : BE CAREFUL WHEN YOU WORK ON THE ENGINE COMPONENTS IMMEDIATELY AFTER
_______
R THE ENGINE IS SHUTDOWN. THE ENGINE COMPONENTS CAN STAY HOT FOR UP TO
R ONE HOUR.
1. __________________
Reason for the Job
2. ______________________
Job Set-up Information
A. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
Subtask 24-21-00-860-053
(2) Do the EIS start procedure (Upper ECAM DU and lower ECAM DU only)
(Ref. TASK 31-60-00-860-001).
R (3) On the ECAM control panel, push the ELEC key to get the ELEC page.
EFF :
ALL 24-21-00
Page 510
May 01/02
SYR
Subtask 24-21-00-865-059
-------------------------------------------------------------------------------
PANEL DESIGNATION IDENT. LOCATION
-------------------------------------------------------------------------------
122VU ELEC/IDG2/DISC 2XT T25
122VU ELEC/IDG1/DISC 1XT T24
4. Procedure
_________
CAUTION : DO NOT PUSH THE IDG DISCONNECT PUSHBUTTON SWITCH IF THE ENGINE
_______
SPEED IS LESS THAN IDLE SPEED. IF YOU DO, YOU WILL CAUSE DAMAGE TO
THE JAW TEETH, AT ENGINE START.
CAUTION : DO NOT PUSH THE IDG DISCONNECT PUSHBUTTON SWITCH FOR MORE THAN 3
_______
SECONDS.
THERE MUST BE AT LEAST 60 SECONDS BETWEEN TWO OPERATIONS OF THE
SWITCH.
THIS IS TO PREVENT DAMAGE TO THE DISCONNECT SOLENOID WHICH WILL
BECOME TOO HOT.
Subtask 24-21-00-720-052
NOTE : This test is for the system 1. For the other system(s), use the
____
indications between the parentheses.
-------------------------------------------------------------------------------
R | ACTION | RESULT |
-------------------------------------------------------------------------------
1. With the engines at idle speed, on On the ELEC control panel 35VU:
the ELEC control panel 35VU: - the FAULT legend of the related GEN
- lift the guard and push the pushbutton switch comes on
IDG1(2) pushbutton switch.
EFF :
ALL 24-21-00
Page 511
May 01/11
SYR
-------------------------------------------------------------------------------
| ACTION | RESULT |
-------------------------------------------------------------------------------
- the external power energizes the
aircraft electrical circuits.
2. On the ELEC control panel 35VU: On the ELEC control panel 35VU:
Release the GEN1(2) pushbutton - the FAULT legend of the related GEN
switch. pushbutton switch goes off,
Subtask 24-21-00-710-055
Subtask 24-21-00-010-064
Subtask 24-21-00-720-053
CAUTION : MAKE SURE THE ENGINE IS STOPPED BEFORE YOU PULL THE DISCONNECT
_______
RESET RING. IF NOT YOU WILL CAUSE DAMAGE TO THE JAW TEETH.
CAUTION : MAKE SURE THAT THERE IS CORRECT RESET OF THE IDG DISCONNECT
_______
MECHANISM. IF THE RESET IS NOT CORRECT, YOU MUST REMOVE AND
REPLACE THE IDG BEFORE THE NEXT FLIGHT.
(1) Slowly, pull out the disconnect reset ring to the full limit of
travel. Monitor the hand force that is necessary: this force must not
be too high. The disconnect mechanism must move freely without hard
points.
EFF :
ALL 24-21-00
Page 512
May 01/11
R
SYR
NOTE : The disconnect solenoid will make a click that you can feel in
____
the disconnect reset ring when the reset ring comes near the
full travel limit.
(2) Let the disconnect reset ring go slowly back to the initial position.
(3) Again, slowly pull out the disconnect reset ring to the full limit of
travel.
Monitor the hand force that is necessary. If the reset of the
disconnect mechanism is correct, This force will be much less than in
step (1). Also there will be no indication of the reset of the
disconnect mechanism.
(4) On the ELEC control panel 35VU, push the GEN 1(2) pushbutton switch
(the FAULT legend comes on).
(5) When you do the first engine start-up, make sure that the related
electrical generation system operates correctly
NOTE : If you start the engine after the test, you must do a GCU
____
reset. To do this, release then push the related GEN
pushbutton switch.
R
5. Close-up
________
Subtask 24-21-00-410-064
A. Close Access
Subtask 24-21-00-860-054
EFF :
ALL 24-21-00
Page 513
May 01/08
SYR
INTEGRATED DRIVE GENERATOR SYSTEM (IDG, GCU) - INSPECTION/CHECK
_______________________________________________________________
TASK 24-21-00-210-045
WARNING : BE CAREFUL WHEN YOU WORK ON THE ENGINE COMPONENTS IMMEDIATELY AFTER
_______
THE ENGINE IS SHUTDOWN. THE ENGINE COMPONENTS CAN STAY HOT FOR UP TO
ONE HOUR.
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
EFF :
ALL 24-21-00
Page 601
May 01/11
SYR
3. __________
Job Set-up
Subtask 24-21-00-941-058
A. Safety Precautions
(a) Put a warning notice in position to tell persons not to start the
engine.
(2) Make sure that the engine 1(2) shutdown occurred not less than 5
minutes before you do this procedure.
(a) Make sure that the ON legend of the ENG/FADEC GND PWR/1(2)
pushbutton switch is off.
Subtask 24-21-00-010-058
B. Get Access
4. Procedure
_________
Subtask 24-21-00-020-051
Subtask 24-21-00-210-065
(1) If you smell a fuel odour from the filter element or filter cover, do
the servicing of the IDG after oil chemical contamination (Ref. TASK
24-21-00-612-044).
EFF :
ALL 24-21-00
Page 602
May 01/11
R
SYR
(2) If you think that the condition of the oil in the filter element or
on the filter cover is not correct, do a sampling of the IDG oil for
analysis (Ref. TASK 12-32-24-281-001).
(3) If the filter element does not show signs of metal particles, do the
steps that follow:
(4) - If the filter element shows bright metal deposits that are chuncks
or pieces which are the result of a breakage, (not non magnetic
flakes or slivers from normal wear), or
- if there are large quantities of bright metal deposits on the
filter element, in the filter cavity or in the oil drained from the
IDG,
(a) Remove the IDG (Ref. TASK 24-21-51-000-010) and send it back to
the overhaul facility.
(5) If the filter element or/and the O-rings is(are) damaged or show
signs of bypass, remove the tubings, the cooler and the IDG and
return them to the overhaul facility.
(b) Remove the cooler (Ref. TASK 24-21-42-000-010) and send it back
to the overhaul facility.
(c) Remove the IDG (Ref. TASK 24-21-51-000-010) and send it back to
the overhaul facility.
EFF :
ALL 24-21-00
Page 603
May 01/11
SYR
5. Close-up
________
Subtask 24-21-00-410-058
A. Close Access
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
(2) Close the right fan cowl door (Ref. TASK 71-13-00-410-010):
EFF :
ALL 24-21-00
Page 604
May 01/11
R
SYR
TASK 24-21-00-210-048
Visual Inspection of the IDG for Oil Leaks and Check of the Electrical Circuits
1. __________________
Reason for the Job
R To make sure that the IDG oil system is serviceable and to do a check for
R leakage, staining or wetting.
R To make sure that the wiring harnesses are in the correct condition.
R NOTE : If you cannot find the source of the oil leakage easily, refer to SIL
____
R 24-073.
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
Subtask 24-21-00-941-085
A. Safety Precautions
(a) Put a warning notice in position to tell persons not to start the
engine.
(2) Make sure that the engine 1(2) shutdown occurred not less than 5
minutes before you do this procedure.
EFF :
ALL 24-21-00
Page 605
Nov 01/08
SYR
R (3) On the overhead maintenance panel 50VU:
R (a) Make sure that the ON legend of the ENG/FADEC GND PWR/1(2)
R pushbutton switch is off.
R Subtask 24-21-00-010-098
R B. Get Access
R 4. Procedure
_________
R Subtask 24-21-00-210-087
R A. Visual Inspection
R (b) IDG oil cooling tubes for leakage and correct condition
R (Ref. TASK 24-21-49-200-010).
EFF :
ALL 24-21-00
Page 606
Nov 01/07
SYR
R - Body of the cooler.
R If you find a leak, replace the IDG oil cooler (Ref. TASK 24-21-
R 42-000-010) and (Ref. TASK 24-21-42-400-010).
R (2) If you find components wet with oil, make sure that you find and
R correct all the causes.
R If necessary, fill the oil tank (Ref. TASK 12-13-24-612-011).
R Subtask 24-21-00-210-088
R (1) Make sure that the wiring harnesses are in the correct condition.
R (2) Make sure that the electrical connectors are correctly connected.
R 5. Close-up
________
R Subtask 24-21-00-410-097
R A. Close Access
R (1) Make sure that the work area is clean and clear of tool(s) and other
R items.
EFF :
ALL 24-21-00
Page 607
Nov 01/07
SYR
R TASK 24-21-00-210-048- 01
R Visual Inspection of the IDG for Oil Leakage Engine Static and Check of the
R Electrical Circuits
R WARNING : BE CAREFUL WHEN YOU WORK ON THE ENGINE COMPONENTS IMMEDIATELY AFTER
_______
R THE ENGINE IS SHUTDOWN. THE ENGINE COMPONENTS CAN STAY HOT FOR UP TO
R ONE HOUR.
R CAUTION : DO NOT USE SOLVENTS THAT CONTAIN CHLORINE TO CLEAN THE EQUIPMENT
_______
R (PUMP, HOSES, TANK AND FUNNEL) USED TO FILL THE IDG WITH OIL.
R CHLORINE CONTAMINATION OF THE OIL CAN CAUSE FAST DETERIORATION OF THE
R OIL AND WILL DECREASE THE LIFE OF THE IDG.
R 1. __________________
Reason for the Job
R To make sure that the IDG oil system is serviceable and to do a check for
R leakage, staining or wetting.
R To make sure that the wiring harnesses are in correct condition.
R 2. ______________________
Job Set-up Information
R -------------------------------------------------------------------------------
R REFERENCE QTY DESIGNATION
R -------------------------------------------------------------------------------
EFF :
ALL 24-21-00
Page 608
Nov 01/09
SYR
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
Subtask 24-21-00-941-088
A. Safety Precautions
(a) Put a warning notice in position to tell persons not to start the
engine.
(2) Make sure that the engine 1(2) shutdown occurred not less than 5
minutes before you do this procedure.
(a) Make sure that the ON legend of the ENG/FADEC GND PWR/1(2)
pushbutton switch is off.
EFF :
ALL 24-21-00
Page 609
May 01/10
SYR
Subtask 24-21-00-865-072
-------------------------------------------------------------------------------
PANEL DESIGNATION IDENT. LOCATION
-------------------------------------------------------------------------------
FOR 1000EM1, 4000XU
122VU ELEC/GCU/1 2XU1 T26
122VU ELEC/IDG1/DISC 1XT T24
FOR 1000EM2, 4000XU
122VU ELEC/GCU/2 2XU2 T27
122VU ELEC/IDG2/DISC 2XT T25
Subtask 24-21-00-010-101
C. Get Access
4. Procedure
_________
Subtask 24-21-00-210-092
(1) On the tool CSD IDG SYSTEM LEAK TESTER (753970A), turn the drain
valve to the off position.
(2) Set the shut-off valve to OFF and close the regulator valve to
prevent pressure release to the IDG fitting.
R (3) Remove the dust cap from the pressure fill half-coupling.
(4) Connect one end of the pressure fill hose of the tool to the pressure
R fill half-coupling (pressure fill port) of the IDG.
(5) Connect the other end of the tool CSD IDG SYSTEM LEAK TESTER
(753970A) to an AIR SOURCE 2 BAR (30 PSI) - REGULATED, FILTERED, DRY.
EFF :
ALL 24-21-00
Page 610
May 01/11
SYR
R Connection of the Test Tool on the IDG
R Figure 601/TASK 24-21-00-991-200
EFF :
ALL 24-21-00
Page 611
May 01/10
SYR
(6) Turn the shut-off valve to ON and adjust the regulator valve to a
pressure of 1.72 bar (24.9464 psi) on the system pressure gauge.
(7) Turn the supply valve to OFF to keep the air in the system.
NOTE : Pressure will become stable in the system, with no leak. When
____
the IDG case is vented:
- The pressure will decrease to a lightly lower value because
of the vent valve setting.
- The pressure will stay at this setting.
(8) Monitor the system pressure for five minutes for confirmation of the
leak.
(b) IDG oil cooling tubes for leakage and correct condition
(Ref. TASK 24-21-49-200-010).
(10) If you find components wet with oil, make sure that you find and
correct all the causes.
If necessary, fill the oil tank (Ref. TASK 12-13-24-612-011).
EFF :
ALL 24-21-00
Page 612
May 01/10
R
SYR
(11) If the visual check does not locate the leak source, do a check of
the system for leaks. To do this, use soap suds or equivalent leak
detector fluid:
- Put an appropriate container below the drain valve and open the
valve to release the pressure.
- Make the necessary corrections and restore the system to an
operational configuration.
- Do the check again to make sure that the leak was corrected.
NOTE : If oil collects in the coalescing filter, use the drain valve
____
a the bottom of the filter housing to drain the oil.
NOTE : If you use an AIR SOURCE 2 BAR (30 PSI) - REGULATED, FILTERED,
____
DRY, it is necessary to install a plug on the port for the
compressed air source.
Subtask 24-21-00-210-094
(1) Make sure that the wiring harnesses are in the correct condition.
(2) Make sure that the electrical connectors are correctly connected.
5. Close-up
________
Subtask 24-21-00-410-100
A. Close Access
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
EFF :
ALL 24-21-00
Page 613
May 01/10
R
SYR
Subtask 24-21-00-865-073
B. Remove the safety clip(s) and the tag(s) and close this(these) circuit
breaker(s):
-------------------------------------------------------------------------------
PANEL DESIGNATION IDENT. LOCATION
-------------------------------------------------------------------------------
FOR 1000EM1, 4000XU
122VU ELEC/GCU/1 2XU1 T26
122VU ELEC/IDG1/DISC 1XT T24
FOR 1000EM2, 4000XU
122VU ELEC/GCU/2 2XU2 T27
122VU ELEC/IDG2/DISC 2XT T25
Subtask 24-21-00-942-055
EFF :
ALL 24-21-00
Page 614
May 01/10
SYR
THERMOCOUPLE - IDG OIL TEMPERATURE (4015KS) - REMOVAL/INSTALLATION
__________________________________________________________________
TASK 24-21-15-000-010
WARNING : BE CAREFUL WHEN YOU WORK ON THE ENGINE COMPONENTS IMMEDIATELY AFTER
_______
THE ENGINE IS SHUTDOWN. THE ENGINE COMPONENTS CAN STAY HOT FOR UP TO
ONE HOUR.
WARNING : DO NOT GET ENGINE OIL ON YOUR SKIN FOR A LONG TIME. FLUSH THE OIL
_______
FROM YOUR SKIN WITH WATER. THE OIL IS POISONOUS AND CAN GO THROUGH
YOUR SKIN AND IN TO YOUR BODY.
CAUTION : DO NOT LET ENGINE FUEL OR OIL FALL ON THE ENGINE. UNWANTED FUEL OR
_______
OIL MUST BE REMOVED IMMEDIATELY WITH A CLEAN LINT FREE CLOTH. THE
FUEL OR OIL CAN CAUSE DAMAGE TO THE SURFACE PROTECTION AND TO SOME
PARTS.
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
No specific covers/caps/plugs
R
No specific warning notice
R B. Consumable Materials
R -------------------------------------------------------------------------------
R REFERENCE DESIGNATION
R -------------------------------------------------------------------------------
EFF :
ALL 24-21-15
Page 401
May 01/11
SYR
R C. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
Subtask 24-21-15-941-050
A. Safety Precautions
(a) Put a warning notice to tell persons not to start the engine.
(2) Make sure that the engine 1(2) shutdown occurred not less than 5
minutes before you do this procedure.
(a) Make sure that the ON legend of the ENG/FADEC GND PWR/1(2)
pushbutton switch is off.
(b) Put a warning notice to tell persons not to energize the FADEC
1(2).
Subtask 24-21-15-010-050
EFF :
ALL 24-21-15
Page 402
May 01/11
SYR
4. Procedure
_________
Subtask 24-21-15-020-050
(1) Disconnect the electrical connector (3) from the IDG oil-temperature
thermocouple (4).
(2) Remove the bolts (2) that attach the thermocouple (4) to the
fuel-cooled IDG oil-cooler.
R (5) Use the clean MISCELLANEOUS (Material No. 19-003) to remove oil
R leakage.
EFF :
ALL 24-21-15
Page 403
May 01/11
SYR
IDG Oil Temperature thermocouple
Figure 401/TASK 24-21-15-991-150
EFF :
ALL 24-21-15
Page 404
May 01/11
R
SYR
TASK 24-21-15-400-010
WARNING : BE CAREFUL WHEN YOU WORK ON THE ENGINE COMPONENTS IMMEDIATELY AFTER
_______
THE ENGINE IS SHUTDOWN. THE ENGINE COMPONENTS CAN STAY HOT FOR UP TO
ONE HOUR.
WARNING : DO NOT GET ENGINE OIL ON YOUR SKIN FOR A LONG TIME. FLUSH THE OIL
_______
FROM YOUR SKIN WITH WATER. THE OIL IS POISONOUS AND CAN GO THROUGH
YOUR SKIN AND IN TO YOUR BODY.
CAUTION : DO NOT LET ENGINE FUEL OR OIL FALL ON THE ENGINE. UNWANTED FUEL OR
_______
OIL MUST BE REMOVED IMMEDIATELY WITH A CLEAN LINT FREE CLOTH. THE
FUEL OR OIL CAN CAUSE DAMAGE TO THE SURFACE PROTECTION AND TO SOME
PARTS.
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
R
No specific warning notice
R No specific 1 ACCESS PLATFORM 1M(3 FT)
No specific Torque Wrench : range 30.00 to 220.00 lbf.in
(0.34 to 2.60 m.daN)
B. Consumable Materials
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
EFF :
ALL 24-21-15
Page 405
May 01/11
SYR
C. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
Subtask 24-21-15-860-050
(1) On the center pedestal panel 115VU, make sure that a warning notice
is in position to tell persons not to start the engine.
(2) On the overhead maintenance panel 50VU, make sure that the ON legend
of the ENG/FADEC GND PWR/1(2) pushbutton switch is off. Make sure
that a warning notice is in position to tell persons not to energize
the FADEC 1(2).
R (3) Make sure that the ACCESS PLATFORM 1M(3 FT) is in position.
Subtask 24-21-15-010-051
B. Get Access
(1) Make sure that the fan cowl doors are open (Ref. TASK 71-13-00-010-
010):
EFF :
ALL 24-21-15
Page 406
May 01/11
SYR
4. Procedure
_________
Subtask 24-21-15-110-050
WARNING : DO NOT GET CLEANING FLUID ON YOUR SKIN OR IN YOUR EYES. PUT ON
_______
PROTECTIVE CLOTHING, GOGGLES AND A FACE MASK. USE THE FLUID IN
A WELL VENTILATED AREA. DO NOT BREATHE THE VAPOR. IF YOU GET
THE CLEANING FLUID ON YOUR SKIN OR IN YOUR EYES FLUSH IT AWAY
WITH WATER. GET MEDICAL AID IF YOUR SKIN OR EYES BECOME
IRRITATED.
(1) Remove all the covers/caps/plugs from the openings the electrical
connector and the electrical receptacle.
R (2) Use a MISCELLANEOUS (Material No. 19-003) made moist with Cleaning
R fluid (Material No. V01-002) to clean these parts:
R (3) Use a clean MISCELLANEOUS (Material No. 19-003) to dry the IDG
oil-cooler and the IDG oil-temperature thermocouple (4).
Subtask 24-21-15-420-050
WARNING : DO NOT GET ENGINE OIL ON YOUR SKIN FOR A LONG TIME. FLUSH THE
_______
OIL FROM YOUR SKIN WITH WATER. THE OIL IS POISONOUS AND CAN GO
THROUGH YOUR SKIN AND IN TO YOUR BODY.
CAUTION : MAKE SURE THAT YOU DO NOT CAUSE DAMAGE TO THE NEW PACKING WHEN
_______
(1) Lubricate the new packing (1) with clean engine oil (Material No.
V10-039), then install it on the IDG oil-temperature thermocouple (4)
(Ref. TASK 70-23-13-911-010).
EFF :
ALL 24-21-15
Page 407
May 01/11
SYR
(2) Install the IDG oil-temperature thermocouple (4) in the IDG oil
cooler and attach with the two bolts (2).
(3) TORQUE the bolts (2) (Ref. TASK 70-23-11-911-013) to 100 lbf.in (1.13
m.daN).
Subtask 24-21-15-710-050
Subtask 24-21-15-790-050
Subtask 24-21-15-210-050
5. Close-up
________
Subtask 24-21-15-410-050
A. Close Access
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
EFF :
ALL 24-21-15
Page 408
May 01/11
R
SYR
(3) Remove the warning notice(s).
EFF :
ALL 24-21-15
Page 409
Nov 01/09
R
SYR
COUPLING - QAD, IDG - REMOVAL/INSTALLATION
__________________________________________
TASK 24-21-41-000-010
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
Subtask 24-21-41-941-050
A. Safety Precautions
R (a) Put a warning notice in position to tell persons not to start the
R engine.
R
EFF :
ALL 24-21-41
Page 401
May 01/03
SYR
R (2) On the overhead maintenance panel 50VU:
R
Subtask 24-21-41-010-050
B. Get Access
4. Procedure
_________
Subtask 24-21-41-020-051
Subtask 24-21-41-020-050
R NOTE : Flat head srews (3) rub or get caught in mating parts. Strong
____
R contact is required to loosen the flat head screws.
CAUTION : YOU CAN DAMAGE THE SCREWS IF YOU USE TOO MUCH FORCE TO HIT
_______
THE PUNCH.
R
R - get a pointed punch.
R
R - put the pointed punch on the screw (3) with an angular position
R which will make the screw turn counterclockwise.
EFF :
ALL 24-21-41
Page 402
May 01/03
SYR
Quick Attach/Detach (QAD) Adapter (Coupling)
Figure 401/TASK 24-21-41-991-150
EFF :
ALL 24-21-41
Page 403
May 01/98
SYR
Removal of the QAD Adapter (Coupling)
Figure 402/TASK 24-21-41-991-152
EFF :
ALL 24-21-41
Page 404
May 01/98
SYR
- hit the screw.
(3) Remove the screws (3) that attach the QAD adapter (1) to the
accessory-gearbox mounting-pad.
(4) Pull the QAD adapter (1) away from the accessory-gearbox
mounting-pad.
NOTE : If you cannot easily release the QAD adapter (1) from the
____
mounting-pad, lightly hit the QAD adapter with a soft-faced
mallet.
EFF :
ALL 24-21-41
Page 405
May 01/04
R
SYR
TASK 24-21-41-400-010
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
B. Consumable Materials
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
C. Expendable Parts
-------------------------------------------------------------------------------
FIG.ITEM |DESIGNATION |IPC-CSN
-------------------------------------------------------------------------------
EFF :
ALL 24-21-41
Page 406
May 01/11
SYR
D. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
Subtask 24-21-41-860-050
A. Safety Precautions
R (a) Make sure that the warning notice is in position to tell persons
R not to start the engine.
(a) Make sure that the ON legend of the ENG/FADEC GND PWR/1(2)
pushbutton switch is off.
(b) Make sure that the warning notice to tell persons not to energize
the FADEC 1(2), is in position.
Subtask 24-21-41-010-052
B. Get Access
(1) Make sure that the fan cowls are open (Ref. TASK 71-13-00-010-010):
- FOR 1000EM1
437AL, 438AR
- FOR 1000EM2
447AL, 448AR
EFF :
ALL 24-21-41
Page 407
May 01/05
SYR
4. Procedure
_________
Subtask 24-21-41-110-050
R (2) Do a visual check of the QAD adapter (1) for damage from incorrect
R shipping or handling.
R (3) Do a visual check of the connecting surfaces of the QAD adapter (1)
R and the accessory-gearbox mounting-pad. They must be smooth and
clean.
Subtask 24-21-41-640-050
CAUTION : LUBRICATE THE QAD ADAPTER TENSION-BOLT BEFORE YOU INSTALL THE
_______
ADAPTER ON THE GEARBOX MOUNTING PAD. NO LUBRICANT ON THE
TENSION BOLT CAN CAUSE INCREASED WEAR TO THE TENSION BOLT AND
THE BRACKET.
(1) Apply OILS (Material No. 03-002) to the QAD tension bolt.
Subtask 24-21-41-420-050
WARNING : DO NOT GET CLEANING FLUID ON YOUR SKIN OR IN YOUR EYES. PUT ON
_______
PROTECTIVE CLOTHING, GOGGLES AND A FACE MASK. USE THE FLUID IN
A WELL VENTILATED AREA. DO NOT BREATHE THE VAPOR. IF YOU GET
THE CLEANING FLUID ON YOUR SKIN OR IN YOUR EYES FLUSH IT AWAY
WITH WATER. GET MEDICAL AID IF YOUR SKIN OR EYES BECOME
IRRITATED.
CAUTION : DO NOT LET THE LUBRICANT STAY IN THE DOWEL PIN HOLES AND SCREW
_______
HOLES OF THE QAD ADAPTER. LUBRICANT BUILDUP CAN CAUSE THE
PRESSURE TO INCREASE. INCREASED PRESSURE CAN CAUSE DAMAGE TO
THE GEARBOX WHEN YOU INSTALL AND TORQUE THE SCREWS.
EFF :
ALL 24-21-41
Page 408
May 01/07
SYR
(1) Clean the gearbox mounting surface, index pin hole and screw holes.
R (a) Use a clean MISCELLANEOUS (Material No. 19-003) and cotton swab
made moist with cleaning fluid (Material No. V01-002) to remove
the lubricant from the screw holes and index pin holes.
R (b) Use a clean MISCELLANEOUS (Material No. 19-003) made moist with
cleaning fluid (Material No. V01-002) to clean the gearbox
mounting surface and QAD adapter. Wipe dry before cleaning fluid
evaporates.
NOTE : Make sure that the stripe on the QAD ring is aligned with
____
the stripe on the adapter plate.
(2) Install the gasket (6) on the face of the QAD adapter (1). Make sure
that the index pin hole of the QAD adapter is aligned with the index
pin hole of the QAD gasket.
NOTE : Make sure that the words TOP-V2500 on the QAD adapter are in
____
the top position (12 oclock).
(4) Use a brush to apply a thin layer of SPECIAL MATERIALS (Material No.
05-063) to the conical surface of the heads of the screws (3) and to
the threads of the screws.
(5) TORQUE the screws to between 29 and 32 lbf.ft (3.93 and 4.33 m.daN)
(Ref. TASK 70-23-11-911-013).
Subtask 24-21-41-420-051
EFF :
ALL 24-21-41
Page 409
May 01/11
SYR
5. Close-up
________
Subtask 24-21-41-410-050
A. Close Access
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
EFF :
ALL 24-21-41
Page 410
May 01/11
R
SYR
COUPLING - QAD, IDG - INSPECTION/CHECK
______________________________________
TASK 24-21-41-200-010
WARNING : BE CAREFUL WHEN YOU WORK ON THE ENGINE COMPONENTS IMMEDIATELY AFTER
_______
THE ENGINE IS SHUTDOWN. THE ENGINE COMPONENTS CAN STAY HOT FOR UP TO
ONE HOUR.
1. __________________
Reason for the Job
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
B. Consumable Materials
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
EFF :
ALL 24-21-41
Page 601
Nov 01/09
SYR
C. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
Subtask 24-21-41-941-051
A. Safety Precautions
(a) Put a warning notice in position to tell persons not to start the
engine.
(2) Make sure that the engine 1(2) shutdown occurred not less than 5
minutes before you do this procedure.
(a) Make sure that the ON legend of the ENG/FADEC GND PWR/1(2)
pushbutton switch is off.
Subtask 24-21-41-010-051
B. Get Access
EFF :
ALL 24-21-41
Page 602
Nov 01/08
SYR
4. Procedure
_________
Subtask 24-21-41-220-050
WARNING : WEAR GOGGLES WHEN YOU REMOVE OR INSTALL THE LOCKWIRE. CUT,
_______
REMOVE AND DISCARD THE LOCKWIRE AS YOU DO THE TASK. LOOSE
LOCKWIRE CAN CUT OR BLIND YOU.
(1) Cut and remove the lockwire (1) from the tension bolt (2).
(2) Do a check of the torque value of the QAD coupling bolt (2):
R (a) TORQUE the QAD coupling bolt to between 264 and 313 lbf.in (2.98
R and 3.53 m.daN), (Ref. TASK 70-23-11-911-013).
(b) Lightly hit the external circumference of the QAD coupling (3) to
enter it and prevent incorrect torque values.
R (c) TORQUE the QAD coupling bolt to between 264 and 313 lbf.in (2.98
R and 3.53 m.daN), (Ref. TASK 70-23-11-911-013).
(d) Continue to do this sequence until the torque value does not
decrease by more than 24 lbf.in (0.27 m.daN).
(e) Do a check of the distance between the ring lug and the bracket
of the QAD ring. If the the distance is less than 0.56
in.(14,3mm):
1
_ Replace the IDG (Ref. TASK 24-21-51-000-010).
2
_ After you install the new IDG and torque the QAD, measure the
QAD gap again before you attach the hoses, the wires, and the
other components.
a
_ If gap is correct, the old IDG is worn and you must replace
its input flange.
b
_ If the gap is not correct, remove the new IDG and replace
the QAD adapter (Ref. TASK 24-21-41-000-010).
(3) Safety the tension bolt (2) with lockwire (Material No. V02-147),
(Ref. TASK 70-40-11-911-012) (1).
EFF :
ALL 24-21-41
Page 603
May 01/09
SYR
IDG QAD Coupling
Figure 601/TASK 24-21-41-991-151
EFF :
ALL 24-21-41
Page 604
May 01/98
SYR
5. Close-up
________
Subtask 24-21-41-410-051
A. Close Access
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
EFF :
ALL 24-21-41
Page 605
May 01/99
SYR
IDG OIL COOLER - FUEL COOLED - REMOVAL/INSTALLATION
___________________________________________________
TASK 24-21-42-000-010
WARNING : DO NOT LET THE ENGINE FUEL OR OIL STAY ON YOUR SKIN FOR A LONG TIME.
_______
FLUSH FUEL AND OIL FROM YOUR SKIN WITH WATER. THE FUEL AND OIL ARE
POISONOUS AND CAN GO THROUGH YOUR SKIN AND INTO YOUR BODY.
WARNING : BE CAREFUL WHEN YOU WORK ON THE ENGINE COMPONENTS IMMEDIATELY AFTER
_______
THE ENGINE IS SHUTDOWN. THE ENGINE COMPONENTS CAN STAY HOT FOR UP TO
ONE HOUR.
CAUTION : DO NOT LET ENGINE FUEL OR OIL FALL ON THE ENGINE. UNWANTED FUEL OR
_______
OIL MUST BE REMOVED IMMEDIATELY WITH A CLEAN LINT FREE CLOTH. THE
FUEL OR OIL CAN CAUSE DAMAGE TO THE SURFACE PROTECTION AND TO SOME
PARTS.
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
EFF :
ALL 24-21-42
Page 401
May 01/98
SYR
3. __________
Job Set-up
Subtask 24-21-42-941-051
A. Safety Precautions
(a) Put a warning notice to tell persons not to start the engine.
(2) Make sure that the engine 1(2) shutdown occurred not less than 5
minutes before you do this procedure.
(a) Make sure that the ON legend of the ENG/FADEC GND PWR/1(2)
pushbutton switch is off.
(b) Put a warning notice to tell persons not to energize the FADEC
1(2).
Subtask 24-21-42-010-052
4. Procedure
_________
Subtask 24-21-42-680-052
CAUTION : DO NOT PUT THE OIL THAT HAS BEEN DRAINED FROM THE ENGINE BACK
_______
IN TO THE OIL SYSTEM.
(1) Cut and discard the wire which safeties the oil drain plug (4) to the
fuel-cooled IDG oil-cooler.
(2) Remove the oil drain plug from the fuel-cooled IDG oil-cooler and
drain the oil into the clean container.
EFF :
ALL 24-21-42
Page 402
May 01/98
SYR
Fuel-Cooled IDG Oil-Cooler
Figure 401/TASK 24-21-42-991-150
EFF :
ALL 24-21-42
Page 403
May 01/98
SYR
Subtask 24-21-42-680-053
CAUTION : DO NOT PUT FUEL THAT HAS BEEN DRAINED FROM THE ENGINE BACK IN
_______
TO THE FUEL SYSTEM.
(1) Cut and discard the wire which safeties the fuel drain plug (3) to
the fuel-cooled IDG oil-cooler.
(2) Remove the fuel drain plug from the fuel-cooled IDG oil-cooler and
drain the fuel into the clean container.
Subtask 24-21-42-020-058
Subtask 24-21-42-020-059
(1) Remove the bolt (12), nut (16) and washer (13) at position B.
(2) Remove the bolt (21), nut (24) and washer (22) at position C.
(3) Remove the bolt (41), nut (43) and washer (46) at position D.
(4) Remove the bolt (31), nut (34) and washer (32) at position E.
Subtask 24-21-42-020-060
(1) Remove the bolts (67) and disconnect the bracket (65) and the oil
tube (64) from the fuel-cooled IDG oil-cooler.
EFF :
ALL 24-21-42
Page 404
May 01/98
SYR
Fuel-Cooled IDG Oil-Cooler
Figure 402/TASK 24-21-42-991-153
EFF :
ALL 24-21-42
Page 405
May 01/98
SYR
Fuel-Cooled IDG Oil-Cooler
Figure 403/TASK 24-21-42-991-151
EFF :
ALL 24-21-42
Page 406
May 01/98
SYR
(3) Remove the bolts (62) and disconnect the bracket (61) and the oil
tube (63) from the fuel-cooled IDG oil-cooler.
Subtask 24-21-42-020-061
(1) Remove the bolts (53) and disconnect the bracket (52) and the fuel
tube (51) from the fuel-cooled IDG oil-cooler.
(3) Disconnect the fuel tube (55) and the seal housing (58) from the
fuel-cooled IDG oil-cooler.
Subtask 24-21-42-020-062
NOTE : Hold the weight of the fuel-cooled IDG oil-cooler before the
____
pin (75) is removed.
(3) Remove the fuel-cooled IDG oil-cooler from the fan case.
(4) Remove the bushes (71) and (77) from the fuel-cooled IDG oil-cooler.
Subtask 24-21-42-020-063
(1) Remove the sealing ring (54) from the fuel tube (51) and discard it.
(2) Remove the seal housing (58) from the fuel tube (55).
(3) Remove the sealing ring (59) from the seal housing and discard it.
(4) Remove the two sealing rings (57) from the fuel tube (55) and discard
them.
EFF :
ALL 24-21-42
Page 407
May 01/98
SYR
Fuel-Cooled IDG Oil-Cooler
Figure 404/TASK 24-21-42-991-152
EFF :
ALL 24-21-42
Page 408
May 01/98
SYR
TASK 24-21-42-400-010
WARNING : DO NOT LET THE ENGINE OIL STAY ON YOUR SKIN FOR A LONG TIME. FLUSH
_______
OIL FROM YOUR SKIN WITH WATER. THE OIL IS POISONOUS AND CAN GO
THROUGH YOUR SKIN AND INTO YOUR BODY.
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
R
No specific warning notice(s)
No specific Torque Wrench : range 30.00 to 220.00 lbf.in
(0.34 to 2.60 m.daN)
B. Consumable Materials
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
EFF :
ALL 24-21-42
Page 409
May 01/11
SYR
C. Expendable Parts
-------------------------------------------------------------------------------
FIG.ITEM |DESIGNATION |IPC-CSN
-------------------------------------------------------------------------------
D. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
Subtask 24-21-42-860-051
(1) Make sure that the warning notice(s) is (are) on the panel 115VU to
tell persons not to start the engine 1(2).
(2) Make sure that the warning notice(s) is (are) on the panel 50VU to
tell persons not to power supply the FADEC system.
EFF :
ALL 24-21-42
Page 410
Nov 01/09
SYR
Subtask 24-21-42-010-053
B. Make sure that the fan cowls are open (Ref. TASK 71-13-00-010-010):
4. Procedure
_________
Subtask 24-21-42-110-052
WARNING : DO NOT GET CLEANING FLUID ON YOUR SKIN OR IN YOUR EYES. PUT ON
_______
PROTECTIVE CLOTHING, GOGGLES AND A FACE MASK. USE THE FLUID IN
A WELL VENTILATED AREA. DO NOT BREATHE THE VAPOR. IF YOU GET
THE CLEANING FLUID ON YOUR SKIN OR IN YOUR EYES FLUSH IT AWAY
WITH WATER. GET MEDICAL AID IF YOUR SKIN OR EYES BECOME
IRRITATED.
R (1) Use a MISCELLANEOUS (Material No. 19-003), made moist with isopropyl
alcohol (Material No. V01-124) to clean the mounting surfaces on the
fan case.
Subtask 24-21-42-420-062
(1) Lubricate the new packing (2) with engine oil (Material No. V10-039)
and install it on the fuel drain plug (3), (Ref. TASK 70-23-13-911-
010).
(2) Install the fuel drain plug on the fuel-cooled IDG oil-cooler.
(3) TORQUE the fuel drain plug to between 40 and 65 lbf.in (0.45 and 0.73
m.daN), (Ref. TASK 70-23-11-911-013).
(4) Safety the fuel drain plug to the fuel-cooled IDG oil-cooler with
corrosion-resistant steel lockwire (Material No. V02-147).
EFF :
ALL 24-21-42
Page 411
May 01/11
SYR
Subtask 24-21-42-420-063
(1) Lubricate the new sealing ring (1) with clean engine oil V10-039 and
install it on the oil drain plug (4), (Ref. TASK 70-23-13-911-010).
(2) Install the oil drain plug on the fuel-cooled IDG oil-cooler.
(3) TORQUE the oil drain plug to between 40 and 65 lbf.in (0.45 and 0.73
m.daN), (Ref. TASK 70-23-11-911-013).
(4) Safety the oil drain plug to the fuel-cooled IDG oil-cooler with the
V02-147 lockwire.
Subtask 24-21-42-420-065
D. Installation of the Sealing Rings and the Seal Housing on the Fuel Tube
(Ref. Fig. 403/TASK 24-21-42-991-151)
(1) Lubricate two new sealing rings (57) with clean engine oil (Material
No. V10-039) and install them on the fuel tube (55), (Ref. TASK 70-
23-13-911-010).
(2) Install the seal housing (58) on the fuel tube (55).
Subtask 24-21-42-420-066
(1) Put the bushes (71) and (77) into the mounting holes in the flanges
of the fuel-cooled IDG oil-cooler.
(2) Put the fuel-cooled IDG oil-cooler on the fan case flange.
(3) Install the pin (75) through the fan case flange and into the bush
(71).
(5) Install the pin (76) through the fan case flange and into the bush
(77).
EFF :
ALL 24-21-42
Page 412
May 01/98
SYR
(7) TORQUE the pins (75) and (76) to between 85 and 105 lbf.in (0.96 and
1.18 m.daN), (Ref. TASK 70-23-11-911-013).
Subtask 24-21-42-420-067
F. Connection of the Seal Housing and the Fuel Tube to the Fuel-Cooled IDG
Oil-Cooler
(Ref. Fig. 403/TASK 24-21-42-991-151)
R (1) Lubricate the new sealing ring (59) with clean engine oil (Material
No. V10-039) and install it in the seal housing (58), (Ref. TASK 70-
23-13-911-010).
(2) Attach the seal housing and the fuel tube to the fuel-cooled IDG
oil-cooler with the bolts (56).
(3) TORQUE the bolts to between 85 and 105 lbf.in (0.96 and 1.18 m.daN),
(Ref. TASK 70-23-11-911-013).
Subtask 24-21-42-420-068
(1) Lubricate the new sealing ring (54) with clean engine oil (Material
No. V10-039) and install it on the fuel tube (51), (Ref. TASK 70-23-
13-911-010).
(2) Attach the fuel tube and the bracket (52) to the fuel-cooled IDG
oil-cooler with the bolts (53).
(3) TORQUE the bolts to between 85 and 105 lbf.in (0.96 and 1.18 m.daN),
(Ref. TASK 70-23-11-911-013).
Subtask 24-21-42-420-069
(1) Lubricate the new sealing ring (60) with clean engine oil (Material
No. V10-039) and install it on the oil tube (63), (Ref. TASK 70-23-
13-911-010).
(2) Attach the oil tube and the bracket (61) to the fuel-cooled IDG
oil-cooler with the bolts (62).
EFF :
ALL 24-21-42
Page 413
Feb 01/99
SYR
(3) TORQUE the bolts to between 85 and 105 lbf.in (0.96 and 1.18 m.daN),
(Ref. TASK 70-23-11-911-013).
Subtask 24-21-42-420-070
(1) Lubricate the new sealing ring (66) with clean engine oil (Material
No. V10-039) and install it on the oil tube (64), (Ref. TASK 70-23-
13-911-010).
(2) Attach the oil tube and the bracket (65) to the fuel-cooled IDG
oil-cooler with the bolts (67).
(3) TORQUE the bolts to between 85 and 105 lbf.in (0.96 and 1.18 m.daN),
(Ref. TASK 70-23-11-911-013).
Subtask 24-21-42-420-071
(1) Attach the harness (33) to the tube (35) with the clip (36), bolt
(31), washer (32) and nut (34) at position E.
(2) Attach the harness (42) to the tube (44) with the clip (45), bolt
(41), washer (46) and nut (43) at position D.
(3) Attach the harness (23) to the tube (25) with the clip (26), bolt
(21), washer (22) and nut (24) at position C.
(4) Attach the harness (14) to the tube (15) with the clip (11), bolt
(12), washer (13) and nut (16) at position B.
(5) TORQUE the bolts (31), (41), (21) and (12) and the nuts (34), (43),
(24), and (16) to between 85 and 105 lbf.in (0.96 and 1.18 m.daN),
(Ref. TASK 70-23-11-911-013).
Subtask 24-21-42-420-072
EFF :
ALL 24-21-42
Page 414
May 01/98
SYR
Subtask 24-21-42-790-051
5. Close-up
________
Subtask 24-21-42-410-051
A. Close Access
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
EFF :
ALL 24-21-42
Page 415
May 01/98
SYR
IDG OIL COOLER - FUEL COOLED - CLEANING/PAINTING
________________________________________________
TASK 24-21-42-100-040
1. __________________
Reason for the Job
2. ______________________
Job Set-up Information
A. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
Subtask 24-21-42-020-056
4. Procedure
_________
Subtask 24-21-42-110-051
5. Close-up
________
Subtask 24-21-42-420-060
EFF :
ALL 24-21-42
Page 701
May 01/98
SYR
IDG - CABLES - REMOVAL/INSTALLATION
___________________________________
TASK 24-21-43-000-010
WARNING : BE CAREFUL WHEN YOU WORK ON THE ENGINE COMPONENTS IMMEDIATELY AFTER
_______
THE ENGINE IS SHUTDOWN. THE ENGINE COMPONENTS CAN STAY HOT FOR UP TO
ONE HOUR.
1. __________________
Reason for the Job
The removal/installation procedures for the IDG cable assembly are identical
for both engines.
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
EFF :
ALL 24-21-43
Page 401
May 01/11
SYR
3. __________
Job Set-up
Subtask 24-21-43-860-050
(a) Put a warning notice to tell persons not to start the engine
1(2).
(2) Make sure that the engine 1(2) shutdown occurred not less than 5
minutes before you do this procedure.
(a) Make sure that the ON legend of the ENG/FADEC GND PWR/1(2)
pushbutton switch is off.
(b) Put a warning notice to tell persons not to energize the FADEC
1(2).
Subtask 24-21-43-010-050
B. Get Access
R (2) Put the ACCESS PLATFORM 2M (6 FT) into position on the right side of
R the engine.
EFF :
ALL 24-21-43
Page 402
May 01/11
SYR
4. Procedure
_________
Subtask 24-21-43-020-050
(a) Remove the screws (12) and the washers (11) from the terminal
cover.
(a) Remove the nuts (13) and the washers (14) from the four terminal
posts.
(4) Remove the IDG cable clips and the cable clamp:
(a) Remove the six bolts (9) and the six nuts (8) from the clips
(10).
(c) Remove the bolts (3) and (5) and the nuts (6) and (7) from the
clamp (4).
(d) Remove the clamp (4) and the support bushes from the IDG cable
assembly (2).
EFF :
ALL 24-21-43
Page 403
May 01/11
R
SYR
R IDG Cables
Figure 401/TASK 24-21-43-991-150- 12 (SHEET 1)
EFF :
ALL 24-21-43
Page 404
Aug 01/11
SYR
R IDG Cables
Figure 401/TASK 24-21-43-991-150- 22 (SHEET 2)
EFF :
ALL 24-21-43
Page 405
Aug 01/11
SYR
(5) Remove the IDG cable assembly from the engine:
EFF :
ALL 24-21-43
Page 406
May 01/11
R
SYR
TASK 24-21-43-400-010
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
R
No specific warning notice
R No specific 1 ACCESS PLATFORM 2M (6 FT) - ADJUSTABLE
No specific Torque Wrench : range 0.00 to 50.00 lbf.in
(0.00 to 0.56 m.daN)
No specific Torque Wrench : range 30.00 to 220.00 lbf.in
(0.34 to 2.60 m.daN)
B. Consumable Materials
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
EFF :
ALL 24-21-43
Page 407
May 01/11
SYR
C. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
Subtask 24-21-43-860-051
(1) On the center pedestal, on the panel 115VU, make sure that a warning
notice is in position to tell persons not to start the engine.
(2) On the overhead maintenance panel 50VU, make sure that the ON legend
of the ENG/FADEC GND PWR/1(2) pushbutton switch is off. Make sure
that a warning notice is in position to tell persons not to energize
the FADEC 1(2).
Subtask 24-21-43-010-051
B. Get Access
(1) Make sure that the fan cowl doors are open (Ref. TASK 71-13-00-010-
010):
EFF :
ALL 24-21-43
Page 408
May 01/11
SYR
4. Procedure
_________
Subtask 24-21-43-110-050
WARNING : DO NOT GET CLEANING FLUID ON YOUR SKIN OR IN YOUR EYES. PUT ON
_______
PROTECTIVE CLOTHING, GOGGLES AND A FACE MASK. USE THE FLUID IN
A WELL VENTILATED AREA. DO NOT BREATHE THE VAPOR. IF YOU GET
THE CLEANING FLUID ON YOUR SKIN OR IN YOUR EYES FLUSH IT AWAY
WITH WATER. GET MEDICAL AID IF YOUR SKIN OR EYES BECOME
IRRITATED.
R (1) Use a MISCELLANEOUS (Material No. 19-003) made moist with cleaning
fluid (Material No. V01-002) to clean the cable assembly (2).
(2) Use a clean lint-free cloth to dry the cable assembly (2).
Subtask 24-21-43-220-051
(2) Check the retention pin of each socket (Ref. ESPM 204823).
(5) Tighten the connector by hand until the orange color is shown in the
coupling nut window.
NOTE : When you tighten the connector, the torque value increases.
____
This causes the connector to make clicks until it is fully
engaged.
EFF :
ALL 24-21-43
Page 409
May 01/11
SYR
Subtask 24-21-43-420-050
(1) Attach the cable assembly (2) to the engine with the six clips (10),
the six bolts (9) and the six nuts (8).
Subtask 24-21-43-220-050
R (2) Make sure dimension X is 12.25 in. (311.15 mm) minimum and 12.52 in.
R (318 mm) maximum for the T1 and T2 cables.
R (3) Make sure dimension X is 11.8 in. (299.72 mm) minimum and 12.07 in.
R (306.57 mm) maximum for the T3 and N cables.
(4) If dimension X is not the correct minimum distance, move the support
bushes to get the correct distance.
Subtask 24-21-43-420-051
(1) Put the support bushes on the IDG cable assembly (2).
(3) Attach the clamp (4) to the support bracket with the two bolts (3)
and (5) and the two nuts (6) and (7).
(4) TORQUE the nuts (6) and (7) to 100 lbf.in (1.13 m.daN) (Ref. TASK 70-
23-11-911-013).
EFF :
ALL 24-21-43
Page 410
Aug 01/11
SYR
Subtask 24-21-43-420-052
(1) TORQUE the nuts (8) to 40 lbf.in (0.45 m.daN) (Ref. TASK 70-23-11-
911-013).
(a) Attach the two cable ends to the terminal post with the nut (1).
(b) TORQUE the nuts to 110 lbf.in (1.24 m.daN) (Ref. TASK 70-23-11-
911-013).
Subtask 24-21-43-420-053
(a) Attach the cable ends to the IDG terminal posts with the washers
(14) and the nuts (13).
NOTE : The cable ends and the IDG terminals are identified as T1
____
(red) , T2 (yellow), T3 (blue) and N (white).
(b) TORQUE the nuts to between 144 and 168 lbf.in (1.62 and 1.89
m.daN) (Ref. TASK 70-23-11-911-013)
(a) Attach the terminal cover to the IDG with the washers (11) and
the screws (12).
(b) TORQUE the screws to between 20 and 22 lbf.in (0.22 and 0.24
m.daN) (Ref. TASK 70-23-11-911-013).
EFF :
ALL 24-21-43
Page 411
May 01/11
R
SYR
Subtask 24-21-43-410-051
H. Close Access
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
Subtask 24-21-43-710-050
(a) Do the EIS start procedure (upper ECAM DU and lower ECAM DU only)
(Ref. TASK 31-60-00-860-001).
(b) On the ECAM control panel, push the ELEC key to get the ELEC
page:
- make sure that the voltage of the IDG is 115VAC
- make sure that the frequency of the IDG is 400Hz + or - 5Hz.
5. Close-up
________
Subtask 24-21-43-942-050
EFF :
ALL 24-21-43
Page 412
May 01/11
SYR
TUBING - IDG COOLER OIL - REMOVAL/INSTALLATION
______________________________________________
TASK 24-21-49-000-041
WARNING : BE CAREFUL WHEN YOU WORK ON THE ENGINE COMPONENTS IMMEDIATELY AFTER
_______
THE ENGINE IS SHUTDOWN. THE ENGINE COMPONENTS CAN STAY HOT FOR UP TO
ONE HOUR.
WARNING : DO NOT GET ENGINE OIL ON YOUR SKIN FOR A LONG TIME. FLUSH THE OIL
_______
FROM YOUR SKIN WITH WATER. THE OIL IS POISONOUS AND CAN GO THROUGH
YOUR SKIN AND IN TO YOUR BODY.
CAUTION : DO NOT LET ENGINE FUEL OR OIL FALL ON THE ENGINE. UNWANTED FUEL OR
_______
OIL MUST BE REMOVED IMMEDIATELY WITH A CLEAN LINT FREE CLOTH. THE
FUEL OR OIL CAN CAUSE DAMAGE TO THE SURFACE PROTECTION AND TO SOME
PARTS.
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
EFF :
ALL 24-21-49
Page 401
May 01/11
SYR
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
Subtask 24-21-49-941-054
A. Safety Precautions
(a) Put a warning notice to tell persons not to start the engine.
(2) Make sure that the engine 1(2) shutdown occurred not less than 5
minutes before you do this procedure.
(a) Make sure that the ON legend of the ENG/FADEC GND PWR/1(2)
R pushbutton switch is off
(b) Put a warning notice to tell persons not to energize the FADEC
1(2).
Subtask 24-21-49-865-056
-------------------------------------------------------------------------------
PANEL DESIGNATION IDENT. LOCATION
-------------------------------------------------------------------------------
FOR 1000EM1, 4000XU
122VU ELEC/GCU/1 2XU1 T26
122VU ELEC/IDG1/DISC 1XT T24
FOR 1000EM2, 4000XU
122VU ELEC/GCU/2 2XU2 T27
122VU ELEC/IDG2/DISC 2XT T25
EFF :
ALL 24-21-49
Page 402
May 01/05
SYR
Subtask 24-21-49-010-056
C. Get Access
4. Procedure
_________
Subtask 24-21-49-864-053
WARNING : YOU MUST PUT THE DRAIN HOSE INTO A CONTAINER BEFORE YOU CONNECT
_______
THE DRAIN HOSE TO THE OVERFLOW DRAIN HALF-COUPLING. MAKE SURE
THAT THE DRAIN HOSE HANGS DOWN VERTICALLY AND THE END OF THE
HOSE IS ABOVE THE OIL LEVEL IN THE CONTAINER. WHEN YOU CONNECT
THE DRAIN HOSE TO THE IDG, YOU RELEASE THE OIL PRESSURE AND OIL
WILL SPRAY FROM THE DRAIN HOSE.
(1) Put a CONTAINER 10 L(2 1/2 USGAL) in position under the IDG.
R (2) Remove the dust cap from the overflow drain half-coupling.
(3) Connect the overflow drain hose of the TANK - ENGINE OIL FILLING UP
R to the overflow drain half-coupling. Oil can come out of the overflow
R drain hose of the TANK - ENGINE OIL FILLING UP from the overflow
R drain half-coupling.
(4) Disconnect the overflow drain hose of the TANK - ENGINE OIL FILLING
R UP from the overflow drain half-coupling.
EFF :
ALL 24-21-49
Page 403
Aug 01/11
SYR
R Tubings - IDG Cooling Oil
Figure 401/TASK 24-21-49-991-901
EFF :
ALL 24-21-49
Page 404
May 01/09
SYR
Subtask 24-21-49-020-059
R WARNING : YOU MUST PUT THE DRAIN HOSE INTO A CONTAINER BEFORE YOU CONNECT
_______
R THE DRAIN HOSE TO THE OVERFLOW DRAIN HALF-COUPLING. MAKE SURE
R THAT THE DRAIN HOSE HANGS DOWN VERTICALLY AND THE END OF THE
R HOSE IS ABOVE THE OIL LEVEL IN THE CONTAINER. WHEN YOU CONNECT
R THE DRAIN HOSE TO THE IDG, YOU RELEASE THE OIL PRESSURE AND OIL
R WILL SPRAY FROM THE DRAIN HOSE.
(1) Put the container minimum capacity 2 USgal (7.5708 l) below the oil
tubes (1) and (2).
(2) Remove the five nuts (5) and the bolts (6).
(3) Use temporary ties to hold the two harness/tubes (7) clear of the two
oil tubes.
Subtask 24-21-49-020-057
CAUTION : MAKE SURE THAT THE COUPLINGS DO NOT TWIST. DAMAGE TO THE IDG
_______
BOSSES CAN OCCUR IF YOU DO NOT HOLD THE COUPLINGS.
CAUTION : MAKE SURE THAT THE TUBES CANNOT TWIST. DAMAGE TO THE TUBES CAN
_______
OCCUR IF THEY DO TWIST.
(1) At the gearbox bracket (8), remove the bolts (9) and (10) and the
spacers (11) and (12).
(2) Hold the coupling (3) and disconnect the oil inlet tube (1).
(3) Hold the coupling (4) and disconnect the oil outlet tube (2).
(4) Hold the tube (24), disconnect and remove the oil inlet tube (1).
(5) Hold the tube (25), disconnect and remove the oil outlet tube (2).
(6) Hold the tube (13), disconnect and remove the oil tube (24).
(7) Hold the tube (14), disconnect and remove the oil tube (25).
EFF :
ALL 24-21-49
Page 405
May 01/11
SYR
Subtask 24-21-49-020-058
(1) Remove the bolts (15) and disconnect the oil tube (13) from the fuel
cooled IDG oil cooler.
(3) Remove the bolts (17) and disconnect the oil tube (14) from the fuel
cooled IDG oil cooler.
EFF :
ALL 24-21-49
Page 406
May 01/98
SYR
TASK 24-21-49-400-041
WARNING : DO NOT GET ENGINE OIL ON YOUR SKIN FOR A LONG TIME. FLUSH THE OIL
_______
FROM YOUR SKIN WITH WATER. THE OIL IS POISONOUS AND CAN GO THROUGH
YOUR SKIN AND IN TO YOUR BODY.
CAUTION : DO NOT LET ENGINE FUEL OR OIL FALL ON THE ENGINE. UNWANTED FUEL OR
_______
OIL MUST BE REMOVED IMMEDIATELY WITH A CLEAN LINT FREE CLOTH. THE
FUEL OR OIL CAN CAUSE DAMAGE TO THE SURFACE PROTECTION AND TO SOME
PARTS.
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
B. Consumable Materials
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
EFF :
ALL 24-21-49
Page 407
Nov 01/09
SYR
C. Expendable Parts
-------------------------------------------------------------------------------
FIG.ITEM |DESIGNATION |IPC-CSN
-------------------------------------------------------------------------------
D. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
Subtask 24-21-49-860-052
(1) Make sure that the warning notice(s) is (are) on the panel 115VU to
tell persons not to start the engine 1(2).
(2) Make sure that the warning notice(s) is (are) on the panel 50VU to
tell persons not to power supply the FADEC system.
EFF :
ALL 24-21-49
Page 408
May 01/09
SYR
Subtask 24-21-49-865-057
B. Make sure that this(these) circuit breaker(s) is(are) open, safetied and
tagged
-------------------------------------------------------------------------------
PANEL DESIGNATION IDENT. LOCATION
-------------------------------------------------------------------------------
FOR 1000EM1, 4000XU
122VU ELEC/GCU/1 2XU1 T26
122VU ELEC/IDG1/DISC 1XT T24
FOR 1000EM2, 4000XU
122VU ELEC/GCU/2 2XU2 T27
122VU ELEC/IDG2/DISC 2XT T25
Subtask 24-21-49-010-057
C. Get Access
(1) Make sure that the fan cowls are open (Ref. TASK 71-13-00-010-010):
- FOR 1000EM1
437AL, 438AR
- FOR 1000EM2
447AL, 448AR
4. Procedure
_________
Subtask 24-21-49-420-057
R (1) Lubricate the new ring (18) with clean engine oil (Material No. V10-
039) and install it to the oil tube (14) (Ref. TASK 70-23-13-911-
010).
(2) Attach the oil tube to the fuel cooled IDG oil cooler with the bolts
(17).
(3) TORQUE the bolts to between 85 and 105 lbf.in (0.96 and 1.18 m.daN)
(Ref. TASK 70-23-11-911-013).
R (4) Lubricate the new packing (16) with clean engine oil (Material No.
V10-039) and install it to the oil tube (13) (Ref. TASK 70-23-13-911-
010).
EFF :
ALL 24-21-49
Page 409
Nov 01/00
SYR
(5) Attach the oil tube to the fuel cooled IDG oil cooler with the bolts
(15).
(6) TORQUE the bolts to between 85 and 105 lbf.in (0.96 and 1.18 m.daN)
(Ref. TASK 70-23-11-911-013).
Subtask 24-21-49-420-058
CAUTION : MAKE SURE THAT THE TUBES CANNOT TWIST. DAMAGE TO THE TUBES CAN
_______
OCCUR IF THEY DO TWIST.
CAUTION : MAKE SURE THAT THE COUPLINGS DO NOT TWIST. DAMAGE TO THE IDG
_______
BOSSES CAN OCCUR IF YOU DO NOT HOLD THE COUPLINGS.
(1) Lighly lubricate the end fittings on the oil tubes and the couplings
with engine oil (Material No. V10-039) (Ref. TASK 70-30-00-918-010).
R (2) Connect the oil inlet tube (1) to the coupling (3).
R (3) Connect the oil inlet tube (2) to the coupling (4).
R (4) Put the oil tube (24) in to the correct position for installation
R between the tube (13) and the tube (1).
R (5) Put the oil tube (25) in to the correct position for installation
R between the tube (14) and the tube (2).
R (7) At the gearbox bracket (8) align the spacer (11) and the clip (18)
and install the bolt (9).
R (8) At the gearbox bracket (8) align the spacer (12) and the clip (19)
and install the bolt (10).
R (9) Hold the tube (24) and TORQUE the oil inlet tube (1) to between 844
R and 945 lbf.in (9.53 and 10.67 m.daN) (Ref. TASK 70-23-11-911-013).
R (10) Hold the tube (25) and TORQUE the oil outlet tube (2) to between 620
R and 680 lbf.in (7.00 and 7.68 m.daN) (Ref. TASK 70-23-11-911-013).
R (11) Hold the tube (13) and TORQUE the oil tube (24) to between 844 and
R 945 lbf.in (9.53 and 10.67 m.daN) (Ref. TASK 70-23-11-911-013).
EFF :
ALL 24-21-49
Page 410
May 01/09
SYR
R (12) Hold the tube (14) and TORQUE the oil tube (25) to between 620 and
R 680 lbf.in (7.00 and 7.68 m.daN) (Ref. TASK 70-23-11-911-013).
R (13) Hold the oil outlet coupling (4) with a wrench and TORQUE the tube
(2) to between 620 and 680 lbf.in (7.00 and 7.68 m.daN) (Ref. TASK
70-23-11-911-013).
R
R (14) Hold the oil inlet coupling (3) with a wrench and TORQUE the tube (1)
to between 855 and 945 lbf.in (9.66 and 10.67 m.daN) (Ref. TASK 70-
23-11-911-013).
Subtask 24-21-49-420-059
(1) Remove the temporary ties from the two harness/tube assemblies.
(2) Align the five clips (21) with the five support clips (20).
(3) Make sure that the two harness/tube (7) assemblies are loose, have no
tension and are clear or adjacent components and the structure.
(4) Install the five bolts (6) and the nuts (5).
Subtask 24-21-49-612-053
Subtask 24-21-49-210-055
(1) Do a visual inspection for oil leaks at the IDG and the oil tubes.
Leaks are not permitted.
Subtask 24-21-49-865-058
F. Remove the safety clip(s) and the tag(s) and close this(these) circuit
breaker(s):
FOR 1000EM1, 4000XU
1XT, 2XU1
FOR 1000EM2, 4000XU
2XT, 2XU2
EFF :
ALL 24-21-49
Page 411
May 01/09
SYR
Subtask 24-21-49-790-050
(1) Do an oil leak test at the IDG and the oil tubes (Ref. TASK 71-00-00-
710-017). Leaks are not permitted.
5. Close-up
________
Subtask 24-21-49-410-054
A. Close Access
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
EFF :
ALL 24-21-49
Page 412
May 01/09
R
SYR
TUBING - IDG COOLER OIL - INSPECTION/CHECK
__________________________________________
TASK 24-21-49-200-010
WARNING : BE CAREFUL WHEN YOU WORK ON THE ENGINE COMPONENTS IMMEDIATELY AFTER
_______
THE ENGINE IS SHUTDOWN. THE ENGINE COMPONENTS CAN STAY HOT FOR UP TO
ONE HOUR.
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
R
No specific warning notice
B. Consumable Materials
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
C. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
EFF :
ALL 24-21-49
Page 601
May 01/11
SYR
3. __________
Job Set-up
Subtask 24-21-49-941-052
A. Safety Precautions
(a) Put a warning notice to tell persons not to start the engine.
(2) Make sure that the engine 1(2) shutdown occurred not less than 5
minutes before you do this procedure.
(a) Make sure that the ON legend of the ENG/FADEC GND PWR/1(2)
pushbutton switch is off.
(b) Put a warning notice to tell persons not to energize the FADEC
1(2).
Subtask 24-21-49-010-054
B. Get Access
4. Procedure
_________
Subtask 24-21-49-110-050
WARNING : DO NOT GET THE FLUID ON YOUR SKIN OR IN YOUR EYES. IF YOU DO:
_______
- FLUSH IT AWAY WITH CLEAN WATER
- GET MEDICAL AID.
R (1) Use a clean MISCELLANEOUS (Material No. 19-003) , made moist with
R cleaning fluid (Material No. V01-002) to clean the tubes.
EFF :
ALL 24-21-49
Page 602
May 01/11
SYR
R IDG Oil-Cooling Tubes
Figure 601/TASK 24-21-49-991-150
EFF :
ALL 24-21-49
Page 603
Nov 01/09
SYR
R (2) Dry the tubes with a clean MISCELLANEOUS (Material No. 19-003).
Subtask 24-21-49-210-052
(1) Examine the IDG oil-cooling tubes for security. Use the inspection
lamp and the inspection mirror.
(2) If the IDG oil-cooling tubes are loose, examine the items below for
damage, wear and loosening:
1
_ If above items show signs of damage or wear, replace them.
Subtask 24-21-49-210-053
(1) Examine the oil cooling tubes for leaks. Use the inspection lamp and
the inspection mirror.
(a) Examine the attachment bolts and the tube connection nuts for
loosening.
1
_ If the bolts or nuts are loose, examine them for damage and
wear. If the above items show signs of damage or wear, replace
them.
Subtask 24-21-49-210-054
(1) Examine the general condition of the oil cooling tubes. Use the
inspection lamp and the inspection mirror.
EFF :
ALL 24-21-49
Page 604
May 01/11
SYR
R (2) Examine the oil cooling tubes for cracks.
R (a) If the straight area of a tube has dents, replace the tube.
1
_ Tube 1 has a dent, replace it.
2
_ Tube 2 or 3 :
a
_ has more than one dent, with less than 1.00 in. (25.3999
R mm) between the edges of the dents, replace it.
b
_ has one or more dents with more than 1.00 in. (25.3999 mm)
R between the edges of the dents, with a depth up to 0.075
R in. (1.9049 mm) and the radius of the dent not less than
R 0.056 in. (1.4223 mm), the tube is serviciable.
- If the tube is out of the tolerances above, replace it.
R 3
_ Tube 4 or 5 :
a
_ has more than one dent, with less than 1.00 in. (25.3999
R mm) between the edges of the dents, replace it.
b
_ one or more dents with more than 1.00 in. (25.3999 mm)
between the edges of the dents, with a deep Up to 0.063 in.
(1.6001 mm) and the radius of the dent not less than 0.056
in. (1.4223 mm),the tube is serviciable.
- If the tube is out of the tolerances above, replace it.
R 4
_ Tube 6 :
a
_ has more than one dent, with less than 1.00 in. (25.3999
R mm) between the edges of the dents, replace it.
b
_ one or more dents with more than 1.00 in. (25.3999 mm)
R between the edges of the dents, with a depth up to 0.070
R in. (1.7779 mm) and the radius of the dent not less than
R 0.056 in. (1.4223 mm), the tube is serviciable.
EFF :
ALL 24-21-49
Page 605
May 01/11
SYR
- If the tube is out of the tolerances above, replace it.
R 1
_ Tube 1 has distortion, replace it.
R 2
_ Tube 2 has a distortion more than 0.038 in. (0.9651 mm),
R replace it.
R 3
_ Tube 3 has a distortion of more than 0.050 in. (1.2699 mm) ,
R replace it.
R 4
_ Tube 4 or 5 has a distortion of more than 0.025 in. (0.6349
R mm), replace it.
R 5
_ Tube 6 has a distortion of more than 0.035 in. (0.8889 mm),
R replace it.
R (a) If the straight area of a tube has rubs, replace the tube.
R 1
_ Tube 1, 2, 4, 5, or 6 has rubs, replace it.
2
_ Tube 3 has rubs of more than 0.010 in. (0.2539 mm), replace
it.
5. Close-up
________
Subtask 24-21-49-410-052
A. Close Access
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
EFF :
ALL 24-21-49
Page 606
May 01/11
SYR
(3) Remove the warning notice(s).
EFF :
ALL 24-21-49
Page 607
May 01/11
SYR
GENERATOR - INTEGRATED DRIVE (IDG) (4000XU) - REMOVAL/INSTALLATION
__________________________________________________________________
TASK 24-21-51-000-010
WARNING : BE CAREFUL WHEN YOU WORK ON THE ENGINE COMPONENTS IMMEDIATELY AFTER
_______
THE ENGINE IS SHUTDOWN. THE ENGINE COMPONENTS CAN STAY HOT FOR UP TO
ONE HOUR.
WARNING : DO NOT GET ENGINE OIL ON YOUR SKIN FOR A LONG TIME. FLUSH THE OIL
_______
FROM YOUR SKIN WITH WATER. THE OIL IS POISONOUS AND CAN GO THROUGH
YOUR SKIN AND IN TO YOUR BODY.
CAUTION : DO NOT LET ENGINE FUEL OR OIL FALL ON THE ENGINE. UNWANTED FUEL OR
_______
OIL MUST BE REMOVED IMMEDIATELY WITH A CLEAN LINT FREE CLOTH. THE
FUEL OR OIL CAN CAUSE DAMAGE TO THE SURFACE PROTECTION AND TO SOME
PARTS.
CAUTION : DO NOT USE THE IDG CABLES FOR A HAND HOLD. IF THE IDG CABLES ARE
_______
PULLED LOOSE IT CAN CAUSE DAMAGE TO THE
CABLES OR TO THE ENGINE.
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
EFF :
ALL 24-21-51
Page 401
May 01/11
SYR
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
Subtask 24-21-51-941-050
A. Safety Precautions
(a) Put a warning notice to tell persons not to start the engine.
(2) Make sure that the engine 1(2) shutdown occurred not less than 5
minutes before you do this procedure.
(a) Make sure that the ON legend of the ENG/FADEC GND PWR/1(2)
pushbutton switch is off.
(b) Put a warning notice to tell persons not to energize the FADEC
1(2).
Subtask 24-21-51-865-050
-------------------------------------------------------------------------------
PANEL DESIGNATION IDENT. LOCATION
-------------------------------------------------------------------------------
FOR 1000EM1, 4000XU
122VU ELEC/GCU/1 2XU1 T26
122VU ELEC/IDG1/DISC 1XT T24
FOR 1000EM2, 4000XU
122VU ELEC/GCU/2 2XU2 T27
122VU ELEC/IDG2/DISC 2XT T25
EFF :
ALL 24-21-51
Page 402
May 01/02
SYR
Subtask 24-21-51-010-050
C. Get Access
4. Procedure
_________
Subtask 24-21-51-680-050
A. Draining of the Oil from the IDG System before you remove the Integrated
Drive Generator
Subtask 24-21-51-020-051
Subtask 24-21-51-020-052
(a) Remove the two bolts (27), the washers (28) and the cover (29)
from the terminal block (30).
EFF :
ALL 24-21-51
Page 403
May 01/10
SYR
Integrated Drive Generator (IDG)
Figure 401/TASK 24-21-51-991-152- 12 (SHEET 1)
EFF :
ALL 24-21-51
Page 404
May 01/98
SYR
Integrated Drive Generator (IDG)
Figure 401/TASK 24-21-51-991-152- 22 (SHEET 2)
EFF :
ALL 24-21-51
Page 405
May 01/98
SYR
(2) For IDG Serial No. 052 and up:
(a) Remove the two bolts (33), the washers (32) and the cover (31)
from the terminal block (37).
(3) Remove the four nuts (34) and the washers (35).
(4) Disconnect the four phase cables (39) from the IDG (1).
(5) Use temporary ties and safety the four phase cables (39) and the
three electrical connectors (38) away from the IDG (1).
Subtask 24-21-51-020-053
CAUTION : MAKE SURE THAT THE COUPLINGS DO NOT TWIST. DAMAGE TO THE IDG
_______
BOSSES CAN OCCUR IF YOU DO NOT HOLD THE COUPLINGS.
CAUTION : MAKE SURE THAT THE TUBES CANNOT TWIST. DAMAGE TO THE TUBES CAN
_______
OCCUR IF THEY DO TWIST.
R (1) Put the CONTAINER 10 L(2 1/2 USGAL) below the oil tubes (52) and (53)
(2) Remove the nut (54), the washer(s) (55) and the bolt (58).
(3) Remove the nut (67), the washer(s) (68) and the bolt (71).
(4) Remove the nut (72), the washer(s) (73) and the bolt (76).
(5) Remove the nut (77), the washer(s) (78) and the bolt (80).
(6) Use temporary ties to hold the harness away from the two oil tubes.
(7) At the gearbox bracket (60), remove the bolts (63) and (64) and the
spacers (61) and (66).
NOTE : Hold the two couplings (14) and (15) when you disconnect the
____
oil tubes.
(8) Hold the coupling (15) and disconnect the oil inlet tube (52).
EFF :
ALL 24-21-51
Page 406
May 01/11
SYR
(9) Hold the coupling (14) and disconnect the oil outlet tube (53).
NOTE : Hold the tubes (51) and (50) when you loosen the connections.
____
(10) Hold the tube (50), disconnect and remove the oil inlet tube (52).
(11) Hold the tube (51), disconnect and remove the oil outlet tube (53).
Subtask 24-21-51-020-054
(1) Make a note of the positions of the banjo couplings (14) and (15),
they must be put in the same positions on installation.
R (4) Remove the overflow drain half-coupling (10) and the pressure fill
R half-coupling (11).
Subtask 24-21-51-480-050
(2) Lift the attachment cradle to the IDG with the hydraulic pump on the
IDG Removal/Installation Tool.
Subtask 24-21-51-020-050
WARNING : WEAR GOGGLES WHEN YOU REMOVE OR INSTALL THE LOCKWIRE. CUT,
_______
REMOVE AND DISCARD THE LOCKWIRE AS YOU DO THE TASK. LOOSE
LOCKWIRE CAN CUT OR BLIND YOU.
EFF :
ALL 24-21-51
Page 407
May 01/11
SYR
R Integrated Drive Generator (IDG)
R Figure 402/TASK 24-21-51-991-151- 13 (SHEET 1)
EFF :
ALL 24-21-51
Page 408
May 01/10
SYR
R Integrated Drive Generator (IDG)
R Figure 402/TASK 24-21-51-991-151- 23 (SHEET 2)
EFF :
ALL 24-21-51
Page 409
May 01/10
SYR
R Integrated Drive Generator (IDG)
R Figure 402/TASK 24-21-51-991-151- 33 (SHEET 3)
EFF :
ALL 24-21-51
Page 410
May 01/10
SYR
Integrated Drive Generator (IDG)
Figure 403/TASK 24-21-51-991-150
EFF :
ALL 24-21-51
Page 411
May 01/10
R
SYR
CAUTION : PULL THE IDG OUT IN A STRAIGHT LINE:
_______
- SO THAT THE INPUT SHAFT DOES NOT RUB
- TO PREVENT DAMAGE TO THE IDG INPUT SEAL.
CAUTION : DO NOT USE EXTERNAL PARTS TO PULL OR LIFT THE IDG. IF YOU DO SO
_______
YOU CAN CAUSE DAMAGE TO THE IDG.
(1) Cut and remove the lockwire from the QAD coupling (4).
NOTE : The QAD kit is in the open position and the clamping lug are
____
disengaged when the stripe marks are aligned.
(3) If the tension bolt (4) does not turn the QAD ring to the
aligned/open position:
- turn the QAD ring by hand or,
- lightly hit the ring, up to the aligned position.
(4) Carefully pull the IDG (1) rearwards from the gearbox and remove it.
(9) Install the protective cover on the IDG interface side of the gearbox
(6).
EFF :
ALL 24-21-51
Page 412
May 01/10
SYR
TASK 24-21-51-400-010
WARNING : DO NOT GET ENGINE OIL ON YOUR SKIN FOR A LONG TIME. FLUSH THE OIL
_______
FROM YOUR SKIN WITH WATER. THE OIL IS POISONOUS AND CAN GO THROUGH
YOUR SKIN AND IN TO YOUR BODY.
CAUTION : DO NOT LET ENGINE FUEL OR OIL FALL ON THE ENGINE. UNWANTED FUEL OR
_______
OIL MUST BE REMOVED IMMEDIATELY WITH A CLEAN LINT FREE CLOTH. THE
FUEL OR OIL CAN CAUSE DAMAGE TO THE SURFACE PROTECTION AND TO SOME
PARTS.
CAUTION : DO NOT USE THE IDG CABLES FOR A HAND HOLD. IF THE IDG CABLES ARE
_______
PULLED LOOSE IT CAN CAUSE DAMAGE TO THE
CABLES OR TO THE ENGINE.
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
EFF :
ALL 24-21-51
Page 413
May 01/11
SYR
B. Consumable Materials
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
C. Expendable Parts
-------------------------------------------------------------------------------
FIG.ITEM |DESIGNATION |IPC-CSN
-------------------------------------------------------------------------------
D. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
EFF :
ALL 24-21-51
Page 414
May 01/11
SYR
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
Subtask 24-21-51-860-050
(1) On the center pedestal, on the ENG panel 115VU, make sure that a
warning notice is in position to tell persons not to start the
engine.
(2) On the overhead maintenance panel 50VU, make sure that the ON legend
of the ENG/FADEC GND PWR/1(2) pushbutton switch is off. Make sure
that a warning notice is in position to tell persons not to energize
the FADEC 1(2).
Subtask 24-21-51-865-051
B. Make sure that this(these) circuit breaker(s) is(are) open, safetied and
tagged
-------------------------------------------------------------------------------
PANEL DESIGNATION IDENT. LOCATION
-------------------------------------------------------------------------------
FOR 1000EM1, 4000XU
122VU ELEC/GCU/1 2XU1 T26
122VU ELEC/IDG1/DISC 1XT T24
FOR 1000EM2, 4000XU
122VU ELEC/GCU/2 2XU2 T27
122VU ELEC/IDG2/DISC 2XT T25
EFF :
ALL 24-21-51
Page 415
May 01/10
R
SYR
Subtask 24-21-51-010-053
C. Make sure that the fan cowls are open (Ref. TASK 71-13-00-010-010):
Subtask 24-21-51-010-067
D. Make sure the reverser cowls are open (Ref. TASK 78-32-00-010-010):
4. Procedure
_________
Subtask 24-21-51-110-050
(1) Remove the protective cover from the IDG interface side of the
gearbox (6).
(4) Remove the blanking plugs from the disconnected line ends.
(5) Make sure that the two couplings (14) and (15) have been removed
WARNING : DO NOT GET CLEANING FLUID ON YOUR SKIN OR IN YOUR EYES. PUT
_______
ON PROTECTIVE CLOTHING, GOGGLES AND A FACE MASK. USE THE
FLUID IN A WELL VENTILATED AREA. DO NOT BREATHE THE VAPOR.
IF YOU GET THE CLEANING FLUID ON YOUR SKIN OR IN YOUR EYES
FLUSH IT AWAY WITH WATER. GET MEDICAL AID IF YOUR SKIN OR
EYES BECOME IRRITATED.
EFF :
ALL 24-21-51
Page 416
May 01/10
SYR
R (a) Use a clean MISCELLANEOUS (Material No. 19-003), made moist with
cleaning fluid (Material No. V01-002) to clean these components:
- the IDG flange on the gearbox (6)
- the IDG (1) mounting flange
- the QAD coupling (4).
R (b) Dry the components with a clean MISCELLANEOUS (Material No. 19-
R 003).
Subtask 24-21-51-420-054
Subtask 24-21-51-420-055
(1) Install new packing (2) and packing (7) on the IDG (1) (Ref. TASK 70-
23-13-911-010)
(2) Put the QAD coupling (4) in position on the gearbox (6).
(4) Turn the QAD coupling (4) until the arrow TOP V2500 (3) is at the
top center and the OPEN mark (5) is aligned with the adjacent gearbox
mark.
Subtask 24-21-51-640-050
Subtask 24-21-51-210-050
EFF :
ALL 24-21-51
Page 417
May 01/11
SYR
Subtask 24-21-51-420-050
WARNING : WEAR GOGGLES WHEN YOU REMOVE OR INSTALL THE LOCKWIRE. CUT,
_______
REMOVE AND DISCARD THE LOCKWIRE AS YOU DO THE TASK. LOOSE
LOCKWIRE CAN CUT OR BLIND YOU.
CAUTION : DO NOT USE EXTERNAL PARTS TO PULL OR LIFT THE IDG. IF YOU DO SO
_______
YOU CAN CAUSE DAMAGE TO THE IDG.
CAUTION : MAKE SURE YOU INSTALL THE IDG CORRECTLY. IF NOT YOU CAN CAUSE
_______
DAMAGE TO MATING PARTS.
(2) Carefully align the IDG drive shaft and the gearbox output shaft.
(3) Push the IDG (1) forward onto the gearbox (6).
(4) Make sure that the mounting flanges are correctly aligned.
(5) Make sure that the two OPEN marks (5) and (8) are aligned.
(6) Make sure that the IDG (1) is correctly engaged in the QAD coupling
(4).
(7) Tighten the QAD coupling (4) until the IDG flange lugs are fully
engaged in the QAD coupling lugs.
(8) Make sure that the QAD coupling turns easily and does not catch.
(9) TORQUE the QAD coupling (4) to between 264 and 313 lbf.in (2.98 and
3.53 m.daN) (Ref. TASK 70-23-11-911-013).
(10) Lightly hit the QAD coupling circumference to center it and make sure
that the torque values are correct.
EFF :
ALL 24-21-51
Page 418
May 01/10
R
SYR
(12) Make sure that the torque has not decreased by more than 24 lbf.in
(0.27 m.daN) from the torque given in step (9).
(14) Make sure that the torque value of the QAD coupling is between the
limits given in step (9).
(15) Safety the QAD coupling with lockwire (Material No. V02-147).
Subtask 24-21-51-110-051
WARNING : DO NOT GET CLEANING FLUID ON YOUR SKIN OR IN YOUR EYES. PUT ON
_______
PROTECTIVE CLOTHING, GOGGLES AND A FACE MASK. USE THE FLUID IN
A WELL VENTILATED AREA. DO NOT BREATHE THE VAPOR. IF YOU GET
THE CLEANING FLUID ON YOUR SKIN OR IN YOUR EYES FLUSH IT AWAY
WITH WATER. GET MEDICAL AID IF YOUR SKIN OR EYES BECOME
IRRITATED.
R (1) Use a clean MISCELLANEOUS (Material No. 19-003) made moist with
cleaning fluid (Material No. V01-002) to clean the components:
R - the overflow drain half-coupling (10)
R - the pressure fill half-coupling (11)
- the couplings (14) and (15)
- the applicable parts on the IDG (1).
R (2) Dry the components with a clean MISCELLANEOUS (Material No. 19-003).
Subtask 24-21-51-640-051
(1) Lubricate these components with engine oil (Material No. V10-039)
(Ref. TASK 70-30-00-918-010)
- the packings (9) and (12),
- the seals (13) and (16).
EFF :
ALL 24-21-51
Page 419
May 01/11
SYR
Subtask 24-21-51-420-056
R (a) Put a new packing (9) on the overflow drain half-coupling (10)
R (Ref. TASK 70-23-13-911-010).
R (c) TORQUE the overflow drain half-coupling to between 108 and 145
R lbf.in (1.22 and 1.63 m.daN) (Ref. TASK 70-23-11-911-013).
R (d) Put the dust cap on the overflow drain half-coupling (10).
R (a) Put a new packing (12) on the pressure fill half-coupling (11)
R (Ref. TASK 70-23-13-911-010).
R (d) Put the dust cap on the pressure fill half-coupling (11).
Subtask 24-21-51-420-051
(1) Lightly lubricate the end fittings on the oil tubes and the couplings
with engine oil (Material No. V10-039) (Ref. TASK 70-30-00-918-010).
(2) Put a new seal (13) on the coupling (14) (Ref. TASK 70-23-13-911-
010).
(3) Loosely install the coupling (14) on the IDG (1) and align the
temporary marks.
(4) Put a new seal (16) on the coupling (15) (Ref. TASK 70-23-13-911-
010).
EFF :
ALL 24-21-51
Page 420
May 01/11
SYR
(5) Loosely install the coupling (15) on the IDG (1) and align the
temporary marks.
(6) Put the oil inlet tube (52) in the correct position for installation
between the tube (50) and the coupling (15).
(7) Put the oil outlet tube (53) in the correct position for installation
between the tube (51) and the coupling (14).
(9) At the gearbox bracket (60), align the spacer (61) and the clip (62)
and install the bolt (63).
(10) At the gearbox bracket (60), align the spacer (66) and the clip (65)
R and install the bolt (64).
CAUTION : MAKE SURE THAT THE TUBES CANNOT TWIST. DAMAGE TO THE TUBES
_______
CAN OCCUR IF THEY DO TWIST.
(a) Hold the tube (51) and TORQUE the oil outlet tube (53) to between
620 and 680 lbf.in (7.00 and 7.68 m.daN) (Ref. TASK 70-23-11-911-
013).
NOTE : Hold the tubes (51) and (50) when you tighten the
____
connections.
(b) Hold the tube (50) and TORQUE the oil inlet tube (52) to between
844 and 945 lbf.in (9.53 and 10.67 m.daN) (Ref. TASK 70-23-11-
911-013).
(12) Hold the outlet coupling (14) with a wrench and TORQUE the collar to
between 300 and 350 lbf.in (3.39 and 3.95 m.daN) (Ref. TASK 70-23-11-
911-013).
(13) Hold the inlet coupling (15) with a wrench and TORQUE the collar to
between 320 and 370 lbf.in (3.61 and 4.18 m.daN) (Ref. TASK 70-23-11-
911-013).
CAUTION : MAKE SURE THAT THE COUPLINGS DO NOT TWIST. DAMAGE TO THE
_______
IDG BOSSES CAN OCCUR IF YOU DO NOT HOLD THE COUPLINGS.
EFF :
ALL 24-21-51
Page 421
May 01/10
SYR
(a) Hold the oil outlet coupling (14) with a wrench and TORQUE the
tube (51) to between 620 and 680 lbf.in (7.00 and 7.68 m.daN)
(Ref. TASK 70-23-11-911-013).
NOTE : Hold the coupling (14) and (15) when you tighten the oil
____
tubes.
(b) Hold the oil inlet coupling (15) with a wrench and TORQUE the
tube (50) to between 855 and 945 lbf.in (9.66 and 10.67 m.daN)
(Ref. TASK 70-23-11-911-013).
Subtask 24-21-51-420-052
R CAUTION : MAKE SURE CLIP POINT 1125 AND CLIP POINT 1124 HOLD THE HARNESS
_______
R INBOARD OF THE OIL TUBE. DAMAGE CAN OCCUR TO THE HARNESS IF
R HELD OUTBOARD.
(1) Remove the temporary ties from the two harness/tube assemblies.
R (a) Align the clip (56) with the support clip (57).
R (b) Make sure that two harness/tube assemblies are loose, have no
R tension and are away from or adjacent components and the
R structure.
R (c) Install the bolt (58), washer(s) (55) and the nut (54).
R (a) Align the clip (69) with the support clip (70).
R (b) Make sure that two harness/tube assemblies are loose, have no
R tension and are away from or adjacent components and the
R structure.
R (c) Install the bolt (71), washer(s) (68) and the nut (67).
EFF :
ALL 24-21-51
Page 422
May 01/10
SYR
R (4) Install the harness and the tube at position E.
R (a) Align the clip (74) with the support clip (75)
R (b) Make sure that two harness/tube assemblies are loose, have no
R tension and are away from or adjacent components and the
R structure.
R (c) Install the bolt (76), washer(s) (73) and the nut (72).
R (b) Make sure that two harness/tube assemblies are loose, have no
R tension and are away from or adjacent components and the
R structure.
R (c) Install the bolt (77), washer (78) (if applicable) and the nut
R (80).
R
Subtask 24-21-51-420-053
M. Installation of the Phase Leads and Electrical Connectors (Ref. TASK 70-
23-15-912-010) to the IDG
(Ref. Fig. 401/TASK 24-21-51-991-152)
CAUTION : IF THE WASHERS ARE NOT INSTALLED CORRECTLY THE TERMINAL BLOCK
_______
CAN BECOME HOT AND BURN.
NOTE : The square washers (36) must be installed between the IDG output
____
cables and the terminal block. The round washers (35) must be
installed between the phase cables (39) and the nuts (34).
(1) Remove the temporary ties from the four phase cables (39) and the
three electrical connectors (38).
(2) Make sure that the IDG ouptut cables and the square washers (36) are
in the correct position on the terminal block.
(3) Put the four phase cables (39) in the correct position for
installation on the terminal block.
EFF :
ALL 24-21-51
Page 423
May 01/10
SYR
(4) Install the four round washers and the four nuts (34). TORQUE the
nuts (34) to between 144 and 168 lbf.in (1.62 and 1.89 m.daN)
(Ref. TASK 70-23-11-911-013).
(5) Install the terminal block cover for IDG Serial No. 021 thru 051
(a) Put the cover (29) in the correct position for installation on
the terminal block (30).
(c) TORQUE the bolts (27) to between 20 and 22 lbf.in (0.22 and 0.24
m.daN) (Ref. TASK 70-23-11-911-013).
(6) Install the terminal block cover for IDG Serial No. 052 and up
(a) Put the cover (31) in the correct position for installation on
the terminal block (37).
(c) TORQUE the bolts (33) to between 20 and 22 lbf.in (0.22 and 0.24
m.daN) (Ref. TASK 70-23-11-911-013).
(7) Make sure that the three electrical connectors (38) are clean.
(8) Connect the three electrical connectors (38) to the IDG and tighten
them manually.
Subtask 24-21-51-612-050
EFF :
ALL 24-21-51
Page 424
May 01/10
R
SYR
Subtask 24-21-51-410-063
Subtask 24-21-51-865-052
Q. Remove the safety clip(s) and the tag(s) and close this(these) circuit
breaker(s):
FOR 1000EM1, 4000XU
1XT, 2XU1
FOR 1000EM2, 4000XU
2XT, 2XU2
Subtask 24-21-51-710-050
Subtask 24-21-51-720-051
EFF :
ALL 24-21-51
Page 425
May 01/10
SYR
R (b) Make sure that there are no oil leaks.
5. Close-up
________
Subtask 24-21-51-410-050
A. Close Access
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
EFF :
ALL 24-21-51
Page 426
May 01/10
SYR
TASK 24-21-51-000-011
WARNING : BE CAREFUL WHEN YOU WORK ON THE ENGINE COMPONENTS IMMEDIATELY AFTER
_______
THE ENGINE IS SHUTDOWN. THE ENGINE COMPONENTS CAN STAY HOT FOR UP TO
ONE HOUR.
CAUTION : DO NOT LET ENGINE OIL FALL ON THE ENGINE. UNWANTED OIL MUST BE
_______
REMOVED IMMEDIATELY WITH A CLEAN LINT FREE CLOTH THE OIL CAN CAUSE
DAMAGE TO THE SURFACE PROTECTION AND TO SOME PARTS.
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
EFF :
ALL 24-21-51
Page 427
May 01/10
R
SYR
3. __________
Job Set-up
Subtask 24-21-51-941-052
A. Safety Precautions
(a) Put a warning notice in position to tell persons not to start the
engine.
(2) Make sure that the engine 1(2) shutdown occurred not less than 5
minutes before you do this procedure.
(a) Make sure that the ON legend of the ENG/FADEC GND PWR/1(2)
pushbutton switch is off.
Subtask 24-21-51-010-052
B. Get Access
4. Procedure
_________
Subtask 24-21-51-680-051
(1) Drain the oil from the IDG (Ref. TASK 12-13-24-680-010).
EFF :
ALL 24-21-51
Page 428
May 01/10
R
SYR
IDG Oil Filter
Figure 404/TASK 24-21-51-991-154
EFF :
ALL 24-21-51
Page 429
May 01/10
R
SYR
Subtask 24-21-51-020-055
WARNING : WEAR GOGGLES WHEN YOU REMOVE OR INSTALL THE LOCKWIRE. CUT,
_______
REMOVE AND DISCARD THE LOCKWIRE AS YOU DO THE TASK. LOOSE
LOCKWIRE CAN CUT OR BLIND YOU.
(1) Cut and remove the lockwire from the filter cover (4).
NOTE : You can put a container 1.5 USgal (5.68 l) below the filter
____
cavity.
(3) Remove and discard the packing (3) from the filter cover (4).
(5) Remove and discard the packing (2) from the filter element (1).
Subtask 24-21-51-210-055
EFF :
ALL 24-21-51
Page 430
May 01/10
R
SYR
TASK 24-21-51-400-011
CAUTION : DO NOT LET ENGINE OIL FALL ON THE ENGINE. UNWANTED OIL MUST BE
_______
REMOVED IMMEDIATELY WITH A CLEAN LINT FREE CLOTH THE OIL CAN CAUSE
DAMAGE TO THE SURFACE PROTECTION AND TO SOME PARTS.
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
B. Consumable Materials
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
EFF :
ALL 24-21-51
Page 431
May 01/10
R
SYR
C. Expendable Parts
-------------------------------------------------------------------------------
FIG.ITEM |DESIGNATION |IPC-CSN
-------------------------------------------------------------------------------
D. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
Subtask 24-21-51-860-051
(1) On the center pedestal, on the ENG panel 115VU, make sure that a
warning notice is in position to tell persons not to start the
engine.
(2) On the overhead maintenance panel 50VU, make sure that the ON legend
of the ENG/FADEC GND PWR/1(2) pushbutton switch is off. Make sure
that a warning notice is in position to tell persons not to energize
the FADEC 1(2).
(3) Make sure that the fan cowls are open (Ref. TASK 71-13-00-010-010):
EFF :
ALL 24-21-51
Page 432
May 01/10
SYR
4. Procedure
_________
Subtask 24-21-51-640-055
(1) Lubricate the new inner packing (2) with the OILS (Material No. 03-
002).
(2) Lubricate the new outer packing (3) with the OILS (Material No. 03-
002).
Subtask 24-21-51-420-057
WARNING : WEAR GOGGLES WHEN YOU REMOVE OR INSTALL THE LOCKWIRE. CUT,
_______
REMOVE AND DISCARD THE LOCKWIRE AS YOU DO THE TASK. LOOSE
LOCKWIRE CAN CUT OR BLIND YOU.
CAUTION : MAKE SURE THE COMPONENTS ARE SEATED IN THE IDG SCAVENGE FILTER
_______
CAVITY BEFORE YOU INSTALL THE FILTER COVER. DO NOT TIGHTEN THE
FILTER COVER SCREWS TO FORCE THE FILTER COMPONENTS INTO THE
HOUSING.
CAUTION : DO NOT CLEAN AND USE AGAIN A FILTER ELEMENT THAT YOU REMOVED.
_______
(1) Remove the blanking cap from the filter cavity port.
(2) Install the new packing (2) on the filter element (1), and make sure
that it is in the correct position (Ref. TASK 70-23-13-911-010).
(3) Install the new packing (3) on the filter cover (4), and make sure
that it is in the correct position (Ref. TASK 70-23-13-911-010).
(6) TORQUE the filter cover to between 13 and 15 lbf.ft (1.76 and 2.03
m.daN).
(7) Safety the filter cover with MISCELLANEOUS (Material No. 19-010).
EFF :
ALL 24-21-51
Page 433
May 01/10
SYR
Subtask 24-21-51-612-051
Subtask 24-21-51-210-051
(1) Do dry motoring (Ref. TASK 71-00-00-710-045) and make sure that there
are no oil leaks at the covers of the IDG oil filter.
5. Close-up
________
Subtask 24-21-51-410-052
A. Close Access
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
EFF :
ALL 24-21-51
Page 434
May 01/10
SYR
GENERATOR - INTEGRATED DRIVE (IDG) (4000XU) - INSPECTION/CHECK
______________________________________________________________
TASK 24-21-51-200-010
Check of the Oil Level and Filter Differential Pressure Indicator (DPI)
WARNING : BE CAREFUL WHEN YOU WORK ON THE ENGINE COMPONENTS IMMEDIATELY AFTER
_______
THE ENGINE IS SHUTDOWN. THE ENGINE COMPONENTS CAN STAY HOT FOR UP TO
ONE HOUR.
1. __________________
Reason for the Job
2. ______________________
Job Set-up Information
A. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
Subtask 24-21-51-869-052
A. Not Applicable
4. Procedure
_________
Subtask 24-21-51-210-053
EFF :
ALL 24-21-51
Page 601
May 01/05
SYR
Subtask 24-21-51-210-054
R (a) Let the oil in the IDG become stable for 5 minutes after engine
R 1(2) shutdown.
EFF :
ALL 24-21-51
Page 602
Nov 01/10
SYR
TASK 24-21-51-200-011
WARNING : BE CAREFUL WHEN YOU WORK ON THE ENGINE COMPONENTS IMMEDIATELY AFTER
_______
THE ENGINE IS SHUTDOWN. THE ENGINE COMPONENTS CAN STAY HOT FOR UP TO
ONE HOUR.
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
Subtask 24-21-51-941-051
A. Safety Precautions
(a) Put a warning notice to tell persons not to start the engine.
(2) Make sure that the engine 1(2) shutdown occurred not less than 5
minutes before you do this procedure.
(a) Make sure that the ON legend of the ENG/FADEC GND PWR/1(2)
pushbutton switch is off.
EFF :
ALL 24-21-51
Page 603
May 01/11
SYR
(b) Put a warning notice to tell persons not to energize the FADEC
1(2).
Subtask 24-21-51-010-051
B. Get Access
4. Procedure
_________
Subtask 24-21-51-210-060
(1) Make sure that the red button of the DPI is not extended.
Use an inspection lamp and an inspection mirror, if necessary.
R (a) If the red button is extended from the end of the indicator.
R - do the alternate procedure: Refer to TSM/24.
5. Close-up
________
Subtask 24-21-51-410-051
A. Close Access
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
EFF :
ALL 24-21-51
Page 604
May 01/11
SYR
Differential Pressure Indicator (DPI) of the Oil Filter
Figure 601/TASK 24-21-51-991-153
EFF :
ALL 24-21-51
Page 605
May 01/98
SYR
(3) Remove the warning notice(s).
EFF :
ALL 24-21-51
Page 606
May 01/98
SYR
AC MAIN GENERATION - DESCRIPTION AND OPERATION
______________________________________________
1. _______
General
The two engine generators provide the AC main generation. The AC main
generation supplies the whole aircraft in normal flight configuration.
The transfer circuit supplies either one or the two distribution networks
from any generation source:
- main,
- auxiliary,
- or ground.
2. __________________
Component Location
-------------------------------------------------------------------------------
FIN | FUNCTIONAL DESIGNATION | PANEL|ZONE|ACCESS | ATA
| | | | DOOR | REF.
-------------------------------------------------------------------------------
1XU1 GCU-1 91VU 121 811 24-22-34
1XU2 GCU-2 91VU 121 811 24-22-34
3XU1 P/BSW-ELEC/GEN 1 35VU 210 831 24-22-00
3XU2 P/BSW-ELEC/GEN 2 35VU 210 831 24-22-00
9XU1 GLC-1 120VU 212 831 24-22-55
9XU2 GLC-2 120VU 212 831 24-22-55
10XU P/BSW-ELEC/BUS TIE 35VU 210 831 24-22-00
11XU1 BTC-1 120VU 212 831 24-22-55
11XU2 BTC-2 120VU 212 831 24-22-55
13XU P/BSW-EMER ELEC PWR/SMOKE DRILL 21VU 211 831 24-22-00
22XU1 EGIU-1 95VU 123 811 24-22-33
22XU2 EGIU-2 96VU 123 811 24-22-33
41XU1 CT-AC, 1 131 831 24-22-00
41XU2 CT-AC, 2 133 831 24-22-00
42XU1 CT-AC, 1 120VU 212 831 24-22-00
42XU2 CT-AC, 2 120VU 212 831 24-22-00
42XU3 CT-AC, 1 120VU 212 831 24-22-00
42XU4 CT-AC, 2 120VU 212 831 24-22-00
50XU1 SENSOR-TDC AC, 1 103VU 126 822 24-22-18
50XU2 SENSOR-TDC AC, 2 103VU 126 822 24-22-18
4000XU IDG 430 24-21-51
EFF :
ALL 24-22-00
Page 1
May 01/98
SYR
AC Main Generation - Component Location
Figure 001 (SHEET 1)
EFF :
ALL 24-22-00
Page 2
May 01/98
SYR
AC Main Generation - Component Location
Figure 001 (SHEET 2)
EFF :
ALL 24-22-00
Page 3
May 01/98
SYR
AC Main Generation - Component Location
Figure 002 (SHEET 1)
EFF :
ALL 24-22-00
Page 4
May 01/98
SYR
AC Main Generation - Component Location
Figure 002 (SHEET 2)
EFF :
ALL 24-22-00
Page 5
May 01/98
SYR
3. __________________
System Description
When the two engines run in normal conditions, generator 1 and generator 2
supply their own network.
Generator 1 supplies network 1, including:
- AC BUS 1,
- AC ESSENTIAL BUS,
- AC SHEDDABLE ESSENTIAL BUS.
GEN1 and GEN2 pushbutton switches, on the panel 35VU on the overhead panel,
control the generators 1 and 2 respectively via the GCU.
The EGIU transmit the main parameters from the GCU and generators to the
ECAM system.
4. _____________________
Component Description
EFF :
ALL 24-22-00
Page 6
Nov 01/04
SYR
AC Main Generation (Normal Configuration) -
General Schematic
Figure 003
R EFF :
001-002,
24-22-00 Page 7/8
Feb 01/99
SYR
R AC Main Generation (Normal Configuration) -
R General Schematic
R Figure 003A
R EFF :
003-099,
24-22-00 Page 9/10
Feb 01/99
R
SYR
R The GCUs are supplied:
R - directly from the PMG, for generator excitation and 28VDC internal and
R external supply,
R - from the aircraft normal network (28 VDC) for the internal and external
R supply.
R This dual supply constitutes a back up supply.
EFF :
ALL 24-22-00
Page 11
Nov 01/04
SYR
Signals received or generated by the GCU control these two relays.
NOTE : After:
____
- activation of a differential pressure, or
- activation of a GLC fault.
The system can be reset only two times via the GEN pushbutton
switch.
EFF :
ALL 24-22-00
Page 12
Feb 01/99
R
SYR
Zone of Protection
Figure 004
EFF :
ALL 24-22-00
Page 13
Feb 01/99
R
SYR
------------------------------------------------------------------------------
| FUNCTION |SENSING | THRESHOLD |TIME DELAY |TRIPS| REMARKS |INHIBITION|
|-----------|--------|-----------|-----------|-----|---------------|----------|
|Overvoltage|Highest | 130 VAC, | Inverse | GLC | Turns off | |
|(OV) |phase at| + or - |(compatible| GCR | voltage | |
| |POR | 1.5 V | with the | | regulator | |
|(IDG and | | | guaranteed| | | |
| APU GEN) | | | transient | | | |
| | | | voltage | | | |
| | | | to the | | | |
| | | | network) | | | |
|-----------|--------|-----------|-----------|-----|---------------|----------|
| Undervol- | Lowest | 100 VAC, |4 s to 5 s | GLC | Turns off | |
| tage (UV) | phase | + or - | | GCR | voltage | |
| | at POR | 4 V | | | regulator | |
| | voltage| | | | | |
| (IDG and | | | | | |Locked out|
| APU GEN) | | | | | |by US TRIP|
| | | | | | |APU TRIP |
| | | | | | |or UP TRIP|
|-----------|--------|-----------|-----------|-----|---------------|----------|
| Overfre- | PMG | PMG fre- |3 s to 5 s | GLC | Turns off | |
| quency(OF)| fre- | quency | | GCR | voltage | |
| (IDG and | quency | correspon-| | | regulator | |
| APU GEN) | | ding to | | | | |
| | | (433 Hz | | | | |
| | | + or - | | | | |
| | | 3 Hz) | | | | |
|-----------|--------|-----------|-----------|-----|---------------|----------|
| Underfre- | PMG | PMG fre- |3 s to 5 s | GLC | Turns off |Locked out|
| quency(UF)| fre- | quency | | GCR | voltage |by US TRIP|
| (IDG and | quency | correspon-| | | regulator | or |
| APU GEN) | | ding to | | | |APU TRIP |
| | | (363 Hz | | | | |
| | | + or - | | | | |
| | | 3 Hz) | | | | |
|-----------|--------|-----------|-----------|-----|---------------|----------|
| Underspeed| IDG |4730 RPM |100 ms max.| GLC | Generator | |
| (US) | input | + or - | | | excitation | |
| (IDG) | speed | 30 RPM | | | is cut off | |
| |magnetic| | | | through an UF | |
| | pick-up| | | | signal at | |
| | | | | | frequency | |
| | | | | | below 325 Hz | |
|-----------|--------|-----------|-----------|-----|---------------|----------|
| Overload | Average| 277 A | 13 s | | Signal for | |
| (OL) | of the | + or - | + or - | | warning and | |
EFF :
ALL 24-22-00
Page 14
Feb 01/99
R
SYR
------------------------------------------------------------------------------
| FUNCTION |SENSING | THRESHOLD |TIME DELAY |TRIPS| REMARKS |INHIBITION|
|-----------|--------|-----------|-----------|-----|---------------|----------|
| (IDG and | three | 13 A | 3 s | | automatic gal-| |
| APU GEN) | genera-| | | | ley shedding | |
| | tor | | | | of APU GEN on | |
| | current| | | | ground | |
|-----------|--------|-----------|-----------|-----|---------------|----------|
| Phase se- |2 phases| A.B.C.N. | None | GLC | Prevents GLC | |
| quence(PS)|at POR | phase | | | closure if | |
| | | sequence | | | phase sequence| |
| (IDG and | | | | | is not ABCN | |
| APU GEN) | | | | | | |
|-----------|--------|-----------|-----------|-----|---------------|----------|
| Disconnect| Discon-| Manual | None | GLC | Turns off vol-| |
| (D) (IDG) | nect | action | | GCR | tage regula- | |
| | signal | | | | tor, turns on | |
| | from | | | | warning light | |
| | cockpit| | | | | |
|-----------|--------|-----------|-----------|-----|---------------|----------|
| Fire (F) | Fire | Manual | None | GLC | Turns off vol-| |
| (IDG) | signal | action | | GCR | tage regulator| |
| | cockpit| | | | | |
|-----------|--------|-----------|-----------|-----|---------------|----------|
| Differen- | Diffe- | 45 A | 37.5 ms | GLC | Open BTC, GLC.| |
| tial Pro- | rential| + or - | + or - | GCR | If DP is in | |
| tection | current| 5 A | 2.5 ms | BTC | zone 1, then | |
| (DP) | of each| | | | remove inter- | |
| | phase | | | | lock from BTC | |
| | from | | | | in 120+10 ms. | |
| (IDG and |the CTs| | | | If DP zone 2, | |
| APU GEN) | sensing| | | | lockout GLC | |
| | | | | | and BTC | |
|-----------|--------|-----------|-----------|-----|---------------|----------|
| Shorted | Three | Ripple | 2 s | GLC | Turns off vol-| |
| Permanent | phases | of PMG -| + or - | GCR | tage regulator| |
| Magnet | voltage| rectified | 0.5 s | | | |
| Generator | PMG | output | | | | |
| (S PMG) | | | | | | |
| (IDG and | | | | | | |
| APU GEN) | | | | | | |
|-----------|--------|-----------|-----------|-----|---------------|----------|
| Open Cable| Diffe- | I > 80 A | 3 ms | GLC | Turns off | |
| (OC) | rential| + or - | + or - | GCR | voltage | |
| (IDG) | current| 0.8 A | 0.3 ms | | regulator. | |
| | from | | | | 28 VDC is pro-| |
| | 6 hole | | | | vided by TDC | |
EFF :
ALL 24-22-00
Page 15
Feb 01/99
R
SYR
------------------------------------------------------------------------------
| FUNCTION |SENSING | THRESHOLD |TIME DELAY |TRIPS| REMARKS |INHIBITION|
|-----------|--------|-----------|-----------|-----|---------------|----------|
| | CTA | | | | AC SENSOR to | |
| | | | | | fire trip GCU | |
| | | | | | input | |
|-----------|--------|-----------|-----------|-----|---------------|----------|
| GLC fai- | Indivi-| GLC status| 250 ms |LOCKS| | |
| -lure (IDG| -dual | ON and I | + or - | OUT | | |
| and APU | CTA | I > or = | 50 ms | BTC | | |
| GEN) | current| 25 A | | | | |
| | GLC | + or - 5 A| | | | |
| | status | with PRR | | | | |
| | | OFF | | | | |
|-----------|--------|-----------|-----------|-----|---------------|----------|
| APU ready | Signal | Absence of| None | GLC | Generator | |
| (APU GEN) | from | signal | | | excitation | |
| | elec- | | | | is cut off | |
| | tronic | | | | through signal| |
| | control| | | | at frequency | |
| | unit of| | | | below 325 Hz. | |
| | APU | | | |.Oil over temp | |
| | | | | | 185 deg. C | |
| | | | | | + or - 5 deg.C| |
| | | | | |.Speed 95 per- | |
| | | | | | cent Nn signal| |
| | | | | | from ECB | |
|-----------|--------|-----------|-----------|-----|---------------|----------|
| Oil Over | Oil out| 185 plus | None | | IDG fault | |
|Temperature| tempe- | or minus | | | indication | |
| (OOT) | rature | 5 deg.C | | | | |
| (IDG) | bulb | | | | | |
|-----------|--------|-----------|-----------|-----|---------------|----------|
| Open Cir- |4 cables| >9 A | 37.5 ms | GCR | If either CT, | |
| cuit (OCT)|from ge-| average | + or - | GLC | except 6 h CT,| |
| |nerator | current | 5 ms | BTC | opens while | |
| |CT and 4| | | | loaded reclose| |
| |cables | | | | BTC and if | |
| |from | | | | line CT opens | |
| |line CT | | | | before closing| |
| (IDG and | | | | | into load, | |
| APU GEN) | | | | | lockout BTC | |
| | | | | | open | |
|-----------|--------|-----------|-----------|-----|---------------|----------|
| Rotor dio-| Current| Function | 3 s | GCR | Turns off vol-| |
| de short | and | of DC ex- | + or - | and | tage regulator| |
| circuit | voltage| citer vol-| 0.5 s | PR | | |
EFF :
ALL 24-22-00
Page 16
Feb 01/99
R
SYR
------------------------------------------------------------------------------
| FUNCTION |SENSING | THRESHOLD |TIME DELAY |TRIPS| REMARKS |INHIBITION|
|-----------|--------|-----------|-----------|-----|---------------|----------|
| sensing | exciter| tage Vs | | | | |
| | field | Generator | | | | |
| (IDG and | | load | | | | |
| APU GEN) | | current | | | | |
|-----------|--------|-----------|-----------|-----|---------------|----------|
| | | | | | | |
| Generator |.Closed | | |.GCR |.GLC will close| |
| control | | | |close| when voltage | |
| switch | | | | | frequency and | |
| | | | | | phase sequence| |
| | | | | | are within | |
| | | | | | limits | |
| |.Open | | |.GCR |.Turns off vol-| |
| | | | | trip| tage regulator| |
| | | | | GLC | | |
| | | | | open| | |
-------------------------------------------------------------------------------
EFF :
ALL 24-22-00
Page 17
Nov 01/10
SYR
R - then, determines the origin of the fault (GCU wiring or
R peripherals).
EFF :
ALL 24-22-00
Page 18
Nov 01/10
SYR
Electrical Generation Interface Unit - Schematic Diagram
Figure 005
EFF :
ALL 24-22-00
Page 19/20
Feb 01/99
R
SYR
R Analog and discrete input parameters are listed below:
R Channel 1: Analog and Discrete Input Parameters
R -------------------------------------------------------------------------------
R | PARAMETER DEFINITION |IDG1|IDG2| STATE | COMMENTS |
R |-----------------------------|----|----|-------------|-----------------------|
R | POR VOLTAGE 115 VAC, 400 Hz | X | X | | Parameter for defini- |
R | (PHASE A) | | | | tion of AC voltage |
R | | | | | and frequency |
R |-----------------------------|----|----|-------------|-----------------------|
R | AC LOAD | X | X | | |
R | | | | | |
R |-----------------------------|----|----|-------------|-----------------------|
R | IDG OIL INLET TEMPERATURE | X | X | | |
R | | | | | |
R |-----------------------------|----|----|-------------|-----------------------|
R | IDG OIL OUTLET TEMPERATURE | X | X | | |
R | | | | | |
R |-----------------------------|----|----|-------------|-----------------------|
R | OVERLOAD WARNING | X | X | Ground when | |
R | | | | overload | |
R |-----------------------------|----|----|-------------|-----------------------|
R | GENERATOR FAULT | X | X | 28 VDC when | |
R | | | | FAULT | |
R |-----------------------------|----|----|-------------|-----------------------|
R | IDG DISC. STATUS | X | X | Ground when | |
R | | | | DISC | |
R |-----------------------------|----|----|-------------|-----------------------|
R | IDG DISC P/BSW POS | X | X | Ground when | From P/BSW contact |
R | | | | ON | relay |
R |-----------------------------|----|----|-------------|-----------------------|
R | IDG OIL LOW PRESSURE | X | X | Ground when | From IDG low pressure |
R | | | | low pressure| switch |
R | | | | | |
R | | | | | |
R |-----------------------------|----|----|-------------|-----------------------|
R | GEN P/BSW POSITION | X | X | 28 VDC when | From GCU TR source |
R | | | | ON | (through PR) |
R -------------------------------------------------------------------------------
EFF :
ALL 24-22-00
Page 21
Nov 01/10
SYR
R -------------------------------------------------------------------------------
R | PARAMETER DEFINITION | EXT| APU| STATE | COMMENTS |
R | | PWR| | | |
R |-----------------------------|----|----|-------------|-----------------------|
R | POR VOLTAGE 115VAC 400 Hz | X | X | | Parameter for defini- |
R | (PHASE A) | | | | tion of AC voltage |
R | | | | | and frequency |
R |-----------------------------|----|----|-------------|-----------------------|
R | AC LOAD | | X | | |
R | | | | | |
R |-----------------------------|----|----|-------------|-----------------------|
R | OVERLOAD WARNING | | X | Ground when | |
R | | | | overload | |
R |-----------------------------|----|----|-------------|-----------------------|
R | GENERATOR FAULT | | X | 28 VDC when | From aircraft 28 VDC |
R | | | | FAULT | (through power ready) |
R |-----------------------------|----|----|-------------|-----------------------|
R | GEN P/BSW POSITIOM | | X | 28 VDC when | From GCU TR source |
R | | | | ON | (through PR) |
R |-----------------------------|----|----|-------------|-----------------------|
R | EXT PWR AVAILABLE | X | | 28 VDC when | |
R | | | | available | |
R |-----------------------------|----|----|-------------|-----------------------|
R | Class II FAILURE | X | | Ground when | |
R | | | | message | |
R |-----------------------------|----|----|-------------|-----------------------|
R | EXT PWR ON | X | | Ground when | |
R | | | | ON | |
R -------------------------------------------------------------------------------
R -------------------------------------------------------------------------------
R | INPUT | STATE | COMMENTS |
R |---------------------------------------|-------------|-----------------------|
R | 28 VDC VIA EXT PWR P/BSW | 28 VDC when | |
R | | P/BSW ON | |
R -------------------------------------------------------------------------------
EFF :
ALL 24-22-00
Page 22
Nov 01/10
SYR
Flip-Flop Circuit - Block Diagram
Figure 006
EFF :
ALL 24-22-00
Page 23
Feb 01/99
R
SYR
A 5 VDC supply is provided to the FAULT legend of the GEN
pushbutton switches.
(1) Table of main digital signals received and sent out by the SDAC 1(2)
-------------------------------------------------------------------------------
| CHANNEL 1 |
|-----------------------------------------------------------------------------|
| OUT | SDI | |FORMAT|REFRESH| No.OF|CODING| | | SOURCE |
|LABEL|GEN1|GEN2| PARAMETER |(BNR | RATE |SIGNI-|RANGE |RESOL|UNIT| ORIGIN |
| | | | DEFINITION | or | (MS) |FICANT| MIN/ | | | |
| | | | | BCD) |MIN/MAX| BITS | MAX | | | |
|-----|----|----|------------|------|-------|------|------|-----|----|--------|
| 070 | 01 | 10 | AC FREQUEN-| BNR |250/500| 9 | 0/512| 1 Hz| Hz | From |
| | | | CY Ph A | | | | | | | 115 VAC|
| | | | | | | | | | | 400 Hz |
| | | | | | | | | | | INPUT |
| | | | | | | | | | | GCU 1 |
| | | | | | | | | | | GCU 2 |
|-----|----|----|------------|------|-------|------|------|-----|----|--------|
| 072 | 01 | 10 | AC VOLTAGE | BNR |250/500| 8 | 0/256| 1 V | V | From |
| | | | Ph A | | | | | | | 115 VAC|
| | | | | | | | | | | 400 Hz |
| | | | | | | | | | | INPUT |
| | | | | | | | | | | GCU 1 |
| | | | | | | | | | | GCU 2 |
|-----|----|----|------------|------|-------|------|------|-----|----|--------|
| 077 | 01 | 10 | AC LOAD | BNR |250/500| 8 | 0/256| 1per| per| GCU 1 |
| | | | | | | | | cent|cent| GCU 2 |
|-----|----|----|------------|------|-------|------|------|-----|----|--------|
| 105 | 01 | 10 | IDG OIL | BNR |250/500| 8 | -256 | 1 |deg.| GCU 1 |
| | | | INLET TEMP | | | | / |deg.C| C | GCU 2 |
| | | | | | | | +256 | | | |
|-----|----|----|------------|------|-------|------|------|-----|----|--------|
| 106 | 01 | 10 | IDG OIL | BNR |250/500| 8 | -256 | 1 |deg.| GCU 1 |
| | | | OUTLET TEMP| | | | / |deg.C| C | GCU 2 |
| | | | | | | | +256 | | | |
EFF :
ALL 24-22-00
Page 24
Nov 01/04
SYR
SDAC Communication - Block Diagram
Figure 007
EFF :
ALL 24-22-00
Page 25
Feb 01/99
R
SYR
-------------------------------------------------------------------------------
| CHANNEL 2 |
|-----------------------------------------------------------------------------|
| OUT | SDI | |FORMAT|REFRESH| No.OF|CODING| | | SOURCE |
|LABEL|APU |EXT | PARAMETER |(BNR | RATE |SIGNI-|RANGE |RESOL|UNIT| ORIGIN |
| |GEN |PWR | DEFINITION | or | (MS) |FICANT| MIN/ | | | |
| | | | | BCD) |MIN/MAX| BITS | MAX | | | |
|-----|----|----|------------|------|-------|------|------|-----|----|--------|
| 071 | 01 | |APU GEN FREQ| BNR |250/500| 9 | 0/512| 1 Hz| Hz |APU GCU |
| | | | | | | | | | | |
| | | 10 |EXT PWR FREQ| | | | | | |GPCU |
|-----|----|----|------------|------|-------|------|------|-----|----|--------|
| 075 | 01 | |APU GEN | BNR |250/500| 8 | 0/256| 1 V | V |APU GCU |
| | | |VOLTAGE | | | | | | | |
| | | | | | | | | | | |
| | | 10 |EXT PWR | | | | | | |GPCU |
| | | |VOLTAGE | | | | | | | |
|-----|----|----|------------|------|-------|------|------|-----|----|--------|
| 100 | 00 | | AC LOAD | BNR |250/500| 8 | 0/256| 1per| per|APU GCU |
| | | | | | | | cent|cent| |
R -------------------------------------------------------------------------------
R | CHANNEL 1 |
R |-----------------------------------------------------------------------------|
R | OUT | | SDI | |REFRESH| | | SOURCE |
R |LABEL| BIT|GEN1|GEN2| PARAMETER | RATE | STATE 0 | STATE 1 | ORIGIN |
R | | No.| | | DEFINITION| (MS) | | | |
R | | | | | |MIN/MAX| | | |
R |-----|----|----|----|-----------|-------|----------|----------|--------------|
R | 050 | 11 | 01 | 10 | OVERLOAD |250/500|no warning| warning | |
R | | | | | WARNING | | | | |
R |-----|----|----|----|-----------|-------|----------|----------|--------------|
R | 050 | 12 | 01 | 10 | GENERATOR |250/500| no fault | fault | |
R | | | | | FAULT | | | | |
R |-----|----|----|----|-----------|-------|----------|----------|--------------|
R | 050 | 13 | 01 | 10 | IDG DIS- |250/500| not disc | disc | |
R | | | | | CONNECT | | | | |
R | | | | | STATUS | | | | |
R |-----|----|----|----|-----------|-------|----------|----------|--------------|
R | 050 | 14 | 01 | 10 | IDG DIS- |250/500| P/BSW OFF| P/BSW ON | |
R | | | | | CONNECT | | | | |
R | | | | | P/B POS | | | | |
R |-----|----|----|----|-----------|-------|----------|----------|--------------|
R | 050 | 17 | 01 | 10 | IDG OIL |250/500| no over- | overheat | From IDG |
R | | | | | OUTLET | | heat | | OUTLET TEMP |
EFF :
ALL 24-22-00
Page 26
Nov 01/10
SYR
-------------------------------------------------------------------------------
| CHANNEL 1 |
|-----------------------------------------------------------------------------|
R | | | | | OVERHEAT | | | | Input parame-|
R | | | | | | | | | ter with |
R | | | | | | | | | threshold |
R | | | | | | | | |185 deg.C plus|
R | | | | | | | | | or minus |
R | | | | | | | | | 5 deg.C |
R |-----|----|----|----|-----------|-------|----------|----------|--------------|
R | 050 | 18 | 01 | 10 | IDG OIL |250/500| low pres-| normal | |
R | | | | | LOW PRES- | | sure | pressure | |
R | | | | | SURE | | | | |
R |-----|----|----|----|-----------|-------|----------|----------|--------------|
R | 050 | 19 | 01 | 10 | GEN P/BSW |250/500| P/BSW OFF| P/BSW ON | |
R | | | | | POSITION | | | | |
-------------------------------------------------------------------------------
| CHANNEL 2 |
|-----------------------------------------------------------------------------|
| OUT | | SDI | |REFRESH| | | SOURCE |
|LABEL| BIT|GEN3| EXT| PARAMETER | RATE | STATE 0 | STATE 1 | ORIGIN |
| | No.| | PWR| DEFINITION| (MS) | | | |
| | | | | |MIN/MAX| | | |
|-----|----|----|----|-----------|-------|----------|----------|--------------|
| 052 | 11 | 01 | | OVERLOAD |250/500|no warning| warning | |
| | | | | WARNING | | | | |
|-----|----|----|----|-----------|-------|----------|----------|--------------|
| 052 | 12 | 01 | | GENERATOR |250/500| no fault | fault | |
| | | | | FAULT | | | | |
|-----|----|----|----|-----------|-------|----------|----------|--------------|
| 052 | 14 | 01 | | GEN P/BSW |250/500| P/BSW OFF| P/BSW ON | |
| | | | | POSITION | | | | |
|-----|----|----|----|-----------|-------|----------|----------|--------------|
| 052 | 12 | | 10 | EXT PWR |250/500| not avai-| available| |
| | | | | AVAILABLE | | lable | | |
|-----|----|----|----|-----------|-------|----------|----------|--------------|
| 052 | 13 | | 10 | EXT PWR ON|250/500| OFF | ON | |
|-----|----|----|----|-----------|-------|----------|----------|--------------|
| 052 | 15 | | 10 | CLASS II |250/500|no failure| failure | Actuated by |
| | | | | FAILURE | | | | GPCU BITE |
| | | | | | | | | Message |
| | | | | | | | | Discrete |
EFF :
ALL 24-22-00
Page 27
Nov 01/10
SYR
(2) Table of main discrete signals received and sent out by the SDAC1(2)
-------------------------------------------------------------------------------
| PARAMETER LIST PARAMETER CHARACTERISTICS (NUMERIC) |
-------------------------------------------------------------------------------
|EQ.SYS.LAB.SDI|PARAMETER | WORD RANGE |UNIT|SIG |BITS|XMSN|CODE|ALPHA|SOURCE |
| |DEFINITION| OPER RANGE | |BIT | |INTV| |CODE |ORIGIN |
| |(*=REMARK)| RESOLUTION | | | | | | |BUS No.|
| |(X=NOTE) | ACCURACY | | | | | | |ATA REF|
| | | | | | | | | |CONV |
-------------------------------------------------------------------------------
| 002 00| BUS TIE | | | | 21 | | | | 10XU |
| | P/B OFF | | | | | | | | |
| 002 00| BUS TIE | | | | 21 | | | | 10XU |
| | P/B ON | | | | | | | | |
| 002 01|GEN1 LINE | | | | 14 | | | | 9XU1 |
| |CNTOR ON | | | | | | | | |
| 002 01|GEN1 LINE | | | | 14 | | | | 9XU1 |
| |CNTOR OFF | | | | | | | | |
| 002 01| TRANSFER | | | | 15 | | | | 11XU1 |
| |CNTOR1 ON | | | | | | | | |
| 002 01| TRANSFER | | | | 15 | | | | 11XU1 |
| |CNTOR1 OFF| | | | | | | | |
| 002 10|GEN2 LINE | | | | 14 | | | | 9XU2 |
| |CNTOR ON | | | | | | | | |
| 002 10|GEN2 LINE | | | | 14 | | | | 9XU2 |
| |CNTOR OFF | | | | | | | | |
| 002 10| TRANSFER | | | | 15 | | | | 11XU2 |
| |CNTOR2 ON | | | | | | | | |
| 002 10| TRANSFER | | | | 15 | | | | 11XU2 |
| |CNTOR2 OFF| | | | | | | | |
R C. Power Contactor
(1) Technology
The contactors are made up of a base with the power circuit connector
terminals and a removable assembly mainly consisting of the motor,
power contacts, auxiliary contacts and connector.
It is possible to remove a contactor without removing the base to
which power circuits are connected.
EFF :
ALL 24-22-00
Page 28
Nov 01/04
SYR
(2) Characteristics of main contacts
R D. TDC AC Sensor
If an open cable condition occurs with a current of more than 80A, after
a 3 seconds delay, the TDC AC sensor 50XU1 (50XU2) supplies a 28 VDC
signal to the GPCU and to the fire trip GCU1 (GCU2) input.
The GCU1 (GCU2) does not energize its related GLC1 (GLC2) contactor.
EFF :
ALL 24-22-00
Page 29
Nov 01/04
SYR
Current Transformers - Block Diagram
Figure 008
EFF :
ALL 24-22-00
Page 30
Feb 01/99
R
SYR
(1) Functions
(a) Generator CT
The generator CT is used for differential and overcurrent
protections (Ref. Para. 4.A.(2) Generator control and protection
functions).
(b) Six-hole CT
The six-hole CT contains six toroidal transformers, one for each
of the parallel power feeder cables. The six-hole CT is connected
in electrical opposition to the CT of the IDG generator.
This CT is used for differential and open cable protections (Ref.
Para. 4.A.(2) Generator control and protection functions).
(c) Three-hole CT
The three-hole CT contains three toroidal transformers, one for
each of the power feeder cables.
5. ________________________________
Operation/Control and Indicating
A. Generator Control
Controls and indications for each generator are located on the overhead
panel in the cockpit. The signals to and from the indicators and controls
transit by the GCU.
A general view of AC main generation channel 1 is shown on
EFF :
ALL 24-22-00
Page 31
Feb 01/99
R
SYR
R AC Main Generation Channel 1 - Schematic Diagram
Figure 009 (SHEET 1)
EFF :
ALL 24-22-00
Page 32
Nov 01/04
SYR
R AC Main Generation Channel 1 - Schematic Diagram
Figure 009 (SHEET 2)
EFF :
ALL 24-22-00
Page 33
Nov 01/04
SYR
R AC Main Generation Channel 1 - Schematic Diagram
Figure 009 (SHEET 3)
EFF :
ALL 24-22-00
Page 34
Nov 01/04
SYR
INTENTIONALLY BLANK
R
24-22-00
Page 35
Feb 01/99
SYR
GLC/BTC Logic - Schematic Diagram
Figure 010 (SHEET 1)
R
EFF :
ALL 24-22-00
Page 36
Feb 01/99
SYR
GLC/BTC Logic - Schematic Diagram
Figure 010 (SHEET 2)
EFF :
ALL 24-22-00
Page 37
Feb 01/99
R
SYR
INTENTIONALLY BLANK
24-22-00
Page 38
Feb 01/99
R
SYR
GLC-1 Supply - Schematic Diagram
Figure 011
R
EFF :
ALL 24-22-00
Page 39/40
Feb 01/99
R
SYR
INTENTIONALLY BLANK
R
24-22-00
Page 41
Feb 01/99
SYR
GEN 1 FAULT - Upper and Lower ECAM Display Unit
Figure 012 (SHEET 1)
EFF :
ALL 24-22-00
Page 42
Feb 01/99
R
SYR
GEN 1 FAULT - Upper and Lower ECAM Display Unit
Figure 012 (SHEET 2)
EFF :
ALL 24-22-00
Page 43
Feb 01/99
R
SYR
GEN 1 FAULT - Upper and Lower ECAM Display Unit
Figure 012 (SHEET 3)
EFF :
ALL 24-22-00
Page 44
Feb 01/99
R
SYR
- on the upper display unit of the ECAM system, an amber message is
displayed,
- on the lower display unit, the ELEC page is automatically displayed.
Simultaneously, the automatic transfer becomes effective:
- the lost network is supplied by another power source available.
The crew has to release-out GEN pushbutton switch (white OFF legend comes
on on GEN pushbutton switch).
NOTE : FAULT legend comes on on GEN pushbutton switch also when GLC is
____
open.
When starting engine 1, GEN 1 OFF warning is displayed on the ECAM
display unit if generator 1 is not on line:
(Ref. Fig. 013)
Similarly, when starting engine 2, GEN 2 OFF warning is displayed
on the ECAM display unit if generator 2 is not in line:
(Ref. Fig. 014)
B. Transfer Circuit
The transfer circuit enables supply of both or either AC electrical
network(s) from one of the four power sources (GEN 1, GEN 2, APU GEN, EXT
PWR). This is via the transfer contactors (BTC). The BTC control is
entirely automatic. It depends on the availability of these sources and
the correct condition of each network. The BTC 1 closes if no interlock
condition exists on GCU 1:
EFF :
ALL 24-22-00
Page 45
Feb 01/99
SYR
GEN 1 OFF - Upper and Lower ECAM Display Unit
Figure 013 (SHEET 1)
EFF :
ALL 24-22-00
Page 46
Feb 01/99
R
SYR
GEN 1 OFF - Upper and Lower ECAM Display Unit
Figure 013 (SHEET 2)
EFF :
ALL 24-22-00
Page 47
Feb 01/99
R
SYR
GEN 2 OFF _ Upper and Lower ECAM Display Unit
Figure 014 (SHEET 1)
R
EFF :
ALL 24-22-00
Page 48
Feb 01/99
SYR
GEN 2 OFF _ Upper and Lower ECAM Display Unit
Figure 014 (SHEET 2)
EFF :
ALL 24-22-00
Page 49
Feb 01/99
R
SYR
INTENTIONALLY BLANK
24-22-00
Page 50
Feb 01/99
R
SYR
BTC-1 Supply - Schematic Diagram
Figure 015
EFF :
ALL 24-22-00
Page 51/52
Feb 01/99
R
SYR
and electrical ground power unit.
In case of single generator configuration, the sheddable busbars 218XP,
220XP, 210PP and 212PP are no longer available.
NOTE : BTCs 1 and 2 can be locked out by pressing BUS TIE pushbutton
____
switch located on ELEC overhead panel (Ref. 24-00-00). This causes
both channels to be isolated.
C. Smoke Detection
In case of smoke detection, amber SMOKE legend comes on on GEN 1 LINE
pushbutton switch located on cockpit overhead panel (Ref. 24-00-00).
It is accompanied by the single chime and the MASTER WARN.
Then, the crew has to follow the procedure shown in figures
NOTE : This smoke procedure is also described in Ref. 24-24-00 since the
____
emergency generator is used in the smoke configuration.
EFF :
ALL 24-22-00
Page 53
May 01/06
SYR
INTENTIONALLY BLANK
R
24-22-00
Page 54
May 01/06
SYR
BTC-2 Supply - Schematic Diagram
Figure 016
EFF :
ALL 24-22-00
Page 55/56
Feb 01/99
R
SYR
INTENTIONALLY BLANK
R
24-22-00
Page 57
Feb 01/99
SYR
AC BUS 1 Fault - Upper and Lower ECAM Display Unit
Figure 017 (SHEET 1)
EFF :
ALL 24-22-00
Page 58
Feb 01/99
R
SYR
AC BUS 1 Fault - Upper and Lower ECAM Display Unit
Figure 017 (SHEET 2)
EFF :
ALL 24-22-00
Page 59
Feb 01/99
R
SYR
AC BUS 2 Fault - Upper and Lower ECAM Display Unit
Figure 018 (SHEET 1)
EFF :
ALL 24-22-00
Page 60
Feb 01/99
R
SYR
AC BUS 2 Fault - Upper and Lower ECAM Display Unit
Figure 018 (SHEET 2)
EFF :
ALL 24-22-00
Page 61
Feb 01/99
R
SYR
Smoke Detection - Upper and Lower ECAM Display Unit
Figure 019 (SHEET 1)
EFF :
ALL 24-22-00
Page 62
Feb 01/99
SYR
Smoke Detection - Upper and Lower ECAM Display Unit
Figure 019 (SHEET 2)
EFF :
ALL 24-22-00
Page 63
Feb 01/99
SYR
Smoke Detection - Upper and Lower ECAM Display Unit
Figure 019 (SHEET 3)
EFF :
ALL 24-22-00
Page 64
Feb 01/99
SYR
AC MAIN GENERATION - ADJUSTMENT/TEST
____________________________________
TASK 24-22-00-710-001
Operational Test of the Generator Line Contactor (GLC-1) Opening in the Smoke
Procedure
1. __________________
Reason for the Job
2. ______________________
Job Set-up Information
A. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
Subtask 24-22-00-860-050
(2) Do the EIS start procedure (Upper ECAM DU and lower ECAM DU only)
(Ref. TASK 31-60-00-860-001).
EFF :
ALL 24-22-00
Page 501
May 01/98
SYR
(3) Start the engine (Ref. TASK 71-00-00-710-043).
NOTE : You can do this test: start engine No. 1 only. Energize the
____
electrical circuit No. 2 with an electrical ground power unit
(Ref. TASK 24-41-00-861-002) or with the APU (Ref. TASK 24-41-
00-861-002).
(4) On the HYD/FUEL panel 40VU, make sure that the L TK PUMPS/1 AND 2 and
R TK PUMPS/1 AND 2 pushbutton switches are pushed.
(5) On the ECAM control panel, push the FUEL key. On the lower ECAM
display unit, make sure that the L wing tank pumps 1 and 2 and R wing
tank pumps 1 and 2 operate correctly.
Subtask 24-22-00-865-050
-------------------------------------------------------------------------------
PANEL DESIGNATION IDENT. LOCATION
-------------------------------------------------------------------------------
49VU FUEL/SMOKE/CONFIG/PUMP CTL 55QA A14
121VU FUEL/L WING TK/PUMP1 SPLY 1QA N23
121VU FUEL/R WING TK/PUMP1 SPLY 2QA Q23
121VU FUEL/PUMPS/1/R CTL AND L IND 4QA R28
121VU FUEL/PUMPS/1/L CTL AND R IND 3QA R23
123VU L WING TK/PUMP 1/STBY SPLY 11QA AD12
123VU R WING TK/PUMP 1/STBY SPLY 12QA AE12
4. Procedure
_________
Subtask 24-22-00-710-050
-------------------------------------------------------------------------------
ACTION RESULT
-------------------------------------------------------------------------------
EFF :
ALL 24-22-00
Page 502
May 01/98
SYR
-------------------------------------------------------------------------------
ACTION RESULT
-------------------------------------------------------------------------------
2. On the EMER ELEC PWR panel 21VU: On the panel 21VU:
- release the GEN 1 LINE - the OFF legend of the GEN 1 LINE
pushbutton switch. pushbutton switch comes on.
EFF :
ALL 24-22-00
Page 503
May 01/98
SYR
-------------------------------------------------------------------------------
ACTION RESULT
-------------------------------------------------------------------------------
9. On the ECAM control panel: On the lower ECAM display unit:
- push the FUEL key. - the pump No. 1 of the right tank
operates.
5. Close-up
________
Subtask 24-22-00-860-051
EFF :
ALL 24-22-00
Page 504
May 01/98
SYR
TASK 24-22-00-710-002
1. __________________
Reason for the Job
2. ______________________
Job Set-up Information
A. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
Subtask 24-22-00-860-052
(2) On the ELEC panel 35VU, make sure that the BAT1 and BAT2 pushbutton
switches are pushed.
EFF :
ALL 24-22-00
Page 505
May 01/98
SYR
4. Procedure
_________
Subtask 24-22-00-710-051
-------------------------------------------------------------------------------
ACTION RESULT
-------------------------------------------------------------------------------
5. Close-up
________
Subtask 24-22-00-862-051
EFF :
ALL 24-22-00
Page 506
May 01/98
SYR
______________________________________________________________
CURRENT TRANSFORMER - AC (41XU1,41XU2,42XU1,42XU2,42XU3,42XU4)
____________________
REMOVAL/INSTALLATION
TASK 24-22-17-000-001
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
R
FOR FIN 42XU1, 42XU2, 42XU3, 42XU4
No specific warning notice(s)
FOR FIN 42XU1, 42XU2
No specific blanking caps
FOR FIN 42XU4
No specific blanking caps
No specific cable ties
EFF :
ALL 24-22-17
Page 401
May 01/10
SYR
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
Subtask 24-22-17-010-051
R A. Get Access
(2) On the rear panel 120VU, open the panel which gives access to the AC
power center 123VU.
EFF :
ALL 24-22-17
Page 402
May 01/10
SYR
Subtask 24-22-17-941-050
R B. Safety Precautions
(1) Make sure that the external power connector is not connected to the
aircraft EXT PWR receptacle.
R
(3) In the cockpit, on the ELEC panel 35VU, make sure that these
pushbutton switches are released:
- BAT1, BAT2,
- APU GEN,
- GEN1, GEN2,
- EXT PWR.
(4) In the cockpit, put warning notice(s) in position to tell persons not
to operate the pushbutton switches on these overhead panels:
- 21VU (EMER ELEC PWR section),
- 25VU (APU section),
- 35VU (ELEC).
4. Procedure
_________
Subtask 24-22-17-020-051
R (a) Remove the nuts (8) and the washers (7) from the studs of the
R contactor (5).
R
R (b) Disconnect the bars (6) from the studs of the contactor (5).
R
EFF :
ALL 24-22-17
Page 403
May 01/10
SYR
R AC Current Transformer (42XU1, 42XU2)
R Figure 401/TASK 24-22-17-991-004
EFF :
ALL 24-22-17
Page 404
May 01/10
SYR
R AC Current Transformer (42XU3, 42XU4)
R Figure 402/TASK 24-22-17-991-003
EFF :
ALL 24-22-17
Page 405
May 01/10
SYR
R (c) Disconnect the electrical connector (4) from the current
R transformer (1).
R
R (e) Remove the screws (3) and the washers (2) from the current
R transformer (1).
R
Subtask 24-22-17-020-052
R (c) In the AC power center 123VU, disconnect all the cables from the
R pin 2 of the circuit breakers 11QA and 12QA.
R
R (d) Record the location and the color of the cables of each bundle
R which goes through the current transformer (1).
R
R (e) Remove the screws (12) and the washers (11) from the studs of the
R contactor (5).
R
EFF :
ALL 24-22-17
Page 406
May 01/10
SYR
R (f) Disconnect the cables (10) from the studs of the contactor (5).
R (g) Remove the nuts (9) and the washers (8) from the studs of the
R contactor (5).
R
R (h) Disconnect the cables (6) and (7) from the studs of the contactor
R (5).
R
R (k) Remove the screws (3) and the washers (2) from the current
R transformer (1).
R
R (l) Remove the necessary cable ties to move the current transformer
R (1) along the cable bundles.
R
EFF :
ALL 24-22-17
Page 407
May 01/10
SYR
TASK 24-22-17-400-001
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
R
FOR FIN 42XU1, 42XU2, 42XU3, 42XU4
No specific warning notice(s)
FOR FIN 42XU3, 42XU4
No specific cable ties
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
EFF :
ALL 24-22-17
Page 408
May 01/10
SYR
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
EFF :
ALL 24-22-17
Page 409
May 01/10
SYR
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
Subtask 24-22-17-010-053
R A. Get Access
(2) On the rear panel 120VU, make sure that the panel which gives access
to the AC power center 123VU is open.
EFF :
ALL 24-22-17
Page 410
May 01/10
SYR
Subtask 24-22-17-860-050
(1) Make sure that the external power connector is not connected to the
aircraft EXT PWR receptacle.
R
R (a) Make sure that the warning notice(s) is (are) in position on the
R access door 121AL to tell persons not to connect the external
R power connector to the aircraft EXT PWR receptacle.
(3) In the cockpit, on the ELEC panel 35VU, make sure that these
pushbutton switches are released:
- BAT1, BAT2,
- APU GEN,
- GEN1, GEN2,
- EXT PWR.
(4) In the cockpit, make sure that the warning notice(s) is (are) in
position to tell persons not to operate the pushbutton switches on
these overhead panels:
- 21VU (EMER ELEC PWR section),
- 25VU (APU section),
- 35VU (ELEC).
4. Procedure
_________
Subtask 24-22-17-420-051
R (a) Install the washers (2) and the screws (3) on the current
R transformer (1) and tighten them.
R
EFF :
ALL 24-22-17
Page 411
May 01/10
SYR
R (c) Make sure that the electrical connectors are clean and in the
R correct condition.
R
R (e) Connect the bars (6) to the studs of the contactor (5).
R
R (f) Install the washers (7) and the nuts (8) on the studs of the
R contactors (5) and tighten them.
Subtask 24-22-17-420-052
R (a) Put the disconnected cables through the current transformer (1).
NOTE : Make sure that the location and the color of the cables of
____
each bundle agree with those you recorded at the removal.
R (b) Move the current transformer (1) along the cable bundles.
R
R (c) Install the washers (2) and the screws (3) on the current
R transformer (1) and tighten them.
R
R (e) Make sure that the electrical connectors are clean and in the
R correct condition.
R
EFF :
ALL 24-22-17
Page 412
May 01/10
SYR
R (g) Install new cable ties.
R
R (h) Connect the cables (6) and (7) to the studs of the contactors
R (5).
R
R (i) Install the washers (8) and the nuts (9) on the studs of the
R contactor (5) and tighten them.
R
R (j) Connect the cables (10) to the studs of the contactor (5).
R
R (k) Install the washers (11) and the screws (12) on the studs of the
R contactor (5) and tighten them.
R
R (n) In the AC power center 123VU, connect the related cables to the
R pin 2 of the circuit breakers 11QA and 12QA.
NOTE : Make sure that the location and the color of the cables
____
agree with those you recorded at the removal.
Subtask 24-22-17-410-054
R C. Close Access
R
R (a) Make sure that the work area is clean and clear of tool(s) and
R other items.
R
EFF :
ALL 24-22-17
Page 413
May 01/10
SYR
R (c) FOR 42XU1
Install the BTC-1 (11XU1) (Ref. TASK 24-22-55-400-002).
R
Subtask 24-22-17-860-054
Subtask 24-22-17-860-057
(2) Energize the aircraft electrical circuits from the external power
(Ref. TASK 24-41-00-861-002).
EFF :
ALL 24-22-17
Page 414
May 01/10
SYR
Subtask 24-22-17-860-058
R (b) Energize the aircraft electrical circuits from the external power
R (Ref. TASK 24-41-00-861-002).
Subtask 24-22-17-860-057-A
(2) Energize the aircraft electrical circuits from the external power
(Ref. TASK 24-41-00-861-002).
EFF :
ALL 24-22-17
Page 415
May 01/10
SYR
Subtask 24-22-17-860-058-A
R (b) Energize the aircraft electrical circuits from the external power
R (Ref. TASK 24-41-00-861-002).
Subtask 24-22-17-865-050
-------------------------------------------------------------------------------
PANEL DESIGNATION IDENT. LOCATION
-------------------------------------------------------------------------------
EFF :
ALL 24-22-17
Page 416
May 01/10
SYR
-------------------------------------------------------------------------------
PANEL DESIGNATION IDENT. LOCATION
-------------------------------------------------------------------------------
**ON A/C 003-099,
Subtask 24-22-17-710-050
H. Operational test
-------------------------------------------------------------------------------
R | ACTION | RESULT |
-------------------------------------------------------------------------------
3. In the FWD and/or AFT galleys: On the lower ECAM display unit:
- energize all the items of - make sure that the electrical
equipment. parameters (load, voltage and
frequency) of the APU GEN are
correct.
EFF :
ALL 24-22-17
Page 417
May 01/11
SYR
**ON A/C 003-099,
Subtask 24-22-17-710-050-A
H. Operational test
-------------------------------------------------------------------------------
R | ACTION | RESULT |
-------------------------------------------------------------------------------
3. In the FWD and/or AFT galleys: On the lower ECAM display unit:
- energize all the items of - make sure that the electrical
equipment. parameters (load, voltage and
frequency) of the APU GEN are
correct.
Subtask 24-22-17-860-056
EFF :
ALL 24-22-17
Page 418
May 01/11
SYR
5. Close-up
________
Subtask 24-22-17-410-051
A. Close Access
(a) Make sure that the work area is clean and clear of tool(s) and
other items.
(b) On the rear panel 120VU, close the panel which gives access to
the AC power center 123VU.
EFF :
ALL 24-22-17
Page 419
May 01/11
R
SYR
TASK 24-22-17-000-002
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
Subtask 24-22-17-010-058
A. Get Access
EFF :
ALL 24-22-17
Page 420
May 01/11
SYR
R (3) In the zone 131, remove the ceiling panels 131AC, 131BC, 131CC
R (Ref. TASK 25-54-12-000-002).
R Subtask 24-22-17-941-053
R B. Safety Precautions
R (1) Make sure that the external power connector is not connected to the
R aircraft EXT PWR receptacle.
R (2) Put a warning notice(s) in position on the access door 121AL to tell
R persons not to connect the external power connector to the aircraft
R EXT PWR receptacle.
R (3) In the cockpit, on the ELEC panel 35VU, make sure that these
R pushbutton switches are released:
R - BAT1, BAT2,
R - APU GEN,
R - GEN1, GEN2,
R - EXT PWR.
R 4. Procedure
_________
R Subtask 24-22-17-020-055
R (2) Remove the cover (7) to get access to the terminal block (5).
R NOTE : You must identify (also with the indications on the current
____
R transformer) and disconnect only the cables which go through
R the current transformer.
R (3) Remove the nuts (1), the washers (2) and the cables (3) and (4) from
R the studs of the terminal block (5).
EFF :
ALL 24-22-17
Page 421
May 01/10
SYR
R AC Current Transformer (41XU1, 41XU2)
R Figure 403/TASK 24-22-17-991-002
EFF :
ALL 24-22-17
Page 422
May 01/10
SYR
R (4) Disconnect the electrical connector (11) from the current transformer
R (10).
R (5) Put blanking caps on the disconnected electrical connector (11) and
R electrical receptacle (12).
R (6) Remove the screws (8) and the washers (9) from the current
R transformer (10).
R (7) Move the current transformer (10) along the cables to remove it.
EFF :
ALL 24-22-17
Page 423
May 01/10
SYR
TASK 24-22-17-400-002
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
EFF :
ALL 24-22-17
Page 424
May 01/11
SYR
3. __________
Job Set-up
Subtask 24-22-17-010-060
A. Get Access
(1) Make sure that the cargo-compartment door 825AR is open (Ref. TASK
52-30-00-860-001).
(3) In the zone 131, make sure that the ceiling panels 131AC, 131BC,
131CC are removed (Ref. TASK 25-54-12-000-002).
Subtask 24-22-17-860-064
(1) Make sure that the external power connector is not connected to the
aircraft EXT PWR receptacle.
(2) Make sure that a warning notice(s) is (are) in position on the access
door 121AL to tell persons not to connect the external power
connector to the aircraft EXT PWR receptacle.
(3) In the cockpit, on the ELEC panel 35VU, make sure that these
pushbutton switches are released:
- BAT1, BAT2,
- APU GEN,
- GEN1, GEN2,
- EXT PWR.
(4) In the cockpit, make sure that the warning notice(s) is (are) in
position to tell persons not to operate the pushbutton switches on
these overhead panels:
- 21VU (EMER ELEC PWR section),
- 25VU (APU section),
- 35VU (ELEC).
EFF :
ALL 24-22-17
Page 425
May 01/11
SYR
R 4. Procedure
_________
R Subtask 24-22-17-420-055
R (1) Put the disconnected cables (3) and (4) through the current
R transformer (10).
R NOTE : Make sure that the location of the cables agrees with that you
____
R recorded at the removal.
R (3) Install the washers (9) and the screws (8) on the current transformer
R (10) and tighten them.
R (5) Make sure that the electrical connectors are clean and in the correct
R condition.
R (7) Install the cables (3) and (4), the washers (2) and the nuts (1) on
R the studs of the terminal block (5) and tighten them.
R NOTE : Make sure that the location of the cables agrees with that you
____
R recorded at the removal.
R (8) Install the cover (7) and the screws (6) on the terminal block (5).
R Subtask 24-22-17-860-065
R (1) Energize the aircraft electrical circuits from the engine 1(2)
R (Ref. TASK 24-41-00-861-002).
EFF :
ALL 24-22-17
Page 426
May 01/10
SYR
R Subtask 24-22-17-865-052
R -------------------------------------------------------------------------------
R PANEL DESIGNATION IDENT. LOCATION
R -------------------------------------------------------------------------------
EFF :
ALL 24-22-17
Page 427
May 01/10
SYR
**ON A/C 001-002,
Subtask 24-22-17-710-054
D. Operational test
-------------------------------------------------------------------------------
R | ACTION | RESULT |
-------------------------------------------------------------------------------
3. In the FWD and/or AFT galleys: On the lower ECAM display unit:
- Energize all the items of - Make sure that the electrical
equipment. parameters (load, voltage and
frequency) of the APU GEN are
correct.
EFF :
001-002, 24-22-17
Page 428
May 01/11
SYR
**ON A/C 003-099,
Subtask 24-22-17-710-054-A
D. Operational test
-------------------------------------------------------------------------------
R | ACTION | RESULT |
-------------------------------------------------------------------------------
3. In the FWD and/or AFT galleys: On the lower ECAM display unit:
- Energize all the items of - Make sure that the electrical
equipment. parameters (load, voltage and
frequency) of the APU GEN are
correct.
Subtask 24-22-17-860-066
(1) De-energize the aircraft electrical circuits supplied from the engine
1(2) (Ref. TASK 24-41-00-862-002).
EFF :
ALL 24-22-17
Page 429
May 01/11
SYR
R 5. Close-up
________
R Subtask 24-22-17-410-055
R A. Close Access
R (1) Make sure that the work area is clean and clear of tool(s) and other
R items.
R (2) In the zone 131, install the ceiling panels 131AC, 131BC, 131CC
R (Ref. TASK 25-54-12-400-002).
EFF :
ALL 24-22-17
Page 430
May 01/10
SYR
SENSOR - TDC AC (50XU1,50XU2) - REMOVAL/INSTALLATION
____________________________________________________
TASK 24-22-18-000-001
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
Subtask 24-22-18-865-050
-------------------------------------------------------------------------------
PANEL DESIGNATION IDENT. LOCATION
-------------------------------------------------------------------------------
FOR 50XU1
122VU ELEC/GCU/1 2XU1 T26
122VU ELEC/IDG1/DISC 1XT T24
FOR 50XU2
122VU ELEC/GCU/2 2XU2 T27
122VU ELEC/IDG2/DISC 2XT T25
EFF :
ALL 24-22-18
Page 401
May 01/11
SYR
Subtask 24-22-18-010-050
B. Get Access
(3) Open the access door of the relay box 103VU (5).
4. Procedure
_________
Subtask 24-22-18-020-050
EFF :
ALL 24-22-18
Page 402
May 01/11
SYR
Time Delay Closing (TDC) AC Sensor
Figure 401/TASK 24-22-18-991-001
EFF :
ALL 24-22-18
Page 403
May 01/98
SYR
TASK 24-22-18-400-001
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
Subtask 24-22-18-860-050
(3) Make sure that the access door 103VU (5) is open.
EFF :
ALL 24-22-18
Page 404
May 01/11
SYR
Subtask 24-22-18-865-051
B. Make sure that this(these) circuit breaker(s) is(are) open, safetied and
tagged
-------------------------------------------------------------------------------
PANEL DESIGNATION IDENT. LOCATION
-------------------------------------------------------------------------------
FOR 50XU1
122VU ELEC/GCU/1 2XU1 T26
122VU ELEC/IDG1/DISC 1XT T24
FOR 50XU2
122VU ELEC/GCU/2 2XU2 T27
122VU ELEC/IDG2/DISC 2XT T25
4. Procedure
_________
Subtask 24-22-18-420-050
(1) Put the sensor (3) in position on the barrels (2) of the base (1).
Subtask 24-22-18-865-052
B. Remove the safety clip(s) and the tag(s) and close this(these) circuit
breaker(s):
2XU1, 2XU2, 1XT, 2XT
Subtask 24-22-18-710-050
C. Do the operational test with the BITE of the GPCU from the CFDS
(Ref. TASK 24-41-00-740-002).
EFF :
ALL 24-22-18
Page 405
May 01/98
SYR
5. Close-up
________
Subtask 24-22-18-410-050
A. Close Access
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
EFF :
ALL 24-22-18
Page 406
May 01/98
SYR
_________________________________________________________
ELECTRICAL GENERATION INTERFACE UNIT (EGIU) (22XU1,22XU2)
____________________
REMOVAL/INSTALLATION
TASK 24-22-33-000-001
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
Subtask 24-22-33-860-052
EFF :
ALL 24-22-33
Page 401
May 01/11
SYR
Subtask 24-22-33-865-050
-------------------------------------------------------------------------------
PANEL DESIGNATION IDENT. LOCATION
-------------------------------------------------------------------------------
FOR 22XU1
122VU ELEC/GCU/1 2XU1 T26
122VU ELEC/IDG1/DISC 1XT T24
122VU ELEC/EXT PWR/LT CLT/AVAIL 4XG X31
122VU ELEC/EXT PWR/CTL 11XG X29
122VU ELEC/EXT PWR/COCKPIT/AVAIL/LT 12XG X28
122VU ELEC/EXT PWR/EGIU1/28VDC 26XU1 Z31
122VU ELEC/GEN1/EGIU1/28VDC 24XU1 Z30
123VU EXT PWR/EGIU1/115VAC 23XG AA07
123VU GEN1/EGIU1/115VAC 23XU1 AF12
FOR 22XU2
122VU ELEC/GEN1/OFF/BTC2 SPLY 14XU T30
122VU ELEC/GCU/2 2XU2 T27
122VU ELEC/IDG2/DISC 2XT T25
122VU APU GEN/EGIU2/28VDC 26XU2 Y31
122VU GEN2/EGIU2/28VDC 24XU2 Y30
123VU APU GEN/EGIU2/115VAC 23XS AA08
123VU GEN2/EGIU2/115VAC 23XU2 AF01
Subtask 24-22-33-010-050
C. Get Access
R (1) Put an ACCESS PLATFORM 2M (6 FT) - ADJUSTABLE at the access door 811
R of the avionics compartment.
4. Procedure
_________
Subtask 24-22-33-020-050
(2) Lower the knurled nut (1) to disengage the stud (2).
EFF :
ALL 24-22-33
Page 402
May 01/11
SYR
Electrical Generation Interface Unit 1(2)
Figure 401/TASK 24-22-33-991-001
EFF :
ALL 24-22-33
Page 403
May 01/98
SYR
(3) Carefully pull the handle (3) until the EGIU (4) is disconnected from
the rack receptacle (5).
(5) Put blanking caps on the rack receptacle (5) and on the EGIU
connector.
EFF :
ALL 24-22-33
Page 404
May 01/98
SYR
TASK 24-22-33-400-002
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
EFF :
ALL 24-22-33
Page 405
May 01/11
SYR
3. __________
Job Set-up
Subtask 24-22-33-860-050
NOTE : When the circuit breakers 4XG and 12XG are open, the EXT
____
PWR/AVAIL caution light and the AVAIL legend of the EXT PWR
pusbutton switch are off.
Subtask 24-22-33-865-053
B. Make sure that this(these) circuit breaker(s) is(are) open, safetied and
tagged
-------------------------------------------------------------------------------
PANEL DESIGNATION IDENT. LOCATION
-------------------------------------------------------------------------------
FOR 22XU1
122VU ELEC/GCU/1 2XU1 T26
122VU ELEC/IDG1/DISC 1XT T24
122VU ELEC/EXT PWR/LT CLT/AVAIL 4XG X31
122VU ELEC/EXT PWR/CTL 11XG X29
122VU ELEC/EXT PWR/COCKPIT/AVAIL/LT 12XG X28
122VU ELEC/EXT PWR/EGIU1/28VDC 26XU1 Z31
123VU EXT PWR/EGIU1/115VAC 23XG AA07
123VU GEN1/EGIU1/115VAC 23XU1 AF12
FOR 22XU2
122VU ELEC/GEN1/OFF/BTC2 SPLY 14XU T30
122VU ELEC/GCU/2 2XU2 T27
122VU ELEC/IDG2/DISC 2XT T25
122VU APU GEN/EGIU2/28VDC 26XU2 Y31
122VU GEN2/EGIU2/28VDC 24XU2 Y30
123VU APU GEN/EGIU2/115VAC 23XS AA08
123VU GEN2/EGIU2/115VAC 23XU2 AF01
EFF :
ALL 24-22-33
Page 406
May 01/11
R
SYR
Subtask 24-22-33-010-051
C. Get Access
4. Procedure
_________
Subtask 24-22-33-420-051
(2) Make sure that the electrical connectors are clean and in the correct
condition.
(6) Carefully push the EGIU until it engages the rack receptacle (5).
(7) Put the knurled nut (1) on the stud (2) and tighten the knurled nut
(1).
Subtask 24-22-33-865-054
B. Remove the safety clip(s) and the tag(s) and close this(these) circuit
breaker(s):
FOR 22XU1
11XG, 12XG, 2XU1, 23XU1, 24XU1, 26XU1, 1XT, 4XG, 23XG
FOR 22XU2
23XS, 2XU2, 23XU2, 24XU2, 26XU2, 2XT, 14XU
Subtask 24-22-33-860-051
EFF :
ALL 24-22-33
Page 407
May 01/11
SYR
Subtask 24-22-33-710-050
(a) Do the EIS start procedure (Upper ECAM DU and lower ECAM DU only)
(Ref. TASK 31-60-00-860-001)
(b) On the ECAM control panel, push the ELEC key (on the lower ECAM
DU, the ELEC page comes into view).
(c) On the ELEC page, make sure that the following EXT PWR parameters
are correct:
- AC V = 115 + or - 5V,
- FRQ HZ = 400 + or - 10HZ.
(b) On the ELEC page, make sure that the following APU GEN parameters
are correct:
- AC LOAD Percent shown in green,
- AC V = 115 + or - 5V,
- FRQ HZ = 400 + or - 10HZ.
5. Close-up
________
Subtask 24-22-33-862-051
EFF :
ALL 24-22-33
Page 408
May 01/98
SYR
Subtask 24-22-33-410-051
B. Close Access
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
EFF :
ALL 24-22-33
Page 409
May 01/98
SYR
CONTROL UNIT - GENERATOR (GCU) (1XU1,1XU2) - REMOVAL/INSTALLATION
_________________________________________________________________
TASK 24-22-34-000-001
CAUTION : USE ONLY THE GROUND SERVICE NETWORK TO SUPPLY THE AIRCRAFT WITH AC
_______
AND DC POWER.
YOU CAN CAUSE DAMAGE TO THE EQUIPMENT DURING ITS REMOVAL/
INSTALLATION IF THE RELATED NETWORK IS NOT ISOLATED.
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
EFF :
ALL 24-22-34
Page 401
May 01/98
SYR
3. __________
Job Set-up
Subtask 24-22-34-860-050
(2) In the cockpit, put a warning notice to tell persons not to operate
the pushbutton switches (ENG MASTER 1(2)) on the pylon panel 115VU
(ENG panel)
Subtask 24-22-34-865-052
-------------------------------------------------------------------------------
PANEL DESIGNATION IDENT. LOCATION
-------------------------------------------------------------------------------
FOR 1XU1
122VU ELEC/GCU/1 2XU1 T26
FOR 1XU2
122VU ELEC/GCU/2 2XU2 T27
Subtask 24-22-34-010-052
C. Get Access
(1) Put an access platform at the access door 811 of the avionics
compartment.
4. Procedure
_________
Subtask 24-22-34-020-052
(2) Lower the 2 knurled nuts (1) to disengage the 2 studs (2).
EFF :
ALL 24-22-34
Page 402
May 01/98
SYR
Generator Control Unit 1(2) GCU-1(2)
Figure 401/TASK 24-22-34-991-001
EFF :
ALL 24-22-34
Page 403
May 01/98
SYR
(3) Carefully pull the handle (3) of the GCU (4) until the GCU is
disconnected from the rack receptacle (5).
(5) Put blanking caps on the rack receptacle (5) and on the GCU
connector.
EFF :
ALL 24-22-34
Page 404
May 01/98
SYR
TASK 24-22-34-400-001
CAUTION : USE ONLY THE GROUND SERVICE NETWORK TO SUPPLY THE AIRCRAFT WITH AC
_______
AND DC POWER.
YOU CAN CAUSE DAMAGE TO THE EQUIPMENT DURING ITS REMOVAL/
INSTALLATION IF THE RELATED NETWORK IS NOT ISOLATED.
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
EFF :
ALL 24-22-34
Page 405
May 01/11
SYR
3. __________
Job Set-up
Subtask 24-22-34-860-051
(2) Make sure that the warning notice is in the cockpit to tell persons
not to operate the pushbutton switches (ENG MASTER 1(2)) on the pylon
panel 115VU (ENG panel).
Subtask 24-22-34-865-054
B. Make sure that this(these) circuit breaker(s) is(are) open, safetied and
tagged
-------------------------------------------------------------------------------
PANEL DESIGNATION IDENT. LOCATION
-------------------------------------------------------------------------------
FOR 1XU1
122VU ELEC/GCU/1 2XU1 T26
FOR 1XU2
122VU ELEC/GCU/2 2XU2 T27
Subtask 24-22-34-010-053
C. Get Access
4. Procedure
_________
Subtask 24-22-34-420-050
(2) Make sure that the electrical connectors are clean and in the correct
condition.
EFF :
ALL 24-22-34
Page 406
May 01/11
SYR
(3) Clean the component interface and/or the adjacent area.
(6) Carefully push the GCU until it is connected to the rack receptacle
(5).
Subtask 24-22-34-865-057
B. Remove the safety clip(s) and the tag(s) and close this(these) circuit
breaker(s):
FOR 1XU1
2XU1
FOR 1XU2
2XU2
Subtask 24-22-34-710-050
C. Do an operational test of the GPCU with the CFDS (Ref. TASK 24-41-00-740-
002).
Subtask 24-22-34-710-051
(2) Do the EIS start procedure (Upper ECAM DU and lower ECAM DU only)
(Ref. TASK 31-60-00-860-001).
R (4) On the lower ECAM display unit, make sure that there is the green
R line between GEN1(2) and AC1(2).
EFF :
ALL 24-22-34
Page 407
Nov 01/03
SYR
(6) Stop the engine 1(2) (Ref. TASK 71-00-00-710-018).
5. Close-up
________
Subtask 24-22-34-410-050
A. Close Access
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
EFF :
ALL 24-22-34
Page 408
May 01/98
SYR
MODULE - LIGHTNING PROTECTION (19XU1,19XU2) - REMOVAL/INSTALLATION
__________________________________________________________________
TASK 24-22-51-000-001
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
A. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
Subtask 24-22-51-010-050
A. Get Access
EFF :
ALL 24-22-51
Page 401
Nov 01/00
SYR
4. Procedure
_________
Subtask 24-22-51-020-050
EFF :
ALL 24-22-51
Page 402
Nov 01/00
R
SYR
Lightning Protection Module
Figure 401/TASK 24-22-51-991-001
EFF :
ALL 24-22-51
Page 403
Nov 01/00
R
SYR
TASK 24-22-51-400-001
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
A. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
Subtask 24-22-51-010-051
A. Get Access
EFF :
ALL 24-22-51
Page 404
Nov 01/00
SYR
4. Procedure
_________
Subtask 24-22-51-420-050
(1) Install the lightning protection module (3) on the three barrels (4)
of the contactor base (5).
(2) Install the bonding lead (2) of the lightning protection module (3)
with the screw (1) and then tighten.
5. Close-up
________
Subtask 24-22-51-410-050
A. Close Access
EFF :
ALL 24-22-51
Page 405
Nov 01/00
SYR
MODULE - LIGHTNING PROTECTION (19XU1,19XU2) - INSPECTION/CHECK
______________________________________________________________
TASK 24-22-51-200-001
1. __________________
Reason for the Job
The crew has made an entry in the log book for a lightning.
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
EFF :
ALL 24-22-51
Page 601
May 01/11
SYR
3. __________
Job Set-up
Subtask 24-22-51-010-052
A. Get Access
(2) In the cockpit, on the rear panel 120VU, open the panel which gives
access to the AC power center 123VU.
Subtask 24-22-51-860-052
B. Safety Precautions
(1) Make sure that the external power connector is not connected to the
aircraft EXT PWR receptacle.
(2) Put a warning notice on the access door 121AL to tell persons not to
connect the external power connector to the aircraft EXT PWR
receptacle.
(3) In the cockpit, on the ELEC panel 35VU, make sure that these
pushbutton switches are released:
- APU GEN,
- BAT 1, BAT 2,
- GEN 1, GEN 2,
- EXT PWR.
(4) In the cockpit, put warning notices to tell persons not to operate
the pushbutton switches on these overhead panels:
- 21VU (EMER ELEC PWR),
- 25VU (APU),
- 35VU (ELEC).
EFF :
ALL 24-22-51
Page 602
May 01/11
SYR
4. Procedure
_________
Subtask 24-22-51-210-050
A. Inspection
5. Close-up
________
Subtask 24-22-51-410-051
A. Close Access
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
(2) In the cockpit, on the rear panel 120VU, close the panel which gives
access to the AC power center 123VU.
EFF :
ALL 24-22-51
Page 603
May 01/98
SYR
CONTACTOR (9XU1,9XU2,11XU1,11XU2) - REMOVAL/INSTALLATION
________________________________________________________
TASK 24-22-55-000-001
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
Subtask 24-22-55-010-050
A. Get Access
(2) On the L lower side of the panel 120VU, remove the access door (8).
EFF :
ALL 24-22-55
Page 401
May 01/11
SYR
Subtask 24-22-55-860-051
B. Safety Precautions
(1) Make sure that the external power connector is not connected to the
aircraft EXT PWR receptacle.
(2) Put warning notice(s) in position on the access door 121AL to tell
persons not to connect the external power connector to the aircraft
EXT PWR receptacle.
(3) In the cockpit, on the ELEC panel 35VU, make sure that these
pushbutton switches are released:
- BAT 1, BAT 2,
- APU GEN,
- GEN 1, GEN 2,
- EXT PWR.
(4) In the cockpit, put warning notices in position to tell persons not
to operate the pushbutton switches on these overhead panels:
- 21VU (EMER ELEC PWR section),
- 25VU (APU section),
- 35VU (ELEC).
4. Procedure
_________
Subtask 24-22-55-020-050
CAUTION : REMOVE THE CONTACTOR ONLY AND NOT THE BASE OR THE MODULE WHERE
_______
THE WIRES ARE CONNECTED.
(2) Put blanking caps on the disconnected electrical connector (1) and
the electrical receptacle (7).
NOTE : Do not remove the captive screws (2) and the spring washers
____
from contactor (3).
EFF :
ALL 24-22-55
Page 402
May 01/11
R
SYR
R Contactors
Figure 401/TASK 24-22-55-991-001
EFF :
ALL 24-22-55
Page 403
Nov 01/04
SYR
(4) Remove the contactor (3).
R Subtask 24-22-55-020-051
R CAUTION : MAKE MATCH MARKS ON ALL THE ELECTRICAL WIRES BEFORE YOU
_______
R DISCONNECT THEM. INCORRECT CONNECTION OF WIRES WILL CAUSE
R DAMAGE TO EQUIPMENT.
R NOTE : The removal of the base is necessary only if the base is damaged.
____
R (5) Remove the jumpers (17) from the base (6) and from the adjacent
R bases.
R (6) Remove the four screws (19) and the four washers (18).
EFF :
ALL 24-22-55
Page 404
Nov 01/04
SYR
TASK 24-22-55-400-002
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
EFF :
ALL 24-22-55
Page 405
May 01/11
SYR
3. __________
Job Set-up
Subtask 24-22-55-010-051
A. Get Access
(1) Make sure that the Third Occupant seat is removed (Ref. TASK 25-11-
41-000-001).
(2) On the L lower side of the panel 120VU, make sure that the access
door (8) is removed.
Subtask 24-22-55-860-050
(1) Make sure that the external power connector is not connected to the
aircraft EXT PWR receptable.
(2) Make sure that the warning notice(s) are in position on the access
door 121AL to tell persons not to connect the external power
connector to the aircraft EXT PWR receptacle.
(3) In the cockpit, on the ELEC panel 35VU, make sure that these
pushbutton switches are released:
- BAT 1, BAT 2,
- APU GEN
- GEN 1, GEN 2,
- EXT PWR.
(4) In the cockpit, make sure that the warning notice(s) are in position
to tell persons not to operate the pushbutton switches on these
overhead panels:
- 21VU (EMERG ELEC PWR section),
- 25VU (APU section),
- 35VU (ELEC).
EFF :
ALL 24-22-55
Page 406
May 01/11
SYR
4. Procedure
_________
Subtask 24-22-55-420-052
CAUTION : REFER TO THE MATCH MARKS MADE DURING THE REMOVAL WHEN YOU
_______
CONNECT THE ELECTRICAL WIRES.
INCORRECT CONNECTION OF THE WIRES WILL CAUSE DAMAGE TO
EQUIPMENT.
(2) Install the four screws (19) and washers (18) and tighten them.
(3) Make sure that the electrical cables (6) are clean and in correct
condition.
(5) Install the nuts (12) and the washers (13) and tighten them.
(b) Install the screws (10) and the washers (9) and tighten them.
(7) Install the jumpers (17) between the base (6) and the adjacent bases.
(8) Install the washers (15) and the nuts (16) and tighten them
(Ref. TASK 20-21-15-912-001).
Subtask 24-22-55-420-051
(1) Install the contactor (3) on the 6 tapped barrels (5) of the
contactor base (6).
(2) TORQUE the captive screws (2) to between 0.50 and 0.60 m.daN (44.24
and 53.09 lbf.in).
EFF :
ALL 24-22-55
Page 407
May 01/11
SYR
(4) Make sure that the electrical connectors are clean and in the correct
condition.
Subtask 24-22-55-710-053
R (b) Do the EIS start procedure (Upper ECAM DU and lower ECAM DU only)
(Ref. TASK 31-60-00-860-001).
R
R (d) On the lower ECAM display unit, make sure that the green lines
R between the EXT PWR and AC 1(2) are present.
R
Subtask 24-22-55-710-054
EFF :
ALL 24-22-55
Page 408
May 01/11
SYR
R (a) Start the engine 1(2) automatically (Ref. TASK 71-00-00-710-043).
R
R (b) Do the EIS start procedure (Upper ECAM DU and lower ECAM DU only)
(Ref. TASK 31-60-00-860-001).
R
R (d) On the lower ECAM display unit, make sure that green line between
R GEN 1(2) and AC 1(2) is present.
R
5. Close-up
________
Subtask 24-22-55-410-051
A. Close Access
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
(2) Install the access door (8) on L lower side of the panel 120VU.
EFF :
ALL 24-22-55
Page 409
May 01/11
SYR
R AC AUXILIARY GENERATION - DESCRIPTION AND OPERATION
___________________________________________________
1. _______
General
The AC auxiliary generation comes from the APU generator. This generator
can:
- in flight, replace either or both engine generator(s) in case of failure,
- on the ground, supply the aircraft electrical network when the electrical
ground power unit is not available.
2. __________________
Component Location
-------------------------------------------------------------------------------
FIN | FUNCTIONAL DESIGNATION | PANEL|ZONE|ACCESS | ATA
| | | | DOOR | REF.
-------------------------------------------------------------------------------
1XS GCU-APU 91VU 121 811 24-23-34
2XS P/BSW-ELEC/APU GEN 35VU 210 831 24-23-00
3XS GLC-APU 120VU 212 831 24-23-55
8XS GEN-APU 310 24-23-51
42XS CT-AC, APU GEN 120VU 212 831 24-23-00
3. __________________
System Description
R 4. _____________________
Component Description
R A. APU Generator
R The APU directly drives the APU generator at a nominal 24000 rpm constant
R speed.
R The APU gearbox supplies the oil for cooling and lubrication of the
R generator. The cooling circuit is common to the APU and the generator.
R The APU supplies, scavenges, drains the oil.
R The generator is a brushless oil-cooled generator with a nominal 115/200
R volt, 90 KVA, 3 phase 400 Hz output.
R NOTE : The frequency range of the APU generator can be from 395Hz to
____
R 405Hz. When the APU fuel-saving mode is used, the APU speed is
R reduced to 99%. In this mode, the frequency of the APU generator
R decreases to 396Hz.
EFF :
ALL 24-23-00
Page 1
May 01/09
SYR
AC Auxiliary Generation (APU Generator GCU)
Component Location
Figure 001 (SHEET 1)
EFF :
ALL
24-23-00 Page 2
May 01/98
SYR
AC Auxiliary Generation (APU Generator GCU)
Component Location
Figure 001 (SHEET 2)
EFF :
ALL
24-23-00 Page 3
May 01/98
SYR
AC Auxiliary Generation (APU Generator GCU)
Component Location
Figure 002
EFF :
ALL
24-23-00 Page 4
May 01/98
SYR
APU Generator Configuration - Block Diagram
Figure 003
EFF :
ALL 24-23-00
Page 5/6
May 01/98
SYR
- the pilot exciter,
- the main exciter,
- the main alternator.
The operation principle is the same as that of the IDG generator (Ref.
24-21, generator section).
NOTE : The PMG frequency for the APU generator is 1600 Hz.
____
D. Power Contactor
Refer to Chapter 24-22-00.
(1) Functions
(a) Generator CT
The generator CT is used for differential and overcurrent
protections.
(b) Three-hole CT
The three-hole CT contains three toroidal transformers, one for
each of the power feeder cables. The three-hole CT is connected
in electrical opposition to the CT of the APU generator.
This CT is used for differential and open cable protections.
EFF :
ALL 24-23-00
Page 7
May 01/11
SYR
Current Transformers - Block Diagram
Figure 004
EFF :
ALL 24-23-00
Page 8
May 01/98
SYR
5. ________________________________
Operation/Control and Indicating
NOTE : On the ground, the generator line contactor closes only if the
____
ground power unit does not already supply the transfer network.
For the power supply of the aircraft, the ground power unit is
more important than the APU generator.
(Ref. Fig. 007)
When the FAULT legend comes on, there is a failure of the channel.
At the same time:
- the single chime operates,
- the MASTER CAUT light comes on,
- on the upper ECAM display unit, an amber message is shown,
- on the lower ECAM display unit, the ELEC page is automatically
shown.
EFF :
ALL 24-23-00
Page 9
May 01/98
SYR
Auxiliary Generation Operation - Schematic Diagram
Figure 005 (SHEET 1)
EFF :
ALL 24-23-00
Page 10
May 01/98
SYR
Auxiliary Generation Operation - Schematic Diagram
Figure 005 (SHEET 2)
EFF :
ALL 24-23-00
Page 11
May 01/98
SYR
INTENTIONALLY BLANK
24-23-00
Page 12
May 01/98
SYR
GLC - APU Supply - Schematic Diagram
Figure 006
EFF :
ALL 24-23-00
Page 13/14
May 01/98
SYR
INTENTIONALLY BLANK
24-23-00
Page 15
May 01/98
SYR
APU GEN FAULT - Upper and Lower ECAM Display Unit
Figure 007 (SHEET 1)
EFF :
ALL 24-23-00
Page 16
May 01/98
SYR
APU GEN FAULT - Upper and Lower ECAM Display Unit
Figure 007 (SHEET 2)
EFF :
ALL 24-23-00
Page 17
May 01/98
SYR
APU GEN FAULT - Upper and Lower ECAM Display Unit
Figure 007 (SHEET 3)
EFF :
ALL 24-23-00
Page 18
May 01/98
SYR
AC AUXILIARY GENERATION - DEACTIVATION/REACTIVATION
___________________________________________________
TASK 24-23-00-040-001
WARNING : DO NOT TOUCH THE APU UNTIL IT IS SUFFICIENTLY COOL TO PREVENT BURNS
_______
WHEN YOU DO THE MAINTENANCE TASK(S).
1. __________________
Reason for the Job
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
EFF :
ALL 24-23-00
Page 401
May 01/11
SYR
B. Consumable Materials
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
C. Expendable Parts
-------------------------------------------------------------------------------
FIG.ITEM |DESIGNATION |IPC-CSN
-------------------------------------------------------------------------------
D. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
EFF :
ALL 24-23-00
Page 402
May 01/07
SYR
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
Subtask 24-23-00-860-050
A. Obey the MMEL requirements related to Weight Impact and Effect on Balance
for Flights without APU Generator
Subtask 24-23-00-860-051
(2) On the APU section of the overhead panel 25VU, make sure that the APU
MASTER SW pushbutton switch is released (the ON legend is off).
(3) Put a warning notice in position in the cockpit to tell persons not
to start the APU.
EFF :
ALL 24-23-00
Page 403
Nov 01/10
SYR
Subtask 24-23-00-865-050
C. Make sure that this(these) circuit breaker(s) is(are) open, safetied and
tagged
-------------------------------------------------------------------------------
PANEL DESIGNATION IDENT. LOCATION
-------------------------------------------------------------------------------
121VU APU/APU/CTL 2KD L42
121VU APU/ECB/SPLY 1KD L41
Subtask 24-23-00-010-050
D. Get Access
R (1) Put the ACCESS PLATFORM 4M (13 FT) in position below the APU
compartment.
(2) Open the APU access doors 315AL and 316AR (Ref. TASK 52-41-00-010-
001).
4. Procedure
_________
Subtask 24-23-00-420-050
(a) Remove the plastic blanking cover from the generator pad on the
accessory drive gearbox.
(c) Remove and keep the nuts (1) from the studs. Make sure that the
nuts (1) are serviceable.
(d) Make sure that the face of the generator pad (10) and the studs
are in the correct condition.
EFF :
ALL 24-23-00
Page 404
May 01/11
SYR
Components for Flight without an APU Generator Installed
Figure 401/TASK 24-23-00-991-001
EFF :
ALL 24-23-00
Page 405
May 01/07
SYR
(2) Do a visual inspection of the cable support assembly (5).
(a) Make sure that the cable support assembly (5) is in the correct
condition.
1
_ Make sure that the components of the terminal block are in the
correct condition.
2
_ Do an inspection of the component interface and/or the
adjacent area.
(a) Clean the seal plate (7) with OILS (Material No. 03-002) or OILS
(Material No. 03-003) and a lint-free cotton cloth MISCELLANEOUS
(Material No. 19-003).
(b) Make sure that the faces of the seal plate (7) are in the correct
condition.
R (a) Make sure that the COVER-ASSEMBLY (3862619-1) (11) is clean and
in the correct condition.
(b) Make sure that the oil transfer channel and its inlet and outlet
openings are clean and not clogged.
(c) Make sure that the drain plug (6) is installed correctly, fully
tightened and safetied with MISCELLANEOUS (Material No. 19-010).
R (5) Install the seal plate (4095KM) (7) on the COVER-ASSEMBLY (3862619-1)
(11).
(a) Lubricate the new seal (9) and the screws (8) with OILS (Material
No. 03-002) or OILS (Material No. 03-003).
EFF :
ALL 24-23-00
Page 406
Nov 01/09
SYR
(6) Install the COVER-ASSEMBLY (3862619-1) (11).
(d) TORQUE the nuts (1) to between 3.9 and 4.4 m.daN (28.76 and 32.44
lbf.ft).
(7) Install the generator supply cables (3) on the terminal block on the
cable support assembly (5).
(b) Remove the tie-wraps that temporarily hold the generator supply
cables (3).
(c) Remove the plastic blanking cover from the ring terminals of the
generator supply cables (3).
(d) Attach the generator supply cables (3) to the applicable studs on
the terminal block with the nuts (2).
NOTE : Refer to the marks on the terminal block and the generator
____
supply cables (3).
(8) Connect the generator control cable to the connector on the cable
support assembly (5).
(c) Make sure that the electrical connectors are clean and in the
correct condition.
EFF :
ALL 24-23-00
Page 407
Nov 01/10
SYR
Subtask 24-23-00-865-051
B. Remove the safety clip(s) and the tag(s) and close this(these) circuit
breaker(s):
1KD, 2KD.
Subtask 24-23-00-790-050
C. Leak test
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
R (a) Examine the joint between the COVER-ASSEMBLY (3862619-1) (11) and
the generator pad (10) on the accessory drive gearbox for oil
leaks.
R (b) Examine the drain plug (6) on the COVER-ASSEMBLY (3862619-1) (11)
for oil leaks.
(5) Do a check of the oil quantity on the APU oil sight-glass. Add oil if
the oil level is on or below the ADD mark on the oil sight glass:
- GTCP 36-300 (Ref. TASK 49-90-00-600-001)
or
- APS 3200 (Ref. TASK 49-90-00-600-004)
or
EFF :
ALL 24-23-00
Page 408
Nov 01/09
SYR
- 131-9(A) (Ref. TASK 49-90-00-600-007).
5. Close-up
________
Subtask 24-23-00-410-050
A. Close Access
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
(3) Close the APU access doors 315AL and 316AR (Ref. TASK 52-41-00-410-
001).
Subtask 24-23-00-860-052
EFF :
ALL 24-23-00
Page 409
Nov 01/09
R
SYR
TASK 24-23-00-440-001
WARNING : DO NOT TOUCH THE APU UNTIL IT IS SUFFICIENTLY COOL TO PREVENT BURNS
_______
WHEN YOU DO THE MAINTENANCE TASK(S).
1. __________________
Reason for the Job
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
B. Consumable Materials
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
EFF :
ALL 24-23-00
Page 410
May 01/11
SYR
C. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
Subtask 24-23-00-860-053
(2) On the APU section of the overhead panel 25VU, make sure that the APU
R MASTER SW pushbutton switch is released (the ON legend is off).
(3) Put a warning notice in position in the cockpit to tell persons not
to start the APU.
Subtask 24-23-00-865-052
-------------------------------------------------------------------------------
PANEL DESIGNATION IDENT. LOCATION
-------------------------------------------------------------------------------
121VU APU/APU/CTL 2KD L42
121VU APU/ECB/SPLY 1KD L41
EFF :
ALL 24-23-00
Page 411
Nov 01/07
SYR
Subtask 24-23-00-010-051
C. Get Access
R (1) Put the ACCESS PLATFORM 4M (13 FT) in position below the APU
compartment.
(2) Open the APU access doors 315AL and 316AR (Ref. TASK 52-41-00-010-
001).
4. Procedure
_________
Subtask 24-23-00-020-050
(1) Disconnect the generator control cable from the connector on the
cable support assembly (5).
(2) Disconnect the generator supply cables (3) from the terminal block on
the cable support assembly (5).
(a) Remove the nuts (2) and disconnect the generator supply cables
(3).
(b) Temporarily install the nuts (2) on the studs of the terminal
block on the cable support assembly (5).
EFF :
ALL 24-23-00
Page 412
May 01/11
SYR
R (3) Drain the remaining oil from the COVER-ASSEMBLY (3862619-1) (11).
(a) Put the container in position below the generator pad (10).
(b) Remove and discard the lockwire from the drain plug (6).
(c) Remove the drain plug (6) and let the residual oil drain fully.
(d) Tighten the drain plug (6) and safety it with MISCELLANEOUS
(Material No. 19-010).
R (4) Remove the cable support assembly (5) and the COVER-ASSEMBLY
R (3862619-1) (11).
R (a) Hold the cable support assembly (5) and the COVER-ASSEMBLY
R (3862619-1) (11) in the correct position.
R (c) Remove the cable support assembly (5) and the COVER-ASSEMBLY
R (3862619-1) (11).
(b) Remove the screws (8) and the seal plate (4095KM) (7).
(8) Make sure that the parts retained from the removed component are
clean and in the correct condition.
5. Close-up
________
Subtask 24-23-00-865-053
A. Remove the safety clip(s) and the tag(s) and close this(these) circuit
breaker(s):
1KD, 2KD.
EFF :
ALL 24-23-00
Page 413
Nov 01/09
SYR
Subtask 24-23-00-410-051
B. Close Access
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
(3) Close the APU access doors 315AL and 316AR (Ref. TASK 52-41-00-410-
001).
Subtask 24-23-00-860-054
EFF :
ALL 24-23-00
Page 414
May 01/07
SYR
TASK 24-23-00-040-002
WARNING : DO NOT TOUCH THE APU UNTIL IT IS SUFFICIENTLY COOL TO PREVENT BURNS
_______
WHEN YOU DO THE MAINTENANCE TASK(S).
1. __________________
Reason for the Job
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
EFF :
ALL 24-23-00
Page 415
May 01/11
SYR
3. __________
Job Set-up
Subtask 24-23-00-860-055
(2) On the APU section of the overhead panel 25VU, make sure that the APU
MASTER SW pushbutton is released (the ON legend is off).
(3) Put a warning notice in position in the cockpit to tell persons not
to start the APU.
(4) Make sure that the ground fire extinguishing equipment is available.
Subtask 24-23-00-865-054
-------------------------------------------------------------------------------
PANEL DESIGNATION IDENT. LOCATION
-------------------------------------------------------------------------------
121VU APU/APU/CTL 2KD L42
121VU APU/ECB/SPLY 1KD L41
Subtask 24-23-00-010-053
C. Get Access
R (1) Put the ACCESS PLATFORM 4M (13 FT) in position below the APU
compartment.
(2) Open the APU access doors 315AL and 316AR (Ref. TASK 52-41-00-010-
001).
EFF :
ALL 24-23-00
Page 416
May 01/11
SYR
4. Procedure
_________
Subtask 24-23-00-020-051
Subtask 24-23-00-020-052
(1) Carefully remove the bolt (1) from the groove in the drive end of the
finished rotor assembly.
(2) Remove the quill shaft assembly (3) from the drive end of the
finished rotor assembly.
(3) Remove the seals (2) and (4) from the quill shaft assembly (3).
Subtask 24-23-00-420-051
C. Install the APU generator (Ref. TASK 24-23-51-400-001) without the quill
shaft.
5. Close-up
________
Subtask 24-23-00-865-055
A. Remove the safety clip(s) and the tag(s) and close this(these) circuit
breaker(s):
1KD, 2KD.
Subtask 24-23-00-410-052
B. Close Access
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
(3) Close the APU access doors 315AL and 316AR (Ref. TASK 52-41-00-410-
001).
EFF :
ALL 24-23-00
Page 417
May 01/07
SYR
APU Generator without Quill Shaft
Figure 402/TASK 24-23-00-991-002
EFF :
ALL 24-23-00
Page 418
May 01/07
SYR
(4) Remove the access platform(s).
Subtask 24-23-00-860-056
EFF :
ALL 24-23-00
Page 419
May 01/07
SYR
TASK 24-23-00-440-002
WARNING : DO NOT TOUCH THE APU UNTIL IT IS SUFFICIENTLY COOL TO PREVENT BURNS
_______
WHEN YOU DO THE MAINTENANCE TASK(S).
1. __________________
Reason for the Job
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
EFF :
ALL 24-23-00
Page 420
May 01/11
SYR
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
Subtask 24-23-00-860-057
(2) On the APU section of the overhead panel 25VU, make sure that the APU
MASTER SW pushbutton is released (the ON legend is off).
(3) Put a warning notice in position in the cockpit to tell persons not
to start the APU.
Subtask 24-23-00-865-056
-------------------------------------------------------------------------------
PANEL DESIGNATION IDENT. LOCATION
-------------------------------------------------------------------------------
121VU APU/APU/CTL 2KD L42
121VU APU/ECB/SPLY 1KD L41
Subtask 24-23-00-010-054
C. Get Access
R (1) Put the ACCESS PLATFORM 4M (13 FT) in position below the APU
compartment.
(2) Open the APU access doors 315AL and 316AR (Ref. TASK 52-41-00-010-
001).
EFF :
ALL 24-23-00
Page 421
May 01/11
SYR
(3) Set the control switch 11LJ to the ON position.
4. Procedure
_________
Subtask 24-23-00-020-053
A. Remove the APU Generator (Ref. TASK 24-23-51-000-001) without the quill
shaft.
Subtask 24-23-00-420-052
5. Close-up
________
Subtask 24-23-00-865-057
A. Remove the safety clip(s) and the tag(s) and close this(these) circuit
breaker(s):
1KD, 2KD.
Subtask 24-23-00-410-053
B. Close Access
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
(3) Close the APU access doors 315AL and 316AR (Ref. TASK 52-41-00-410-
001).
Subtask 24-23-00-860-058
EFF :
ALL 24-23-00
Page 422
May 01/11
R
SYR
CURRENT TRANSFORMER - AC (42XS) - REMOVAL/INSTALLATION
______________________________________________________
TASK 24-23-17-000-001
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
EFF :
ALL 24-23-17
Page 401
May 01/11
SYR
3. __________
Job Set-up
Subtask 24-23-17-010-050
A. Get Access
(2) On the rear panel 120VU, open the panel which gives access to the AC
power center 123VU.
Subtask 24-23-17-941-050
B. Safety Precautions
(1) Make sure that the external power connector is not connected to the
aircraft EXT PWR receptacle.
(2) Put warning notice(s) in position on the access door 121AL to tell
persons not to connect the external power connector to the aircraft
EXT PWR receptacle.
(3) In the cockpit, on the ELEC panel 35VU, make sure that these
pusbutton switches are released:
- BAT 1, BAT 2,
- APU GEN,
- GEN 1, GEN 2,
- EXT PWR.
(4) In the cockpit, put warning notice(s) in position to tell persons not
to operate the pushbutton switches on these overhead panels:
- 21VU (EMER ELEC PWR section),
- 25VU (APU section),
- 35VU (ELEC).
EFF :
ALL 24-23-17
Page 402
May 01/11
SYR
4. Procedure
_________
Subtask 24-23-17-020-051
(1) Remove the screws (12) and the washers (11) from the studs of the
contactor (5).
(2) Disconnect the cables (10) from the studs of the contactor (5).
NOTE : You must identify (also with the indications on the current
____
transformer) and disconnect only the cables which go through
the current transformer.
(3) Remove the nuts (9) and the washers (8) from the studs of the
contactor (5).
(4) Disconnect the cables (6) and (7) from the studs of the contactor
(5).
(5) Disconnect the electrical connector (4) from the current transformer
(1).
(6) Put blanking caps on the disconnected electrical connector (4) and
electrical receptacle.
(7) Remove the screws (3) and the washers (2) from the current
transformer (1).
(8) Remove the necessary cable ties to move the current transformer (1)
along the cables.
EFF :
ALL 24-23-17
Page 403
May 01/98
SYR
AC Current Transformer - Block Diagram
Figure 401/TASK 24-23-17-991-003
EFF :
ALL 24-23-17
Page 404
May 01/98
SYR
AC Current Transformer
Figure 402/TASK 24-23-17-991-004
EFF :
ALL 24-23-17
Page 405
May 01/98
SYR
TASK 24-23-17-400-001
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
EFF :
ALL 24-23-17
Page 406
May 01/11
SYR
3. __________
Job Set-up
Subtask 24-23-17-010-051
A. Get access
(1) Make sure that the Third Occupant seat is removed (Ref. TASK 25-11-
41-000-001).
(2) On the rear panel 120VU, make sure that the panel which gives access
to the AC power center 123VU is open.
R (3) Make sure that the ACCESS PLATFORM 18M (59 FT) - ADJUSTABLE is in
R position at the access door 121AL.
Subtask 24-23-17-860-050
(1) Make sure that the external power connector is not connected to the
aircraft external power receptacle.
(2) Make sure that the warning notice(s) is (are) in position on the
access door 121AL to tell persons not to connect the external power
connector to the aircraft external power receptacle.
(3) In the cockpit, on the ELEC panel 35VU, make sure that these
pushbutton switches are released:
- BAT 1, BAT 2,
- APU GEN,
- GEN 1, GEN 2,
- EXT PWR.
(4) In the cockpit, make sure that the warning notice(s) is (are) in
position to tell persons not to operate the pushbutton switches on
these overhead panels:
- 21VU (EMER ELEC PWR section),
- 25VU (APU section),
- 35VU (ELEC).
EFF :
ALL 24-23-17
Page 407
May 01/11
SYR
4. Procedure
_________
Subtask 24-23-17-420-050
(1) Put the cables (6), (7) and (10) through the current transformer (1).
NOTE : Make sure that the location of the cables agrees with that you
____
recorded at the removal.
(3) Install the washers (2) and the screws (3) on the current transformer
(1) and tighten them.
(5) Make sure that the electrical connectors are clean and in the correct
condition.
(6) Connect the electrical connector (4) to the current transformer (1).
(8) Install the cables (6) and (7), the washers (8) and the nuts (9) on
the studs of the contactor (5) and tighten them.
(9) Install the cables (10), the washers (11) and the screws (12) on the
studs of the contactor (5) and tighten them.
Subtask 24-23-17-860-051
(1) Energize the aircraft electrical circuits from the APU (Ref. TASK 24-
41-00-861-002).
EFF :
ALL 24-23-17
Page 408
May 01/11
SYR
Subtask 24-23-17-865-050
-------------------------------------------------------------------------------
PANEL DESIGNATION IDENT. LOCATION
-------------------------------------------------------------------------------
EFF :
ALL 24-23-17
Page 409
May 01/11
R
SYR
**ON A/C 001-002,
Subtask 24-23-17-710-050
D. Operational test
-------------------------------------------------------------------------------
R | ACTION | RESULT |
-------------------------------------------------------------------------------
3. In the FWD and/or AFT galleys: On the lower ECAM display unit:
- energize all the items of - make sure that the electrical
equipment. parameters (load, voltage and
frequency) of the APU GEN are
correct.
EFF :
001-002, 24-23-17
Page 410
May 01/11
SYR
**ON A/C 003-099,
Subtask 24-23-17-710-050-A
D. Operational test
-------------------------------------------------------------------------------
R | ACTION | RESULT |
-------------------------------------------------------------------------------
3. In the FWD and/or AFT galleys: On the lower ECAM display unit:
- energize all the items of - make sure that the electrical
equipment. parameters (load, voltage and
frequency) of the APU GEN are
correct.
Subtask 24-23-17-860-052
(1) De-energize the aircraft electrical circuits supplied from the APU
(Ref. TASK 24-41-00-862-002).
EFF :
ALL 24-23-17
Page 411
May 01/11
SYR
Subtask 24-23-17-410-050
F. Close Access
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
R (2) On the rear panel 120VU, close the panel which gives access to the AC
R power center 123VU.
EFF :
ALL 24-23-17
Page 412
Nov 01/00
SYR
CONTROL UNIT - GENERATOR (GCU) (1XS) - REMOVAL/INSTALLATION
___________________________________________________________
TASK 24-23-34-000-001
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
Subtask 24-23-34-860-051
A. Safety Precautions
(1) In the cockpit, on the overhead panel 25VU and 35VU, make sure these
pushbutton switches are released:
- START,
- APU GEN.
EFF :
ALL 24-23-34
Page 401
May 01/11
SYR
(2) In the cockpit, put warning notices to tell persons not to operate
the pushbutton switches on these overhead panels:
- 25VU (APU),
- 35VU (ELEC).
Subtask 24-23-34-865-050
-------------------------------------------------------------------------------
PANEL DESIGNATION IDENT. LOCATION
-------------------------------------------------------------------------------
122VU ELEC/GEN1/OFF/BTC1 SPLY 5XU T28
122VU ELEC/APU/GCU 6XS Y25
Subtask 24-23-34-010-050
C. Get Access
R (1) Put an ACCESS PLATFORM 18M (59 FT) - ADJUSTABLE at the access door
R 811 of the avionics compartment.
4. Procedure
_________
Subtask 24-23-34-020-050
(2) Lower the 2 knurled nuts (1) to disengage the 2 studs (2).
(3) Carefully pull the handle (3) of the GCU (4) until the GCU is
disconnected from the rack receptacle (5).
(5) Put blanking caps on the rack receptacle (5) and the GCU connector.
EFF :
ALL 24-23-34
Page 402
May 01/11
SYR
APU Generator Control Unit (GCU)
Figure 401/TASK 24-23-34-991-001
EFF :
ALL 24-23-34
Page 403
May 01/98
SYR
TASK 24-23-34-400-001
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
EFF :
ALL 24-23-34
Page 404
May 01/11
SYR
3. __________
Job Set-up
Subtask 24-23-34-860-052
(1) In the cockpit, on the overhead panel 25VU and 35VU, make sure that
these pushbutton switches are released:
- START,
- APU GEN.
(2) In the cockpit, make sure that warning notices are in position to
tell persons not to operate the pushbutton switches on these overhead
panels:
- 25VU (APU),
- 35VU (ELEC).
Subtask 24-23-34-865-052
B. Make sure that this(these) circuit breaker(s) is(are) open, safetied and
tagged
-------------------------------------------------------------------------------
PANEL DESIGNATION IDENT. LOCATION
-------------------------------------------------------------------------------
122VU ELEC/GEN1/OFF/BTC1 SPLY 5XU T28
122VU ELEC/APU/GCU 6XS Y25
Subtask 24-23-34-010-051
C. Get Access
EFF :
ALL 24-23-34
Page 405
May 01/11
SYR
4. Procedure
_________
Subtask 24-23-34-420-050
(2) Make sure that the electrical connectors are clean and in the correct
condition.
(6) Carefully push the GCU until it is connected to the rack receptacle
(5).
Subtask 24-23-34-865-055
B. Remove the safety clip(s) and the tag(s) and close this(these) circuit
breaker(s):
6XS, 5XU
Subtask 24-23-34-710-050
(1) Do an operational test of the GCU via the GPCU from the CFDS
(Ref. TASK 24-41-00-740-002).
(a) Do the procedure to energize the electrical circuits with the APU
(Ref. TASK 24-41-00-861-002).
EFF :
ALL 24-23-34
Page 406
May 01/11
SYR
(b) Do the EIS start procedure (Upper ECAM DU and lower ECAM DU only)
(Ref. TASK 31-60-00-860-001).
(d) On the lower ECAM display unit, make sure that the A/C electrical
configuration is correct.
5. Close-up
________
Subtask 24-23-34-410-050
A. Close Access
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
EFF :
ALL 24-23-34
Page 407
May 01/98
SYR
GENERATOR - APU (8XS) - REMOVAL/INSTALLATION
____________________________________________
TASK 24-23-51-000-001
WARNING : ISOLATE THE ELECTRICAL CIRCUITS FROM THE RELATED EQUIPMENT AND THE
_______
ENVIRONMENT.
WARNING : LOCK THE MECHANISM OF THE ACCESS DOOR 316AR WITH THE PIP PIN WHEN YOU
_______
OPEN THE ACCESS DOOR. THIS WILL PREVENT INJURY.
WARNING : DO NOT TOUCH THE APU UNTIL IT IS SUFFICIENTLY COOL TO PREVENT BURNS
_______
WHEN YOU DO THE MAINTENANCE TASK(S).
WARNING : DO NOT LET OIL STAY ON YOUR SKIN FOR A LONG TIME AS IT CAN CAUSE
_______
INJURY.
WARNING : DO NOT CAUSE DAMAGE TO THE THREADS OF THE SET SCREWS WHEN YOU REMOVE
_______
OR INSTALL THE GENERATOR.
THE GENERATOR WEIGHS APPROXIMATELY 23kg (50.7lb).
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
EFF :
ALL 24-23-51
Page 401
Nov 01/10
SYR
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
Subtask 24-23-51-860-050
(1) On the panel 25VU, make sure that the APU MASTER SW pushbutton switch
is off.
(2) Put a warning notice in the cockpit to tell persons not to start the
APU.
EFF :
ALL 24-23-51
Page 402
May 01/11
SYR
Subtask 24-23-51-865-050
-------------------------------------------------------------------------------
PANEL DESIGNATION IDENT. LOCATION
-------------------------------------------------------------------------------
121VU APU/APU/CTL 2KD L42
121VU APU/ECB/SPLY 1KD L41
Subtask 24-23-51-010-050
C. Get Access
R (1) Put the ACCESS PLATFORM 3M (10 FT)- ADJUSTABLE in position below the
APU access doors 315AL and 316AR.
(2) Open the APU access doors 315AL and 316AR (Ref. TASK 52-41-00-010-
001).
4. Procedure
_________
Subtask 24-23-51-020-050
WARNING : DO NOT CAUSE DAMAGE TO THE THREADS OF THE SET SCREWS WHEN YOU
_______
REMOVE OR INSTALL THE GENERATOR.
THE GENERATOR WEIGHS APPROXIMATELY 23kg (50.7lb).
R (1) Put the CABLE-SAFETY, APU GENERATOR on the generator to get a safe
condition when you remove the generator.
(2) Disconnect the electrical connector (12) from the APU generator (4).
(4) Remove the screws (17),the washers (16) and the cover plate (18).
(5) Remove the nuts (19), the four electrical cables (20) and the washers
(21).
(6) Put a container below the generator (4) to collect the oil which will
flow when you remove the drain plug (14).
EFF :
ALL 24-23-51
Page 403
Nov 01/10
SYR
R APU Generator 8XS
Figure 401/TASK 24-23-51-991-001-A
EFF :
ALL 24-23-51
Page 404
May 01/06
SYR
APU Generator Safety Cable
R Figure 402/TASK 24-23-51-991-003-A
EFF :
ALL 24-23-51
Page 405
Nov 01/01
SYR
(7) Remove and discard the lockwire from the drain plug (14) and remove
it. Take care to collect the drained oil in the container.
(8) Remove and discard the sealwasher (13) from the drain plug (14).
CAUTION : BE CAREFUL WHEN YOU REMOVE THE NUTS. A SPANNER CAN EASILY
_______
CAUSE DAMAGE TO THE ADJACENT WEBS OF THE GENERATOR HOUSING.
(a) Support the generator (4), loosen the bolts (15) until the
generator can be rotated.
CAUTION : BE CAREFUL WHEN YOU TURN THE GENERATOR. TOOLS THAT YOU USE
_______
TO HELP YOU MOVE THE APU GENERATOR CAN EASILY CAUSE DAMAGE
TO THE HOUSING. DO NOT APPLY FORCE TO THE WEBS AT THE MAIN
FLANGE.
(a) Turn the generator (4) counterclockwise and withdraw it from the
gear-box splined drive.
(12) Remove the countersunk screws (1) and the seal plate (7), if a new
generator must be installed.
Subtask 24-23-51-210-059
Subtask 24-23-51-612-050
EFF :
ALL 24-23-51
Page 406
May 01/11
SYR
- for APU 131-9(A)
(Ref. TASK 49-90-00-600-008).
EFF :
ALL 24-23-51
Page 407
May 01/11
R
SYR
TASK 24-23-51-000-001- 01
WARNING : ISOLATE THE ELECTRICAL CIRCUITS FROM THE RELATED EQUIPMENT AND THE
_______
ENVIRONMENT.
WARNING : LOCK THE MECHANISM OF THE ACCESS DOOR 316AR WITH THE PIP PIN WHEN YOU
_______
OPEN THE ACCESS DOOR. THIS WILL PREVENT INJURY.
WARNING : DO NOT TOUCH THE APU UNTIL IT IS SUFFICIENTLY COOL TO PREVENT BURNS
_______
WHEN YOU DO THE MAINTENANCE TASK(S).
WARNING : DO NOT LET OIL STAY ON YOUR SKIN FOR A LONG TIME AS IT CAN CAUSE
_______
INJURY.
WARNING : DO NOT CAUSE DAMAGE TO THE THREADS OF THE SET SCREWS WHEN YOU REMOVE
_______
OR INSTALL THE GENERATOR.
THE GENERATOR WEIGHS APPROXIMATELY 23kg (50.7lb).
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
EFF :
ALL 24-23-51
Page 408
Aug 01/11
SYR
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
Subtask 24-23-51-860-052
(1) On the panel 25VU, make sure that the APU MASTER SW pushbutton switch
is off.
(2) Put a warning notice in the cockpit to tell persons not to start the
APU.
EFF :
ALL 24-23-51
Page 409
May 01/11
SYR
Subtask 24-23-51-865-058
-------------------------------------------------------------------------------
PANEL DESIGNATION IDENT. LOCATION
-------------------------------------------------------------------------------
121VU APU/APU/CTL 2KD L42
121VU APU/ECB/SPLY 1KD L41
Subtask 24-23-51-010-053
C. Get Access
R (1) Put the ACCESS PLATFORM 3M (10 FT)- ADJUSTABLE in position below the
APU access doors 315AL and 316AR.
(2) Open the APU access doors 315AL and 316AR (Ref. TASK 52-41-00-010-
001).
4. Procedure
_________
Subtask 24-23-51-020-052
WARNING : DO NOT CAUSE DAMAGE TO THE THREADS OF THE SET SCREWS WHEN YOU
_______
REMOVE OR INSTALL THE GENERATOR.
THE GENERATOR WEIGHS APPROXIMATELY 23kg (50.7lb).
(1) Disconnect the electrical connector (12) from the APU generator (4).
(3) Remove the screws (17), the washers (16) and the cover plate (18).
(4) Remove the nuts (19), the four electrical cables (20) and the washers
(21).
EFF :
ALL 24-23-51
Page 410
Nov 01/10
SYR
R APU Generator 8XS
Figure 403/TASK 24-23-51-991-005-A
EFF :
ALL 24-23-51
Page 411
Aug 01/11
SYR
APU Generator Hoist
Figure 404/TASK 24-23-51-991-006-A
EFF :
ALL 24-23-51
Page 412
May 01/10
R
SYR
(5) Put a container below the generator (4) to collect the oil which will
flow when you remove the drain plug (14).
(6) Remove and discard the lockwire from the drain plug (14) and remove
it. Take care to collect the drained oil in the container.
(7) Remove and discard the sealwasher (13) from the drain plug (14).
(8) Install the lifting eye (23) to the lifting boss of the generator
(4).
NOTE : Make sure that the threads of the lifting eye (23) and the
____
generator-lifting boss are in correct condition. Use the
drained oil to lubricate the thread of the lifting eye (23).
(10) Install the shackle with the quick-release pin (25) to the generator
lifting-eye (23).
(11) Operate the HOIST-MINILIFT until its cable (24) has a sufficient
tension.
CAUTION : BE CAREFUL WHEN YOU REMOVE THE NUTS. A SPANNER CAN EASILY
_______
CAUSE DAMAGE TO THE ADJACENT WEBS OF THE GENERATOR HOUSING.
(a) Make sure that the HOIST-MINILIFT holds the weight of the
generator (4) and loosen the bolts (15) until the generator can
be rotated.
CAUTION : BE CAREFUL WHEN YOU TURN THE GENERATOR. TOOLS THAT YOU USE
_______
TO HELP YOU MOVE THE APU GENERATOR CAN EASILY CAUSE DAMAGE
TO THE HOUSING. DO NOT APPLY FORCE TO THE WEBS AT THE MAIN
FLANGE.
(a) Turn the generator (4) counterclockwise and withdraw it from the
gear-box splined drive.
(14) Lower the generator from the APU compartment and disconnect the
shackle from the lifting eye (23).
EFF :
ALL 24-23-51
Page 413
Aug 01/11
SYR
(16) Remove and discard the O-rings (9) and (10).
(17) Remove the countersunk screws (1) and the seal plate (7), if a new
generator must be installed.
Subtask 24-23-51-210-060
Subtask 24-23-51-612-051
EFF :
ALL 24-23-51
Page 414
May 01/11
SYR
TASK 24-23-51-400-001
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
B. Consumable Materials
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
EFF :
ALL 24-23-51
Page 415
Nov 01/10
SYR
C. Expendable Parts
-------------------------------------------------------------------------------
FIG.ITEM |DESIGNATION |IPC-CSN
-------------------------------------------------------------------------------
D. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
Subtask 24-23-51-860-051
(1) On the panel 25VU make sure that the APU MASTER SW pushbutton switch
is off.
(2) Make sure that there is a warning notice in the cockpit to tell
persons not to start the APU.
EFF :
ALL 24-23-51
Page 416
May 01/10
SYR
(4) Make sure that ground fire extinguishing equipment is available.
(5) Make sure that the access platform is in position below the APU
compartment.
(6) Make sure that the APU access doors are open (Ref. TASK 52-41-00-010-
001).
4. Procedure
_________
Subtask 24-23-51-420-050
(1) Examine the seal plate (7) and the seal (8) and (11), which are part
of the seal plate.
(a) Remove the countersunk screws (1) and the seal plate (7).
(b) Lubricate the seals (8) and (11) of the new seal plate with a
thin layer of OILS (Material No. 03-002)
(c) Position the seal plate (7) with the seal (8) for the oil
scavenge port in the 6 oclock position on the flange of the APU
generator (4).
NOTE : Make sure that the dowel pin (3) engages correctly with
____
the pilot hole (2).
(d) Lubricate the countersunk screws (1) with OILS (Material No. 03-
002).
(3) Lubricate the new packing (10) and the new seal (9) with a thin layer
of OILS (Material No. 03-002)
EFF :
ALL 24-23-51
Page 417
Nov 01/10
SYR
(4) Install the new seal (10) on the generator splined drive shaft.
(5) Install the new preformed packing (9) on the generator mount flange.
(6) Install the generator (4) over the nuts (15) and turn it clockwise to
engage the slots.
(7) Make sure that the dowel pin (3) fully engages in the mounting flange
of the accessory drive gearbox.
R (8) TORQUE the nuts (15) to between 2.6 and 3.0 m.daN (19.17 and 22.12
R lbf.ft).
(9) TORQUE the nuts (15) behind the generator terminal with an ADAPTER-
TORQUE (Ref. TASK 20-21-11-911-001).
(10) Clean the nuts of the APU generator with CLEANING AGENTS (Material
No. 11-004).
(11) Mark the tightened generator nuts with PAINTS FOR DETAIL (INTERNAL
AND EXTERN AL) (Material No. 07-020).
(13) Connect the electrical connector (12) to the APU generator (4).
NOTE : Make sure that you connect the electrical cable connections
____
correctly to the APU generator terminal.
(14) Connect the electrical cables (20) with the washers (21) and the nuts
(19) to the APU generator (4) as follows:
CAUTION : MAKE SURE THAT THE WASHER IS INSTALLED BETWEEN THE PHASE
_______
LEADS AND THE TERMINAL NUT. IF NOT, THE TERMINAL BLOCK WILL
BURN LOCALLY BECAUSE OF RESISTANCE HEATING.
EFF :
ALL 24-23-51
Page 418
May 01/11
SYR
- cable 8XS-T2 to generator terminal T2,
- cable 8XS-T3 to generator terminal T3,
- cable 8XS- N to generator terminal N.
R (15) TORQUE the nuts (19) to between 2.3 and 2.49 m.daN (16.96 and 18.36
R lbf.ft).
(16) Install the cover plate (18) with the washers (16) and the screws
(17).
(17) TORQUE the screws (17) to between 0.43 and 0.47 m.daN (38.05 and
41.59 lbf.in).
(18) Install the drain plug (14) with a new sealwasher (13).
(19) TORQUE the drain plug (14) to between 2.95 and 3.25 m.daN (21.75 and
23.96 lbf.ft).
(20) Safety the drain plug (14) with lockwire-corrosion resistant steel
0.8 mm (0.0314 in.) dia.
Subtask 24-23-51-210-051
B. Visual Check
(1) Do a visual check of the oil quantity on the APU oil level. Add oil
if the oil level is on or less than the ADD mark on the sight glass
- for APU GTCP 36-300
(Ref. TASK 49-90-00-600-001)
- for APU APS 3200
(Ref. TASK 49-90-00-600-004)
- for APU 131-9(A)
(Ref. TASK 49-90-00-600-007)
Subtask 24-23-51-865-053
C. Remove the safety clip(s) and the tag(s) and close this(these) circuit
breaker(s):
-------------------------------------------------------------------------------
PANEL DESIGNATION IDENT. LOCATION
-------------------------------------------------------------------------------
121VU APU/APU/CTL 2KD L42
121VU APU/ECB/SPLY 1KD L41
EFF :
ALL 24-23-51
Page 419
May 01/10
SYR
Subtask 24-23-51-710-050
(3) Check at 95 % speed of the APU that the generator energizes and
begins to indicate voltage and frequency (without the selection of
electrical loads).
(4) An AVAIL message on top of the APU page shows that you can select
an electric/pneumatic load.
5. Close-up
________
Subtask 24-23-51-410-051
A. Close Access
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
(2) Close the APU access doors 315AL, 316AR (Ref. TASK 52-41-00-410-001).
EFF :
ALL 24-23-51
Page 420
May 01/10
R
SYR
(4) Remove the warning notice(s).
EFF :
ALL 24-23-51
Page 421
May 01/10
R
SYR
TASK 24-23-51-400-001- 01
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
B. Consumable Materials
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
EFF :
ALL 24-23-51
Page 422
Aug 01/11
SYR
C. Expendable Parts
-------------------------------------------------------------------------------
FIG.ITEM |DESIGNATION |IPC-CSN
-------------------------------------------------------------------------------
D. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
Subtask 24-23-51-860-053
(1) On the panel 25VU make sure that the APU MASTER SW pushbutton switch
is off.
(2) Make sure that there is a warning notice in the cockpit to tell
persons not to start the APU.
EFF :
ALL 24-23-51
Page 423
May 01/10
SYR
(3) Make sure that hydraulic systems are depressurized
(Ref. TASK 29-00-00-864-001).
(5) Make sure that the access platform is in position below the APU
compartment.
(6) Make sure that the APU access doors are open (Ref. TASK 52-41-00-010-
001).
R (7) Make sure that the HOIST-MINILIFT is installed correctly in the APU
generator hoist bracket.
4. Procedure
_________
Subtask 24-23-51-420-053
WARNING : DO NOT CAUSE DAMAGE TO THE THREADS OF THE SET SCREWS WHEN YOU
_______
REMOVE OR INSTALL THE GENERATOR.
THE GENERATOR WEIGHS APPROXIMATELY 23kg (50.7lb).
(2) Lubricate the new packing (10) and the new seal (9) with a thin layer
of OILS (Material No. 03-002)
(3) Install the new seal (10) on the generator splined-drive-shaft (6).
(4) Install the new preformed packing (9) on the generator mount-flange
(5).
EFF :
ALL 24-23-51
Page 424
Aug 01/11
SYR
(5) Install the lifting eye (23) to the lifting boss of the generator
(4).
NOTE : Make sure that the threads of the lifting eye (23) and the
____
generator lifting boss are in good condition. Lubricate the
thread of the lifting eye (23) with OILS (Material No. 03-
002).
(6) Install the shackel with the quick-release pin (25) to the lifting
eye (23).
(7) Operate the HOIST-MINILIFT and lift the generator (4) in position to
the generator mounting flange.
(9) Install the generator (4) over the nuts (15) and turn it clockwise to
engage the slots.
(10) Make sure that the dowel pin (3) fully engages in the mounting flange
of the accessory drive gearbox.
(11) TORQUE the nuts (15) to between 2.69 and 3.22 m.daN (19.83 and 23.74
lbf.ft).
(12) TORQUE the nuts (15) behind the generator terminal with an ADAPTER-
TORQUE (Ref. TASK 20-21-11-911-001).
(13) Clean the nuts of the APU generator with CLEANING AGENTS (Material
No. 11-004).
R (14) Mark the tightened generator nuts with 07-560 SECURING LACQUER
EFF :
ALL 24-23-51
Page 425
Aug 01/11
SYR
(16) Connect the electrical connector (12) to the APU generator (4).
NOTE : Make sure that you connect the electrical cable connections
____
correctly to the APU generator terminal.
(17) Connect the electrical cables (20) with the washers (21) and the nuts
(19) to the APU generator (4) as follows:
CAUTION : MAKE SURE THAT THE WASHER IS INSTALLED BETWEEN THE PHASE
_______
LEADS AND THE TERMINAL NUT. IF NOT, THE TERMINAL BLOCK WILL
BURN LOCALLY BECAUSE OF RESISTANCE HEATING.
R (18) TORQUE the nuts (19) to between 2.3 and 2.49 m.daN (16.96 and 18.36
R lbf.ft).
(19) Install the cover plate (18) with the washers (16) and the screws
(17).
(20) TORQUE the screws (17) to between 0.43 and 0.47 m.daN (38.05 and
41.59 lbf.in).
(21) Install the drain plug (14) with a new sealwasher (13).
(22) TORQUE the drain plug (14) to between 2.95 and 3.25 m.daN (21.75 and
23.96 lbf.ft).
(23) Safety the drain plug (14) with lockwire-corrosion resistant steel
0.8 mm (0.0314 in.) dia.
Subtask 24-23-51-210-058
B. Visual Check
(1) Do a visual check of the oil quantity on the APU oil level. Add oil
if the oil level is on or less than the ADD mark on the sight glass
- for APU GTCP 36-300
(Ref. TASK 49-90-00-600-001)
- for APU APS 3200
(Ref. TASK 49-90-00-600-004)
EFF :
ALL 24-23-51
Page 426
May 01/10
SYR
- for APU 131-9(A)
(Ref. TASK 49-90-00-600-007)
Subtask 24-23-51-865-059
C. Remove the safety clip(s) and the tag(s) and close this(these) circuit
breaker(s):
-------------------------------------------------------------------------------
PANEL DESIGNATION IDENT. LOCATION
-------------------------------------------------------------------------------
121VU APU/APU/CTL 2KD L42
121VU APU/ECB/SPLY 1KD L41
Subtask 24-23-51-710-054
(3) Check at 95 % speed of the APU that the generator energizes and
begins to indicate voltage and frequency (without the selection of
electrical loads).
(4) An AVAIL message on top of the APU page shows that you can select
an electric/pneumatic load.
EFF :
ALL 24-23-51
Page 427
May 01/10
R
SYR
(7) Do a leak check of the APU Oil System.
5. Close-up
________
Subtask 24-23-51-410-056
A. Close Access
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
(2) Close the APU access doors 315AL, 316AR (Ref. TASK 52-41-00-410-001).
EFF :
ALL 24-23-51
Page 428
May 01/10
SYR
CONTACTOR (3XS) - REMOVAL/INSTALLATION
______________________________________
TASK 24-23-55-000-001
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
R
No specific blanking caps
No specific warning notices
R No specific 1 ACCESS PLATFORM 1M (3 FT)-ADJUSTABLE
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
EFF :
ALL 24-23-55
Page 401
May 01/11
SYR
3. __________
Job Set-up
Subtask 24-23-55-860-050
A. Safety Precautions
(1) Make sure that the external power connector is not connected to the
aircraft EXT PWR receptacle.
(2) Put warning notice(s) in position on the access door 121AL to tell
persons not to connect the external power connector to the aircraft
EXT PWR receptacle.
(3) In the cockpit, on the ELEC panel 35VU, make sure that these
pushbutton switches are released:
- BAT 1, BAT 2,
- APU GEN,
- GEN 1, GEN 2,
- EXT PWR.
(4) In the cockpit, put warning notices in position to tell persons not
to operate the pushbutton switches on these overhead panels:
- 21VU (EMER ELEC PWR section),
- 25VU (APU section),
- 35VU (ELEC).
Subtask 24-23-55-010-050
B. Get Access
(2) On the L lower side of the panel 120VU, remove the access door (8).
EFF :
ALL 24-23-55
Page 402
May 01/11
SYR
4. Procedure
_________
Subtask 24-23-55-020-050
R CAUTION : REMOVE THE CONTACTOR ONLY AND NOT THE BASE OR THE MODULE WHERE
_______
R THE WIRES ARE CONNECTED.
(2) Put blanking caps on the disconnected electrical connector (1) and
the electrical receptacle (7).
NOTE : Do not remove the captive screws (2) and the spring washers
____
(4) from the contactor (3).
R Subtask 24-23-55-020-051
R CAUTION : MAKE MATCH MARKS ON ALL THE ELECTRICAL WIRES BEFORE YOU
_______
R DISCONNECT THEM. INCORRECT CONNECTION OF WIRES WILL CAUSE
R DAMAGE TO EQUIPMENT.
R NOTE : The removal of the base is necessary only if the base is damaged.
____
EFF :
ALL 24-23-55
Page 403
Nov 01/04
SYR
R Contactor
Figure 401/TASK 24-23-55-991-001
EFF :
ALL 24-23-55
Page 404
Nov 01/04
SYR
R (5) Remove the jumpers (17) from the base (6) and from the adjacent
R bases.
R (6) Remove the four screws (19) and the four washers (18).
EFF :
ALL 24-23-55
Page 405
Nov 01/04
SYR
TASK 24-23-55-400-001
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
EFF :
ALL 24-23-55
Page 406
May 01/05
SYR
3. __________
Job Set-up
Subtask 24-23-55-860-051
(1) Make sure that the external power connector is not connected to the
aircraft EXT PWR receptacle.
(2) Make sure that the warning notice(s) are in position on the access
door 121AL to tell persons not to connect the external power
connector to the aircraft EXT PWR receptacle.
(3) In the cockpit, on the ELEC panel 35VU, make sure that these
pushbutton switches are released:
- BAT 1, BAT 2,
- APU GEN,
- GEN 1, GEN 2,
- EXT PWR.
(4) In the cockpit, make sure that the warning notices are in position to
tell persons not to operate the pushbutton switches on these overhead
panels:
- 21VU (EMER ELEC PWR section),
- 25VU (APU section),
- 35VU (ELEC).
Subtask 24-23-55-010-051
B. Get Access
(1) Make sure that the Third Occupant seat is removed (Ref. TASK 25-11-
41-000-001).
(2) On the L lower side of the panel 120VU, make sure that the access
door (8) is removed.
(3) Make sure that the access platform is in position at the access door
121AL.
EFF :
ALL 24-23-55
Page 407
Nov 01/04
R
SYR
4. Procedure
_________
R Subtask 24-23-55-420-051
R CAUTION : REFER TO THE MATCH MARKS MADE DURING THE REMOVAL WHEN YOU
_______
R CONNECT THE ELECTRICAL WIRES.
R INCORRECT CONNECTION OF THE WIRES WILL CAUSE DAMAGE TO
R EQUIPMENT.
R (2) Install the four screws (19) and washers (18) and tighten them.
R (3) Make sure that the electrical cables (14) are clean and in correct
R condition.
R (5) Install the nuts (12) and the washers (13) and tighten them.
R (b) Install the screws (10) and the washers (9) and tighten them.
R (7) Install the jumpers (17) between the base (6) and the adjacent bases.
R (8) Install the washers (15) and the nuts (16) and tighten them
R (Ref. TASK 20-21-15-912-001).
Subtask 24-23-55-420-050
(1) Install the contactor (3) on the 6 tapped barrels (5) of the
contactor base (6).
(2) TORQUE the captive screws (2) to between 0.50 and 0.60 m.daN (44.24
and 53.09 lbf.in).
(3) Remove the blanking caps from the electrical connector (1) and the
electrical receptacle (7).
EFF :
ALL 24-23-55
Page 408
Nov 01/04
SYR
(4) Make sure that the electrical connectors are clean and in the correct
condition.
Subtask 24-23-55-710-050
(1) Energize the aircraft electrical circuits from the APU (Ref. TASK 24-
41-00-861-002).
(2) Do the EIS start procedure (Upper ECAM DU and lower ECAM DU only)
(Ref. TASK 31-60-00-860-001).
(3) On the ECAM control panel, push the ELEC key to get the ELEC system
page.
(4) On the lower ECAM display unit, make sure that the A/C electrical
configuration is correct.
(6) De-energize the aircraft electrical circuits supplied from the APU
(Ref. TASK 24-41-00-862-002).
5. Close-up
________
Subtask 24-23-55-410-050
A. Close Access
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
(2) Install the access door (8) on the L lower side of the panel 120VU.
EFF :
ALL 24-23-55
Page 409
Nov 01/04
SYR
R AC EMERGENCY GENERATION - DESCRIPTION AND OPERATION
___________________________________________________
1. _______
General
The AC emergency generation enables part of the distribution network to be
recovered in case of:
- loss of the two main generation sources and,
- unavailability of the auxiliary generation.
2. Component
__________________
Location
(Ref. Fig. 001, 002, 003)
-------------------------------------------------------------------------------
R FIN | FUNCTIONAL DESIGNATION | PANEL|ZONE|ACCESS | ATA
R | | | | DOOR | REF.
-------------------------------------------------------------------------------
2XE GLC-EMER 106VU 125 812 24-24-55
-------------------------------------------------------------------------------
FIN | FUNCTIONAL DESIGNATION | PANEL|ZONE|ACCESS | ATA
| | | | DOOR | REF.
-------------------------------------------------------------------------------
1XE CONTROL UNIT-CSM/G 125 812 24-24-34
8XE CSM/G 148 734 24-24-51
14XE ANN-EMER ELEC PWR/RAT/&/EMER GEN 21VU 211 831 24-24-00
15XE CNTOR-AC ESS BUS SWITCHING 106VU 125 812 24-24-55
23XE P/BSW-EMER ELEC PWR/EMER GEN TEST 21VU 211 831 24-24-00
24XE P/BSW-EMER ELEC PWR/MAN ON 21VU 211 831 24-24-00
33XE TIMER 106VU 125 812 24-24-00
3. System
__________________
Description
(Ref. Fig. 004)
4. Component
_____________________
Description
The emergency generation system is mainly composed of:
- a Constant Speed Motor/Generator (CSM/G) including a hydraulic motor and
an AC generator,
- a Generator Control Unit (GCU).
A hydraulic motor drives the emergency generator.
A servo valve speed regulator controls the speed: it transforms the oil flow
of the Blue hydraulic system into constant speed for the generator.
When emergency conditions are met, this Blue system is supplied by a Ram Air
Turbine (RAT).
EFF :
ALL 24-24-00
Page 1
Nov 01/10
SYR
R AC Emergency Generation - Component Location
Figure 001
EFF :
ALL 24-24-00
Page 2
Feb 01/00
SYR
AC Emergency Generation - Component Location
Figure 002
EFF :
ALL 24-24-00
Page 3
May 01/98
SYR
AC Emergency Generation - Component Location
Figure 003
EFF :
ALL 24-24-00
Page 4
May 01/98
SYR
Electrical Emergency Generating System - Schematic
Figure 004
EFF :
ALL 24-24-00
Page 5/6
May 01/98
SYR
A. Constant Speed Motor/Generator
(2) AC generator:
R - Three phase 115V/200V - 400 Hz (12000 rpm),
- output power: 5 KVA continuously,
- oil cooled.
-------------------------------------------------------------------------------
CONTROLS/PROTECTIONS OF GCU | TIME DELAY | EFFECTS
-------------------------------------------------------------------------------
R - Over/Under Voltage (OV/UV) | 3-5 s | Line contactor opens, generator
R - Over Frequency (OF) | 3-5 s | de-energization and control
R - Under Frequency (UF) | 300 ms | valve close (FAULT warning on,
R - Shorted PMG | 3-5 s | RAT & EMER GEN warning light).
R - Fast overspeed shutdown | 150 ms |
5. Operation
_________
R
EFF :
ALL 24-24-00
Page 7
Nov 01/10
SYR
R
EFF :
ALL 24-24-00
Page 8
Nov 01/10
SYR
Electrical Emergency Switching - Schematic
Figure 005
EFF :
ALL 24-24-00
Page 9/10
May 01/98
SYR
EMER & AC ESS BUS Contactors Control - Logic Diagram
Figure 006
EFF :
ALL 24-24-00
Page 11
May 01/98
SYR
RAT Extension Logic & CSM/G Control Logic - Schematic
Figure 007
EFF :
ALL 24-24-00
Page 12
May 01/98
SYR
Electrical Emergency Generation System - Control System
Figure 008
EFF :
ALL 24-24-00
Page 13/14
May 01/98
SYR
(b) A test of the emergency generator can be initiated on the ground.
The procedure is controlled by the EMER GEN TEST pushbutton
switch located on the EMER ELEC PWR section of overhead panel
21VU.
When EMER GEN TEST pushbutton switch is pressed and held:
- ELEC page is automatically displayed on the ECAM system (on
ground only),
- the emergency generator is coupled to its network,
- DC ESS BUS SPLY and AC ESS BUS switching line contactors
(4PC/3XC) open, isolating AC and DC essential busses,
- on the ECAM system: green lines between normal busbars and
essential busbar disappear.
The white EMER GEN, ESS TR and the green indications of the
corresponding parameters appear, green lines between EMER GEN
and AC ESS and DC ESS appear.
NOTE : The ELEC page must disappear when the EMER GEN TEST
____
pushbutton switch is released.
(c) A test of the emergency GCU can be initiated on the ground from
the CFDS.
The emergency GCU is a type 3 system:
i.e. it has neither an input bus nor an output bus, it is
connected to CFDIU by 2 discrete links.
The test procedure is described in
(Ref. Fig. 009)
(1) Electrical emergency configuration during RAT extension (<10 sec) and
in landing gear extended configuration
(Ref. Fig. 011)
This configuration is the result either of the RAT extension phase or
of the activation of the CSM/G interlock logic when the landing gear
is extended during an emergency configuration. In this case the CSM/G
is switched off through a logic controlled by LGCIU-1.
No power source (GEN 1, GEN 2, APU GEN, EXT PWR, EMER GEN) being
available, static inverter, busbars 4XP and 901XP are supplied by
battery 1 and busbar 4PP by battery 2 via static inverter through
contactor 2XB.
NOTE : 1
____
EFF :
ALL 24-24-00
Page 15
Nov 01/02
SYR
Test Procedure for GCU EMER by MCDU
Figure 009
EFF :
ALL 24-24-00
Page 16
May 01/98
SYR
Electrical Emergency Configuration - Upper and Lower ECAM Display Unit
Figure 010
EFF :
ALL 24-24-00
Page 17
May 01/98
SYR
INTENTIONALLY BLANK
24-24-00
Page 18
May 01/98
SYR
ELectrical Emergency Configuration
During RAT Deployment and in Landing Gear Extented Configuration
Figure 011
EFF :
ALL
24-24-00 Page 19/20
May 01/98
SYR
In landing gear extended configuration, at go around, the
emergency generator can be restored to the on-line status by
opening the circuit breaker associated with LGCIU 1 and
pressing MAN ON pushbutton switch located on the EMER ELEC PWR
section of overhead panel 21VU.
NOTE : 2
____
If in landing gear extented configuration, the crew must
retract the landing gear, it is necessary to press MAN ON
pushbutton switch on the EMER ELEC PWR section of panel 21VU
to restore the emergency generator to the on line status.
EFF :
ALL 24-24-00
Page 21
May 01/98
SYR
ESS BUSES ON BAT - Upper and Lower ECAM Display Unit
Figure 012
EFF :
ALL 24-24-00
Page 22
May 01/98
SYR
Electrical Emergency Configuration with CSM/G Running
Figure 013
EFF :
ALL 24-24-00
Page 23/24
May 01/98
SYR
Electrical Emergency Configuration on the Ground with speed < 50kts
Figure 014
EFF :
ALL 24-24-00
Page 25/26
May 01/98
SYR
NOTE : A list of available functions in emergency configuration is
____
shown in the following figures:
Smoke isolation:
- EMER ELEC PWR/GEN 1 LINE pushbutton switch to OFF (opens GLC1),
- EMER ELEC PWR/MAN ON pushbutton switch (RAT extension),
- ELEC/APU GEN pushbutton switch to OFF,
- ELEC/GEN 2 pushbutton switch to OFF (2 fuel pumps supplied by Gen 1
upstream GLC1).
R
R Before landing gear extension:
R - GEN 2 pushbutton switch to ON
R - GEN 1 LINE pushbutton switch to ON.
EFF :
ALL 24-24-00
Page 27
Nov 01/02
SYR
Available Functions in Emergency Configuration
Figure 015
EFF :
ALL 24-24-00
Page 28
May 01/98
SYR
Available Functions in Emergency Configuration
Figure 016
EFF :
ALL 24-24-00
Page 29
May 01/98
SYR
Available Functions in Emergency Configuration
Figure 017
EFF :
ALL 24-24-00
Page 30
May 01/98
SYR
Available Functions in Emergency Configuration
Figure 018
EFF :
ALL 24-24-00
Page 31
May 01/98
SYR
Available Functions in Emergency Configuration
Figure 019
EFF :
ALL 24-24-00
Page 32
May 01/98
SYR
R Available Functions in Emergency Configuration
R Figure 020
EFF :
ALL 24-24-00
Page 33
Nov 01/01
SYR
Smoke Detection - Upper and Lower ECAM Display Unit
Figure 021 (SHEET 1)
EFF :
ALL 24-24-00
Page 34
May 01/98
SYR
Smoke Detection - Upper and Lower ECAM Display Unit
Figure 021 (SHEET 2)
EFF :
ALL 24-24-00
Page 35
May 01/98
SYR
INTENTIONALLY BLANK
24-24-00
Page 36
May 01/98
SYR
Electrical Smoke Configuration
Figure 022
EFF :
ALL 24-24-00
Page 37/38
May 01/98
SYR
R When the aircraft is on the ground:
R - below 100 knots, the DC BAT BUS is automatically connected to the
R batteries
R - below 50 knots, the AC ESS BUS is automatically shed, which causes the
R loss of all CRTs.
R NOTE : During RAT extension and CSM/G coupling (about 8 seconds), the
____
R batteries power the emergency generation network.
R NOTE : If only the batteries power the emergency generation network, APU
____
R start is only available on ground (speed below 100 knots).
EFF :
ALL 24-24-00
Page 39
Nov 01/02
SYR
AC EMERGENCY GENERATION - ADJUSTMENT/TEST
_________________________________________
TASK 24-24-00-710-001
1. __________________
Reason for the Job
NOTE : You can do this test with the Blue electric pump or with a ground
____
hydraulic cart.
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
EFF :
ALL 24-24-00
Page 501
May 01/11
SYR
3. __________
Job Set-up
Subtask 24-24-00-860-050
WARNING : MAKE SURE THAT THE TRAVEL RANGES OF THE FLIGHT CONTROLS ARE
_______
CLEAR. MOVEMENT OF FLIGHT CONTROLS CAN CAUSE INJURY TO PERSONS
AND/OR DAMAGE.
(2) Do the EIS start procedure (Upper ECAM DU and lower ECAM DU only)
(Ref. TASK 31-60-00-860-001).
(3) Pressurize the Blue hydraulic system with the Blue electric pump
(Ref. TASK 29-10-00-863-003) or with a ground power supply (Ref. TASK
29-10-00-863-003).
(5) On the HYD section of the panel 50VU, release the LEAK MEASUREMENT
VALVES/B pushbutton switch (the OFF legend comes on).
Subtask 24-24-00-010-051
R (1) Put an ACCESS PLATFORM 2M (6 FT) - ADJUSTABLE at the access doors 812
R and 822 of the avionics compartment.
EFF :
ALL 24-24-00
Page 502
May 01/11
SYR
Subtask 24-24-00-865-050
-------------------------------------------------------------------------------
PANEL DESIGNATION IDENT. LOCATION
-------------------------------------------------------------------------------
49VU FWS/FWC1/SPLY 3WW F01
105VU ELEC/CSM/G /EV AUTO/SPLY 7XE C01
106VU CSM/G /EV/MAN/SPLY 6XE B04
106VU ESS TR/CNTOR/CTL 5PE C02
106VU ESS TR/SPLY 4PE C01
121VU EIS/FWC2/SPLY 2WW Q07
122VU ELEC/EMER GEN AUTO/2 9XE Z26
122VU ELEC/EMER GEN AUTO/1 11XE Z25
4. Procedure
_________
Subtask 24-24-00-710-050
-------------------------------------------------------------------------------
R | ACTION | RESULT |
-------------------------------------------------------------------------------
1. On the panel 21VU, on the EMER On the lower ECAM display unit:
ELEC PWR section: - The ELEC page comes into view
- Lift the safety guard. automatically.
- Push and hold the EMER GEN TEST - The green lines between the AC1 and
pushbutton switch. the AC ESS busbar and the DC1 and the
DC ESS busbar go out of view.
- The EMER GEN and ESS TR indications
are shown in white. The related
parameters are shown in green.
- The green lines between the EMER GEN
and the AC ESS busbar, the EMER GEN
and the ESS TR, the ESS TR and the DC
ESS busbar come into view.
- The SHED indication comes into view
below the AC ESS and DC ESS busbar
indications.
EFF :
ALL 24-24-00
Page 503
May 01/11
SYR
-------------------------------------------------------------------------------
| ACTION | RESULT |
-------------------------------------------------------------------------------
. the green line between the
essential TR and the DC
essential busbar is not shown.
EFF :
ALL 24-24-00
Page 504
May 01/11
R
SYR
-------------------------------------------------------------------------------
ACTION RESULT
-------------------------------------------------------------------------------
longer supplies the DC ESS
busbar.
4. On the ECAM control panel: On the STATUS page of the lower ECAM
R - Push the STS key to get the display unit:
R STATUS page. - If the AIR BLEED status maintenance
R comes into view below the MAINTENANCE
R item, it is necessary to reset the
R two FWCs. Thus the FWCs will not keep
R a record of the indication in the
R POST FLIGHT REPORT at the next
R flight.
Do the step that follows.
5. Close-up
________
Subtask 24-24-00-860-051
(1) If the test continues for more than 30 seconds, on the panel 22VU,
the FAULT legend of the EXTRACT pushbutton switch comes on.
In this case, release then push the EXTRACT pushbutton switch (the
FAULT legend goes off).
(2) On the HYD section of the panel 50VU, push the LEAK MEASUREMENT
VALVES/B pushbutton switch (the OFF legend goes off).
R (4) Remove the TOOL-ZERO LOCKING, FLAP SLAT CTL LEVER (98D27803500001) of
the flap/slat control lever.
EFF :
ALL 24-24-00
Page 505
May 01/09
SYR
R (6) De-energize the aircraft electrical circuits
(Ref. TASK 24-41-00-862-002).
Subtask 24-24-00-410-051
B. Close Access
EFF :
ALL 24-24-00
Page 506
May 01/09
SYR
TASK 24-24-00-710-002
Operational Test of the Emergency Generator Control Unit (GCU) from Centralized
Fault Display System (CFDS)
1. __________________
Reason for the Job
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
Subtask 24-24-00-010-052
R (1) Put an ACCESS PLATFORM 2M (6 FT) - ADJUSTABLE at the access doors 812
R and 822 of the avionics compartments.
EFF :
ALL 24-24-00
Page 507
May 01/11
SYR
Subtask 24-24-00-865-056
-------------------------------------------------------------------------------
PANEL DESIGNATION IDENT. LOCATION
-------------------------------------------------------------------------------
105VU ELEC/CSM/G /EV AUTO/SPLY 7XE C01
106VU CSM/G /EV/MAN/SPLY 6XE B04
Subtask 24-24-00-860-052
(2) Do the procedure to get the SYSTEM REPORT/TEST ELEC page. (Ref. TASK
31-32-00-860-004).
4. Procedure
_________
Subtask 24-24-00-710-051
-------------------------------------------------------------------------------
R | ACTION | RESULT |
-------------------------------------------------------------------------------
2. On the MCDU, on the GCU EMER page: On the MCDU, on the GCU EMER page:
- push the line key adjacent to - the TEST OK message comes into view.
the TEST indication.
EFF :
ALL 24-24-00
Page 508
May 01/11
SYR
5. Close-up
________
Subtask 24-24-00-860-053
(1) On the MCDU, push the line key adjacent to the RETURN indication
until the CFDS menu page comes into view.
Subtask 24-24-00-410-052
B. Close Access
EFF :
ALL 24-24-00
Page 509
May 01/08
SYR
CONTROL UNIT - CSM/G (1XE) - REMOVAL/INSTALLATION
_________________________________________________
TASK 24-24-34-000-001
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
Subtask 24-24-34-860-050
(2) In the cockpit, on the EMER ELEC PWR section of the overhead panel
21VU, put a warning notice to tell persons not to operate the
pushbutton switches.
EFF :
ALL 24-24-34
Page 401
May 01/11
SYR
Subtask 24-24-34-010-050
R (1) Put an ACCESS PLATFORM 2M (6 FT) - ADJUSTABLE at the access doors 812
R and 822 of the avionics compartment.
Subtask 24-24-34-865-050
-------------------------------------------------------------------------------
PANEL DESIGNATION IDENT. LOCATION
-------------------------------------------------------------------------------
105VU ELEC/CSM/G /EV AUTO/SPLY 7XE C01
106VU CSM/G /EV/MAN/SPLY 6XE B04
4. Procedure
_________
Subtask 24-24-34-020-050
(6) Put blanking caps on the electrical connector (4) and the electrical
receptacle (5).
EFF :
ALL 24-24-34
Page 402
May 01/11
SYR
CSM/G Control Unit
Figure 401/TASK 24-24-34-991-001
EFF :
ALL 24-24-34
Page 403
May 01/98
SYR
TASK 24-24-34-400-001
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
R
No specific warning notice
R No specific 1 ACCESS PLATFORM 2M (6 FT) - ADJUSTABLE
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
EFF :
ALL 24-24-34
Page 404
May 01/11
SYR
3. __________
Job Set-up
Subtask 24-24-34-860-052
(2) Make sure that the warning notice is in the cockpit, on the EMER ELEC
PWR section of the overhead panel 21VU, to tell persons not to
operate the pushbutton switches.
(4) Make sure that the access doors 812 and 822 are open.
Subtask 24-24-34-865-051
B. Make sure that this(these) circuit breaker(s) is(are) open, safetied and
tagged
-------------------------------------------------------------------------------
PANEL DESIGNATION IDENT. LOCATION
-------------------------------------------------------------------------------
105VU ELEC/CSM/G /EV AUTO/SPLY 7XE C01
106VU CSM/G /EV/MAN/SPLY 6XE B04
4. Procedure
_________
Subtask 24-24-34-420-050
(4) Make sure that the electrical connectors are clean and in the correct
condition.
EFF :
ALL 24-24-34
Page 405
May 01/11
SYR
(6) Install the washers (2) and the screws (3) and then tighten the
screws.
Subtask 24-24-34-865-052
B. Remove the safety clip(s) and the tag(s) and close this(these) circuit
breaker(s):
6XE, 7XE
Subtask 24-24-34-710-050
C. Operational test
(1) Do an operational test of the emergency GCU, with the CFDS (Ref. TASK
24-24-00-710-002).
5. Close-up
________
Subtask 24-24-34-410-050
A. Close Access
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
Subtask 24-24-34-860-051
EFF :
ALL 24-24-34
Page 406
May 01/11
R
SYR
GENERATOR - CONSTANT SPEED MOTOR (CSM/G) (8XE) - REMOVAL/INSTALLATION
_____________________________________________________________________
TASK 24-24-51-000-001
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
EFF :
ALL 24-24-51
Page 401
May 01/11
SYR
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
Subtask 24-24-51-860-050
EFF :
ALL 24-24-51
Page 402
May 01/11
SYR
Subtask 24-24-51-865-050
-------------------------------------------------------------------------------
PANEL DESIGNATION IDENT. LOCATION
-------------------------------------------------------------------------------
105VU ELEC/CSM/G /EV AUTO/SPLY 7XE C01
106VU CSM/G /EV/MAN/SPLY 6XE B04
122VU ELEC/EMER GEN AUTO/2 9XE Z26
122VU ELEC/EMER GEN AUTO/1 11XE Z25
Subtask 24-24-51-010-050
C. Get Access
(1) Open the LH or RH Main Landing-Gear (MLG) door (Ref. TASK 32-12-00-
010-001).
R (2) Put the STEPLADDER 2.0 M (6.6 FT) in position at the MLG bay.
4. Procedure
_________
Subtask 24-24-51-020-050
(1) Disconnect the electrical connectors (2),(3),(13) and (14) from the
CSM/G (1).
(4) Disconnect the flexible hydraulic pipes (11), (12) and (15) from the
CSM/G (1).
(5) Disconnect the flexible drain hoses (4) and (10) from the CSM/G (1).
(7) Loosen the lockwashers (8), remove the screws (5), the washer (6) and
discard the lockwashers (8).
EFF :
ALL 24-24-51
Page 403
May 01/11
SYR
Constant Speed Motor/Generator - CSM/G 8XE.
Figure 401/TASK 24-24-51-991-001
EFF :
ALL 24-24-51
Page 404
May 01/98
SYR
(8) Loosen the bonding strap (7) from its position.
(9) Remove the CSM/G (1) from the support mounts (9).
EFF :
ALL 24-24-51
Page 405
Nov 01/10
R
SYR
TASK 24-24-51-400-001
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
B. Expendable Parts
-------------------------------------------------------------------------------
FIG.ITEM |DESIGNATION |IPC-CSN
-------------------------------------------------------------------------------
EFF :
ALL 24-24-51
Page 406
May 01/11
SYR
C. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
Subtask 24-24-51-860-052
(1) Make sure that the blue hydraulic system is depressurized (Ref. TASK
29-00-00-864-001).
(2) Make sure that the reservoir of the blue hydraulic system is
depressurized (Ref. TASK 29-14-00-614-001).
(3) Make sure that the LH and RH Main Landing Gear (MLG) is opened
(Ref. TASK 32-12-00-010-001).
R (4) Make sure that the STEPLADDER 2.0 M (6.6 FT) is in position at the
R MLG bay.
EFF :
ALL 24-24-51
Page 407
May 01/11
SYR
Subtask 24-24-51-865-051
B. Make sure that this(these) circuit breaker(s) is(are) open, safetied and
tagged
-------------------------------------------------------------------------------
PANEL DESIGNATION IDENT. LOCATION
-------------------------------------------------------------------------------
105VU ELEC/CSM/G /EV AUTO/SPLY 7XE C01
106VU CSM/G /EV/MAN/SPLY 6XE B04
122VU ELEC/EMER GEN AUTO/2 9XE Z26
122VU ELEC/EMER GEN AUTO/1 11XE Z25
4. Procedure
_________
Subtask 24-24-51-420-051
(1) Put the CSM/G (1) in position on the support mounts (9) on top of the
keel beam.
(2) Attach the CSM/G (1) with new lockwashers (8) , the screws (5), the
washer (6) and the bonding strap (7) on the support mounts (9)
(Ref. TASK 20-28-00-912-004).
(5) Make sure that the hydraulic line end-fittings are serviceable.
(6) Remove the blanking plugs and connect the hydraulic pipes (11),(12)
and (15) to the CSM/G (1).
(7) Remove the blanking plugs and connect the flexible drain hoses (4)
and (10) to the CSM/G (1).
(8) Remove the blanking caps and connect the electrical connectors (2),
(3), (13) and (14) to the CSM/G (1).
EFF :
ALL 24-24-51
Page 408
Nov 01/10
R
SYR
Subtask 24-24-51-865-055
B. Remove the safety clip(s) and the tag(s) and close this(these) circuit
breaker(s):
6XE, 7XE, 9XE, 11XE.
Subtask 24-24-51-860-051
(2) Do the EIS start procedure (Upper ECAM DU and lower ECAM DU only)
(Ref. TASK 31-60-00-860-001).
(a) Pressurize the reservoir of the Blue hydraulic system (Ref. TASK
29-14-00-614-002).
(b) Pressurize the Blue hydraulic system either with the electric
pump or a ground hydraulic cart (Ref. TASK 29-10-00-863-003).
Subtask 24-24-51-710-051
D. Test
-------------------------------------------------------------------------------
R | ACTION | RESULT |
-------------------------------------------------------------------------------
1. On the overhead panel 21VU, on the On the lower ECAM display unit:
EMER ELEC PWR section: - The ELEC page comes into view
- Lift the safety guard, push and automatically.
hold the EMER GEN TEST - The green lines between the AC1 and
pushbutton switch 23XE. the AC ESS busbar and the DC1 and the
DC ESS busbar go out of view.
- The EMER GEN and ESS TR indications
are white. The parameters are green.
- Green lines come into view between:
EMER GEN and AC ESS
EMER GEN and ESS TR
ESS TR and DC ESS indications.
- The SHED indication comes into view
below the AC ESS and DC ESS
indications.
EFF :
ALL 24-24-51
Page 409
May 01/11
SYR
-------------------------------------------------------------------------------
| ACTION | RESULT |
-------------------------------------------------------------------------------
NOTE : It is necessary to do a reset of
____
the essential TR when:
- Its related parameters are
amber and/or
- The green line between the ESS
TR and the DC ESS indications
is not shown.
3. On the overhead panel 21VU, on the On the overhead panel 21VU, on the EMER
EMER ELEC PWR section: ELEC PWR section:
- Release the EMER GEN TEST - The safety guard is back in the
pushbutton switch 23XE. released position.
EFF :
ALL 24-24-51
Page 410
May 01/11
R
SYR
5. Close-up
________
Subtask 24-24-51-410-052
A. Close Access
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
(5) Remove the warning notices from the cockpit and from the ground
service panel of the Blue hydraulic system.
(6) Remove the ground support and maintenance equipment, the special and
standard tools and all other items.
Subtask 24-24-51-860-053
EFF :
ALL 24-24-51
Page 411
Nov 01/10
SYR
R CONTACTOR (2XE,15XE) - REMOVAL/INSTALLATION
___________________________________________
TASK 24-24-55-000-001
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
Subtask 24-24-55-941-051
A. Safety Precautions
(1) In the cockpit, on the overhead panel 35VU, make sure that these
pushbutton switches are released:
- BAT 1, BAT 2,
- GEN 1(2), APU GEN,
- EXT PWR.
EFF :
ALL 24-24-55
Page 401
May 01/11
SYR
(2) In the cockpit, put a warning notice to tell persons not to operate
the pushbutton switches on the overhead panels:
- 21VU (EMER ELEC PWR),
- 35VU (ELEC).
(3) Make sure that the external power connector is not connected to the
aircraft receptable EXT PWR.
(4) Put a warning notice on the access door 121AL to tell persons not to
connect the external power connector.
Subtask 24-24-55-010-050
Subtask 24-24-55-865-050
-------------------------------------------------------------------------------
PANEL DESIGNATION IDENT. LOCATION
-------------------------------------------------------------------------------
105VU ELEC/CSM/G /EV AUTO/SPLY 7XE C01
106VU ESS TR/SPLY 4PE C01
122VU ELEC/CNTOR/ESS/DC BUS/TIE 3PC W26
123VU AC ESS/BUS ON/BUS 1 1XC AC12
123VU AC ESS/BUS ON/BUS 2 2XC AC01
Subtask 24-24-55-010-052
D. Get Access
(1) In the avionics compartment, remove the access panel (1) from the
AC/DC emergency power center 106VU.
4. Procedure
_________
CAUTION : MAKE MATCH MARKS ON ALL THE ELECTRICAL WIRES BEFORE YOU DISCONNECT
_______
THEM. INCORRECT CONNECTION OF WIRES WILL CAUSE DAMAGE TO
EQUIPMENT.
EFF :
ALL 24-24-55
Page 402
May 01/11
SYR
Contactor
Figure 401/TASK 24-24-55-991-001
EFF :
ALL 24-24-55
Page 403
May 01/98
SYR
Subtask 24-24-55-020-050
EFF :
ALL 24-24-55
Page 404
May 01/98
SYR
TASK 24-24-55-400-001
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
Subtask 24-24-55-860-052
(1) In the cockpit, on the overhead panel 35VU, make sure that these
pushbutton switches are realeased:
- BAT 1, BAT 2,
- GEN 1(2), APU GEN,
- EXT PWR.
(2) Make sure that there is a warning notice in the cockpit to tell
persons not to operate the pushbutton switches on the overhead
panels:
- 21VU (EMER ELEC PWR),
- 35VU (ELEC).
EFF :
ALL 24-24-55
Page 405
May 01/07
R
SYR
(3) Make sure that the external power connector is not connected to the
aircraft receptable EXT PWR.
(4) Make sure that there is a warning notice on the access door 121AL to
tell persons not to connect the external power connector.
(5) Make sure that the access platforms are in position at the access
doors 812 and 822.
(6) Make sure that the access doors 812 and 822 are open.
(7) In the avionics compartment, make sure that the access panel (1) from
the AC/DC emergency power center 106VU is open.
Subtask 24-24-55-865-051
B. Make sure that this(these) circuit breaker(s) is(are) open, safetied and
tagged
-------------------------------------------------------------------------------
PANEL DESIGNATION IDENT. LOCATION
-------------------------------------------------------------------------------
105VU ELEC/CSM/G /EV AUTO/SPLY 7XE C01
106VU ESS TR/SPLY 4PE C01
122VU ELEC/CNTOR/ESS/DC BUS/TIE 3PC W26
123VU AC ESS/BUS ON/BUS 1 1XC AC12
123VU AC ESS/BUS ON/BUS 2 2XC AC01
4. Procedure
_________
Subtask 24-24-55-420-050
CAUTION : REFER TO THE MATCH MARKS MADE DURING THE REMOVAL WHEN YOU
_______
CONNECT THE ELECTRICAL WIRES.
R INCORRECT CONNECTION OF THE WIRES WILL CAUSE DAMAGE TO
R EQUIPMENT.
EFF :
ALL 24-24-55
Page 406
May 01/07
SYR
(2) Install the nuts (2) and tighten them.
(4) Install the 6 washers (4) and screws (5). Tighten the screws (5).
Subtask 24-24-55-865-052
B. Remove the safety clip(s) and the tag(s) and close this(these) circuit
breaker(s):
3PC, 1XC, 2XC, 4PE, 7XE
Subtask 24-24-55-710-050
5. Close-up
________
Subtask 24-24-55-410-050
A. Close Access
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
(2) Install the access panel (1) on the AC/DC emergency power center
106VU.
EFF :
ALL 24-24-55
Page 407
May 01/98
SYR
TASK 24-24-55-000-002
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
Subtask 24-24-55-941-052
A. Safety Precautions
(1) In the cockpit, on the overhead panel 35VU, make sure that these
pushbutton switches are released:
- BAT 1, BAT 2,
- GEN 1(2), APU GEN,
- EXT PWR.
EFF :
ALL 24-24-55
Page 408
May 01/11
SYR
(2) In the cockpit, put a warning notice to tell persons not to operate
the pushbutton switches on the overhead panels:
- 21VU (EMER ELEC PWR),
- 35VU (ELEC).
(3) Make sure that the external power connector is not connected to the
aircraft receptable EXT PWR.
(4) Put a warning notice on the access door 121AL to tell persons not to
connect the external power connector.
Subtask 24-24-55-010-051
R (1) Put an ACCESS PLATFORM 2M (6 FT) - ADJUSTABLE at the access doors 812
R and 822.
Subtask 24-24-55-865-053
-------------------------------------------------------------------------------
PANEL DESIGNATION IDENT. LOCATION
-------------------------------------------------------------------------------
106VU AC ESS/BUS/EMER/CNTOR/SPLY 15PC C08
106VU AC ESS BUS/EMER/STBY/CNTOR/SPLY 10XE C06
Subtask 24-24-55-010-053
D. Get Access
(1) In the avionics compartment, remove the access panel (13) from the
AC/DC emergency power center 106VU.
4. Procedure
_________
CAUTION : MAKE MATCH MARKS ON ALL THE ELECTRICAL WIRES BEFORE YOU DISCONNECT
_______
THEM. INCORRECT CONNECTION OF WIRES WILL CAUSE DAMAGE TO
EQUIPMENT.
EFF :
ALL 24-24-55
Page 409
May 01/11
SYR
Contactor
Figure 402/TASK 24-24-55-991-003
EFF :
ALL 24-24-55
Page 410
May 01/98
SYR
Subtask 24-24-55-020-051
(2) Put blanking caps on the electrical connectors (5) and the electrical
receptacles (4).
(5) Remove the power supply wires (8) and the retaining washers (9).
R (6) Remove the crimped lugs (10) with the shunts (11) and but do not
R discard them.
EFF :
ALL 24-24-55
Page 411
Nov 01/00
SYR
TASK 24-24-55-400-002
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
Subtask 24-24-55-860-053
(1) In the cockpit, on the overhead panel 35VU, make sure that these
pushbutton switches are realeased:
- BAT 1, BAT 2,
- GEN 1(2), APU GEN,
- EXT PWR.
EFF :
ALL 24-24-55
Page 412
May 01/98
SYR
(2) Make sure that there is a warning notice in the cockpit to tell
persons not to operate the pushbutton switches on the overhead
panels:
- 21VU (EMER ELEC PWR),
- 35VU (ELEC).
(3) Make sure that the external power connector is not connected to the
aircraft receptable EXT PWR.
(4) Make sure that there is a warning notice on the access door 121AL to
tell persons not to connect the external power connector.
(5) Make sure that the access platforms are in position at the access
doors 812 and 822.
(6) Make sure that the access doors 812 and 822 are open.
(7) In the avionics compartment, make sure that the access panel (13) of
the AC/DC emergency power center 106VU is open.
Subtask 24-24-55-865-054
B. Make sure that this(these) circuit breaker(s) is(are) open, safetied and
tagged
-------------------------------------------------------------------------------
PANEL DESIGNATION IDENT. LOCATION
-------------------------------------------------------------------------------
106VU AC ESS/BUS/EMER/CNTOR/SPLY 15PC C08
106VU AC ESS BUS/EMER/STBY/CNTOR/SPLY 10XE C06
4. Procedure
_________
Subtask 24-24-55-420-051
CAUTION : REFER TO THE MATCH MARKS MADE DURING THE REMOVAL WHEN YOU
_______
CONNECT THE ELECTRICAL WIRES.
R INCORRECT CONNECTION OF THE WIRES WILL CAUSE DAMAGE TO
R EQUIPMENT.
(2) Install the washers (1) and the nuts (12). Tighten the nuts.
EFF :
ALL 24-24-55
Page 413
May 01/07
SYR
(3) Install the crimped lugs (10) with the shunts (11).
(6) Install the washers (7) and the nuts (6). Tighten the nuts (6).
(8) Make sure that the electrical connectors are clean and in the correct
condition.
Subtask 24-24-55-865-055
B. Remove the safety clip(s) and the tag(s) and close this(these) circuit
breaker(s):
15PC, 10XE
Subtask 24-24-55-710-051
C. Operational Tests
(1) Do the operational test of the emergency generation system (Ref. TASK
24-24-00-710-001).
(2) Do the operational test of the static inverter (Ref. TASK 24-28-00-
710-001).
5. Close-up
________
Subtask 24-24-55-410-051
A. Close Access
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
(2) Install the access panel (13) on the AC/DC emergency power center
106VU.
EFF :
ALL 24-24-55
Page 414
May 01/11
SYR
(5) Remove the access platform(s).
EFF :
ALL 24-24-55
Page 415
Feb 01/99
SYR
AC ESSENTIAL GENERATION SWITCHING - DESCRIPTION AND OPERATION
_____________________________________________________________
1. _______
General
These circuits control the supply of the AC essential distribution network.
They enable:
- its normal supply in normal flight configuration,
R - transfer of the supply in case of AC BUS 1 loss,
2. __________________
Component Location
-------------------------------------------------------------------------------
FIN | FUNCTIONAL DESIGNATION | PANEL|ZONE|ACCESS | ATA
| | | | DOOR | REF.
-------------------------------------------------------------------------------
3XC CNTOR-AC ESS BUS SWITCHING 106VU 125 812 24-25-55
11XC P/BSW-ELEC/AC ESS FEED 35VU 210 831 24-25-00
3. Operation
_________
NOTE : MASTER CAUT light + single chime + amber message on the upper ECAM DU
____
confirm this failure.
To recover AC ESS busses, the crew has to push AC ESS FEED pushbutton
switch. AC ESS busses are then supplied by AC BUS 2.
EFF :
ALL 24-25-00
Page 1
Nov 01/07
SYR
AC Essential Generation Switching - Component Location
Figure 001
EFF :
ALL 24-25-00
Page 2
May 01/98
SYR
AC Essential Generation Switching - Component Location
Figure 002
EFF :
ALL 24-25-00
Page 3
May 01/98
SYR
INTENTIONALLY BLANK
24-25-00
Page 4
May 01/98
SYR
Loss of AC Normal BUS 1XP - Block Diagram
Control and Indicating Circuits
Figure 003
EFF :
ALL
24-25-00 Page 5/6
May 01/98
SYR
White ALTN legend illuminates on AC ESS FEED pushbutton switch, (FAULT
legend remains on if AC ESS bus is still not supplied).
On the lower ECAM DU, AC ESS becomes green again and synoptic is modified.
R NOTE : MASTER CAUT light + single chime + amber message on the upper ECAM DU
____
R confirm this failure.
R To recover AC ESS busses, supplied by the AC BUS 2, the crew must release
R the AC ESS FEED pushbutton switch. If, after 3 seconds, the creaw did not
R release the AC ESS pushbutton switch, the auto switching system is set on.
R When the crew releases the AC ESS FEED pushbutton switch, the white ALTN
R legend comes on (the FAULT legend stays on if the AC ESS bus stays not
R supplied).
R On the lower ECAM DU, the AC ESS becomes green again and the synoptic is
R modified.
EFF :
ALL 24-25-00
Page 7
Nov 01/07
SYR
AC ESSENTIAL GENERATION SWITCHING - ADJUSTMENT/TEST
___________________________________________________
TASK 24-25-00-710-001
1. __________________
Reason for the Job
2. ______________________
Job Set-up Information
R -------------------------------------------------------------------------------
R REFERENCE QTY DESIGNATION
R -------------------------------------------------------------------------------
R B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
Subtask 24-25-00-860-050
(2) Do the EIS start procedure (Upper ECAM DU and lower ECAM DU only)
(Ref. TASK 31-60-00-860-001).
EFF :
ALL 24-25-00
Page 501
Nov 01/10
SYR
Subtask 24-25-00-865-050
-------------------------------------------------------------------------------
PANEL DESIGNATION IDENT. LOCATION
-------------------------------------------------------------------------------
106VU AC ESS BUS/STBY/CNTOR/CTL 5XC B08
106VU AC ESS/BUS NORM/CNTOR/CTL 4XC B03
122VU ELEC/AC/BUS1/CTL 17XN1 V25
123VU AC ESS/BUS ON/BUS 1 1XC AC12
123VU AC ESS/BUS ON/BUS 2 2XC AC01
R Subtask 24-25-00-865-051
R -------------------------------------------------------------------------------
R PANEL DESIGNATION IDENT. LOCATION
R -------------------------------------------------------------------------------
R 122VU ANTI ICE/PROBES/2/PITOT 3DA2 Y14
R 122VU ANTI ICE/PROBES/3/PITOT 3DA3 Z16
R 122VU ANTI ICE/PROBES/1/TAT 1DA1 Z12
EFF :
ALL 24-25-00
Page 502
Nov 01/10
SYR
R **ON A/C ALL
4. Procedure
_________
Subtask 24-25-00-710-050
-------------------------------------------------------------------------------
ACTION RESULT
-------------------------------------------------------------------------------
1. On the ECAM control panel: On the ECAM DU, on the ELEC page:
- Push the ELEC key. - A green bar comes into view between
the AC1 and AC ESS busbars. This
shows that the AC1 busbar energizes
the AC ESS busbar.
The indications:
ELEC AC ESS BUS FAULT then AC ESS
FEED... ALTN is shown on the ECAM DU.
4. On the ECAM control panel: On the ECAM DU, on the ELEC page:
- Push the ELEC key. - A green bar comes into view between
the AC2 and AC ESS busbars. This
shows that the AC2 busbar energizes
the AC ESS busbar.
- The green bar between the AC1 and AC
ESS busbars goes out of view.
EFF :
ALL 24-25-00
Page 503
Nov 01/10
SYR
-------------------------------------------------------------------------------
ACTION RESULT
-------------------------------------------------------------------------------
5. On the AC power center 123VU:
- Close the circuit breaker 1XC.
Subtask 24-25-00-710-050-A
-------------------------------------------------------------------------------
ACTION RESULT
-------------------------------------------------------------------------------
1. On the ECAM control panel: On the ECAM DU, on the ELEC page:
- Push the ELEC key. - A green line comes into view between
the AC1 and AC ESS busbars. This
shows that the AC1 busbar energizes
the AC ESS busbar.
EFF :
ALL 24-25-00
Page 504
Nov 01/10
R
SYR
-------------------------------------------------------------------------------
ACTION RESULT
-------------------------------------------------------------------------------
The indications ELEC AC ESS BUS FAULT
then AC ESS FEED... ALTN are shown on
the ECAM DU.
4. On the ECAM control panel: On the ECAM DU, on the ELEC page:
- Push the ELEC key. - A green line comes into view between
the AC2 and AC ESS busbars. This
shows that the AC2 busbar energizes
the AC ESS busbar.
- The green line between the AC1 and AC
ESS busbars goes out of view.
5. On the EMER ELEC PWR section of On the ECAM DU, on the ELEC page:
the panel 21VU : - The AC2 busbar energizes the AC ESS
- Lift the safety guard. busbar.
- Push and hold the EMER GEN TEST
pushbutton switch.
7. On the rear circuit-breaker panel On the ECAM DU, on the ELEC page:
122VU: - The AC2 busbar continues to supply
- Close the circuit breaker the AC ESS busbar.
17XN1.
8. On the EMER ELEC PWR section of On the EMER ELEC PWR section of the
the panel 21VU: panel 21VU:
- Release the EMER GEN TEST - Make sure that the safety guard is
pushbutton switch. back in position.
EFF :
ALL 24-25-00
Page 505
Nov 01/10
R
SYR
-------------------------------------------------------------------------------
ACTION RESULT
-------------------------------------------------------------------------------
- The green line between the AC1 and
the AC ESS busbars comes into view.
This shows that the AC1 busbar
energizes the AC ESS busbar.
11. On the ECAM control panel: On the ECAM DU, on the ELEC page:
- Push the ELEC key. - A green line comes into view between
the AC2 and AC ESS busbars. This
shows that the AC2 busbar energizes
the AC ESS busbar.
- The green line between the AC1 and AC
ESS busbars goes out of view.
EFF :
ALL 24-25-00
Page 506
Nov 01/10
R
SYR
-------------------------------------------------------------------------------
ACTION RESULT
-------------------------------------------------------------------------------
- The green line between the AC1 and AC
ESS busbars comes into view.
5. Close-up
________
R Subtask 24-25-00-865-052
R A. Remove the safety clip(s) and the tag(s) and close this(these) circuit
R breaker(s):
R -------------------------------------------------------------------------------
R PANEL DESIGNATION IDENT. LOCATION
R -------------------------------------------------------------------------------
R 122VU ANTI ICE/PROBES/2/PITOT 3DA2 Y14
R 122VU ANTI ICE/PROBES/3/PITOT 3DA3 Z16
R 122VU ANTI ICE/PROBES/1/TAT 1DA1 Z12
Subtask 24-25-00-860-051
EFF :
ALL 24-25-00
Page 507
Nov 01/10
SYR
CONTACTOR (3XC) - REMOVAL/INSTALLATION
______________________________________
TASK 24-25-55-000-001
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
Subtask 24-25-55-941-051
A. Safety Precautions
(1) In the cockpit, on the overhead panel 35VU, make sure these
pushbutton switches are released:
- BAT 1, BAT 2,
- GEN 1, GEN 2,
- EXT A.
(2) In the cockpit, put a warning notice to tell persons not to operate
the pushbutton switches on these panels of the overhead panels:
- 35VU (ELEC),
- 21VU (EMER ELEC PWR).
EFF :
ALL 24-25-55
Page 401
May 01/11
SYR
(3) Make sure that the external power connector is not connected to the
aircraft receptable EXT PWR A.
(4) Put a warning notice on the access door 121AL to tell persons not to
connect the external power connector.
Subtask 24-25-55-010-050
(3) Remove the access door (14) from the panel 106VU.
Subtask 24-25-55-865-052
-------------------------------------------------------------------------------
PANEL DESIGNATION IDENT. LOCATION
-------------------------------------------------------------------------------
105VU ELEC/CSM/G /EV AUTO/SPLY 7XE C01
106VU CSM/G /EV/MAN/SPLY 6XE B04
106VU ESS TR/SPLY 4PE C01
122VU ELEC/CNTOR/ESS/DC BUS/TIE 3PC W26
123VU AC ESS/BUS ON/BUS 1 1XC AC12
123VU AC ESS/BUS ON/BUS 2 2XC AC01
4. Procedure
_________
Subtask 24-25-55-020-050
(2) Put blanking caps on the electrical connectors (1, 2) and the
electrical receptacles (12, 13)
EFF :
ALL 24-25-55
Page 402
May 01/11
SYR
Contactor
Figure 401/TASK 24-25-55-991-001
EFF :
ALL 24-25-55
Page 403
May 01/98
SYR
(3) Loosen the 9 nuts (3).
(4) Remove the 9 nuts (3), the spring washers (4) and the plates (5) and
(10).
CAUTION : MAKE MATCH MARKS ON ALL THE ELECTRICAL WIRES BEFORE YOU
_______
DISCONNECT THEM. INCORRECT CONNECTION OF WIRES WILL CAUSE
DAMAGE TO EQUIPMENT.
EFF :
ALL 24-25-55
Page 404
May 01/98
SYR
TASK 24-25-55-400-001
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
R
No specific warning notice
R No specific 1 ACCESS PLATFORM 2M (6 FT) - ADJUSTABLE
No specific Torque Wrench : range 0.00 to 1.20 m.daN
(0.00 to 9.00 lbf.ft)
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
EFF :
ALL 24-25-55
Page 405
May 01/11
SYR
3. __________
Job Set-up
Subtask 24-25-55-860-050
(1) In the cockpit, on the overhead panel 35VU, make sure that these
puhbutton switches are released:
- BAT 1, BAT 2,
- GEN 1, GEN 2,
- EXT A.
(2) In the cockpit, make sure that the warning notice is in position to
tell persons not to operate the pushbutton switches on these panels
of the overhead panels:
- 35VU (ELEC),
- 21VU (EMER ELEC PWR).
(3) Make sure that the external power connector is not connected to the
aircraft receptable EXT PWR A.
(4) On the access door 121AL, make sure that the warning notice is in
position to tell persons not to connect the external power connector.
(7) In the avionics compartment, make sure that the access door (14) is
removed from the panel 106VU.
Subtask 24-25-55-865-050
B. Make sure that this(these) circuit breaker(s) is(are) open, safetied and
tagged
-------------------------------------------------------------------------------
PANEL DESIGNATION IDENT. LOCATION
-------------------------------------------------------------------------------
105VU ELEC/CSM/G /EV AUTO/SPLY 7XE C01
106VU CSM/G /EV/MAN/SPLY 6XE B04
106VU ESS TR/SPLY 4PE C01
122VU ELEC/CNTOR/ESS/DC BUS/TIE 3PC W26
123VU AC ESS/BUS ON/BUS 1 1XC AC12
123VU AC ESS/BUS ON/BUS 2 2XC AC01
EFF :
ALL 24-25-55
Page 406
May 01/11
SYR
4. Procedure
_________
Subtask 24-25-55-420-050
(4) Install the washers (9) and the nuts (7), then tighten the nuts.
CAUTION : REFER TO THE MATCH MARKS MADE DURING THE REMOVAL WHEN YOU
_______
CONNECT THE ELECTRICAL WIRES.
INCORRECT CONNECTION OF THE WIRES WILL CAUSE DAMAGE TO
EQUIPMENT.
(b) Install the plates (5) and (10), the spring washers (4) and the
nuts (3),
(c) TORQUE the nuts (3) to between 0.147 and 0.176 m.daN (13.00 and
15.57 lbf.in).
(7) Make sure that the electrical connectors are clean and in the correct
condition.
Subtask 24-25-55-865-051
B. Remove the safety clip(s) and the tag(s) and close this(these) circuit
breaker(s):
3PC, 1XC, 2XC, 7XE, 4PE, 6XE
EFF :
ALL 24-25-55
Page 407
May 01/11
SYR
Subtask 24-25-55-710-050
5. Close-up
________
Subtask 24-25-55-410-050
A. Close Access
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
EFF :
ALL 24-25-55
Page 408
May 01/11
R
SYR
GALLEY SUPPLY CONTROL - DESCRIPTION AND OPERATION
_________________________________________________
1. _______
General
The galley assembly is divided into several parts:
- Aft galley,
- Forward galley.
2. __________________
Component Location
-------------------------------------------------------------------------------
FIN | FUNCTIONAL DESIGNATION | PANEL|ZONE|ACCESS | ATA
| | | | DOOR | REF.
-------------------------------------------------------------------------------
2XA P/BSW-ELEC/GALLEY 35VU 210 831 24-26-00
3. __________________
System Description
EFF :
ALL 24-26-00
Page 1
Feb 01/99
SYR
Galley Supply Control - Component Location
Figure 001
R
EFF :
001-002, 24-26-00
Page 2
Feb 01/99
SYR
R Galley Supply Control - Component Location
R Figure 001A
R
EFF :
003-099, 24-26-00
Page 3
Feb 01/99
SYR
Galley Supply Control - Block Diagram
Figure 002
R
EFF :
001-002, 24-26-00
Page 4
Feb 01/99
SYR
**ON A/C 003-099,
The galley general supply is controlled from the cockpit ELEC panel 35VU by
means of the GALY & CAB pushbutton switch (normal operation when the
pushbutton is pressed in).
4. ________________________________
Operation/Control and Indicating
EFF :
ALL 24-26-00
Page 5
Nov 01/04
SYR
R Galley Supply Control - Block Diagram
R Figure 002A
R
EFF :
003-099, 24-26-00
Page 6
Feb 01/99
SYR
INTENTIONALLY BLANK
R
24-26-00
Page 7
Feb 01/99
SYR
Overload - Upper and Lower ECAM Display Unit
Figure 003 (SHEET 1)
EFF :
ALL 24-26-00
Page 8
Feb 01/99
SYR
Overload - Upper and Lower ECAM Display Unit
Figure 003 (SHEET 2)
EFF :
ALL 24-26-00
Page 9
Feb 01/99
SYR
Overload - Upper and Lower ECAM Display Unit
Figure 003 (SHEET 3)
EFF :
ALL 24-26-00
Page 10
Feb 01/99
SYR
R GALLEY indication is displayed on the lower ECAM DU, STATUS page.
R
EFF :
ALL 24-26-00
Page 11
Nov 01/04
SYR
GALLEY SUPPLY CONTROL - ADJUSTMENT/TEST
_______________________________________
TASK 24-26-00-710-001
1. __________________
Reason for the Job
2. ______________________
Job Set-up Information
A. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
Subtask 24-26-00-860-050
(1) Energize the aircraft electrical circuits from the external power
(Ref. TASK 24-41-00-861-002) or from the APU (Ref. TASK 24-41-00-861-
002).
(2) Do the EIS start procedure (Upper ECAM DU and lower ECAM DU only)
(Ref. TASK 31-60-00-860-001).
EFF :
ALL 24-26-00
Page 501
May 01/09
SYR
(3) In the cockpit, on the overhead ELEC panel 35VU, make sure that the
GALLEY pushbutton switch is pushed (the OFF legend is off).
Subtask 24-26-00-865-050
-------------------------------------------------------------------------------
PANEL DESIGNATION IDENT. LOCATION
-------------------------------------------------------------------------------
122VU ELEC/GALLEY/CTL 1XA S26
122VU ELEC/GALLEY/FAULT/LT CTL 8XA S25
122VU ELEC/GALLEY/GND/FLT/LOGIC 7XA S24
R 123VU AFT GALLEY/FEEDER B 12MC AD09
4. Procedure
_________
Subtask 24-26-00-710-050
-------------------------------------------------------------------------------
ACTION RESULT
-------------------------------------------------------------------------------
EFF :
001-002, 24-26-00
Page 502
Nov 01/06
SYR
-------------------------------------------------------------------------------
ACTION RESULT
-------------------------------------------------------------------------------
In the forward and aft galleys:
- make sure that all the galley
equipment operate.
5. Close-up
________
Subtask 24-26-00-860-051
EFF :
001-002, 24-26-00
Page 503
May 01/09
SYR
**ON A/C 003-099,
TASK 24-26-00-710-002
Operational Test of the Manual and Automatic Galley and Bus Shedding
1. __________________
Reason for the Job
2. ______________________
Job Set-up Information
A. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
Subtask 24-26-00-860-054
(1) Energize the aircraft electrical circuits from the external power
(Ref. TASK 24-41-00-861-002) or from the APU (Ref. TASK 24-41-00-861-
002).
(2) Do the EIS start procedure (Upper ECAM DU and lower ECAM DU only)
(Ref. TASK 31-60-00-860-001).
(3) In the cockpit, on the overhead ELEC panel 35VU, make sure that the
GALY & CAB pushbutton switch is pushed (the OFF legend is off).
R
EFF :
003-099, 24-26-00
Page 504
May 01/05
SYR
Subtask 24-26-00-865-052
-------------------------------------------------------------------------------
PANEL DESIGNATION IDENT. LOCATION
-------------------------------------------------------------------------------
122VU ELEC/GALY & CAB/CTL 1XA S26
122VU ELEC/GALY & CAB/FAULT/LT CTL 8XA S25
122VU ELEC/GALY & CAB/GND/FLT/LOGIC 7XA S24
R 123VU AFT GALLEY/FEEDER B 12MC AD09
4. Procedure
_________
Subtask 24-26-00-710-052
A. Operational Test of the Manual and Automatic Galley and Bus Shedding
-------------------------------------------------------------------------------
ACTION RESULT
-------------------------------------------------------------------------------
EFF :
003-099, 24-26-00
Page 505
Nov 01/06
SYR
-------------------------------------------------------------------------------
ACTION RESULT
-------------------------------------------------------------------------------
In the forward and aft galleys:
- make sure that all the galley
equipment operates.
R
EFF :
003-099, 24-26-00
Page 506
Nov 01/07
SYR
5. Close-up
________
Subtask 24-26-00-860-055
EFF :
003-099, 24-26-00
Page 507
Nov 01/07
R
SYR
AC GENERATION MONITORING AND INDICATING - DESCRIPTION AND OPERATION
___________________________________________________________________
1. General
_______
2. __________________
System Description
3. ________________________________
Operation/Control and Indicating
A. Operation
B. Description
EFF :
ALL 24-27-00
Page 1
May 01/98
SYR
AC Generation Monitoring and Indicating - ECAM
Figure 001
EFF :
ALL 24-27-00
Page 2
May 01/98
SYR
AC GENERATION MONITORING AND INDICATING - ADJUSTMENT/TEST
_________________________________________________________
TASK 24-27-00-710-001
1. __________________
Reason for the Job
Make sure that the GEN FAULT warning is operative when there are no more
indications on the ECAM ELEC page.
2. ______________________
Job Set-up Information
A. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
Subtask 24-27-00-860-050
(2) In the cockpit, on the overhead panel 35VU, make sure that the GEN1
(2) pushbutton switch is released.
EFF :
ALL 24-27-00
Page 501
May 01/98
SYR
4. Procedure
_________
Subtask 24-27-00-710-050
-------------------------------------------------------------------------------
ACTION RESULT
-------------------------------------------------------------------------------
5. Close-up
________
Subtask 24-27-00-862-050
EFF :
ALL 24-27-00
Page 502
May 01/98
SYR
TASK 24-27-00-710-002
1. __________________
Reason for the Job
Make sure that the automatic galley shedding is operative when there are no
more indications on the ECAM ELEC page.
2. ______________________
Job Set-up Information
A. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
Subtask 24-27-00-860-051
(1) Energize the aircraft electrical circuits from the APU (Ref. TASK 24-
41-00-861-002).
(2) In the cockpit, on the overhead panel 35VU, make sure that the GALLEY
pushbutton switch is pushed (the OFF legend is off).
(3) In the forward and aft galleys, make sure that all the units operate.
EFF :
ALL 24-27-00
Page 503
Feb 01/99
R
SYR
Subtask 24-27-00-865-050
-------------------------------------------------------------------------------
PANEL DESIGNATION IDENT. LOCATION
-------------------------------------------------------------------------------
4. Procedure
_________
Subtask 24-27-00-710-051
-------------------------------------------------------------------------------
ACTION RESULT
-------------------------------------------------------------------------------
5. Close-up
________
Subtask 24-27-00-862-051
EFF :
ALL 24-27-00
Page 504
Feb 01/99
SYR
R STATIC INVERTER - DESCRIPTION AND OPERATION
___________________________________________
1. _______
General
The 1000 VA nominal-power static inverter transforms the direct current
voltage from battery 1 into a single-phase 115 VAC/400 Hz alternating
current.
2. __________________
Component Location
-------------------------------------------------------------------------------
FIN | FUNCTIONAL DESIGNATION | PANEL|ZONE|ACCESS | ATA
| | | | DOOR | REF.
-------------------------------------------------------------------------------
2XB CNTOR-STAT INV 105VU 126 822 24-28-55
3XB STAT INV 126 822 24-28-51
-------------------------------------------------------------------------------
FIN | FUNCTIONAL DESIGNATION | PANEL|ZONE|ACCESS | ATA
| | | | DOOR | REF.
_______________________________________________________________________________
5XB HOLDER-FUSE 105VU 126 822 24-28-00
5XB1 FUSE-AC STAT INV BUS SPLY 105VU 126 822 24-28-00
3. System
__________________
Description
R The static inverter starts to operate automatically in the conditions that
R follow:
R - APU start (supply of fuel pump)
R - Battery supplies the engine ignition system (in emergency configuration)
R - Ram Air Turbine (RAT) deployment (< 10s) (supply of ECAM display units)
R - On ground, on batteries only (pushbutton switch supply)
R - In emergency configuration with landing gear extended (the 115 VAC ESS BUS
R 4XP is supplied, the CSM/G is not supplied).
4. Operation/Control
________________________________
and Indicating
(Ref. Fig. 003)
The static inverter starts automatically if:
- the AC BUS 1 and 2 are lost,
- the CSM/G is not available, and
- speed is more than 50 Kts.
When the static inverter is faulty, it generates a permanent ground signal
to the BCL1.
The presence of the ground signal means:
- overheat,
- output overvoltage,
- input undervoltage,
- input overvoltage.
EFF :
ALL 24-28-00
Page 1
Nov 01/10
SYR
Contactor and Fuse - Component Location
Figure 001
EFF :
ALL 24-28-00
Page 2
May 01/98
SYR
Static Inverter - Component Location
Figure 002
EFF :
ALL 24-28-00
Page 3
May 01/98
SYR
INTENTIONALLY BLANK
24-28-00
Page 4
May 01/98
SYR
Static Inverter - Schematic Diagram
Figure 003
EFF :
ALL 24-28-00
Page 5/6
May 01/98
SYR
The static inverter defect is sent to the battery charge limiter 1 which
stores it in a memory as a class I failure.
When the network is supplied, STATIC INV FAULT message appears on the upper
ECAM display unit.
The fault indication will be available during BCL BITE reading from the
Centralized Fault Display System (CFDS).
5. ____
Test
On the ground, the static inverter can be checked applying the following
procedure (aircraft supplied by EXT POWER or APU GEN):
- EMER GEN TEST: ON
- BUS TIE: OFF
- On the ECAM ELEC page, check voltage and frequency of static inverter.
EFF :
ALL 24-28-00
Page 7
May 01/98
SYR
STATIC INVERTER - ADJUSTMENT/TEST
_________________________________
TASK 24-28-00-710-001
Operational Test of the Static Inverter (3XB) when the Aircraft Electrical
Circuits are Energized from the External Power
1. __________________
Reason for the Job
NOTE : If the external power is available and the APU is in operation, you
____
must refer to the alternative method with the APU to do the
operational test of the static inverter.
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
EFF :
ALL 24-28-00
Page 501
May 01/11
SYR
3. __________
Job Set-up
Subtask 24-28-00-860-050
A. Safety Precautions
NOTE : On the panel 2000VU, put the MAINT BUS switch (5XX) in the OFF
____
position during the test.
Subtask 24-28-00-010-050
R (1) Put an ACCESS PLATFORM 2M (6 FT) - ADJUSTABLE at the access doors 812
R and 822 of the avionics compartment.
Subtask 24-28-00-865-050
-------------------------------------------------------------------------------
PANEL DESIGNATION IDENT. LOCATION
-------------------------------------------------------------------------------
105VU ELEC/HOT BUS/702PP SPLY 5PB2 D02
105VU ELEC/HOT BUS/701PP SPLY 5PB1 D01
105VU ELEC/BAT REF/BCL2 9PB2 F02
105VU ELEC/BAT REF/BCL1 9PB1 F01
105VU ELEC/STAT INV/CNTOR/CTL 14XB G02
105VU ELEC/STAT INV/BUS 901XP/SPLY 12XB H02
106VU AC ESS BUS/EMER/STBY/CNTOR/SPLY 10XE C06
4. Procedure
_________
EFF :
ALL 24-28-00
Page 502
May 01/11
SYR
Subtask 24-28-00-710-050
-------------------------------------------------------------------------------
R | ACTION | RESULT |
-------------------------------------------------------------------------------
- push the BAT1 pushbutton switch. - the OFF legend of the BAT1 pushbutton
switch goes off.
- release the BAT2 pushbutton - the OFF legend of the BAT2 pushbutton
switch. switch comes on.
- push the BAT2 pushbutton switch. - the OFF legend of the BAT2 pushbutton
switch goes off.
EFF :
ALL 24-28-00
Page 503
May 01/11
SYR
-------------------------------------------------------------------------------
| ACTION | RESULT |
-------------------------------------------------------------------------------
NOTE : If the current does not decrease
____
after 10 seconds, it is
necessary to do a charging cycle
of the batteries. When the
charging cycle is completed
(batteries no longer connected
to the DC BAT BUS), do the check
again.
- after 5 seconds, on the panel - the OFF legend of the BUS TIE
35VU, release the BUS TIE pushbutton switch comes on.
pushbutton switch.
EFF :
ALL 24-28-00
Page 504
May 01/11
R
SYR
-------------------------------------------------------------------------------
| ACTION | RESULT |
-------------------------------------------------------------------------------
- push the BAT1 and BAT2 - the OFF legend of the BAT1 and BAT2
pushbutton switches. pushbutton switches goes off.
11. On the ECAM control panel: On the lower ECAM display unit:
- get the ELEC page. - check that the external power
energizes correctly the aircraft
electrical circuits.
5. Close-up
________
Subtask 24-28-00-860-051
Subtask 24-28-00-410-050
B. Close Access
EFF :
ALL 24-28-00
Page 505
May 01/11
R
SYR
TASK 24-28-00-710-001- 01
Operational Test of the Static Inverter (3XB) when the Aircraft Electrical
Circuits are Energized from the APU
1. __________________
Reason for the Job
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
EFF :
ALL 24-28-00
Page 506
May 01/11
SYR
3. __________
Job Set-up
Subtask 24-28-00-860-052
A. Safety Precautions
NOTE : On the panel 2000VU, put the MAINT BUS switch (5XX) in the OFF
____
position during the test.
Subtask 24-28-00-010-051
R (1) Put an ACCESS PLATFORM 2M (6 FT) - ADJUSTABLE at the access doors 812
R and 822 of the avionics compartment.
Subtask 24-28-00-865-051
-------------------------------------------------------------------------------
PANEL DESIGNATION IDENT. LOCATION
-------------------------------------------------------------------------------
105VU ELEC/HOT BUS/702PP SPLY 5PB2 D02
105VU ELEC/HOT BUS/701PP SPLY 5PB1 D01
105VU ELEC/BAT REF/BCL2 9PB2 F02
105VU ELEC/BAT REF/BCL1 9PB1 F01
105VU ELEC/STAT INV/CNTOR/CTL 14XB G02
105VU ELEC/STAT INV/BUS 901XP/SPLY 12XB H02
106VU AC ESS BUS/EMER/STBY/CNTOR/SPLY 10XE C06
4. Procedure
_________
EFF :
ALL 24-28-00
Page 507
May 01/11
SYR
Subtask 24-28-00-710-051
-------------------------------------------------------------------------------
R | ACTION | RESULT |
-------------------------------------------------------------------------------
- push the BAT1 pushbutton switch. - the OFF legend of the BAT1 pushbutton
switch goes off.
- release the BAT2 pushbutton - the OFF legend of the BAT2 pushbutton
switch. switch comes on.
- push the BAT2 pushbutton switch. - the OFF legend of the BAT2 pushbutton
switch goes off.
EFF :
ALL 24-28-00
Page 508
May 01/11
SYR
-------------------------------------------------------------------------------
ACTION RESULT
-------------------------------------------------------------------------------
R NOTE : If the current does not decrease
____
R after 10 seconds, it is
R necessary to do a charging cycle
R of the batteries. When the
R charging cycle is completed
R (batteries no longer connected
R to the DC BAT BUS), do the check
R again.
- after 5 seconds, on the panel - the OFF legend of the BUS TIE
35VU, release the BUS TIE pushbutton switch comes on.
pushbutton switch.
EFF :
ALL 24-28-00
Page 509
May 01/08
SYR
-------------------------------------------------------------------------------
ACTION RESULT
-------------------------------------------------------------------------------
- push the BUS TIE pushbutton - the OFF legend of the BUS TIE
switch. pushbutton switch goes off.
R - push the BAT1 pushbutton - the OFF legend of the BAT1 pushbutton
R switch. switch goes off.
11. On the ECAM control panel: On the lower ECAM display unit:
- get the ELEC page. - check that the APU energizes
correctly the aircraft electrical
circuits.
5. Close-up
________
Subtask 24-28-00-860-053
(2) De-energize the aircraft electrical circuits from the APU (Ref. TASK
24-41-00-862-002).
Subtask 24-28-00-410-051
B. Close Access
EFF :
ALL 24-28-00
Page 510
Nov 01/08
SYR
STATIC INVERTER (3XB) - REMOVAL/INSTALLATION
____________________________________________
TASK 24-28-51-000-001
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
Subtask 24-28-51-861-050
Subtask 24-28-51-010-050
R (1) Put an ACCESS PLATFORM 2M (6 FT) - ADJUSTABLE at the access door 822.
EFF :
ALL 24-28-51
Page 401
May 01/11
SYR
Subtask 24-28-51-865-050
-------------------------------------------------------------------------------
PANEL DESIGNATION IDENT. LOCATION
-------------------------------------------------------------------------------
105VU ELEC/STAT INV/CNTOR/CTL 14XB G02
4. Procedure
_________
Subtask 24-28-51-020-050
(2) Put blanking caps on the electrical connector (3) and the electrical
receptacle (2).
EFF :
ALL 24-28-51
Page 402
May 01/11
R
SYR
Static Inverter
Figure 401/TASK 24-28-51-991-001
EFF :
ALL 24-28-51
Page 403
May 01/98
SYR
TASK 24-28-51-400-001
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
Subtask 24-28-51-860-050
EFF :
ALL 24-28-51
Page 404
May 01/11
SYR
Subtask 24-28-51-865-051
B. Make sure that this(these) circuit breaker(s) is(are) open, safetied and
tagged
-------------------------------------------------------------------------------
PANEL DESIGNATION IDENT. LOCATION
-------------------------------------------------------------------------------
105VU ELEC/STAT INV/CNTOR/CTL 14XB G02
4. Procedure
_________
Subtask 24-28-51-420-050
(1) Put the static inverter (1) in position on its support (4).
(2) Install the washers (5) and the screws (6) and then tighten the
screws.
(4) Make sure that the electrical connectors are clean and in the correct
condition.
Subtask 24-28-51-865-052
B. Remove the safety clip(s) and the tag(s) and close this(these) circuit
breaker(s):
14XB
Subtask 24-28-51-710-050
EFF :
ALL 24-28-51
Page 405
May 01/11
SYR
5. Close-up
________
Subtask 24-28-51-410-050
A. Close Access
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
Subtask 24-28-51-862-050
EFF :
ALL 24-28-51
Page 406
May 01/98
SYR
CONTACTOR (2XB) - REMOVAL/INSTALLATION
______________________________________
TASK 24-28-55-000-001
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
Subtask 24-28-55-941-050
A. Safety Precautions
(1) In the cockpit, on the overhead panel 35VU, release these pushbutton
switches:
- BAT 1, BAT 2,
- GEN 1, GEN 2,
- EXT A.
EFF :
ALL 24-28-55
Page 401
May 01/11
SYR
(2) In the cockpit, put a warning notice to tell persons not to operate
the pushbutton switches on these overhead panels:
- 35VU (ELEC),
- 21VU (EMER ELEC PWR).
(3) Make sure that the external power connector is not connected to the
aircraft receptacle EXT PWR A.
(4) Put a warning notice on the access door 121AL to tell persons not to
connect the external power connector.
Subtask 24-28-55-010-050
B. Get Access
(3) In the avionics compartment, open the access door of the panel 105VU.
Subtask 24-28-55-869-050
(a) Loosen the knurled nut by one quarter of a turn and disconnect
the connector from the batteries 1 and 2.
Subtask 24-28-55-865-050
-------------------------------------------------------------------------------
PANEL DESIGNATION IDENT. LOCATION
-------------------------------------------------------------------------------
105VU ELEC/HOT BUS/702PP SPLY 5PB2 D02
105VU ELEC/HOT BUS/701PP SPLY 5PB1 D01
105VU ELEC/STAT INV/CNTOR/CTL 14XB G02
106VU CSM/G /EV/MAN/SPLY 6XE B04
122VU ELEC/REFLNG/ON/BAT 1PR U28
EFF :
ALL 24-28-55
Page 402
May 01/11
SYR
4. Procedure
_________
Subtask 24-28-55-020-050
R CAUTION : REMOVE THE CONTACTOR ONLY AND NOT THE BASE OR THE MODULE WHERE
_______
R THE WIRES ARE CONNECTED.
(2) Put blanking caps on the connector (3) and the electrical receptacle
(2).
NOTE : Do not remove the captive screws (4) and the spring washers
____
from the contactor (1).
(4) Disengage the contactor (1) from the base (7) and remove the
contactor (1).
EFF :
ALL 24-28-55
Page 403
Nov 01/04
SYR
Static Inverter Contactor
Figure 401/TASK 24-28-55-991-001
EFF :
ALL 24-28-55
Page 404
May 01/98
SYR
TASK 24-28-55-400-001
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
EFF :
ALL 24-28-55
Page 405
May 01/10
SYR
3. __________
Job Set-up
Subtask 24-28-55-860-050
(1) In the cockpit, on the overhead panel 35VU, make sure these
pushbutton switches are released:
- BAT 1, BAT 2,
- GEN 1, GEN 2,
- EXT A.
(2) In the cockpit, make sure that the warning notice is in position to
tell persons not to operate the pushbutton switches on these overhead
panels:
- 35VU (ELEC),
- 21VU (EMER ELEC PWR).
(3) Make sure that the external power connector is not connected to the
aircraft receptable EXT PWR A.
(4) On the access door 121AL, make sure that the warning notice is in
position to tell persons not to connect the external power connector.
(5) Make sure that the access platform is in position at the access door
822.
(7) In the avionics compartment, make sure that the access door from the
panel 105VU is open.
Subtask 24-28-55-865-051
B. Make sure that this(these) circuit breaker(s) is(are) open, safetied and
tagged
-------------------------------------------------------------------------------
PANEL DESIGNATION IDENT. LOCATION
-------------------------------------------------------------------------------
105VU ELEC/HOT BUS/702PP SPLY 5PB2 D02
105VU ELEC/HOT BUS/701PP SPLY 5PB1 D01
105VU ELEC/STAT INV/CNTOR/CTL 14XB G02
106VU CSM/G /EV/MAN/SPLY 6XE B04
122VU ELEC/REFLNG/ON/BAT 1PR U28
EFF :
ALL 24-28-55
Page 406
May 01/05
R
SYR
4. Procedure
_________
Subtask 24-28-55-420-050
(1) Install the contactor (1) on the 6 tapped barrels (6) of the
contactor base (7).
R (2) TORQUE the six captive screws (4) to between 13.0128 and 15.5808
R lbf.in (0.14 and 0.17 m.daN).
(4) Make sure that the electrical connectors are clean and in the correct
condition.
Subtask 24-28-55-865-052
B. Remove the safety clip(s) and the tag(s) and close this(these) circuit
breaker(s):
14XB, 5PB1, 5PB2, 6XE, 1PR.
Subtask 24-28-55-710-050
EFF :
ALL 24-28-55
Page 407
Aug 01/11
SYR
5. Close-up
________
Subtask 24-28-55-410-050
A. Close Access
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
EFF :
ALL 24-28-55
Page 408
May 01/98
SYR
DC GENERATION - DESCRIPTION AND OPERATION
_________________________________________
1. General
_______
A. In Normal Configuration
(Ref. Fig. 001)
In normal configuration, direct current is provided by both normal
transformers rectifiers (TR1 and TR2) and possibly by batteries.
TR1 supplies, through TR1 contactor (5PU1) normal bus 1 (DC BUS1),
battery bus (DC BAT BUS), essential bus (DC ESS BUS) and sheddable
essential bus (DC SHED ESS BUS).
The BAT BUS is supplied from BUS 1, through DC NORM BUS 1 SWITCHING
contactor (1PC1), and provides power to ESS BUS and SHED ESS BUS through
respectively DC ESS BUS SUPPLY contactor (4PC) and DC SHED ESS BUS
contactor (8PH) in succession.
Both batteries and their respective HOT BUS are connected or not to BAT
BUS, in parallel, through both BATTERY LINE contactors (6PB1 & 6PB2).
TR2 supplies, through TR2 contactor (5PU2), normal bus 2 (DC BUS 2).
R A. In Normal Configuration
R (Ref. Fig. 001A)
R In normal configuration, direct current is provided by both normal
R transformers rectifiers (TR1 and TR2) and possibly by batteries.
R TR1 supplies, through TR1 contactor (5PU1) normal bus 1 (DC BUS1),
R battery bus (DC BAT BUS), essential bus (DC ESS BUS) and sheddable
R essential bus (DC SHED ESS BUS).
R The BAT BUS is supplied from BUS 1, through DC NORM BUS 1 SWITCHING
R contactor (1PC1), and provides power to ESS BUS and SHED ESS BUS through
EFF :
ALL 24-30-00
Page 1
Feb 01/99
SYR
R respectively DC ESS BUS SUPPLY contactor (4PC) and DC SHED ESS BUS
R contactor (8PH) in succession.
R Both batteries and their respective HOT BUS are connected or not to BAT
R BUS, in parallel, through both BATTERY LINE contactors (6PB1 & 6PB2).
R TR2 supplies, through TR2 contactor (5PU2), normal bus 2 (DC BUS 2).
R
EFF :
ALL 24-30-00
Page 2
Feb 01/99
SYR
DC Generation and Distribution - General
Figure 001
R
EFF :
001-002, 24-30-00
Page 3/4
Feb 01/99
SYR
R DC Generation and Distribution - General
R Figure 001A
R
EFF :
003-099, 24-30-00
Page 5/6
Feb 01/99
SYR
Loss of Transformer Rectifier 1 - Block Diagram
Figure 002
EFF :
ALL 24-30-00
Page 7/8
Feb 01/99
R
SYR
Loss of Transformer Rectifier 2 - Block Diagram
Figure 003
EFF :
ALL 24-30-00
Page 9/10
Feb 01/99
R
SYR
2. Component
__________________
Location
R (Ref. Fig. 004, 005)
-------------------------------------------------------------------------------
FIN | FUNCTIONAL DESIGNATION | PANEL|ZONE|ACCESS | ATA
| | | | DOOR | REF.
-------------------------------------------------------------------------------
1PB1 BCL-1 124 822 24-38-34
1PB2 BCL-2 124 822 24-38-34
2PB1 BAT-1 126 822 24-38-51
2PB2 BAT-2 126 822 24-38-51
4PB1 HOLDER-BAT 1 FUSE 120VU 212 831 24-38-00
4PB2 HOLDER-BAT 2 FUSE 120VU 212 831 24-38-00
6PB1 CNTOR-LINE, BAT 1 105VU 126 822 24-38-55
6PB2 CNTOR-LINE, BAT 2 105VU 126 822 24-38-55
7PB1 P/BSW-ELEC/BAT 1 35VU 210 831 24-38-00
7PB2 P/BSW-ELEC/BAT 2 35VU 210 831 24-38-00
1PC1 CNTOR-DC NORM BUS 1 SWITCHING 120VU 212 831 24-35-55
1PC2 CNTOR-DC NORM BUS 2 SWITCHING 120VU 212 831 24-35-55
4PC CNTOR-DC ESS BUS SUPPLY 106VU 125 812 24-35-55
20PC HOLDER-FUSE 120VU 212 831 24-35-00
1PE TR-ESS 125 812 24-34-51
3PE CNTOR-ESS TR 106VU 125 812 24-34-55
1PU1 TR-1 126 822 24-32-51
1PU2 TR-2 126 822 24-32-51
5PU1 CNTOR-TR 1 120VU 212 831 24-32-55
5PU2 CNTOR-TR 2 120VU 212 831 24-32-55
14PU CNTOR-TR 2/AC SVCE BUS NORM SPLY 120VU 212 831 24-32-55
15PU P/BSW-TR RST 103VU 126 822 24-32-00
3PV1 VOLTMETER-BAT 1 35VU 210 831 24-37-21
3PV2 VOLTMETER-BAT 2 35VU 210 831 24-37-21
-------------------------------------------------------------------------------
FIN I FUNCTIONAL DESIGNATION I PANELIZONEIACCESS I ATA
I I I I DOOR I REF.
-------------------------------------------------------------------------------
4PB11 FUSE-BAT1 120VU 212 24-38-00
4PB21 FUSE-BAT2 120VU 212 24-38-00
20PC1 FUSE 120VU 212 24-35-00
EFF :
ALL 24-30-00
Page 11
Nov 01/04
SYR
DC Generation - Component Location
Figure 004
EFF :
ALL 24-30-00
Page 12
Feb 01/99
R
SYR
Spare Fuses - Component Location
Figure 005
EFF :
ALL 24-30-00
Page 13
Feb 01/99
SYR
A. Spare Fuses
(1) If fuses 4PB11 and 4PB21 blow, you can replace them by spare 350 A
fuses located on the panel 120VU.
(2) If fuse 20PC1 blows, you can replace it by a spare 80 A fuse located
on the panel 120VU or by a spare 80 A fuse located on the left side
panel, in the cockpit.
3. _________
BITE Test
EFF :
ALL 24-30-00
Page 14
Feb 01/99
SYR
CFDS Architecture (Liaison with TRs and BCLs)
Figure 006
EFF :
ALL 24-30-00
Page 15
Feb 01/99
SYR
DC GENERATION - DEACTIVATION/REACTIVATION
_________________________________________
TASK 24-30-00-040-001
Perform a Charging Cycle on the Battery Associated With the Operative Battery
Charge Limiter (BCL)
1. __________________
Reason for the Job
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
Subtask 24-30-00-010-053
(3) Open the access panel of the BATTERY power center 105VU.
EFF :
ALL 24-30-00
Page 401
May 01/11
SYR
Subtask 24-30-00-865-051
-------------------------------------------------------------------------------
PANEL DESIGNATION IDENT. LOCATION
-------------------------------------------------------------------------------
105VU ELEC/HOT BUS/702PP SPLY 5PB2 D02
105VU ELEC/HOT BUS/701PP SPLY 5PB1 D01
105VU ELEC/BAT REF/BCL2 9PB2 F02
105VU ELEC/BAT REF/BCL1 9PB1 F01
105VU ELEC/BAT BUS/REF/BCL1 8PB1 G01
105VU ELEC/BAT BUS/REF/BCL2 8PB2 J02
125VU BAT BUS/301PP/SPLY 11PB CC01
Subtask 24-30-00-860-052
(3) Do the EIS start procedure (Upper ECAM DU and lower ECAM DU only)
(Ref. TASK 31-60-00-860-001).
4. Procedure
_________
Subtask 24-30-00-040-050
(1) If:
- the failure of the BCL 1(2) occurred during the last flight and the
time the aircraft was on ground was not more than 3 hours, or
- the BCL 1(2) did not operate during the last flight and the time
the aircraft was on ground was not more than 3 hours:
EFF :
ALL 24-30-00
Page 402
May 01/11
R
SYR
(b) In the cockpit, on the ELEC panel 35VU:
- push the related BAT 1 (2) pushbutton switch to start the
charging cycle of the battery 1 (2).
(d) On the ELEC system page, make sure that the ground power-unit
voltage stays above 114VAC during the charge.
1
_ After some 12 seconds, the green line between the BAT 1 (2)
indication and the DC BAT busbar indication:
- goes out of view if the battery charge is correct,
- stays in view if a battery charge is necessary.
(f) On the lower ECAM display unit, ELEC page, make sure that the
battery voltage is above 25V and the battery discharge current is
equal to or lower than 1A.
(h) Start a charging cycle of the battery which was related to the
failed BCL during the previous flight.
(i) On the ELEC panel 35VU, push the related BAT 2 (1) pushbutton
switch to start the charging cycle of the battery 2 (1).
(j) Release the BAT 1 (2) pushbutton switch related to the BCL not in
operation.
EFF :
ALL 24-30-00
Page 403
May 01/98
SYR
Subtask 24-30-00-040-051
(2) Send the battery 1(2) to the overhaul workshop to charge it (Ref.
R CMMV 243851).
5. Close-up
________
Subtask 24-30-00-410-051
A. Close Access
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
(2) Close the access panel of the BATTERY power center 105VU.
Subtask 24-30-00-860-053
(2) Put a warning notice in position in the cockpit to tell the crew that
one BCL does not operate.
EFF :
ALL 24-30-00
Page 404
Nov 01/08
SYR
TASK 24-30-00-440-001
1. __________________
Reason for the Job
2. ______________________
Job Set-up Information
A. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
Subtask 24-30-00-861-051
4. Procedure
_________
Subtask 24-30-00-810-050
5. Close-up
________
Subtask 24-30-00-862-051
EFF :
ALL 24-30-00
Page 405
May 01/11
SYR
TASK 24-30-00-040-002
1. __________________
Reason for the Job
2. ______________________
Job Set-up Information
A. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
Subtask 24-30-00-860-054
(2) Do the EIS start procedure (Upper ECAM DU and lower ECAM DU only)
(Ref. TASK 31-60-00-860-001).
EFF :
ALL 24-30-00
Page 406
May 01/11
SYR
Subtask 24-30-00-865-052
-------------------------------------------------------------------------------
PANEL DESIGNATION IDENT. LOCATION
-------------------------------------------------------------------------------
106VU AC ESS BUS/STBY/CNTOR/CTL 5XC B08
106VU AC ESS/BUS NORM/CNTOR/CTL 4XC B03
123VU AC ESS/BUS ON/BUS 1 1XC AC12
123VU AC ESS/BUS ON/BUS 2 2XC AC01
4. Procedure
_________
Subtask 24-30-00-040-052
-------------------------------------------------------------------------------
R | ACTION | RESULT |
-------------------------------------------------------------------------------
1. On the ECAM control panel: On the lower ECAM DU, on the ELEC page:
- Push the ELEC key. - A green bar comes into view between
the AC1 and AC ESS busbars. This
shows that the AC1 busbar energizes
the AC ESS busbar.
EFF :
ALL 24-30-00
Page 407
May 01/11
SYR
-------------------------------------------------------------------------------
| ACTION | RESULT |
-------------------------------------------------------------------------------
- Release the AC ESS FEED - The FAULT legend of the AC ESS FEED
pushbutton switch. pushbutton switch goes off.
- The ALTN legend of the AC ESS FEED
pushbutton switch comes on.
4. On the ECAM control panel: On the lower ECAM DU, on the ELEC page:
- Push the ELEC key. - A green bar comes into view between
the AC2 and AC ESS busbars. This
shows that the AC2 busbar energizes
the AC ESS busbar,
- The green bar between the AC1 and AC
ESS busbars goes out of view.
5. Close-up
________
Subtask 24-30-00-860-055
EFF :
ALL 24-30-00
Page 408
May 01/11
R
SYR
TASK 24-30-00-440-002
1. __________________
Reason for the Job
2. ______________________
Job Set-up Information
A. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
Subtask 24-30-00-860-056
(2) Do the EIS start procedure (Upper ECAM DU and lower ECAM DU only)
(Ref. TASK 31-60-00-860-001).
4. Procedure
_________
Subtask 24-30-00-440-050
EFF :
ALL 24-30-00
Page 409
Nov 01/10
SYR
R 5. Close-up
________
R Subtask 24-30-00-860-057
EFF :
ALL 24-30-00
Page 410
May 01/05
SYR
DC GENERATION - ADJUSTMENT/TEST
_______________________________
TASK 24-30-00-710-001
Operational Test of the Emergency Generation System with One Normal Transformer
Rectifier (TR) Failed
WARNING : MAKE SURE THAT THE TRAVEL RANGES OF THE FLIGHT CONTROLS ARE CLEAR.
_______
MOVEMENT OF FLIGHT CONTROLS CAN CAUSE INJURY TO PERSONS AND/OR
DAMAGE.
1. __________________
Reason for the Job
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
EFF :
ALL 24-30-00
Page 501
May 01/98
SYR
3. __________
Job Set-up
Subtask 24-30-00-860-050
(2) Do the EIS start procedure (Upper ECAM DU and lower ECAM DU only)
(Ref. TASK 31-60-00-860-001).
(3) On the HYD/FUEL panel 40VU, make sure that the OFF legend of the BLUE
ELEC PUMP pushbutton switch is OFF.
Subtask 24-30-00-010-052
(1) Put the access platforms at the access doors 812 and 822.
Subtask 24-30-00-865-050
-------------------------------------------------------------------------------
PANEL DESIGNATION IDENT. LOCATION
-------------------------------------------------------------------------------
105VU ELEC/CSM/G /EV AUTO/SPLY 7XE C01
106VU CSM/G /EV/MAN/SPLY 6XE B04
106VU ESS TR/CNTOR/CTL 5PE C02
R 106VU ESS TR/SPLY 4PE C01
R
122VU ELEC/EMER GEN AUTO/2 9XE Z26
122VU ELEC/EMER GEN AUTO/1 11XE Z25
Subtask 24-30-00-710-050
Subtask 24-30-00-869-052
E. On the Ecam Control Panel (ECP), get the HYD page and make sure on the
System Display (SD) that the blue system pressure is 3000 psi.
EFF :
ALL 24-30-00
Page 502
May 01/03
SYR
4. Procedure
_________
Subtask 24-30-00-710-051
-------------------------------------------------------------------------------
ACTION RESULT
-------------------------------------------------------------------------------
1. On the panel 21VU, on the EMER On the lower ECAM display unit:
ELEC PWR section: - the ELEC page comes into view
- lift the safety cover, automatically,
- push and hold the EMER GEN TEST - the green lines between the AC1 and
pushbutton switch. the AC ESS busbars and the DC1 and
the DC ESS busbars go out of view,
- the EMER GEN and ESS TR indications
are shown in white. The related
parameters are shown in green,
- the green lines between the EMER GEN
indication and the AC ESS busbar, the
EMER GEN and the ESS TR indications,
the ESS TR indication and the DC ESS
busbar come into view,
- the SHED indication comes into view
below the AC ESS and DC ESS busbars.
5. Close-up
________
Subtask 24-30-00-710-052
EFF :
ALL 24-30-00
Page 503
May 01/98
SYR
Subtask 24-30-00-860-051
(1) If the test duration is more than 30 seconds, on the panel 22VU, the
FAULT light of the EXTRACT pushbutton switch comes on.
If this occurs, release then push the EXTRACT pushbutton switch (the
FAULT light goes off).
Subtask 24-30-00-410-050
C. Close Access
EFF :
ALL 24-30-00
Page 504
May 01/98
SYR
R DC MAIN GENERATION - DESCRIPTION AND OPERATION
______________________________________________
1. _______
General
The DC main generation is provided by the two Transformers Rectifiers 1 and
2 (TR1 and TR2).
They are supplied with three phases 115 VAC/400 Hz voltage from the normal
Alternating Current (AC) distribution network.
2. Component
__________________
Location
(Ref. Fig. 001)
-------------------------------------------------------------------------------
FIN | FUNCTIONAL DESIGNATION | PANEL|ZONE|ACCESS | ATA
| | | | DOOR | REF.
-------------------------------------------------------------------------------
1PU1 TR-1 126 822 24-32-51
1PU2 TR-2 126 822 24-32-51
5PU1 CNTOR-TR 1 120VU 212 831 24-32-55
5PU2 CNTOR-TR 2 120VU 212 831 24-32-55
14PU CNTOR-TR 2/AC SVCE BUS NORM SPLY 120VU 212 831 24-32-55
15PU P/BSW-TR RST 103VU 126 822 24-32-00
3. _____________________
Component Description
A. Transformer Rectifier
(1) Operation
(Ref. Fig. 002, 003, 004)
R Each TR controls its contactor via an internal TR logic.
R This logic, which is intended to protect the Direct Current (DC)
R network and the TR, controls contactor opening in case of:
R - no current flow to the DC BUS (minimum current detection),
R - TR overheat (171/Deg.C).
R To ensure these protections, each TR sends a fault signal to the
R Centralized Fault Display System (CFDS) for maintenace purpose.
R Main TRs are ventilated by air extracted from the aircraft
R ventilation network.
R
R B. TR Characteristics
R - supply: 115 VAC/400 Hz, three phase
R - DC output current:
R 200 A in continuous operation
R 300 A for 5 minutes
R 500 A for 30 seconds
R 1000 A for 1 second
R - DC output voltage:
EFF :
ALL 24-32-00
Page 1
Nov 01/10
SYR
DC Main Generation (TR) - Component Location
Figure 001 (SHEET 1)
EFF :
ALL 24-32-00
Page 2
May 01/98
SYR
DC Main Generation (TR) - Component Location
Figure 001 (SHEET 2)
EFF :
ALL 24-32-00
Page 3
May 01/98
SYR
Transformer Rectifier 1 (TR1) - Component Description
Figure 002
EFF :
ALL 24-32-00
Page 4
May 01/98
SYR
Transformer Rectifier 2 (TR2) - Component Description
Figure 003
EFF :
ALL 24-32-00
Page 5
May 01/98
SYR
Transformer Rectifier Contactor Control - Simplified Logic
Figure 004
EFF :
ALL 24-32-00
Page 6
May 01/98
SYR
R 30.2 V with no load
R 27.5 V at 200A.
TR1 (1PU1) is fully interchangeable with essential TR (1PE) and has the
same electrical properties.
NOTE : TR2 (1PU2) has not the same electrical properties and is not
____
interchangeable.
4. ________________________________
Operation/Control and Indicating
A. Normal Operation
The transformers rectifiers start to operate as soon as they are
supplied:
- TR1 is supplied by 1XP busbar,
- TR2 is normally supplied by 2XP busbar.
NOTE : TR2 can also supply part of the DC network from the ground power
____
unit and in ground service configuration (Ref. 24-43-00).
The parameters such as voltage and current are available and displayed
via the SDAC on the ELEC page on the lower ECAM DU.
(1) Table of Main Digital Signals Sent Out by the Equipments to SDAC 1(2)
-------------------------------------------------------------------------------
| PARAMETER LIST PARAMETER CHARACTERISTICS (NUMERIC) |
-------------------------------------------------------------------------------
|EQ.SYS.LAB.SDI|PARAMETER | WORD RANGE |UNIT|SIG |BITS|XMSN|CODE|ALPHA|SOURCE |
| |DEFINITION| OPER RANGE | |BIT | |INTV| |CODE |ORIGIN |
| |(*=REMARK)| RESOLUTION | | | | | | |BUS No.|
| |(X=NOTE) | ACCURACY | | | | | | |ATA REF|
| | | | | | | | | |CONV |
-------------------------------------------------------------------------------
| 1 102 01 | BAT1 | 512 | A | | 09 | | | |BCL1 |
| | CURRENT | | | | | | | | |
| 2 102 10 | BAT2 | 512 | A | | 09 | | | |BCL2 |
| | CURRENT | | | | | | | | |
| 1 104 01 | BAT1 | 32 | V | | 05 | | | |BCL1 |
| | VOLTAGE | | | | | | | | |
| 2 104 10 | BAT2 | 32 | V | | 05 | | | |BCL2 |
| | VOLTAGE | | | | | | | | |
EFF :
ALL 24-32-00
Page 7
Nov 01/10
SYR
TR1 Fault (Class 1 - Level 1) - ECAM
Figure 005 (SHEET 1)
EFF :
ALL 24-32-00
Page 8
May 01/98
SYR
TR1 Fault (Class 1 - Level 1) - ECAM
Figure 005 (SHEET 2)
EFF :
ALL 24-32-00
Page 9
May 01/98
SYR
Normal Operation - Lower ECAM Display unit
Figure 006
EFF :
ALL 24-32-00
Page 10
May 01/98
SYR
(2) Table of Main Low Level Direct Current (LLDC) Analogic Signals sent
out by the Equipments to SDAC 1(2)
-------------------------------------------------------------------------------
| PARAMETER LIST PARAMETER CHARACTERISTICS (NUMERIC) |
-------------------------------------------------------------------------------
|EQ.SYS.LAB.SDI|PARAMETER | WORD RANGE |UNIT|SIG |BITS|XMSN|CODE|ALPHA|SOURCE |
| |DEFINITION| OPER RANGE | |BIT | |INTV| |CODE |ORIGIN |
| |(*=REMARK)| RESOLUTION | | | | | | |BUS No.|
| |(X=NOTE) | ACCURACY | | | | | | |ATA REF|
| | | | | | | | | |CONV |
-------------------------------------------------------------------------------
| | TRU1 | | V | | | | | |1PU1 |
| | VOLTAGE | | | | | | | | |
| | TRU1 | | A | | | | | |1PU1 |
| | CURRENT | | | | | | | | |
| | TRU2 | | V | | | | | |1PU2 |
| | VOLTAGE | | | | | | | | |
| | TRU2 | | A | | | | | |1PU2 |
| | CURRENT | | | | | | | | |
| | ESS TRU | | V | | | | | |1PE |
| | VOLTAGE | | | | | | | | |
| | ESS TRU | | A | | | | | |1PE |
| | CURRENT | | | | | | | | |
-------------------------------------------------------------------------------
| PARAMETER LIST PARAMETER CHARACTERISTICS (NUMERIC) |
-------------------------------------------------------------------------------
|EQ.SYS.LAB.SDI|PARAMETER | WORD RANGE |UNIT|SIG |BITS|XMSN|CODE|ALPHA|SOURCE |
| |DEFINITION| OPER RANGE | |BIT | |INTV| |CODE |ORIGIN |
| |(*=REMARK)| RESOLUTION | | | | | | |BUS No.|
| |(X=NOTE) | ACCURACY | | | | | | |ATA REF|
| | | | | | | | | |CONV |
-------------------------------------------------------------------------------
| 002 00 | ESS TRU | | | | 17 | | | |3PE |
| | CNTOR ON | | | | | | | | |
| 002 00 | ESS TRU | | | | 17 | | | |3PE |
| | CNTOR OFF| | | | | | | | |
| 002 00 |DC BAT/ DC| | | | 19 | | | |8PH |
| | ESS SHED | | | | | | | | |
| | CNTOR ON | | | | | | | | |
| 002 00 |DC BAT/ DC| | | | 19 | | | |8PH |
| | ESS SHED | | | | | | | | |
| | CNTOR OFF| | | | | | | | |
| 1 002 01 |TRU1 CNTOR| | | | 17 | | | |5PU1 |
EFF :
ALL 24-32-00
Page 11
May 01/98
SYR
-------------------------------------------------------------------------------
| PARAMETER LIST PARAMETER CHARACTERISTICS (NUMERIC) |
-------------------------------------------------------------------------------
|EQ.SYS.LAB.SDI|PARAMETER | WORD RANGE |UNIT|SIG |BITS|XMSN|CODE|ALPHA|SOURCE |
| |DEFINITION| OPER RANGE | |BIT | |INTV| |CODE |ORIGIN |
| |(*=REMARK)| RESOLUTION | | | | | | |BUS No.|
| |(X=NOTE) | ACCURACY | | | | | | |ATA REF|
| | | | | | | | | |CONV |
-------------------------------------------------------------------------------
| | ON | | | | | | | | |
| 1 002 01 |TRU1 CNTOR| | | | 17 | | | |5PU1 |
| | OFF | | | | | | | | |
| 002 01 |DC1/DC ESS| | | | 18 | | | |1PC1 |
| | CNTOR ON | | | | | | | | |
| 002 01 |DC1/DC ESS| | | | 18 | | | |1PC1 |
| | CNTOR OFF| | | | | | | | |
| 1 002 01 |BAT1 CNTOR| | | | 19 | | | |6PB1 |
| | ON | | | | | | | | |
| 1 002 01 |BAT1 CNTOR| | | | 19 | | | |6PB1 |
| | OFF | | | | | | | | |
| 002 01 |DC BAT/ DC| | | | 21 | | | |4PC |
| |ESS CNTOR | | | | | | | | |
| | ON | | | | | | | | |
| 002 01 |DC BAT/ DC| | | | 21 | | | |4PC |
| |ESS CNTOR | | | | | | | | |
| | OFF | | | | | | | | |
| 1 002 01 | BAT1 P/B | | | | 24 | | | |7PB1 |
| | OFF | | | | | | | | |
| 1 002 01 | BAT1 P/B | | | | 24 | | | |7PB1 |
| | ON | | | | | | | | |
| 2 002 10 |TRU2 CNTOR| | | | 17 | | | |5PU2 |
| | ON | | | | | | | | |
| 2 002 10 |TRU2 CNTOR| | | | 17 | | | |5PU2 |
| | OFF | | | | | | | | |
| 002 10 |DC2 / DC1 | | | | 18 | | | |1PC2 |
| |CNTOR ON | | | | | | | | |
| 002 10 |DC2 / DC1 | | | | 18 | | | |1PC2 |
| |CNTOR OFF | | | | | | | | |
| 2 002 10 |BAT2 CNTOR| | | | 19 | | | |6PB2 |
| | ON | | | | | | | | |
| 2 002 10 |BAT2 CNTOR| | | | 19 | | | |6PB2 |
| | OFF | | | | | | | | |
| 2 002 10 | AC2 BUS | | | | 20 | | | |16XC |
| | OFF | | | | | | | | |
| 2 002 10 |AC2 BUS ON| | | | 20 | | | |16XC |
| 2 002 10 | BAT2 P/B | | | | 24 | | | |7PB2 |
| | OFF | | | | | | | | |
EFF :
ALL 24-32-00
Page 12
May 01/98
SYR
-------------------------------------------------------------------------------
| PARAMETER LIST PARAMETER CHARACTERISTICS (NUMERIC) |
-------------------------------------------------------------------------------
|EQ.SYS.LAB.SDI|PARAMETER | WORD RANGE |UNIT|SIG |BITS|XMSN|CODE|ALPHA|SOURCE |
| |DEFINITION| OPER RANGE | |BIT | |INTV| |CODE |ORIGIN |
| |(*=REMARK)| RESOLUTION | | | | | | |BUS No.|
| |(X=NOTE) | ACCURACY | | | | | | |ATA REF|
| | | | | | | | | |CONV |
-------------------------------------------------------------------------------
| 2 002 10 | BAT2 P/B | | | | 24 | | | |7PB2 |
| | ON | | | | | | | | |
| 1 004 01 | DC1 BUS | | | | 29 | | | |14WV |
| | OFF | | | | | | | | |
| 1 004 01 |DC1 BUS ON| | | | 29 | | | |14WV |
| 2 004 10 | DC2 BUS | | | | 29 | | | |44WV |
| | OFF | | | | | | | | |
| 2 004 10 |DC2 BUS ON| | | | 29 | | | |44WV |
| 004 11 |DC ESS BUS| | | | 29 | | | |12WV |
| | OFF | | | | | | | | |
| 004 11 |DC ESS BUS| | | | 29 | | | |12WV |
| | ON | | | | | | | | |
EFF :
ALL 24-32-00
Page 13
May 01/98
SYR
TR Reset Procedure
Figure 007
EFF :
ALL 24-32-00
Page 14
May 01/98
SYR
NOTE : After the reset procedure is performed, on the panel 35VU,
____
the AC ESS FEED pushbutton switch must be released, and
then pushed. The ESS TR no longer supplies the DC ESS BUS
(4PP). On the lower ECAM display unit, the normal
configuration comes into view.
EFF :
ALL 24-32-00
Page 15
May 01/98
SYR
DC MAIN GENERATION - ADJUSTMENT/TEST
____________________________________
TASK 24-32-00-710-001
1. __________________
Reason for the Job
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
EFF :
ALL 24-32-00
Page 501
May 01/11
SYR
3. __________
Job Set-up
Subtask 24-32-00-860-050
(2) In the cockpit, on the overhead panel 35VU, make sure that the BAT1
and BAT2 pushbutton switches are pushed. (On these pushbutton
switches, the OFF legend is off).
(3) Do the EIS start procedure (Upper ECAM DU and lower ECAM DU only)
(Ref. TASK 31-60-00-860-001).
(5) On the MCDU, get the ELEC menu on the SYSTEM REPORT/TEST page.
(Ref. TASK 31-32-00-860-004)
Subtask 24-32-00-010-050
(1) Put the access platforms at the access doors 812 and 822.
Subtask 24-32-00-865-054
-------------------------------------------------------------------------------
PANEL DESIGNATION IDENT. LOCATION
-------------------------------------------------------------------------------
49VU HYD/HYD PWR/B WARN/& CTL 2702GJ C12
123VU B HYD/ELEC PUMP 2701GJ AB09
EFF :
ALL 24-32-00
Page 502
Aug 01/11
SYR
R **ON A/C ALL
Subtask 24-32-00-865-050
-------------------------------------------------------------------------------
PANEL DESIGNATION IDENT. LOCATION
-------------------------------------------------------------------------------
49VU AIR COND/AVNCS VENT/CTL 6HQ D06
105VU ELEC/HOT BUS/702PP SPLY 12PB2 E02
105VU ELEC/HOT BUS/701PP SPLY 12PB1 E01
106VU AC ESS/BUS NORM/CNTOR/CTL 4XC B03
106VU ESS TR/CNTOR/CTL 5PE C02
106VU ESS TR/SPLY 4PE C01
121VU APU/FIRE/EXTIG/SQUIB/A 1WF L38
121VU APU/FIRE/LP VALVE/NORM 4WF M42
121VU HYDRAULIC/BRAKING AND STEERING/SYS1/CTL 1GG M34
122VU AIR COND/CARGO/FIRE/EXTIG 1WX T19
122VU ELEC/CNTOR/DC BUS/TIE 1/FAULT 14PC U24
122VU ELEC/AC/BUS1/CTL 17XN1 V25
122VU AIR COND/ZONE TEMP CTL/28VDC/SYS1 3HK V19
122VU LIGHTING/WING/STROBE 10LV V05
122VU ELEC/TR2/FAULT/DC BUS TIE/CONFIG 7PC2 W30
122VU ELEC/TR1/FAULT/DC BUS TIE/CONFIG 7PC1 W29
122VU ELEC/CNTOR/ESS/DC BUS/TIE 3PC W26
122VU ELEC/CNTOR/DC/BUS/TIE1 9PC W25
122VU ELEC/TR2/MONG 3PU2 X26
122VU ELEC/TR1/MONG 3PU1 X25
123VU TR1/SPLY 2PU1 AB10
123VU TR2/214XP/SPLY 2PU2 AB04
123VU AC ESS/BUS ON/BUS 1 1XC AC12
123VU AVNCS VENT/BLOWER/FAN 1HQ AD10
124VU TR2/CNTOR/SPLY 4PU2 BC01
125VU TR1/CNTOR/SPLY 4PU1 CF01
2000VU WATER SYSTEM-QANT-IND 1MA B01
EFF :
ALL 24-32-00
Page 503
May 01/11
SYR
4. Procedure
_________
Subtask 24-32-00-710-050
NOTE : This test is for the system 1. For the other system(s), use the
____
indications between the parentheses.
-------------------------------------------------------------------------------
R | ACTION | RESULT |
-------------------------------------------------------------------------------
EFF :
ALL 24-32-00
Page 504
May 01/11
SYR
-------------------------------------------------------------------------------
ACTION RESULT
-------------------------------------------------------------------------------
- push the line key adjacent to - the NO FAULT indication comes into
the RESET indication. view.
8. On the MCDU:
- push the line key adjacent to
the RETURN indication until the
ELEC page comes into view.
11. On the ECAM control panel: On the lower ECAM display unit:
- push the ELEC key to get the - the ESS TR no longer supplies the DC
ELEC page. ESS busbar (the normal configuration
comes into view).
EFF :
ALL 24-32-00
Page 505
May 01/08
SYR
-------------------------------------------------------------------------------
ACTION RESULT
-------------------------------------------------------------------------------
On the lower ECAM display unit:
- the TR1(2) no longer supplies the
DC1(2) busbar,
- the DC2(1) busbar supplies DC1(2)
busbar through the DC BAT busbar,
- the voltage from TR1(2) = 0 V,
- the AC ESS busbar supplies the DC ESS
busbar through the ESS TR.
21. On the ECAM control panel: On the lower ECAM display unit:
- push the ELEC key to get ELEC - the ESS TR no longer supplies the DC
page. ESS busbar (the normal configuration
comes into view).
EFF :
ALL 24-32-00
Page 506
May 01/08
R
SYR
5. Close-up
________
Subtask 24-32-00-865-055
A. Remove the safety clip(s) and the tag(s) and close this(these) circuit
breaker(s):
-------------------------------------------------------------------------------
PANEL DESIGNATION IDENT. LOCATION
-------------------------------------------------------------------------------
49VU HYD/HYD PWR/B WARN/& CTL 2702GJ C12
123VU B HYD/ELEC PUMP 2701GJ AB09
Subtask 24-32-00-860-051
Subtask 24-32-00-410-050
C. Close Access
EFF :
ALL 24-32-00
Page 507
Aug 01/11
SYR
TRANSFORMER RECTIFIER (1PU1,1PU2) - REMOVAL/INSTALLATION
________________________________________________________
TASK 24-32-51-000-001
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
EFF :
ALL 24-32-51
Page 401
May 01/11
SYR
3. __________
Job Set-up
Subtask 24-32-51-865-050
-------------------------------------------------------------------------------
PANEL DESIGNATION IDENT. LOCATION
-------------------------------------------------------------------------------
FOR 1PU1
123VU TR1/SPLY 2PU1 AB10
FOR 1PU2
123VU TR2/SVCE/BUS 2/SPLY 1XX AB08
123VU TR2/214XP/SPLY 2PU2 AB04
Subtask 24-32-51-010-050
R (1) Put the ACCESS PLATFORM 2M (6 FT) - ADJUSTABLE at the access door
R 822.
4. Procedure
_________
Subtask 24-32-51-020-050
(1) Remove the protective caps (7) from the DC output terminals (2).
(2) Remove the nuts (5), (8) and the washers (4), (9).
EFF :
ALL 24-32-51
Page 402
May 01/11
SYR
R Transformer Rectifier
Figure 401/TASK 24-32-51-991-001
EFF :
ALL 24-32-51
Page 403
Feb 01/00
SYR
TASK 24-32-51-400-001
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
EFF :
ALL 24-32-51
Page 404
May 01/11
SYR
3. __________
Job Set-up
Subtask 24-32-51-865-051
A. Make sure that this(these) circuit breaker(s) is(are) open, safetied and
tagged
-------------------------------------------------------------------------------
PANEL DESIGNATION IDENT. LOCATION
-------------------------------------------------------------------------------
FOR 1PU1
123VU TR1/SPLY 2PU1 AB10
FOR 1PU2
123VU TR2/SVCE/BUS 2/SPLY 1XX AB08
123VU TR2/214XP/SPLY 2PU2 AB04
Subtask 24-32-51-010-051
4. Procedure
_________
Subtask 24-32-51-420-050
(3) Engage the transformer rectifier (1) on the centering pins to put it
in position.
(4) Install the washers (10) and the screws (11) and then tighten the
screws.
(6) Make sure that the electrical connectors are clean and in the correct
condition.
EFF :
ALL 24-32-51
Page 405
May 01/11
SYR
R (7) Connect the connectors (6) to the transformer rectifier.
R (9) Connect the lugs (3) to the output terminals (2) of the transformer
R rectifier.
(10) Install the washer (4) and the nut (5) and TORQUE it to between 1.5
and 1.6 m.daN (11.06 and 11.79 lbf.ft).
(11) Install the washer (9) and the nut (8) and TORQUE it to between 0.6
and 0.7 m.daN (53.09 and 61.94 lbf.in).
(12) Install the protective caps (7) on the output terminals (2).
Subtask 24-32-51-865-052
B. Remove the safety clip(s) and the tag(s) and close this(these) circuit
breaker(s):
FOR 1PU1
2PU1
FOR 1PU2
2PU2, 1XX
Subtask 24-32-51-710-050
NOTE : Before you start the operational test, you must reset the
____
transformer rectifier from the CFDS.
5. Close-up
________
Subtask 24-32-51-410-050
A. Close Access
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
EFF :
ALL 24-32-51
Page 406
May 01/03
SYR
CONTACTOR (5PU1,5PU2,14PU) - REMOVAL/INSTALLATION
_________________________________________________
TASK 24-32-55-000-001
Removal of the TR 1 and TR 2 Contactors (5PU1, 5PU2) and the TR 2/AC Service
Bus Normal Supply Contactor (14PU)
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
EFF :
ALL 24-32-55
Page 401
May 01/11
SYR
3. __________
Job Set-up
Subtask 24-32-55-010-050
A. Get Access
(Ref. Fig. 401/TASK 24-32-55-991-001)
Subtask 24-32-55-860-050
B. Safety Precautions
(1) Make sure that the external power connector is not connected to the
aircraft EXT PWR receptacle.
(2) Put warning notice(s) in position on the access door 121AL to tell
persons not to connect the external power connector to the aircraft
EXT PWR receptacle.
(3) In the cockpit, on the ELEC panel 35VU, make sure that these
pushbutton switches are released:
- BAT 1, BAT 2,
- APU GEN,
- GEN 1, GEN 2,
- EXT PWR.
(4) In the cockpit, put warning notices in position to tell persons not
to operate the pushbutton switches on these overhead panels:
- 21VU (EMER ELEC PWR section),
- 25VU (APU section),
- 35VU (ELEC).
EFF :
ALL 24-32-55
Page 402
May 01/11
SYR
R Transformer Rectifier Contactors - Location
Figure 401/TASK 24-32-55-991-001
EFF :
ALL 24-32-55
Page 403
Nov 01/08
SYR
4. Procedure
_________
Subtask 24-32-55-020-050
CAUTION : REMOVE THE CONTACTOR ONLY AND NOT THE BASE OR THE MODULE WHERE
_______
THE WIRES ARE CONNECTED.
R (2) Put blanking caps on the disconnected electrical connector (9) and
R the electrical receptacle (8).
R NOTE : Do not remove the captive screws (7) and the spring washers
____
R from the contactor (10).
R Subtask 24-32-55-020-053
R CAUTION : MAKE MATCH MARKS ON ALL THE ELECTRICAL WIRES BEFORE YOU
_______
R DISCONNECT THEM. INCORRECT CONNECTION OF WIRES WILL CAUSE
R DAMAGE TO EQUIPMENT.
R (2) Disconnect the cables (13) from the contactor base (1).
R (4) Remove the jumper (4) from the contactor base (1) and from the
R adjacent contactor base.
EFF :
ALL 24-32-55
Page 404
Nov 01/08
SYR
R TR 2/AC Service Bus Normal Supply Contactor
Figure 402/TASK 24-32-55-991-002
EFF :
ALL 24-32-55
Page 405
Nov 01/08
SYR
R TR 1 and TR 2 Contactors
Figure 403/TASK 24-32-55-991-003
EFF :
ALL 24-32-55
Page 406
Nov 01/08
SYR
R (6) Remove the contactor base (1).
EFF :
ALL 24-32-55
Page 407
Nov 01/08
SYR
TASK 24-32-55-400-001
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
EFF :
ALL 24-32-55
Page 408
May 01/11
SYR
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
Subtask 24-32-55-010-051
A. Get Access
(1) Make sure that the Third Occupant seat is removed (Ref. TASK 25-11-
41-000-001).
Subtask 24-32-55-860-051
(1) Make sure that the external power connector is not connected to the
aircraft EXT PWR receptacle.
(2) Make sure that the warning notice(s) is in position at the access
door 121AL to tell persons not to connect the external power
connector to the aircraft EXT PWR receptacle.
EFF :
ALL 24-32-55
Page 409
May 01/11
SYR
(3) In the cockpit, on the ELEC panel 35VU, make sure that these
pushbutton switches are released:
- BAT 1, BAT 2,
- APU GEN,
- GEN 1, GEN 2,
- EXT PWR.
(4) In the cockpit, make sure that the warning notice(s) are in position
to tell persons not to operate the pushbutton switches on these
overhead panels:
- 21VU (EMER ELEC PWR section),
- 25VU (APU section),
- 35VU (ELEC).
4. Procedure
_________
CAUTION : MAKE SURE THAT THE CONTACTOR LOCATING PIN IS CORRECTLY ENGAGED IN
_______
ITS RECESS LOCATED IN ONE POWER TERMINAL.
THIS PREVENTS DAMAGE TO THE LOCATING PIN WHEN YOU APPLY THE
TORQUE.
R Subtask 24-32-55-420-053
R CAUTION : REFER TO THE MATCH MARKS MADE DURING THE REMOVAL WHEN YOU
_______
R CONNECT THE ELECTRICAL WIRES.
R INCORRECT CONNECTION OF THE WIRES WILL CAUSE DAMAGE TO
R EQUIPMENT.
R (2) Install the washers (2) and screws (3) and tighten them.
R (3) Make sure that the electrical cables (13) are clean and in correct
R condition.
EFF :
ALL 24-32-55
Page 410
Nov 01/08
SYR
(4) Installation of the electrical cables (13).
(b) TORQUE the nuts (11) to between 0.27 and 0.3 m.daN (23.89 and
26.54 lbf.in).
(5) Install the jumpers (4) between the contactor base (1) and the
adjacent base.
(6) Install the washers (5) and the nuts (6) and tighten them (Ref. TASK
20-21-15-912-001).
Subtask 24-32-55-420-050
R (a) Install the contactor (10) on the tapped barrels (14) of the
R contactor base (1).
R
1
_ FOR 5PU1, 5PU2
TORQUE the screws to between 33.63 and 41.6 lbf.in (0.38 and
0.47 m.daN).
2
_ FOR 14PU
TORQUE the screws to between 13.28 and 15.93 lbf.in (0.15 and
0.18 m.daN).
R
R (d) Make sure that the electrical connectors are clean and in the
R correct condition.
R
EFF :
ALL 24-32-55
Page 411
May 01/10
SYR
R (e) Connect the connector (9).
Subtask 24-32-55-861-051
Subtask 24-32-55-860-052
D. Do the EIS start procedure (Upper ECAM DU and lower ECAM DU only)
(Ref. TASK 31-60-00-860-001).
Subtask 24-32-55-710-050
(2) On the lower ECAM DU, make sure that the aircraft electrical
configuration is correct.
Subtask 24-32-55-860-053
Subtask 24-32-55-862-051
5. Close-up
________
Subtask 24-32-55-410-050
A. Close Access
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
EFF :
ALL 24-32-55
Page 412
May 01/10
SYR
(b) FOR 5PU1, 5PU2
in the left Lower side of the panel 120VU, install the access
door.
EFF :
ALL 24-32-55
Page 413
May 01/10
R
SYR
DC EMERGENCY GENERATION (TR) - DESCRIPTION AND OPERATION
________________________________________________________
1. _______
General
The DC emergency generation consists in the essential Transformer Rectifier
(TR) and its associated contactor.
It is supplied with 115 VAC/400 Hz either by the emergency generator or by
the AC normal busbars, in failure conditions.
2. Component
__________________
Location
(Ref. Fig. 001)
-------------------------------------------------------------------------------
FIN | FUNCTIONAL DESIGNATION | PANEL|ZONE|ACCESS | ATA
| | | | DOOR | REF.
-------------------------------------------------------------------------------
1PE TR-ESS 125 812 24-34-51
3PE CNTOR-ESS TR 106VU 125 812 24-34-55
3. Component
______________________
Desccription
(Ref. Fig. 002)
A. Essential TR
The essential TR directly controls its contactor (3PE).
The essential TR is ventilated by natural convection.
R NOTE : The normal TR2 (1PU2) has not the same electrical properties and
____
R is not interchangeable.
4. Operation/Control
________________________________
and Indicating
The essential TR starts to operate as soon as it is supplied. It is supplied
in the following cases:
- loss of TR1,
- loss of TR2,
- loss of both TRs,
- loss of DC NORM BUS 1 switching contactor (1PC1) or DC ESS BUS supply
contactor (4PC),
- availability of emergency generator in operation (Ref. 24-24-00).
The essential TR is linked to the ECAM system in the same manner as the main
TRs (Ref. 24-32-00, P. Block 1).
EFF :
ALL 24-34-00
Page 1
Nov 01/04
SYR
DC Emergency Generation - Component Location
Figure 001
EFF :
ALL 24-34-00
Page 2
May 01/98
SYR
Essential TR Contactor-Control - Simplified Logic
Figure 002
EFF :
ALL 24-34-00
Page 3
May 01/98
SYR
A. Reset of the Protection of the TR
Before you reset the TR, make sure that the related electrical network
supplies its primary winding, in any RESET mode.
EFF :
ALL 24-34-00
Page 4
May 01/99
SYR
R DC EMERGENCY GENERATION - ADJUSTMENT/TEST
_________________________________________
TASK 24-34-00-710-001
1. __________________
Reason for the Job
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
Subtask 24-34-00-860-050
(2) Do the EIS start procedure (Upper ECAM DU and lower ECAM DU only)
(Ref. TASK 31-60-00-860-001).
EFF :
ALL 24-34-00
Page 501
May 01/11
SYR
Subtask 24-34-00-010-050
(3) Open the access panel on the AC/DC emergency power center 106VU.
Subtask 24-34-00-865-050
-------------------------------------------------------------------------------
PANEL DESIGNATION IDENT. LOCATION
-------------------------------------------------------------------------------
49VU SDAC/1 AND 2/28VDC/ESS BUS 12WV F05
106VU DC BUS/1 AND 2/MONG 68WV C03
4. Procedure
_________
Subtask 24-34-00-710-050
-------------------------------------------------------------------------------
R | ACTION | RESULT |
-------------------------------------------------------------------------------
EFF :
ALL 24-34-00
Page 502
May 01/11
SYR
-------------------------------------------------------------------------------
ACTION RESULT
-------------------------------------------------------------------------------
4. On the panel 106VU: On the upper ECAM DU:
- close the circuit breaker 68WV. - C/B TRIPPED L ELEC BAY indication
goes out of view.
5. Close-up
________
Subtask 24-34-00-410-050
A. Close Access
(1) Close the access panel on the AC/DC emergency power center 106VU.
Subtask 24-34-00-860-051
EFF :
ALL 24-34-00
Page 503
May 01/98
SYR
TRANSFORMER RECTIFIER (1PE) - REMOVAL/INSTALLATION
__________________________________________________
TASK 24-34-51-000-001
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
Subtask 24-34-51-010-050
(3) Open the access panel of the AC/DC emergency power center 106VU.
EFF :
ALL 24-34-51
Page 401
May 01/11
SYR
Subtask 24-34-51-865-050
-------------------------------------------------------------------------------
PANEL DESIGNATION IDENT. LOCATION
-------------------------------------------------------------------------------
106VU ESS TR/SPLY 4PE C01
4. Procedure
_________
Subtask 24-34-51-020-050
(1) Remove the protective caps from the output terminals (8).
(2) Remove the nuts (5), (10) and the washers (6), (9).
EFF :
ALL 24-34-51
Page 402
May 01/11
R
SYR
R Essential Transformer Rectifier
Figure 401/TASK 24-34-51-991-002
EFF :
ALL 24-34-51
Page 403
Feb 01/00
SYR
TASK 24-34-51-400-001
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
Subtask 24-34-51-860-050
(3) In the avionics compartment, make sure that the access panel of the
AC/DC emergency power center 106VU is open.
EFF :
ALL 24-34-51
Page 404
May 01/11
SYR
Subtask 24-34-51-865-051
B. Make sure that this(these) circuit breaker(s) is(are) open, safetied and
tagged
-------------------------------------------------------------------------------
PANEL DESIGNATION IDENT. LOCATION
-------------------------------------------------------------------------------
R 106VU ESS TR/SPLY 4PE C01
R
4. Procedure
_________
Subtask 24-34-51-420-050
(2) Install the washers (2) and the screws (3) and then tighten the
screws.
(4) Make sure that the electrical connectors are clean and in the correct
condition.
(8) Install the washer (6) and the nut (5) and TORQUE it to between 0.6
and 0.7 m.daN (53.09 and 61.94 lbf.in).
(9) Install the washer (9) and the nut (10) and TORQUE it to between 1.5
and 1.6 m.daN (11.06 and 11.79 lbf.ft).
EFF :
ALL 24-34-51
Page 405
May 01/03
SYR
Subtask 24-34-51-865-052
B. Remove the safety clip(s) and the tag(s) and close this(these) circuit
breaker(s):
4PE
Subtask 24-34-51-710-050
5. Close-up
________
Subtask 24-34-51-410-050
A. Close Access
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
(2) In the avionics compartment, close the access panel of the AC/DC
emergency power center 106VU.
EFF :
ALL 24-34-51
Page 406
May 01/03
R
SYR
CONTACTOR (3PE) - REMOVAL/INSTALLATION
______________________________________
TASK 24-34-55-000-001
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
Subtask 24-34-55-010-050
(3) Open the access panels of the AC/DC emergency power center 106VU and
the access panels of the BATTERY power center 105VU.
EFF :
ALL 24-34-55
Page 401
May 01/11
SYR
Subtask 24-34-55-865-050
-------------------------------------------------------------------------------
PANEL DESIGNATION IDENT. LOCATION
-------------------------------------------------------------------------------
105VU ELEC/CSM/G /EV AUTO/SPLY 7XE C01
106VU CSM/G /EV/MAN/SPLY 6XE B04
106VU ESS TR/SPLY 4PE C01
122VU ELEC/CNTOR/ESS/DC BUS/TIE 3PC W26
123VU AC ESS/BUS ON/BUS 1 1XC AC12
123VU AC ESS/BUS ON/BUS 2 2XC AC01
4. Procedure
_________
Subtask 24-34-55-020-050
CAUTION : REMOVE THE CONTACTOR ONLY AND NOT THE BASE OR THE MODULE WHERE
_______
THE WIRES ARE CONNECTED.
NOTE : Do not remove the captive screws (3) and the spring washers
____
from contactor(5).
(4) Disengage the contactor (5) from the base (1) and remove the
contactor.
EFF :
ALL 24-34-55
Page 402
May 01/11
SYR
Essential TR Contactor
Figure 401/TASK 24-34-55-991-001
EFF :
ALL 24-34-55
Page 403
May 01/98
SYR
TASK 24-34-55-400-001
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
Subtask 24-34-55-860-050
R (2) Make sure that the access doors 812 and 822 are open.
(3) In the avionics compartment, make sure that the access panel of the
AC/DC emergency power center 106VU and BATTERY power center 105VU are
open.
EFF :
ALL 24-34-55
Page 404
May 01/11
SYR
Subtask 24-34-55-865-051
B. Make sure that this(these) circuit breaker(s) is(are) open, safetied and
tagged
-------------------------------------------------------------------------------
PANEL DESIGNATION IDENT. LOCATION
-------------------------------------------------------------------------------
105VU ELEC/CSM/G /EV AUTO/SPLY 7XE C01
106VU CSM/G /EV/MAN/SPLY 6XE B04
106VU ESS TR/SPLY 4PE C01
122VU ELEC/CNTOR/ESS/DC BUS/TIE 3PC W26
123VU AC ESS/BUS ON/BUS 1 1XC AC12
123VU AC ESS/BUS ON/BUS 2 2XC AC01
4. Procedure
_________
CAUTION : MAKE SURE THAT THE CONTACTOR LOCATING PIN IS CORRECTLY ENGAGED IN
_______
ITS RECESS LOCATED IN ONE POWER TERMINAL.
THIS PREVENTS DAMAGE TO THE LOCATING PIN WHEN YOU APPLY THE
TORQUE.
Subtask 24-34-55-420-050
(1) Install the contactor (5) in position on the tapped barrels (6) of
the connecting base (1).
(2) TORQUE the captive screws (3) to between 0.27 and 0.30 m.daN (23.89
and 26.54 lbf.in).
(4) Make sure that the electrical connectors are clean and in the correct
condition.
Subtask 24-34-55-865-052
B. Remove the safety clip(s) and the tag(s) and close this(these) circuit
breaker(s):
3PC, 1XC, 2XC, 7XE, 4PE, 6XE
EFF :
ALL 24-34-55
Page 405
May 01/11
SYR
Subtask 24-34-55-710-050
5. Close-up
________
Subtask 24-34-55-410-050
A. Close Access
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
(2) In the avionics compartment, close the access panels of the AC/DC
emergency power center 106VU and the BATTERY power center 105VU.
EFF :
ALL 24-34-55
Page 406
May 01/98
SYR
DC ESSENTIAL & NORMAL GENERATION SWITCHING - DESCRIPTION AND OPERATION
______________________________________________________________________
1. _______
General
These circuits control the supply of DC normal busbars and DC essential
busbars.
They enable:
- their normal supply in normal flight configuration,
- automatic transfer in some failure conditions.
2. Component
__________________
Location
(Ref. Fig. 001)
-------------------------------------------------------------------------------
FIN | FUNCTIONAL DESIGNATION | PANEL|ZONE|ACCESS | ATA
| | | | DOOR | REF.
-------------------------------------------------------------------------------
1PC1 CNTOR-DC NORM BUS 1 SWITCHING 120VU 212 831 24-35-55
1PC2 CNTOR-DC NORM BUS 2 SWITCHING 120VU 212 831 24-35-55
4PC CNTOR-DC ESS BUS SUPPLY 106VU 125 812 24-35-55
20PC HOLDER-FUSE 120VU 212 831 24-35-00
-------------------------------------------------------------------------------
FIN | FUNCTIONAL DESIGNATION | PANEL | ZONE | ACCESS | ATA
| | | | DOOR | REF.
-------------------------------------------------------------------------------
20PC1 FUSE 120VU 212 24-35-00
R 3. ________________________________
Operation/Control and Indicating
EFF :
ALL 24-35-00
Page 1
Nov 01/04
SYR
DC Essential & Normal Generation Switching - Component Location
Figure 001
EFF :
ALL 24-35-00
Page 2
May 01/98
SYR
DC NORM BUS SWITCHING Contactor Control - Simplified Logic
Figure 002
EFF :
ALL 24-35-00
Page 3
May 01/98
SYR
DC ESS BUS SPLY Contactor Control - Simplified Logic
Figure 003
EFF :
ALL 24-35-00
Page 4
May 01/98
SYR
CONTACTOR (1PC1,1PC2,4PC) - REMOVAL/INSTALLATION
________________________________________________
TASK 24-35-55-000-001
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
Subtask 24-35-55-010-051
A. Get Access
(2) Remove the front panel on the bottom right side of the panel 120VU.
EFF :
ALL 24-35-55
Page 401
May 01/11
SYR
(4) Open the access door 121AL.
Subtask 24-35-55-860-050
B. Safety Precautions
(1) Make sure that the external power connector is not connected to the
aircraft EXT PWR receptacle.
(2) Put warning notices in position on the access door 121AL to tell
persons not to connect the external power connector to the aircraft
EXT PWR receptacle.
(3) In the cockpit, on the ELEC panel 35VU, make sure that these
pushbutton switches are released:
- BAT 1, BAT 2,
- APU GEN,
- GEN 1, GEN 2,
- EXT PWR.
(4) In the cockpit, put warning notices in position to tell the persons
not to operate the pushbutton switches on these overhead panels:
- 21VU (EMER ELEC PWR section),
- 25VU (APU section)
- 35VU (ELEC).
4. Procedure
_________
Subtask 24-35-55-020-050
CAUTION : REMOVE THE CONTACTOR ONLY AND NOT THE BASE OR THE MODULE WHERE
_______
THE WIRES ARE CONNECTED.
(2) Put a blanking caps on the disconnect electrical connector (4) and
the electrical receptacle.
EFF :
ALL 24-35-55
Page 402
May 01/11
R
SYR
Contactors
Figure 401/TASK 24-35-55-991-005
EFF :
ALL 24-35-55
Page 403
May 01/98
SYR
(3) Loosen the captive screws (3).
NOTE : Do not remove the captive screws (3) and the spring washers
____
from the contactor (5).
EFF :
ALL 24-35-55
Page 404
Nov 01/00
SYR
TASK 24-35-55-400-001
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
Subtask 24-35-55-860-051
(1) Make sure that the access platform is in position at the access door
121AL.
EFF :
ALL 24-35-55
Page 405
May 01/10
SYR
(3) Make sure that the external power connector is not connected to the
aircraft receptacle.
(4) Make sure that, on the access door 121AL, there is a warning notice
to tell persons not to connect the external power connector.
(5) In the cockpit, on the overhead panel 35VU, make sure that these
pushbutton switches are released:
- BAT 1, BAT 2,
- APU GEN,
- GEN 1, GEN 2,
- EXT PWR.
(6) Make sure that there is a warning notice in the cockpit to tell
persons not to operate the pushbutton switches on these overhead
panels:
- 21VU (EMER ELEC PWR),
- 35VU (ELEC).
(7) In the cockpit, on the APU section of the overhead panel 25VU, make
sure that a warning notice is in position to tell persons not to
start the APU.
(8) In the cockpit, make sure that the third occupant seat is removed
(Ref. TASK 25-11-41-000-001).
(9) In the cockpit, make sure that the front panel on the bottom right
side of the panel 120VU is removed.
4. Procedure
_________
Subtask 24-35-55-420-050
CAUTION : MAKE SURE THAT THE CONTACTOR LOCATING PIN IS CORRECTLY ENGAGED
_______
IN ITS RECESS LOCATED IN ONE POWER TERMINAL.
THIS PREVENTS DAMAGE TO THE LOCATING PIN WHEN YOU APPLY THE
TORQUE.
(1) Install the contactor (5) on the tapped barrels (6) of the connecting
base (1).
(2) TORQUE the captive screws (3) to between 33.63 and 41.6 lbf.in (0.38
and 0.47 m.daN).
EFF :
ALL 24-35-55
Page 406
May 01/98
SYR
R (3) Remove the blanking caps from the electrical connector(s).
(4) Make sure that the electrical connectors are clean and in the correct
condition.
Subtask 24-35-55-710-050
5. Close-up
________
Subtask 24-35-55-410-050
A. Close Access
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
(2) Install the front panel on the bottom right side of the panel 120VU.
EFF :
ALL 24-35-55
Page 407
May 01/10
SYR
TASK 24-35-55-000-002
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
Subtask 24-35-55-010-052
(3) Open the access panels of the AC/DC emergency power center 106VU and
BATTERY power center 105VU.
EFF :
ALL 24-35-55
Page 408
May 01/11
SYR
Subtask 24-35-55-865-050
-------------------------------------------------------------------------------
PANEL DESIGNATION IDENT. LOCATION
-------------------------------------------------------------------------------
105VU ELEC/CSM/G /EV AUTO/SPLY 7XE C01
106VU CSM/G /EV/MAN/SPLY 6XE B04
106VU ESS TR/SPLY 4PE C01
122VU ELEC/CNTOR/ESS/DC BUS/TIE 3PC W26
123VU AC ESS/BUS ON/BUS 1 1XC AC12
123VU AC ESS/BUS ON/BUS 2 2XC AC01
4. Procedure
_________
Subtask 24-35-55-020-051
CAUTION : REMOVE THE CONTACTOR ONLY AND NOT THE BASE OR THE MODULE WHERE
_______
THE WIRES ARE CONNECTED.
NOTE : Do not remove the captive screws (3) and the spring washers
____
from the contactor (5).
(4) Release the contactor (5) from its base (1) and remove it.
EFF :
ALL 24-35-55
Page 409
May 01/10
SYR
Contactor
Figure 402/TASK 24-35-55-991-006
EFF :
ALL 24-35-55
Page 410
May 01/98
SYR
TASK 24-35-55-400-002
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
Subtask 24-35-55-010-054
(2) Make sure that the access doors 812 and 822 are open.
EFF :
ALL 24-35-55
Page 411
May 01/11
SYR
(3) In the avionics compartment, make sure that the access panels of the
AC/DC emergency power center 106VU and BATTERY power center 105VU are
open.
Subtask 24-35-55-865-051
B. Make sure that this(these) circuit breaker(s) is(are) open, safetied and
tagged
-------------------------------------------------------------------------------
PANEL DESIGNATION IDENT. LOCATION
-------------------------------------------------------------------------------
105VU ELEC/CSM/G /EV AUTO/SPLY 7XE C01
106VU CSM/G /EV/MAN/SPLY 6XE B04
106VU ESS TR/SPLY 4PE C01
122VU ELEC/CNTOR/ESS/DC BUS/TIE 3PC W26
123VU AC ESS/BUS ON/BUS 1 1XC AC12
123VU AC ESS/BUS ON/BUS 2 2XC AC01
4. Procedure
_________
Subtask 24-35-55-420-051
(1) Install the contactor (5) in position on the tapped barrels (6) of
the contactor base (1).
(2) TORQUE the captive screws (3) to between 0.27 and 0.30 m.daN (23.89
and 26.54 lbf.in).
(4) Make sure that the electrical connectors are clean and in the correct
condition.
Subtask 24-35-55-865-052
B. Remove the safety clip(s) and the tag(s) and close this(these) circuit
breaker(s):
3PC, 1XC, 2XC, 7XE, 4PE, 6XE
EFF :
ALL 24-35-55
Page 412
May 01/10
SYR
Subtask 24-35-55-710-051
5. Close-up
________
Subtask 24-35-55-410-052
A. Close Access
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
(2) In the avionics compartment, close the access panels of the AC/DC
emergency power center 106VU and the BATTERY power center 105VU.
EFF :
ALL 24-35-55
Page 413
May 01/98
SYR
DC GENERATION MONITORING AND INDICATING - DESCRIPTION AND OPERATION
___________________________________________________________________
1. _______
General
Monitoring and indicating of aircraft DC generation and distribution are
performed by means of:
- two voltmeters located on the overhead ELEC panel (35VU) in the cockpit.
They indicate to the flight crew the voltage of the HOT busses 701PP and
702PP.
NOTE : The HOT busses are directly connected to the batteries as follows:
____
. 701PP is connected to Bat 1,
. 702PP is connected to Bat 2.
2. Component
__________________
Location
(Ref. Fig. 001)
-------------------------------------------------------------------------------
FIN | FUNCTIONAL DESIGNATION | PANEL|ZONE|ACCESS | ATA
| | | | DOOR | REF.
-------------------------------------------------------------------------------
3PV1 VOLTMETER-BAT 1 35VU 210 831 24-37-21
3PV2 VOLTMETER-BAT 2 35VU 210 831 24-37-21
EFF :
ALL 24-37-00
Page 1
May 01/98
SYR
DC Generation Monitoring and Indicating - Component Location
Figure 001
EFF :
ALL 24-37-00
Page 2
May 01/98
SYR
VOLTMETER (3PV1,3PV2) - REMOVAL/INSTALLATION
____________________________________________
TASK 24-37-21-000-001
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
Subtask 24-37-21-861-051
Subtask 24-37-21-010-050
EFF :
ALL 24-37-21
Page 401
May 01/11
SYR
(3) Open the access panel of the BATTERY power center 105VU.
Subtask 24-37-21-865-050
-------------------------------------------------------------------------------
PANEL DESIGNATION IDENT. LOCATION
-------------------------------------------------------------------------------
FOR 3PV1
105VU ELEC/BAT REF/BCL1 9PB1 F01
FOR 3PV2
105VU ELEC/BAT REF/BCL2 9PB2 F02
4. Procedure
_________
Subtask 24-37-21-020-050
CAUTION : MAKE MATCH MARKS ON ALL THE ELECTRICAL WIRES BEFORE YOU
_______
DISCONNECT THEM. INCORRECT CONNECTION OF WIRES WILL CAUSE
DAMAGE TO EQUIPMENT.
(4) Remove the panel 35VU (2) from its housing; do not disconnect the
electrical connectors from the rear plate.
(5) Disconnect the electrical wires (5) from the voltmeter (1) with the
contact extraction tool.
EFF :
ALL 24-37-21
Page 402
May 01/11
R
SYR
Voltmeters of Batteries
Figure 401/TASK 24-37-21-991-001
EFF :
ALL 24-37-21
Page 403
May 01/98
SYR
TASK 24-37-21-400-001
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
Subtask 24-37-21-860-050
(1) Make sure that the ground service network is energized (Ref. TASK 24-
42-00-861-001).
(4) Make sure that the access panel of the BATTERY power center 105VU is
opened.
EFF :
ALL 24-37-21
Page 404
May 01/11
SYR
Subtask 24-37-21-865-051
B. Make sure that this(these) circuit breaker(s) is(are) open, safetied and
tagged
-------------------------------------------------------------------------------
PANEL DESIGNATION IDENT. LOCATION
-------------------------------------------------------------------------------
FOR 3PV1
105VU ELEC/BAT REF/BCL1 9PB1 F01
FOR 3PV2
105VU ELEC/BAT REF/BCL2 9PB2 F02
4. Procedure
_________
Subtask 24-37-21-420-050
CAUTION : REFER TO THE MATCH MARKS MADE DURING THE REMOVAL WHEN YOU
_______
CONNECT THE ELECTRICAL WIRES.
R INCORRECT CONNECTION OF THE WIRES WILL CAUSE DAMAGE TO
R EQUIPMENT.
(3) Connect the electrical wires (5) to the voltmeter (1) with the
contact insertion tool.
EFF :
ALL 24-37-21
Page 405
May 01/07
SYR
Subtask 24-37-21-865-052
B. Remove the safety clip(s) and the tag(s) and close this(these) circuit
breaker(s):
- FOR 3PV1
9PB1
- FOR 3PV2
9PB2
Subtask 24-37-21-710-050
(1) Make sure that the battery voltage comes into view.
5. Close-up
________
Subtask 24-37-21-862-050
Subtask 24-37-21-410-050
B. Close Access
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
(2) Close the access panel of the BATTERY power center 105VU.
EFF :
ALL 24-37-21
Page 406
Nov 01/03
R
SYR
DC GENERATION - BATTERIES - DESCRIPTION AND OPERATION
_____________________________________________________
1. _______
General
The DC generation is provided by two batteries.
Each of them has a nominal capacity of 23 Ah.
They are mainly used to:
- start the APU in flight and on ground,
- supply AC/DC essential network in emergency configuration during RAT
deployment and when the emergency generator is not available (landing gear
extended configuration).
R Each battery is associated with a Battery Charge Limiter (BCL) and a battery
R shunt.
It should be noted that, in normal configuration, the batteries are most of
the time uncoupled from the network during the flight.
2. Component
__________________
Location
(Ref. Fig. 001, 002, 003)
-------------------------------------------------------------------------------
FIN | FUNCTIONAL DESIGNATION | PANEL|ZONE|ACCESS | ATA
| | | | DOOR | REF.
-------------------------------------------------------------------------------
1PB1 BCL-1 124 822 24-38-34
1PB2 BCL-2 124 822 24-38-34
2PB1 BAT-1 126 822 24-38-51
2PB2 BAT-2 126 822 24-38-51
3PB1 SHUNT-BAT 1 126 24-38-54
3PB2 SHUNT-BAT 2 126 24-38-54
4PB1 HOLDER-BAT 1 FUSE 120VU 212 831 24-38-00
4PB2 HOLDER-BAT 2 FUSE 120VU 212 831 24-38-00
6PB1 CNTOR-LINE, BAT 1 105VU 126 822 24-38-55
6PB2 CNTOR-LINE, BAT 2 105VU 126 822 24-38-55
7PB1 P/BSW-ELEC/BAT 1 35VU 210 831 24-38-00
7PB2 P/BSW-ELEC/BAT 2 35VU 210 831 24-38-00
-------------------------------------------------------------------------------
FIN I FUNCTIONAL DESIGNATION I PANELIZONEIACCESS I ATA
I I I I DOOR I REF.
-------------------------------------------------------------------------------
4PB11 FUSE BAT-1 120VU 212 24-38-00
4PB21 FUSE BAT-2 120VU 212 24-38-00
EFF :
ALL 24-38-00
Page 1
May 01/11
SYR
DC Generation - Batteries - Component Location
Figure 001
EFF :
ALL 24-38-00
Page 2
May 01/98
SYR
DC Generation - Batteries - Component Location
Figure 002
EFF :
ALL 24-38-00
Page 3
May 01/98
SYR
R DC Generation - Battery Shunt - Component Location
R Figure 003
EFF :
ALL 24-38-00
Page 4
Nov 01/06
SYR
3. _____________________
Component Description
A. Batteries
Each battery of the nickel-cadmium type is composed of twenty elements
housed in a stainless steel case.
Characteristics:
- nominal voltage: 24 V,
- nominal capacity: 23 Ah,
- high instantaneous power,
- electrolyte reserve: 60 cubic centimeters,
- two ventilation ducts.
-------------------------------------------------------------------------------
| FUNCTION | THRESHOLD | TIME DELAY | ACTION | No.|
|-----------------------------------------------------------------------------|
| Control of | - Battery charge | | |BAT.CNTOR| |
| battery | . Charging |VBAT < 26,5 V| 225 ms | CLOSING | 7 |
| contactor | cycle |& V3PP > 27 V| | | |
| | | | | | |
| | . end of | ICH < 4 A | 10 s | OPENING | 6 |
| | charging | | | | |
| | cycle on | | | | |
| | ground | | | | |
| | | | | | |
| | . end of | ICH < 4 A | 30 mn | OPENING | |
| | charging | | | | |
R | | cycle if | | | | |
R | | aircraft | | | | |
R | | speed is | | | | |
R | | greater than | | | | |
R | | 100 Kts | | | | |
| | or after an | | | | |
| | APU start | | | | |
| | | | | | |
| | - Thermal runaway| | | | |
| | (1) | | | | |
| | . -------------| ICH > 10 A | 3 X 60 s | OPENING | 5 |
| | |& >0,375 A/mn| | | |
| | | | | | |
| | | | | | |
| | .--------------| ICH > 150 A | 90 s | OPENING | 4 |
| | | | | | |
| | - Starting of APU| | | CLOSING | 8 |
| | | | | | |
| | - Supply on | | 75 ms | CLOSING | 3 |
| | ground | | | | |
| | | | | | |
| | - Transient fault| V3PP < 5 V | | CLOSING | 2 |
| | conditions | | | | |
| | | | | | |
EFF :
ALL 24-38-00
Page 5
Aug 01/11
SYR
-------------------------------------------------------------------------------
| FUNCTION | THRESHOLD | TIME DELAY | ACTION | No.|
|-----------------------------------------------------------------------------|
| | - Integrity of | IDECH >100 A| 300 ms | OPENING | 1 |
| | hot bus | | | | |
| | | | | | |
| | - Electrical | | | OPENING | 10 |
| | emer condition | | | | |
|-----------------------------------------------------------------------------|
| Control of BCL| - Complete | VBAT < 23 V | 15 s | OPENING BCL |
| supply | discharge | | | SUPPLY |
| | protection | | | |
| RAT-CSM/G | | | | WARNING |
| FAULT | | | | |
| warning | - | - | 1 s | LIGHT |
| control | | | | |
|-----------------------------------------------------------------------------|
| Inhibition of | | When ELEC | 45 s | APU START |
| APU start | | EMER | | CNTOR |
| sequence | |configuration| | INHIBITED |
| | |initiated and| | |
| | |CSM/G not | | |
| | |available | | |
|-----------------------------------------------------------------------------|
| BAT FAULT | - Thermal runaway| | | WARNING |
| warning | (see 1) | | | |
| control | | | | LIGHT |
C. Battery Shunt
A 400 A/75mV shunt is installed on a base. It is used to read the
charging and the discharging currents of a 24 V, 23 Ah battery.
Characteristics:
- Rating: the shunt supplies a voltage of 75 mV when a 400 A current goes
through it.
- Accuracy: 1% at 20 deg.C in the 0 - 400A range.
- Overload capacity: 600 A during 30 seconds, 1000 A during 5 seconds.
- Max. weight: 300 g.
4. ________________________________
Operation/Control and Indicating
EFF :
ALL 24-38-00
Page 6
Aug 01/11
R
SYR
Battery Charge Limiter (BCL1) - Schematic Simplified
Cockpit Compartment Controls and Indicating
R Figure 004
EFF :
ALL
24-38-00 Page 7/8
Nov 01/06
SYR
(1) The pushbutton switch is released
The battery charge limiter is not operating and the battery is
uncoupled from the network.
The status of this control is indicated by illumination of the white
OFF legend on the pushbutton switch. The same indication is displayed
on the ELEC page of the lower ECAM Display Unit and generates a
warning if one or both engines are running.
EFF :
ALL 24-38-00
Page 9
Nov 01/06
R
SYR
- to prevent complete discharge of the battery, when the aircraft is
parked,
- to supply equipment with DC during transient fault configurations,
- to ensure integrity of the HOT bus.
EFF :
ALL 24-38-00
Page 10
Nov 01/06
R
SYR
(g) Integrity of the HOT bus
Battery isolation in case of failure on DC network through
monitoring of the battery discharge current (either I discharge >
400 A for 5 ms or I discharge > 100 A for 300 ms).
NOTE : If the CSM/G comes on line before 45 seconds, the APU start
____
sequence is available as soon as the CSM/G is coupled to the
network.
5. BITE
_________
Test
Built-In Test Equipment (BITE) allows two types of test:
- tests at each power up on ground,
- tests on ground from the Centralized Fault Display System (CFDS).
Furthermore, the BCL system is monitored when the BCL is in operation.
A. Power up Test
On the ground, when the equipment is switched on, the following tests are
performed:
- EPROM test (checksum),
- RAM test,
- timer test,
- discret inputs test,
- acquisition current test,
EFF :
ALL 24-38-00
Page 11
Nov 01/06
R
SYR
- test of the output stage of the battery contactor control,
- test of the output stage of the BAT FAULT warning control,
- test of the output stage of the RAT & CSM/G warning control,
- test of the output stage of the APU start inhibition control,
- test of specific external wiring of the BCL,
- watchdog test.
R
In case of BCL FAULT warning, the crew is informed by the BCL FAULT
message displayed on the upper ECAM display unit whereas the ELEC page is
displayed on the lower ECAM display unit.
Class 3 failures can be read using the CFDS. Maintenance personnel must
localize the failures by means of CFDS readouts
(Ref. Fig. 007)
NOTE : If a BAT pushbutton switch is released (OFF position), the BAT OFF
____
warning is displayed on the upper ECAM display unit whereas the
ELEC page is displayed on the lower ECAM display unit.
EFF :
ALL 24-38-00
Page 12
May 01/11
SYR
INTENTIONALLY BLANK
R
24-38-00
Page 13
Nov 01/06
SYR
BAT 1 FAULT - Lower and Upper ECAM Display Unit
R Figure 005 (SHEET 1)
EFF :
ALL 24-38-00
Page 14
Nov 01/06
SYR
BAT 1 FAULT - Lower and Upper ECAM Display Unit
R Figure 005 (SHEET 2)
EFF :
ALL 24-38-00
Page 15
Nov 01/06
SYR
BAT 2 FAULT - Lower and Upper ECAM Display Unit
R Figure 006 (SHEET 1)
EFF :
ALL 24-38-00
Page 16
Nov 01/06
SYR
BAT 2 FAULT - Lower and Upper ECAM Display Unit
R Figure 006 (SHEET 2)
EFF :
ALL 24-38-00
Page 17
Nov 01/06
SYR
Maintenance Test Procedure for BCL
R Figure 007
EFF :
ALL 24-38-00
Page 18
Nov 01/06
SYR
-------------------------------------------------------------------------------
| ATA REF. | MESSAGE | CLASS | COMMENT |
|----------|----------------------|-------|-----------------------------------|
| 24-38-51 | BATTERY 1 (or 2) | I | Battery thermal runaway or |
| | | | internal short circuit |
|----------|----------------------|-------|-----------------------------------|
| 24-28-51 | STATIC INVERTER 3XB | I | Failure of static inverter |
|----------|----------------------|-------|-----------------------------------|
| 24-38-55 | CHECK CONTACTOR | I | Failure of battery contactor |
| | 6PB1 (or 6PB2) | | control of status circuit |
| | BCL1 (or BCL2) | | |
| | CIRCUIT | | |
|----------|----------------------|-------|-----------------------------------|
| 24-38-00 | PUSHBUTTON 7PB1 | I | Failure of control P/BSW circuit |
| | (or 7PB2) / BCL1 | | |
| | (or BCL2) CIRCUIT | | |
|--------- |----------------------|-------|-----------------------------------|
| 24-38-00 | SHUNT 3PB1 (or 3PB2) | I | Failure of current acquisition |
| | /BCL1 (or BCL2) | | circuit |
| | CIRCUIT | | |
|--------- |----------------------|-------|-----------------------------------|
| 24-38-00 | FUSE 4PB1 (or 4PB2) | I | Fuse blown |
|----------|----------------------|-------|-----------------------------------|
| 24-38-34 | BCL1 (or BCL2) | I | Failure of: |
| | | | -analogic/numeric converter |
| | | | -battery contactor control |
|----------|----------------------|-------|-----------------------------------|
| 24-38-00 | CHECK DC BAT BUS | I | Failure of BCL BAT BUS supply |
| | 3PP/BCL1 (or BCL2) | | |
|----------|----------------------|-------|-----------------------------------|
| 24-38-34 | BCL1 (or BCL2) | III | Failure of: |
| | | | -WATCH DOG |
| | | | -BAT FAULT control |
| | | | -APU START VALID control |
| | | | -RAT/EMER GEN/FAULT control |
| | | | (internal to BCL) |
|----------|----------------------|-------|-----------------------------------|
| 33-14-00 | BOARD 5LP/BCL1 | III | Failure of BAT FAULT indication |
| | (or BCL2) CIRCUIT | | circuit |
|----------|----------------------|-------|-----------------------------------|
| 24-24-00 | RELAY 31XE/BCL1 | III | Failure of RAT/EMER GEN/FAULT |
| | (or BCL2) CIRCUIT | | indication circuit |
|----------|----------------------|------ |-----------------------------------|
| 32-62-00 | CHECK LGCIU1/BCL1 | III | Failure of nose L/G locked up |
| | (or BCL2) CIRCUIT | | information |
|----------|----------------------|-------|-----------------------------------|
| 24-38-00 | BCL1 (or BCL2) | III | Ground/flight ADIRU or LGCIU |
EFF :
ALL 24-38-00
Page 19
Nov 01/06
SYR
-------------------------------------------------------------------------------
| ATA REF. | MESSAGE | CLASS | COMMENT |
|----------|----------------------|-------|-----------------------------------|
| | LGCIU/ADIRU1 | | information disagree |
| | SIGNAL DISAGREE | | |
|----------|----------------------|-------|-----------------------------------|
| 24-34-55 | CHECK CONTACTOR | III | Failure of ESS TR contactor |
| | 3PE/BCL1 (or BCL2) | | status circuit |
| | CIRCUIT | | |
|----------|----------------------|-------|-----------------------------------|
| 24-38-00 | CHECK HOT BUS 701PP | III | Failure of voltage from HOT bus |
| | (or 702PP)/ BCL1 | | |
| | (or BCL2) CIRCUIT | | |
|----------|----------------------|-------|-----------------------------------|
| 24-25-00 | RELAYS 15XC or 16XC/ | III | Failure of emergency |
| | BCL1 (or BCL2) | | configuration information |
| | CIRCUIT | | |
|----------|----------------------|-------|-----------------------------------|
| 24-38-00 | CHECK HOT BUS POWER | III | Abnormal consumption on HOT bus |
| | CONSUMPTION | | |
|-----------------------------------------------------------------------------|
EFF :
ALL 24-38-00
Page 20
Nov 01/06
SYR
DC GENERATION - BATTERIES - ADJUSTMENT/TEST
___________________________________________
TASK 24-38-00-710-001
Operational Test of the Battery Charge Limiter (BCL), (with the CFDS)
1. __________________
Reason for the Job
NOTE : If the CFDS is not available, there is an alternative method for this
____
procedure. This task gives the first method. For the alternative
method, refer to the other task in this page block.
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
EFF :
ALL 24-38-00
Page 501
May 01/11
SYR
3. __________
Job Set-up
Subtask 24-38-00-860-051
(2) In the cockpit, on the overhead panel 35VU, make sure that the BAT 1
and BAT 2 pushbutton switches are released. (On these pushbutton
switches, the OFF legend is on).
(3) On the MCDU, on the SYSTEM REPORT/TEST page, get the ELEC menu
(Ref. TASK 31-32-00-860-004).
Subtask 24-38-00-010-051
(3) Open the access panels of the AC/DC emergency power center 106VU and
BATTERY power center 105VU.
Subtask 24-38-00-865-050
-------------------------------------------------------------------------------
PANEL DESIGNATION IDENT. LOCATION
-------------------------------------------------------------------------------
105VU ELEC/HOT BUS/702PP SPLY 5PB2 D02
105VU ELEC/HOT BUS/701PP SPLY 5PB1 D01
105VU ELEC/BAT REF/BCL2 9PB2 F02
105VU ELEC/BAT REF/BCL1 9PB1 F01
105VU ELEC/BAT BUS/REF/BCL1 8PB1 G01
105VU ELEC/BAT BUS/REF/BCL2 8PB2 J02
106VU CSM/G /EV/MAN/SPLY 6XE B04
125VU BAT BUS/301PP/SPLY 11PB CC01
EFF :
ALL 24-38-00
Page 502
May 01/11
SYR
4. Procedure
_________
Subtask 24-38-00-710-050
-------------------------------------------------------------------------------
R | ACTION | RESULT |
-------------------------------------------------------------------------------
4. On the MCDU:
- push the line key adjacent to
the RETURN indication until the
ELEC page comes into view.
EFF :
ALL 24-38-00
Page 503
May 01/11
SYR
-------------------------------------------------------------------------------
| ACTION | RESULT |
-------------------------------------------------------------------------------
- push the line key adjacent to - the FAULT legend of the BAT 2
the TEST indication. pushbutton switch comes on for 6
seconds approximately.
5. Close-up
________
Subtask 24-38-00-410-051
A. Close Access
(1) Close the access panels of the AC/DC emergency power center 106VU and
BATTERY power center 105VU.
Subtask 24-38-00-860-050
(1) On the MCDU, push the line key adjacent to the RETURN indication
until the CFDS menu page comes into view.
EFF :
ALL 24-38-00
Page 504
May 01/11
R
SYR
TASK 24-38-00-710-001- 01
Operational Test of the Battery Charge Limiter (BCL), (without the CFDS)
1. __________________
Reason for the Job
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
Subtask 24-38-00-860-052
(2) In the cockpit, on the overhead panel 35VU, make sure that the BAT 1
and BAT 2 pushbutton switches are released (the OFF legends are on).
(3) Do the EIS start procedure (Upper ECAM DU and lower ECAM DU only)
(Ref. TASK 31-60-00-860-001).
EFF :
ALL 24-38-00
Page 505
May 01/11
SYR
Subtask 24-38-00-010-052
B. Get Access
(3) Open the access panel of the BATTERY power center 105VU.
Subtask 24-38-00-865-054
-------------------------------------------------------------------------------
PANEL DESIGNATION IDENT. LOCATION
-------------------------------------------------------------------------------
105VU ELEC/HOT BUS/702PP SPLY 5PB2 D02
105VU ELEC/HOT BUS/701PP SPLY 5PB1 D01
105VU ELEC/BAT REF/BCL2 9PB2 F02
105VU ELEC/BAT REF/BCL1 9PB1 F01
105VU ELEC/BAT BUS/REF/BCL1 8PB1 G01
105VU ELEC/BAT BUS/REF/BCL2 8PB2 J02
125VU BAT BUS/301PP/SPLY 11PB CC01
4. Procedure
_________
Subtask 24-38-00-710-052
-------------------------------------------------------------------------------
R | ACTION | RESULT |
-------------------------------------------------------------------------------
EFF :
ALL 24-38-00
Page 506
May 01/11
SYR
-------------------------------------------------------------------------------
ACTION RESULT
-------------------------------------------------------------------------------
On the lower ECAM display unit:
- the green DC BAT busbar indication
comes into view,
- the green line between the BAT 1(2)
indication and the DC BAT busbar
indication comes into view. The arrow
points to the BAT 1(2) indication,
- the related parameter indications
(voltage and current) come into view
in green.
EFF :
ALL 24-38-00
Page 507
May 01/98
SYR
5. Close-up
________
Subtask 24-38-00-410-052
A. Close Access
(1) Close the access panel of the BATTERY power center 105VU.
Subtask 24-38-00-860-053
EFF :
ALL 24-38-00
Page 508
May 01/98
SYR
DC GENERATION - BATTERIES - INSPECTION/CHECK
____________________________________________
TASK 24-38-00-210-001
1. __________________
Reason for the Job
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
B. Consumable Materials
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
EFF :
ALL 24-38-00
Page 601
May 01/11
SYR
C. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
Subtask 24-38-00-861-054
Subtask 24-38-00-941-051
B. Safety Precautions
(1) In the cockpit, on the overhead panel 35VU, make sure that the BAT 1
and 2 pushbutton switches are released (out).
(2) In the cockpit, on the overhead panel 35VU, put a warning notice in
position to tell the persons not to use the batteries.
Subtask 24-38-00-010-050
C. Get Access
(3) Open the access panel of the BATTERY power center 105VU.
EFF :
ALL 24-38-00
Page 602
May 01/11
SYR
Subtask 24-38-00-865-051
-------------------------------------------------------------------------------
PANEL DESIGNATION IDENT. LOCATION
-------------------------------------------------------------------------------
105VU ELEC/HOT BUS/702PP SPLY 5PB2 D02
105VU ELEC/HOT BUS/701PP SPLY 5PB1 D01
4. Procedure
_________
Subtask 24-38-00-210-050
(1) To do this:
(a) Disconnect the battery connector and put a blanking caps on the
connector.
(b) Examine the battery externally and make sure that these are in
good condition:
- case and lid,
- latches,
- pins of the electrical connector.
1
_ Cut and remove the lockwire from the lid.
2
_ Remove the lid and do a check of the condition of:
- cells (electrolytic spillage, overheating, deformation),
- connections between cells (oxidation),
- safety valves.
If you find spilled electrolyte, overheat marks or deformation
(such as a cell with a swollen case, damaged cell strap),
replace the battery.
(d) Install the lid and safety it with MISCELLANEOUS (Material No.
19-010).
EFF :
ALL 24-38-00
Page 603
May 01/11
R
SYR
Subtask 24-38-00-210-051
(1) To do this:
(b) Remove the ducts to clean and wash them with water and, if
necessary, remove the electrolyte.
Subtask 24-38-00-160-050
(2) In areas which you cannot get access to easily (complex structure):
(a) First clean the area with a 5 percent acetic acid solution.
(b) Then wipe and dry the area as well as possible with a clean
cloth.
(4) If some electrolyte comes out of the battery, you must write a report
to give details on:
- the area where it occurred
- the cleaning procedure used and
- the cable repair you did.
This is necessary to do another check after 2 weeks.
EFF :
ALL 24-38-00
Page 604
May 01/11
SYR
5. Close-up
________
Subtask 24-38-00-865-052
A. Remove the safety clip(s) and the tag(s) and close this(these) circuit
breaker(s):
-------------------------------------------------------------------------------
PANEL DESIGNATION IDENT. LOCATION
-------------------------------------------------------------------------------
R 105VU ELEC/HOT BUS/702PP SPLY 5PB2 D02
R 105VU ELEC/HOT BUS/701PP SPLY 5PB1 D01
R
Subtask 24-38-00-410-050
B. Close Access
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
(2) Close the access panel of the BATTERY power center 105VU.
Subtask 24-38-00-862-051
EFF :
ALL 24-38-00
Page 605
Feb 01/99
SYR
CHARGE LIMITER - BATTERY (BCL) (1PB1,1PB2) - REMOVAL/INSTALLATION
_________________________________________________________________
TASK 24-38-34-000-001
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
Subtask 24-38-34-860-050
(2) In the cockpit, on the overhead panel 35VU, release the BAT
pushbutton switches.
(3) In the cockpit, on the overhead panel 35VU, put a warning notice to
tell the persons not to operate the batteries.
EFF :
ALL 24-38-34
Page 401
May 01/11
SYR
Subtask 24-38-34-010-050
(3) Open the access panel of the BATTERY power center 105VU.
Subtask 24-38-34-865-050
-------------------------------------------------------------------------------
PANEL DESIGNATION IDENT. LOCATION
-------------------------------------------------------------------------------
FOR 1PB1
105VU ELEC/BAT REF/BCL1 9PB1 F01
105VU ELEC/BAT BUS/REF/BCL1 8PB1 G01
FOR 1PB2
105VU ELEC/BAT REF/BCL2 9PB2 F02
105VU ELEC/BAT BUS/REF/BCL2 8PB2 J02
4. Procedure
_________
Subtask 24-38-34-020-050
(3) Loosen and remove the four screws (4) and the washers (3).
EFF :
ALL 24-38-34
Page 402
May 01/11
SYR
Battery Charge Limiter
Figure 401/TASK 24-38-34-991-001
EFF :
ALL 24-38-34
Page 403
May 01/98
SYR
TASK 24-38-34-400-001
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
Subtask 24-38-34-860-051
(1) Make sure that the ground service network is energized (Ref. TASK 24-
42-00-861-001).
(2) In the cockpit, on the overhead panel 35VU, make sure that the BAT
pushbutton switches are released.
EFF :
ALL 24-38-34
Page 404
May 01/98
SYR
(3) In the cockpit, on the overhead panel 35VU, make sure that the
warning notice is in position to tell persons not to operate the
batteries.
(4) Make sure that the access platform is in position at the access door
822.
(6) Make sure that the access panel of the BATTERY power center 105VU is
open.
Subtask 24-38-34-865-051
B. Make sure that this(these) circuit breaker(s) is(are) open, safetied and
tagged
-------------------------------------------------------------------------------
PANEL DESIGNATION IDENT. LOCATION
-------------------------------------------------------------------------------
FOR 1PB1
105VU ELEC/BAT REF/BCL1 9PB1 F01
105VU ELEC/BAT BUS/REF/BCL1 8PB1 G01
FOR 1PB2
105VU ELEC/BAT REF/BCL2 9PB2 F02
105VU ELEC/BAT BUS/REF/BCL2 8PB2 J02
4. Procedure
_________
Subtask 24-38-34-420-050
(2) Install the four screws (4) and the washers (3) and then tighten
screws.
(4) Make sure that the electrical connectors are clean and in the correct
condition.
(5) Connect the connector (2) to the battery charge limiter (1).
EFF :
ALL 24-38-34
Page 405
May 01/11
SYR
Subtask 24-38-34-865-052
B. Remove the safety clip(s) and the tag(s) and close this(these) circuit
breaker(s):
FOR 1PB1
8PB1, 9PB1
FOR 1PB2
8PB2, 9PB2
Subtask 24-38-34-710-050
C. Do an operational test of the BCL from the CFDS (Ref. TASK 24-38-00-710-
001).
5. Close-up
________
Subtask 24-38-34-410-050
A. Close Access
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
(2) Close the access panel of the BATTERY power center 105VU.
Subtask 24-38-34-862-050
EFF :
ALL 24-38-34
Page 406
May 01/11
R
SYR
BATTERY (2PB1,2PB2) - REMOVAL/INSTALLATION
__________________________________________
TASK 24-38-51-000-001
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
EFF :
ALL 24-38-51
Page 401
May 01/11
SYR
**ON A/C ALL
3. __________
Job Set-up
Subtask 24-38-51-860-051
(2) In the cockpit, on the overhead panel 35VU, release these pushbutton
switches:
- BAT 1,
- BAT 2.
(3) In the cockpit, on the overhead panel 35VU, put a warning notice in
position to tell the persons not to operate the batteries.
Subtask 24-38-51-010-050
(3) Open the access panels of the AC/DC emergency power center 106VU and
the BATTERY power center 105VU.
Subtask 24-38-51-865-050
-------------------------------------------------------------------------------
PANEL DESIGNATION IDENT. LOCATION
-------------------------------------------------------------------------------
FOR 2PB1
105VU ELEC/HOT BUS/701PP SPLY 5PB1 D01
105VU ELEC/HOT BUS/701PP SPLY 12PB1 E01
FOR 2PB2
105VU ELEC/HOT BUS/702PP SPLY 5PB2 D02
105VU ELEC/HOT BUS/702PP SPLY 12PB2 E02
106VU CSM/G /EV/MAN/SPLY 6XE B04
EFF :
ALL 24-38-51
Page 402
May 01/11
SYR
4. Procedure
_________
Subtask 24-38-51-020-050
WARNING : BE CAREFUL WHEN YOU REMOVE OR INSTALL THE BATTERY. THE BATTERY
_______
IS HEAVY AND CAN CAUSE INJURY AND/OR DAMAGE.
(5) Disconnect the ventilation duct (10) and put a blanking cap on the
duct.
(6) Cut and remove the lockwire from the two wing nuts (2).
(8) Release the two rods (3) that hold the battery.
EFF :
ALL 24-38-51
Page 403
Nov 01/10
SYR
R Batteries
Figure 401/TASK 24-38-51-991-001
EFF :
001-001, 24-38-51
Page 404
May 01/09
SYR
R Batteries
Figure 401A/TASK 24-38-51-991-001-A
EFF :
002-099, 24-38-51
Page 405
May 01/09
SYR
**ON A/C 002-099,
Subtask 24-38-51-020-050-A
WARNING : BE CAREFUL WHEN YOU REMOVE OR INSTALL THE BATTERY. THE BATTERY
_______
IS HEAVY AND CAN CAUSE INJURY AND/OR DAMAGE.
(1) Cut and remove the copper shear wire between the knurled nut (6) and
the connector (7).
(6) Disconnect the ventilation duct (10) and put a blanking cap on the
duct.
(7) Cut and remove the lockwire from the two wing nuts (2).
(9) Release the two rods (3) that hold the battery.
Subtask 24-38-51-869-051
NOTE : If there is, remove the duct, clean it and rinse it with water.
____
EFF :
ALL 24-38-51
Page 406
Nov 01/10
SYR
TASK 24-38-51-400-001
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
B. Consumable Materials
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
C. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
EFF :
ALL 24-38-51
Page 407
Nov 01/10
SYR
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
Subtask 24-38-51-860-052
(1) Make sure that the ground service network is energized (Ref. TASK 24-
42-00-861-001).
(2) In the cockpit, on the overhead panel 35VU, make sure that these
pushbutton switches are released:
- BAT 1,
- BAT 2.
(3) In the cockpit, on the overhead panel 35VU, make sure that the
warning notice is in position to tell persons not to operate the
batteries.
R (5) Make sure that the access doors 812 and 822 are open.
(6) Make sure that the access panels of the AC/DC emergency power center
106VU and BATTERY power center 105VU are open.
EFF :
ALL 24-38-51
Page 408
Nov 01/07
SYR
Subtask 24-38-51-865-051
B. Make sure that this(these) circuit breaker(s) is(are) open, safetied and
tagged
-------------------------------------------------------------------------------
PANEL DESIGNATION IDENT. LOCATION
-------------------------------------------------------------------------------
FOR 2PB1
105VU ELEC/HOT BUS/701PP SPLY 5PB1 D01
105VU ELEC/HOT BUS/701PP SPLY 12PB1 E01
FOR 2PB2
105VU ELEC/HOT BUS/702PP SPLY 5PB2 D02
105VU ELEC/HOT BUS/702PP SPLY 12PB2 E02
106VU CSM/G /EV/MAN/SPLY 6XE B04
4. Procedure
_________
Subtask 24-38-51-420-050
WARNING : BE CAREFUL WHEN YOU REMOVE OR INSTALL THE BATTERY. THE BATTERY
_______
IS HEAVY AND CAN CAUSE INJURY AND/OR DAMAGE.
R (1) Put the battery (1) in position between the four stops (4) on the
R plate assembly (5).
R NOTE : Make sure that the rods are engaged in the cover assembly
____
R slots of the battery (1) and the spacers (8) are in position.
EFF :
ALL 24-38-51
Page 409
May 01/09
SYR
(3) Tighten the wing nuts (2) with your hand until they touch the
battery, then tighten a 1/4 turn more.
(4) Safety the wing nuts (2) with MISCELLANEOUS (Material No. 19-009).
(5) Remove all the blanking caps and connect the duct (10) on the
battery.
(8) Make sure that the electrical connectors are clean and in the correct
condition.
R (11) If possible, install the COPPER SHEAR WIRE NFL23-321 between the
R knurled nut (6) and the connector (7).
Subtask 24-38-51-420-050-A
WARNING : BE CAREFUL WHEN YOU REMOVE OR INSTALL THE BATTERY. THE BATTERY
_______
IS HEAVY AND CAN CAUSE INJURY AND/OR DAMAGE.
(1) Put the battery (1) in position between the fours stops (4) on the
plate assembly (5).
NOTE : Make sure that the rods are engaged in the cover assembly
____
slots of the battery (1) and the spacers (8) are in position.
(3) Tighten the wing nuts (2) with your hand until they touch the
battery, then tighten a 1/4 turn more.
EFF :
ALL 24-38-51
Page 410
Nov 01/10
SYR
(4) Safety the wing nuts (2) with MISCELLANEOUS (Material No. 19-009).
(5) Remove all the blanking caps and connect the duct (10) on the
battery.
(8) Make sure that the electrical connectors are clean and in the correct
condition.
(11) Install the COPPER SHEAR WIRE NFL23-321 between the knurled nut (6)
and the connector (7).
Subtask 24-38-51-865-052
B. Remove the safety clip(s) and the tag(s) and close this(these) circuit
breaker(s):
FOR 2PB1
5PB1, 12PB1
FOR 2PB2
5PB2, 12PB2, 6XE
Subtask 24-38-51-710-050
C. Do an operational test of the BCL from the CFDS (Ref. TASK 24-38-00-710-
001).
EFF :
ALL 24-38-51
Page 411
Nov 01/10
SYR
Subtask 24-38-51-750-050
5. Close-up
________
Subtask 24-38-51-410-050
A. Close Access
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
(2) Close the access panels of the AC/DC emergency power center 106VU and
BATTERY power center 105VU.
Subtask 24-38-51-862-051
EFF :
ALL 24-38-51
Page 412
Nov 01/10
SYR
BATTERY (2PB1,2PB2) - INSPECTION/CHECK
______________________________________
TASK 24-38-51-280-001
1. __________________
Reason for the Job
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
Subtask 24-38-51-861-050
EFF :
ALL 24-38-51
Page 601
May 01/11
SYR
Subtask 24-38-51-010-051
4. Procedure
_________
Subtask 24-38-51-020-051
Subtask 24-38-51-280-050
(1) Send the batteries to the workshop for the restoration procedure
(Ref. CMM 243851).
Subtask 24-38-51-420-051
5. Close-up
________
Subtask 24-38-51-410-051
A. Close Access
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
Subtask 24-38-51-862-050
EFF :
ALL 24-38-51
Page 602
May 01/11
SYR
SHUNT - BATTERY (3PB1,3PB2) - REMOVAL/INSTALLATION
__________________________________________________
TASK 24-38-54-000-001
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
Subtask 24-38-54-861-050
Subtask 24-38-54-941-050
B. Safety Precautions
(1) In the cockpit, on the ELEC panel 35VU, release these pushbutton
switches:
- BAT 1,
- BAT 2.
EFF :
ALL 24-38-54
Page 401
May 01/11
SYR
(2) In the cockpit, on the ELEC panel 35VU, put a warning notice in
position to tell persons not to operate the batteries.
Subtask 24-38-54-010-050
(3) Open the access panels of the AC/DC emergency power center 106VU and
the battery power center 105VU.
Subtask 24-38-54-865-050
-------------------------------------------------------------------------------
PANEL DESIGNATION IDENT. LOCATION
-------------------------------------------------------------------------------
FOR 3PB1
105VU ELEC/HOT BUS/701PP SPLY 5PB1 D01
105VU ELEC/HOT BUS/701PP SPLY 12PB1 E01
106VU CSM/G /EV/MAN/SPLY 6XE B04
122VU ELEC/REFLNG/ON/BAT 1PR U28
FOR 3PB2
105VU ELEC/HOT BUS/702PP SPLY 5PB2 D02
105VU ELEC/HOT BUS/702PP SPLY 12PB2 E02
106VU CSM/G /EV/MAN/SPLY 6XE B04
122VU ELEC/REFLNG/ON/BAT 1PR U28
4. Procedure
_________
Subtask 24-38-54-020-050
(1) Remove the bolts (8), remove and discard the lockwashers (9), remove
the washers (10) and the ground cable (11).
(2) Remove the bolt (12), remove and discard the lockwasher (13), remove
the electrical wire (14).
EFF :
ALL 24-38-54
Page 402
May 01/11
SYR
Battery Shunt (3PB1, 3PB2)
Figure 401/TASK 24-38-54-991-001
EFF :
ALL 24-38-54
Page 403
Nov 01/00
R
SYR
(3) Remove the bolt (4), remove and discard the lockwasher (3), remove
the electrical wire (2).
(4) Remove the bolts (7), the washers (6) and the nuts (1).
EFF :
ALL 24-38-54
Page 404
Nov 01/00
R
SYR
TASK 24-38-54-400-001
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
B. Expendable Parts
-------------------------------------------------------------------------------
FIG.ITEM |DESIGNATION |IPC-CSN
-------------------------------------------------------------------------------
C. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
EFF :
ALL 24-38-54
Page 405
May 01/10
SYR
3. __________
Job Set-up
Subtask 24-38-54-860-050
(1) Make sure that the ground service network is energized (Ref. TASK 24-
42-00-861-001).
(2) In the cockpit, on the ELEC panel 35VU, make sure that these
pushbutton switches are released:
- BAT 1,
- BAT 2.
(3) In the cockpit, on the ELEC panel 35VU, make sure that the warning
notice to tell persons not to operate the batteries, is in position.
(4) Make sure that the access platform is in position at the avionics
compartment doors 812 and 822.
(5) Make sure that the access doors 812 and 822 are open.
(6) Make sure that the access panels of the AC/DC emergency power center
106VU and the battery power center 105VU are open.
Subtask 24-38-54-865-051
B. Make sure that this(these) circuit breaker(s) is(are) open, safetied and
tagged
-------------------------------------------------------------------------------
PANEL DESIGNATION IDENT. LOCATION
-------------------------------------------------------------------------------
FOR 2PB1
105VU ELEC/HOT BUS/701PP SPLY 5PB1 D01
R 105VU ELEC/HOT BUS/701PP SPLY 12PB1 E01
106VU CSM/G /EV/MAN/SPLY 6XE B04
122VU ELEC/REFLNG/ON/BAT 1PR U28
FOR 2PB2
105VU ELEC/HOT BUS/702PP SPLY 5PB2 D02
105VU ELEC/HOT BUS/702PP SPLY 12PB2 E02
106VU CSM/G /EV/MAN/SPLY 6XE B04
122VU ELEC/REFLNG/ON/BAT 1PR U28
EFF :
ALL 24-38-54
Page 406
May 01/02
SYR
4. Procedure
_________
Subtask 24-38-54-420-050
(3) Install the bolts (7), the washers (6) and the nuts (1).
(4) TORQUE the nuts (1) to between 40 and 44.51 lbf.in (0.45 and 0.50
m.daN).
(5) Install the ground cables (11), the washers (10), new lockwasher (9)
and the bolts (8).
(6) TORQUE the bolts (8) to between 53.10 and 79.65 lbf.in (0.60 and 0.90
m.daN).
(7) Install the electrical wire (2), a new lockwasher (3) and the bolt
(4).
(8) Install the electrical wire (14), a new lockwasher (13) and the bolt
(12).
(9) TORQUE the bolts (4) and (12) to between 22.12 and 33.63 lbf.in (0.24
and 0.38 m.daN).
5. Close-up
________
Subtask 24-38-54-865-052
A. Remove the safety clip(s) and the tag(s) and close this(these) circuit
breaker(s):
- FOR 2PB1
R 5PB1, 12PB1, 6XE, 1PR
- FOR 2PB2
5PB2, 12PB2, 6XE, 1PR
EFF :
ALL 24-38-54
Page 407
May 01/02
SYR
Subtask 24-38-54-410-050
B. Close Access
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
(2) Close the access panels of the AC/DC emergency power center 106VU and
the battery power center 105VU.
Subtask 24-38-54-862-050
EFF :
ALL 24-38-54
Page 408
May 01/00
SYR
CONTACTOR (6PB1,6PB2) - REMOVAL/INSTALLATION
____________________________________________
TASK 24-38-55-000-001
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
Subtask 24-38-55-010-050
A. Get Access
EFF :
ALL 24-38-55
Page 401
May 01/98
SYR
(4) Open the access door 121AL.
Subtask 24-38-55-941-050
B. Safety Precautions
(1) Make sure that the external power connector is not connected to the
aircraft receptacle.
(2) Put warning notice(s) on the access door 121AL to tell the persons
not to use the external power receptacle.
(3) In the cockpit, on the overhead ELEC panel 35VU, release these
pushbutton switches:
- BAT 1, BAT 2,
- APU GEN,
- GEN 1, GEN 2,
- EXT PWR.
(4) In the cockpit, put warning notice(s) to tell persons not to operate
the pushbutton switches on these overhead panels:
- 21VU (EMER ELEC PWR),
- 35VU (ELEC).
(5) In the cockpit, on the APU section of the overhead panel 25VU, put
warning notice(s) to tell persons not to start the APU.
4. Procedure
_________
CAUTION : REMOVE THE CONTACTOR ONLY AND NOT THE BASE OR THE MODULE WHERE THE
_______
WIRES ARE CONNECTED.
Subtask 24-38-55-020-051
NOTE : Do not remove the captive screws (2) and the spring washers
____
from the contactor (3).
EFF :
ALL 24-38-55
Page 402
May 01/10
SYR
Contactors
Figure 401/TASK 24-38-55-991-001
EFF :
ALL 24-38-55
Page 403
May 01/98
SYR
(4) Disengage the contactor (3) from the base (5) and remove the
contactor.
EFF :
ALL 24-38-55
Page 404
May 01/98
SYR
TASK 24-38-55-400-001
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
Subtask 24-38-55-860-050
EFF :
ALL 24-38-55
Page 405
May 01/11
SYR
R (3) Make sure that the ACCESS PLATFORM 1M (3 FT)-ADJUSTABLE is in
R position at the access door 121AL.
(5) Make sure that the external power connector is not connected to the
aircraft receptacle.
(6) Make sure that a warning notice is in position on the access door
121AL to tell persons not to use the external power receptacle.
(7) In the cockpit, on the overhead ELEC panel 35VU, make sure that these
pushbutton switches are released:
- BAT 1, BAT 2,
- APU GEN,
- GEN 1, GEN 2,
- EXT PWR.
(9) In the cockpit, on the APU section of the overhead panel 25VU, make
sure that a warning notice is in position to tell persons not to
start the APU.
4. Procedure
_________
Subtask 24-38-55-420-050
CAUTION : MAKE SURE THAT THE CONTACTOR LOCATING PIN IS CORRECTLY ENGAGED
_______
IN ITS RECESS LOCATED IN ONE POWER TERMINAL.
THIS PREVENTS DAMAGE TO THE LOCATING PIN WHEN YOU APPLY THE
TORQUE.
(1) Put the contactor (3) on the tapped barrels (6) of the contactor base
(5).
(2) TORQUE the captive screws (2) to between 33.63 and 41.6 lbf.in (0.38
and 0.47 m.daN).
EFF :
ALL 24-38-55
Page 406
May 01/11
SYR
(3) Remove the blanking caps from the electrical connectors.
(4) Make sure that the electrical connectors are clean and in the correct
condition.
Subtask 24-38-55-710-050
(1) Do an operational test of the BCL from the CFDS (Ref. TASK 24-38-00-
710-001).
5. Close-up
________
Subtask 24-38-55-410-050
A. Close Access
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
EFF :
ALL 24-38-55
Page 407
May 01/98
SYR
EXTERNAL POWER - DESCRIPTION AND OPERATION
__________________________________________
1. _______
General
The aircraft network can be supplied by a ground power unit. For this, an
external power receptacle is provided forward of the nose landing gear well.
This receptacle enables to supply:
- either the whole network via the transfer circuit (Ref. 24-41-00),
- or only part of it, the ground service network which comprises:
. the AC ground service bus control (Ref. 24-42-00),
. the DC ground service bus control (Ref. 24-43-00).
2. Component
__________________
Location
(Ref. Fig. 001)
-------------------------------------------------------------------------------
FIN | FUNCTIONAL DESIGNATION | PANEL|ZONE|ACCESS | ATA
| | | | DOOR | REF.
-------------------------------------------------------------------------------
1XG GPCU 92VU 121 811 24-41-34
3XG EPC 120VU 212 831 24-41-55
8XG IND LT-EXT PWR/NOT IN USE 108VU 120 824 24-41-00
9XG CAUT LT-EXT PWR/AVAIL 108VU 120 824 24-41-00
10XG P/BSW-ELEC/EXT PWR 35VU 210 831 24-41-00
20XG RCPT-EXT PWR 120 121AL 24-41-51
12XX CNTOR-AC GND SVCE SPLY 120VU 212 831 24-42-55
14XX CNTOR-AC & DC GND SVCE SPLY 120VU 212 831 24-42-55
-------------------------------------------------------------------------------
FIN I FUNCTIONAL DESIGNATION I PANELIZONEIACCESS I ATA
I I I I DOOR I REF.
-------------------------------------------------------------------------------
5XX SW-MAINT BUS 2000VU 220 841 24-42-00
EFF :
ALL 24-40-00
Page 1
May 01/98
SYR
Main Components - Component Location
Figure 001
EFF :
ALL 24-40-00
Page 2
May 01/98
SYR
AC EXTERNAL POWER CONTROL - DESCRIPTION AND OPERATION
_____________________________________________________
1. _______
General
The power supply control of the whole aircraft network from a ground power
unit is performed from the cockpit overhead panel (Ref. 24-00-00).
This control is associated with a ground power control unit (GPCU).
2. __________________
Component Location
-------------------------------------------------------------------------------
FIN | FUNCTIONAL DESIGNATION | PANEL|ZONE|ACCESS | ATA
| | | | DOOR | REF.
-------------------------------------------------------------------------------
1XG GPCU 92VU 121 811 24-41-34
3XG EPC 120VU 212 831 24-41-55
8XG IND LT-EXT PWR/NOT IN USE 108VU 120 824 24-41-00
9XG CAUT LT-EXT PWR/AVAIL 108VU 120 824 24-41-00
10XG P/BSW-ELEC/EXT PWR 35VU 210 831 24-41-00
20XG RCPT-EXT PWR 120 121AL 24-41-51
3. System
__________________
Description
(Ref. Fig. 003, 004)
R In ground configuration, these two power sources can supply all of the
R aircraft network:
R - The APU generator, to a maximum power of 115 KVA, or
R - The GPU, to a maximum power of 90 KVA (approximately 60KVA for the
R technical loads).
EFF :
ALL 24-41-00
Page 1
Aug 01/11
SYR
AC External Power Control (GPCU) - Component Location
Figure 001 (SHEET 1)
EFF :
ALL 24-41-00
Page 2
May 01/98
SYR
AC External Power Control (GPCU) - Component Location
Figure 001 (SHEET 2)
EFF :
ALL 24-41-00
Page 3
May 01/98
SYR
AC External Power Control (GPCU) - Component Location
Figure 002
EFF :
ALL 24-41-00
Page 4
May 01/98
SYR
External Power Configuration - Block Diagram
Figure 003
EFF :
ALL 24-41-00
Page 5/6
May 01/98
SYR
Ground Power Control Unit (GPCU) - Schematic Diagram
Figure 004
EFF :
ALL 24-41-00
Page 7
May 01/98
SYR
4. _____________________
Component Description
NOTE : The GPCU transmits command and data to and receives data from up
____
to the GCUs.
The communication is made via RS422 serial data links.
R (2) Controls
The GPCU (in association with the EXT PWR pushbutton switch) controls
the connection/disconnection of the external power to/from the
aircraft electrical system.
The necessary controls are achieved by means of relays.
- The Pin Monitoring Relay (PMR)
This relay when energized, connects a holding supply to the GPU
line contactor. It is energized when the DC input voltage (Pin E
and F) is within acceptable limits (less than 42 VDC).
- The External Power Available Relay (PR)
The PR when excited enables the connection of the ground power unit
to the aircraft network provided none of the following protections
is actived:
. over/undervoltage,
. over/underfrequency,
. incorrect phase order,
EFF :
ALL 24-41-00
Page 8
Aug 01/11
SYR
. GPCU internal fault.
Any fault detection:
- prevents the ground power unit from being connected to the aircraft
network,
- or causes it to trip if already in line.
R (3) Protections
- Over/underfrequency (OF, UF)
The control unit permanently monitors the frequency of phase A
voltage of the external power receptacle.
The over/underfrequencies protection are triggered when the
frequency becomes higher/lower than a certain threshold.
- Over/undervoltage (OV, UV)
The control unit permanently monitors the voltage of the three
phases of the external power receptacle.
The undervoltage protection is triggered when the voltage of the
lower phase becomes lower than a certain threshold.
- Incorrect phase order (IPS)
This detection is performed from voltage information of phases A
and B of the external power receptacle.
After excitation of the ground power unit generator, the control
unit analyzes the phase order of the voltage supply. When the
voltage is incorrect, the GPCU prevents the closure of the PR relay
(protection of the three phase consumers).
EFF :
ALL 24-41-00
Page 9
Aug 01/11
SYR
A table listing these functions is shown below:
GPCU PROTECTIONS
------------------------------------------------------------------------------I
I FUNCTION ISENSING I THRESHOLD ITIME DELAY ITRIPSI REMARKS I INHIBITION I
------------------------------------------------------------------------------I
IEP Overvol-IHighest I 124-132 I Inverse IEPC, I I I
Itage (OV) Iphase EPI Volts I IGSRsI I I
I Ivoltage I I I I I I
I-----------I--------I-----------I-----------I-----I-------------I------------I
IEP Under- IIndivi- I 100 plus I 3 - 5 s IEPC IThis functionI I
Ivoltage Idual I or minus I IGSRsIcovers open I I
I(UV) Iphase I 4 V I I Iphase. I I
I Iunder- I I I I I I
I Ivoltage I I I I I I
I-----------I--------I-----------I-----------I-----I-------------I------------I
IEP Overfre-IEP fre- I 433 plus I 3 - 5 s IEPC I I I
Iquency (OF)Iquency I or minus I IGSRsI I I
I I I 3 Hz I I I I I
I-----------I--------I-----------I-----------I-----I-------------I------------I
IEP Under- IEP fre- I 363 plus I 3 - 5 s IEPC I I I
Ifrequency Iquency I or minus I IGSRsI I I
I(UF) I I 3 Hz I I I I I
I-----------I--------I-----------I-----------I-----I-------------I------------I
IEP Phase I2 phasesI A-B-C-N I None IEPC IPrevents EPC I I
ISequence I Iphase I IGSRsIclosure if I I
I(PS) I Isequence I I Iphase sequen-I I
I I I I I Ice is not ABCI I
I I I I I Ior if neutralI I
I I I I I Iand phase I I
I I I I I Ilead are I I
I I I I I Icrossed. I I
-------------------------------------------------------------------------------
EFF :
ALL 24-41-00
Page 10
Aug 01/11
SYR
R (b) Interface with CFDIU
The GPCU permanently sends to the CFDIU all Fault messages
detected in flight or on ground by the GPCU and GCUs.
All the information transmitted from the GPCU to the CFDIU is in
Clear English Message form.
There are two transmission modes:
- the normal mode
- the menu mode.
5. ________________________________
Operation/Control and Indicating
R
- when the pushbutton switch is pressed and released, the EPC closes and
supplies the transfer circuit.
Blue ON legend comes on to indicate the closure of EPC (AVAIL legend
goes off).
The effective supply of the aircraft network by means of the BTCs depends
on the availability of the onboard main generation sources.
In the case of APU generator already supplying the transfer circuit, the
supply command by means of the external power receptacle causes the
opening of the APU generator line contactor.
For reference only, each channel is supplied according to the following
priority order:
- its generator,
- the ground power unit,
- the APU generator,
- the second generator.
EFF :
ALL 24-41-00
Page 11
Aug 01/11
SYR
R B. Control and Indicating Circuits - Indicating in the External Power
R Receptacle Housing
Two lights located in the external power receptacle housing enable easier
utilization or removal of the ground power unit by the ground personnel.
- Amber EXT PWR/AVAIL caution light controlled by the GPCU, comes on to
indicate that the ground power unit is operating and the voltage
correct.
- White EXT/PWR NOT IN USE indicator light comes on to indicate that the
ground power unit does not supply the aircraft and can be disconnected.
NOTE : A lamp test of these two lights can be performed by means of the
____
LIGHT TEST pushbutton switch located in the external power
receptacle housing.
R C. Communications
(Ref. Fig. 006)
A general schematic is shown in this figure and describes all the
communications between the different systems. They are of 2 types:
- communications toward the SDAC,
- BITE communications.
-------------------------------------------------------------------------------
| PARAMETER LIST PARAMETER CHARACTERISTICS (NUMERIC) |
-------------------------------------------------------------------------------
|EQ.SYS.LAB.SDI|PARAMETER | WORD RANGE |UNIT|SIG |BITS|XMSN|CODE|ALPHA|SOURCE |
| |DEFINITION| OPER RANGE | |BIT | |INTV| |CODE |ORIGIN |
| |(*=REMARK)| RESOLUTION | | | | | | |BUS No.|
| |(X=NOTE) | ACCURACY | | | | | | |ATA REF|
| | | | | | | | | |CONV |
-------------------------------------------------------------------------------
| 1 070 01|GEN1 FREQ | 512 | HZ | | 09 | | | | GCU1 |
| 2 070 10|GEN2 FREQ | 512 | HZ | | 09 | | | | GCU2 |
| 071 01| APU GEN | 512 | HZ | | 09 | | | |GCU-APU|
| | FREQ | | | | | | | | |
| 071 10| EXT PWR | 512 | HZ | | 09 | | | | GPCU |
| | FREQ | | | | | | | | |
| 1 072 01| GEN1 | 256 | V | | 08 | | | | GCU1 |
| | VOLTAGE | | | | | | | | |
| 2 072 10| GEN2 | 256 | V | | 08 | | | | GCU2 |
| | VOLTAGE | | | | | | | | |
EFF :
ALL 24-41-00
Page 12
Aug 01/11
SYR
External Power Contactor (EPC) Supply - Schematic Diagram
Figure 005
EFF :
ALL 24-41-00
Page 13/14
May 01/98
SYR
Communication - Block Diagram
Figure 006
EFF :
ALL 24-41-00
Page 15
May 01/98
SYR
-------------------------------------------------------------------------------
| PARAMETER LIST PARAMETER CHARACTERISTICS (NUMERIC) |
-------------------------------------------------------------------------------
|EQ.SYS.LAB.SDI|PARAMETER | WORD RANGE |UNIT|SIG |BITS|XMSN|CODE|ALPHA|SOURCE |
| |DEFINITION| OPER RANGE | |BIT | |INTV| |CODE |ORIGIN |
| |(*=REMARK)| RESOLUTION | | | | | | |BUS No.|
| |(X=NOTE) | ACCURACY | | | | | | |ATA REF|
| | | | | | | | | |CONV |
-------------------------------------------------------------------------------
| 075 01| APU GEN | 256 | V | | 08 | | | |GCU-APU|
| | VOLTAGE | | | | | | | | |
| 075 10| EXT PWR | 256 | V | | 08 | | | | GPCU |
| | VOLTAGE | | | | | | | | |
| 1 077 01| GEN1 LOAD| 256 |PCT | | 08 | | | | GCU1 |
| 2 077 10| GEN2 LOAD| 256 |PCT | | 08 | | | | GCU2 |
| 100 00| APU GEN | 256 |PCT | | 08 | | | |GCU-APU|
| | LOAD | | | | | | | | |
| 1 105 01|IDG1 INLET| 256 |deg.| | 08 | | | | GCU1 |
| | TEMP | | C | | | | | | |
| 2 105 10|IDG2 INLET| 256 |deg.| | 08 | | | | GCU2 |
| | TEMP | | C | | | | | | |
| 1 106 01|IDG1OUTLET| 256 |deg.| | 08 | | | | GCU1 |
| | TEMP | | C | | | | | | |
| 2 106 10|IDG2OUTLET| 256 |deg.| | 08 | | | | GCU2 |
| | TEMP | | C | | | | | | |
| 071 11| EMER GEN | 512 | HZ | | 09 | | | | 27WV |
| | FREQ | | | | | | | | |
| 075 11| EMER GEN | 256 | V | | 08 | | | | 27WV |
| | VOLTAGE | | | | | | | | |
R -------------------------------------------------------------------------------
EFF :
ALL 24-41-00
Page 16
Nov 01/10
SYR
R (b) Table of Main Discrete Signals Received by the SDAC1(2)
R -------------------------------------------------------------------------------
R | PARAMETER LIST PARAMETER CHARACTERISTICS (NUMERIC) |
R -------------------------------------------------------------------------------
R |EQ.SYS.LAB.SDI|PARAMETER | WORD RANGE |UNIT|SIG |BITS|XMSN|CODE|ALPHA|SOURCE |
R | |DEFINITION| OPER RANGE | |BIT | |INTV| |CODE |ORIGIN |
R | |(*=REMARK)| RESOLUTION | | | | | | |BUS No.|
R | |(X=NOTE) | ACCURACY | | | | | | |ATA REF|
R | | | | | | | | | |CONV |
R -------------------------------------------------------------------------------
R | 002 00|AC/ESS TRU| | | | 15 | | | | 15XE |
R | | CNTOR ON | | | | | | | | |
R | 002 00|AC/ESS TRU| | | | 15 | | | | 15XE |
R | | CNTOR OFF| | | | | | | | |
R | 002 00| AC ESS | | | | 16 | | | | 3XH |
R | | SHED BUS | | | | | | | | |
R | | ON | | | | | | | | |
R | 002 00| AC ESS | | | | 16 | | | | 3XH |
R | | SHED BUS | | | | | | | | |
R | | OFF | | | | | | | | |
R | 002 00|AC ESS BUS| | | | 18 | | | | 3XH |
R | | OFF | | | | | | | | |
R | 002 00|AC ESS BUS| | | | 18 | | | | 3XH |
R | | ON | | | | | | | | |
R | 002 00| AC ESS | | | | 20 | | | | 11XC |
R | | FEED P/B | | | | | | | | |
R | | ALTN | | | | | | | | |
R | 002 00| AC ESS | | | | 20 | | | | 11XC |
R | | FEED P/B | | | | | | | | |
R | | NOT ALTN | | | | | | | | |
R | 002 00| BUS TIE | | | | 21 | | | | 10XU |
R | | P/B OFF | | | | | | | | |
R | 002 00| BUS TIE | | | | 21 | | | | 10XU |
R | | P/B ON | | | | | | | | |
R | 002 01|GEN1 LINE | | | | 14 | | | | 9XU1 |
R | |CNTOR ON | | | | | | | | |
R | 002 01|GEN1 LINE | | | | 14 | | | | 9XU1 |
R | |CNTOR OFF | | | | | | | | |
R | 002 01| TRANSFER | | | | 15 | | | | 11XU1 |
R | |CNTOR1 ON | | | | | | | | |
R | 002 01| TRANSFER | | | | 15 | | | | 11XU1 |
R | |CNTOR1 OFF| | | | | | | | |
R | 002 01|AC1/AC ESS| | | | 16 | | | | 13XC |
R | | CNTOR ON | | | | | | | | |
R | 002 01|AC1/AC ESS| | | | 16 | | | | 13XC |
R | | CNTOR OFF| | | | | | | | |
EFF :
ALL 24-41-00
Page 17
Nov 01/10
SYR
-------------------------------------------------------------------------------
| PARAMETER LIST PARAMETER CHARACTERISTICS (NUMERIC) |
-------------------------------------------------------------------------------
|EQ.SYS.LAB.SDI|PARAMETER | WORD RANGE |UNIT|SIG |BITS|XMSN|CODE|ALPHA|SOURCE |
| |DEFINITION| OPER RANGE | |BIT | |INTV| |CODE |ORIGIN |
| |(*=REMARK)| RESOLUTION | | | | | | |BUS No.|
| |(X=NOTE) | ACCURACY | | | | | | |ATA REF|
| | | | | | | | | |CONV |
-------------------------------------------------------------------------------
R | 002 10|GEN2 LINE | | | | 14 | | | | 9XU2 |
R | |CNTOR ON | | | | | | | | |
R | 002 10|GEN2 LINE | | | | 14 | | | | 9XU2 |
R | |CNTOR OFF | | | | | | | | |
R | 002 10| TRANSFER | | | | 15 | | | | 11XU2 |
R | |CNTOR2 ON | | | | | | | | |
R | 002 10| TRANSFER | | | | 15 | | | | 11XU2 |
R | |CNTOR2 OFF| | | | | | | | |
R | 002 10|AC2/AC ESS| | | | 16 | | | | 14XC |
R | |CNTOR ON | | | | | | | | |
R | 002 10|AC2/AC ESS| | | | 16 | | | | 14XC |
R | |CNTOR OFF | | | | | | | | |
R | 002 11| APU GEN | | | | 14 | | | | 3XS |
R | |LINE CNTOR| | | | | | | | |
R | | ON | | | | | | | | |
R | 002 11| APU GEN | | | | 14 | | | | 3XS |
R | |LINE CNTOR| | | | | | | | |
R | | OFF | | | | | | | | |
R | 002 11| EXT PWR | | | | 15 | | | | 3XG |
R | |LINE CNTOR| | | | | | | | |
R | | ON | | | | | | | | |
R | 002 11| EXT PWR | | | | 15 | | | | 3XG |
R | |LINE CNTOR| | | | | | | | |
R | | OFF | | | | | | | | |
R | 002 11| GALLEY | | | | 17 | | | | 2XA |
R | | SHED P/B | | | | | | | | |
R | | OFF | | | | | | | | |
R | 002 11| GALLEY | | | | 17 | | | | 2XA |
R | | SHED P/B | | | | | | | | |
R | | NOT OFF | | | | | | | | |
R | 002 11|EMERGENCY | | | | 22 | | | | 23XE |
R | |GEN TEST | | | | | | | | |
R | 002 11| NO | | | | 22 | | | | 23XE |
R | |EMERGENCY | | | | | | | | |
R | |GEN TEST | | | | | | | | |
R | 004 11| MAIN | | | | 27 | | | | 6XA |
R | | GALLEY | | | | | | | | |
R | | SHED | | | | | | | | |
EFF :
ALL 24-41-00
Page 18
Nov 01/10
SYR
-------------------------------------------------------------------------------
| PARAMETER LIST PARAMETER CHARACTERISTICS (NUMERIC) |
-------------------------------------------------------------------------------
|EQ.SYS.LAB.SDI|PARAMETER | WORD RANGE |UNIT|SIG |BITS|XMSN|CODE|ALPHA|SOURCE |
| |DEFINITION| OPER RANGE | |BIT | |INTV| |CODE |ORIGIN |
| |(*=REMARK)| RESOLUTION | | | | | | |BUS No.|
| |(X=NOTE) | ACCURACY | | | | | | |ATA REF|
| | | | | | | | | |CONV |
-------------------------------------------------------------------------------
R | 004 11| NO MAIN | | | | 27 | | | | 6XA |
R | | GALLEY | | | | | | | | |
R | | SHED | | | | | | | | |
R -------------------------------------------------------------------------------
(b) GPCU
The GPCU transmits the fault messages in clear English to the
CFDIU (the CFDIU is connected to the GPCU by a discrete input and
an ARINC 429 output bus).
It is also the interface between the CFDIU and the various
control units (GCU1, GCU2, APU GCU).
The control units are connected to the GPCU by RS422 serial data
links.
1
_ Operation in normal mode
The GPCU receives the fault information recorded by the GCUs,
compiles them with its own failures and transmits for the
whole system a list of the failures in clear language and
starting from the most recent. When a failure is identified,
the information is permanently transmitted with the ATA
reference of the LRU or of the faulty circuit up to the
beginning of the next flight.
The CFDIU records all the failures - Class I or II and
internal to the system - transmitted by the GPCU in flight to
EFF :
ALL 24-41-00
Page 19
Nov 01/10
SYR
inscribe them in the aircraft LAST LEG REPORT. The most recent
failure is the first to be displayed on the MCDU.
2
_ Operation in menu mode
In menu mode, 3 selections are possible: LAST LEG REPORT, TEST
and CLASS 3 FAULTS.
a
_ LAST LEG REPORT
When pressing the corresponding key (in the SYSTEM
REPORT/TEST page)
(Ref. Fig. 007)
All the class I and II flight and ground failures of the
current flight are displayed. The MCDU display order is as
follows:
- the flight messages (the most recent flight failure
first),
- then GND and the ground messages (the most recent ground
failure first).
At GPCU power up on the ground, the contents of the
various NVMs (GCUs and GPCU) for the current flight is
recovered in the order GPCU, GCU1, GCU2 and APU GCU. All
the messages (flight and ground) become then ground
messages.
b
_ TEST
When pressing the corresponding key
(Ref. Fig. 007)
a test is generated and taken into account by the GPCU. The
test request is transmitted by the discrete input signal
from the CFDIU.
Test logic:
- ground signal for 500 ms + or - 10 percent = request for
test,
- open circuit = no test.
EFF :
ALL 24-41-00
Page 20
Nov 01/10
R
SYR
Reading of Class 3 Faults on MCDU
Figure 007
EFF :
ALL 24-41-00
Page 21
May 01/98
SYR
NOTE : The results remain displayed on the MCDU display
____
unit until the key adjacent to the RETURN line is
pressed.
c
_ Class 3 faults
When pressing the corresponding key
(Ref. Fig. 007)
the class III faults occured during the current flight are
displayed (see TSM manual).
EFF :
ALL 24-41-00
Page 22
Aug 01/11
SYR
AC EXTERNAL POWER CONTROL - MAINTENANCE PRACTICES
_________________________________________________
TASK 24-41-00-861-002
WARNING : MAKE SURE THAT ALL THE CIRCUITS IN MAINTENANCE ARE ISOLATED BEFORE
_______
YOU SUPPLY ELECTRICAL POWER TO THE AIRCRAFT.
CAUTION : DO NOT USE A GROUND POWER UNIT WITH A CAPACITY LESS THAN 90 KVA. IF
_______
YOU USE A LESS POWERFUL UNIT:
- AN OVERLOAD OF THE GROUND POWER UNIT COULD OCCUR
- IT COULD BE NECESSARY TO RESET MANY COMPUTERS ON THE AIRCRAFT.
1. __________________
Reason for the Job
NOTE : There are alternative methods for this procedure. This task gives one
____
of the methods. For the other methods, refer to the other tasks in
this page block.
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
EFF :
ALL 24-41-00
Page 201
Aug 01/11
SYR
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
Subtask 24-41-00-860-050
Subtask 24-41-00-010-050
B. Get Access
(1) Open the access door 121AL to get access to the external power
receptacle and the panel 108VU.
Subtask 24-41-00-480-050
(1) Attach the CABLE HOLDING STRAP (98A24403000000) to the feeder cable.
(2) Connect the snap hook of the cable holding strap to the fitting on
the aircraft structure.
EFF :
ALL 24-41-00
Page 202
Aug 01/11
R
SYR
External Power Receptacle - Location
Figure 201/TASK 24-41-00-991-001
EFF :
ALL 24-41-00
Page 203
May 01/98
SYR
Subtask 24-41-00-420-050
WARNING : BEFORE YOU CONNECT THE GROUND POWER UNIT TO THE EXTERNAL POWER
_______
RECEPTACLE OF THE AIRCRAFT, MAKE SURE THAT THE EXTERNAL
ELECTRICAL POWER SUPPLY IS NOT ENERGIZED. IF IT IS ENERGIZED,
DANGEROUS ARCING CAN OCCUR.
CAUTION : MAKE SURE THAT THE CABLE STRAP SUPPORTS ALL THE WEIGHT OF THE
_______
CABLE WHEN THE CONNECTOR IS CONNECTED. THIS PREVENTS DAMAGE TO
THE EXTERNAL POWER RECEPTACLE.
CAUTION : BEFORE YOU CONNECT THE GROUND POWER UNIT TO THE AIRCRAFT, MAKE
_______
SURE THAT THERE ARE NO FOREIGN OBJECTS OR FLUID IN THE EXTERNAL
POWER RECEPTACLE OR THE GPU CONNECTOR. FOREIGN OBJECTS AND
FLUID CAN CAUSE AN OVERHEAT AND/OR DAMAGE TO EQUIPMENT.
R (1) Examine the external power-supply cable and the external power
R receptacle before you do the connection.
R (a) If you find damage or if the pins are not aligned correctly:
R - Replace the external power receptacle (Ref. TASK 24-41-51-000-
R 001) and (Ref. TASK 24-41-51-400-001).
R
R (3) Connect the connector of the ground power unit to the external
receptacle of the aircraft.
EFF :
ALL 24-41-00
Page 204
Aug 01/11
SYR
4. Procedure
_________
Subtask 24-41-00-861-051
(2) On the overhead CTL and IND panel 22VU, make sure that:
- The BLOWER and EXTRACT pushbutton switches are pushed.
WARNING : BEFORE YOU START THE GROUND POWER UNIT, MAKE SURE THAT THE
_______
CONNECTOR OF THE GROUND POWER UNIT IS CORRECTLY CONNECTED
TO THE EXTERNAL POWER RECEPTACLE. THERE IS A RISK OF ARCING
IF THE CONNECTOR IS NOT CORRECTLY CONNECTED.
(a) Obey the instructions given with the ground power unit and start
the ground power unit.
(5) On the panel 35VU, push the EXT PWR pushbutton switch:
- The AVAIL legend goes off.
R
EFF :
ALL 24-41-00
Page 205
Aug 01/11
SYR
(7) On the panel 22VU, make sure that the FAULT legend of the BLOWER and
EXTRACT pushbutton switches is off.
(8) On the panel 35VU, push the BAT1 and BAT2 pushbutton switches:
- The OFF legends go off.
(9) Do the EIS start procedure (Upper ECAM DU and lower ECAM DU only)
(Ref. TASK 31-60-00-860-001).
(a) On the ECAM control panel, push the ELEC key (on the lower ECAM
DU, the ELEC page comes into view).
(b) On the ELEC page, make sure that these EXT PWR parameters are
correct:
- AC V = 115 + or - 5V,
- FRQ HZ = 400 + or - 10HZ.
Subtask 24-41-00-861-051-A
(2) On the overhead CTL and IND panel 22VU, make sure that:
- The BLOWER and EXTRACT pushbutton switches are pushed.
(3) Obey the instructions given with the ground power unit and start the
ground power unit.
EFF :
ALL 24-41-00
Page 206
Aug 01/11
R
SYR
(5) On the panel 35VU, push the EXT PWR pushbutton switch:
- The AVAIL legend goes off.
(7) On the panel 22VU, make sure that the FAULT legend of the BLOWER and
EXTRACT pushbutton switches is off.
(8) On the panel 35VU, push the BAT1 and BAT2 pushbutton switches:
- The OFF legends go off.
(9) Do the EIS start procedure (Upper ECAM DU and lower ECAM DU only)
(Ref. TASK 31-60-00-860-001).
(a) On the ECAM control panel, push the ELEC key (on the lower ECAM
DU, the ELEC page comes into view).
(b) On the ELEC page, make sure that these EXT PWR parameters are
correct:
- AC V = 115 + or - 5V,
- FRQ HZ = 400 + or - 10HZ.
EFF :
003-099, 24-41-00
Page 207
Aug 01/11
R
SYR
**ON A/C ALL
TASK 24-41-00-861-002- 01
WARNING : MAKE SURE THAT ALL THE CIRCUITS IN MAINTENANCE ARE ISOLATED BEFORE
_______
YOU SUPPLY ELECTRICAL POWER TO THE AIRCRAFT.
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
A. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
Subtask 24-41-00-860-051
EFF :
ALL 24-41-00
Page 208
May 01/07
R
SYR
(3) On the overhead CTL and IND panel 22VU, make sure that BLOWER and
EXTRACT pushbutton switches are pushed.
4. Procedure
_________
Subtask 24-41-00-861-052
(2) Do the EIS start procedure (Upper ECAM DU and lower ECAM DU only)
(Ref. TASK 31-60-00-860-001).
(3) On the ECAM control panel, push the ELEC key (on the lower ECAM DU,
the ELEC page comes into view).
(4) Make sure that the APU energizes the aircraft electrical circuit
correctly.
EFF :
ALL 24-41-00
Page 209
May 01/07
R
SYR
TASK 24-41-00-861-002- 02
WARNING : MAKE SURE THAT ALL THE CIRCUITS IN MAINTENANCE ARE ISOLATED BEFORE
_______
YOU SUPPLY ELECTRICAL POWER TO THE AIRCRAFT.
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
A. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
Subtask 24-41-00-860-052
R
EFF :
ALL 24-41-00
Page 210
May 01/07
SYR
(2) Do not energize the aircraft electrical circuits from the external
power.
(3) Energize the aircraft electrical circuits from APU (Ref. TASK 24-41-
00-861-002).
4. Procedure
_________
Subtask 24-41-00-861-053
(1) Start the engine 1(2) with the automatic procedure (Ref. TASK 71-00-
00-710-043):
- on the ELEC panel 35VU, the FAULT legend of the GEN 1(2) pushbutton
switch goes off.
(2) Do the EIS start procedure (Upper ECAM DU and lower ECAM DU only)
(Ref. TASK 31-60-00-860-001).
(3) On the ECAM control panel, push the ELEC key (on the lower ECAM DU,
the ELEC page comes into view).
(5) On the ELEC panel 35VU, release the APU GEN pushbutton switch:
- the OFF legend of the APU GEN pushbutton switch comes on.
EFF :
ALL 24-41-00
Page 211
May 01/01
R
SYR
TASK 24-41-00-862-002
De-energize the Aircraft Electrical Circuits Supplied from the External Power
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
A. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
Subtask 24-41-00-869-067
A. Not Applicable
4. Procedure
_________
Subtask 24-41-00-862-051
(1) On the ELEC panel 35VU, push and release the BAT1 and BAT2 pushbutton
switches:
- the OFF legends come on.
(2) On the panel 35VU, push the EXT PWR pushbutton switch:
- the ON legend goes off,
- the AVAIL legend comes on.
EFF :
ALL 24-41-00
Page 212
May 01/01
R
SYR
(b) On the panel 108VU, the EXT PWR/NOT IN USE indicator light comes
on.
Subtask 24-41-00-862-051-A
(1) On the ELEC panel 35VU, push and release the BAT1 and BAT2 pushbutton
switches:
- the OFF legends come on.
(2) On the panel 35VU, push the EXT PWR pushbutton switch:
- the ON legend goes off,
- the AVAIL legend comes on.
(b) On the panel 108VU, the EXT PWR/NOT IN USE indicator light comes
on.
5. Close-up
________
Subtask 24-41-00-080-051
A. Obey the instructions given with the ground power unit and stop the
ground power unit.
- On the panel 35VU, all the pushbutton switch legends are off.
- On the panel 108VU, all the lights are off.
EFF :
ALL 24-41-00
Page 213
May 01/01
R
SYR
Subtask 24-41-00-020-050
(1) Disconnect the connector of the ground power unit from the external
power receptacle.
Subtask 24-41-00-080-050
C. Remove the ground support and maintenance equipment, the special and
standard tools and all other items.
(1) Disconnect the snap hook from the fitting on the aircraft structure.
Subtask 24-41-00-410-051
D. Close Access
EFF :
ALL 24-41-00
Page 214
May 01/01
R
SYR
TASK 24-41-00-862-002- 01
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
A. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
Subtask 24-41-00-869-068
(1) On the panel 35VU, make sure that the APU GEN pushbutton switch is
pushed (OFF legend is off).
4. Procedure
_________
Subtask 24-41-00-862-052
(1) On the ELEC panel 35VU, release the APU GEN pushbutton switch.
EFF :
ALL 24-41-00
Page 215
Nov 01/04
SYR
5. Close-up
________
R Subtask 24-41-00-860-053
EFF :
ALL 24-41-00
Page 216
Nov 01/04
SYR
R
TASK 24-41-00-862-002- 02
De-energize the Aircraft Electrical Circuits Supplied from the Engine 1(2)
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
A. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
Subtask 24-41-00-869-069
A. Not Applicable
4. Procedure
_________
Subtask 24-41-00-862-053
(2) On the panel 35VU, make sure that the FAULT legend of the GEN 1(2)
pushbutton switch comes on.
EFF :
ALL 24-41-00
Page 217
Nov 01/01
SYR
5. Close-up
________
Subtask 24-41-00-860-054
(1) On the panel 35VU, release the BAT1 and BAT2 pushbutton switches :
- the FAULT legends of the GEN1 and GEN2 pushbutton switches go off.
EFF :
ALL 24-41-00
Page 218
May 01/01
SYR
AC EXTERNAL POWER CONTROL - DEACTIVATION/REACTIVATION
_____________________________________________________
TASK 24-41-00-040-001
1. __________________
Reason for the Job
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
B. Consumable Materials
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
EFF :
ALL 24-41-00
Page 401
May 01/11
SYR
C. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
Subtask 24-41-00-860-062
A. Safety Precautions
(1) Make sure that the ground power source is not connected to the
aircraft external-power receptacle.
Subtask 24-41-00-010-053
B. Get Access
EFF :
ALL 24-41-00
Page 402
May 01/11
R
SYR
4. Procedure
_________
Subtask 24-41-00-210-051
1
_ If there is overheat damage:
1
_ Make sure that there are no cracks on the external power
receptacle and on the adjacent structure.
1
_ If the aircraft structure is damaged:
- Repair it (Ref. SRM 531113).
EFF :
ALL 24-41-00
Page 403
May 01/11
SYR
External Power Receptacle
Figure 401/TASK 24-41-00-991-002
EFF :
ALL 24-41-00
Page 404
May 01/11
R
SYR
(2) Examine the external-power receptacle door (121AL).
1
_ If the external-power receptacle door (121AL) does not operate
correctly:
- Remove the external-power receptacle door (121AL) (Ref. TASK
52-42-12-000-001). Refer to CDL 52-7: External power ground
connection access door assy, or
- Replace the external-power receptacle door (121AL)
(Ref. TASK 52-42-12-000-001) and (Ref. TASK 52-42-12-400-
001).
5. Close-up
________
Subtask 24-41-00-410-053
A. Close Access
Subtask 24-41-00-942-051
EFF :
ALL 24-41-00
Page 405
May 01/11
R
SYR
AC EXTERNAL POWER CONTROL - ADJUSTMENT/TEST
___________________________________________
R TASK 24-41-00-740-004
R 1. __________________
Reason for the Job
R 2. ______________________
Job Set-up Information
R A. Referenced Information
R -------------------------------------------------------------------------------
R REFERENCE DESIGNATION
R -------------------------------------------------------------------------------
R 3. __________
Job Set-up
R Subtask 24-41-00-860-063
R (2) In the cockpit, on the overhead ELEC panel 35VU, make sure that the
R GEN 1 and GEN 2 pushbutton switches are in the ON position (FAULT
R legend on).
R (3) On the MCDU, get access to the SYSTEM REPORT/TEST page of the ELEC
R system (Ref. TASK 31-32-00-860-004).
EFF :
ALL 24-41-00
Page 501
Aug 01/11
SYR
R Subtask 24-41-00-865-054
R -------------------------------------------------------------------------------
R PANEL DESIGNATION IDENT. LOCATION
R -------------------------------------------------------------------------------
R 122VU ELEC/GCU/2 2XU2 T27
R 122VU ELEC/GCU/1 2XU1 T26
R 122VU ELEC/APU/GCU 6XS Y25
R 122VU ELEC/GPCU 7XG Y24
R 123VU GND/PWR/PROT 2XG AB07
R 4. Procedure
_________
R Subtask 24-41-00-710-069
R A. Test of the GPCU from the Centralized Fault Display System (CFDS)
R -------------------------------------------------------------------------------
R | ACTION | RESULT |
R -------------------------------------------------------------------------------
R - Push the GEN 1 and GEN 2 - The FAULT legend of the GEN 1 and GEN
R pushbutton switches. 2 pushbutton switches comes on.
R 4. On the MCDU:
R - Push the line key adjacent to
R the RETURN indication until the
R AC GEN page comes into view.
EFF :
ALL 24-41-00
Page 502
Aug 01/11
SYR
R Subtask 24-41-00-710-070
R -------------------------------------------------------------------------------
R | ACTION | RESULT |
R -------------------------------------------------------------------------------
R 5. Close-up
________
R Subtask 24-41-00-860-064
R (1) On the MCDU, push the line key adjacent to the RETURN indication
R until the CFDS menu page comes into view.
EFF :
ALL 24-41-00
Page 503
Aug 01/11
SYR
R CONTROL UNIT - GROUND POWER (GPCU OR GAPCU) (1XG) - REMOVAL/INSTALLATION
________________________________________________________________________
TASK 24-41-34-000-001
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
Subtask 24-41-34-010-050
A. Get Access
R (1) Put an ACCESS PLATFORM 2M (6 FT) - ADJUSTABLE at the access door 811.
EFF :
ALL 24-41-34
Page 401
May 01/11
SYR
R (3) Put an ACCESS PLATFORM 1M (3 FT)-ADJUSTABLE at the access door 121AL.
Subtask 24-41-34-941-051
B. Safety Precautions
(1) Make sure that the external power connector is not connected to the
aircraft receptacle.
(2) Put warning notice(s) on the access door 121AL to tell persons not to
use the external power receptacle.
(3) In the cockpit, on the overhead ELEC panel 35VU, release these
pushbutton switches:
- BAT 1, BAT 2,
- APU GEN,
- GEN 1, GEN 2,
- EXT PWR.
(4) In the cockpit, put warning notice(s) to tell persons not to operate
the pushbutton switches on these overhead panels:
- 21VU (EMER ELEC PWR),
- 35VU (ELEC).
(5) In the cockpit, on the APU section of the overhead panel 25VU, put
warning notice(s) to tell persons not to start the APU.
Subtask 24-41-34-865-056
-------------------------------------------------------------------------------
PANEL DESIGNATION IDENT. LOCATION
-------------------------------------------------------------------------------
122VU ELEC/EXT PWR/CTL 11XG X29
122VU ELEC/GPCU 7XG Y24
123VU GND/PWR/PROT 2XG AB07
EFF :
ALL 24-41-34
Page 402
May 01/11
SYR
4. Procedure
_________
Subtask 24-41-34-020-050
(2) Lower the two knurled nuts (1) to release the two studs (2).
(3) Carefully pull on the handle (3) of the GPCU (4) until the fixed
connector (5) is disconnected.
EFF :
ALL 24-41-34
Page 403
May 01/11
SYR
Ground Power Control Unit (GPCU)
Figure 401/TASK 24-41-34-991-001
EFF :
ALL 24-41-34
Page 404
May 01/98
SYR
TASK 24-41-34-400-001
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
Subtask 24-41-34-860-050
EFF :
ALL 24-41-34
Page 405
May 01/11
SYR
R (3) Make sure that the ACCESS PLATFORM 1M (3 FT)-ADJUSTABLE is in
R position at the access door 121AL.
(5) Make sure that the external power connector is not connected to the
aircraft receptacle.
(6) Make sure that a warning notice is in position on the access door
121AL to tell persons not to use the external power receptacle.
(7) In the cockpit, on the overhead ELEC panel 35VU, make sure that these
pushbutton switches are released:
- BAT 1, BAT 2,
- APU GEN,
- GEN 1, GEN 2,
- EXT PWR.
(9) In the cockpit, on the APU section of the overhead panel 25VU, make
sure that a warning notice is in position to tell persons not to
start the APU.
Subtask 24-41-34-865-057
B. Make sure that this(these) circuit breaker(s) is(are) open, safetied and
tagged
-------------------------------------------------------------------------------
PANEL DESIGNATION IDENT. LOCATION
-------------------------------------------------------------------------------
122VU ELEC/EXT PWR/CTL 11XG X29
122VU ELEC/GPCU 7XG Y24
123VU GND/PWR/PROT 2XG AB07
EFF :
ALL 24-41-34
Page 406
May 01/11
SYR
4. Procedure
_________
Subtask 24-41-34-420-050
(2) Make sure that the electrical connectors are clean and in the correct
condition.
(6) Slowly push the GPCU until it connects with the fixed connector (5).
(7) Lift the 2 knurled nuts (1) over the 2 studs (2).
Subtask 24-41-34-865-058
B. Remove the safety clip(s) and the tag(s) and close this(these) circuit
breaker(s):
7XG, 11XG, 2XG
Subtask 24-41-34-710-050
(1) Do an operational test of the GPCU with the CFDS (Ref. TASK 24-41-00-
740-002).
EFF :
ALL 24-41-34
Page 407
May 01/11
SYR
5. Close-up
________
Subtask 24-41-34-410-050
A. Close Access
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
EFF :
ALL 24-41-34
Page 408
May 01/98
SYR
RECEPTACLE - EXTERNAL POWER (20XG) - REMOVAL/INSTALLATION
_________________________________________________________
TASK 24-41-51-000-001
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
Subtask 24-41-51-010-050
A. Get Access
R (1) Put an ACCESS PLATFORM 2M (6 FT) - ADJUSTABLE at the access door 811.
EFF :
ALL 24-41-51
Page 401
May 01/11
SYR
(4) Open the access door 121AL.
Subtask 24-41-51-941-050
B. Safety Precautions
(1) Make sure that the external power connector is not connected to the
aircraft receptacle.
(2) Put warning notice(s) on the access door 121AL to tell persons not to
use the external power receptacle.
(3) In the cockpit, on the overhead ELEC panel 35VU, release these
pushbutton switches:
- BAT 1, BAT 2,
- APU GEN,
- GEN 1, GEN 2,
- EXT PWR.
(4) In the cockpit, put warning notice(s) to tell persons not to operate
the pushbutton switches on these overhead panels:
- 21VU (EMER ELEC PWR),
- 35VU (ELEC).
(5) In the cockpit, on the APU section of the overhead panel 25VU, put
warning notice(s) to tell persons not to start the APU.
4. Procedure
_________
Subtask 24-41-51-020-050
CAUTION : MAKE MATCH MARKS ON ALL THE ELECTRICAL WIRES BEFORE YOU
_______
DISCONNECT THEM. INCORRECT CONNECTION OF WIRES WILL CAUSE
DAMAGE TO EQUIPMENT.
(2) Remove the 4 nuts (14) and the washers (15, 13).
EFF :
ALL 24-41-51
Page 402
May 01/98
SYR
External Power Receptacle
Figure 401/TASK 24-41-51-991-001
EFF :
ALL 24-41-51
Page 403
May 01/98
SYR
(5) Remove the nuts (3) and the washers (4).
EFF :
ALL 24-41-51
Page 404
May 01/98
SYR
TASK 24-41-51-400-001
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
B. Expendable Parts
-------------------------------------------------------------------------------
FIG.ITEM |DESIGNATION |IPC-CSN
-------------------------------------------------------------------------------
C. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
EFF :
ALL 24-41-51
Page 405
May 01/11
SYR
3. __________
Job Set-up
Subtask 24-41-51-860-050
(5) Make sure that the external power connector is not connected to the
aircraft receptacle.
(6) Make sure that a warning notice is in position on the access door
121AL to tell persons not to use the external power receptacle.
(7) In the cockpit, on the overhead ELEC panel 35VU, make sure that these
pushbutton switches are released:
- BAT 1, BAT 2,
- APU GEN,
- GEN 1, GEN 2,
- EXT PWR.
(8) In the cockpit, make sure that warning notices are in position to
tell persons not to operate the pushbutton switches on these overhead
panels:
- 21VU (EMER ELEC PWR),
- 35VU (ELEC).
(9) In the cockpit, on the APU section of the overhead panel 25VU, make
sure that a warning notice is in position to tell persons not to
start the APU.
EFF :
ALL 24-41-51
Page 406
May 01/11
SYR
4. Procedure
_________
Subtask 24-41-51-420-050
CAUTION : REFER TO THE MATCH MARKS MADE DURING THE REMOVAL WHEN YOU
_______
CONNECT THE ELECTRICAL WIRES.
INCORRECT CONNECTION OF THE WIRES WILL CAUSE DAMAGE TO
EQUIPMENT.
(3) Install the washers (11) and the studs (12) on the external power
R receptacle (10), then tighten the studs (Ref. TASK 20-21-15-912-001)
R (Ref. ESPM 204593).
R (4) Install the washers (6) and the 3 screws (2) and then tighten the
R screws (Ref. TASK 20-21-15-912-001) (Ref. ESPM 204593).
R (6) Install washers (4) and the nuts (3) and then tighten the nuts
R (Ref. TASK 20-21-15-912-001) (Ref. ESPM 204593).
R (8) Install the washers (13, 15) and the nuts (14) and then tighten the
R nuts (Ref. TASK 20-21-15-912-001) (Ref. ESPM 204593).
Subtask 24-41-51-710-050
(1) Make sure that the aircraft electrical circuits are correctly
energized with the external power supply (Ref. TASK 24-41-00-861-
002).
EFF :
ALL 24-41-51
Page 407
May 01/11
SYR
5. Close-up
________
Subtask 24-41-51-862-050
Subtask 24-41-51-410-050
B. Close Access
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
EFF :
ALL 24-41-51
Page 408
May 01/11
R
SYR
CONTACTOR (3XG) - REMOVAL/INSTALLATION
______________________________________
TASK 24-41-55-000-001
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
Subtask 24-41-55-010-050
A. Get Access
(2) In the cokpit, remove the access panel (8) from the bottom left side
of the panel 120VU.
EFF :
ALL 24-41-55
Page 401
May 01/11
SYR
R (3) Put an ACCESS PLATFORM 1M (3 FT)-ADJUSTABLE at the access door 121AL.
Subtask 24-41-55-941-050
B. Safety Precautions
(1) Make sure that the external power connector is not connected to the
aircraft receptacle.
(2) Put warning notice(s) on the access door 121AL to tell persons not to
use the external power receptacle.
(3) In the cockpit, on the overhead ELEC panel 35VU, release these
pushbutton switches:
- BAT 1, BAT 2,
- APU GEN,
- GEN 1, GEN 2,
- EXT PWR.
(4) In the cockpit, put warning notice(s) to tell persons not to operate
the pushbutton switches on these overhead panels:
- 21VU (EMER ELEC PWR),
- 35VU (ELEC).
(5) In the cockpit, on the APU section of the overhead panel 25VU, put
warning notice(s) to tell persons not to start the APU.
4. Procedure
_________
Subtask 24-41-55-020-050
CAUTION : REMOVE THE CONTACTOR ONLY AND NOT THE BASE OR THE MODULE WHERE
_______
THE WIRES ARE CONNECTED.
EFF :
ALL 24-41-55
Page 402
May 01/11
SYR
R Contactor
Figure 401/TASK 24-41-55-991-001
EFF :
ALL 24-41-55
Page 403
Nov 01/04
SYR
(3) Loosen the 6 captive screws (2).
NOTE : Do not remove the captive screws (2) and the spring washers
____
from the contactor (3).
R Subtask 24-41-55-020-051
R CAUTION : MAKE MATCH MARKS ON ALL THE ELECTRICAL WIRES BEFORE YOU
_______
R DISCONNECT THEM. INCORRECT CONNECTION OF WIRES WILL CAUSE
R DAMAGE TO EQUIPMENT.
R NOTE : The removal of the base is necessary only if the base is damaged.
____
R (5) Remove the jumpers (17) from the base (6) and from the adjacent
R bases.
R (6) Remove the four screws (19) and the four washers (18).
EFF :
ALL 24-41-55
Page 404
Nov 01/04
SYR
TASK 24-41-55-400-001
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
EFF :
ALL 24-41-55
Page 405
May 01/11
SYR
3. __________
Job Set-up
Subtask 24-41-55-860-050
(1) In the cockpit, make sure that the third occupant seat is removed
(Ref. TASK 25-11-41-000-001).
(2) In the cockpit, make sure that the access panel (8) is removed.
(5) Make sure that the external power connector is not connected to the
aircraft receptacle.
(6) Make sure that a warning notice is in position on the access door
121AL to tell persons not to use the external power receptacle.
(7) In the cockpit, on the overhead ELEC panel 35VU, make sure that these
pushbutton switches are released:
- BAT 1, BAT 2,
- APU GEN,
- GEN 1, GEN 2,
- EXT PWR.
(9) In the cockpit, on the APU section of the overhead panel 25VU, make
sure that a warning notice is in position to tell persons not to
start the APU.
EFF :
ALL 24-41-55
Page 406
May 01/11
SYR
4. Procedure
_________
Subtask 24-41-55-420-051
CAUTION : REFER TO THE MATCH MARKS MADE DURING THE REMOVAL WHEN YOU
_______
CONNECT THE ELECTRICAL WIRES.
INCORRECT CONNECTION OF THE WIRES WILL CAUSE DAMAGE TO
EQUIPMENT.
(2) Install the four screws (19) and washers (18) and tighten them.
(3) Make sure that the electrical cables (14) are clean and in correct
condition.
(5) Install the nuts (12) and the washers (13) and tighten them.
(b) Install the screws (10) and the washers (9) and tighten them.
(7) Install the jumpers (17) between the base (6) and the adjacent bases.
(8) Install the washers (15) and the nuts (16) and tighten them
(Ref. TASK 20-21-15-912-001).
Subtask 24-41-55-420-050
(1) Install the contactor (3) on the 6 tapped barrels (5) of the
contactor base (6).
(2) TORQUE the six captive screws (2) to between 0.50 and 0.60 m.daN
(44.24 and 53.09 lbf.in).
EFF :
ALL 24-41-55
Page 407
May 01/11
SYR
(4) Make sure that the electrical connectors are clean and in the correct
condition.
Subtask 24-41-55-710-050
(1) Make sure that the aircraft electrical circuits are correctly
energized with the external power supply (Ref. TASK 24-41-00-861-
002).
5. Close-up
________
Subtask 24-41-55-862-050
Subtask 24-41-55-410-050
B. Close Access
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
EFF :
ALL 24-41-55
Page 408
Nov 01/04
SYR
AC GROUND SERVICE BUS CONTROL - DESCRIPTION AND OPERATION
_________________________________________________________
1. _______
General
(Ref. Fig. 001)
AC ground/flight distribution network can be supplied:
- either normally from the aircraft network,
- or directly by the ground power unit upstream of the external power
contactor, in ground service configuration.
In ground service configuration this network can be supplied without
energizing the whole aircraft network.
2. Component
__________________
Location
(Ref. Fig. 002)
-------------------------------------------------------------------------------
FIN | FUNCTIONAL DESIGNATION | PANEL|ZONE|ACCESS | ATA
| | | | DOOR | REF.
-------------------------------------------------------------------------------
12XX CNTOR-AC GND SVCE SPLY 120VU 212 831 24-42-55
14XX CNTOR-AC & DC GND SVCE SPLY 120VU 212 831 24-42-55
-------------------------------------------------------------------------------
FIN I FUNCTIONAL DESIGNATION I PANELIZONEIACCESS I ATA
I I I I DOOR I REF.
-------------------------------------------------------------------------------
5XX SW-MAINT BUS 2000VU 220 841
3. System
__________________
Description
The AC ground/flight network comprises the sub-busbars:
- 212XP,
- 214XP,
- 216XP-C.
4. Operation/Control
________________________________
and Indicating
(Ref. Fig. 003)
Supply selection for ground service network is controlled from panel 2000VU,
MAINT BUS switch:
- one position corresponds to the normal supply configuration,
- the other position controls the ground service network supply from the
ground power unit, if available. This position is electromagnetically
latched.
The switch returns to the normal position in case of voluntary or automatic
(GPCU protections) unlatching of the ground power unit.
The normal supply configuration takes precedence over the ground service
configuration.
EFF :
ALL 24-42-00
Page 1
May 01/98
SYR
NOTE : Overheat of TR2 results in the automatic unlatching of MAINT BUS
____
switch. This entails the cut-off of the ground distribution network.
EFF :
ALL 24-42-00
Page 2
May 01/98
SYR
AC Ground Service Network - Block Diagram
Figure 001
EFF :
ALL 24-42-00
Page 3/4
May 01/98
SYR
AC Ground Service Bus - Component Location
Figure 002
EFF :
ALL 24-42-00
Page 5
May 01/98
SYR
AC Ground Service Bus Control - Schematic Diagram
Figure 003
EFF :
ALL 24-42-00
Page 6
May 01/98
SYR
AC GROUND SERVICE BUS CONTROL - MAINTENANCE PRACTICES
_____________________________________________________
TASK 24-42-00-861-001
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
Subtask 24-42-00-010-050
A. Get Access
(1) Open the door 121AL to have access to the external power receptacle
and panel 108VU.
Subtask 24-42-00-480-050
(1) Make sure that the CABLE HOLDING STRAP (98A24403000000) with the snap
hook is in position on the feeder of the ground power unit.
(2) Attach the feeder to the support with the snap hook.
EFF :
ALL 24-42-00
Page 201
Feb 01/99
SYR
Subtask 24-42-00-420-050
CAUTION : MAKE SURE THAT THE CABLE STRAP SUPPORTS ALL THE WEIGHT OF THE
_______
CABLE WHEN THE CONNECTOR IS CONNECTED. THIS PREVENTS DAMAGE TO
THE EXTERNAL POWER RECEPTACLE.
R NOTE : Examine the external power supply-cable and the external power
____
R receptacle before you do the connection.
R If you find corrosion or damage, or if the pins are not aligned
R correctly, replace the external power receptacle (Ref. TASK 24-41-
R 51-000-001) and (Ref. TASK 24-41-51-400-001).
(1) Connect the connector of the ground power unit to the external power
receptacle of the aircraft (Ref. TASK 24-41-00-861-002).
4. Procedure
_________
Subtask 24-42-00-861-054
(1) On the ELEC panel 35VU, make sure that all pushbutton switches are
released except BUS TIE and AC ESS FEED pushbutton switches.
(2) Start the ground power unit (obey the special instructions of the
ground power unit).
(4) On the front circuit breaker panel 2000VU which is in the middle of
the cabin ceiling at the level of the FWD passenger/crew door, put
the MAINT BUS switch in the ON position.
NOTE : The ground MECH/CALL horn which is in the nose gear well
____
operates when the BAT 1 and/or BAT 2 pushbutton switch(es) on
the ELEC panel 35VU is(are) pushed.
(5) On the panel 108VU, the EXT PWR/NOT IN USE indicator light goes off.
This shows that the power supply from the ground service network is
correct.
EFF :
ALL 24-42-00
Page 202
Feb 01/99
SYR
TASK 24-42-00-862-001
De-energize the Ground Service Network Supplied from the External Power
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
Not Applicable
3. __________
Job Set-up
Subtask 24-42-00-869-058
A. Not Applicable
4. Procedure
_________
Subtask 24-42-00-862-054
(1) On the front circuit breaker panel 2000VU which is in the middle of
the cabin ceiling at the level of the FWD passenger/crew door, put
the MAINT BUS switch in the OFF position.
(2) On the panel 108VU, the EXT PWR/NOT IN USE indicator light comes on.
This shows that the ground service network is de-energized correctly.
5. Close-up
________
Subtask 24-42-00-080-050
A. Obey the instructions given with the ground power and stop the ground
power unit:
- on the panel 35VU, the legends of all the pushbutton switches are off,
- on the panel 108VU, all the lights are off.
Subtask 24-42-00-020-050
EFF :
ALL 24-42-00
Page 203
May 01/98
SYR
(1) Disconnect the connector of the ground power unit and release the
snap hook from the support.
Subtask 24-42-00-410-052
C. Close Access
EFF :
ALL 24-42-00
Page 204
May 01/98
SYR
CONTACTOR (12XX,14XX) - REMOVAL/INSTALLATION
____________________________________________
TASK 24-42-55-000-001
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
Subtask 24-42-55-010-050
A. Get Access
EFF :
ALL 24-42-55
Page 401
May 01/11
SYR
Subtask 24-42-55-941-050
B. Safety Precautions
(1) Make sure that the external power connector is not connected to the
aircraft EXT PWR receptacle.
(2) Put warning notice(s) in position on the access door 121AL to tell
persons not to connect the external power connector to the aircraft
EXT PWR receptacle.
(3) In the cockpit, on the ELEC panel 35VU, make sure that these
pushbutton switches are released:
- BAT 1, BAT 2,
- APU GEN,
- GEN 1, GEN 2,
- EXT PWR.
(4) In the cockpit, put warning notice(s) in position to tell persons not
to operate the pushbutton switches on these overhead panels:
- 21VU (EMER ELEC PWR section),
- 25VU (APU section),
- 35VU (ELEC).
Subtask 24-42-55-865-050
-------------------------------------------------------------------------------
PANEL DESIGNATION IDENT. LOCATION
-------------------------------------------------------------------------------
122VU ELEC/EXT PWR/LT CLT/NOT IN/USE 6XG X30
4. Procedure
_________
Subtask 24-42-55-020-050
CAUTION : REMOVE THE CONTACTOR ONLY AND NOT THE BASE OR THE MODULE WHERE
_______
THE WIRES ARE CONNECTED.
EFF :
ALL 24-42-55
Page 402
May 01/11
R
SYR
R Contactors
Figure 401/TASK 24-42-55-991-001
EFF :
ALL 24-42-55
Page 403
Nov 01/08
SYR
R (2) Put blanking caps on the disconnected electrical connector (10) and
R the electrical receptacle (9).
R NOTE : Do not remove the captive screws (8) and the spring washers
____
R from the contactor (11).
R Subtask 24-42-55-020-052
R CAUTION : MAKE MATCH MARKS ON ALL THE ELECTRICAL WIRES BEFORE YOU
_______
R DISCONNECT THEM. INCORRECT CONNECTION OF WIRES WILL CAUSE
R DAMAGE TO EQUIPMENT.
R (2) Disconnect the cables (5) from the contactor base (1).
R (4) Remove the jumper (14) from the contactor base (1) and from the
R adjacent contactor base.
EFF :
ALL 24-42-55
Page 404
Nov 01/08
SYR
TASK 24-42-55-400-001
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
EFF :
ALL 24-42-55
Page 405
May 01/11
SYR
3. __________
Job Set-up
Subtask 24-42-55-860-050
(1) In the cockpit, make sure that the third occupant seat is removed
(Ref. TASK 25-11-41-000-001).
(2) In the cockpit, in the L lower section of the panel 120VU, make sure
that the access panel of the panel 123VU is removed.
(5) Make sure that the external power connector is not connected to the
aircraft receptacle.
(6) Make sure that a warning notice is in position on the access door
121AL to tell persons not to use the external power receptacle.
(7) In the cockpit, on the overhead ELEC panel 35VU, make sure that these
pushbutton switches are released:
- BAT 1, BAT 2,
- APU GEN,
- GEN 1, GEN 2,
- EXT PWR.
(9) In the cockpit, on the APU section of the overhead panel 25VU, make
sure that a warning notice is in position to tell persons not to
start the APU.
EFF :
ALL 24-42-55
Page 406
May 01/11
SYR
Subtask 24-42-55-865-051
B. Make sure that this(these) circuit breaker(s) is(are) open, safetied and
tagged
-------------------------------------------------------------------------------
PANEL DESIGNATION IDENT. LOCATION
-------------------------------------------------------------------------------
122VU ELEC/EXT PWR/LT CLT/NOT IN/USE 6XG X30
4. Procedure
_________
R Subtask 24-42-55-420-052
R CAUTION : REFER TO THE MATCH MARKS MADE DURING THE REMOVAL WHEN YOU
_______
R CONNECT THE ELECTRICAL WIRES.
R INCORRECT CONNECTION OF THE WIRES WILL CAUSE DAMAGE TO
R EQUIPMENT.
R (2) Install the washers (3) and the screws (4) and tighten them.
R (3) Make sure that the electrical cables (5) are clean and in correct
R condition.
R (b) TORQUE the nuts (7) to between 0.27 and 0.3 m.daN (23.89 and
R 26.54 lbf.in).
R (5) Install the jumpers (14) between the contactor base (1) and the
R adjacent base.
R (6) Install the washers (13) and the nuts (12) and tighten them
R (Ref. TASK 20-21-15-912-001).
EFF :
ALL 24-42-55
Page 407
Nov 01/08
SYR
Subtask 24-42-55-420-050
CAUTION : MAKE SURE THAT THE CONTACTOR LOCATING PIN IS CORRECTLY ENGAGED
_______
IN ITS RECESS LOCATED IN ONE POWER TERMINAL.
THIS PREVENTS DAMAGE TO THE LOCATING PIN WHEN YOU APPLY THE
TORQUE.
(1) Install the contactor (11) on the 6 tapped barrels (2) of the
contactor base (1).
(2) TORQUE the captive screws (8) to between 13.28 and 15.93 lbf.in (0.15
and 0.18 m.daN).
(4) Make sure that the electrical connectors are clean and in the correct
condition.
Subtask 24-42-55-865-052
C. Remove the safety clip(s) and the tag(s) and close this(these) circuit
breaker(s):
6XG.
Subtask 24-42-55-710-050
D. Operational Test
5. Close-up
________
Subtask 24-42-55-862-050
EFF :
ALL 24-42-55
Page 408
May 01/10
SYR
Subtask 24-42-55-410-050
B. Close Access
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
EFF :
ALL 24-42-55
Page 409
Nov 01/08
SYR
DC GROUND SERVICE BUS CONTROL - DESCRIPTION AND OPERATION
_________________________________________________________
1. _______
General
(Ref. Fig. 001)
DC ground flight distribution network can be supplied:
- either normally from the aircraft network,
- or directly by the ground power unit upstream of the external power
contactor. This is via the TR2 in ground service configuration, without
energizing the whole aircraft network.
2. Component
__________________
Location
(Ref. Fig. 002)
-------------------------------------------------------------------------------
FIN | FUNCTIONAL DESIGNATION | PANEL|ZONE|ACCESS | ATA
| | | | DOOR | REF.
-------------------------------------------------------------------------------
3PX CNTOR-DC SVCE BUS GND SPLY 120VU 212 831 24-43-55
3. System
__________________
Description
(Ref. Fig. 001)
The DC ground/flight network comprises the following 28 VDC service busses:
- 601PP,
- 602PP.
These sub-busbars are supplied directly from the ground power unit through
the contactor 14XX via the TR2.
The contactor 14XX is controlled by the MAINT BUS control switch 5XX
located on panel 2000VU.
4. Operation/Control
________________________________
and Indicating
The operation is described in ATA Ref. 24-42-00.
NOTE : In case of TR2 overheat, the supply of the ground service network is
____
cut off.
EFF :
ALL 24-43-00
Page 1
May 01/98
SYR
INTENTIONALLY BLANK
24-43-00
Page 2
May 01/98
SYR
Ground Service Network-General
Figure 001
EFF :
ALL 24-43-00
Page 3/4
May 01/98
SYR
DC Ground Service Bus Control-Component Location
Figure 002
EFF :
ALL 24-43-00
Page 5
May 01/98
SYR
CONTACTOR (3PX) - REMOVAL/INSTALLATION
______________________________________
TASK 24-43-55-000-001
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
Subtask 24-43-55-010-050
A. Get Access
(2) In the cockpit, remove the front panel on the bottom right side of
the panel 120VU.
EFF :
ALL 24-43-55
Page 401
May 01/11
SYR
R (3) Put the ACCESS PLATFORM 1M (3 FT)-ADJUSTABLE in position at the
R access door 121AL.
Subtask 24-43-55-860-050
B. Safety Precautions
(1) Make sure that the external power connector is not connected to the
aircraft EXT PWR receptacle.
(2) Put warning notice(s) in position on the access door 121AL to tell
persons not to connect the external power connector to the EXT PWR
receptacle.
(3) In the cockpit, on the ELEC panel 35VU, make sure that these
pushbutton switches are released:
- BAT 1, BAT 2,
- APU GEN,
- GEN 1, GEN 2,
- EXT PWR.
(4) In the cockpit, put warning notice(s) in position to tell persons not
to operate the pushbutton switches on these overhead panels:
- 21VU (EMER ELEC PWR section),
- 25VU (APU section),
- 35VU (ELEC).
Subtask 24-43-55-865-050
-------------------------------------------------------------------------------
PANEL DESIGNATION IDENT. LOCATION
-------------------------------------------------------------------------------
122VU ELEC/DC SVCE/BUS/ON TR2 5PX U30
124VU SVCE/601PP/602PP/SPLY 1PX BB01
EFF :
ALL 24-43-55
Page 402
May 01/11
SYR
4. Procedure
_________
Subtask 24-43-55-020-050
CAUTION : REMOVE THE CONTACTOR ONLY AND NOT THE BASE OR THE MODULE WHERE
_______
THE WIRES ARE CONNECTED.
R (2) Put blanking caps on the disconnected electrical connector (4) and
R the electrical receptacle.
R
NOTE : Do not remove the captive screws (2) and the spring washers
____
from the contactor (3).
EFF :
ALL 24-43-55
Page 403
Nov 01/00
SYR
Contactor
Figure 401/TASK 24-43-55-991-001
EFF :
ALL 24-43-55
Page 404
May 01/98
SYR
TASK 24-43-55-400-001
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
Subtask 24-43-55-860-051
(1) Make sure that the access platform is in position at the access door
121AL.
(3) Make sure that the external power connector is not connected to the
aircraft receptacle.
EFF :
ALL 24-43-55
Page 405
May 01/10
SYR
(4) Make sure that on the access door 121AL there is a warning notice to
tell persons not to connect the external power connector.
(5) In the cockpit, on the overhead panel 35VU, make sure that these
pushbutton switches are released:
- BAT 1, BAT 2,
- APU GEN,
- GEN 1, GEN 2,
- EXT PWR.
(6) Make sure that there is a warning notice in the cockpit to tell
persons not to operate the pushbutton switches on these overhead
panels:
- 21VU (EMER ELEC PWR),
- 35VU (ELEC).
(7) In the cockpit, on the APU section of the overhead panel 25VU, make
sure that a warning notice is in position to tell persons not to
start the APU.
(8) In the cockpit, make sure that the third occupant seat is removed
(Ref. TASK 25-11-41-000-001).
(9) In the cockpit, make sure that the front panel is removed from the
bottom right side of the panel 120VU.
Subtask 24-43-55-865-051
B. Make sure that this(these) circuit breaker(s) is(are) open, safetied and
tagged
-------------------------------------------------------------------------------
PANEL DESIGNATION IDENT. LOCATION
-------------------------------------------------------------------------------
122VU ELEC/DC SVCE/BUS/ON TR2 5PX U30
124VU SVCE/601PP/602PP/SPLY 1PX BB01
EFF :
ALL 24-43-55
Page 406
May 01/98
SYR
4. Procedure
_________
Subtask 24-43-55-420-050
CAUTION : MAKE SURE THAT THE CONTACTOR LOCATING PIN IS CORRECTLY ENGAGED
_______
IN ITS RECESS LOCATED IN ONE POWER TERMINAL.
THIS PREVENTS DAMAGE TO THE LOCATING PIN WHEN YOU APPLY THE
TORQUE.
(1) Put the contactor (3) in position on the two tapped barrels (6) of
the contactor base (5).
(2) TORQUE the two captive screws (2) to between 23.9 and 26.55 lbf.in
(0.27 and 0.30 m.daN).
(4) Make sure that the electrical connectors are clean and in the correct
condition.
Subtask 24-43-55-865-052
B. Remove the safety clip(s) and the tag(s) and close this(these) circuit
breaker(s):
1PX, 5PX.
Subtask 24-43-55-710-050
(2) On the overhead panel 25VU, put the INT LT/DOME switch in the BRT
position. On the panel 453VU, the L dome light comes on.
EFF :
ALL 24-43-55
Page 407
May 01/10
SYR
5. Close-up
________
Subtask 24-43-55-862-050
Subtask 24-43-55-410-050
B. Close Access
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
R (2) Install the front panel on the bottom right side of the panel 120VU.
EFF :
ALL 24-43-55
Page 408
Nov 01/00
SYR
AC ELECTRICAL LOAD DISTRIBUTION - DESCRIPTION AND OPERATION
___________________________________________________________
1. _______
General
The AC electrical power distribution on board is carried out in several
R steps corresponding to:
- Power distribution:
. from the different sources towards the main AC busbars located in panel
120VU,
. then, from the main AC busbars, either directly towards important
consumers (pumps, galleys...), or towards the associated distribution
sub-busbars located in the circuit breaker panels.
- Power distribution from sub-busbars:
. the distribution from these sub-busbars towards the different AC
consumers.
This chapter deals only with power distribution. The referenced figure gives
a schematic summary of the whole AC distribution on board:
2. __________________
Component Location
A. Component Location
(Ref. Fig. 002)
EFF :
ALL 24-50-00
Page 1
May 01/03
SYR
**ON A/C 001-002,
-------------------------------------------------------------------------------
FIN | FUNCTIONAL DESIGNATION | PANEL|ZONE|ACCESS | ATA
| | | | DOOR | REF.
-------------------------------------------------------------------------------
5XH A/XFMR-115/26VAC, ESS 125 812 24-52-51
12XN CNTOR-AC SVCE BUS NORM SPLY 120VU 212 831 24-51-55
15XN1 A/XFMR-115/26VAC, 1 120VU 212 831 24-51-51
15XN2 A/XFMR-115/26VAC, 2 120VU 212 831 24-51-51
49VU OVERHEAD C/B PNL 210 831 93-00-00
105VU POWER CENTER-BATTERY 126 822 93-00-00
106VU POWER CENTER-AC/DC EMERGENCY 125 812 93-00-00
121VU REAR C/B PNL 212 831 93-00-00
122VU REAR C/B PNL 212 831 93-00-00
123VU POWER CENTER-AC 212 831 93-00-00
124VU POWER CENTER-DC 212 831 93-00-00
125VU REAR C/B PNL 212 831 93-00-00
2000VU C/B PNL 2000VU 220 93-00-00
2001VU C/B PNL 2001VU 260 93-00-00
EFF :
ALL 24-50-00
Page 2
Nov 01/06
R
SYR
AC Electrical Load Distribution - General
Figure 001
R
EFF :
001-002, 24-50-00
Page 3/4
Feb 01/99
SYR
INTENTIONALLY BLANK
24-50-00
Page 5
May 01/98
SYR
INTENTIONALLY BLANK
R
24-50-00
Page 6
Feb 01/99
SYR
R AC Electrical Load Distribution - General
R Figure 001A
R
EFF :
003-099, 24-50-00
Page 7/8
Feb 01/99
R
SYR
INTENTIONALLY BLANK
R
24-50-00
Page 9
Feb 01/99
SYR
AC Power Distribution Contactors - Component Location
Figure 002 (SHEET 1)
EFF :
ALL 24-50-00
Page 10
Feb 01/99
R
SYR
AC Power Distribution Contactors - Component Location
Figure 002 (SHEET 2)
EFF :
ALL 24-50-00
Page 11
Feb 01/99
R
SYR
- the channel 1 line and transfer contactor and 115 VAC bus 1 (1XP),
- the channel 2 line and transfer contactor and 115 VAC bus 2 (2XP),
- the APU generator line contactor (APU GLC) and the external power
contactor.
The panel 106VU mainly contains contactors related to the electrical
emergency power.
The panel 105VU comprises the static inverter contactor.
B. Spare Fuses
(Ref. Fig. 002)
Panel 120VU also contains a set of 3 spare fuses of different amperage
for replacement of the fuses given below if defective:
- 350A spare fuse to replace fuses 4PB11 and 4PB21 (Ref. 24-30-00, P.
Block 1),
- 400A spare fuse to replace fuse 6KA (Ref. 49-42-00, P. Block 1),
- 80A spare fuse to replace fuse 20PC1 (Ref. 24-30-00, P. Block 1).
3. System
__________________
Description
The distribution busbars are supplied according to various configurations
depending on:
- the procedures applied by the crew members in the different failure
configurations,
- the availability of the various power sources.
The possible configurations are:
- normal flight configuration:
EFF :
ALL 24-50-00
Page 12
Nov 01/06
R
SYR
Normal Flight Configuration for the Whole Network (AC/DC)
Figure 003
R
EFF :
001-002, 24-50-00
Page 13/14
Feb 01/99
SYR
R Normal Flight Configuration for the Whole Network (AC/DC)
R Figure 003A
R
EFF :
003-099, 24-50-00
Page 15/16
Feb 01/99
R
SYR
R
EFF :
ALL 24-50-00
Page 17/18
May 01/06
SYR
Smoke Configuration for the Whole Network (AC/DC)
Figure 005
EFF :
ALL 24-50-00
Page 19/20
May 01/06
R
SYR
NOTE : These configurations are dealt with in their respective ATA chapter.
____
EFF :
ALL 24-50-00
Page 21
May 01/06
R
SYR
INTENTIONALLY BLANK
24-50-00
Page 22
May 01/06
R
SYR
4. Interface
_________
(a) General
The overhead circuit breaker panel 49VU is accessible to the
Captain and First Officer.
The circuit breakers are connected either to an AC or a DC power
source.
1
_ AC Power Supply
- 115 VAC
- 26 VAC
2
_ DC Power Supply
- 28 VDC
(b) Description
(Ref. Fig. 006)
A simplified drawing shows the provision for circuit breakers
installation on the panel 49VU.
On the aircraft, the Functional Item Number (FIN) is shown on the
rear side of the VU panel.
EFF :
ALL 24-50-00
Page 23
Feb 01/99
R
SYR
Provision for C/B(s) Installation on the Panel 49VU
Figure 006
EFF :
ALL 24-50-00
Page 24
Feb 01/99
R
SYR
(2) Circuit Breaker Panel 105VU
(a) General
The circuit breaker panel 105VU (Battery Power Center) is located
in the avionics compartment next to access door 822. You must
open the access door from the panel 105VU.
The circuit breakers are connected to BAT 1(2) power source.
1
_ BAT power supply
- 28 VDC
(b) Description
(Ref. Fig. 007)
A simplified drawing shows the provision for circuit breakers
installation on the panel 105VU.
On the aircraft, the FIN is marked below the head of each circuit
breaker.
EFF :
ALL 24-50-00
Page 25
Feb 01/99
R
SYR
Provision for C/B(s) Installation on the Panels 105VU and 106VU
Figure 007
EFF :
ALL 24-50-00
Page 26
Feb 01/99
R
SYR
(3) Circuit Breaker Panel 106VU
(a) General
The circuit breaker panel 106VU (AC/DC emergency power center) is
located in the avionics compartment next to access door 812. You
must open the access door from the panel 106VU.
The circuit breakers are connected either to an AC or a DC power
source.
1
_ AC Power Supply
- 115 VAC
- 26 VAC
2
_ DC Power Supply
- 28 VDC
(b) Description
(Ref. Fig. 007)
A simplified drawing shows the provision for circuit breakers
installation on the panel 106VU.
On the aircraft, the labels and the FINs are marked behind the
access door of the panel 106VU opposite the circuit breaker
panel.
R
EFF :
ALL 24-50-00
Page 27
May 01/11
SYR
R (4) Rear Circuit Breaker Panel 120VU
R It comprises the following panels:
R - 121VU,
R - 122VU,
R - 123VU,
R - 124VU,
R - 125VU.
R (a) General
R These circuit breaker panels are located on the rear panel 120VU.
R The circuit breakers are connected either to an AC or a DC power
R source.
R 1
_ AC Power Supply
R - 115 VAC
R - 26 VAC
R 2
_ DC Power Supply
R - 28 VDC
R (b) Description
R (Ref. Fig. 008, 009, 010, 011)
R Simplified drawings show the provision for circuit breakers
R installation on panels 121VU, 122VU, 123VU, 124VU and 125VU.
R On the aircraft, the FIN is marked below the head of each circuit
R breaker.
EFF :
ALL 24-50-00
Page 28
Aug 01/11
SYR
INTENTIONALLY BLANK
R
24-50-00
Page 29
Aug 01/11
SYR
Provision for C/B(s) Installation on the Panel 121VU
R Figure 008 (SHEET 1)
EFF :
ALL 24-50-00
Page 30
Aug 01/11
SYR
Provision for C/B(s) Installation on the Panel 121VU
R Figure 008 (SHEET 2)
EFF :
ALL 24-50-00
Page 31
Aug 01/11
SYR
Provision for C/B(s) Installation on the Panel 122VU
R Figure 009 (SHEET 1)
EFF :
ALL 24-50-00
Page 32
Aug 01/11
SYR
Provision for C/B(s) Installation on the Panel 122VU
R Figure 009 (SHEET 2)
EFF :
ALL 24-50-00
Page 33
Aug 01/11
SYR
Provision for C/B(s) Installation on the Panel 123VU
R Figure 010
EFF :
ALL 24-50-00
Page 34
Aug 01/11
SYR
Provision for C/B(s) Installation on the Panels 124VU and 125VU
R Figure 011
EFF :
ALL 24-50-00
Page 35
Aug 01/11
SYR
R (5) Circuit Breaker Panel 2000VU
(a) General
The front circuit breaker panel 2000VU faces the FWD
passenger/crew door (841) and is located in the center of the
cabin ceiling. The circuit breakers are connected to either an AC
or a DC power source.
1
_ AC Power Supply
- 115 VAC
- 26 VAC
2
_ DC Power Supply
- 28 VDC
(b) Description
R (Ref. Fig. 012)
A simplified drawing shows the provision for circuit breakers
installation on the panel 2000VU.
(a) General
The circuit breaker panel 2001VU faces the aft passenger door
(842) and is located in the center of the cabin ceiling. The
circuit breakers are connected to either an AC or a DC power
source.
1
_ AC Power Supply
- 115 VAC
- 26 VAC
2
_ DC Power Supply
- 28 VDC
(b) Description
R (Ref. Fig. 013)
A simplified drawing shows the provision for circuit breakers
installation on the panel 2001VU.
EFF :
ALL 24-50-00
Page 36
Aug 01/11
SYR
Provision for C/B(s) Installation on the Panel 2000VU
R Figure 012
EFF :
ALL 24-50-00
Page 37
Aug 01/11
SYR
Provision for C/B(s) Installation on the Panel 2001VU
R Figure 013
EFF :
ALL 24-50-00
Page 38
Aug 01/11
SYR
(2) Green head circuit breaker
This type of circuit breaker holds an auxiliary contact connected to
SDAC when it is tripped.
(5) For clipped circuit breaker, there are two types of collars, metallic
or plastic, secured by lockwire, (Ref. ESPM 20-46-10).
-------------------------------------------------------------------------------
PANEL DESIGNATION IDENT. LOCATION
-------------------------------------------------------------------------------
49VU AIR COND/FWD CARGO/VENT/CTL & MONG 2HN C08
49VU AIR COND/RAM/AIR/INLET 1HZ D10
49VU AIR COND/CAB/PRESS/CTL1 1HL D09
49VU AIR COND/FLOW/CTL &/IND1 1HB D07
49VU AIR COND/AVNCS VENT/CTL 6HQ D06
49VU AIR COND/AVNCS VENT/CTL 5HQ D05
122VU FWD CARGO VENT AND HTG/FAN 1HN T22
122VU AIR COND/LAV/GALLEY VENT CTL/EXTRACT FAN/CTL 5HU U21
122VU AIR COND/LAV/GALLEY VENT CTL/EXTRACT FAN/SPLY 6HU U19
122VU AIR COND/FLOW/MIXER/FLAP 3HB V22
122VU AIR COND/FLOW/CTL AND IND/2 2HB V21
122VU AIR COND/ZONE TEMP CTL/28VDC/SYS2 4HK V20
122VU AIR COND/ZONE TEMP CTL/28VDC/SYS1 3HK V19
122VU AIR COND/ZONE TEMP CTL/115VAC/SYS2 2HK V18
122VU AIR COND/ZONE TEMP CTL/115VAC/SYS1 1HK V17
122VU AIR COND/PACK TEMP/CTL SYS1/2/115VAC 21HH W22
122VU AIR COND/PACK TEMP/CTL SYS1/2/28VDC 23HH W21
122VU AIR COND/RECIRC FAN/R/CTL 11HG W20
122VU AIR COND/RECIRC FAN/R/SPLY 3HG W18
122VU AIR COND/PACK TEMP/CTL SYS1/1/115VAC 1HH X22
122VU AIR COND/PACK TEMP/CTL SYS1/1/28VDC 3HH X21
122VU AIR COND/RECIRC FAN/L/CTL 2HG X20
122VU AIR COND/RECIRC FAN/L/SPLY 1HG X18
122VU AIR COND/CAB PRESS/CTL/MAN 3HL Y23
122VU AIR COND/CAB PRESS/CTL/2 2HL Y22
122VU AIR COND/PACK TEMP CTL SYS2/2/28VDC 24HH Y21
EFF :
ALL 24-50-00
Page 39
Aug 01/11
R
SYR
-------------------------------------------------------------------------------
PANEL DESIGNATION IDENT. LOCATION
-------------------------------------------------------------------------------
122VU AIR COND/PACK TEMP CTL SYS2/2/115VAC 22HH Y20
122VU AIR COND/PACK TEMP CTL SYS2/1/28VDC 4HH Y19
122VU AIR COND/PACK TEMP CTL SYS2/1/115VAC 2HH Y18
122VU AIR COND/AVNCS/VENT/MONG 3HQ Y17
123VU AVNCS VENT/BLOWER/FAN 1HQ AD10
123VU AVNCS VENT/EXTC/FAN 2HQ AE02
-------------------------------------------------------------------------------
PANEL DESIGNATION IDENT. LOCATION
-------------------------------------------------------------------------------
49VU AUTO FLT/FCU/1 9CA1 B05
49VU AUTO FLT/FAC1/28VDC 5CC1 B04
49VU AUTO FLT/FAC1/26VAC 14CC1 B03
49VU AUTO FLT/FMGC/1 10CA1 B02
49VU AUTO FLT/MCDU/1 11CA1 B01
121VU AUTO FLT/FCU/2 9CA2 M21
121VU AUTO FLT/RUDDER/TRIM/IND 15CC M20
121VU AUTO FLT/FAC2/28VDC 5CC2 M19
121VU AUTO FLT/FAC2/26VAC 14CC2 M18
121VU AUTO FLT/FMGC/2 10CA2 M17
121VU AUTO FLT/MCDU/2 11CA2 N20
121VU AUTO FLT/RUDDER/ARTF/FEEL 14CA N17
121VU AUTO FLT/STICK/LOCK 13CA N16
-------------------------------------------------------------------------------
PANEL DESIGNATION IDENT. LOCATION
-------------------------------------------------------------------------------
TBD 5TT
49VU COM/CVR/SPLY 2RK E14
49VU COM/CVR/CTL 4RK E13
49VU COM/RMP/1 2RG1 G10
49VU COM/VHF/1 2RC1 G09
49VU COM/AUDIO/FLT/INTPH 9RN G08
49VU COM/AUDIO/ACP/F/O 5RN G07
49VU COM/AUDIO/ACP/CAPT 4RN G06
49VU COM/CIDS/DEU A ESS/LINE 2 155RH G05
49VU COM/CIDS/DEU A ESS/LINE 1 154RH G04
49VU COM/CIDS/DEU B/ESS 153RH G03
49VU COM/CIDS/DIR 1 AND 2/ESS 150RH G02
49VU COM/HF1 1RE1 HA14
EFF :
ALL 24-50-00
Page 40
Aug 01/11
R
SYR
-------------------------------------------------------------------------------
PANEL DESIGNATION IDENT. LOCATION
-------------------------------------------------------------------------------
121VU COM NAV/VHF/3 2RC3 L05
121VU COM NAV/VHF/2 2RC2 L04
121VU COM NAV/RMP/2 2RG2 L02
121VU COM NAV/CIDS/FWD ATTND/PNL 170RH M14
121VU COM NAV/CIDS/DEU A NORM/R AFT 168RH M13
121VU COM NAV/CIDS/DEU A NORM/L AFT 167RH M12
121VU COM NAV/CIDS/DEU A NORM/R MID 166RH M11
121VU COM NAV/CIDS/DEU A NORM/L MID 165RH M10
121VU COM NAV/CIDS/DEU A NORM/R FWD 164RH M09
121VU COM NAV/CIDS/DEU A NORM/L FWD 163RH M08
121VU COM NAV/CIDS/DEU B/NORM 162RH M07
121VU COM NAV/CIDS/PROG AND TST PNL 161RH M06
121VU COM NAV/CIDS/DIR 1 AND 2/NORM 151RH M05
121VU COM NAV/SELCAL 8RN M04
121VU COM NAV/ACP/AVNCS/COMPT 7RN M03
121VU COM NAV/ACP/THIRD/OCCPNT 6RN M02
121VU EIS/HORN/SPLY 2WC P09
EFF :
ALL 24-50-00
Page 41
Aug 01/11
R
SYR
F. Circuit Breakers Data Tables by Circuit - ELECTRICAL POWER system
-------------------------------------------------------------------------------
PANEL DESIGNATION IDENT. LOCATION
-------------------------------------------------------------------------------
49VU ELEC/AC BUS/8XP/MONG 6XH H11
49VU ELEC/LT/CTL 13XG H10
105VU ELEC/CSM/G /EV AUTO/SPLY 7XE C01
105VU ELEC/HOT BUS/702PP SPLY 5PB2 D02
105VU ELEC/HOT BUS/701PP SPLY 5PB1 D01
105VU ELEC/HOT BUS/702PP SPLY 12PB2 E02
105VU ELEC/HOT BUS/701PP SPLY 12PB1 E01
105VU ELEC/BAT REF/BCL2 9PB2 F02
105VU ELEC/BAT REF/BCL1 9PB1 F01
105VU ELEC/STAT INV/CNTOR/CTL 14XB G02
105VU ELEC/BAT BUS/REF/BCL1 8PB1 G01
105VU ELEC/STAT INV/BUS 901XP/SPLY 12XB H02
105VU ELEC/BAT BUS/REF/BCL2 8PB2 J02
106VU AC ESS BUS/STBY/CNTOR/CTL 5XC B08
106VU AC ESS BUS/EMER/CNTOR/CTL 5XE B07
106VU 26VAC/ESS BUS/SPLY 4XH B06
106VU CSM/G /EV/MAN/SPLY 6XE B04
106VU AC ESS/BUS NORM/CNTOR/CTL 4XC B03
106VU AC ESS/BUS/EMER/CNTOR/SPLY 15PC C08
106VU EMER/SHED/CNTOR/SPLY 1PH C07
106VU AC ESS BUS/EMER/STBY/CNTOR/SPLY 10XE C06
106VU AC ESS BUS/MONG/SPLY 2XH C05
106VU AC/SHED/ESS BUS/CNTOR/CTL 1XH C04
106VU ESS TR/CNTOR/CTL 5PE C02
106VU ESS TR/SPLY 4PE C01
EFF :
ALL 24-50-00
Page 42
Aug 01/11
R
SYR
-------------------------------------------------------------------------------
PANEL DESIGNATION IDENT. LOCATION
-------------------------------------------------------------------------------
122VU ELEC/GCU/2 2XU2 T27
122VU ELEC/GCU/1 2XU1 T26
122VU ELEC/IDG2/DISC 2XT T25
122VU ELEC/IDG1/DISC 1XT T24
122VU ELEC/DC SVCE/BUS/ON TR2 5PX U30
122VU ELEC/RFL/SPLY/LOGIC 4PR U29
122VU ELEC/REFLNG/ON/BAT 1PR U28
122VU ELEC/CNTOR/DC BUS/TIE 1/FAULT 14PC U24
122VU ELEC/AC PWR/SVCE/CTL 3XX V29
122VU ELEC/BUS/2XP/CTL 17XN2 V27
122VU ELEC/AC/BUS1/CTL 17XN1 V25
122VU ELEC/DC BUS/TIE2//APU/START 18PC W31
122VU ELEC/TR2/FAULT/DC BUS TIE/CONFIG 7PC2 W30
122VU ELEC/TR1/FAULT/DC BUS TIE/CONFIG 7PC1 W29
122VU ELEC/CNTOR/ESS/DC BUS/TIE 3PC W26
122VU ELEC/CNTOR/DC/BUS/TIE1 9PC W25
122VU ELEC/EXT PWR/LT CLT/AVAIL 4XG X31
122VU ELEC/EXT PWR/LT CLT/NOT IN/USE 6XG X30
122VU ELEC/EXT PWR/CTL 11XG X29
122VU ELEC/EXT PWR/COCKPIT/AVAIL/LT 12XG X28
122VU ELEC/TR2/MONG 3PU2 X26
122VU ELEC/TR1/MONG 3PU1 X25
122VU ELEC/DC/SVCE/BUS 5PN X24
122VU APU GEN/EGIU2/28VDC 26XU2 Y31
122VU GEN2/EGIU2/28VDC 24XU2 Y30
122VU ELEC/APU/GCU 6XS Y25
122VU ELEC/GPCU 7XG Y24
122VU ELEC/EXT PWR/EGIU1/28VDC 26XU1 Z31
122VU ELEC/GEN1/EGIU1/28VDC 24XU1 Z30
122VU ELEC/EMER GEN AUTO/2 9XE Z26
122VU ELEC/EMER GEN AUTO/1 11XE Z25
EFF :
ALL 24-50-00
Page 43
Aug 01/11
R
SYR
-------------------------------------------------------------------------------
PANEL DESIGNATION IDENT. LOCATION
-------------------------------------------------------------------------------
**ON A/C ALL
EFF :
ALL 24-50-00
Page 44
Aug 01/11
R
SYR
-------------------------------------------------------------------------------
PANEL DESIGNATION IDENT. LOCATION
-------------------------------------------------------------------------------
124VU TR2/CNTOR/SPLY 4PU2 BC01
124VU DC SVCE/602PP/SPLY 7PN BD01
124VU 206PP/208PP/SPLY 6PN BE01
124VU 204PP/SPLY 3PN2 BF01
124VU 202PP/SPLY 1PN2 BG01
-------------------------------------------------------------------------------
PANEL DESIGNATION IDENT. LOCATION
-------------------------------------------------------------------------------
TBD 36ME
TBD 51MF
TBD 61MF
122VU COCKPIT SEATS/SEAT CTL/F/O 1MS2 U14
122VU COCKPIT SEATS/SEAT CTL/CAPT 1MS1 U11
2001VU LAV SHAVER SOCKET 1MT B01
-------------------------------------------------------------------------------
PANEL DESIGNATION IDENT. LOCATION
-------------------------------------------------------------------------------
49VU ENGINE/2/FIRE DET/LOOP B 8WD2 A07
49VU ENGINE/1/FIRE DET/LOOP A 7WD1 A06
49VU AIR COND/SDCU/CHAN1 11WQ C06
121VU APU/FIRE AND OVHT/DET/LOOP B 2WG L44
121VU APU/FIRE AND OVHT/DET/LOOP A 1WG L43
121VU APU/AUTO/EXTIG/GND/TEST 30WF L40
121VU APU/FIRE/EXTIG/SQUIB/B 2WF L39
121VU APU/FIRE/EXTIG/SQUIB/A 1WF L38
EFF :
ALL 24-50-00
Page 45
Aug 01/11
R
SYR
-------------------------------------------------------------------------------
PANEL DESIGNATION IDENT. LOCATION
-------------------------------------------------------------------------------
121VU APU/FIRE/LP VALVE/NORM 4WF M42
121VU APU/FIRE/LP VALVE/STBY 3WF M41
121VU ENGINE/ENG1 AND 2 FIRE EXTIG/BTL1/SQUIB/B 2WE1 Q44
121VU ENGINE/ENG1 AND 2 FIRE EXTIG/BTL1/SQUIB/A 1WE1 Q43
121VU ENGINE/ENG1 AND 2 FIRE EXTIG/BTL2/SQUIB/B 2WE2 Q42
121VU ENGINE/ENG1 AND 2 FIRE EXTIG/BTL2/SQUIB/A 1WE2 Q41
121VU ENGINE/ENG2/FIRE DET/LOOP A 7WD2 Q39
121VU ENGINE/ENG1/FIRE DET/LOOP B 8WD1 Q38
122VU AIR COND/CARGO/FIRE/EXTIG 1WX T19
122VU AIR COND/SDCU/CHAN2 12WQ T18
-------------------------------------------------------------------------------
PANEL DESIGNATION IDENT. LOCATION
-------------------------------------------------------------------------------
49VU FLIGHT CONTROLS/SLT FLP/POS/IND 1 1CN B12
49VU FLIGHT CONTROLS/ELAC1/NORM/SPLY 15CE1 B11
49VU FLIGHT CONTROLS/FCDC1/SPLY 20CE1 B10
49VU FLIGHT CONTROLS/THS/ACTR/MOT2 19CE2 B09
49VU FLIGHT CONTROLS/SEC1/NORM/SPLY 21CE1 B08
49VU FLIGHT CONTROLS/FLP/CTL AND MONG/SYS1 6CV B07
49VU FLIGHT CONTROLS/SLT/CTL AND MONG/SYS1 5CV B06
105VU FLIGHT CONTROLS/ELAC2/STBY SPLY 16CE2 A02
105VU FLT CTL/ELAC1/STBY SPLY 16CE1 A01
105VU FLT CTL/SEC1/STBY SPLY 22CE B01
121VU FLIGHT CONTROLS/WTB/FLP/SYS2 12CV P20
121VU FLIGHT CONTROLS/WTB/SLT/SYS2 11CV P19
121VU FLIGHT CONTROLS/SLT FLP/POS/IND2 2CN P16
121VU FLIGHT CONTROLS/FLP/CTL AND/MONG/SYS2 8CV Q21
121VU FLIGHT CONTROLS/FCDC2/SPLY 20CE2 Q20
121VU FLIGHT CONTROLS/SEC3/SPLY 21CE3 Q19
121VU FLIGHT CONTROLS/SEC2/SPLY 21CE2 Q18
121VU FLIGHT CONTROLS/THS ACTR/MOT3 19CE3 Q17
121VU FLIGHT CONTROLS/THS ACTR/MOT1 19CE1 Q16
121VU FLIGHT CONTROLS/SLT/CTL/SYS2 7CV R21
121VU FLIGHT CONTROLS/ELAC2/NORM/SPLY 15CE2 R20
122VU FLIGHT CONTROLS/WTB/FLP/SYS1 10CV S07
122VU FLIGHT CONTROLS/WTB/SLT/SYS1 9CV S06
EFF :
ALL 24-50-00
Page 46
Aug 01/11
R
SYR
K. Circuit Breakers Data Tables by Circuit - FUEL system
-------------------------------------------------------------------------------
PANEL DESIGNATION IDENT. LOCATION
-------------------------------------------------------------------------------
49VU FUEL/SMOKE/CONFIG/PUMP CTL 55QA A14
49VU FUEL/FQI/CHAN/1 1QT A13
49VU FUEL/X FEED/VALVE/MOT1 2QE A12
49VU FUEL/XFR VALVE1/WING/R 2QP A11
49VU FUEL/XFR VALVE1/WING/L 1QP A10
49VU FUEL/LP VALVE/MOT1/ENG2 2QG A09
49VU FUEL/LP VALVE/MOT1/ENG1 1QG A08
49VU APU/FUEL/BLOW OFF/PUMP 2QC B14
121VU APU/FUEL/BLOW OFF/CTL 1QC K39
121VU FUEL/FQI/CHANNEL/1 AND 2 8QT L26
121VU FUEL/HI/LVL/SPLY 1QJ L25
121VU FUEL/RFL/DFL/SPLY 2QU L24
121VU FUEL/RFL/DFL/XFR/DEFUEL/VALVE 1QU L23
121VU APU/FUEL/LP VALVE/CTL 1QF M40
121VU APU/FUEL/LP VALVE/SPLY 2QF M39
121VU APU/FUEL/PUMP/CTL 3QC M38
121VU FUEL/FQI/CHAN/2 2QT M27
121VU FUEL/LP VALVE/MOT2/ENG2 4QG M26
121VU FUEL/LP VALVE/MOT2/ENG1 3QG M25
121VU FUEL/X FEED/VALVE/MOT2 1QE M24
121VU FUEL/XFR VALVE2/WING/R 4QP M23
121VU FUEL/XFR VALVE2/WING/L 3QP M22
121VU FUEL/L WING TK/PUMP2 SPLY 7QA N26
121VU FUEL/L WING TK/PUMP1 SPLY 1QA N23
121VU FUEL/CTR TK/PUMP2 SPLY 30QA P26
121VU FUEL/CTR TK/PUMP1 SPLY 29QA P23
121VU FUEL/R WING TK/PUMP2 SPLY 8QA Q26
121VU FUEL/R WING TK/PUMP1 SPLY 2QA Q23
121VU FUEL/PUMPS/2/R CTL AND L IND 10QA R29
121VU FUEL/PUMPS/1/R CTL AND L IND 4QA R28
121VU FUEL/CTR TK/AUTO/CTL 47QA R27
121VU FUEL/CTR TK/PUMPS1 AND 2/CTL AND IND 32QA R26
121VU FUEL/CTR TK/PUMPS1 AND 2/CTL AND IND 31QA R25
121VU FUEL/PUMPS/2/L CTL AND R IND 9QA R24
121VU FUEL/PUMPS/1/L CTL AND R IND 3QA R23
123VU L WING TK/PUMP 1/STBY SPLY 11QA AD12
123VU R WING TK/PUMP 1/STBY SPLY 12QA AE12
EFF :
ALL 24-50-00
Page 47
Aug 01/11
R
SYR
L. Circuit Breakers Data Tables by Circuit - HYDRAULIC POWER system
-------------------------------------------------------------------------------
PANEL DESIGNATION IDENT. LOCATION
-------------------------------------------------------------------------------
49VU HYD/FIRE VALVE/Y/ENG2 3702GD C14
49VU HYD/FIRE VALVE/G/ENG1 1703GK C13
49VU HYD/HYD PWR/B WARN/& CTL 2702GJ C12
49VU HYD/HYD/PRESS/XMTR 1841GN C11
EFF :
ALL 24-50-00
Page 48
Aug 01/11
SYR
M. Circuit Breakers Data Tables by Circuit - ICE AND RAIN PROTECTION system
-------------------------------------------------------------------------------
PANEL DESIGNATION IDENT. LOCATION
-------------------------------------------------------------------------------
49VU ANTI ICE/WING/CTL 2DL C02
49VU ANTI ICE/WING/MONG 1DL C01
49VU ANTI ICE/PROBES/AOA/1 4DA1 D04
49VU ANTI ICE/PROBES/PHC/1 2DA1 D03
49VU ANTI ICE/PROBES/PITOT/1 3DA1 D02
EFF :
ALL 24-50-00
Page 49
Aug 01/11
R
SYR
-------------------------------------------------------------------------------
PANEL DESIGNATION IDENT. LOCATION
-------------------------------------------------------------------------------
**ON A/C ALL
-------------------------------------------------------------------------------
PANEL DESIGNATION IDENT. LOCATION
-------------------------------------------------------------------------------
49VU EIS/ECAM/CTL/PNL 15WT E12
49VU EIS/DMC1/SPLY 10WT1 E11
49VU EIS/DMC3/STBY/SPLY 14WT1 E10
49VU EIS/DMC1/SWTG 21WT1 E09
49VU EIS/RLY/BOX/CAPT 17WT1 E08
49VU EIS/DMC3/SWTG 21WT3 E07
49VU EIS/ECAM DU/UPPER/SWTG 24WT1 E06
49VU EIS/ECAM DU/UPPER/SPLY 13WT1 E05
49VU EIS/PFD CAPT/SWTG 22WT1 E04
49VU EIS/PFD CAPT/SPLY 11WT1 E03
49VU EIS/ND CAPT/SWTG 23WT1 E02
49VU EIS/ND CAPT/SPLY 12WT1 E01
49VU CLOCK/NORM/SPLY 6FS F11
49VU CAPT/LOUD/SPKR 5WW F10
49VU SDAC/1 AND 2/28VDC/ESS BUS 12WV F05
49VU SDAC/1/SPLY 3WV F04
49VU SDAC/2/26VAC SYNC/AC ESS BUS 6WV F03
49VU SDAC/1/26VAC SYNC/AC ESS BUS 5WV F02
49VU FWS/FWC1/SPLY 3WW F01
49VU NAV/DME/1 1SD1 G14
106VU EMER/GEN/REF 27WV B05
106VU DC BUS/1 AND 2/MONG 68WV C03
121VU PTR/SPLY 6TW J21
121VU CFDS/TEST PLUG/2 10TW J20
121VU CFDS/TEST PLUG/1 9TW J19
121VU CFDS/CFDIU/SPLY 2TW J18
121VU CFDS/CFDIU/BACK/UP 8TW J17
121VU DATA/LOADER/SPLY 3TD J16
EFF :
ALL 24-50-00
Page 50
Aug 01/11
R
SYR
-------------------------------------------------------------------------------
PANEL DESIGNATION IDENT. LOCATION
-------------------------------------------------------------------------------
121VU RCDR/ACCLRM 9TU K18
121VU FDIU 8TU K17
121VU RCDR/DFDR 7TU K16
121VU AIDS/DMU 4TV K15
121VU COM NAV/DME/2 1SD2 K06
121VU CLOCK/STBY/SPLY 4FS N03
121VU EIS/F/O/LOUD/SPKR 4WW P08
121VU EIS/SDAC1 AND 2/DOOR/DET/PAX 48WV P05
121VU EIS/SDAC1 AND 2/BUS1/28VDC 14WV P04
121VU EIS/SDAC1 AND 2/BUS2/28VDC 44WV P03
121VU EIS/SDAC1 AND 2/DOOR/DET/AVNCS 46WV P02
121VU EIS/DMC3/SPLY 10WT3 Q09
121VU EIS/DMC2/SPLY 10WT2 Q08
121VU EIS/FWC2/SPLY 2WW Q07
121VU EIS/SDAC/2/SPLY 2WV Q06
121VU EIS/SDAC/2/BUS1/26VAC SYNC AC 10WV Q05
121VU EIS/SDAC/1/BUS1/26VAC SYNC AC 9WV Q04
121VU EIS/SDAC/1/BUS2/26VAC SYNC AC 7WV Q03
121VU EIS/SDAC/2/BUS2/26VAC SYNC AC 8WV Q02
121VU EIS/ECAM DU/LOWER/SPLY 13WT2 R11
121VU EIS/ECAM DU/LOWER/SWTG 24WT2 R10
121VU EIS/DMC2/SWTG 21WT2 R08
121VU EIS/RLY/BOX/F/O 17WT2 R07
121VU EIS/ND/F/O/SWTG 23WT2 R06
121VU EIS/PFD/F/O/SWTG 22WT2 R05
121VU EIS/ND/F/O 12WT2 R04
121VU EIS/PFD/F/O 11WT2 R03
-------------------------------------------------------------------------------
PANEL DESIGNATION IDENT. LOCATION
-------------------------------------------------------------------------------
49VU L/G/Y BRK/PRESS/IND 61GG C10
49VU L/G/LGCIU/SYS1/NORM 1GA C09
121VU HYDRAULIC/BRK/TEMP/DET/UNIT 1GW M37
121VU HYDRAULIC/BRAKING AND STEERING/SYS2/SPLY 4GG M36
121VU HYDRAULIC/BRAKING AND STEERING/SYS2/CTL 3GG M35
121VU HYDRAULIC/BRAKING AND STEERING/SYS1/CTL 1GG M34
121VU HYDRAULIC/BRAKING AND STEERING/SYS1/IND AND/SPLY 2GG M33
121VU HYDRAULIC/PARK BRK/CTL/STBY 71GG N37
121VU HYDRAULIC/PARK BRK/CTL/NORM 70GG N36
121VU HYDRAULIC/LGCIU/SYS2 2GA Q35
121VU HYDRAULIC/LGCIU/SYS1/GRND SPLY 52GA Q34
R
EFF :
ALL 24-50-00
Page 51
Aug 01/11
SYR
-------------------------------------------------------------------------------
PANEL DESIGNATION IDENT. LOCATION
-------------------------------------------------------------------------------
R **ON A/C ALL
-------------------------------------------------------------------------------
PANEL DESIGNATION IDENT. LOCATION
-------------------------------------------------------------------------------
49VU LIGHTING/EMER LT/CKPT/DOME 1LE H08
49VU LIGHTING/EMER LT/CABIN 79WL H07
49VU LIGHTING/EMER LT/CABIN 2WL H06
49VU LIGHTING/EMER LT/CABIN 1WL H05
49VU LIGHTING/ICE AND STBY/COMP/LIGHT 1LF H04
49VU LIGHTING/XFMR/115V.5V/ESS BUS 29LP H03
122VU LIGHTING/LANDING LT/R/CTL 4LB T07
122VU LIGHTING/LANDING LT/R/SPLY 2LB T06
122VU LIGHTING/LANDING LT/L/CTL 3LB T05
122VU LIGHTING/LANDING LT/L/SPLY 1LB T04
122VU LIGHTING/EXT LT/NAV1/AND LOGO/LT 1LA T03
122VU LIGHTING/EXT LT/NAV2/AND LOGO/LT 2LA T02
122VU LIGHTING/EXT LT/BEACON/UPPER 1LV U06
122VU LIGHTING/EXT LT/BEACON/LOWER 5LV U03
122VU LIGHTING/CABIN/EMER/LT 3WL V07
122VU LIGHTING/WING/STROBE 10LV V05
122VU LIGHTING/LOGO/L 2LY V03
122VU LIGHTING/LOGO/R 1LY V02
122VU LIGHTING/EXT LT/TAXI AND TAKE OFF/CTL 2LR W09
122VU LIGHTING/EXT LT/TAXI AND TAKE OFF/TAXI 1LR W08
122VU LIGHTING/EXT LT/TAXI AND TAKE OFF/TO 3LR W07
122VU LIGHTING/EXT LT/RWY TURN OFF/L 1LC1 W06
122VU LIGHTING/EXT LT/RWY TURN OFF/R 1LC2 W05
122VU LIGHTING/EXT LT/WING/AND ENG SCAN/R 1LX W03
122VU LIGHTING/EXT LT/WING/AND ENG SCAN/L 5LX W02
122VU LIGHTING/WHL WELL/LTG/DOME 2LL X08
122VU LIGHTING/WHL WELL/LTG/OUT 1LL X07
122VU LIGHTING/TST/BOARD/SPLY 30LP X06
122VU LIGHTING/ANN LT SPLY/XFMR/BUS 2 27LP X05
EFF :
ALL 24-50-00
Page 52
Aug 01/11
SYR
-------------------------------------------------------------------------------
PANEL DESIGNATION IDENT. LOCATION
-------------------------------------------------------------------------------
122VU LIGHTING/ANN LT SPLY/XFMR/BUS 1 26LP X04
122VU LIGHTING/ANN LT SPLY/XFMR/STAT INV 28LP X03
122VU LIGHTING/CKPT/DOME 3LE Y06
122VU LIGHTING/INSTL LT/GLARE/SHLD 5LF Y05
122VU LIGHTING/INSTL LT/MAIN INST/PNL AND/PED 4LF Y04
122VU LIGHTING/INSTL LT/OVHD/PNL 3LF Y03
122VU LIGHTING/AVNCS COMPT/OUT/115VAC 12LS Z09
122VU LIGHTING/AVNCS COMPT/OUT/28VDC 11LS Z08
122VU LIGHTING/AVNCS COMPT/DOME 1LS Z07
122VU LIGHTING/FLOOD/F/O/SIDE 4LE Z06
122VU LIGHTING/FLOOD/CAPT/SIDE 5LE Z05
122VU LIGHTING/FLOOD/CTR INST/PNL 2LE Z04
2000VU LAV FWD-OCCUPIED 1WJ F01
2000VU AIR CONDTN-COMPT-OUTLET 1LK G08
2000VU PASSENGER READING LIGHT 6LW G06
2000VU PASSENGER READING LIGHT 5LW G05
2000VU PASSENGER READING LIGHT 4LW G04
2000VU PASSENGER READING LIGHT 3LW G03
2000VU PASSENGER READING LIGHT 2LW G02
2000VU PASSENGER READING LIGHT 1LW G01
2000VU CAB LIGHT PWR-CEILING-AFT 307LG H08
2000VU CAB LIGHT PWR-CEILING-AFT 304LG H07
2000VU CAB LIGHT PWR-CEILING-FWD 306LG H06
2000VU CAB LIGHT PWR-CEILING-FWD 305LG H05
2000VU CAB LIGHT PWR-WINDOW-AFT 302LG H04
2000VU CAB LIGHT PWR-WINDOW-AFT 301LG H03
2000VU CAB LIGHT PWR-WINDOW-FWD 303LG H02
2000VU CAB LIGHT PWR-WINDOW-FWD 300LG H01
2000VU LIGHT-LDG-AREA 3LU J08
2000VU LIGHT-CARGO COMPT-AFT 2LU J07
2000VU LIGHT-CARGO COMPT-FWD 1LU J06
R 2000VU LIGHT-ATTND-WORK 1LZ J05
R
2000VU LIGHT-CABIN-ENTRY 308LG J02
2000VU LIGHT-LAV 1LQ J01
2001VU LAVATORY AFT-OCCUPIED 11WJ B04
2001VU LIGHT-APU 2LJ E08
2001VU LIGHT-SEC 19 1LJ E07
EFF :
ALL 24-50-00
Page 53
Aug 01/11
SYR
R. Circuit Breakers Data Tables by Circuit - NAVIGATION system
-------------------------------------------------------------------------------
PANEL DESIGNATION IDENT. LOCATION
-------------------------------------------------------------------------------
49VU NAV/STBY/ALTM 16FN F14
49VU NAV/VOR/DME/RMI 12FN F13
49VU NAV/STBY/HORIZON 5FN F12
49VU NAV PROBES/ADIRU3/PWR/SWTG 8FP F09
49VU NAV PROBES/ADIRU 1/AND AOA 1/26VAC 5FP1 F07
49VU NAV PROBES/ADIRU1/115VAC 4FP1 F06
49VU NAV/VOR/1 2RS1 G13
49VU NAV/ILS/1 1RT1 G12
49VU COM NAV/ATC/1 5SH1 G11
49VU NAV/ADF/1 1RP1 H14
105VU ADIRS/ADIRU1/28VDC 6FP1 C02
EFF :
ALL 24-50-00
Page 54
Aug 01/11
R
SYR
S. Circuit Breakers Data Tables by Circuit - OXYGEN system
-------------------------------------------------------------------------------
PANEL DESIGNATION IDENT. LOCATION
-------------------------------------------------------------------------------
49VU OXYGEN/PASSENGER/ACTUATION 7WR HA08
49VU OXYGEN/PASSENGER/ACTUATION 6WR HA07
49VU OXYGEN/PASSENGER/ACTUATION 5WR HA06
49VU OXYGEN/PASSENGER/ACTUATION 4WR HA05
49VU OXYGEN/PASSENGER/CTL AND WARN 3WR HA04
49VU OXYGEN/PASSENGER/CTL AND WARN 2WR HA03
49VU OXYGEN/PASSENGER/CTL AND WARN 1WR HA02
49VU OXYGEN/CREW/OXY/SPLY 1HT HA01
-------------------------------------------------------------------------------
PANEL DESIGNATION IDENT. LOCATION
-------------------------------------------------------------------------------
49VU AIR BLEED/X FEED/VALVE/BAT 2HV D13
49VU AIR BLEED/ENG 1/CTL 3HA1 D12
49VU AIR BLEED/ENG 1/MONG 2HA1 D11
122VU AIR BLEED/ENG 2/CTL 3HA2 Z23
122VU AIR BLEED/ENG 2/MONG 2HA2 Z22
122VU AIR BLEED/X FEED VALVE/NORM 1HV Z20
-------------------------------------------------------------------------------
PANEL DESIGNATION IDENT. LOCATION
-------------------------------------------------------------------------------
2000VU WATER SYSTEM-QANT-IND 1MA B01
2001VU VACU TOIL SYS-VACUUM-GEN 33MG A08
2001VU VACU TOIL SYS-VACU-SYS 35MG A06
2001VU VACU TOIL SYS-LAV PWR-E 34MG A04
R
2001VU WATER SYS-DRAIN 1MP B05
R 2001VU VACU TOIL SYS-LAV PWR- 39MG B04
2001VU LAV AFT-HOT WATER-E 9MB B03
2001VU LAV AFT-HOT WATER-D 2MB B02
2001VU VACU TOIL SYS-LAV PWR- 32MG B01
2001VU WATER SYS-AIR-COMPRESSOR 19MD F01
EFF :
ALL 24-50-00
Page 55
Aug 01/11
SYR
V. Circuit Breakers Data Tables by Circuit - INFORMATION system
-------------------------------------------------------------------------------
PANEL DESIGNATION IDENT. LOCATION
-------------------------------------------------------------------------------
-------------------------------------------------------------------------------
PANEL DESIGNATION IDENT. LOCATION
-------------------------------------------------------------------------------
121VU APU/OIL/HTR/SPLY 1KT K41
121VU APU/APU/CTL 2KD L42
121VU APU/ECB/SPLY 1KD L41
-------------------------------------------------------------------------------
PANEL DESIGNATION IDENT. LOCATION
-------------------------------------------------------------------------------
121VU EIS/SLIDES/ARM AND WARN/FLT 15WN P11
121VU EIS/SLIDES/ARM AND WARN/GND 13WN P10
122VU DOORS/PAX/MONG 1MQ T13
122VU DOORS/CARGO 1MJ T12
-------------------------------------------------------------------------------
PANEL DESIGNATION IDENT. LOCATION
-------------------------------------------------------------------------------
49VU ENGINE/2/FADEC A/AND EIU 2 2KS2 A05
49VU ENGINE/1/FADEC A/AND EIU 1 2KS1 A04
49VU ENGINE/1 AND 2/IGN/SYS A 1JH A03
49VU ENGINE/2/HP FUEL SOV 1KC2 A02
49VU ENGINE/1/HP FUEL SOV 1KC1 A01
121VU ENG2/REV/LOCK 1EG2 N45
121VU ENG1/REV/LOCK 1EG1 N44
121VU ENGINE/ENG2/OIL/PRESS/AND REV SNSR/CHAN A 2EN2 N42
121VU ENGINE/ENG2/OIL/QTY 1EN2 N41
121VU ENGINE/ENG1/OIL/PRESS/AND REV SNSR/CHAN A 2EN1 N40
121VU ENGINE/ENG1/OIL/QTY 1EN1 N39
121VU ENGINE/IGN/ENG2/SYS B 3JH2 P42
121VU ENGINE/IGN/ENG1/SYS B 3JH1 P41
121VU ENGINE/IGN/ENG2/SYS A BAT 2JH2 P40
121VU ENGINE/IGN/ENG1/SYS A BAT 2JH1 P39
EFF :
ALL 24-50-00
Page 56
Aug 01/11
SYR
-------------------------------------------------------------------------------
PANEL DESIGNATION IDENT. LOCATION
-------------------------------------------------------------------------------
121VU ENGINE/ENG2/FADEC B 4KS2 Q40
121VU ENGINE/ENG1 AND 2/EVMU 1EV R44
121VU ENGINE/ENG1/FADEC B/AND EIU 1 4KS1 R41
-------------------------------------------------------------------------------
PANEL DESIGNATION IDENT. LOCATION
-------------------------------------------------------------------------------
EFF :
ALL 24-50-00
Page 57
Aug 01/11
R
SYR
5. ________________________________
Operation/Control and Indicating
EFF :
ALL 24-50-00
Page 58
Aug 01/11
SYR
AC ELECTRICAL LOAD DISTRIBUTION - DEACTIVATION/REACTIVATION
___________________________________________________________
TASK 24-50-00-040-001
1. __________________
Reason for the Job
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
Subtask 24-50-00-860-054
(2) Do the EIS start procedure (Upper ECAM DU and lower ECAM DU only)
(Ref. TASK 31-60-00-860-001).
EFF :
ALL 24-50-00
Page 401
May 01/11
SYR
Subtask 24-50-00-010-051
B. Get Access
4. Procedure
_________
Subtask 24-50-00-040-052
(1) If the C/B TRIPPED ECAM warning comes into view, do this check:
-------------------------------------------------------------------------------
R | ACTION | RESULT |
-------------------------------------------------------------------------------
EFF :
ALL 24-50-00
Page 402
May 01/11
SYR
-------------------------------------------------------------------------------
| ACTION | RESULT |
-------------------------------------------------------------------------------
3. If the C/B TRIPPED L ELEC BAY
warning comes into view on the
upper ECAM DU:
EFF :
ALL 24-50-00
Page 403
May 01/11
R
SYR
5. Close-up
________
Subtask 24-50-00-410-051
A. Close Access
(1) Install the protective cover on the battery power center 105VU.
(3) Install the protective cover on the AC/DC emergency power center
106VU.
(6) Make sure that the work area is clean and clear of tool(s) and other
items.
Subtask 24-50-00-860-055
(2) On the ECAM control panel, set the UPPER DISPLAY and LOWER DISPLAY
potentiometers to OFF.
EFF :
ALL 24-50-00
Page 404
May 01/06
SYR
TASK 24-50-00-440-001
1. __________________
Reason for the Job
2. ______________________
Job Set-up Information
A. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
Subtask 24-50-00-860-056
(2) Do the EIS start procedure (Upper ECAM DU and lower ECAM DU only)
(Ref. TASK 31-60-00-860-001).
4. Procedure
_________
Subtask 24-50-00-440-052
A. Do the troubleshooting procedure given in the TSM task (Ref. TSM TASK 24-
00-00-810-803).
EFF :
ALL 24-50-00
Page 405
May 01/11
SYR
5. Close-up
________
Subtask 24-50-00-860-057
EFF :
ALL 24-50-00
Page 406
May 01/06
SYR
AC MAIN DISTRIBUTION - DESCRIPTION AND OPERATION
________________________________________________
1. General
_______
The AC main distribution network corresponds to busbars 1XP and 2XP and
their associated sub-busbars.
2. Component
__________________
Location
(Ref. Fig. 002)
-------------------------------------------------------------------------------
FIN | FUNCTIONAL DESIGNATION | PANEL|ZONE|ACCESS | ATA
| | | | DOOR | REF.
-------------------------------------------------------------------------------
12XN CNTOR-AC SVCE BUS NORM SPLY 120VU 212 831 24-51-55
15XN1 A/XFMR-115/26VAC, 1 120VU 212 831 24-51-51
15XN2 A/XFMR-115/26VAC, 2 120VU 212 831 24-51-51
R 12XN CNTOR-AC SVCE BUS NORM SPLY 120VU 212 831 24-51-55
R 15XN1 A/XFMR-115/26VAC, 1 120VU 212 831 24-51-51
R 15XN2 A/XFMR-115/26VAC, 2 120VU 212 831 24-51-51
R 27XN CONTACTOR 120 VU 212 831 24-51-00
EFF :
ALL 24-51-00
Page 1
Feb 01/99
SYR
R **ON A/C ALL
3. Operation/Control
________________________________
and Indicating
The main busbars can be supplied:
- either by the corresponding generator,
- or by the other main generator, or by the APU generator or the ground
power unit by means of the transfer circuit.
The major part of the network is supplied with three-phase 115 VAC/400 Hz.
A 115/26 VAC single-phase autotransformer supplying a normal 26 VAC/400 Hz
sub-busbar (131XP.A and 231XP.A) is connected to each main busbar.
Part of the AC main network (212XP, 214XP, 216XP.C) can be supplied directly
by the ground power unit in ground service configuration (Ref. 24-42-00, P.
Block 1). For each main busbar, a warning is triggered on the ECAM to
indicate a loss of supply
(Ref. Fig. 003)
R
EFF :
ALL 24-51-00
Page 2
Feb 01/99
SYR
AC Main Distribution - Block Diagram
Figure 001
R
EFF :
001-002, 24-51-00
Page 3/4
Feb 01/99
SYR
R AC Main Distribution - Block Diagram
R Figure 001A
R
EFF :
003-099, 24-51-00
Page 5/6
Feb 01/99
R
SYR
AC Main Distribution - Component Location
Figure 002
EFF :
ALL 24-51-00
Page 7
Feb 01/99
SYR
AC Main Distribution - ECAM Warnings
Figure 003
EFF :
ALL 24-51-00
Page 8
Feb 01/99
SYR
TRANSFORMER - 115/26VAC (15XN1,15XN2) - REMOVAL/INSTALLATION
____________________________________________________________
TASK 24-51-51-000-001
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
Subtask 24-51-51-010-050
A. Get Access
(1) In the cockpit, remove the panel (6) which gives access to the panel
122VU. The panel 122VU is at the top of the panel 120VU.
EFF :
ALL 24-51-51
Page 401
May 01/11
SYR
(3) Open the access door 121AL.
Subtask 24-51-51-860-050
B. Safety Precautions
(1) Make sure that the external power connector is not connected to the
aircraft receptacle.
(2) Put warning notice(s) on the access door 121AL to tell persons not to
connect the external power connector.
(3) In the cockpit, on the overhead ELEC panel 35VU, release these
pushbutton switches:
- BAT 1, BAT 2,
- APU GEN,
- GEN 1(2),
- EXT PWR.
(4) In the cockpit, put warning notice(s) to tell persons not to operate
the pushbutton switches on these overhead panels:
- 21VU (EMER ELEC PWR),
- 35VU (ELEC).
(5) In the cockpit, on the APU section of the overhead panel 25VU, put
warning notice(s) to tell persons not to start the APU.
Subtask 24-51-51-865-050
-------------------------------------------------------------------------------
PANEL DESIGNATION IDENT. LOCATION
-------------------------------------------------------------------------------
FOR 15XN1
123VU BUS 1/131XP-A/SPLY 5XN1 AB12
FOR 15XN2
123VU BUS 2/231XP-A/SPLY 5XN2 AB01
EFF :
ALL 24-51-51
Page 402
May 01/11
R
SYR
4. Procedure
_________
Subtask 24-51-51-020-050
(2) Put blanking caps on the disconnected electrical connectors (1) and
(5).
EFF :
ALL 24-51-51
Page 403
May 01/98
SYR
Autotransformers
Figure 401/TASK 24-51-51-991-001
EFF :
ALL 24-51-51
Page 404
May 01/98
SYR
TASK 24-51-51-400-001
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
EFF :
ALL 24-51-51
Page 405
May 01/11
SYR
3. __________
Job Set-up
Subtask 24-51-51-860-051
(3) Make sure that the external power connector is not connected to the
aircraft receptacle.
(4) Make sure that, on the access door 121AL, there is a warning notice
to tell persons not to connect the external power connector.
(5) In the cockpit, on the overhead ELEC panel 35VU, make sure that these
pushbutton switches are released:
- BAT 1, BAT 2,
- APU GEN,
- GEN 1, GEN 2,
- EXT PWR.
(6) Make sure that there is a warning notice in the cockpit to tell
persons not to operate the pushbutton switches on these overhead
panels:
- 21VU (EMER ELEC PWR),
- 35VU (ELEC).
(7) In the cockpit, on the APU section of the overhead panel 25VU, make
sure that a warning notice is in position to tell persons not to
start the APU.
(8) In the cockpit, make sure that the panel (6) which gives access to
the panel 122VU is removed.
EFF :
ALL 24-51-51
Page 406
May 01/11
SYR
Subtask 24-51-51-865-051
B. Make sure that this(these) circuit breaker(s) is(are) open, safetied and
tagged
-------------------------------------------------------------------------------
PANEL DESIGNATION IDENT. LOCATION
-------------------------------------------------------------------------------
FOR 15XN1
123VU BUS 1/131XP-A/SPLY 5XN1 AB12
FOR 15XN2
123VU BUS 2/231XP-A/SPLY 5XN2 AB01
4. Procedure
_________
Subtask 24-51-51-420-050
(2) Install the washers (3) and the screws (4) and then tighten the
screws.
(3) Remove the blanking caps from the electrical connectors (1) and (5).
(4) Make sure that the electrical connectors are clean and in the correct
condition.
Subtask 24-51-51-865-052
B. Remove the safety clip(s) and the tag(s) and close this(these) circuit
breaker(s):
FOR 15XN1
R 5XN1
FOR 15XN2
R 5XN2
EFF :
ALL 24-51-51
Page 407
May 01/11
SYR
Subtask 24-51-51-710-050
(a) Do the EIS start procedure (Upper ECAM DU and lower ECAM DU only)
(Ref. TASK 31-60-00-860-001).
(a) On the ADIRS CDU, put the OFF/NAV/ATT selector switch of the
ADIRU 2 in NAV position.
(b) Make sure that the FAULT legend on the ADR 2 pushbutton switch
does not remain on.
5. Close-up
________
Subtask 24-51-51-862-050
Subtask 24-51-51-410-050
B. Close Access
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
(3) Install the panel (6) which gives access to panel 122VU.
EFF :
ALL 24-51-51
Page 408
May 01/98
SYR
(5) Remove the access platform(s).
EFF :
ALL 24-51-51
Page 409
May 01/98
SYR
CONTACTOR (12XN,27XN) - REMOVAL/INSTALLATION
____________________________________________
TASK 24-51-55-000-001
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
Subtask 24-51-55-010-050
A. Get Access
EFF :
ALL 24-51-55
Page 401
May 01/11
SYR
Subtask 24-51-55-860-050
B. Safety Precautions
(1) Make sure that the external power connector is not connected to the
aircraft EXT PWR receptacle.
(2) Put warning notice(s) in position on the access door 121AL to tell
persons not to connect the external power connector to the aircraft
EXT PWR receptacle.
(3) In the cockpit, on the ELEC panel 35VU, make sure that these
pushbutton switches are released:
- BAT 1, BAT 2,
- APU GEN,
- GEN 1, GEN 2,
- EXT PWR.
(4) In the cockpit, put warning notice(s) in position to tell persons not
to operate the pushbutton switches on these overhead panels:
- 21VU (EMER ELEC PWR section),
- 25VU (APU section),
- 35VU (ELEC).
Subtask 24-51-55-865-050
-------------------------------------------------------------------------------
PANEL DESIGNATION IDENT. LOCATION
-------------------------------------------------------------------------------
122VU ELEC/AC PWR/SVCE/CTL 3XX V29
4. Procedure
_________
Subtask 24-51-55-020-050
CAUTION : REMOVE THE CONTACTOR ONLY AND NOT THE BASE OR THE MODULE WHERE
_______
THE WIRES ARE CONNECTED.
EFF :
ALL 24-51-55
Page 402
May 01/11
R
SYR
Contactor
Figure 401/TASK 24-51-55-991-001
EFF :
ALL 24-51-55
Page 403
May 01/06
R
SYR
(2) Put blanking caps on the disconnected electrical connector (1) and
electrical receptacle (7).
NOTE : Do not remove the captive screws (2) and the spring washers
____
from the contactor (3).
EFF :
ALL 24-51-55
Page 404
May 01/06
R
SYR
TASK 24-51-55-400-001
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
EFF :
ALL 24-51-55
Page 405
Aug 01/11
SYR
3. __________
Job Set-up
Subtask 24-51-55-860-051
(3) Make sure that the external power connector is not connected to the
aircraft receptacle.
(4) Make sure that, on the access door 121AL, there is a warning notice
to tell persons not to connect the external power connector.
(5) In the cockpit, on the overhead ELEC panel 35VU, make sure that these
pushbutton switches are released:
- BAT 1, BAT 2,
- APU GEN,
- GEN 1, GEN 2,
- EXT PWR.
(6) Make sure that there is a warning notice in the cockpit to tell
persons not to operate the pushbutton switches on these overhead
panels:
- 21VU (EMER ELEC PWR),
- 35VU (ELEC).
(7) In the cockpit, on the APU section of the overhead panel 25VU, make
sure that a warning notice is in position to tell persons not to
start the APU.
(8) In the cockpit, make sure that the third occupant seat is removed
(Ref. TASK 25-11-41-000-001).
(9) Make sure that the front panel (8) of the panel 123VU is removed.
EFF :
ALL 24-51-55
Page 406
May 01/11
SYR
Subtask 24-51-55-865-051
B. Make sure that this(these) circuit breaker(s) is(are) open, safetied and
tagged
-------------------------------------------------------------------------------
PANEL DESIGNATION IDENT. LOCATION
-------------------------------------------------------------------------------
122VU ELEC/AC PWR/SVCE/CTL 3XX V29
4. Procedure
_________
Subtask 24-51-55-420-050
(1) Install the contactor (3) on the 6 tapped barrels (5) of the
contactor base (6).
R (2) TORQUE the six captive screws (2) to between 0.14 and 0.17 m.daN
R (12.38 and 15.04 lbf.in).
(3) Remove the blanking caps from the electrical connectors (1) and (7).
(4) Make sure that the electrical connectors are clean and in the correct
condition.
Subtask 24-51-55-865-052
B. Remove the safety clip(s) and the tag(s) and close this(these) circuit
breaker(s):
3XX
EFF :
ALL 24-51-55
Page 407
Aug 01/11
SYR
Subtask 24-51-55-710-050
(2) On the FWD ATTENDANT panel 120RH, push the MAIN ON pushbutton switch.
Make sure that these lights come on:
- CEILING FWD RH,
- CEILING AFT RH,
- WINDOW FWD LH,
- WINDOW AFT LH.
5. Close-up
________
Subtask 24-51-55-862-050
Subtask 24-51-55-410-050
B. Close Access
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
EFF :
ALL 24-51-55
Page 408
Nov 01/00
SYR
**ON A/C 003-099,
TASK 24-51-55-000-002
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
EFF :
003-099, 24-51-55
Page 409
May 01/11
SYR
3. __________
Job Set-up
Subtask 24-51-55-010-051
A. Get Access
(1) In the cockpit, remove the panel (6) which gives access to the panel
122VU. The panel 122VU is at the top of the panel 120VU.
Subtask 24-51-55-860-052
B. Safety Precautions
(1) Make sure that the external power connector is not connected to the
aircraft external power receptacle.
(2) Put warning notice(s) in position on the access door 121AL to tell
persons not to connect the external power connector to the aircraft
external power receptacle.
(3) In the cockpit, on the ELEC panel 35VU, make sure that these
pushbutton switches are released:
- BAT 1, BAT 2.
- APU GEN.
- GEN 1, GEN 2.
- EXT PWR.
Subtask 24-51-55-865-053
-------------------------------------------------------------------------------
PANEL DESIGNATION IDENT. LOCATION
-------------------------------------------------------------------------------
122VU ELEC/AC SHED BUS/CNTOR 26XN U25
123VU SHED BUS/218XP/220XP SPLY 28XN AC02
EFF :
003-099, 24-51-55
Page 410
May 01/11
SYR
R 4. Procedure
_________
R Subtask 24-51-55-020-052
R CAUTION : REMOVE THE CONTACTOR ONLY AND NOT THE BASE OR THE MODULE WHERE
_______
R THE WIRES ARE CONNECTED.
R (2) Put blanking caps on the disconnected electrical connector (4) and
R the electrical receptacle (5).
R NOTE : Do not remove the captive screws (2) and the spring washers
____
R from the contactor (3).
R (4) Remove the contactor (3) from the contactor base (1).
EFF :
003-099, 24-51-55
Page 411
May 01/06
SYR
R Contactor
R Figure 402/TASK 24-51-55-991-003
EFF :
003-099, 24-51-55
Page 412
May 01/06
SYR
TASK 24-51-55-400-002
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
EFF :
003-099, 24-51-55
Page 413
May 01/11
SYR
3. __________
Job Set-up
Subtask 24-51-55-860-053
(3) Make sure that the external power connector is not connected to the
aircraft receptacle.
(4) Make sure that, on the access door 121AL, a warning notice is in
position to tell persons not to connect the external power connector.
(5) In the cockpit, on the ELEC panel 35VU, make sure that these
pushbutton switches are released:
- BAT 1, BAT 2.
- APU GEN.
- GEN 1, GEN 2.
- EXT PWR.
(6) Make sure that a warning notice is in position in the cockpit to tell
persons not to operate the pushbutton switches on these overhead
panels:
- 21VU (EMER ELEC PWR section).
- 25VU (APU section).
- 35VU (ELEC).
(7) In the cockpit, on the APU section of the overhead panel 25VU, make
sure that a warning notice is in position to tell persons not to
start the APU.
(8) In the cockpit, make sure that the panel (6) which gives access to
the panel 122VU is removed.
EFF :
003-099, 24-51-55
Page 414
May 01/11
SYR
Subtask 24-51-55-865-054
B. Make sure that this(these) circuit breaker(s) is(are) open, safetied and
tagged
-------------------------------------------------------------------------------
PANEL DESIGNATION IDENT. LOCATION
-------------------------------------------------------------------------------
122VU ELEC/AC SHED BUS/CNTOR 26XN U25
123VU SHED BUS/218XP/220XP SPLY 28XN AC02
4. Procedure
_________
Subtask 24-51-55-420-052
(3) TORQUE the six captive screws (2) to between 0.15 and 0.18 m.daN
(13.27 and 15.92 lbf.in).
(5) Make sure that the electrical connectors are clean and in the correct
condition.
Subtask 24-51-55-865-055
B. Remove the safety clip(s) and the tag(s) and close this(these) circuit
breaker(s):
26XN, 28XN.
EFF :
003-099, 24-51-55
Page 415
May 01/11
SYR
R Subtask 24-51-55-710-051
R C. Test
R (2) On the overhead ELEC panel 35VU, push the GALY & CAB pushbutton
R switch (2XA) (the white indication light goes off).
R (3) On the rear panel 120VU, make sure that there is 115VAC on busbars
R 218XP and 220XP.
R (4) On the overhead ELEC panel 35VU, release the GALLEY pushbutton switch
R (2XA) (the white indication light goes on).
R 5. Close-up
________
R Subtask 24-51-55-410-051
R A. Close Access
R (1) Make sure that the work area is clean and clear of tool(s) and other
R items.
R Subtask 24-51-55-862-051
EFF :
003-099, 24-51-55
Page 416
May 01/06
SYR
AC ESSENTIAL DISTRIBUTION - DESCRIPTION AND OPERATION
_____________________________________________________
1. _______
General
(Ref. Fig. 001)
2. Component
__________________
Location
(Ref. Fig. 002, 003)
-------------------------------------------------------------------------------
FIN | FUNCTIONAL DESIGNATION | PANEL|ZONE|ACCESS | ATA
| | | | DOOR | REF.
-------------------------------------------------------------------------------
5XH A/XFMR-115/26VAC, ESS 125 812 24-52-51
-------------------------------------------------------------------------------
FIN | FUNCTIONAL DESIGNATION | PANEL |ZONE|ACCESS | ATA
| | | | DOOR | REF.
-------------------------------------------------------------------------------
8XH CNTOR-AC SHED ESS BUS 106VU 125 812 24-52-55
R 3. _________
Operation
R The AC essential distribution network can be supplied:
R - either by 115 VAC BUS1 1XP,
R - or by 115 VAC BUS2 2XP in case of loss of power from main busbar 1XP (in
R this case, the crew has to select ALTN on AC ESS FEED pushbutton switch to
R recover 115 VAC ESS BUS),
R - or by the emergency generator in emergency configuration or smoke
R emergency configuration,
R - or by the static inverter in emergency configuration during RAT extension
R and when the landing gear is extended.
R The major part of this network is supplied with three-phase 115 VAC/400 Hz.
R A 115/26 VAC single-phase autotransformer, identical to those of the main
R distribution supplies an essential 26 VAC/400 Hz sub-busbar (431XP-A).
R In case of loss of supply of 115 VAC ESS bus and 115 VAC SHED bus, a warning
R is tiggered on the ECAM
R (Ref. Fig. 004, 005, 006)
R NOTE : Part of this network (115 VAC SHED BUS 8XP) is automatically shed in
____
R emergency configuration when the static inverter is operating.
EFF :
ALL 24-52-00
Page 1
Nov 01/04
SYR
INTENTIONALLY BLANK
24-52-00
Page 2
May 01/98
SYR
AC Essential Distribution - Block Diagram
Figure 001
EFF :
ALL 24-52-00
Page 3/4
May 01/98
SYR
AC Essential Distribution - Component Location
Figure 002
EFF :
ALL 24-52-00
Page 5
May 01/98
SYR
AC Essential Distribution - Component Location
Figure 003
EFF :
ALL 24-52-00
Page 6
May 01/98
SYR
AC Essential Distribution - ECAM Warnings
Figure 004
EFF :
ALL 24-52-00
Page 7
May 01/98
SYR
115 VAC SHED BUS - Upper and Lower ECAM Display Unit
Figure 005 (SHEET 1)
EFF :
ALL 24-52-00
Page 8
May 01/98
SYR
115 VAC SHED BUS - Upper and Lower ECAM Display Unit
Figure 005 (SHEET 2)
EFF :
ALL 24-52-00
Page 9
May 01/98
SYR
Loss of the 115 VAC ESS BUS (Class 1 - Level 2)
Figure 006
EFF :
ALL 24-52-00
Page 10
May 01/98
SYR
TRANSFORMER - 115/26VAC (5XH) - REMOVAL/INSTALLATION
____________________________________________________
TASK 24-52-51-000-001
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
Subtask 24-52-51-861-051
Subtask 24-52-51-010-050
R (1) Put the ACCESS PLATFORM 2M (6 FT) - ADJUSTABLE at the access door 812
R to get access to the avionics compartment.
EFF :
ALL 24-52-51
Page 401
May 01/11
SYR
(3) Open the access panel of the AC/DC emergency power center 106VU.
Subtask 24-52-51-865-050
-------------------------------------------------------------------------------
PANEL DESIGNATION IDENT. LOCATION
-------------------------------------------------------------------------------
106VU 26VAC/ESS BUS/SPLY 4XH B06
4. Procedure
_________
Subtask 24-52-51-020-050
EFF :
ALL 24-52-51
Page 402
May 01/11
SYR
AutoTransformer
Figure 401/TASK 24-52-51-991-001
EFF :
ALL 24-52-51
Page 403
May 01/98
SYR
TASK 24-52-51-400-001
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
Subtask 24-52-51-860-050
EFF :
ALL 24-52-51
Page 404
May 01/11
SYR
(4) Make sure that the access panel of the AC/DC emergency power center
106VU is open.
Subtask 24-52-51-865-051
B. Make sure that this(these) circuit breaker(s) is(are) open, safetied and
tagged
-------------------------------------------------------------------------------
PANEL DESIGNATION IDENT. LOCATION
-------------------------------------------------------------------------------
106VU 26VAC/ESS BUS/SPLY 4XH B06
4. Procedure
_________
Subtask 24-52-51-420-050
(2) Install the washers (5) and the screws (4), then tighten the screws.
(4) Make sure that the electrical connectors are clean and in the correct
condition.
Subtask 24-52-51-865-052
B. Remove the safety clip(s) and the tag(s) and close this(these) circuit
breaker(s):
4XH
Subtask 24-52-51-710-050
(2) On the ADIRS CDU, put the OFF/NAV/ATT selector switch of the ADIRU 1
and ADIRU 3 in NAV position.
EFF :
ALL 24-52-51
Page 405
May 01/11
SYR
(3) Make sure that the FAULT legend on the ADR 1 and ADR 3 pushbutton
switches does not stay on.
5. Close-up
________
Subtask 24-52-51-410-050
A. Close Access
(1) In the avionics compartment, close the access panel of the AC/DC
emergency power center 106VU.
EFF :
ALL 24-52-51
Page 406
May 01/11
R
SYR
CONTACTOR (8XH) - REMOVAL/INSTALLATION
______________________________________
TASK 24-52-55-000-001
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
Subtask 24-52-55-010-050
(3) Open the access panels of the AC/DC emergency power center 106VU and
the access panels of the BATTERY power center 105VU.
EFF :
ALL 24-52-55
Page 401
May 01/11
SYR
Subtask 24-52-55-865-050
-------------------------------------------------------------------------------
PANEL DESIGNATION IDENT. LOCATION
-------------------------------------------------------------------------------
105VU ELEC/CSM/G /EV AUTO/SPLY 7XE C01
106VU CSM/G /EV/MAN/SPLY 6XE B04
106VU AC/SHED/ESS BUS/CNTOR/CTL 1XH C04
106VU ESS TR/SPLY 4PE C01
122VU ELEC/CNTOR/ESS/DC BUS/TIE 3PC W26
123VU AC ESS/BUS ON/BUS 1 1XC AC12
123VU AC ESS/BUS ON/BUS 2 2XC AC01
4. Procedure
_________
Subtask 24-52-55-020-050
NOTE : Do not remove the captive screws (1) and the spring washers
____
from the contactor (2).
EFF :
ALL 24-52-55
Page 402
May 01/11
R
SYR
AC SHED ESS BUS Contactor
Figure 401/TASK 24-52-55-991-001
EFF :
ALL 24-52-55
Page 403
May 01/98
SYR
TASK 24-52-55-400-001
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
Subtask 24-52-55-860-050
R (2) Make sure that the access doors 812 and 822 are open.
EFF :
ALL 24-52-55
Page 404
May 01/11
SYR
(3) In the avionics compartment, make sure that the access panel of the
AC/DC emergency power center 106VU and BATTERY power center 105VU are
open.
Subtask 24-52-55-865-051
B. Make sure that this(these) circuit breaker(s) is(are) open, safetied and
tagged
-------------------------------------------------------------------------------
PANEL DESIGNATION IDENT. LOCATION
-------------------------------------------------------------------------------
105VU ELEC/CSM/G /EV AUTO/SPLY 7XE C01
106VU CSM/G /EV/MAN/SPLY 6XE B04
106VU AC/SHED/ESS BUS/CNTOR/CTL 1XH C04
106VU ESS TR/SPLY 4PE C01
122VU ELEC/CNTOR/ESS/DC BUS/TIE 3PC W26
123VU AC ESS/BUS ON/BUS 1 1XC AC12
123VU AC ESS/BUS ON/BUS 2 2XC AC01
4. Procedure
_________
Subtask 24-52-55-420-050
(1) Install the contactor (2) on the 3 tapped barrels (3) of the
contactor base.
R (2) TORQUE the 3 captive screws (1) to between 0.05 and 0.068 m.daN (4.42
R and 6.01 lbf.in).
Subtask 24-52-55-865-052
B. Remove the safety clip(s) and the tag(s) and close this(these) circuit
breaker(s):
3PC, 1XC, 2XC, 7XE, 4PE, 6XE, 1XH
EFF :
ALL 24-52-55
Page 405
May 01/11
SYR
Subtask 24-52-55-710-050
(2) Do the EIS start procedure (Upper ECAM DU and lower ECAM DU only)
(Ref. TASK 31-60-00-860-001).
(3) Make sure that the AC SHED ESS BUS OFF warning does not come into
view.
5. Close-up
________
Subtask 24-52-55-410-050
A. Close Access
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
(2) In the avionics compartment, close the access panels of the AC/DC
emergency power center 106VU and the BATTERY power center 105VU.
EFF :
ALL 24-52-55
Page 406
May 01/98
SYR
GALLEY SUPPLY - DESCRIPTION AND OPERATION
_________________________________________
1. _______
General
R The power supply provides the galleys with 115 V AC. There are 50 KVA
R available for all galleys. This power is divided into two parts, the AFT
R galley power with 30 KVA and the FWD galley power with 20 KVA. The galleys
R are electrically connected with cable lugs to the aircraft terminal blocks.
2. Component
__________________
Location
R (Ref. Fig. 001)
R -------------------------------------------------------------------------------
R FIN I FUNCTIONAL DESIGNATION I PANEL I ZONE I ACCESS
R I I I I DOOR
R -------------------------------------------------------------------------------
R 4MC CONTACTOR 220
R 5MC CONTACTOR 220
R 6MC CONTACTOR 220
R 13MC CONTACTOR 220
R 15MC CONTACTOR 220
R 17MC CONTACTOR 220
R 6475MM GALLEY (LOC.I) 222
R 6478MM GALLEY (LOC.II) 222
R 6483MM GALLEY (LOC.V) 262
3. System
__________________
Description
R (Ref. Fig. 002)
R The power supply provides the galley assemblies with 115 V AC through the
R three phase normal busbars 1XP and 2XP. Six triple core wires (feeders A to
R F) distribute the power to terminal blocks in the forward and aft galley
R area. Vendor wiring distributes the power to the galley units. The wiring is
R connected to the terminal blocks by the electrical connector.
R The maximum available load for all galleys is 50 KVA. The load is
R distributed as follows:
R - Network 1 = feeder A, B and E with 30 KVA,
R - Network 2 = feeder C, D and F with 20 KVA.
R Circuit breakers protect the feeders. Power contactors switch the power.
EFF :
ALL 24-56-00
Page 1
Nov 01/05
SYR
R Galley Supply - Component Location
R Figure 001 (SHEET 1)
EFF :
ALL 24-56-00
Page 2
Nov 01/05
SYR
R Galley Supply - Component Location
R Figure 001 (SHEET 2)
R
EFF :
ALL 24-56-00
Page 3
Nov 01/05
SYR
Galley Power Supply and Distribution - Schematic
Figure 002 (SHEET 1)
EFF :
ALL 24-56-00
Page 4
May 01/98
SYR
Galley Power Supply and Distribution - Schematic
Figure 002 (SHEET 2)
EFF :
ALL 24-56-00
Page 5
May 01/98
SYR
4. Operation/Control
_______________________
& Ind
R The power contactors for the galleys are controlled through control relays
R as follows:
R With the APU generator running or with external power supplied you can
R supply all feeders with power (on the ground). With both engine driven
R generators running, you can supply all feeders with power (on the ground or
R in flight). With only engine 1 driven generator running, only feeders B and
R D is supplied. Feeders A, C, E and F are shed automatically (on the ground
R or in flight). You can manually shed all the feeders to the galley with the
R pushbutton switch 2XA GALLEY OFF in the cockpit (on the overhead panel
R 35VU).
EFF :
ALL 24-56-00
Page 6
Nov 01/05
SYR
GALLEY SUPPLY - DEACTIVATION/REACTIVATION
_________________________________________
TASK 24-56-00-040-001
1. __________________
Reason for the Job
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
R B. Consumable Materials
R -------------------------------------------------------------------------------
R REFERENCE DESIGNATION
R -------------------------------------------------------------------------------
R No specific PLACARD
R C. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
EFF :
ALL 24-56-00
Page 401
Aug 01/11
SYR
3. __________
Job Set-up
Subtask 24-56-00-860-052
(2) Make sure that the pushbutton switch GALLEY 2XA on the overhead panel
35VU is in the OFF position (white indication light shows OFF).
Subtask 24-56-00-865-050
-------------------------------------------------------------------------------
PANEL DESIGNATION IDENT. LOCATION
-------------------------------------------------------------------------------
EFF :
ALL 24-56-00
Page 402
Aug 01/11
R
SYR
4. Procedure
_________
Subtask 24-56-00-040-050
R (1) Make sure that the galley electrical panel(s) and galley equipment(s)
R does (do) not operate.
R (2) Install a PLACARD INOP on the galley electrical panel(s) and galley
R equipment(s) to tell persons not to use it (Ref. TASK 11-00-00-400-
R 021).
5. Close-up
________
Subtask 24-56-00-862-050
EFF :
ALL 24-56-00
Page 403
Aug 01/11
SYR
TASK 24-56-00-040-003
1. __________________
Reason for the Job
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
R B. Consumable Materials
R -------------------------------------------------------------------------------
R REFERENCE DESIGNATION
R -------------------------------------------------------------------------------
R No specific PLACARD
R C. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
EFF :
ALL 24-56-00
Page 404
Aug 01/11
SYR
3. __________
Job Set-up
Subtask 24-56-00-860-054
(2) Make sure that the pushbutton switch GALLEY 2XA on the overhead panel
35VU is in the OFF position (white indication light shows OFF).
Subtask 24-56-00-865-055
-------------------------------------------------------------------------------
PANEL DESIGNATION IDENT. LOCATION
-------------------------------------------------------------------------------
EFF :
ALL 24-56-00
Page 405
Aug 01/11
R
SYR
4. Procedure
_________
Subtask 24-56-00-040-051
R (1) Make sure that the galley electrical panel(s) and galley equipment(s)
R does (do) not operate.
R (2) Install a PLACARD INOP on the galley electrical panel(s) and galley
R equipment(s) to tell persons not to use it (Ref. TASK 11-00-00-400-
R 021).
5. Close-up
________
Subtask 24-56-00-862-053
EFF :
ALL 24-56-00
Page 406
Aug 01/11
SYR
TASK 24-56-00-440-001
1. __________________
Reason for the Job
2. ______________________
Job Set-up Information
A. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
Subtask 24-56-00-861-051
EFF :
ALL 24-56-00
Page 407
Aug 01/11
SYR
Subtask 24-56-00-865-051
B. Remove the safety clip(s) and the tag(s) and close this(these) circuit
breaker(s):
-------------------------------------------------------------------------------
PANEL DESIGNATION IDENT. LOCATION
-------------------------------------------------------------------------------
4. Procedure
_________
Subtask 24-56-00-440-050
R (1) Do the trouble shooting procedure of the galley supply system (Ref.
TSM TASK 24-56-00-810-801).
R
R (2) Remove the PLACARD INOP from the galley electrical panel(s) and
R galley equipment(s) (Ref. TASK 11-00-00-000-003).
EFF :
ALL 24-56-00
Page 408
Aug 01/11
SYR
5. Close-up
________
Subtask 24-56-00-862-052
EFF :
ALL 24-56-00
Page 409
Aug 01/11
SYR
TASK 24-56-00-440-003
1. __________________
Reason for the Job
2. ______________________
Job Set-up Information
A. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
Subtask 24-56-00-861-054
EFF :
ALL 24-56-00
Page 410
Aug 01/11
SYR
Subtask 24-56-00-865-060
B. Remove the safety clip(s) and the tag(s) and close this(these) circuit
breaker(s):
-------------------------------------------------------------------------------
PANEL DESIGNATION IDENT. LOCATION
-------------------------------------------------------------------------------
4. Procedure
_________
Subtask 24-56-00-440-052
R (1) Do the trouble shooting procedure of the galley supply system (Ref.
TSM TASK 24-56-00-810-801).
R
R (2) Remove the PLACARD INOP from the galley electrical panel(s) and
R galley equipment(s) (Ref. TASK 11-00-00-000-003).
EFF :
ALL 24-56-00
Page 411
Aug 01/11
SYR
5. Close-up
________
Subtask 24-56-00-862-056
EFF :
ALL 24-56-00
Page 412
Aug 01/11
SYR
GALLEY SUPPLY - ADJUSTMENT/TEST
_______________________________
TASK 24-56-00-710-001
WARNING : MAKE SURE THAT ALL THE CIRCUITS IN MAINTENANCE ARE ISOLATED BEFORE
_______
YOU SUPPLY ELECTRICAL POWER TO THE AIRCRAFT.
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
A. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
Subtask 24-56-00-860-050
(2) Make sure that the pushbutton switch GALLEY 2XA, on the overhead
panel 35VU is in the OFF position (a white indication light shows
OFF).
EFF :
ALL 24-56-00
Page 501
May 01/98
SYR
Subtask 24-56-00-865-052
-------------------------------------------------------------------------------
PANEL DESIGNATION IDENT. LOCATION
-------------------------------------------------------------------------------
4. Procedure
_________
Subtask 24-56-00-710-050
-------------------------------------------------------------------------------
ACTION RESULT
-------------------------------------------------------------------------------
- push and release the GALLEY - the white indicator light comes on.
pushbutton switch 2XA again.
EFF :
ALL 24-56-00
Page 502
Nov 01/09
SYR
-------------------------------------------------------------------------------
ACTION RESULT
-------------------------------------------------------------------------------
In the FWD and AFT galleys:
- no galley equipment operates.
5. Close-up
________
Subtask 24-56-00-860-051
(2) Make sure that the pushbutton switch GALLEY 2XA, on the overhead
panel 35VU is in the OFF position (a white indication light shows
OFF).
EFF :
ALL 24-56-00
Page 503
May 01/05
R
SYR
CONTACTOR - GALLEY SUPPLY (4MC,5MC,6MC,13MC,15MC,17MC) - REMOVAL/INSTALLATION
_____________________________________________________________________________
TASK 24-56-55-000-001
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
EFF :
ALL 24-56-55
Page 401
Feb 01/99
R
SYR
3. __________
Job Set-up
Subtask 24-56-55-860-050
A. Safety Precautions
(1) In the cockpit, on the overhead ELEC panel 35VU, make sure that the
GALLEY pushbutton switch is released (the OFF legend is on).
(2) Put a warning notice on the ELEC panel 35VU to tell persons not to
operate the GALLEY pushbutton switch.
R Subtask 24-56-55-860-050-A
R A. Safety Precautions
R (1) In the cockpit, on the overhead ELEC panel 35VU, make sure that the
R GALY & CAB pushbutton switch is released (the OFF legend is on).
R (2) Put a warning notice on the ELEC panel 35VU to tell persons not to
R operate the GALY & CAB pushbutton switch.
Subtask 24-56-55-010-050
(1) Remove the ceiling panels (Ref. TASK 25-23-41-000-001) and the
forward utility area ceiling panels (Ref. TASK 25-23-42-000-001).
EFF :
ALL 24-56-55
Page 402
Feb 01/99
SYR
Subtask 24-56-55-865-050
-------------------------------------------------------------------------------
PANEL DESIGNATION IDENT. LOCATION
-------------------------------------------------------------------------------
4. Procedure
_________
Subtask 24-56-55-020-050
CAUTION : MAKE MATCH MARKS ON ALL THE ELECTRICAL WIRES BEFORE YOU
_______
DISCONNECT THEM. INCORRECT CONNECTION OF WIRES WILL CAUSE
DAMAGE TO EQUIPMENT.
EFF :
ALL 24-56-55
Page 403
Nov 01/09
SYR
Micro Contactor Located in the Panel 200VU
Figure 401/TASK 24-56-55-991-001
EFF :
ALL 24-56-55
Page 404
Feb 01/99
R
SYR
(2) Remove the 6 screws (4) and washers (3).
EFF :
ALL 24-56-55
Page 405
Feb 01/99
R
SYR
TASK 24-56-55-400-001
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
EFF :
ALL 24-56-55
Page 406
Feb 01/99
R
SYR
3. __________
Job Set-up
Subtask 24-56-55-860-051
A. Safety Precautions
(1) In the cockpit, on the overhead ELEC panel 35VU, make sure that the
GALLEY pushbutton switch is released (the OFF legend is on).
(2) Make sure that there is a warning notice on the ELEC panel 35VU to
tell persons not to operate the GALLEY pushbutton switch.
R Subtask 24-56-55-860-051-A
R A. Safety Precautions
R (1) In the cockpit, on the overhead ELEC panel 35VU, make sure that the
R GALY & CAB pushbutton switch is released (the OFF legend is on).
R (2) Make sure that there is a warning notice on the ELEC panel 35VU to
R tell persons not to operate the GALY & CAB pushbutton switch.
EFF :
ALL 24-56-55
Page 407
Feb 01/99
SYR
**ON A/C ALL
Subtask 24-56-55-865-051
B. Make sure that this(these) circuit breaker(s) is(are) open, safetied and
tagged
-------------------------------------------------------------------------------
PANEL DESIGNATION IDENT. LOCATION
-------------------------------------------------------------------------------
EFF :
ALL 24-56-55
Page 408
Nov 01/09
SYR
4. Procedure
_________
Subtask 24-56-55-420-050
CAUTION : REFER TO THE MATCH MARKS MADE DURING THE REMOVAL WHEN YOU
_______
CONNECT THE ELECTRICAL WIRES.
INCORRECT CONNECTION OF THE WIRES WILL CAUSE DAMAGE TO
EQUIPMENT.
(4) Install the 6 washers (3) and screws (4). Tighten the screws (4).
5. Close-up
________
Subtask 24-56-55-865-052
A. Remove the safety clip(s) and the tag(s) and close this(these) circuit
breaker(s):
R 1XA, 7MC, 16MC, 14MC, 3MC, 12MC.
Subtask 24-56-55-410-050
(1) Install the ceiling panels (Ref. TASK 25-23-41-400-001) and the
forward utility area ceiling panels (Ref. TASK 25-23-42-400-001).
Subtask 24-56-55-942-050
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
EFF :
ALL 24-56-55
Page 409
Nov 01/09
SYR
TASK 24-56-55-000-002
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
EFF :
ALL 24-56-55
Page 410
Feb 01/99
R
SYR
3. __________
Job Set-up
Subtask 24-56-55-860-052
A. Safety Precautions
(1) In the cockpit, on the overhead ELEC panel 35VU, make sure that the
GALLEY pushbutton switch is released (the OFF legend is on).
(2) Put a warning notice on the ELEC panel 35VU to tell persons not to
operate the GALLEY pushbutton switch.
R Subtask 24-56-55-860-052-A
R A. Safety Precautions
R (1) In the cockpit, on the overhead ELEC panel 35VU, make sure that the
R GALY & CAB pushbutton switch is released (the OFF legend is on).
R (2) Put a warning notice on the ELEC panel 35VU to tell persons not to
R operate the GALY & CAB pushbutton switch.
Subtask 24-56-55-010-051
(1) Remove the ceiling panels (Ref. TASK 25-23-41-000-001) and the
forward utility area ceiling panels (Ref. TASK 25-23-42-000-001).
EFF :
ALL 24-56-55
Page 411
Feb 01/99
SYR
Subtask 24-56-55-865-053
-------------------------------------------------------------------------------
PANEL DESIGNATION IDENT. LOCATION
-------------------------------------------------------------------------------
4. Procedure
_________
Subtask 24-56-55-020-051
CAUTION : REMOVE THE CONTACTOR ONLY AND NOT THE BASE OR THE MODULE WHERE
_______
THE WIRES ARE CONNECTED.
EFF :
ALL 24-56-55
Page 412
Nov 01/09
SYR
Contactor Located in the Panel 200VU
Figure 402/TASK 24-56-55-991-002
EFF :
ALL 24-56-55
Page 413
Feb 01/99
R
SYR
R (2) Put blanking caps on the disconnected electrical connector(s).
NOTE : Do not remove the captive screws (5) and the spring washers
____
(6) from the contactor (3).
EFF :
ALL 24-56-55
Page 414
May 01/10
SYR
TASK 24-56-55-400-002
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
EFF :
ALL 24-56-55
Page 415
May 01/10
SYR
3. __________
Job Set-up
Subtask 24-56-55-860-053
A. Safety Precautions
(1) In the cockpit, on the overhead ELEC panel 35VU, make sure that the
GALLEY pushbutton switch is released (the OFF legend is on).
(2) Make sure that there is a warning notice on the ELEC panel 35VU to
tell persons not to operate the GALLEY pushbutton switch.
R Subtask 24-56-55-860-053-A
R A. Safety Precautions
R (1) In the cockpit, on the overhead ELEC panel 35VU, make sure that the
R GALY & CAB pushbutton switch is released (the OFF legend is on).
R (2) Make sure that there is a warning notice on the ELEC panel 35VU to
R tell persons not to operate the GALY & CAB pushbutton switch.
EFF :
ALL 24-56-55
Page 416
Feb 01/99
SYR
**ON A/C ALL
Subtask 24-56-55-865-054
B. Make sure that this(these) circuit breaker(s) is(are) open, safetied and
tagged
-------------------------------------------------------------------------------
PANEL DESIGNATION IDENT. LOCATION
-------------------------------------------------------------------------------
4. Procedure
_________
Subtask 24-56-55-420-051
CAUTION : MAKE SURE THAT THE CONTACTOR LOCATING PIN IS CORRECTLY ENGAGED
_______
IN ITS RECESS LOCATED IN ONE POWER TERMINAL.
THIS PREVENTS DAMAGE TO THE LOCATING PIN WHEN YOU APPLY THE
TORQUE.
EFF :
ALL 24-56-55
Page 417
May 01/10
R
SYR
(1) Install the contactor (3) on the 6 tapped barrels (2) of the
contactor base (1).
(2) TORQUE the captive screws (5) to between 23.90 and 26.55 lbf.in (0.27
and 0.30 m.daN).
(4) Make sure that the electrical connectors are clean and in the correct
condition.
5. Close-up
________
Subtask 24-56-55-865-055
A. Remove the safety clip(s) and the tag(s) and close this(these) circuit
breaker(s):
1XA, 7MC, 16MC, 14MC, 3MC, 12MC.
Subtask 24-56-55-410-051
(1) Install the ceiling panels (Ref. TASK 25-23-41-400-001) and the
forward utility area ceiling panels (Ref. TASK 25-23-42-400-001).
Subtask 24-56-55-942-051
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
EFF :
ALL 24-56-55
Page 418
May 01/10
SYR
TASK 24-56-55-000-003
Removal of the Micro Contactor or/and Contactor Located in the Panel 200VU
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
EFF :
ALL 24-56-55
Page 419
May 01/05
R
SYR
3. __________
Job Set-up
Subtask 24-56-55-860-054
A. Safety Precautions
(1) In the cockpit, on the overhead ELEC panel 35VU, make sure that the
GALLEY pushbutton switch is released (the OFF legend is on).
(2) Put a warning notice on the ELEC panel 35VU to tell persons not to
operate the GALLEY pushbutton switch.
Subtask 24-56-55-860-054-A
A. Safety Precautions
(1) In the cockpit, on the overhead ELEC panel 35VU, make sure that the
GALY & CAB pushbutton switch is released (the OFF legend is on).
(2) Put a warning notice on the ELEC panel 35VU to tell persons not to
operate the GALY & CAB pushbutton switch.
Subtask 24-56-55-010-052
(1) Remove the ceiling panels (Ref. TASK 25-23-41-000-001) and the
forward utility area ceiling panels (Ref. TASK 25-23-42-000-001).
EFF :
ALL 24-56-55
Page 420
May 01/05
R
SYR
Subtask 24-56-55-865-056
-------------------------------------------------------------------------------
PANEL DESIGNATION IDENT. LOCATION
-------------------------------------------------------------------------------
4. Procedure
_________
Subtask 24-56-55-020-052
Subtask 24-56-55-020-053
EFF :
ALL 24-56-55
Page 421
Nov 01/09
SYR
Micro Contactor or/and Contactor Located in the Panel 200VU
Figure 403/TASK 24-56-55-991-003
EFF :
ALL 24-56-55
Page 422
May 01/05
R
SYR
TASK 24-56-55-400-003
Installation of the Micro Contactor or/and Contactor Located in the Panel 200VU
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
EFF :
ALL 24-56-55
Page 423
May 01/05
R
SYR
3. __________
Job Set-up
Subtask 24-56-55-860-055
A. Safety Precautions
(1) In the cockpit, on the overhead ELEC panel 35VU, make sure that the
GALLEY pushbutton switch is released (the OFF legend is on).
(2) Make sure that there is a warning notice on the ELEC panel 35VU to
tell persons not to operate the GALLEY pushbutton switch.
Subtask 24-56-55-860-055-A
A. Safety Precautions
(1) In the cockpit, on the overhead ELEC panel 35VU, make sure that the
GALY & CAB pushbutton switch is released (the OFF legend is on).
(2) Make sure that there is a warning notice on the ELEC panel 35VU to
tell persons not to operate the GALY & CAB pushbutton switch.
EFF :
ALL 24-56-55
Page 424
May 01/05
R
SYR
**ON A/C ALL
Subtask 24-56-55-865-057
B. Make sure that this(these) circuit breaker(s) is(are) open, safetied and
tagged
-------------------------------------------------------------------------------
PANEL DESIGNATION IDENT. LOCATION
-------------------------------------------------------------------------------
4. Procedure
_________
Subtask 24-56-55-420-052
EFF :
ALL 24-56-55
Page 425
Nov 01/09
SYR
Subtask 24-56-55-420-053
Subtask 24-56-55-865-058
C. Remove the safety clip(s) and the tag(s) and close this(these) circuit
breaker(s):
R 1XA, 7MC, 16MC, 14MC, 3MC, 12MC.
Subtask 24-56-55-710-050
5. Close-up
________
Subtask 24-56-55-410-052
(1) Install the ceiling panels (Ref. TASK 25-23-41-400-001) and the
forward utility area ceiling panels (Ref. TASK 25-23-42-400-001).
Subtask 24-56-55-942-052
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
EFF :
ALL 24-56-55
Page 426
Nov 01/09
SYR
DC ELECTRICAL LOAD DISTRIBUTION - DESCRIPTION AND OPERATION
___________________________________________________________
1. _______
General
The DC electrical distribution on board is carried out in several steps
corresponding to:
- power distribution from the transformers rectifiers towards the main DC
busbars located in the DC electrical power center, then from the main
busbars towards the associated distribution sub-busbars,
- distribution from these sub-busbars towards the different consumers.
This chapter deals only with power distribution.
The referenced figure gives a schematic summary of the whole DC distribution
on board.
2. Component
__________________
Location
R (Ref. Fig. 002, 003)
-------------------------------------------------------------------------------
FIN | FUNCTIONAL DESIGNATION | PANEL|ZONE|ACCESS | ATA
| | | | DOOR | REF.
-------------------------------------------------------------------------------
8PH CNTOR-DC SHED ESS BUS 106VU 125 812 24-62-55
8PN CNTOR-DC SVCE BUS NORM SPLY 120VU 125 812 24-61-55
EFF :
ALL 24-60-00
Page 1
Nov 01/04
SYR
**ON A/C 003-099,
-------------------------------------------------------------------------------
FIN | FUNCTIONAL DESIGNATION | PANEL|ZONE|ACCESS | ATA
| | | | DOOR | REF.
-------------------------------------------------------------------------------
-------------------------------------------------------------------------------
FIN I FUNCTIONAL DESIGNATION I PANELIZONEIACCESS I ATA
I I I I DOOR I REF.
-------------------------------------------------------------------------------
6PH HOLDER-FUSE 105VU 126 24-62-00
6PH1 FUSE 105VU 126 24-62-00
A. Spare Fuse If fuse 6PH1 melts, you can replace it by a spare 80 A fuse
located, in the cockpit, behind the pilot seat, at the top on the left
side panel.
R 3. System
__________________
Description
R Different distribution configurations: (See ATA Ref. 24-50-00).
R In case of loss of the DC BUS 1, DC BUS 2, DC BAT BUS and DC ESS BUS (DC
R power snag), the crew must extend the RAT by pressing the RAT & EMER GEN/MAN
R ON pushbutton switch located on the EMER ELEC PWR section of the overhead
R panel:
R (Ref. Fig. 004, 005, 006)
R
EFF :
ALL 24-60-00
Page 2
Nov 01/04
SYR
DC Electrical Load Distribution - General
Figure 001
R
EFF :
001-002, 24-60-00
Page 3/4
Feb 01/99
SYR
R DC Electrical Load Distribution - General
R Figure 001A
R
EFF :
003-099, 24-60-00
Page 5/6
Feb 01/99
R
SYR
DC Electrical Load Distribution - Component Location
Figure 002
R
EFF :
ALL 24-60-00
Page 7
Feb 01/99
SYR
Spare Fuse - Component Location
Figure 003
EFF :
ALL 24-60-00
Page 8
Feb 01/99
R
SYR
INTENTIONALLY BLANK
R
24-60-00
Page 9
Feb 01/99
SYR
DC EMER CONFIG - Upper and Lower ECAM Display Unit
Figure 004 (SHEET 1)
EFF :
ALL 24-60-00
Page 10
Feb 01/99
R
SYR
DC EMER CONFIG - Upper and Lower ECAM Display Unit
Figure 004 (SHEET 2)
EFF :
ALL 24-60-00
Page 11
Feb 01/99
R
SYR
DC Emergency Configuration - Supply of the Network by the CSM/G
Figure 005
EFF :
ALL 24-60-00
Page 12
Feb 01/99
SYR
DC Emergency Configuration - Supply of the Network
with the Landing Gear Extended
Figure 006
EFF :
ALL
24-60-00 Page 13
Feb 01/99
SYR
DC MAIN DISTRIBUTION - DESCRIPTION AND OPERATION
________________________________________________
1. _______
General
The main 28 VDC distribution network corresponds to busbars 1PP, 2PP, 3PP,
6PP and associated sub-busbars,
2. __________________
Component Location
R -------------------------------------------------------------------------------
R FIN | FUNCTIONAL DESIGNATION | PANEL|ZONE|ACCESS | ATA
R | | | | DOOR | REF.
R -------------------------------------------------------------------------------
R 8PN CNTOR-DC SVCE BUS NORM SPLY 120VU 125 812 24-61-55
R -------------------------------------------------------------------------------
R FIN | FUNCTIONAL DESIGNATION | PANEL|ZONE|ACCESS | ATA
R | | | | DOOR | REF.
R -------------------------------------------------------------------------------
R 8PN CNTOR-DC SVCE BUS NORM SPLY 120VU 125 812 24-61-55
R 10PN CONTACTOR 120 VU 212 831 24-61-00
EFF :
ALL 24-61-00
Page 1
Nov 01/04
SYR
R **ON A/C ALL
3. Operation/Control
______________________________
& Indicating
Busbars 1PP, 3PP are supplied by TR1.
Busbars 2PP, 6PP are supplied by TR2.
NOTE : In case of loss of one main TR, both main busbars are supplied by the
____
remaining main TR.
R
EFF :
ALL 24-61-00
Page 2
Feb 01/99
SYR
DC Main Distribution - General
Figure 001
R
EFF :
001-002, 24-61-00
Page 3/4
Feb 01/99
SYR
R DC Main Distribution - General
R Figure 001A
R
EFF :
003-099, 24-61-00
Page 5/6
Feb 01/99
R
SYR
DC Main Distribution - Component Location
Figure 002
R
EFF :
ALL 24-61-00
Page 7
Feb 01/99
SYR
DC Main Distribution - ECAM Warnings
Figure 003
EFF :
ALL 24-61-00
Page 8
Feb 01/99
R
SYR
INTENTIONALLY BLANK
R
24-61-00
Page 9
Feb 01/99
SYR
DC BUS 1 FAULT - Upper and Lower ECAM display Unit
Figure 004 (SHEET 1)
EFF :
ALL 24-61-00
Page 10
Feb 01/99
R
SYR
DC BUS 1 FAULT - Upper and Lower ECAM display Unit
Figure 004 (SHEET 2)
EFF :
ALL 24-61-00
Page 11
Feb 01/99
R
SYR
DC BUS 2 FAULT - Upper and Lower ECAM Display Unit
Figure 005 (SHEET 1)
EFF :
ALL 24-61-00
Page 12
Feb 01/99
R
SYR
DC BUS 2 FAULT - Upper and Lower ECAM Display Unit
Figure 005 (SHEET 2)
EFF :
ALL 24-61-00
Page 13
Feb 01/99
R
SYR
DC BUS 1 and DC BUS 2 FAULT - Upper and Lower ECAM Display Unit
Figure 006 (SHEET 1)
EFF :
ALL 24-61-00
Page 14
Feb 01/99
R
SYR
DC BUS 1 and DC BUS 2 FAULT - Upper and Lower ECAM Display Unit
Figure 006 (SHEET 2)
EFF :
ALL 24-61-00
Page 15
Feb 01/99
R
SYR
DC BAT BUS FAULT - Upper and Lower ECAM Display Unit
Figure 007 (SHEET 1)
EFF :
ALL 24-61-00
Page 16
Feb 01/99
SYR
DC BAT BUS FAULT - Upper and Lower ECAM Display Unit
Figure 007 (SHEET 2)
EFF :
ALL 24-61-00
Page 17
Feb 01/99
SYR
CONTACTOR (8PN,10PN) - REMOVAL/INSTALLATION
___________________________________________
TASK 24-61-55-000-001
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
Subtask 24-61-55-010-050
A. Get Access
(2) Remove the front panel on the bottom right side of the panel 120VU.
EFF :
ALL 24-61-55
Page 401
May 01/11
SYR
R (3) Put the ACCESS PLATFORM 1M (3 FT)-ADJUSTABLE in position at the
R access door 121AL.
Subtask 24-61-55-860-050
B. Safety Precautions
(1) Make sure that the external power connector is not connected to the
aircraft EXT PWR receptacle.
(2) Put warning notices in position on the access door 121AL to tell
persons not to connect the external power connector to the aircraft
EXT PWR receptacle.
(3) In the cockpit, on the ELEC panel 35VU, make sure that these
pushbutton switches are released:
- BAT 1, BAT 2,
- APU GEN,
- GEN 1, GEN 2,
- EXT PWR.
(4) In the cockpit, put warning notices in position to tell the persons
not to operate the pushbutton switches on these overhead panels:
- 21VU (EMER ELEC PWR section),
- 25VU (APU section),
- 35VU (ELEC).
(5) In the cockpit, on the APU section of the overhead panel 25VU, put a
warning notice to tell persons not to start the APU.
4. Procedure
_________
Subtask 24-61-55-020-050
CAUTION : REMOVE THE CONTACTOR ONLY AND NOT THE BASE OR THE MODULE WHERE
_______
THE WIRES ARE CONNECTED.
(2) Put a blanking caps on the disconnected electrical connector (4) and
the electrical receptacle.
EFF :
ALL 24-61-55
Page 402
May 01/11
SYR
Contactor
Figure 401/TASK 24-61-55-991-001
EFF :
ALL 24-61-55
Page 403
May 01/98
SYR
R (3) Loosen the captive screws (2).
NOTE : Do not remove the captive screws (2) and the spring washers
____
from the contactor (3).
EFF :
ALL 24-61-55
Page 404
Nov 01/00
SYR
TASK 24-61-55-400-001
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
EFF :
ALL 24-61-55
Page 405
May 01/10
SYR
3. __________
Job Set-up
Subtask 24-61-55-860-051
(1) Make sure that the access platform is in position at the access door
121AL.
(3) Make sure that the external power connector is not connected to the
aircraft receptacle.
(4) Make sure that, on the access door 121AL, there is a warning notice
to tell persons not to connect the external power connector.
(5) In the cockpit, on the overhead panel 35VU, make sure that these
pushbutton switches are released:
- BAT 1, BAT 2,
- APU GEN,
- GEN 1, GEN 2,
- EXT PWR.
(6) Make sure that there is a warning notice in the cockpit to tell
persons not to operate the pushbutton switches on these overhead
panels:
- 21VU (EMER ELEC PWR),
- 35VU (ELEC).
(7) In the cockpit, on the APU section of the overhead panel 25VU, make
sure that a warning notice is in position to tell persons not to
start the APU.
(8) In the cockpit, make sure that the third occupant seat is removed
(Ref. TASK 25-11-41-000-001).
(9) In the cockpit, make sure that the front panel on the bottom right
side of the panel 120VU is removed.
EFF :
ALL 24-61-55
Page 406
May 01/98
SYR
4. Procedure
_________
Subtask 24-61-55-420-050
CAUTION : MAKE SURE THAT THE CONTACTOR LOCATING PIN IS CORRECTLY ENGAGED
_______
IN ITS RECESS LOCATED IN ONE POWER TERMINAL.
THIS PREVENTS DAMAGE TO THE LOCATING PIN WHEN YOU APPLY THE
TORQUE.
(1) Put the contactor (3) in position on the tapped barrels (6) of the
connecting base (5).
(2) TORQUE the two captive screws (2) to between 23.9 and 26.55 lbf.in
(0.27 and 0.30 m.daN).
(4) Make sure that the electrical connectors are clean and in the correct
condition.
Subtask 24-61-55-710-050
(2) On the overhead panel 25VU, put the INT LT/DOME switch in the BRT
position. The dome lights on the panel 453VU, on the left of the
cockpit, come on.
EFF :
ALL 24-61-55
Page 407
May 01/10
SYR
5. Close-up
________
Subtask 24-61-55-410-050
A. Close Access
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
(2) Install the front panel on the bottom right side of the panel 120VU.
EFF :
ALL 24-61-55
Page 408
May 01/10
R
SYR
**ON A/C 003-099,
TASK 24-61-55-000-002
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
EFF :
003-099, 24-61-55
Page 409
May 01/11
SYR
3. __________
Job Set-up
Subtask 24-61-55-010-051
A. Get Access
(2) Remove the front panel on the bottom right side of the panel 120VU.
Subtask 24-61-55-860-052
B. Safety Precautions
(1) Make sure that the external power connector is not connected to the
aircraft external power receptacle.
(2) Put warning notices in position on the access door 121AL to tell
persons not to connect the external power connector to the aircraft
external power receptacle.
(3) In the cockpit, on the ELEC panel 35VU, make sure that these
pushbutton switches are released:
- BAT 1, BAT 2.
- APU GEN.
- GEN 1, GEN 2.
- EXT PWR.
(4) In the cockpit, put warning notices in position to tell the persons
not to operate the pushbutton switches on these overhead panels:
- 21VU (EMER ELEC PWR section),
- 25VU (APU section),
- 35VU (ELEC).
(5) In the cockpit, on the APU section of the overhead panel 25VU, put a
warning notice to tell persons not to start the APU.
EFF :
003-099, 24-61-55
Page 410
May 01/11
SYR
R Subtask 24-61-55-865-050
R -------------------------------------------------------------------------------
R PANEL DESIGNATION IDENT. LOCATION
R -------------------------------------------------------------------------------
R 122VU ELEC/DC SHED BUS/CNTR 9PN U26
R 124VU SHED BUS 210PP/212PP/SPLY 11PN BA01
R 4. Procedure
_________
R Subtask 24-61-55-020-051
R CAUTION : REMOVE THE CONTACTOR ONLY AND NOT THE BASE OR THE MODULE WHERE
_______
R THE WIRES ARE CONNECTED.
R (2) Put blanking caps on the disconnected electrical connector (5) and
R the electrical receptacle (4).
R NOTE : Do not remove the captive screws (2) and the spring washers
____
R from the contactor (3).
R (4) Remove the contactor (3) from the contactor base (1).
EFF :
003-099, 24-61-55
Page 411
May 01/06
SYR
R Contactor
R Figure 402/TASK 24-61-55-991-003
EFF :
003-099, 24-61-55
Page 412
May 01/06
SYR
TASK 24-61-55-400-002
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
EFF :
003-099, 24-61-55
Page 413
May 01/11
SYR
3. __________
Job Set-up
Subtask 24-61-55-860-053
(3) Make sure that the external power connector is not connected to the
aircraft receptacle.
(4) Make sure that on the access door 121AL, a warning notice is in
position to tell persons not to connect the external power connector.
(5) In the cockpit, on the ELEC panel 35VU, make sure that these
pushbutton switches are released:
- BAT 1, BAT 2.
- APU GEN.
- GEN 1, GEN 2.
- EXT PWR.
(6) Make sure that a warning notice is in position in the cockpit to tell
persons not to operate the pushbutton switches on these overhead
panels:
- 21VU (EMER ELEC PWR section).
- 25VU (APU section).
- 35VU (ELEC).
(7) In the cockpit, on the APU section of the overhead panel 25VU, make
sure that a warning notice is in position to tell persons not to
start the APU.
(8) In the cockpit, make sure that the third occupant seat is removed
(Ref. TASK 25-11-41-000-001).
(9) In the cockpit, make sure that the front panel on the bottom right
side of the panel 120VU is removed.
EFF :
003-099, 24-61-55
Page 414
May 01/11
SYR
Subtask 24-61-55-865-051
B. Make sure that this(these) circuit breaker(s) is(are) open, safetied and
tagged
-------------------------------------------------------------------------------
PANEL DESIGNATION IDENT. LOCATION
-------------------------------------------------------------------------------
122VU ELEC/DC SHED BUS/CNTR 9PN U26
124VU SHED BUS 210PP/212PP/SPLY 11PN BA01
4. Procedure
_________
Subtask 24-61-55-420-051
CAUTION : MAKE SURE THAT THE CONTACTOR LOCATING PIN IS CORRECTLY ENGAGED
_______
IN ITS RECESS LOCATED IN ONE POWER TERMINAL.
THIS PREVENTS DAMAGE TO THE LOCATING PIN WHEN YOU APPLY THE
TORQUE.
(2) TORQUE the two captive screws (2) to between 0.27 and 0.30 m.daN
(23.89 and 26.54 lbf.in).
(4) Remove the blanking caps from the electrical receptacle (4).
(5) Make sure that the electrical connectors are clean and in the correct
condition.
Subtask 24-61-55-865-052
B. Remove the safety clip(s) and the tag(s) and close this(these) circuit
breaker(s):
9PN, 11PN.
EFF :
003-099, 24-61-55
Page 415
May 01/10
SYR
R Subtask 24-61-55-710-051
R C. Test
R (2) On the overhead ELEC panel 35VU, push the GALY & CAB pushbutton
R switch (2XA) (the white indication light goes off).
R (3) On the rear panel 120VU, make sure that there is 28VDC on busbar
R 210PP.
R (4) On the panel 2000VU, make sure that there is 28VDC on busbar 212PP.
R (5) On the overhead ELEC panel 35VU, release the GALY & CAB pushbutton
R switch (2XA) (the white indication light goes on).
R 5. Close-up
________
R Subtask 24-61-55-410-051
R A. Close Access
R (1) Make sure that the work area is clean and clear of tool(s) and other
R items.
R (2) Install the front panel on the bottom right side of the panel 120VU.
R Subtask 24-61-55-862-051
EFF :
003-099, 24-61-55
Page 416
May 01/06
SYR
DC ESSENTIAL DISTRIBUTION - DESCRIPTION AND OPERATION
_____________________________________________________
1. General
_______
R
R (Ref. Fig. 001)
R The essential 28 VDC distribution network corresponds to busbars 4PP, 8PP
R and associated sub-busbars.
2. Component
__________________
Location
R (Ref. Fig. 002)
-------------------------------------------------------------------------------
FIN | FUNCTIONAL DESIGNATION | PANEL|ZONE|ACCESS | ATA
| | | | DOOR | REF.
-------------------------------------------------------------------------------
8PH CNTOR-DC SHED ESS BUS 106VU 125 812 24-62-55
-------------------------------------------------------------------------------
FIN I FUNCTIONAL DESIGNATION I PANELIZONEIACCESS I ATA
I I I I DOOR I REF.
-------------------------------------------------------------------------------
6PH HOLDER-FUSE 105VU 126 24-62-00
6PH1 FUSE 105VU 126 24-62-00
R 3. _________
Operation
R The essential 28 VDC distribution network can be supplied:
R - either by busbar 3PP (in fact by TR1) in normal configuration,
R - by Essential TR in case of loss of one main TR, loss of both main TRs or
R in emergency configuration.
R Part of this network (busbar 8PP) can be shed in emergency configuration
R during RAT extension and when CSM/G is switched off after landing (case of
R battery supply).
R In case of loss of supply, a warning is triggered on the ECAM system,
R (Ref. Fig. 003)
R In case of loss of busbars 4PP or 8PP, the ELEC page is automatically
R displayed on the ECAM lower display unit:
R (Ref. Fig. 004, 005)
R
It must be noted that due to segregation rules between DC channels, the TR2
cannot supply the DC ESS busbar.
EFF :
ALL 24-62-00
Page 1
Nov 01/04
SYR
INTENTIONALLY BLANK
24-62-00
Page 2
May 01/98
SYR
DC Essential Distribution - General
Figure 001
EFF :
ALL 24-62-00
Page 3/4
May 01/98
SYR
DC Essential Distribution - Component Location
Figure 002
EFF :
ALL 24-62-00
Page 5
May 01/98
SYR
DC Essential Distribution - ECAM Warnings
Figure 003
EFF :
ALL 24-62-00
Page 6
May 01/98
SYR
INTENTIONALLY BLANK
24-62-00
Page 7
May 01/98
SYR
DC ESS BUS FAULT - Upper and Lower ECAM Display Unit
Figure 004 (SHEET 1)
EFF :
ALL 24-62-00
Page 8
May 01/98
SYR
DC ESS BUS FAULT - Upper and Lower ECAM Display Unit
Figure 004 (SHEET 2)
EFF :
ALL 24-62-00
Page 9
May 01/98
SYR
DC ESS BUS SHED - Upper and Lower ECAM Display Unit
Figure 005 (SHEET 1)
EFF :
ALL 24-62-00
Page 10
May 01/98
SYR
DC ESS BUS SHED - Upper and Lower ECAM Display Unit
Figure 005 (SHEET 2)
EFF :
ALL 24-62-00
Page 11
May 01/98
SYR
CONTACTOR (8PH) - REMOVAL/INSTALLATION
______________________________________
TASK 24-62-55-000-001
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
Subtask 24-62-55-010-050
(3) Open the access panels of the AC/DC emergency power center 106VU and
the access panels of the BATTERY power center 105VU.
EFF :
ALL 24-62-55
Page 401
May 01/11
SYR
Subtask 24-62-55-865-050
-------------------------------------------------------------------------------
PANEL DESIGNATION IDENT. LOCATION
-------------------------------------------------------------------------------
105VU ELEC/CSM/G /EV AUTO/SPLY 7XE C01
106VU CSM/G /EV/MAN/SPLY 6XE B04
106VU ESS TR/SPLY 4PE C01
122VU ELEC/CNTOR/ESS/DC BUS/TIE 3PC W26
123VU AC ESS/BUS ON/BUS 1 1XC AC12
123VU AC ESS/BUS ON/BUS 2 2XC AC01
4. Procedure
_________
Subtask 24-62-55-020-050
CAUTION : REMOVE THE CONTACTOR ONLY AND NOT THE BASE OR THE MODULE WHERE
_______
THE WIRES ARE CONNECTED.
NOTE : Do not remove the captive screws (2) and the spring washers
____
from the contactor (3).
(4) Disengage the contactor (3) from the base (5) and then remove the
contactor.
EFF :
ALL 24-62-55
Page 402
May 01/10
SYR
DC Shed Essential Bus Contactor
Figure 401/TASK 24-62-55-991-001
EFF :
ALL 24-62-55
Page 403
May 01/98
SYR
TASK 24-62-55-400-001
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
Subtask 24-62-55-860-050
R (2) Make sure that the access doors 812 and 822 are open.
EFF :
ALL 24-62-55
Page 404
May 01/11
SYR
(3) In the avionics compartment, make sure that the access panel of the
AC/DC emergency power center 106VU and BATTERY power center 105VU are
open.
Subtask 24-62-55-865-051
B. Make sure that this(these) circuit breaker(s) is(are) open, safetied and
tagged
-------------------------------------------------------------------------------
PANEL DESIGNATION IDENT. LOCATION
-------------------------------------------------------------------------------
105VU ELEC/CSM/G /EV AUTO/SPLY 7XE C01
106VU CSM/G /EV/MAN/SPLY 6XE B04
106VU ESS TR/SPLY 4PE C01
122VU ELEC/CNTOR/ESS/DC BUS/TIE 3PC W26
123VU AC ESS/BUS ON/BUS 1 1XC AC12
123VU AC ESS/BUS ON/BUS 2 2XC AC01
4. Procedure
_________
Subtask 24-62-55-420-050
CAUTION : MAKE SURE THAT THE CONTACTOR LOCATING PIN IS CORRECTLY ENGAGED
_______
IN ITS RECESS LOCATED IN ONE POWER TERMINAL.
THIS PREVENTS DAMAGE TO THE LOCATING PIN WHEN YOU APPLY THE
TORQUE.
(1) Put the contactor (3) on the tapped barrels (6) of the contactor base
(5).
(2) TORQUE the two captive screws (2) to between 23.9 and 26.55 lbf.in
(0.27 and 0.30 m.daN).
(4) Make sure that the electrical connectors are clean and in the correct
condition.
EFF :
ALL 24-62-55
Page 405
May 01/10
SYR
Subtask 24-62-55-865-052
B. Remove the safety clip(s) and the tag(s) and close this(these) circuit
breaker(s):
3PC, 1XC, 2XC, 7XE, 4PE, 6XE
Subtask 24-62-55-710-050
(2) Do the EIS start procedure (Upper ECAM DU and lower ECAM DU only)
(Ref. TASK 31-60-00-860-001).
(3) Make sure that the DC ESS BUS SHED warning does not come into view.
5. Close-up
________
Subtask 24-62-55-410-050
A. Close Access
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
(2) In the avionics compartment, close the access panels of the AC/DC
emergency power center 106VU and the BATTERY power center 105VU.
EFF :
ALL 24-62-55
Page 406
May 01/98
SYR
REFUELING ON BATTERY - DESCRIPTION AND OPERATION
________________________________________________
1. _______
General
(Ref. Fig. 001)
The network consists of busbars 501PP and 502PP (28 VDC). It is supplied as
soon as the refuel door located on the fuselage below the right wing is
opened.
Two supplies are then possible:
- 28 VDC service bus 601PP if at least ground service busses are energized,
- 28 VDC hot bus 701PP (directly linked to battery 1) if no other power is
available on board.
NOTE : Refueling power supply is automatically cut off ten minutes after.
____
2. Component
__________________
Location
(Ref. Fig. 002)
EFF :
ALL 24-67-00
Page 1
May 01/98
SYR
Refueling on Battery - Simplified Schematic
Figure 001
EFF :
ALL 24-67-00
Page 2
May 01/98
SYR
R Refuel/Defuel Panel - Component Location
Figure 002
EFF :
ALL 24-67-00
Page 3
May 01/04
SYR
ELECTRICAL ROUTING - REMOVAL/INSTALLATION
_________________________________________
TASK 24-92-00-000-001
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
Subtask 24-92-00-860-081
(a) Put a warning notice in position to tell persons not to start the
engine 1(2).
(2) Make sure that the engine 1(2) shutdown occurred not less than 5
minutes before you do this procedure.
(a) Make sure that the ON legend of the ENG/FADEC GND PWR/1(2)
pushbutton switch is off.
EFF :
ALL 24-92-00
Page 401
May 01/11
SYR
Subtask 24-92-00-010-073-A
B. Get Access
4. Procedure
_________
Subtask 24-92-00-020-050
(1) Disconnect the feeder cables from the right side of the pylon:
(a) Remove the bolts (18), the washers (17) and the plate (16).
(b) Disconnect the IDG feeder connector from the connector (14).
(d) Remove and discard the lockwire from the attachment plate (13)
and the connector (14).
(e) Remove the four nuts (12), the four bolts (15) and one attachment
plate (13).
EFF :
ALL 24-92-00
Page 402
May 01/11
SYR
IDG Feeders on the Pylon
Figure 401/TASK 24-92-00-991-040
EFF :
ALL 24-92-00
Page 403
May 01/05
SYR
(g) Disengage the two clamps (8) and remove the spacers (7).
(h) Remove the clamp blocks (6), the bobbins (11) and the spacers
(5).
(i) Remove and discard the lockwire (2) from the plate (4).
(k) Remove the nuts (1) and disconnect the four electrical feeders.
EFF :
ALL 24-92-00
Page 404
May 01/05
SYR
TASK 24-92-00-400-001
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
B. Consumable Materials
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
C. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
EFF :
ALL 24-92-00
Page 405
May 01/11
SYR
3. __________
Job Set-up
Subtask 24-92-00-860-082
(1) On the center pedestal, on the panel 115VU, make sure that a warning
notice is in position to tell persons not to start the engine.
(a) Make sure that the ON legend of the ENG/FADEC GND PWR/1(2)
pushbutton switch is off.
Subtask 24-92-00-010-074-A
B. Get Access
(3) Make sure that the right fan cowl is open (Ref. TASK 71-13-00-010-
010):
EFF :
ALL 24-92-00
Page 406
May 01/11
SYR
4. Procedure
_________
Subtask 24-92-00-420-052
(1) Connection of the feeder cables on the right side of the pylon:
(a) Install the IDG feeders in the engine electrical box 400VC.
(b) Install the attachment plate (13), the four bolts (15), the four
nuts (12) and tighten the nuts (12).
(d) Install the plate (16) on the engine electrical box, install the
washers (17), the bolts (18) and tighten the bolts.
(e) Install the spacers (5), the clamp blocks (6) and the bobbins
(11) on the pylon.
(g) Install the washers (9), the nuts (10) and tighten the nuts (10).
(h) Install the four electrical feeders on the plate 400VT (4) with
the nuts (1).
(i) Install the cover (3) and the new MISCELLANEOUS (Material No. 19-
010) (2) on the plate (4).
(k) Make sure that the electrical connectors are clean and in the
correct condition.
EFF :
ALL 24-92-00
Page 407
May 01/10
SYR
Subtask 24-92-00-410-075-A
B. Close Access
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
Subtask 24-92-00-710-050
(a) Do the EIS start procedure (upper ECAM DU and lower ECAM DU only)
(Ref. TASK 31-60-00-860-001).
(b) On the ECAM control panel, push the ELEC key to get the ELEC
page:
- Make sure that the voltage of the IDG is 115 VAC.
- Make sure that the frequency of the IDG is 400Hz + or - 5Hz.
5. Close-up
________
Subtask 24-92-00-942-054
EFF :
ALL 24-92-00
Page 408
May 01/10
R
SYR
TASK 24-92-00-000-002
Removal of the IDG Feeders from the Wing and the Pylon
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
Subtask 24-92-00-860-083
(a) Put a warning notice in position to tell persons not to start the
engine 1(2).
EFF :
ALL 24-92-00
Page 409
May 01/11
SYR
(2) Make sure that the engine 1(2) shutdown occurred not less than 5
minutes before you do this procedure.
(a) Make sure that the ON legend of the ENG/FADEC GND PWR/1(2)
pushbutton switch is off.
Subtask 24-92-00-010-075
B. Get Access
(2) Open the FWD cargo-compartment door 825AR (Ref. TASK 52-30-00-860-
001).
(4) In the zone 131, remove the sidewall and partition panels (Ref. TASK
25-54-12-000-003) and (Ref. TASK 25-54-12-000-001).
EFF :
ALL 24-92-00
Page 410
May 01/11
SYR
4. Procedure
_________
Subtask 24-92-00-020-051
(1) Disconnect the feeder cables from the right side of the pylon:
(a) Remove the bolts (27), the washers (28) and the plate (29).
(d) Remove the four nuts (18) and the four screws (21).
(e) Disengage the connector (19) from the engine electrical box (20).
(f) Remove the nut (14), the washer (15) and the bolt (17) from the
clamp (16).
(g) Remove the bolt (13) and the washer (12) from the clamp (11).
(h) Remove and discard the lockwire (22) from the two screws (23).
(i) Remove the screws (23) and the cover (24) from the terminal block
(25).
(j) Remove the nuts (26) and disconnect the electrical feeders from
the terminal block (25).
(2) Loosen the nut (31) of the pressure seal (32) on the wing above the
pylon.
(3) Remove the bolt (33) and the washer (34) from the clamp (37).
(5) Remove the bolt (35) from the ground point (36).
(6) Loosen the nut (45) of the pressure seal (46) at the wing and cargo
compartment junction.
EFF :
ALL 24-92-00
Page 411
May 01/10
SYR
R IDG Feeders
R Figure 402/TASK 24-92-00-991-042-A15 (SHEET 1)
EFF :
ALL 24-92-00
Page 412
Nov 01/05
SYR
R IDG Feeders
R Figure 402/TASK 24-92-00-991-042-A25 (SHEET 2)
EFF :
ALL 24-92-00
Page 413
Nov 01/05
SYR
R IDG Feeders
R Figure 402/TASK 24-92-00-991-042-A35 (SHEET 3)
EFF :
ALL 24-92-00
Page 414
Nov 01/05
SYR
R IDG Feeders
R Figure 402/TASK 24-92-00-991-042-A45 (SHEET 4)
EFF :
ALL 24-92-00
Page 415
Nov 01/05
SYR
R IDG Feeders
R Figure 402/TASK 24-92-00-991-042-A55 (SHEET 5)
EFF :
ALL 24-92-00
Page 416
Nov 01/05
SYR
(7) Disconnect the electrical feeders in the cargo compartment:
(a) Remove and discard the lockwire (42) from the two screws (41).
(b) Remove the screws (41) and the cover (43) from the terminal block
(44).
(c) Remove the nuts (40) and disconnect the electrical feeders from
the terminal block (44).
(8) Removal of the cable supports along the IDG feeder cables:
(b) Remove all the bolts (3), the plate (4) and the spacers (5).
(c) Remove all the bolts (7) and the nuts (8).
(d) Remove all the nuts (9) and the bolts (10).
CAUTION : BE CAREFUL NOT TO CAUSE DAMAGE TO THE IDG FEEDERS WHEN YOU
_______
REMOVE/INSTALL THEM.
(a) Remove the IDG feeder cables from the wing, the pylon and the
cargo compartment.
EFF :
ALL 24-92-00
Page 417
May 01/11
R
SYR
TASK 24-92-00-400-002
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
B. Consumable Materials
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
C. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
EFF :
ALL 24-92-00
Page 418
May 01/11
SYR
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
Subtask 24-92-00-860-084
(1) On the center pedestal, on the panel 115VU, make sure that a warning
notice is in position to tell persons not to start the engine.
(a) Make sure that the ON legend of the ENG/FADEC GND PWR/1(2)
pushbutton switch is off.
EFF :
ALL 24-92-00
Page 419
May 01/11
SYR
Subtask 24-92-00-010-076
B. Get Access
(2) Make sure that the FWD cargo-compartment door 825AR is open
(Ref. TASK 52-30-00-860-001).
(4) In the zone 131, make sure that these sidewall and partition panels
are removed (Ref. TASK 25-54-12-000-003) and (Ref. TASK 25-54-12-000-
001):
EFF :
ALL 24-92-00
Page 420
May 01/11
SYR
4. Procedure
_________
Subtask 24-92-00-420-053
CAUTION : BE CAREFUL NOT TO CAUSE DAMAGE TO THE IDG FEEDERS WHEN YOU
_______
REMOVE/INSTALL THEM.
(1) Put the feeder cables in position in the cargo compartment, the wing
and the pylon.
(2) Connection of the feeder cables on the right side of the pylon:
(a) Install the electrical feeder cables on the terminal block (25)
R with the nuts (26) (Ref. AWM 24-22-01) or (Ref. AWM 24-22-02).
(c) Install the cover (24) with the screws (23) on the terminal block
(25).
(d) Tighten the screws (23) and safety with new MISCELLANEOUS
(Material No. 19-010) (22).
(e) Install the connector (19) in the engine electrical box (20).
NOTE : When you put the connector in place, make sure that the
____
harness is not twisted.
(f) Install the screws (21) and the nuts (18) and tighten the nuts
(18).
(g) Install the clamp (16) with the bolt (17), the washer (15) and
the nut (14).
(h) Install the clamp (11) with the bolt (13) and the washer (12).
(k) Make sure that the electrical connectors are clean and in the
correct condition.
EFF :
ALL 24-92-00
Page 421
May 01/11
SYR
(l) Connect the electrical connector to the connector (19).
(n) Install the washers (28), the bolts (27) and tighten the bolts
(27).
(3) Install the nut (31) on the pressure seal (32) on the wing above the
pylon and tighten it.
(4) Install the bolt (33) with the washer (34) on the clamp (37).
(5) Install the bolt (35) on the ground point (36) (Ref. ESPM 204819).
(7) Apply SEALANTS (Material No. 09-002) on the ground point (36).
(8) Install the nut (45) on the pressure seal (46) at the wing and cargo
compartment junction and tighten it.
(a) Install the electrical feeder cables on the terminal block (44)
R with the nuts (40) (Ref. AWM 24-22-01) or (Ref. AWM 24-22-02).
(c) Install the cover (43) with the screws (41) on the terminal block
(44).
(d) Tighten the screws (41) and safety with new MISCELLANEOUS
(Material No. 19-010) (42).
(10) Installation of the cable supports along the IDG feeder cables:
CAUTION : MAKE SURE THAT THE IDG CABLES DO NOT TOUCH THE PYLON
_______
FITTING. IF THE IDG CABLES TOUCH THE PYLON FITTING, DAMAGE
WILL OCCUR TO THE CABLES AND/OR PYLON FITTING.
(a) Install the clamp block (30) on the rod with a clearance of 33.5
mm (1.32 in.) minimum between the top axis attachment of the rod
and the top axis attachment of the clamp block.
EFF :
ALL 24-92-00
Page 422
May 01/11
SYR
(c) Make sure that there is a clearance of 20 mm (0.79 in.) minimum
between the IDG feeder cables and the other components of the
structure.
(d) Turn the clamp block to give maximum clearance between the pylon
fitting and the feeder cables.
(f) Install all the bolts (7) and the nuts (8) and tighten the nuts
(8).
(g) Install all the bolts (10) and the nuts (9) and tighten the nuts
(9).
(h) Install all the spacers (5), the plate (4) and the bolts (3) and
tighten the bolts (3).
(i) Install all the new cable ties (1) (Ref. ESPM 204610).
R
Subtask 24-92-00-710-051
R B. Test
(1) Energize the aircraft electrical circuits from engine 1(2) (Ref. TASK
24-41-00-861-002).
(2) On the ECAM control panel, push the ELEC key to get the ELEC page:
- Make sure that the voltage of the IDG is 115 VAC.
- Make sure that the frequency of the IDG is 400Hz + or - 5Hz.
5. Close-up
________
R Subtask 24-92-00-410-076
R A. Close Access
R (1) Make sure that the work area is clean and clear of tool(s) and other
items.
EFF :
ALL 24-92-00
Page 423
May 01/10
SYR
R (b) For the right pylon:
R - 424ER, 424CR, 424AR, 423FL
R (3) In the zone 131, install the sidewall and partition panels (Ref. TASK
R 25-54-12-400-003) and (Ref. TASK 25-54-12-400-001).
R (4) Close the FWD cargo-compartment door 825AR (Ref. TASK 52-30-00-860-
002).
Subtask 24-92-00-942-055
EFF :
ALL 24-92-00
Page 424
May 01/10
SYR
ELECTRICAL ROUTING - INSPECTION/CHECK
_____________________________________
TASK 24-92-00-210-003
WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______
GEAR.
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
WARNING : MAKE SURE THAT YOU OBEY ALL THE WARNINGS AND THE CAUTIONS INCLUDED IN
_______
THE REFERENCED PROCEDURES.
1. __________________
Reason for the Job
R
EFF :
ALL 24-92-00
Page 601
Aug 01/99
SYR
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
B. Consumable Materials
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
C. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
EFF :
ALL 24-92-00
Page 602
Aug 01/11
SYR
3. __________
Job Set-up
Subtask 24-92-00-860-055
Subtask 24-92-00-862-052
Subtask 24-92-00-869-054
Subtask 24-92-00-010-052
D. Get Access
R (1) Put the ACCESS PLATFORM 3M (10 FT)- ADJUSTABLE in position at the
wing inboard leading-edge.
4. Procedure
_________
Subtask 24-92-00-210-052
WARNING : BE CAREFUL NOT TO CUT YOUR FINGERS. FLAKES OF NICKEL ARE SHARP.
_______
(1) At each fitting use the procedure that follows to protect against
corrosion:
EFF :
ALL 24-92-00
Page 603
May 01/11
SYR
Electrical Harness Conduits - Corrosion Protection
Figure 601/TASK 24-92-00-991-005
R
EFF :
ALL 24-92-00
Page 604
Aug 01/99
SYR
Typical Fittings
Figure 602/TASK 24-92-00-991-006
R
EFF :
ALL 24-92-00
Page 605
Aug 01/99
SYR
Location of Conduit Fittings
Figure 603/TASK 24-92-00-991-007- 12 (SHEET 1)
R
EFF :
ALL 24-92-00
Page 606
Aug 01/99
SYR
Location of Conduit Fittings
Figure 603/TASK 24-92-00-991-007- 22 (SHEET 2)
R
EFF :
ALL 24-92-00
Page 607
Aug 01/99
SYR
(b) Remove any flakes or blisters, make sure that the you do not
damage the base metal while you do this task.
5. Close-up
________
Subtask 24-92-00-410-053
A. Close Access
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
Subtask 24-92-00-860-056
(1) Disconnect the aircraft from the ground (Ref. TASK 12-34-24-869-002).
EFF :
ALL 24-92-00
Page 608
Aug 01/11
SYR
TASK 24-92-00-210-004
WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______
GEAR.
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
WARNING : MAKE SURE THAT YOU OBEY ALL THE WARNINGS AND THE CAUTIONS INCLUDED IN
_______
THE REFERENCED PROCEDURES.
1. __________________
Reason for the Job
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
EFF :
ALL 24-92-00
Page 609
Aug 01/11
SYR
B. Consumable Materials
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
C. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
Subtask 24-92-00-860-057
EFF :
ALL 24-92-00
Page 610
Aug 01/11
R
SYR
Subtask 24-92-00-862-053
Subtask 24-92-00-869-057
Subtask 24-92-00-010-053
D. Get Access
(1) Put the ACCESS PLATFORM 3M (10 FT)- ADJUSTABLE in position at the
wing outboard leading-edge.
(a) Remove and retain the access panels: 522AB (Ref. TASK 57-41-37-
000-004).
(a) Remove and retain the access panels: 622AB (Ref. TASK 57-41-37-
000-004).
4. Procedure
_________
Subtask 24-92-00-210-053
WARNING : BE CAREFUL NOT TO CUT YOUR FINGERS. FLAKES OF NICKEL ARE SHARP.
_______
(1) At each fitting use the procedure that follows to protect against
corrosion:
EFF :
ALL 24-92-00
Page 611
Aug 01/11
R
SYR
Electrical Harness Conduits - Corrosion Protection
Figure 604/TASK 24-92-00-991-008
EFF :
ALL 24-92-00
Page 612
Aug 01/11
R
SYR
INTENTIONALLY BLANK
R
24-92-00
Page 613
Aug 01/11
SYR
Location of Conduit Fittings
Figure 605/TASK 24-92-00-991-009- 12 (SHEET 1)
R
EFF :
ALL 24-92-00
Page 614
Aug 01/99
SYR
Location of Conduit Fittings
Figure 605/TASK 24-92-00-991-009- 22 (SHEET 2)
R
EFF :
ALL 24-92-00
Page 615
Aug 01/99
SYR
(b) Remove any flakes or blisters, make sure that the you do not
damage the base metal while you do this task.
5. Close-up
________
Subtask 24-92-00-410-054
A. Close Access
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
Subtask 24-92-00-860-058
(1) Disconnect the aircraft from the ground (Ref. TASK 12-34-24-869-002).
EFF :
ALL 24-92-00
Page 616
Aug 01/11
SYR
TASK 24-92-00-210-005
WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______
GEAR.
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
WARNING : MAKE SURE THAT YOU OBEY ALL THE WARNINGS AND THE CAUTIONS INCLUDED IN
_______
THE REFERENCED PROCEDURES.
1. __________________
Reason for the Job
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
EFF :
ALL 24-92-00
Page 617
Aug 01/11
SYR
B. Consumable Materials
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
C. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
Subtask 24-92-00-862-054
Subtask 24-92-00-869-059
EFF :
ALL 24-92-00
Page 618
May 01/11
SYR
R Subtask 24-92-00-010-054-A
R C. Get Access
R (1) Put the ACCESS PLATFORM 3M (10 FT)- ADJUSTABLE in position at the
R wing tip.
R (4) Remove the Wingtip Navigation Light 9LA (10LA) (Ref. TASK 33-41-11-
R 000-001).
4. Procedure
_________
Subtask 24-92-00-210-054
WARNING : BE CAREFUL NOT TO CUT YOUR FINGERS. FLAKES OF NICKEL ARE SHARP.
_______
(1) At each fitting use the procedure that follows to protect against
corrosion:
(b) Remove any flakes or blisters, make sure that the you do not
damage the base metal while you do this task.
EFF :
ALL 24-92-00
Page 619
Aug 01/11
SYR
Electrical Harness Conduits
Figure 606/TASK 24-92-00-991-010
R
EFF :
ALL 24-92-00
Page 620
Aug 01/99
SYR
R Location of Conduit Fittings
Figure 607/TASK 24-92-00-991-011
EFF :
ALL 24-92-00
Page 621
Nov 01/07
SYR
5. Close-up
________
R Subtask 24-92-00-410-055-A
R A. Close Access
R (2) Install the Wingtip Navigation Light 9LA (10LA) (Ref. TASK 33-41-11-
R 400-001).
R (3) Make sure that the work area is clean and clear of tool(s) and other
R items.
R (6) Disconnect the aircraft from the ground (Ref. TASK 12-34-24-869-002).
EFF :
ALL 24-92-00
Page 622
Aug 01/11
SYR
TASK 24-92-00-210-006
WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______
GEAR.
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
WARNING : MAKE SURE THAT YOU OBEY ALL THE WARNINGS AND THE CAUTIONS INCLUDED IN
_______
THE REFERENCED PROCEDURES.
1. __________________
Reason for the Job
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
EFF :
ALL 24-92-00
Page 623
Aug 01/11
SYR
B. Consumable Materials
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
C. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
Subtask 24-92-00-860-061
Subtask 24-92-00-862-055
EFF :
ALL 24-92-00
Page 624
Aug 01/11
R
SYR
Subtask 24-92-00-869-061
Subtask 24-92-00-010-055
D. Get Access
(1) Put the ACCESS PLATFORM 3M (10 FT)- ADJUSTABLE in position at the
wing outboard trealing-edge.
(a) Remove and retain the access panel: 575BB, 575CB, 575DB, 575EB,
575FB, 575GB, 575HB, 575KB, 575LB, 575MB.
(a) Remove and retain the access panel: 675BB, 675CB, 675DB, 675EB,
675FB, 675GB, 675HB, 675KB, 675LB, 675MB.
4. Procedure
_________
Subtask 24-92-00-210-055
WARNING : BE CAREFUL NOT TO CUT YOUR FINGERS. FLAKES OF NICKEL ARE SHARP.
_______
(1) At each fitting, use the procedure that follows to protect against
corrosion:
(b) Remove any flakes or blisters, make sure that the you do not
damage the base metal while you do this task.
EFF :
ALL 24-92-00
Page 625
Aug 01/11
SYR
Electrical Harness Conduits - Corrosion Protection
Figure 608/TASK 24-92-00-991-012
EFF :
ALL 24-92-00
Page 626
Aug 01/11
R
SYR
INTENTIONALLY BLANK
R
24-92-00
Page 627
Aug 01/11
SYR
R Location of Conduit Fittings
Figure 609/TASK 24-92-00-991-013-A14 (SHEET 1)
EFF :
ALL 24-92-00
Page 628
May 01/11
SYR
R Location of Conduit Fittings
Figure 609/TASK 24-92-00-991-013-A24 (SHEET 2)
EFF :
ALL 24-92-00
Page 629
May 01/11
SYR
R Location of Conduit Fittings
Figure 609/TASK 24-92-00-991-013-A34 (SHEET 3)
EFF :
ALL 24-92-00
Page 630
May 01/11
SYR
R Location of Conduit Fittings
Figure 609/TASK 24-92-00-991-013-A44 (SHEET 4)
EFF :
ALL 24-92-00
Page 631
May 01/11
SYR
(c) Use a brush or an airless spray to apply a continuous coat of
STORAGE PRESERVATION (Material No. 15-008) with a thickness of
0.030 mm (0.001 in.), to cover all the fitting.
5. Close-up
________
Subtask 24-92-00-410-056
A. Close Access
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
(a) Install the access panel: 575BB, 575CB, 575DB, 575EB, 575FB,
575GB, 575HB, 575KB, 575LB, 575MB.
(a) Install the access panel: 675BB, 675CB, 675DB, 675EB, 675FB,
675GB, 675HB, 675KB, 675LB, 675MB.
Subtask 24-92-00-860-062
(1) Disconnect the aircraft from the ground (Ref. TASK 12-34-24-869-002).
EFF :
ALL 24-92-00
Page 632
Aug 01/11
R
SYR
TASK 24-92-00-210-007
WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______
GEAR.
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
WARNING : MAKE SURE THAT YOU OBEY ALL THE WARNINGS AND THE CAUTIONS INCLUDED IN
_______
THE REFERENCED PROCEDURES.
1. __________________
Reason for the Job
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
EFF :
ALL 24-92-00
Page 633
Aug 01/11
SYR
B. Consumable Materials
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
C. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
Subtask 24-92-00-862-056
Subtask 24-92-00-869-063
EFF :
ALL 24-92-00
Page 634
Aug 01/11
R
SYR
Subtask 24-92-00-010-056
C. Get Access
(b) Open the L and R main landing-gear doors at zone 734 and 744
(Ref. TASK 32-12-00-010-001).
4. Procedure
_________
Subtask 24-92-00-210-056
WARNING : BE CAREFUL NOT TO CUT YOUR FINGERS. FLAKES OF NICKEL ARE SHARP.
_______
(1) At each fitting use the procedure that follows to protect against
corrosion:
(b) Remove any flakes or blisters, make sure that the you do not
damage the base metal while you do this task.
EFF :
ALL 24-92-00
Page 635
Aug 01/11
SYR
Electrical Harness Conduits - Corrosion Protection
Figure 610/TASK 24-92-00-991-014
EFF :
ALL 24-92-00
Page 636
Nov 01/01
R
SYR
INTENTIONALLY BLANK
R
24-92-00
Page 637
Nov 01/01
SYR
Location of Conduit Fittings
Figure 611/TASK 24-92-00-991-015- 12 (SHEET 1)
EFF :
ALL 24-92-00
Page 638
Nov 01/01
R
SYR
Location of Conduit Fittings
Figure 611/TASK 24-92-00-991-015- 22 (SHEET 2)
EFF :
ALL 24-92-00
Page 639
Nov 01/01
R
SYR
5. Close-up
________
Subtask 24-92-00-410-057
A. Close Access
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
(b) Close the L and R main landing-gear doors at zone 734 and 744
(Ref. TASK 32-12-00-410-001).
(3) Disconnect the aircraft from the ground (Ref. TASK 12-34-24-869-002).
EFF :
ALL 24-92-00
Page 640
Aug 01/11
R
SYR
TASK 24-92-00-210-008
WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______
GEAR.
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
WARNING : MAKE SURE THAT YOU OBEY ALL THE WARNINGS AND THE CAUTIONS INCLUDED IN
_______
THE REFERENCED PROCEDURES.
1. __________________
Reason for the Job
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
EFF :
ALL 24-92-00
Page 641
Aug 01/11
SYR
B. Consumable Materials
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
C. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
Subtask 24-92-00-862-057
Subtask 24-92-00-869-065
EFF :
ALL 24-92-00
Page 642
Aug 01/11
R
SYR
Subtask 24-92-00-010-057
C. Get Access
4. Procedure
_________
Subtask 24-92-00-210-057
WARNING : BE CAREFUL NOT TO CUT YOUR FINGERS. FLAKES OF NICKEL ARE SHARP.
_______
(1) At each fitting use the procedure that follows to protect against
corrosion:
(b) Remove any flakes or blisters, make sure that the you do not
damage the base metal while you do this task.
EFF :
ALL 24-92-00
Page 643
Aug 01/11
SYR
Electrical Harness Conduits - Corrosion Protection
Figure 612/TASK 24-92-00-991-016
EFF :
ALL 24-92-00
Page 644
Nov 01/01
R
SYR
Location of Conduit Fittings
Figure 613/TASK 24-92-00-991-017
EFF :
ALL 24-92-00
Page 645
Nov 01/01
R
SYR
5. Close-up
________
Subtask 24-92-00-410-058
A. Close Access
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
EFF :
ALL 24-92-00
Page 646
Nov 01/01
R
SYR
TASK 24-92-00-210-010
Inspection of the End Fittings of Electrical Conduits in the Fuselage Tail Area
WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______
GEAR.
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
WARNING : MAKE SURE THAT YOU OBEY ALL THE WARNINGS AND THE CAUTIONS INCLUDED IN
_______
THE REFERENCED PROCEDURES.
1. __________________
Reason for the Job
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
EFF :
ALL 24-92-00
Page 647
Aug 01/11
SYR
B. Consumable Materials
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
C. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
Subtask 24-92-00-862-059
Subtask 24-92-00-869-069
Subtask 24-92-00-010-059
C. Get Access
R (1) Put the ACCESS PLATFORM 5M (16 FT)- ADJUSTABLE in position at the
fuselage tail area.
EFF :
ALL 24-92-00
Page 648
May 01/11
SYR
(3) Open the access doors: 315AL, 316AR.
4. Procedure
_________
Subtask 24-92-00-210-059
WARNING : BE CAREFUL NOT TO CUT YOUR FINGERS. FLAKES OF NICKEL ARE SHARP.
_______
(1) At each fitting use the procedure that follows to protect against
corrosion:
(b) Remove any flakes or blisters, make sure that the you do not
damage the base metal while you do this task.
5. Close-up
________
Subtask 24-92-00-410-060
A. Close Access
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
(4) Disconnect the aircraft from the ground (Ref. TASK 12-34-24-869-002).
EFF :
ALL 24-92-00
Page 649
Aug 01/11
SYR
Electrical Harness Conduits - Corrosion Protection
Figure 614/TASK 24-92-00-991-020
EFF :
ALL 24-92-00
Page 650
Nov 01/01
R
SYR
INTENTIONALLY BLANK
R
24-92-00
Page 651
Nov 01/01
SYR
Location of Conduit Fittings
Figure 615/TASK 24-92-00-991-021- 12 (SHEET 1)
EFF :
ALL 24-92-00
Page 652
Nov 01/01
R
SYR
Location of Conduit Fittings
Figure 615/TASK 24-92-00-991-021- 22 (SHEET 2)
EFF :
ALL 24-92-00
Page 653
Nov 01/01
R
SYR
TASK 24-92-00-210-011
WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______
GEAR.
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
WARNING : MAKE SURE THAT YOU OBEY ALL THE WARNINGS AND THE CAUTIONS INCLUDED IN
_______
THE REFERENCED PROCEDURES.
1. __________________
Reason for the Job
EFF :
ALL 24-92-00
Page 654
Nov 01/01
R
SYR
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
B. Consumable Materials
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
C. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
Subtask 24-92-00-862-060
Subtask 24-92-00-869-071
EFF :
ALL 24-92-00
Page 655
Aug 01/11
SYR
Subtask 24-92-00-010-060
C. Get Access
(1) Put the ACCESS PLATFORM 6M (20 FT) - ADJUSTABLE in position at the
THS.
(a) Remove and retain the access panels: 334CB, 334DB, 334EB.
(a) Remove and retain the access panels: 344CB, 344DB, 344EB.
4. Procedure
_________
Subtask 24-92-00-210-060
WARNING : BE CAREFUL NOT TO CUT YOUR FINGERS. FLAKES OF NICKEL ARE SHARP.
_______
(1) At each fitting use the procedure that follows to protect against
corrosion:
(b) Remove any flakes or blisters, make sure that the you do not
damage the base metal while you do this task.
EFF :
ALL 24-92-00
Page 656
Aug 01/11
SYR
Electrical Harness Conduits - Corrosion Protection
Figure 616/TASK 24-92-00-991-022
EFF :
ALL 24-92-00
Page 657
Nov 01/01
R
SYR
Location of Conduit Fittings
Figure 617/TASK 24-92-00-991-023
EFF :
ALL 24-92-00
Page 658
Nov 01/01
R
SYR
5. Close-up
________
Subtask 24-92-00-410-061
A. Close Access
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
EFF :
ALL 24-92-00
Page 659
Nov 01/01
R
SYR
TASK 24-92-00-210-012
WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______
GEAR.
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
WARNING : MAKE SURE THAT YOU OBEY ALL THE WARNINGS AND THE CAUTIONS INCLUDED IN
_______
THE REFERENCED PROCEDURES.
1. __________________
Reason for the Job
EFF :
ALL 24-92-00
Page 660
Nov 01/01
R
SYR
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
B. Consumable Materials
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
C. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
EFF :
ALL 24-92-00
Page 661
Aug 01/11
SYR
3. __________
Job Set-up
Subtask 24-92-00-862-061
Subtask 24-92-00-869-073
Subtask 24-92-00-010-061
C. Get Access
(1) Put the ACCESS PLATFORM 10M (33 FT) - ADJUSTABLE in position at the
vertical stabilizer leading-edge.
(2) Remove and retain the access panels: 321AL, 322BL, 324AT.
4. Procedure
_________
Subtask 24-92-00-210-061
WARNING : BE CAREFUL NOT TO CUT YOUR FINGERS. FLAKES OF NICKEL ARE SHARP.
_______
(1) At each fitting use the procedure that follows to protect against
corrosion:
(b) Remove any flakes or blisters, make sure that the you do not
damage the base metal while you do this task.
EFF :
ALL 24-92-00
Page 662
Aug 01/11
SYR
Electrical Harness Conduits - Corrosion Protection
Figure 618/TASK 24-92-00-991-024
EFF :
ALL 24-92-00
Page 663
Nov 01/01
R
SYR
Location of Conduit Fittings
Figure 619/TASK 24-92-00-991-025
EFF :
ALL 24-92-00
Page 664
Nov 01/01
R
SYR
5. Close-up
________
Subtask 24-92-00-410-062
A. Close Access
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
EFF :
ALL 24-92-00
Page 665
Nov 01/01
R
SYR
TASK 24-92-00-210-013
WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______
GEAR.
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
WARNING : MAKE SURE THAT YOU OBEY ALL THE WARNINGS AND THE CAUTIONS INCLUDED IN
_______
THE REFERENCED PROCEDURES.
1. __________________
Reason for the Job
EFF :
ALL 24-92-00
Page 666
Nov 01/01
R
SYR
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
B. Consumable Materials
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
C. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
Subtask 24-92-00-862-063
Subtask 24-92-00-869-077
EFF :
ALL 24-92-00
Page 667
Aug 01/11
SYR
Subtask 24-92-00-010-063
C. Get Access
(1) Put the ACCESS PLATFORM 3M (10 FT)- ADJUSTABLE in position at the
flap track No. 2 fairing.
(a) Remove and retain the top cover of the movable fairing of the No.
2 flap track: 531AT.
(a) Remove and retain the top cover of the movable fairing of the No.
2 flap track: 631AT.
4. Procedure
_________
Subtask 24-92-00-210-063
WARNING : BE CAREFUL NOT TO CUT YOUR FINGERS. FLAKES OF NICKEL ARE SHARP.
_______
(1) At each fitting use the procedure that follows to protect against
corrosion:
(b) Remove any flakes or blisters, make sure that the you do not
damage the base metal while you do this task.
EFF :
ALL 24-92-00
Page 668
Aug 01/11
SYR
Electrical Harness Conduits - Corrosion Protection
Figure 620/TASK 24-92-00-991-026
EFF :
ALL 24-92-00
Page 669
Nov 01/01
R
SYR
Location of Conduit Fittings
Figure 621/TASK 24-92-00-991-027
EFF :
ALL 24-92-00
Page 670
Nov 01/01
R
SYR
5. Close-up
________
Subtask 24-92-00-410-064
A. Close Access
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
(a) Install the top cover of the movable fairing of the No. 2 flap
track: 531AT.
(a) Install the top cover of the movable fairing of the No. 2 flap
track: 631AT.
(4) Disconnect the aircraft from the ground (Ref. TASK 12-34-24-869-002).
EFF :
ALL 24-92-00
Page 671
Nov 01/01
R
SYR
TASK 24-92-00-210-014
Inspection of the End Fittings of Electrical Conduits in the Main Landing Gear
(MLG) Well and False Spar Box
WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______
GEAR.
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
WARNING : MAKE SURE THAT YOU OBEY ALL THE WARNINGS AND THE CAUTIONS INCLUDED IN
_______
THE REFERENCED PROCEDURES.
1. __________________
Reason for the Job
EFF :
ALL 24-92-00
Page 672
Nov 01/01
R
SYR
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
B. Consumable Materials
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
C. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
EFF :
ALL 24-92-00
Page 673
Aug 01/11
SYR
3. __________
Job Set-up
Subtask 24-92-00-862-064
Subtask 24-92-00-869-079
Subtask 24-92-00-010-064
C. Get Access
(1) Put the ACCESS PLATFORM 3M (10 FT)- ADJUSTABLE in position at the MLG
well and false spar box.
4. Procedure
_________
Subtask 24-92-00-210-064
WARNING : BE CAREFUL NOT TO CUT YOUR FINGERS. FLAKES OF NICKEL ARE SHARP.
_______
(1) At each fitting use the procedure that follows to protect against
corrosion:
(b) Remove any flakes or blisters, make sure that the you do not
damage the base metal while you do this task.
EFF :
ALL 24-92-00
Page 674
Aug 01/11
SYR
Electrical Harness Conduits - Corrosion Protection
Figure 622/TASK 24-92-00-991-028
EFF :
ALL 24-92-00
Page 675
Nov 01/01
R
SYR
Location of Conduit Fittings
Figure 623/TASK 24-92-00-991-029- 12 (SHEET 1)
EFF :
ALL 24-92-00
Page 676
Nov 01/01
R
SYR
Location of Conduit Fittings
Figure 623/TASK 24-92-00-991-029- 22 (SHEET 2)
EFF :
ALL 24-92-00
Page 677
Nov 01/01
R
SYR
Location of Conduit Fittings
Figure 624/TASK 24-92-00-991-030
EFF :
ALL 24-92-00
Page 678
Nov 01/01
R
SYR
(c) Use a brush or an airless spray to apply a continuous coat of
STORAGE PRESERVATION (Material No. 15-008) with a thickness of
0.030 mm (0.001 in.), to cover all the fitting.
5. Close-up
________
Subtask 24-92-00-410-065
A. Close Access
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
(3) Disconnect the aircraft from the ground (Ref. TASK 12-34-24-869-002).
EFF :
ALL 24-92-00
Page 679
May 01/11
R
SYR
TASK 24-92-00-210-015
Inspection of tne End Fittings of Electrical Conduits in the Dry Bay (Outboard)
WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______
GEAR.
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
WARNING : MAKE SURE THAT YOU OBEY ALL THE WARNINGS AND THE CAUTIONS INCLUDED IN
_______
THE REFERENCED PROCEDURES.
1. __________________
Reason for the Job
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
EFF :
ALL 24-92-00
Page 680
Aug 01/11
SYR
B. Consumable Materials
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
C. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
Subtask 24-92-00-862-062
Subtask 24-92-00-869-075
Subtask 24-92-00-010-062
C. Get Access
R (1) Put the ACCESS PLATFORM 3M (10 FT)- ADJUSTABLE in position at the dry
bay.
EFF :
ALL 24-92-00
Page 681
May 01/11
SYR
4. Procedure
_________
Subtask 24-92-00-210-062
WARNING : BE CAREFUL NOT TO CUT YOUR FINGERS. FLAKES OF NICKEL ARE SHARP.
_______
(1) At each fitting use the procedure that follows to protect against
corrosion:
(b) Remove any flakes or blisters, make sure that the you do not
damage the base metal while you do this task.
5. Close-up
________
Subtask 24-92-00-410-063
A. Close Access
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
(4) Disconnect the aircraft from the ground (Ref. TASK 12-34-24-869-002).
EFF :
ALL 24-92-00
Page 682
Aug 01/11
SYR
Electrical Harness Conduits - Corrosion Protection
Figure 625/TASK 24-92-00-991-031
EFF :
ALL 24-92-00
Page 683
Nov 01/01
R
SYR
(5) Remove the access platform(s).
EFF :
ALL 24-92-00
Page 684
Nov 01/01
R
SYR
TASK 24-92-00-210-018
WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______
GEAR.
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
1. __________________
Reason for the Job
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
EFF :
ALL 24-92-00
Page 685
May 01/10
SYR
3. __________
Job Set-up
Subtask 24-92-00-860-069
(1) Put a warning notice in the cockpit to tell persons not to operate
the pitch controls.
Subtask 24-92-00-010-067
B. Get Access
(1) Put an access platform in position below the access panels 334AB,
334BB, 334CB, 334DB, 334EB, 344AB, 344BB, 344CB, 344DB and 344EB.
(a) For the left Trimmable Horizontal Stabilizer (THS): 334AB, 334BB,
334CB, 334DB and 334EB.
(b) For the right THS: 344AB, 344BB, 344CB, 344DB and 344EB.
4. Procedure
_________
Subtask 24-92-00-210-067
A. Inspection
(Ref. Fig. 626/TASK 24-92-00-991-032, 627/TASK 24-92-00-991-038)
EFF :
ALL 24-92-00
Page 686
May 01/06
SYR
R Electrical Harnesses - Inspection
Figure 626/TASK 24-92-00-991-032
EFF :
ALL 24-92-00
Page 687
Nov 01/05
SYR
R Electrical Harnesses - Inspection
Figure 627/TASK 24-92-00-991-038
EFF :
ALL 24-92-00
Page 688
Nov 01/05
SYR
5. Close-up
________
Subtask 24-92-00-410-068
A. Close Access
(a) For the left THS: 334AB, 334BB, 334CB, 334DB and 334EB.
(b) For the right THS: 344AB, 344BB, 344CB, 344DB and 344EB.
Subtask 24-92-00-860-070
EFF :
ALL 24-92-00
Page 689
May 01/06
SYR
TASK 24-92-00-210-019
WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______
GEAR.
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
1. __________________
Reason for the Job
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
ESPM 205332
ESPM 205500
24-92-00-991-033 Fig. 628
EFF :
ALL 24-92-00
Page 690
May 01/11
SYR
3. __________
Job Set-up
Subtask 24-92-00-860-071
(1) Put a warning notice in the cockpit to tell persons not to operate
the pitch controls.
Subtask 24-92-00-010-068
B. Get Access
R (1) Put an ACCESS PLATFORM 10M (33 FT) - ADJUSTABLE in position at the
vertical stabilizer leading-edge.
4. Procedure
_________
Subtask 24-92-00-210-068
A. Inspection
(Ref. Fig. 628/TASK 24-92-00-991-033)
EFF :
ALL 24-92-00
Page 691
May 01/11
SYR
Electrical Harnesses - Inspection
R Figure 628/TASK 24-92-00-991-033
EFF :
ALL 24-92-00
Page 692
May 01/03
SYR
5. Close-up
________
Subtask 24-92-00-410-069
A. Close Access
Subtask 24-92-00-860-072
EFF :
ALL 24-92-00
Page 693
May 01/03
R
SYR
TASK 24-92-00-210-020
WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______
GEAR.
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
1. __________________
Reason for the Job
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
ESPM 205332
ESPM 205500
24-92-00-991-034 Fig. 629
EFF :
ALL 24-92-00
Page 694
May 01/11
SYR
3. __________
Job Set-up
Subtask 24-92-00-860-073
(1) Put a warning notice in the cockpit to tell persons not to operate
the pitch controls.
Subtask 24-92-00-010-069
B. Get Access
R (1) Put an ACCESS PLATFORM 10M (33 FT) - ADJUSTABLE in position at the
vertical stabilizer leading-edge.
4. Procedure
_________
Subtask 24-92-00-210-069
A. Inspection
(Ref. Fig. 629/TASK 24-92-00-991-034)
EFF :
ALL 24-92-00
Page 695
May 01/11
SYR
Electrical Harnesses - Inspection
R Figure 629/TASK 24-92-00-991-034
EFF :
ALL 24-92-00
Page 696
May 01/03
SYR
5. Close-up
________
Subtask 24-92-00-410-070
A. Close Access
Subtask 24-92-00-860-074
EFF :
ALL 24-92-00
Page 697
May 01/03
R
SYR
TASK 24-92-00-210-021
WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______
GEAR.
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
1. __________________
Reason for the Job
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
ESPM 205332
ESPM 205500
24-92-00-991-035 Fig. 630
EFF :
ALL 24-92-00
Page 698
May 01/11
SYR
3. __________
Job Set-up
Subtask 24-92-00-860-075
(1) Put a warning notice in the cockpit to tell persons not to operate
the pitch controls.
Subtask 24-92-00-010-070
B. Get Access
R (1) Put an ACCESS PLATFORM 10M (33 FT) - ADJUSTABLE in position at the
vertical stabilizer leading-edge.
4. Procedure
_________
Subtask 24-92-00-210-070
A. Inspection
(Ref. Fig. 630/TASK 24-92-00-991-035)
5. Close-up
________
Subtask 24-92-00-410-071
A. Close Access
EFF :
ALL 24-92-00
Page 699
May 01/11
SYR
Electrical Harnesses - Inspection
R Figure 630/TASK 24-92-00-991-035
EFF :
ALL 24-92-00
Page A600
May 01/03
SYR
Subtask 24-92-00-860-076
EFF :
ALL 24-92-00
Page A601
Nov 01/01
R
SYR
TASK 24-92-00-210-023
WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______
GEAR.
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
WARNING : MAKE SURE THAT YOU OBEY ALL THE WARNINGS AND THE CAUTIONS INCLUDED IN
_______
THE REFERENCED PROCEDURES.
1. __________________
Reason for the Job
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
No specific multimeter
No specific test set-loop resistance
R No specific 1 ACCESS PLATFORM 4M (13 FT)-ADJUSTABLE
EFF :
ALL 24-92-00
Page A602
Nov 01/10
SYR
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
Subtask 24-92-00-860-079
Subtask 24-92-00-862-066
Subtask 24-92-00-869-082
EFF :
ALL 24-92-00
Page A603
May 01/10
SYR
Subtask 24-92-00-010-072
D. Get Access
4. Procedure
_________
Subtask 24-92-00-280-051
(1) Install the test set-loop resistance and measure the resistance
(Ref. TASK 20-28-00-720-014) around the applicable braided conduit.
(b) Set the multimeter to the mA position (push the AC button).
(c) Set the test set to on and adjust the RANGE and SETTING controls
until you get a current of 1 mA on the multimeter.
(d) The test set meter shows directly the loop resistance in
milliohms.
EFF :
ALL 24-92-00
Page A604
Nov 01/10
SYR
R Location of the Loop Tester Measurement Points
Figure 631/TASK 24-92-00-991-037
EFF :
ALL 24-92-00
Page A605
Nov 01/07
SYR
(3) Make sure that the measured values are not more than the maximum
permitted value of 200 milliohms.
(a) If the measured value is more than the maximum permitted value of
200 milliohms:
- Do the electrical bonding of the electrical connectors
(Ref. TASK 20-28-00-912-003) and of the components. Use
conductive bolts and screws and bonding straps in the fuselage
and in the wings (Ref. TASK 20-28-00-912-004).
5. Close-up
________
Subtask 24-92-00-410-074
A. Close Access
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
Subtask 24-92-00-860-080
EFF :
ALL 24-92-00
Page A606
Nov 01/10
SYR
TASK 24-92-00-210-024
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______
GEAR.
CAUTION : BE CAREFUL WHEN YOU DO MAINTENANCE TASKS ON THE WING TRAILING EDGE:
_______
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE RACEWAYS.
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE INSTALLATIONS.
- MAKE SURE THAT THE ELECTRICAL CABLES ARE INSTALLED CORRECTLY.
INCORRECT INSTALLATION CAN CAUSE DAMAGE.
1. __________________
Reason for the Job
EFF :
ALL 24-92-00
Page A607
May 01/10
SYR
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
EFF :
ALL 24-92-00
Page A608
May 01/11
SYR
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
EFF :
ALL 24-92-00
Page A609
May 01/11
SYR
3. __________
Job Set-up
Subtask 24-92-00-861-055
Subtask 24-92-00-941-052
B. Safety Precautions
(1) Install the ground safety locks on the landing gear doors (Ref. TASK
32-00-00-481-002).
Subtask 24-92-00-860-086
WARNING : MAKE SURE THAT THE TRAVEL RANGES OF THE FLIGHT CONTROLS ARE
_______
CLEAR. MOVEMENT OF FLIGHT CONTROLS CAN CAUSE INJURY TO PERSONS
AND/OR DAMAGE.
(1) Extend the slats to the fully extended position (Ref. TASK 27-80-00-
866-004).
(2) Extend the flaps to the fully extended position (Ref. TASK 27-50-00-
866-008).
EFF :
ALL 24-92-00
Page A610
May 01/11
R
SYR
(5) Depressurize the hydraulic reservoirs (Ref. TASK 29-14-00-614-001).
Subtask 24-92-00-865-050
-------------------------------------------------------------------------------
PANEL DESIGNATION IDENT. LOCATION
-------------------------------------------------------------------------------
49VU FLIGHT CONTROLS/ELAC1/NORM/SPLY 15CE1 B11
49VU FLIGHT CONTROLS/THS/ACTR/MOT2 19CE2 B09
49VU FLIGHT CONTROLS/SEC1/NORM/SPLY 21CE1 B08
49VU FLIGHT CONTROLS/FLP/CTL AND MONG/SYS1 6CV B07
49VU FLIGHT CONTROLS/SLT/CTL AND MONG/SYS1 5CV B06
49VU AUTO FLT/FAC1/28VDC 5CC1 B04
49VU AUTO FLT/FAC1/26VAC 14CC1 B03
105VU FLIGHT CONTROLS/ELAC2/STBY SPLY 16CE2 A02
105VU FLT CTL/ELAC1/STBY SPLY 16CE1 A01
105VU FLT CTL/SEC1/STBY SPLY 22CE B01
121VU AUTO FLT/RUDDER/TRIM/IND 15CC M20
121VU AUTO FLT/FAC2/28VDC 5CC2 M19
121VU AUTO FLT/FAC2/26VAC 14CC2 M18
121VU FLIGHT CONTROLS/WTB/FLP/SYS2 12CV P20
121VU FLIGHT CONTROLS/FLP/CTL AND/MONG/SYS2 8CV Q21
121VU FLIGHT CONTROLS/SEC3/SPLY 21CE3 Q19
121VU FLIGHT CONTROLS/SEC2/SPLY 21CE2 Q18
121VU FLIGHT CONTROLS/THS ACTR/MOT3 19CE3 Q17
121VU FLIGHT CONTROLS/THS ACTR/MOT1 19CE1 Q16
121VU FLIGHT CONTROLS/SLT/CTL/SYS2 7CV R21
121VU FLIGHT CONTROLS/ELAC2/NORM/SPLY 15CE2 R20
122VU FLIGHT CONTROLS/WTB/FLP/SYS1 10CV S07
Subtask 24-92-00-010-078
E. Get Access
(3) Open the passenger/crew doors (Ref. TASK 52-10-00-010-001) and remove
the door lining panels (Ref. TASK 25-23-46-000-001) (Ref. TASK 25-23-
46-000-002):
- 831FZ, 841FZ, 831GZ, 841GZ, 832FZ, 842FZ, 832GZ, 842GZ.
R (4) Put the ACCESS PLATFORM 4M (13 FT)-ADJUSTABLE in position below the
R applicable zone.
EFF :
ALL 24-92-00
Page A611
May 01/11
SYR
(5) Open the access doors.
4. Procedure
_________
Subtask 24-92-00-220-061
EFF :
ALL 24-92-00
Page A612
May 01/11
SYR
INTENTIONALLY BLANK
R
24-92-00
Page A613
Aug 01/11
SYR
R Bonding Leads located on Movable Surfaces
R Figure 632/TASK 24-92-00-991-090- 12 (SHEET 1)
EFF :
ALL 24-92-00
Page A614
May 01/10
SYR
R Bonding Leads located on Movable Surfaces
R Figure 632/TASK 24-92-00-991-090- 22 (SHEET 2)
EFF :
ALL 24-92-00
Page A615
May 01/10
SYR
- Spoilers
- Surfaces between slats 2 and 3, 3 and 4, 4 and 5
- Slat tracks No. 1, No. 5 and No. 11
- Ailerons
- Elevators
- Rudder.
(2) During the inspection, replace all the bonding leads if they are
found broken or if more than 25 per cent of their strands are damaged
(Ref. TASK 20-28-00-912-004).
(3) If you cannot replace all the bonding leads before the planned
aircraft release, the bonding lead installations that follow are
satisfactory.
Subtask 24-92-00-220-062
(1) During the inspection, if you cannot replace the bonding leads that
are broken or damaged, the bonding lead installations that follow are
satisfactory:
(2) Replace all the remaining broken or damages bonding leads at the next
maintenance opportunity but before 20 months (or 6000 flight hours,
4500 flight cycles), whichever occurs first.
EFF :
ALL 24-92-00
Page A616
Aug 01/11
R
SYR
Subtask 24-92-00-220-063
(1) During the inspection, if you cannot replace the bonding leads that
are broken or damaged, the bonding lead installations that follow are
satisfactory:
(b) And for the other bonding leads installed on the elevator:
- If only one lead is broken or has more than 25 percent of its
strands damaged and the other bonding leads have less than 25
percent of their strands damaged.
(2) Replace all the remaining broken or damaged bonding leads at the next
maintenance opportunity but before 20 months (or 6000 flight hours,
4500 flight cycles), wichever occurs first.
Subtask 24-92-00-220-064
(1) During the inspection, if you cannot replace the bonding leads that
are broken or damaged, the installations that follow are
satisfactory:
(a) Bonding leads installed on the rudder hinge arms No. 1 and 7 (on
the top and bottom part of the rudder):
- If less than 25 percent of their strands are damaged.
(b) And for bonding leads installed on the rudder hinge arms No. 2,
3, 4, 5 and 6:
- If only one lead is broken or has more than 25 percent of its
strand damaged.
- And if the other bonding leads have less than 25 percent of
their strands damaged.
(2) Replace all the remaining broken or damaged bonding leads at the next
maintenance opportunity but before 100 days (or 600 flight hours, 750
flight cycles), whichever occurs first.
EFF :
ALL 24-92-00
Page A617
Aug 01/11
R
SYR
5. Close-up
________
Subtask 24-92-00-410-078
A. Close Access
EFF :
ALL 24-92-00
Page A618
Aug 01/11
R
SYR
(5) Install the door lining panels (Ref. TASK 25-23-46-400-001)
(Ref. TASK 25-23-46-400-002) and close the passenger/crew doors
(Ref. TASK 52-10-00-410-001):
- 831FZ, 841FZ, 831GZ, 841GZ 832FZ, 842FZ, 832GZ, 842GZ.
Subtask 24-92-00-865-052
B. Remove the safety clip(s) and the tag(s) and close this(these) circuit
breaker(s):
-------------------------------------------------------------------------------
PANEL DESIGNATION IDENT. LOCATION
-------------------------------------------------------------------------------
49VU FLIGHT CONTROLS/ELAC1/NORM/SPLY 15CE1 B11
49VU FLIGHT CONTROLS/THS/ACTR/MOT2 19CE2 B09
49VU FLIGHT CONTROLS/SEC1/NORM/SPLY 21CE1 B08
49VU FLIGHT CONTROLS/FLP/CTL AND MONG/SYS1 6CV B07
49VU FLIGHT CONTROLS/SLT/CTL AND MONG/SYS1 5CV B06
49VU AUTO FLT/FAC1/28VDC 5CC1 B04
49VU AUTO FLT/FAC1/26VAC 14CC1 B03
105VU FLIGHT CONTROLS/ELAC2/STBY SPLY 16CE2 A02
105VU FLT CTL/ELAC1/STBY SPLY 16CE1 A01
105VU FLT CTL/SEC1/STBY SPLY 22CE B01
121VU AUTO FLT/RUDDER/TRIM/IND 15CC M20
121VU AUTO FLT/FAC2/28VDC 5CC2 M19
121VU AUTO FLT/FAC2/26VAC 14CC2 M18
121VU FLIGHT CONTROLS/WTB/FLP/SYS2 12CV P20
121VU FLIGHT CONTROLS/FLP/CTL AND/MONG/SYS2 8CV Q21
121VU FLIGHT CONTROLS/SEC3/SPLY 21CE3 Q19
121VU FLIGHT CONTROLS/SEC2/SPLY 21CE2 Q18
121VU FLIGHT CONTROLS/THS ACTR/MOT3 19CE3 Q17
121VU FLIGHT CONTROLS/THS ACTR/MOT1 19CE1 Q16
121VU FLIGHT CONTROLS/SLT/CTL/SYS2 7CV R21
121VU FLIGHT CONTROLS/ELAC2/NORM/SPLY 15CE2 R20
122VU FLIGHT CONTROLS/WTB/FLP/SYS1 10CV S07
Subtask 24-92-00-860-087
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
EFF :
ALL 24-92-00
Page A619
Aug 01/11
R
SYR
(3) Pressurize the hydraulic reservoirs (Ref. TASK 29-14-00-614-002).
(6) Remove the ground support and maintenance equipment, the special and
standard tools and all other items.
Subtask 24-92-00-862-068
EFF :
ALL 24-92-00
Page A620
Aug 01/11
R
SYR
TASK 24-92-00-210-025
General Visual Inspection of G and P Routes Installed in the Tail Cone and APU
Accessory Compartment (EWIS)
1. __________________
Reason for the Job
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
Subtask 24-92-00-010-079
A. Get Access
EFF :
ALL 24-92-00
Page A621
Aug 01/11
R
SYR
Subtask 24-92-00-862-069
4. Procedure
_________
Subtask 24-92-00-210-075
5. Close-up
________
Subtask 24-92-00-410-079
A. Close Access
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
EFF :
ALL 24-92-00
Page A622
Aug 01/11
SYR
Tail Cone and APU Accessory Compartment - Inspection Area - Zones 315-316
Figure 633/TASK 24-92-00-991-043
EFF :
ALL 24-92-00
Page A623
Aug 01/11
R
SYR
TASK 24-92-00-220-001
1. __________________
Reason for the Job
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
No specific flashlight
No specific mirror
No specific warning notice
No specific 1 ACCESS PLATFORM 4M (13 FT)-ADJUSTABLE
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
Subtask 24-92-00-941-054
A. Safety Precautions
EFF :
ALL 24-92-00
Page A624
Aug 01/11
R
SYR
(2) Make sure that the engine 1(2) shutdown occurred not less than 5
minutes before you do this procedure.
(4) Put a warning notice in position to tell persons not to energize the
FADEC 1(2).
Subtask 24-92-00-862-070
Subtask 24-92-00-010-080
C. Get Access
4. Procedure
_________
Subtask 24-92-00-220-051
EFF :
ALL 24-92-00
Page A625
Aug 01/11
SYR
Upper Forward Pylon - Access Panels
R Figure 634/TASK 24-92-00-991-044- 12 (SHEET 1)
EFF :
ALL 24-92-00
Page A626
May 01/10
SYR
Upper Forward Pylon - Access Panels
R Figure 634/TASK 24-92-00-991-044- 22 (SHEET 2)
EFF :
ALL 24-92-00
Page A627
May 01/10
SYR
Upper Forward Pylon - Inspection Area - Zones 413-414-423-424
R Figure 635/TASK 24-92-00-991-106
EFF :
ALL 24-92-00
Page A628
May 01/10
SYR
(c) On the other routes: 1M, 2M.
5. Close-up
________
Subtask 24-92-00-410-080
A. Close Access
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
EFF :
ALL 24-92-00
Page A629
Aug 01/11
R
SYR
TASK 24-92-00-220-003
Detailed Inspection of EWIS in the Fan and Accessory Gear Box (EWIS)
1. __________________
Reason for the Job
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
R
No specific warning notice
No specific 1 ACCESS PLATFORM 4M (13 FT)-ADJUSTABLE
R No specific 1 FLASHLIGHT
R No specific 1 MIRROR - INSPECTION
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
EFF :
ALL 24-92-00
Page A630
Aug 01/11
SYR
3. __________
Job Set-up
Subtask 24-92-00-941-056
A. Safety Precautions
(2) Make sure that the engine 1(2) shutdown occurred not less than 5
minutes before you do this procedure.
(4) Put a warning notice in position to tell persons not to energize the
FADEC 1(2).
Subtask 24-92-00-862-072
Subtask 24-92-00-010-082
C. Get Access
(1) Put the ACCESS PLATFORM 4M (13 FT)-ADJUSTABLE in position below the
engine.
EFF :
ALL 24-92-00
Page A631
Aug 01/11
SYR
4. Procedure
_________
Subtask 24-92-00-220-053
A. Detailed Inspection of All Wiring in the Fan and Accessory Gear Box
R (a) Start the detailed inspection of the wiring at the forward tip of
R the pylon and then continue into the fan and accessory gear box.
R Use FLASHLIGHT a or a MIRROR - INSPECTION, if necessary.
R
R (2) On the AC/DC feeder routes: 1G (Ref. AWM 94-08-01), 2G (Ref. AWM 94-
08-02).
R
R (3) On the engine control routes: 1S (Ref. AWM 94-08-02), 2S (Ref. AWM
94-08-01).
R
R (4) On the other routes: 1M (Ref. AWM 94-08-01), 2M (Ref. AWM 94-08-02).
R
EFF :
ALL 24-92-00
Page A632
Aug 01/11
SYR
Fan and Accessory Gear Box - Access
Figure 636/TASK 24-92-00-991-046
EFF :
ALL 24-92-00
Page A633
Aug 01/11
R
SYR
5. Close-up
________
Subtask 24-92-00-410-082
A. Close Access
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
EFF :
ALL 24-92-00
Page A634
Aug 01/11
R
SYR
TASK 24-92-00-220-004
1. __________________
Reason for the Job
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
R
No specific warning notice
No specific 1 ACCESS PLATFORM 4M (13 FT)-ADJUSTABLE
R No specific 1 FLASHLIGHT
R No specific 1 MIRROR - INSPECTION
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
EFF :
ALL 24-92-00
Page A635
Aug 01/11
SYR
3. __________
Job Set-up
Subtask 24-92-00-941-057
A. Safety Precautions
(2) Make sure that the engine 1(2) shutdown occurred not less than 5
minutes before you do this procedure.
(4) Put a warning notice in position to tell persons not to energize the
FADEC 1(2).
Subtask 24-92-00-010-083
B. Get Access
(1) Put the ACCESS PLATFORM 4M (13 FT)-ADJUSTABLE in position below the
engine.
Subtask 24-92-00-040-051
EFF :
ALL 24-92-00
Page A636
Aug 01/11
R
SYR
Subtask 24-92-00-862-073
Subtask 24-92-00-010-084
E. Get Access
4. Procedure
_________
Subtask 24-92-00-220-054
R (a) Start the detailed inspection of the wiring at the forward tip of
R the pylon and then continue into the hot engine section. Use a
R FLASHLIGHT or a MIRROR - INSPECTION, if necessary.
R
R 1
_ On the engine control routes: 1S (Ref. AWM 94-08-02), 2S (Ref.
AWM 94-08-01).
R
R 2
_ On the other routes: 1M (Ref. AWM 94-08-01), 2M (Ref. AWM 94-
08-02).
R
EFF :
ALL 24-92-00
Page A637
Aug 01/11
SYR
Hot Section - Access
Figure 637/TASK 24-92-00-991-047
EFF :
ALL 24-92-00
Page A638
Aug 01/11
R
SYR
5. Close-up
________
Subtask 24-92-00-410-163
A. Close Access
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
Subtask 24-92-00-440-050
Subtask 24-92-00-410-083
C. Close Access
EFF :
ALL 24-92-00
Page A639
Aug 01/11
R
SYR
TASK 24-92-00-210-026
General Visual Inspection of EWIS installed in the Wing Center Box (EWIS)
1. __________________
Reason for the Job
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
EFF :
ALL 24-92-00
Page A640
Aug 01/11
R
SYR
3. __________
Job Set-up
Subtask 24-92-00-010-086
A. Get Access
(1) Open the main gear doors for access (Ref. TASK 32-12-00-010-001).
(2) Put a warning notice in position to tell persons not to operate the
landing gear.
(4) Remove the access panels from the wing center box (Ref. TASK 57-17-
11-000-001):
- 147AZ, 148AZ.
Subtask 24-92-00-862-074
4. Procedure
_________
Subtask 24-92-00-210-076
(1) Do a visual inspection of the wiring to make sure that there are no
signs of ageing, alteration, overheating, scaling and deformation
(Ref. ESPM 205211):
5. Close-up
________
Subtask 24-92-00-410-084
A. Close Access
(1) Install the access panels on the wing center box (Ref. TASK 57-17-11-
400-001):
- 147AZ, 148AZ.
EFF :
ALL 24-92-00
Page A641
Aug 01/11
SYR
Wing Center Box - Access - Zones 141-142
Figure 638/TASK 24-92-00-991-048
EFF :
ALL 24-92-00
Page A642
Aug 01/11
R
SYR
(2) Close the main gear doors after access (Ref. TASK 32-12-00-410-001).
(4) Remove the ground support and maintenance equipment, the special and
standard tools and all other items.
EFF :
ALL 24-92-00
Page A643
Aug 01/11
R
SYR
TASK 24-92-00-210-027
1. __________________
Reason for the Job
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
No specific flashlight
No specific mirror
No specific 1 ACCESS PLATFORM 2M (6 FT) - ADJUSTABLE
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
Subtask 24-92-00-010-089
A. Get Access
R
EFF :
ALL 24-92-00
Page A644
Aug 01/11
SYR
(3) Remove the forward avionic-compartment floor-panels 121AF, 121BF,
121CF, 122BF (Ref. TASK 53-12-13-000-001).
Subtask 24-92-00-862-077
4. Procedure
_________
Subtask 24-92-00-210-077
EFF :
ALL 24-92-00
Page A645
Aug 01/11
SYR
Forward Avionic Compartment - Access
R Figure 639/TASK 24-92-00-991-061
EFF :
ALL 24-92-00
Page A646
May 01/10
SYR
Forward Avionic Compartment - Inspection Area - Zones 121-122
R Figure 640/TASK 24-92-00-991-110
EFF :
ALL 24-92-00
Page A647
May 01/10
SYR
5. Close-up
________
Subtask 24-92-00-410-087
A. Close Access
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
EFF :
ALL 24-92-00
Page A648
May 01/10
R
SYR
TASK 24-92-00-210-028
General Visual Inspection of 90VU, 108VU and 109VU in the Forward Avionic
Compartment (EWIS)
1. __________________
Reason for the Job
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
No specific flashlight
No specific mirror
R No specific 1 ACCESS PLATFORM 2M (6 FT) - ADJUSTABLE
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
Subtask 24-92-00-010-090
A. Get Access
EFF :
ALL 24-92-00
Page A649
May 01/11
SYR
Subtask 24-92-00-862-078
4. Procedure
_________
Subtask 24-92-00-210-078
A. General Visual Inspection of 90VU, 108VU and 109VU in the Forward Avionic
Compartment
EFF :
ALL 24-92-00
Page A650
Aug 01/11
SYR
90VU, 108VU and 109VU Location
R Figure 641/TASK 24-92-00-991-053
EFF :
ALL 24-92-00
Page A651
May 01/10
SYR
5. Close-up
________
Subtask 24-92-00-410-088
A. Close Access
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
EFF :
ALL 24-92-00
Page A652
May 01/10
R
SYR
TASK 24-92-00-220-005
1. __________________
Reason for the Job
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
No specific flashlight
No specific mirror
R No specific 1 ACCESS PLATFORM 2M (6 FT) - ADJUSTABLE
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
Subtask 24-92-00-010-091
A. Get Access
EFF :
ALL 24-92-00
Page A653
May 01/11
SYR
(3) Remove the forward avionic-compartment floor-panels 121AF, 121BF,
121CF, 122BF (Ref. TASK 53-12-13-000-001).
Subtask 24-92-00-862-079
4. Procedure
_________
Subtask 24-92-00-220-055
5. Close-up
________
Subtask 24-92-00-410-089
A. Close Access
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
EFF :
ALL 24-92-00
Page A654
Aug 01/11
SYR
TASK 24-92-00-210-029
1. __________________
Reason for the Job
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
Subtask 24-92-00-010-093
A. Get Access
(2) Open the forward passenger/crew door 831 (841) (Ref. TASK 52-10-00-
010-001).
EFF :
ALL 24-92-00
Page A655
May 01/11
SYR
(3) Open the circuit breaker panel 2000VU at the zone 220.
Subtask 24-92-00-862-081
4. Procedure
_________
Subtask 24-92-00-210-079
5. Close-up
________
Subtask 24-92-00-410-091
A. Close Access
(1) Remove the ground support and maintenance equipment, the special and
standard tools and all other items.
(2) Close the circuit breaker panel 2000VU at the zone 220.
(3) Close the forward passenger/crew door 831 (841) (Ref. TASK 52-10-00-
410-001).
EFF :
ALL 24-92-00
Page A656
Aug 01/11
SYR
Forward Cabin Overhead Compartment - Inspection Area -Zones 223-224
R Figure 642/TASK 24-92-00-991-055
EFF :
ALL 24-92-00
Page A657
May 01/10
SYR
TASK 24-92-00-210-030
General Visual Inspection of 105VU, 106VU, 103VU, 107VU and 70VU Installed in
the Lateral Avionic Compartment (EWIS)
1. __________________
Reason for the Job
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
No specific flashlight
No specific mirror
R No specific 1 ACCESS PLATFORM 4M (13 FT)-ADJUSTABLE
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
Subtask 24-92-00-010-095
A. Get Access
(2) Open the forward passenger/crew door 831 (Ref. TASK 52-10-00-010-
001).
EFF :
ALL 24-92-00
Page A658
May 01/11
SYR
(3) Open the access doors 812, 822.
Subtask 24-92-00-862-083
4. Procedure
_________
Subtask 24-92-00-210-080
A. General Visual Inspection of the 105VU, 106VU, 103VU, 107VU and 70VU
Installed in the Lateral Avionic Compartment
EFF :
ALL 24-92-00
Page A659
Aug 01/11
SYR
105VU, 106VU, 103VU, 107VU and 70VU - Location
R Figure 643/TASK 24-92-00-991-058
EFF :
ALL 24-92-00
Page A660
May 01/10
SYR
5. Close-up
________
Subtask 24-92-00-410-093
A. Close Access
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
(2) Close the forward passenger/crew door 831 (Ref. TASK 52-10-00-410-
001).
EFF :
ALL 24-92-00
Page A661
May 01/10
R
SYR
TASK 24-92-00-210-031
1. __________________
Reason for the Job
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
EFF :
ALL 24-92-00
Page A662
May 01/11
SYR
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
Subtask 24-92-00-010-097
A. Get Access
(2) Open the passenger/crew door 832 (842) (Ref. TASK 52-10-00-010-001).
(4) Remove the linings and insulation panels in the zone 242 at FR47:
EFF :
ALL 24-92-00
Page A663
May 01/11
SYR
Subtask 24-92-00-862-085
4. Procedure
_________
Subtask 24-92-00-210-081
5. Close-up
________
Subtask 24-92-00-410-095
A. Close Access
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
(2) Install the linings and insulation panels in the zone 242 at FR47:
EFF :
ALL 24-92-00
Page A664
Aug 01/11
SYR
Center Passenger Compartment - Inspection -Route 6G
R Figure 644/TASK 24-92-00-991-062
EFF :
ALL 24-92-00
Page A665
May 01/10
SYR
(3) Install the furnishings in the zone 242 at FR47:
(4) Close the passenger/crew door 832 (842) (Ref. TASK 52-10-00-410-001).
EFF :
ALL 24-92-00
Page A666
May 01/10
R
SYR
TASK 24-92-00-210-033
1. __________________
Reason for the Job
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
No specific flashlight
No specific mirror
R No specific 1 ACCESS PLATFORM 2M (6 FT) - ADJUSTABLE
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
EFF :
ALL 24-92-00
Page A667
May 01/11
SYR
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
Subtask 24-92-00-010-107
A. Get Access
(3) Open the FWD cargo-compartment door 825 (Ref. TASK 52-30-00-860-001)
or (Ref. TASK 52-30-00-860-003).
Subtask 24-92-00-862-095
4. Procedure
_________
Subtask 24-92-00-210-083
EFF :
ALL 24-92-00
Page A668
Aug 01/11
SYR
Rear Avionic Compartment - Access
R Figure 645/TASK 24-92-00-991-077
EFF :
ALL 24-92-00
Page A669
May 01/10
SYR
Rear Avionic Compartment - Inspection Area - Zones 127-128
R Figure 646/TASK 24-92-00-991-113
EFF :
ALL 24-92-00
Page A670
May 01/10
SYR
(c) On the flight control wiring.
5. Close-up
________
Subtask 24-92-00-410-105
A. Close Access
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
(4) Close the FWD cargo-compartment door 825 (Ref. TASK 52-30-00-860-002)
or (Ref. TASK 52-30-00-860-004).
EFF :
ALL 24-92-00
Page A671
May 01/10
R
SYR
TASK 24-92-00-220-007
1. __________________
Reason for the Job
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
No specific flashlight
No specific mirror
R No specific 1 ACCESS PLATFORM 2M (6 FT) - ADJUSTABLE
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
EFF :
ALL 24-92-00
Page A672
May 01/11
SYR
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
Subtask 24-92-00-010-109
A. Get Access
(3) Open the FWD cargo-compartment door 825 (Ref. TASK 52-30-00-860-001)
and (Ref. TASK 52-30-00-860-003).
Subtask 24-92-00-862-097
4. Procedure
_________
Subtask 24-92-00-220-057
EFF :
ALL 24-92-00
Page A673
Aug 01/11
SYR
(c) On the generator excitation routes: 1E and 2E.
5. Close-up
________
Subtask 24-92-00-410-107
A. Close Access
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
(4) Close the FWD cargo-compartment door 825 (Ref. TASK 52-30-00-860-002)
and (Ref. TASK 52-30-00-860-004).
EFF :
ALL 24-92-00
Page A674
May 01/10
R
SYR
TASK 24-92-00-210-034
General Visual Inspection of 63VU, 80VU, 187VU and 188VU Installed in the Rear
Avionic Compartment (EWIS)
1. __________________
Reason for the Job
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
No specific flashlight
No specific mirror
R No specific 1 ACCESS PLATFORM 2M (6 FT) - ADJUSTABLE
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
EFF :
ALL 24-92-00
Page A675
May 01/11
SYR
3. __________
Job Set-up
Subtask 24-92-00-010-110
A. Get Access
(3) Open the FWD cargo-compartment door 825 (Ref. TASK 52-30-00-860-001)
or (Ref. TASK 52-30-00-860-003).
(4) Remove the FWD cargo-compartment partition FR24 (Ref. TASK 25-54-11-
000-001).
Subtask 24-92-00-862-098
4. Procedure
_________
Subtask 24-92-00-210-084
A. General Visual Inspection of 63VU, 80VU, 187VU and 188VU Installed in the
Rear Avionic compartment
EFF :
ALL 24-92-00
Page A676
Aug 01/11
SYR
63VU, 80VU, 187VU and 188VU - Location
R Figure 647/TASK 24-92-00-991-079
EFF :
ALL 24-92-00
Page A677
May 01/10
SYR
(h) On the generator excitation routes: 1E and 2E.
5. Close-up
________
Subtask 24-92-00-410-108
A. Close Access
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
(2) Install the FWD cargo-compartment partition FR24 (Ref. TASK 25-54-11-
400-001).
(3) Close the FWD cargo-compartment door 825 (Ref. TASK 52-30-00-860-002)
or (Ref. TASK 52-30-00-860-004).
EFF :
ALL 24-92-00
Page A678
May 01/10
R
SYR
TASK 24-92-00-210-035
General Visual Inspection of EWIS of the 49VU and the 120VU (EWIS)
1. __________________
Reason for the Job
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
No specific flashlight
No specific mirror
No specific 1 ACCESS PLATFORM 4M (13 FT)-ADJUSTABLE
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
Subtask 24-92-00-862-099
EFF :
ALL 24-92-00
Page A679
Aug 01/11
SYR
Subtask 24-92-00-010-111
B. Get Access
(2) Open the forward passenger/crew door 831 (841) (Ref. TASK 52-10-00-
010-001).
4. Procedure
_________
Subtask 24-92-00-210-085
A. General Visual Inspection of All Wiring of the 49VU and the 120VU
EFF :
ALL 24-92-00
Page A680
May 01/11
SYR
49VU and 120VU - Location
R Figure 648/TASK 24-92-00-991-082
EFF :
ALL 24-92-00
Page A681
May 01/10
SYR
5. Close-up
________
Subtask 24-92-00-410-109
A. Close Access
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
(4) Close the forward passenger/crew door 831 (841) (Ref. TASK 52-10-00-
410-001).
EFF :
ALL 24-92-00
Page A682
May 01/10
R
SYR
TASK 24-92-00-210-036
General Visual Inspection of EWIS Between Seat and A/C Installed in the Forward
Passenger Compartment (EWIS)
1. __________________
Reason for the Job
NOTE : This task is applicable only for aircraft with seats and with wiring
____
connections between seats and aircraft.
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
EFF :
ALL 24-92-00
Page A683
May 01/11
SYR
3. __________
Job Set-up
Subtask 24-92-00-010-112
A. Get Access
(2) Open the forward passenger/crew door 831 (841) (Ref. TASK 52-10-00-
010-001).
(3) Remove the seat covers in zones 231 and 232, if necessary.
Subtask 24-92-00-862-100
4. Procedure
_________
Subtask 24-92-00-210-086
5. Close-up
________
Subtask 24-92-00-410-110
A. Close Access
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
(2) Install the seat covers in zones 231 and 232, if necessary.
(3) Close the forward passenger/crew door 831 (841) (Ref. TASK 52-10-00-
410-001).
EFF :
ALL 24-92-00
Page A684
Aug 01/11
SYR
Forward Passenger Compartment - Inspection Area - Zones 231-232
R Figure 649/TASK 24-92-00-991-083
EFF :
ALL 24-92-00
Page A685
May 01/10
SYR
(4) Remove the access platform(s).
EFF :
ALL 24-92-00
Page A686
May 01/10
R
SYR
TASK 24-92-00-210-810
1. __________________
Reason for the Job
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
EFF :
ALL 24-92-00
Page A687
Aug 01/11
SYR
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
Subtask 24-92-00-010-163
A. Get Access
(2) Open the passenger/crew door 831 (841) (Ref. TASK 52-10-00-010-001).
(4) Remove the overhead stowage compartments between FR20 and FR35
(Ref. TASK 25-24-41-000-001).
(5) Remove the ceiling panels in the zones 233 and 234 (Ref. TASK 25-23-
41-000-001):
- 231AC, 232AC, 231BC, 231CC, 231DC, 231EC, 231FC, 231GC, 231HC.
Subtask 24-92-00-862-145
EFF :
ALL 24-92-00
Page A688
Aug 01/11
SYR
4. Procedure
_________
Subtask 24-92-00-210-110
5. Close-up
________
Subtask 24-92-00-410-161
A. Close Access
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
(2) Install the ceiling panels in the zones 233 and 234 (Ref. TASK 25-23-
41-400-001):
- 231AC, 232AC, 231BC, 231CC, 231DC, 231EC, 231FC, 231GC, 231HC.
(3) Install the overhead stowage compartments between FR20 and FR35
(Ref. TASK 25-24-41-400-001).
(5) Close the passenger/crew door 831 (841) (Ref. TASK 52-10-00-410-001).
EFF :
ALL 24-92-00
Page A689
May 01/10
SYR
Forward Passenger Overhead-Compartment - Access Panels - Zones 233-234
R Figure 650/TASK 24-92-00-991-160
EFF :
ALL 24-92-00
Page A690
May 01/10
SYR
Forward Passenger Overhead-Compartment - Inspection Area - Zones 233-234
R Figure 651/TASK 24-92-00-991-161
EFF :
ALL 24-92-00
Page A691
May 01/10
SYR
(6) Remove the access platform(s).
EFF :
ALL 24-92-00
Page A692
May 01/10
R
SYR
TASK 24-92-00-210-037
General Visual Inspection of EWIS Connections Between Seats and A/C Installed
in the Center Passenger Compartment (EWIS)
1. __________________
Reason for the Job
NOTE : This task is applicable only for aircraft with seats and with wiring
____
connections between seats and aircraft.
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
EFF :
ALL 24-92-00
Page A693
May 01/11
SYR
3. __________
Job Set-up
Subtask 24-92-00-010-114
A. Get Access
(2) Open the aft passenger/crew door 832 (842) (Ref. TASK 52-10-00-010-
001).
(3) Remove the seat covers in zones 241 and 242, if necessary.
Subtask 24-92-00-862-102
4. Procedure
_________
Subtask 24-92-00-210-087
5. Close-up
________
Subtask 24-92-00-410-112
A. Close Access
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
(2) Install the seat covers in zones 241 and 242, if necessary.
(3) Close the aft passenger/crew door 832 (842) (Ref. TASK 52-10-00-410-
001).
EFF :
ALL 24-92-00
Page A694
Aug 01/11
SYR
Center Passenger Compartment - Inspection Area - Zones 241-242
R Figure 652/TASK 24-92-00-991-084
EFF :
ALL 24-92-00
Page A695
May 01/10
SYR
(4) Remove the access platform(s).
EFF :
ALL 24-92-00
Page A696
May 01/10
R
SYR
TASK 24-92-00-210-039
General Visual Inspection of EWIS connections Between Seats and A/C Installed
in the Aft Passenger Compartment (EWIS)
1. __________________
Reason for the Job
NOTE : This task is applicable only for aircraft with seats and with wiring
____
connections between seats and aircraft.
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
EFF :
ALL 24-92-00
Page A697
May 01/11
SYR
3. __________
Job Set-up
Subtask 24-92-00-010-120
A. Get Access
(2) Open the aft passenger/crew door 832 (842) (Ref. TASK 52-10-00-010-
001).
(3) Remove the seat covers in zones 251 and 252, if necessary.
Subtask 24-92-00-862-108
4. Procedure
_________
Subtask 24-92-00-210-089
5. Close-up
________
Subtask 24-92-00-410-118
A. Close Access
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
(2) Install the seat covers in zones 251 and 252, if necessary.
(3) Close the aft passenger/crew door 832 (842) (Ref. TASK 52-10-00-410-
001).
EFF :
ALL 24-92-00
Page A698
Aug 01/11
SYR
Aft Passenger Compartment - Inspection Area - Zones 251-252
R Figure 653/TASK 24-92-00-991-093
EFF :
ALL 24-92-00
Page A699
May 01/10
SYR
(4) Remove the access platform(s).
EFF :
ALL 24-92-00
Page B600
May 01/10
R
SYR
TASK 24-92-00-210-040
General Visual Inspection of EWIS Connections Between Seats and A/C Installed
in the Aft Cabin Utility (EWIS)
1. __________________
Reason for the Job
NOTE : This task is applicable only for aircraft with seats and with wiring
____
connections between seats and aircraft.
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
EFF :
ALL 24-92-00
Page B601
May 01/11
SYR
3. __________
Job Set-up
Subtask 24-92-00-010-121
A. Get Access
(2) Open the aft passenger/crew door 832 (842) (Ref. TASK 52-10-00-010-
001).
(3) Remove the seat covers in zones 261 and 262, if necessary.
Subtask 24-92-00-862-109
4. Procedure
_________
Subtask 24-92-00-210-090
5. Close-up
________
Subtask 24-92-00-410-119
A. Close Access
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
(2) Install the seat covers in zones 261 and 262, if necessary.
(3) Close the aft passenger/crew door 832 (842) (Ref. TASK 52-10-00-410-
001).
EFF :
ALL 24-92-00
Page B602
Aug 01/11
SYR
Aft Cabin Utility - Inspection Area - Zones 261-262
R Figure 654/TASK 24-92-00-991-095
EFF :
ALL 24-92-00
Page B603
May 01/10
SYR
(4) Remove the access platform(s).
EFF :
ALL 24-92-00
Page B604
May 01/10
R
SYR
TASK 24-92-00-210-041
1. __________________
Reason for the Job
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
EFF :
ALL 24-92-00
Page B605
May 01/11
SYR
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
Subtask 24-92-00-010-123
A. Get Access
(2) Open the passenger/crew door 832 (842) (Ref. TASK 52-10-00-010-001).
(4) Remove the overhead stowage compartments between FR35 and FR47
(Ref. TASK 25-24-41-000-001).
(5) Remove the ceiling panels in the zones 243 and 244 (Ref. TASK 25-23-
41-000-001):
- 241AC, 241BC, 241CC, 241DC, 241EC, 241FC.
Subtask 24-92-00-862-111
EFF :
ALL 24-92-00
Page B606
Aug 01/11
SYR
4. Procedure
_________
Subtask 24-92-00-210-091
5. Close-up
________
Subtask 24-92-00-410-121
A. Close Access
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
(2) Install the ceiling panels in the zones 243 and 244 (Ref. TASK 25-23-
41-400-001):
- 241AC, 241BC, 241CC, 241DC, 241EC, 241FC.
(3) Install the overhead stowage compartments between FR35 and FR47
(Ref. TASK 25-24-41-400-001).
(5) Close the passenger/crew door 832 (842) (Ref. TASK 52-10-00-410-001).
EFF :
ALL 24-92-00
Page B607
May 01/10
SYR
Center Passenger Overhead-Compartment - Access Panels - Zones 243-244
R Figure 655/TASK 24-92-00-991-099
EFF :
ALL 24-92-00
Page B608
May 01/10
SYR
Center Passenger Overhead-Compartment - Inspection Area - Zones 243-244
R Figure 656/TASK 24-92-00-991-098
EFF :
ALL 24-92-00
Page B609
May 01/10
SYR
(6) Remove the access platform(s).
EFF :
ALL 24-92-00
Page B610
Nov 01/09
R
SYR
TASK 24-92-00-210-042
1. __________________
Reason for the Job
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
EFF :
ALL 24-92-00
Page B611
May 01/11
SYR
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
Subtask 24-92-00-010-124
A. Get Access
(2) Open the passenger/crew door 832 (842) (Ref. TASK 52-10-00-010-001).
(4) Remove the overhead stowage compartments between FR47 and FR64
(Ref. TASK 25-24-41-000-001).
(5) Remove the ceiling panels in the zones 253 and 254 (Ref. TASK 25-23-
41-000-001):
- 251AC, 251BC, 251CC, 251DC, 251EC, 251FC, 251GC, 251HC, 251JC.
Subtask 24-92-00-862-112
EFF :
ALL 24-92-00
Page B612
Aug 01/11
SYR
4. Procedure
_________
Subtask 24-92-00-210-092
5. Close-up
________
Subtask 24-92-00-410-122
A. Close Access
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
(2) Install the ceiling panels in the zones 253 and 254 (Ref. TASK 25-23-
41-400-001):
- 251AC, 251BC, 251CC, 251DC, 251EC, 251FC, 251GC, 251HC, 251JC.
(3) Install the overhead stowage compartments between FR47 and FR64
(Ref. TASK 25-24-41-400-001).
(5) Close the passenger/crew door 832 (842) (Ref. TASK 52-10-00-410-001).
EFF :
ALL 24-92-00
Page B613
May 01/10
SYR
Aft Passenger Overhead-Compartment - Access Panels - Zones 253-254
R Figure 657/TASK 24-92-00-991-101
EFF :
ALL 24-92-00
Page B614
May 01/10
SYR
Aft Passenger Overhead-Compartment - Inspection Area -Zones 253-254
R Figure 658/TASK 24-92-00-991-100
EFF :
ALL 24-92-00
Page B615
May 01/10
SYR
(6) Remove the access platform(s).
EFF :
ALL 24-92-00
Page B616
May 01/10
R
SYR
TASK 24-92-00-210-043
1. __________________
Reason for the Job
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
EFF :
ALL 24-92-00
Page B617
May 01/11
SYR
3. __________
Job Set-up
Subtask 24-92-00-010-128
A. Get Access
(2) Open the passenger/crew door 832 (842) (Ref. TASK 52-10-00-010-001).
(3) Remove the overhead stowage compartments between FR64 and FR70
(Ref. TASK 25-24-41-000-001).
(4) Remove the ceiling panel in the zones 263 and 264 (Ref. TASK 25-23-
41-000-001):
- 251JC.
(5) Remove the ceiling panels in the aft utility area (Ref. TASK 25-23-
42-000-002):
- 261BC, 261CC, 262BC, 262CC.
Subtask 24-92-00-862-116
4. Procedure
_________
Subtask 24-92-00-210-093
EFF :
ALL 24-92-00
Page B618
Aug 01/11
SYR
Aft Cabin Overhead-Compartment - Access Panels - Zones 261-262
R Figure 659/TASK 24-92-00-991-116
EFF :
ALL 24-92-00
Page B619
May 01/10
SYR
Aft Cabin Overhead-Compartment - Inspection Area - Zones 261-262
R Figure 660/TASK 24-92-00-991-115
EFF :
ALL 24-92-00
Page B620
May 01/10
SYR
5. Close-up
________
Subtask 24-92-00-410-126
A. Close Access
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
(2) Install the ceiling panels in the aft utility area (Ref. TASK 25-23-
42-400-002):
- 261BC, 261CC, 262BC, 262CC.
(3) Install the ceiling panel in the zones 263 and 264 (Ref. TASK 25-23-
41-400-001):
- 251JC.
(4) Install the overhead stowage compartments between FR64 and FR70
(Ref. TASK 25-24-41-400-001).
(5) Close the passenger/crew door 832 (842) (Ref. TASK 52-10-00-410-001).
EFF :
ALL 24-92-00
Page B621
May 01/10
R
SYR
TASK 24-92-00-210-044
1. __________________
Reason for the Job
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
EFF :
ALL 24-92-00
Page B622
May 01/11
SYR
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
Subtask 24-92-00-010-129
A. Get Access
(2) Open the passenger/crew door 832 (842) (Ref. TASK 52-10-00-010-001).
EFF :
ALL 24-92-00
Page B623
Aug 01/11
R
SYR
(b) Remove the galleys and stowage, if installed (Ref. TASK 25-33-41-
000-001), (Ref. TASK 25-33-41-000-002), (Ref. TASK 25-33-41-000-
008), (Ref. TASK 25-33-42-000-001), (Ref. TASK 25-33-43-000-001),
(Ref. TASK 25-33-45-000-001), (Ref. TASK 25-33-46-000-001),
(Ref. TASK 25-33-47-000-001), (Ref. TASK 25-33-48-000-001) and
(Ref. TASK 25-33-49-000-001).
Subtask 24-92-00-862-117
4. Procedure
_________
Subtask 24-92-00-210-094
5. Close-up
________
Subtask 24-92-00-410-127
A. Close Access
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
EFF :
ALL 24-92-00
Page B624
Aug 01/11
SYR
Aft Cabin Utility-Area - Access Panels - Zones 261-262
R Figure 661/TASK 24-92-00-991-119
EFF :
ALL 24-92-00
Page B625
May 01/10
SYR
Aft Cabin Utility Area - Inspection Area - Zones 261-262
R Figure 662/TASK 24-92-00-991-118
EFF :
ALL 24-92-00
Page B626
May 01/10
SYR
R
(b) Install the galleys and stowage, if removed (Ref. TASK 25-33-41-
400-001), (Ref. TASK 25-33-41-400-002), (Ref. TASK 25-33-41-400-
008), (Ref. TASK 25-33-42-400-001), (Ref. TASK 25-33-43-400-001),
(Ref. TASK 25-33-45-400-001), (Ref. TASK 25-33-46-400-001),
(Ref. TASK 25-33-47-400-001), (Ref. TASK 25-33-48-400-001) and
(Ref. TASK 25-33-49-400-001).
(3) Close the passenger/crew door 832 (842) (Ref. TASK 52-10-00-410-001).
EFF :
ALL 24-92-00
Page B627
May 01/11
SYR
TASK 24-92-00-210-045
1. __________________
Reason for the Job
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
Subtask 24-92-00-010-130
A. Get Access
(2) Open the passenger/crew door 832 (842) (Ref. TASK 52-10-00-010-001).
(3) Open the circuit breaker panel 2001VU at the zone 260.
EFF :
ALL 24-92-00
Page B628
May 01/11
SYR
Subtask 24-92-00-862-118
4. Procedure
_________
Subtask 24-92-00-210-095
5. Close-up
________
Subtask 24-92-00-410-128
A. Close Access
(1) Remove the ground support and maintenance equipment, the special and
standard tools and all other items.
(2) Close the circuit breaker panel 2001VU at the zone 260.
(3) Close the passenger/crew door 832 (842) (Ref. TASK 52-10-00-410-001).
EFF :
ALL 24-92-00
Page B629
Aug 01/11
SYR
Forward Cabin Overhead-Compartment - Inspection Area - Zones 263-264
R Figure 663/TASK 24-92-00-991-121
EFF :
ALL 24-92-00
Page B630
May 01/10
SYR
TASK 24-92-00-210-801
General Visual Inspection of All Exposed EWIS Within the Wing Fuel Tank (EWIS)
1. __________________
Reason for the Job
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
EFF :
ALL 24-92-00
Page B631
May 01/11
SYR
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
Subtask 24-92-00-941-058
A. Safety Precautions
WARNING : OBEY THE SAFETY PROCEDURES WHEN YOU DO WORK IN A FUEL TANK.
_______
NOTE : You must obey the fuel safety procedures (Ref. TASK 28-10-00-
____
910-001) and (Ref. TASK 28-10-00-910-002) when you do work in
R a fuel tank.
(2) Install the TOOL-ZERO LOCKING, FLAP SLAT CTL LEVER (98D27803500001)
on the flap/slat control lever.
(3) Put warning notices in position in the cockpit to tell persons not to
operate the flaps or slats.
EFF :
ALL 24-92-00
Page B632
May 01/10
SYR
Subtask 24-92-00-650-050
B. Fuel Configuration
(2) Drain the remaining fuel from the applicable fuel tank (Ref. TASK 28-
25-00-650-003).
Subtask 24-92-00-010-135
C. Get Access
R (1) Put an adjustable ACCESS PLATFORM 5M (16 FT) in position at the zones
540 and 640.
(3) Remove the access panels between RIB2 to RIB13 (Ref. TASK 57-27-11-
000-001) and (Ref. TASK 57-27-11-000-005):
(4) Remove the access panels between RIB13 to RIB22 (Ref. TASK 57-27-11-
000-002):
EFF :
ALL 24-92-00
Page B633
May 01/11
SYR
Subtask 24-92-00-862-123
4. Procedure
_________
Subtask 24-92-00-210-099
A. General Visual Inspection of All Exposed Wiring Within the Wing Fuel Tank
5. Close-up
________
Subtask 24-92-00-410-133
A. Close Access
(2) Install the access panels between RIB2 to RIB13 (Ref. TASK 57-27-11-
400-001) and (Ref. TASK 57-27-11-400-005):
EFF :
ALL 24-92-00
Page B634
Aug 01/11
SYR
Wing Fuel Tank - Access Panels - Zone 540
R Figure 664/TASK 24-92-00-991-135
EFF :
ALL 24-92-00
Page B635
May 01/10
SYR
Wing Fuel Tank - Access Panels - Zone 640
R Figure 665/TASK 24-92-00-991-136
EFF :
ALL 24-92-00
Page B636
May 01/10
SYR
Wing Fuel Tank - Inspection Area - Zones 540-640
R Figure 666/TASK 24-92-00-991-131
EFF :
ALL 24-92-00
Page B637
May 01/10
SYR
(3) Install the access panels between RIB13 to RIB22 (Ref. TASK 57-27-11-
400-002):
Subtask 24-92-00-650-052
B. Fuel Configuration
Subtask 24-92-00-942-056
C. Removal of Equipment
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
(2) Remove the TOOL-ZERO LOCKING, FLAP SLAT CTL LEVER (98D27803500001)
from the flap/slat control lever.
EFF :
ALL 24-92-00
Page B638
May 01/10
R
SYR
TASK 24-92-00-210-802
General Visual Inspection of All Exposed EWIS Within the Vent Surge Tank (EWIS)
1. __________________
Reason for the Job
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
EFF :
ALL 24-92-00
Page B639
May 01/11
SYR
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
ESPM 205211
24-92-00-991-138 Fig. 667
24-92-00-991-139 Fig. 668
3. __________
Job Set-up
Subtask 24-92-00-941-061
A. Safety Precautions
WARNING : OBEY THE SAFETY PROCEDURES WHEN YOU DO WORK IN A FUEL TANK.
_______
NOTE : You must obey the fuel safety procedures when you do work in a
____
fuel tank (Ref. TASK 28-10-00-910-001) and (Ref. TASK 28-10-
00-910-002).
(2) Install the TOOL-ZERO LOCKING, FLAP SLAT CTL LEVER (98D27803500001)
on the flap/slat control lever.
(3) Put warning notices in the cockpit to tell persons not to operate the
flaps or slats.
Subtask 24-92-00-650-056
B. Fuel Configuration
(1) Drain the remaining fuel from the applicable surge tank (Ref. TASK
28-25-00-650-003).
Subtask 24-92-00-010-138
C. Get Access
(2) Remove the access panels between RIB22 to RIB26 (Ref. TASK 57-27-11-
000-002):
EFF :
ALL 24-92-00
Page B640
May 01/11
SYR
(b) For the right wing:
- 650AB, 650BB, 650CB, 650DB.
Subtask 24-92-00-862-126
4. Procedure
_________
Subtask 24-92-00-210-102
A. General Visual Inspection of All Exposed Wiring Within the Vent Surge
Tank
5. Close-up
________
Subtask 24-92-00-410-136
A. Close Access
(1) Install the access panels between RIB22 to RIB26 (Ref. TASK 57-27-11-
400-002):
Subtask 24-92-00-650-057
B. Fuel Configuration
EFF :
ALL 24-92-00
Page B641
Aug 01/11
SYR
Vent Surge Tank - Access Panels - Zones 550-650
R Figure 667/TASK 24-92-00-991-138
EFF :
ALL 24-92-00
Page B642
May 01/10
SYR
Vent Surge Tank - Inspection Area - Zones 550-650
R Figure 668/TASK 24-92-00-991-139
EFF :
ALL 24-92-00
Page B643
May 01/10
SYR
Subtask 24-92-00-942-059
C. Removal of Equipment
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
(2) Remove the TOOL-ZERO LOCKING, FLAP SLAT CTL LEVER from the flap/slat
control lever.
EFF :
ALL 24-92-00
Page B644
May 01/10
R
SYR
TASK 24-92-00-210-803
General Visual Inspection of All Exposed EWIS Within Dry Bay (Outboard)(EWIS)
1. __________________
Reason for the Job
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
EFF :
ALL 24-92-00
Page B645
May 01/11
SYR
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
ESPM 205211
24-92-00-991-140 Fig. 669
24-92-00-991-141 Fig. 670
3. __________
Job Set-up
Subtask 24-92-00-941-062
A. Safety Precautions
WARNING : OBEY THE SAFETY PROCEDURES WHEN YOU DO WORK IN A FUEL TANK.
_______
NOTE : You must obey the fuel safety procedures (Ref. TASK 28-10-00-
____
910-001) and (Ref. TASK 28-10-00-910-002) when you do work in
a fuel tank.
(2) Install the TOOL-ZERO LOCKING, FLAP SLAT CTL LEVER (98D27803500001)
on the flap/slat control lever.
(3) Put warning notices in position in the cockpit to tell persons not to
operate the flaps or slats.
Subtask 24-92-00-650-058
B. Fuel Configuration
(1) Drain the remaining fuel from the applicable surge tank (Ref. TASK
28-25-00-650-003).
Subtask 24-92-00-010-139
C. Get Access
EFF :
ALL 24-92-00
Page B646
May 01/11
SYR
(b) For the right wing:
- 660AB.
Subtask 24-92-00-862-127
4. Procedure
_________
Subtask 24-92-00-210-103
A. General Visual Inspection of All Exposed Wiring Within Dry Bay (Outboard)
(a) On sensitive routes: 1S and 2S, vent surge tank overflow sensor.
5. Close-up
________
Subtask 24-92-00-410-137
A. Close Access
Subtask 24-92-00-650-059
B. Fuel Configuration
EFF :
ALL 24-92-00
Page B647
Aug 01/11
SYR
Dry Bay (Outboard) - Access Panels - Zones 560-660
R Figure 669/TASK 24-92-00-991-140
EFF :
ALL 24-92-00
Page B648
May 01/10
SYR
Dry Bay (Outboard) - Inspection Area - Zones 560-660
R Figure 670/TASK 24-92-00-991-141
EFF :
ALL 24-92-00
Page B649
May 01/10
SYR
Subtask 24-92-00-942-060
C. Removal of Equipment
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
(2) Remove the TOOL-ZERO LOCKING, FLAP SLAT CTL LEVER (98D27803500001)
from the flap/slat control lever.
EFF :
ALL 24-92-00
Page B650
May 01/10
R
SYR
TASK 24-92-00-210-804
1. __________________
Reason for the Job
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
EFF :
ALL 24-92-00
Page B651
May 01/11
SYR
3. __________
Job Set-up
Subtask 24-92-00-941-063
A. Safety Precautions
(2) Make sure that the ground safety locks are on the landing gear
(Ref. TASK 32-00-00-481-001).
Subtask 24-92-00-010-140
B. Get Access
(2) Make sure that the GROUND LOCK SLEEVE is correctly installed on the
applicable MLG door actuating-cylinder.
Subtask 24-92-00-862-128
EFF :
ALL 24-92-00
Page B652
Aug 01/11
SYR
4. Procedure
_________
Subtask 24-92-00-210-104
5. Close-up
________
Subtask 24-92-00-410-138
A. Close Access
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
EFF :
ALL 24-92-00
Page B653
May 01/10
SYR
MLG Bay - Inspection Area - Zones 571-671
R Figure 671/TASK 24-92-00-991-142
EFF :
ALL 24-92-00
Page B654
May 01/10
SYR
TASK 24-92-00-210-805
1. __________________
Reason for the Job
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
No specific flashlight
No specific mirror
R No specific 1 ACCESS PLATFORM 2M (6 FT) - ADJUSTABLE
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
EFF :
ALL 24-92-00
Page B655
May 01/11
SYR
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
Subtask 24-92-00-010-143
A. Get Access
(2) Open the FWD cargo-compartment door 825 (Ref. TASK 52-30-00-860-001)
and (Ref. TASK 52-30-00-860-003).
(3) Remove the ceiling panels in the FWD cargo compartment from FR24 to
FR34 (Ref. TASK 25-54-12-000-002).
(4) Remove the sidewall panels in the FWD cargo compartment from FR24 to
FR34 (Ref. TASK 25-54-12-000-003).
Subtask 24-92-00-862-131
4. Procedure
_________
Subtask 24-92-00-210-105
EFF :
ALL 24-92-00
Page B656
Aug 01/11
SYR
Forward Cargo Compartment - Inspection Area - Zones 131-132
R Figure 672/TASK 24-92-00-991-146
EFF :
ALL 24-92-00
Page B657
May 01/10
SYR
(c) On the generator excitation routes: 1E and 2E.
5. Close-up
________
Subtask 24-92-00-410-141
A. Close Access
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
(2) Install the sidewall panels in the FWD cargo compartment from FR24 to
FR34 (Ref. TASK 25-54-12-400-003).
(3) Install the ceiling panels in the FWD cargo compartment from FR24 to
FR34 (Ref. TASK 25-54-12-400-002).
(4) Close the FWD cargo-compartment door 825 (Ref. TASK 52-30-00-860-002)
and (Ref. TASK 52-30-00-860-004).
EFF :
ALL 24-92-00
Page B658
May 01/10
R
SYR
TASK 24-92-00-210-806
1. __________________
Reason for the Job
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
EFF :
ALL 24-92-00
Page B659
May 01/11
SYR
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
Subtask 24-92-00-010-144
A. Get Access
(2) Open the AFT cargo-compartment door 826 (Ref. TASK 52-30-00-860-001)
and (Ref. TASK 52-30-00-860-003).
(3) Remove the additional center tanks No. 1, No. 2 and No. 3 in zones
151 and 152, if installed (Ref. TASK 28-11-27-000-002), (Ref. TASK
28-11-27-000-003) and (Ref. TASK 28-11-27-000-004).
(4) Remove the sidewall panels in the AFT cargo compartment from FR47 to
FR59 (Ref. TASK 25-55-11-000-003).
NOTE : To see the panels that you must remove, refer to (Ref. AWM
____
944220) or (Ref. AWM 944221).
(5) Remove the ceiling panels in the AFT cargo compartment from FR47 to
FR59 (Ref. TASK 25-55-11-000-002).
NOTE : To see the panels that you must remove, refer to (Ref. AWM
____
944220) or (Ref. AWM 944221).
EFF :
ALL 24-92-00
Page B660
May 01/11
SYR
Subtask 24-92-00-862-132
4. Procedure
_________
Subtask 24-92-00-210-106
5. Close-up
________
Subtask 24-92-00-410-142
A. Close Access
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
(2) Install the ceiling panels in the AFT cargo compartment from FR47 to
FR59 (Ref. TASK 25-55-11-400-002).
(3) Install the sidewall panels in the AFT cargo compartment from FR47 to
FR59 (Ref. TASK 25-55-11-400-003).
(4) Install the additional center tanks No. 1, No. 2 and No. 3 in zones
151 and 152, if removed (Ref. TASK 28-11-27-400-002), (Ref. TASK 28-
11-27-400-003) and (Ref. TASK 28-11-27-400-004).
(5) Close the AFT cargo-compartment door 826 (Ref. TASK 52-30-00-860-002)
and (Ref. TASK 52-30-00-860-004).
EFF :
ALL 24-92-00
Page B661
Aug 01/11
SYR
Aft Cargo Compartment - Inspection Area - Zones 151-152
R Figure 673/TASK 24-92-00-991-147
EFF :
ALL 24-92-00
Page B662
May 01/10
SYR
TASK 24-92-00-210-808
1. __________________
Reason for the Job
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
No specific flashlight
No specific mirror
R No specific 1 ACCESS PLATFORM 4M (13 FT)-ADJUSTABLE
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
Subtask 24-92-00-010-153
A. Get Access
(2) Open the forward passenger/crew door 831 (Ref. TASK 52-10-00-010-
001).
EFF :
ALL 24-92-00
Page B663
May 01/11
SYR
(3) Open the access doors 812, 822, 824.
Subtask 24-92-00-862-139
4. Procedure
_________
Subtask 24-92-00-210-108
EFF :
ALL 24-92-00
Page B664
Aug 01/11
SYR
Lateral Avionic Compartment - Inspection Area - Zones 125-126
R Figure 674/TASK 24-92-00-991-156
EFF :
ALL 24-92-00
Page B665
May 01/10
SYR
5. Close-up
________
Subtask 24-92-00-410-151
A. Close Access
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
(4) Close the forward passenger/crew door 831 (Ref. TASK 52-10-00-410-
001).
EFF :
ALL 24-92-00
Page B666
May 01/10
R
SYR
TASK 24-92-00-220-008
1. __________________
Reason for the Job
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
No specific flashlight
No specific mirror
R No specific 1 ACCESS PLATFORM 4M (13 FT)-ADJUSTABLE
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
EFF :
ALL 24-92-00
Page B667
May 01/11
SYR
3. __________
Job Set-up
Subtask 24-92-00-010-154
A. Get Access
(2) Open the forward passenger/crew door 831 (Ref. TASK 52-10-00-010-
001).
(5) Remove the cabin floor panels FR9 to FR16 (Ref. TASK 53-12-11-000-
001) and (Ref. TASK 53-12-12-000-001).
Subtask 24-92-00-862-140
4. Procedure
_________
Subtask 24-92-00-220-058
(a) On the AC/DC feeder routes: 1G, 2G (Ref. AWM 94-23-05), 4G, 6G
(Ref. AWM 94-21-06).
(c) On the generator excitation routes: 1E, 2E, 3E and 6E. (Ref. AWM
94-23-05), (Ref. AWM 94-21-06) and (Ref. AWM 94-21-20).
EFF :
ALL 24-92-00
Page B668
Aug 01/11
SYR
(2) Make sure that there is no dust, lint or hydraulic contamination.
5. Close-up
________
Subtask 24-92-00-410-152
A. Close Access
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
(2) Install the cabin floor panels FR9 to FR16 (Ref. TASK 53-12-11-400-
001) and (Ref. TASK 53-12-12-400-001).
(5) Close the forward passenger/crew door 831 (Ref. TASK 52-10-00-410-
001).
EFF :
ALL 24-92-00
Page B669
May 01/10
SYR
TASK 24-92-00-210-812
Visual Inspection of EWIS Installed in the Forward Pylon After an Engine Bleed
Leak (EWIS)
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
Subtask 24-92-00-941-064
A. Safety Precautions
(2) Make sure that the engine 1(2) shutdown occurred not less than 5
minutes before you do this procedure.
EFF :
ALL 24-92-00
Page B670
May 01/10
SYR
(3) On the overhead maintenance panel 50VU:
- Make sure that the ON legend of the ENG/FADEC GND PWR/1(2)
pushbutton switch is off.
(4) Put a warning notice in position to tell persons not to energize the
FADEC 1(2).
Subtask 24-92-00-865-061
R WARNING : MAKE SURE THAT YOU OPEN THE CIRCUIT BREAKERS AS FOLLOWS:
_______
R - 1JH, 2JH1 AND 3JH1 BEFORE 2KS1
R - 1JH, 2JH2 AND 3JH2 BEFORE 2KS2.
R IF YOU DO NOT OBEY THIS SEQUENCE, THERE IS A RISK OF
R ELECTROCUTION. THIS IS BECAUSE YOU WILL START CONTINUOUS
R IGNITION IF YOU OPEN CIRCUIT BREAKER 2KS1 OR 2KS2 FIRST.
-------------------------------------------------------------------------------
PANEL DESIGNATION IDENT. LOCATION
-------------------------------------------------------------------------------
R FOR 1000EM1
49VU ENGINE/1/FADEC A/AND EIU 1 2KS1 A04
R 49VU ENGINE/1 AND 2/IGN/SYS A 1JH A03
R 121VU ENGINE/IGN/ENG1/SYS B 3JH1 P41
R 121VU ENGINE/IGN/ENG1/SYS A BAT 2JH1 P39
121VU ENGINE/ENG1/FADEC B/AND EIU 1 4KS1 R41
R FOR 1000EM2
49VU ENGINE/2/FADEC A/AND EIU 2 2KS2 A05
R 49VU ENGINE/1 AND 2/IGN/SYS A 1JH A03
R 121VU ENGINE/IGN/ENG2/SYS B 3JH2 P42
R 121VU ENGINE/IGN/ENG2/SYS A BAT 2JH2 P40
121VU ENGINE/ENG2/FADEC B 4KS2 Q40
Subtask 24-92-00-010-165
C. Get Access
EFF :
ALL 24-92-00
Page B671
May 01/10
SYR
Subtask 24-92-00-862-147
4. Procedure
_________
Subtask 24-92-00-210-114
1
_ On the AC/DC feeder route: 1G.
2
_ On the sensitive system routes: 1S and 2S.
3
_ On the not sensitive system route: 1M.
1
_ On the AC/DC feeder route: 2G.
2
_ On the sensitive system routes: 1S and 2S.
3
_ On the not sensitive system route: 2M.
EFF :
ALL 24-92-00
Page B672
Aug 01/11
SYR
Visual Inspection of the Wiring Installed in the Forward Pylon Between Rib01
and Rib07 at Zone B2
R Figure 675/TASK 24-92-00-991-164
EFF :
ALL
24-92-00 Page B673
May 01/10
SYR
5. Close-up
________
Subtask 24-92-00-410-164
A. Close Access
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
Subtask 24-92-00-865-062
B. Remove the safety clip(s) and the tag(s) and close this(these) circuit
breaker(s):
-------------------------------------------------------------------------------
PANEL DESIGNATION IDENT. LOCATION
-------------------------------------------------------------------------------
FOR 1000EM1
49VU ENGINE/1/FADEC A/AND EIU 1 2KS1 A04
R 49VU ENGINE/1 AND 2/IGN/SYS A 1JH A03
R 121VU ENGINE/IGN/ENG1/SYS B 3JH1 P41
R 121VU ENGINE/IGN/ENG1/SYS A BAT 2JH1 P39
121VU ENGINE/ENG1/FADEC B/AND EIU 1 4KS1 R41
FOR 1000EM2
49VU ENGINE/2/FADEC A/AND EIU 2 2KS2 A05
R 49VU ENGINE/1 AND 2/IGN/SYS A 1JH A03
R 121VU ENGINE/IGN/ENG2/SYS B 3JH2 P42
R 121VU ENGINE/IGN/ENG2/SYS A BAT 2JH2 P40
121VU ENGINE/ENG2/FADEC B 4KS2 Q40
EFF :
ALL 24-92-00
Page B674
May 01/10
SYR
TASK 24-92-00-210-813
General Visual Inspection of EWIS Installed in the Keel Beam Area of MLG-Well
and Hydraulic Compartment (EWIS)
1. __________________
Reason for the Job
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
Subtask 24-92-00-010-168
A. Get Access
EFF :
ALL 24-92-00
Page B675
Aug 01/11
R
SYR
Subtask 24-92-00-862-150
4. Procedure
_________
Subtask 24-92-00-210-117
A. General Visual Inspection of EWIS installed in the Keel Beam Area of the
Main Landing Gear (MLG) Well and Hydraulic Compartment (EWIS)
5. Close-up
________
Subtask 24-92-00-410-166
A. Close Access
EFF :
ALL 24-92-00
Page B676
Aug 01/11
SYR
R Aft Cargo Compartment - Inspection Area - Zones 147-148
R Figure 676/TASK 24-92-00-991-166
EFF :
ALL 24-92-00
Page B677
May 01/10
SYR
TASK 24-92-00-210-814
1. __________________
Reason for the Job
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
EFF :
ALL 24-92-00
Page B678
May 01/11
SYR
3. __________
Job Set-up
Subtask 24-92-00-010-169
A. Get Access
(2) Open the AFT cargo-compartment door 826 (Ref. TASK 52-30-00-860-001)
or (Ref. TASK 52-30-00-860-003).
(3) Remove the sidewall panels in the AFT cargo-compartment from FR59 to
FR65 (Ref. TASK 25-55-12-000-003).
Subtask 24-92-00-862-149
4. Procedure
_________
Subtask 24-92-00-210-116
5. Close-up
________
Subtask 24-92-00-410-167
A. Close Access
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
(2) Install the sidewall panels in the AFT cargo-compartment from FR59 to
FR65 (Ref. TASK 25-55-12-400-003).
EFF :
ALL 24-92-00
Page B679
Aug 01/11
SYR
R Bulk Cargo Compartment - Inspection Area - Zones 161-162
R Figure 677/TASK 24-92-00-991-167
EFF :
ALL 24-92-00
Page B680
May 01/10
SYR
R (3) Close the AFT cargo-compartment door 826 (Ref. TASK 52-30-00-860-002)
R or (Ref. TASK 52-30-00-860-004).
EFF :
ALL 24-92-00
Page B681
May 01/10
SYR
TASK 24-92-00-210-815
1. __________________
Reason for the Job
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
EFF :
ALL 24-92-00
Page B682
May 01/11
SYR
3. __________
Job Set-up
Subtask 24-92-00-866-054
Subtask 24-92-00-010-167
B. Get Access
Subtask 24-92-00-862-148
4. Procedure
_________
Subtask 24-92-00-210-115
EFF :
ALL 24-92-00
Page B683
Aug 01/11
SYR
R Access Panels - Wing Upper and Lower Surfaces
R Figure 678/TASK 24-92-00-991-165- 12 (SHEET 1)
EFF :
ALL 24-92-00
Page B684
May 01/10
SYR
R Access Panels - Wing Upper and Lower Surfaces
R Figure 678/TASK 24-92-00-991-165- 22 (SHEET 2)
EFF :
ALL 24-92-00
Page B685
May 01/10
SYR
R 5. Close-up
________
R Subtask 24-92-00-410-165
R A. Close Access
R (1) Make sure that the work area is clean and clear of tool(s) and other
R items.
R Subtask 24-92-00-866-055
EFF :
ALL 24-92-00
Page B686
May 01/10
SYR
ELECTRICAL ROUTING - CLEANING/PAINTING
______________________________________
TASK 24-92-00-100-001
1. __________________
Reason for the Job
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
EFF :
ALL 24-92-00
Page 701
May 01/11
SYR
3. __________
Job Set-up
Subtask 24-92-00-010-087
A. Get Access
(3) Remove the AFT cargo-compartment partition FR65 (Ref. TASK 25-55-12-
000-001).
Subtask 24-92-00-862-075
4. Procedure
_________
Subtask 24-92-00-160-050
EFF :
ALL 24-92-00
Page 702
May 01/11
SYR
Aft Cabin Underfloor Compartment - Access Panels - Zones 171-172
Figure 701/TASK 24-92-00-991-049
EFF :
ALL 24-92-00
Page 703
Nov 01/07
SYR
Aft Cabin Underfloor Compartment - Cleaning Area - Zones 171-172
Figure 702/TASK 24-92-00-991-050
EFF :
ALL 24-92-00
Page 704
Nov 01/07
SYR
5. Close-up
________
Subtask 24-92-00-410-085
A. Close Access
(2) Install the AFT cargo-compartment partition FR65 (Ref. TASK 25-55-12-
400-001).
EFF :
ALL 24-92-00
Page 705
May 01/10
R
SYR
TASK 24-92-00-100-002
1. __________________
Reason for the Job
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
EFF :
ALL 24-92-00
Page 706
May 01/11
SYR
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
Subtask 24-92-00-010-088
A. Get Access
(2) Open the forward passenger/crew door 831 (841) (Ref. TASK 52-10-00-
010-001).
EFF :
ALL 24-92-00
Page 707
May 01/11
SYR
R (d) Remove the passenger seats, if installed (Ref. TASK 25-21-41-000-
001).
(4) Remove the door frame linings at the left and right FWD
passenger/crew doors at FR20 (Ref. TASK 25-23-45-000-005) and
(Ref. TASK 25-23-45-000-002).
(5) Remove the linings and insulation panels in the zones 231 and 232:
Subtask 24-92-00-862-076
4. Procedure
_________
Subtask 24-92-00-160-051
(e) On the coaxial wiring: routes 1T, 3T, 7T, 8T, 9T and 1U.
EFF :
ALL 24-92-00
Page 708
May 01/11
SYR
Forward Passenger Compartment - Access Panels - Zones 231-232
Figure 703/TASK 24-92-00-991-052
EFF :
ALL 24-92-00
Page 709
Nov 01/07
SYR
Forward Passenger Compartment - Cleaning Area - Zones 231-232
Figure 704/TASK 24-92-00-991-051
EFF :
ALL 24-92-00
Page 710
Nov 01/07
SYR
5. Close-up
________
Subtask 24-92-00-410-086
A. Close Access
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
(2) Install the linings and insulation panels in the zones 231 and 232:
(3) Install the door frame linings at the left and right FWD
passenger/crew doors at FR20 (Ref. TASK 25-23-45-400-006) and
(Ref. TASK 25-23-45-400-007).
(5) Close the forward passenger/crew door 831 (841) (Ref. TASK 52-10-00-
410-001).
EFF :
ALL 24-92-00
Page 711
May 01/11
SYR
TASK 24-92-00-100-003
1. __________________
Reason for the Job
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
EFF :
ALL 24-92-00
Page 712
May 01/11
SYR
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
Subtask 24-92-00-010-094
A. Get Access
(2) Open the passenger/crew door 832 (842) (Ref. TASK 52-10-00-010-001).
EFF :
ALL 24-92-00
Page 713
May 01/11
SYR
(4) Remove the linings and insulation panels in the zones 241 and 242:
(a) Remove the upper sidewall panel assembly (Ref. TASK 25-23-47-000-
002):
- 241CW, 241LW, 242CW, 242LW.
Subtask 24-92-00-862-082
4. Procedure
_________
Subtask 24-92-00-160-053
EFF :
ALL 24-92-00
Page 714
May 01/11
R
SYR
Center Passenger Compartment - Access Panels - Zones 241-242
Figure 705/TASK 24-92-00-991-057
EFF :
ALL 24-92-00
Page 715
Nov 01/07
SYR
Center Passenger Compartment - Cleaning Area - Zones 241-242
Figure 706/TASK 24-92-00-991-056
EFF :
ALL 24-92-00
Page 716
Nov 01/07
SYR
5. Close-up
________
Subtask 24-92-00-410-092
A. Close Access
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
(2) Install the linings and insulation panels in the zones 241 and 242:
(a) Install the upper sidewall panel assembly (Ref. TASK 25-23-47-
400-002):
- 241CW, 241LW, 242CW, 242LW.
(4) Close the passenger/crew door 832 (842) (Ref. TASK 52-10-00-410-001).
EFF :
ALL 24-92-00
Page 717
May 01/11
SYR
TASK 24-92-00-100-004
1. __________________
Reason for the Job
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
Subtask 24-92-00-010-092
A. Get Access
EFF :
ALL 24-92-00
Page 718
May 01/11
SYR
Subtask 24-92-00-862-080
4. Procedure
_________
Subtask 24-92-00-160-052
5. Close-up
________
Subtask 24-92-00-410-090
A. Close Access
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
EFF :
ALL 24-92-00
Page 719
Nov 01/07
SYR
Forward Avionic Compartment - Access
Figure 707/TASK 24-92-00-991-054
EFF :
ALL 24-92-00
Page 720
Nov 01/07
SYR
Forward Avionic Compartment - Cleaning Area - Zones 121-122
Figure 708/TASK 24-92-00-991-117
EFF :
ALL 24-92-00
Page 721
Nov 01/07
SYR
(4) Remove the access platform(s).
EFF :
ALL 24-92-00
Page 722
Nov 01/07
SYR
TASK 24-92-00-100-005
1. __________________
Reason for the Job
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
EFF :
ALL 24-92-00
Page 723
May 01/11
SYR
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
Subtask 24-92-00-010-096
A. Get Access
(2) Open the passenger/crew door 831 (841) (Ref. TASK 52-10-00-010-001).
(4) Remove the overhead stowage compartments between FR20 and FR35
(Ref. TASK 25-24-41-000-001).
(5) Remove the ceiling panels in the zones 233 and 234 (Ref. TASK 25-23-
41-000-001):
- 231AC, 232AC, 231BC, 231CC, 231DC, 231EC, 231FC, 231GC, 231HC.
Subtask 24-92-00-862-084
EFF :
ALL 24-92-00
Page 724
May 01/11
SYR
4. Procedure
_________
Subtask 24-92-00-160-054
(1) Clean the wiring if there is dust contamination (Ref. ESPM 205500).
5. Close-up
________
Subtask 24-92-00-410-094
A. Close Access
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
(2) Install the ceiling panels in the zones 233 and 234 (Ref. TASK 25-23-
41-400-001):
- 231AC, 232AC, 231BC, 231CC, 231DC, 231EC, 231FC, 231GC, 231HC.
(3) Install the overhead stowage compartments between FR20 and FR35
(Ref. TASK 25-24-41-400-001).
EFF :
ALL 24-92-00
Page 725
Nov 01/07
SYR
Forward Passenger Overhead-Compartment - Access Panels - Zones 231-232
Figure 709/TASK 24-92-00-991-060
EFF :
ALL 24-92-00
Page 726
Nov 01/07
SYR
Forward Passenger Overhead Compartment - Cleaning - Zones 233-234
Figure 710/TASK 24-92-00-991-059
EFF :
ALL 24-92-00
Page 727
Nov 01/07
SYR
(b) Install the stowage, if removed (Ref. TASK 25-27-44-400-002) and
(Ref. TASK 25-27-44-400-003).
(5) Close the forward passenger/crew door 831 (841) (Ref. TASK 52-10-00-
410-001).
EFF :
ALL 24-92-00
Page 728
Nov 01/08
SYR
TASK 24-92-00-100-007
1. __________________
Reason for the Job
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
EFF :
ALL 24-92-00
Page 729
May 01/11
SYR
3. __________
Job Set-up
Subtask 24-92-00-010-100
A. Get Access
(2) Open the forward passenger/crew door 831 (841) (Ref. TASK 52-10-00-
010-001).
(3) Remove the door frame linings at the left and right FWD
passenger/crew door (Ref. TASK 25-23-45-000-005) and (Ref. TASK 25-
23-45-000-002).
(4) Remove the cabin floor panels from FR12 to FR20 (Ref. TASK 53-12-12-
000-001).
Subtask 24-92-00-862-088
4. Procedure
_________
Subtask 24-92-00-160-056
(1) Clean the wiring if there is dust or lint contamination (Ref. ESPM
205500).
EFF :
ALL 24-92-00
Page 730
May 01/11
SYR
5. Close-up
________
Subtask 24-92-00-410-098
A. Close Access
(1) Install the cabin floor panels from FR12 to FR20 (Ref. TASK 53-12-12-
400-001).
(2) Install the door frame linings at the left and right FWD
passenger/crew door (Ref. TASK 25-23-45-400-006) and (Ref. TASK 25-
23-45-400-007).
(3) Close the forward passenger/crew door 831 (841) (Ref. TASK 52-10-00-
410-001).
R
EFF :
ALL 24-92-00
Page 731
May 01/11
SYR
R Forward Cabin Utility-Area - Access Panels - Zones 221-222
R Figure 711/TASK 24-92-00-991-066-A12 (SHEET 1)
EFF :
ALL 24-92-00
Page 732
Nov 01/08
SYR
R Forward Cabin Utility-Area - Access Panels - Zones 221-222
R Figure 711/TASK 24-92-00-991-066-A22 (SHEET 2)
EFF :
ALL 24-92-00
Page 733
Nov 01/08
SYR
Forward Cabin Utility-Area - Cleaning Area - Zones 221-222
R Figure 712/TASK 24-92-00-991-065
EFF :
ALL 24-92-00
Page 734
Nov 01/08
SYR
TASK 24-92-00-100-009
1. __________________
Reason for the Job
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
EFF :
ALL 24-92-00
Page 735
May 01/11
SYR
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
Subtask 24-92-00-010-102
A. Get Access
(2) Open the passenger/crew door 832 (842) (Ref. TASK 52-10-00-010-001).
(4) Remove the overhead stowage compartments between FR35 and FR47
(Ref. TASK 25-24-41-000-001).
(5) Remove the ceiling panels in the zones 243 and 244 (Ref. TASK 25-23-
41-000-001):
- 241AC, 241BC, 241CC, 241DC, 241EC, 241FC.
Subtask 24-92-00-862-090
EFF :
ALL 24-92-00
Page 736
May 01/11
SYR
4. Procedure
_________
Subtask 24-92-00-160-058
(1) Clean the wiring if there is dust contamination (Ref. ESPM 205500).
5. Close-up
________
Subtask 24-92-00-410-100
A. Close Access
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
(2) Install the ceiling panels in the zones 243 and 244 (Ref. TASK 25-23-
41-400-001):
- 241AC, 241BC, 241CC, 241DC, 241EC, 241FC.
(3) Install the overhead stowage compartments between FR35 and FR47
(Ref. TASK 25-24-41-400-001).
EFF :
ALL 24-92-00
Page 737
May 01/11
R
SYR
Center Passenger Overhead-Compartment - Access Panels - Zones 243-244
Figure 713/TASK 24-92-00-991-070
EFF :
ALL 24-92-00
Page 738
May 01/11
R
SYR
Center Passenger Overhead-Compartment - Cleaning Area - Zones 243-244
Figure 714/TASK 24-92-00-991-069
EFF :
ALL 24-92-00
Page 739
May 01/11
R
SYR
(4) Install the furnishings in the zones 241 and 242:
(5) Close the passenger/crew door 832 (842) (Ref. TASK 52-10-00-410-001).
EFF :
ALL 24-92-00
Page 740
May 01/11
R
SYR
TASK 24-92-00-100-010
1. __________________
Reason for the Job
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
EFF :
ALL 24-92-00
Page 741
May 01/11
SYR
3. __________
Job Set-up
Subtask 24-92-00-010-103
A. Get Access
(2) Open the forward passenger/crew door 831 (841) (Ref. TASK 52-10-00-
010-001).
(3) Remove the ceiling panels in the forward utility area (Ref. TASK 25-
23-42-000-001):
- 221AC, 221BC, 222BC.
(5) Remove the forward galley unit (6475MM) (Ref. TASK 25-31-41-000-001)
or (Ref. TASK 25-31-42-000-001) if installed.
Subtask 24-92-00-862-091
4. Procedure
_________
Subtask 24-92-00-160-059
(1) Clean the wiring if there is dust contamination (Ref. ESPM 205500).
EFF :
ALL 24-92-00
Page 742
May 01/11
SYR
Forward Cabin Overhead-Compartment - Access Panels - Zones 223-224
Figure 715/TASK 24-92-00-991-111
EFF :
ALL 24-92-00
Page 743
May 01/11
R
SYR
INTENTIONALLY BLANK
R
24-92-00
Page 744
May 01/11
SYR
Forward Cabin Overhead-Compartment - Cleaning Area - Zones 223-224
Figure 716/TASK 24-92-00-991-073
EFF :
ALL 24-92-00
Page 745
May 01/09
R
SYR
5. Close-up
________
Subtask 24-92-00-410-101
A. Close Access
(1) Install the ceiling panels in the forward utility area (Ref. TASK 25-
23-42-400-001).
- 221AC, 221BC, 222BC.
(2) Install the forward galley unit (6475MM) (Ref. TASK 25-31-41-400-001)
or (Ref. TASK 25-31-42-400-001) if removed.
(4) Close the forward passenger/crew door 831 (841) (Ref. TASK 52-10-00-
410-001).
EFF :
ALL 24-92-00
Page 746
May 01/09
R
SYR
TASK 24-92-00-100-013
1. __________________
Reason for the Job
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
EFF :
ALL 24-92-00
Page 747
May 01/11
SYR
3. __________
Job Set-up
Subtask 24-92-00-010-108
A. Get Access
(3) Open the FWD cargo-compartment door 825 (Ref. TASK 52-30-00-860-001)
or (Ref. TASK 52-30-00-860-003).
Subtask 24-92-00-862-096
4. Procedure
_________
Subtask 24-92-00-160-062
EFF :
ALL 24-92-00
Page 748
May 01/11
SYR
Rear Avionic Compartment - Access
Figure 717/TASK 24-92-00-991-078
EFF :
ALL 24-92-00
Page 749
May 01/09
R
SYR
(g) On the coaxial wiring routes: 3T and 4T.
5. Close-up
________
Subtask 24-92-00-410-106
A. Close Access
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
(4) Close the FWD cargo-compartment door 825 (Ref. TASK 52-30-00-860-002)
or (Ref. TASK 52-30-00-860-004).
EFF :
ALL 24-92-00
Page 750
May 01/09
R
SYR
TASK 24-92-00-100-015
1. __________________
Reason for the Job
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
Subtask 24-92-00-010-116
A. Get Access
(2) Open the aft passenger/crew doors 832 (842) (Ref. TASK 52-10-00-010-
001).
EFF :
ALL 24-92-00
Page 751
May 01/11
SYR
(3) Remove the cabin floor panels from FR36 to FR46 (Ref. TASK 53-32-12-
000-002).
Subtask 24-92-00-862-104
4. Procedure
_________
Subtask 24-92-00-160-064
A. Cleaning of All Wiring Installed in the Zone Under Cabin Floor (Only
Contaminated Wiring)
5. Close-up
________
Subtask 24-92-00-410-114
A. Close Access
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
(2) Install the cabin floor panels from FR36 to FR46 (Ref. TASK 53-32-12-
400-002).
(3) Close the aft passenger/crew doors 832 (842) (Ref. TASK 52-10-00-410-
001).
EFF :
ALL 24-92-00
Page 752
May 01/10
R
SYR
Zone Under Cabin Floor - Cleaning Area - Zones 145-146
Figure 718/TASK 24-92-00-991-087
EFF :
ALL 24-92-00
Page 753
May 01/09
R
SYR
TASK 24-92-00-100-016
1. __________________
Reason for the Job
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
Subtask 24-92-00-010-117
A. Get Access
(2) Open the forward passenger/crew door 831 (841) (Ref. TASK 52-10-00-
010-001).
(3) Remove the cockpit ceiling panels 211BC, 211FC, 211HC, 212BC, 212FC,
212KW (Ref. TASK 25-13-41-000-001).
EFF :
ALL 24-92-00
Page 754
May 01/11
SYR
Subtask 24-92-00-862-105
4. Procedure
_________
Subtask 24-92-00-160-065
(1) Clean the wiring if there is dust or lint contamination (Ref. ESPM
205500).
5. Close-up
________
Subtask 24-92-00-410-115
A. Close Access
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
(2) Install the cockpit ceiling panels 211BC, 211FC, 211HC, 212BC, 212FC,
212KW (Ref. TASK 25-13-41-400-001).
(3) Close the forward passenger/crew door 831 (Ref. TASK 52-10-00-410-
001).
EFF :
ALL 24-92-00
Page 755
May 01/09
R
SYR
Cockpit - Sidewall Panels and Ceiling Panels - Zones 211-212
Figure 719/TASK 24-92-00-991-088
EFF :
ALL 24-92-00
Page 756
May 01/09
R
SYR
Cockpit - Cleaning Area - Zones 211-212
Figure 720/TASK 24-92-00-991-130
EFF :
ALL 24-92-00
Page 757
May 01/09
R
SYR
TASK 24-92-00-100-017
1. __________________
Reason for the Job
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
Subtask 24-92-00-862-106
EFF :
ALL 24-92-00
Page 758
May 01/11
SYR
Subtask 24-92-00-010-118
B. Get Access
(2) Open the forward passenger/crew door 831 (841) (Ref. TASK 52-10-00-
010-001).
4. Procedure
_________
Subtask 24-92-00-160-066
(1) Clean the wiring if there is dust or lint contamination (Ref. ESPM
205500).
EFF :
ALL 24-92-00
Page 759
May 01/11
SYR
49VU and 120VU - Location
R Figure 721/TASK 24-92-00-991-089
EFF :
ALL 24-92-00
Page 760
Nov 01/08
SYR
5. Close-up
________
Subtask 24-92-00-410-116
A. Close Access
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
R (4) Close the forward passenger/crew door 831 (841) (Ref. TASK 52-10-00-
410-001).
EFF :
ALL 24-92-00
Page 761
Nov 01/09
SYR
TASK 24-92-00-100-019
1. __________________
Reason for the Job
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
EFF :
ALL 24-92-00
Page 762
May 01/11
SYR
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
Subtask 24-92-00-010-122
A. Get Access
(2) Open the passenger/crew door 832 (842) (Ref. TASK 52-10-00-010-001).
(4) Remove the linings and insulation panels in the zones 251 and 252:
EFF :
ALL 24-92-00
Page 763
May 01/11
SYR
(b) Remove the lower sidewall panels (Ref. TASK 25-23-44-000-001):
- 251AW, 251DW, 251GW, 251KW, 251NW, 251RW, 251UW, 251XW, 251AX,
252AW, 252DW, 252GW, 252KW, 252NW, 252RW, 252UW, 252XW, 252AX.
Subtask 24-92-00-862-110
4. Procedure
_________
Subtask 24-92-00-160-068
(1) Clean the wiring if there is dust or lint contamination (Ref. ESPM
205500).
5. Close-up
________
Subtask 24-92-00-410-120
A. Close Access
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
(2) Install the linings and insulation panels in the zones 251 and 252:
EFF :
ALL 24-92-00
Page 764
May 01/11
R
SYR
Aft Passenger Compartment - Access Panels - Zones 251-252
Figure 722/TASK 24-92-00-991-097
EFF :
ALL 24-92-00
Page 765
Nov 01/09
R
SYR
Aft Passenger Compartment - Cleaning Area - Zones 251-252
Figure 723/TASK 24-92-00-991-096
EFF :
ALL 24-92-00
Page 766
Nov 01/09
R
SYR
(b) Install the lower sidewall panels (Ref. TASK 25-23-44-400-001):
- 251AW, 251DW, 251GW, 251KW, 251NW, 251RW, 251UW, 251XW, 251AX,
252AW, 252DW, 252GW, 252KW, 252NW, 252RW, 252UW, 252XW, 252AX.
(4) Close the passenger/crew door 832 (842) (Ref. TASK 52-10-00-410-001).
EFF :
ALL 24-92-00
Page 767
May 01/11
SYR
TASK 24-92-00-100-021
1. __________________
Reason for the Job
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
EFF :
ALL 24-92-00
Page 768
May 01/11
SYR
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
Subtask 24-92-00-010-125
A. Get Access
(2) Open the passenger/crew door 832 (842) (Ref. TASK 52-10-00-010-001).
(4) Remove the overhead stowage compartments between FR47 and FR64
(Ref. TASK 25-24-41-000-001).
(5) Remove the ceiling panels in the zones 253 and 254 (Ref. TASK 25-23-
41-000-001):
- 251AC, 251BC, 251CC, 251DC, 251EC, 251FC, 251GC, 251HC, 251JC.
Subtask 24-92-00-862-113
EFF :
ALL 24-92-00
Page 769
May 01/11
SYR
4. Procedure
_________
Subtask 24-92-00-160-069
(1) Clean the wiring if there is dust contamination (Ref. ESPM 205500).
5. Close-up
________
Subtask 24-92-00-410-123
A. Close Access
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
(2) Install the ceiling panels in the zones 253 and 254 (Ref. TASK 25-23-
41-400-001):
- 251AC, 251BC, 251CC, 251DC, 251EC, 251FC, 251GC, 251HC, 251JC.
(3) Install the overhead stowage compartments between FR47 and FR64
(Ref. TASK 25-24-41-400-001).
EFF :
ALL 24-92-00
Page 770
Nov 01/09
R
SYR
Aft Passenger Overhead-Compartment - Access Panels - Zones 253-254
Figure 724/TASK 24-92-00-991-103
EFF :
ALL 24-92-00
Page 771
Nov 01/09
R
SYR
Aft Passenger Overhead-Compartment - Cleaning Area - Zones 253-254
Figure 725/TASK 24-92-00-991-102
EFF :
ALL 24-92-00
Page 772
Nov 01/09
R
SYR
(5) Close the passenger/crew door 832 (842) (Ref. TASK 52-10-00-410-001).
EFF :
ALL 24-92-00
Page 773
Nov 01/09
R
SYR
TASK 24-92-00-100-022
1. __________________
Reason for the Job
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
EFF :
ALL 24-92-00
Page 774
May 01/11
SYR
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
Subtask 24-92-00-010-126
A. Get Access
(2) Open the passenger/crew door 832 (842) (Ref. TASK 52-10-00-010-001).
EFF :
ALL 24-92-00
Page 775
May 01/11
SYR
(3) Remove the furnishings in the zones 261 and 262:
(b) Remove the galleys and stowage, if installed (Ref. TASK 25-33-41-
000-001), (Ref. TASK 25-33-41-000-002), (Ref. TASK 25-33-41-000-
008), (Ref. TASK 25-33-42-000-001), (Ref. TASK 25-33-43-000-001),
(Ref. TASK 25-33-45-000-001), (Ref. TASK 25-33-46-000-001),
(Ref. TASK 25-33-47-000-001), (Ref. TASK 25-33-48-000-001) and
(Ref. TASK 25-33-49-000-001).
(4) Remove the linings and insulation panels in the zones 261 and 262:
Subtask 24-92-00-862-114
4. Procedure
_________
Subtask 24-92-00-160-070
(1) Clean the wiring if there is dust or lint contamination (Ref. ESPM
205500).
EFF :
ALL 24-92-00
Page 776
May 01/11
SYR
Aft Cabin Utility-Area - Access Panels - Zones 261-262
Figure 726/TASK 24-92-00-991-105
EFF :
ALL 24-92-00
Page 777
May 01/11
R
SYR
Aft Cabin Utility-Area - Cleaning Area - Zones 261-262
Figure 727/TASK 24-92-00-991-104
EFF :
ALL 24-92-00
Page 778
May 01/11
R
SYR
(b) On other routes: 1M, 2M and 8M.
5. Close-up
________
Subtask 24-92-00-410-124
A. Close Access
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
(2) Install the linings and insulation panels in the zones 261 and 262:
(b) Install the galleys and stowage, if removed (Ref. TASK 25-33-41-
400-001), (Ref. TASK 25-33-41-400-002), (Ref. TASK 25-33-41-400-
008), (Ref. TASK 25-33-42-400-001), (Ref. TASK 25-33-43-400-001),
(Ref. TASK 25-33-45-400-001), (Ref. TASK 25-33-46-400-001),
(Ref. TASK 25-33-47-400-001), (Ref. TASK 25-33-48-400-001) and
(Ref. TASK 25-33-49-400-001).
(4) Close the passenger/crew door 832 (842) (Ref. TASK 52-10-00-410-001).
EFF :
ALL 24-92-00
Page 779
May 01/11
SYR
TASK 24-92-00-100-023
1. __________________
Reason for the Job
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
EFF :
ALL 24-92-00
Page 780
May 01/11
SYR
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
Subtask 24-92-00-010-127
A. Get Access
(2) Open the passenger/crew door 832 (842) (Ref. TASK 52-10-00-010-001).
EFF :
ALL 24-92-00
Page 781
May 01/11
SYR
(3) Remove the furnishings in the zones 261 and 262:
(b) Remove the galleys and stowage, if installed (Ref. TASK 25-33-41-
000-001), (Ref. TASK 25-33-41-000-002), (Ref. TASK 25-33-41-000-
008), (Ref. TASK 25-33-42-000-001), (Ref. TASK 25-33-43-000-001),
(Ref. TASK 25-33-45-000-001), (Ref. TASK 25-33-46-000-001),
(Ref. TASK 25-33-47-000-001), (Ref. TASK 25-33-48-000-001) and
(Ref. TASK 25-33-49-000-001).
(4) Remove the overhead stowage compartments between FR64 and FR70
(Ref. TASK 25-24-41-000-001).
(5) Remove the ceiling panel in the zones 263 and 264 (Ref. TASK 25-23-
41-000-001):
- 251JC.
(6) Remove the ceiling panels in the aft utility area (Ref. TASK 25-23-
42-000-002):
- 261BC, 261CC, 262BC, 262CC.
Subtask 24-92-00-862-115
4. Procedure
_________
Subtask 24-92-00-160-071
(1) Clean the wiring if there is dust contamination (Ref. ESPM 205500).
EFF :
ALL 24-92-00
Page 782
May 01/11
SYR
Aft Cabin Overhead Compartment - Access Panels -Zones 263-264
Figure 728/TASK 24-92-00-991-109
EFF :
ALL 24-92-00
Page 783
May 01/11
R
SYR
Aft Cabin Overhead Compartment - Cleaning Area - Zones 263-264
Figure 729/TASK 24-92-00-991-108
EFF :
ALL 24-92-00
Page 784
May 01/11
R
SYR
(d) On the audio and video route: 1R.
5. Close-up
________
Subtask 24-92-00-410-125
A. Close Access
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
(2) Install the ceiling panels in the aft utility area (Ref. TASK 25-23-
42-400-002):
- 261BC, 261CC, 262BC, 262CC.
(3) Install the ceiling panel in the zones 263 and 264 (Ref. TASK 25-23-
41-400-001):
- 251JC.
(b) Install the galleys and stowage, if removed (Ref. TASK 25-33-41-
400-001), (Ref. TASK 25-33-41-400-002), (Ref. TASK 25-33-41-400-
008), (Ref. TASK 25-33-42-400-001), (Ref. TASK 25-33-43-400-001),
(Ref. TASK 25-33-45-400-001), (Ref. TASK 25-33-46-400-001),
(Ref. TASK 25-33-47-400-001), (Ref. TASK 25-33-48-400-001) and
(Ref. TASK 25-33-49-400-001).
(5) Install the overhead stowage compartments between FR64 and FR70
(Ref. TASK 25-24-41-400-001).
(6) Close the passenger/crew door 832 (842) (Ref. TASK 52-10-00-410-001).
EFF :
ALL 24-92-00
Page 785
May 01/11
SYR
TASK 24-92-00-100-024
1. __________________
Reason for the Job
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
EFF :
ALL 24-92-00
Page 786
May 01/11
SYR
3. __________
Job Set-up
Subtask 24-92-00-010-131
A. Get Access
(2) Open the FWD cargo-compartment door 825 (Ref. TASK 52-30-00-860-001)
and (Ref. TASK 52-30-00-860-003).
Subtask 24-92-00-862-119
4. Procedure
_________
Subtask 24-92-00-160-072
EFF :
ALL 24-92-00
Page 787
May 01/11
SYR
INTENTIONALLY BLANK
R
24-92-00
Page 788
May 01/11
SYR
Forward Cargo Compartment - Cleaning Area - Zones 133-134
Figure 730/TASK 24-92-00-991-122
EFF :
ALL 24-92-00
Page 789
May 01/10
R
SYR
5. Close-up
________
Subtask 24-92-00-410-129
A. Close Access
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
(3) Close the FWD cargo-compartment door 825 (Ref. TASK 52-30-00-860-002)
and (Ref. TASK 52-30-00-860-004).
EFF :
ALL 24-92-00
Page 790
May 01/10
R
SYR
TASK 24-92-00-100-025
1. __________________
Reason for the Job
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
EFF :
ALL 24-92-00
Page 791
May 01/11
SYR
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
Subtask 24-92-00-010-141
A. Get Access
(2) Open the FWD cargo-compartment door 825 (Ref. TASK 52-30-00-860-001)
and (Ref. TASK 52-30-00-860-003).
(3) Remove the ceiling panels in the FWD cargo compartment from FR24 to
FR34 (Ref. TASK 25-54-12-000-002).
(4) Remove the sidewall panels in the FWD cargo compartment from FR24 to
FR34 (Ref. TASK 25-54-12-000-003).
Subtask 24-92-00-862-129
4. Procedure
_________
Subtask 24-92-00-160-073
EFF :
ALL 24-92-00
Page 792
May 01/11
SYR
Forward Cargo Compartment - Cleaning Area - Zones 131-132
Figure 731/TASK 24-92-00-991-144
EFF :
ALL 24-92-00
Page 793
May 01/10
R
SYR
(e) On the other routes: 1M and 2M.
(f) On the coaxial wiring routes: 1U, 2U, 1T, 2T, 3T, 4T, 9T and 5V.
5. Close-up
________
Subtask 24-92-00-410-139
A. Close Access
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
(2) Install the sidewall panels in the FWD cargo compartment from FR24 to
FR34 (Ref. TASK 25-54-12-400-003).
(3) Install the ceiling panels in the FWD cargo compartment from FR24 to
FR34 (Ref. TASK 25-54-12-400-002).
(4) Close the FWD cargo-compartment door 825 (Ref. TASK 52-30-00-860-002)
and (Ref. TASK 52-30-00-860-004).
EFF :
ALL 24-92-00
Page 794
May 01/10
R
SYR
TASK 24-92-00-100-026
1. __________________
Reason for the Job
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
EFF :
ALL 24-92-00
Page 795
May 01/11
SYR
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
Subtask 24-92-00-010-142
A. Get Access
(2) Open the AFT cargo-compartment door 826 (Ref. TASK 52-30-00-860-001)
and (Ref. TASK 52-30-00-860-003).
R
R (3) Remove the additional center tanks No. 1, No. 2 and No. 3 in zones
151 and 152, if installed (Ref. TASK 28-11-27-000-002), (Ref. TASK
28-11-27-000-003) and (Ref. TASK 28-11-27-000-004).
R (4) Remove the sidewall panels in the AFT cargo compartment from FR47 to
R FR59 (Ref. TASK 25-55-11-000-003).
R (5) Remove the ceiling panels in the AFT cargo compartment from FR47 to
R FR59 (Ref. TASK 25-55-11-000-002).
Subtask 24-92-00-862-130
EFF :
ALL 24-92-00
Page 796
May 01/11
SYR
4. Procedure
_________
Subtask 24-92-00-160-074
(1) Clean the wiring if there is dust, lint or other contamination (Ref.
ESPM 205500).
5. Close-up
________
Subtask 24-92-00-410-140
A. Close Access
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
R (2) Install the ceiling panels in the AFT cargo compartment from FR47 to
R FR59 (Ref. TASK 25-55-11-400-002).
R (3) Install the sidewall panels in the AFT cargo compartment from FR47 to
R FR59 (Ref. TASK 25-55-11-400-003).
R (4) Install the additional center tanks No. 1, No. 2 and No. 3 in zones
R 151 and 152, if removed (Ref. TASK 28-11-27-400-002), (Ref. TASK 28-
R 11-27-400-003) and (Ref. TASK 28-11-27-400-004).
R
R (5) Close the AFT cargo-compartment door 826 (Ref. TASK 52-30-00-860-002)
and (Ref. TASK 52-30-00-860-004).
EFF :
ALL 24-92-00
Page 797
May 01/11
SYR
Aft Cargo Compartment - Cleaning Area - Zones 151-152
Figure 732/TASK 24-92-00-991-145
EFF :
ALL 24-92-00
Page 798
May 01/11
R
SYR
TASK 24-92-00-100-027
1. __________________
Reason for the Job
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
EFF :
ALL 24-92-00
Page 799
May 01/11
SYR
3. __________
Job Set-up
Subtask 24-92-00-010-145
A. Get Access
Subtask 24-92-00-862-133
4. Procedure
_________
Subtask 24-92-00-160-075
(1) Clean the wiring if there is dust or lint contamination (Ref. ESPM
205500).
EFF :
ALL 24-92-00
Page A700
May 01/11
SYR
Air Conditioning Compartment and Fairings - Access Panels on the Left Side
Figure 733/TASK 24-92-00-991-148
EFF :
ALL 24-92-00
Page A701
May 01/10
R
SYR
Air Conditioning Compartment and Fairings - Access Panels on the Right Side
Figure 734/TASK 24-92-00-991-150
EFF :
ALL 24-92-00
Page A702
May 01/10
R
SYR
Air Conditioning Compartment and Fairings - Cleaning Area - Zones 191-192
Figure 735/TASK 24-92-00-991-151
EFF :
ALL 24-92-00
Page A703
May 01/10
R
SYR
5. Close-up
________
Subtask 24-92-00-410-143
A. Close Access
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
EFF :
ALL 24-92-00
Page A704
May 01/10
R
SYR
TASK 24-92-00-100-029
Cleaning of EWIS Installed in the Bay Behind FWD Cargo Compartment (Only If
Contaminated)(EWIS)
1. __________________
Reason for the Job
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
EFF :
ALL 24-92-00
Page A705
May 01/11
SYR
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
Subtask 24-92-00-010-148
A. Get Access
(2) Open the FWD cargo-compartment door 825 (Ref. TASK 52-30-00-860-001)
and (Ref. TASK 52-30-00-860-003).
(3) Remove the additional center tanks No. 4 and No. 6 in zones 137 and
138, if installed (Ref. TASK 28-11-27-000-005) and (Ref. TASK 28-11-
27-000-007).
(4) Remove the FWD cargo-compartment partition FR34 (Ref. TASK 25-54-12-
000-001).
Subtask 24-92-00-862-135
4. Procedure
_________
Subtask 24-92-00-160-077
A. Cleaning of All Wiring Installed in the Bay Behind FWD Cargo Compartment
(Only Contaminated Wiring)
EFF :
ALL 24-92-00
Page A706
May 01/11
SYR
Bay Behind FWD Cargo Compartment - Cleaning Area - Zones 137-138
Figure 736/TASK 24-92-00-991-152
EFF :
ALL 24-92-00
Page A707
May 01/10
R
SYR
(c) On the flight control routes: 1S and 2S.
5. Close-up
________
Subtask 24-92-00-410-146
A. Close Access
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
(2) Install the additional center tanks No. 4 and No. 6 in zones 137 and
R 138, if removed (Ref. TASK 28-11-27-400-005) and (Ref. TASK 28-11-27-
400-007).
(3) Install the FWD cargo-compartment partition FR34 (Ref. TASK 25-54-12-
400-001).
(4) Close the FWD cargo-compartment door 825 (Ref. TASK 52-30-00-860-002)
and (Ref. TASK 52-30-00-860-004).
EFF :
ALL 24-92-00
Page A708
May 01/11
SYR
TASK 24-92-00-100-030
1. __________________
Reason for the Job
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
EFF :
ALL 24-92-00
Page A709
May 01/11
SYR
3. __________
Job Set-up
Subtask 24-92-00-010-149-A
A. Get Access
(2) Open the AFT cargo-compartment door 826 (Ref. TASK 52-30-00-860-001)
and (Ref. TASK 52-30-00-860-003).
(3) Remove the sidewall panels in the AFT cargo compartment from FR59 to
FR65 (Ref. TASK 25-55-12-000-003).
Subtask 24-92-00-862-136
4. Procedure
_________
Subtask 24-92-00-160-078
EFF :
ALL 24-92-00
Page A710
May 01/11
SYR
Bulk Cargo Compartment - Cleaning Area - Zones 161-162
Figure 737/TASK 24-92-00-991-153
EFF :
ALL 24-92-00
Page A711
May 01/10
R
SYR
5. Close-up
________
Subtask 24-92-00-410-147-A
A. Close Access
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
(2) Install the sidewall panels in the AFT cargo compartment from FR59 to
FR65 (Ref. TASK 25-55-12-400-003).
(3) Close the AFT cargo-compartment door 826 (Ref. TASK 52-30-00-860-002)
and (Ref. TASK 52-30-00-860-004).
EFF :
ALL 24-92-00
Page A712
May 01/10
R
SYR
TASK 24-92-00-100-031
1. __________________
Reason for the Job
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
Subtask 24-92-00-010-152
A. Get Access
(2) Open the forward passenger/crew door 831 (Ref. TASK 52-10-00-010-
001).
EFF :
ALL 24-92-00
Page A713
May 01/11
SYR
(4) Open the access door 813, if installed.
Subtask 24-92-00-862-138
4. Procedure
_________
Subtask 24-92-00-160-080
5. Close-up
________
Subtask 24-92-00-410-150
A. Close Access
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
EFF :
ALL 24-92-00
Page A714
May 01/10
R
SYR
Lateral Avionic Compartment - Cleaning Area - Zones 125-126
Figure 738/TASK 24-92-00-991-155
EFF :
ALL 24-92-00
Page A715
May 01/10
R
SYR
(4) Close the forward passenger/crew door 831 (Ref. TASK 52-10-00-410-
001).
EFF :
ALL 24-92-00
Page A716
May 01/10
R
SYR
Rear Avionic Compartment - Cleaning Area - Zones 127-128
Figure 739/TASK 24-92-00-991-120
EFF :
ALL 24-92-00
Page A717
May 01/10
R
SYR