CHAPTER 11
__________
11-HIGHLIGHTS Page 1 of 2
REVISION NO. 31 Aug 01/11
SYR
--------------------------------------------------------------------------------------
CH/SE/SU C REASON FOR CHANGE EFFECTIVITY
PAGES
--------------------------------------------------------------------------------------
11-HIGHLIGHTS Page 2 of 2
REVISION NO. 31 Aug 01/11
SYR
CHAPTER 11
__________
11-L.E.P. Page 1
Aug 01/11
SYR
CH/SE/SU C PAGE DATE CH/SE/SU C PAGE DATE CH/SE/SU C PAGE DATE
11-L.E.P. Page 2
Aug 01/11
SYR
CH/SE/SU C PAGE DATE CH/SE/SU C PAGE DATE CH/SE/SU C PAGE DATE
11-33-24 1 Nov01/98
11-33-24 2 Nov01/98
11-33-35 1 May01/98
11-33-35 2 Nov01/04
11-34-32 1 May01/98
11-34-32 2 May01/98
11-35-00 1 Nov01/08
11-35-25 1 Feb01/00
11-35-25 2 May01/05
11-35-25 3 May01/05
11-35-25 4 Feb01/00
11-35-25 5 May01/05
11-35-25 6 May01/05
11-35-38 1 May01/98
11-35-38 2 May01/98
11-35-52 1 Nov01/08
11-35-52 2 Nov01/08
11-35-53 1 Feb01/00
11-35-53 2 Nov01/04
11-36-00 1 Nov01/08
11-36-25 1 May01/00
11-36-25 2 May01/05
11-36-25 3 May01/05
11-36-53 1 Nov01/04
11-36-53 2 Nov01/04
11-36-53 3 Nov01/04
11-37-00 1 May01/98
11-37-21 N 1 Aug01/11
11-37-21 N 2 Aug01/11
11-37-49 1 May01/98
11-L.E.P. Page 3
Aug 01/11
SYR
CHAPTER 11
__________
TABLE OF CONTENTS
_________________
_______
SUBJECT ________
CH/SE/SU C
_ PAGE ___________
____ EFFECTIVITY
PLACARDS AND MARKINGS - GENERAL
_______________________________ 11-00-00
DESCRIPTION AND OPERATION 1 ALL
General 1 ALL
Safety Data 1 ALL
Maintenance Data 1 ALL
By Local Regulation 1 ALL
Labels 1 ALL
General 1 ALL
Dimensions 1 ALL
Label Replacement 3 ALL
________________________________
PLACARDS AND MARKINGS - GENERAL 11-00-00
MAINTENANCE PRACTICES 201 ALL
Removal of the Decals 201 ALL
Removal of the Cabin Placards 203 ALL
Installation of the Decals 205 ALL
Installation of the Self-Adhesive 210 ALL
Placards Affixed to Plexiglas
Installation of the Identification 212 ALL
Tapes on Metal Lines
Installation of the Labels on Heat 214 ALL
Resistant Ducting
Installation of the Labels on 216 ALL
Laminated Tubing
Installation of the ESSO Labels 218 ALL
Installation of the ESSO 220 ALL
(Scotchcal Labels)
Installation of the ESSO 222 ALL
(Scotchcal Labels) in the Presence
of Skydrol
Installation of the FOTOFOIL 224 ALL
Labels
Installation of the BSB (DUROFIX) 226 ALL
Labels (Material No. 05-136)
(Marking with Reactivable Transfer
Label)
Installation of the Metal 230 ALL
Identification Plates
Installation of the Labels on 232 ALL
Landing Gear
Application of Identification and 234 ALL
Marking Paints
Replacement of the Tail Cone 237 ALL
Reference Triangle
Installation of the Cabin Placards 242 ALL
11-CONTENTS Page 1
Nov 01/09
R
SYR
CHAPTER 11
__________
TABLE OF CONTENTS
_________________
_______
SUBJECT CH/SE/SU
________ C
_ ____ ___________
PAGE EFFECTIVITY
Installation of the Fuselage 245 ALL
Reference Triangle
Apply Marking Paints with Stencils 247 ALL
Replacement of the Engine Leasing 250 ALL
Plate
Replacement of the Cockpit Leasing 253 002-099,
Plate
Installation of DISA (SUPRAFIX FRS 255 ALL
Material No. 05-135) Labels
(Marking with Reactivable Transfer
Label)
Installation of the Asymmetric 259 ALL
Labels on the Flap Track Beam 3
______________________________
EXTERIOR PLACARDS AND MARKINGS 11-20-00
DESCRIPTION AND OPERATION 1 ALL
General 1 ALL
Markings of the Hoisting Points 1 ALL
Markings on Access Panels and 1 ALL
Doors necessary
Markings on Fuselage 1 ALL
Markings on L and R Wings 1 ALL
Markings on Engine Pylons and 1 ALL
Cowl
FUSELAGE 11-21-00
DESCRIPTION AND OPERATION 1 ALL
General 1 ALL
LIFTING AND SHORING 11-21-07
DESCRIPTION AND OPERATION 1 ALL
General 1 ALL
Marking of the Lifting and 1 ALL
Shoring points on the Fuselage
LEVELING AND WEIGHING 11-21-08
DESCRIPTION AND OPERATION 1 ALL
General 1 ALL
Markings of the Leveling Points 1 ALL
on the Fuselage.
AIR CONDITIONING 11-21-21
DESCRIPTION AND OPERATION 1 ALL
General 1 ALL
Markings of the Skin Air Inlet 1 ALL
and Outlet Valves
Markings of the LP Ground 1 ALL
Connection
Markings of the Air Inlet of the 1 ALL
11-CONTENTS Page 2
Nov 01/09
R
SYR
CHAPTER 11
__________
TABLE OF CONTENTS
_________________
SUBJECT
_______ CH/SE/SU
________ C
_ PAGE ___________
____ EFFECTIVITY
Packs 1 and 2
Markings of the External 1 ALL
Air-Supply Caution
ELECTRICAL POWER 11-21-24
DESCRIPTION AND OPERATION 1 ALL
General 1 ALL
Markings of the External Power 1 ALL
Receptacle
FLIGHT CONTROLS 11-21-27
DESCRIPTION AND OPERATION 1 ALL
General 1 ALL
THS Incidence Markings 1 ALL
Location of the Elevator and 1 ALL
Rudder Neutral Position Triangle
FUEL 11-21-28
DESCRIPTION AND OPERATION 1 ALL
General 1 ALL
Markings of the magnetic level 1 ALL
indicators and APU fuel drain.
Markings of the fuel panel 1 ALL
Markings on the APU Fuel Drain 1 ALL
HYDRAULIC POWER 11-21-29
DESCRIPTION AND OPERATION 1 ALL
General 1 ALL
Markings for the Hydraulic 1 ALL
Ground Connection of the Blue
System
Markings for the Hydraulic 1 ALL
Reservoir Filling
Markings for the Hydraulic 1 ALL
Ground Connection of the Yellow
System
Markings for the Hydraulics 1 ALL
Compartment (Blue System) and
Main Gear Doors
Markings for the Hydraulics 1 ALL
Compartment (Yellow System) and
Main Gear Doors
INDICATING/RECORDING SYSTEMS 11-21-31
DESCRIPTION AND OPERATION 1 ALL
General 1 ALL
Flight Recorder Markings 1 ALL
LANDING GEAR 11-21-32
DESCRIPTION AND OPERATION 1 ALL
General 1 ALL
DOOR GROUND OPENING/CAUTION WHEN 1 ALL
11-CONTENTS Page 3
Nov 01/09
R
SYR
CHAPTER 11
__________
TABLE OF CONTENTS
_________________
SUBJECT
_______ CH/SE/SU
________ C
_ PAGE ___________
____ EFFECTIVITY
CLOSING Markings on the Nose
Gear Leg Door
NAVIGATION 11-21-34
DESCRIPTION AND OPERATION 1 ALL
General 1 ALL
Markings of the Static Ports 1 ALL
OXYGEN 11-21-35
DESCRIPTION AND OPERATION 1 ALL
General 1 ALL
Markings of the Oxygen Discharge 1 ALL
PNEUMATIC 11-21-36
DESCRIPTION AND OPERATION 1 ALL
General 1 ALL
Markings of the HP Ground 1 ALL
Connection
WATER/WASTE 11-21-38
DESCRIPTION AND OPERATION 1 ALL
General 1 ALL
Toilet Service Door 1 ALL
Markings on the Toilet Service 1 ALL
Panel
Markings on the Potable-Water 1 ALL
Drain Door
Markings on the Potable-Water 1 ALL
Service Door
Markings on the Potable-Water 1 ALL
Panel
Markings on the Potable-Water 1 ALL
Drain Panel
Markings on the Potable-Water 1 ALL
Service Panel
Markings on the Potable-Water 1 ALL
Panel
DOORS 11-21-52
DESCRIPTION AND OPERATION 1 ALL
General 1 ALL
Passenger/Crew Door 1 ALL
Emergency Exits 1 ALL
Forward and Aft Cargo 1 ALL
Compartment Doors
Avionics Compartment Door 812 1 ALL
Cargo Door Control-Panel 1 ALL
Avionics Compartment Doors 811, 1 ALL
822, 824
Lower Access Door 1 ALL
Bulk Cargo-Compartment Door 1 ALL
11-CONTENTS Page 4
Aug 01/11
R
SYR
CHAPTER 11
__________
TABLE OF CONTENTS
_________________
SUBJECT
_______ CH/SE/SU
________ C
_ ____ ___________
PAGE EFFECTIVITY
Markings Inside the Main Landing 1 ALL
Gear Doors
FUSELAGE 11-21-53
DESCRIPTION AND OPERATION 1 ALL
General 1 ALL
Markings on the Fuselage - 1 ALL
Maintenance
WINGS 11-23-00
DESCRIPTION AND OPERATION 1 ALL
General 1 ALL
LIFTING AND SHORING 11-23-07
DESCRIPTION AND OPERATION 1 ALL
General 1 ALL
Markings of Jacking Points under 1 ALL
the Wings
FLIGHT CONTROLS 11-23-27
DESCRIPTION AND OPERATION 1 ALL
General 1 ALL
Markings of the Hoisting Points 1 ALL
Flap/Slat Travel Markings 1 ALL
Markings of turnbutton on cover 1 ALL
inspection.
Marking on the Flap Track. 1 ALL
11-CONTENTS Page 5
Aug 01/11
R
SYR
CHAPTER 11
__________
TABLE OF CONTENTS
_________________
_______
SUBJECT ________
CH/SE/SU C
_ PAGE ___________
____ EFFECTIVITY
FUEL 11-23-28
DESCRIPTION AND OPERATION 1 ALL
General 1 ALL
Gravity Filling Markings on the 1 ALL
Wing Upper Surface
Markings on the Lower Surface of 1 ALL
the Left Wing
Markings on the Lower Surface of 1 ALL
the Right Wing
WINGS 11-23-57
DESCRIPTION AND OPERATION 1 ALL
General 1 ALL
Markings on the wing upper 1 ALL
surface
Markings on the cabin escape 1 ALL
facilities
STABILIZERS 11-25-00
DESCRIPTION AND OPERATION 1 ALL
General 1 ALL
FLIGHT CONTROLS 11-25-27
DESCRIPTION AND OPERATION 1 ALL
General 1 ALL
11-CONTENTS Page 6
Aug 01/11
R
SYR
CHAPTER 11
__________
TABLE OF CONTENTS
_________________
SUBJECT
_______ CH/SE/SU
________ C
_ ____ ___________
PAGE EFFECTIVITY
Markings of the Hoisting Points 1 ALL
STABILIZERS 11-25-55
DESCRIPTION AND OPERATION 1 ALL
General 1 ALL
Markings on the Horizontal 1 ALL
Stabilizer
Markings of the Hoisting Points 1 ALL
COCKPIT 11-31-00
DESCRIPTION AND OPERATION 1 ALL
General 1 ALL
AIR CONDITIONING 11-31-21
DESCRIPTION AND OPERATION 1 ALL
General 1 ALL
Markings of the Air Conditioning 1 ALL
System
COMMUNICATIONS 11-31-23
DESCRIPTION AND OPERATION 1 ALL
General 1 ALL
Hand Mic, Headset and Boomset 1 ALL
Markings
Placard Registration Selcal Code 1 ALL
Marking
ELECTRICAL POWER 11-31-24
DESCRIPTION AND OPERATION 1 ALL
General 1 ALL
Markings of the electrical power 1 ALL
EQUIPMENT/FURNISHINGS 11-31-25
DESCRIPTION AND OPERATION 1 ALL
General 1 ALL
Markings for 1 ALL
equipment/furnishings
Markings in the Cockpit 1 ALL
Owner and/or Manufacturer Plates 1 002-099,
in the Cockpit
FIRE PROTECTION 11-31-26
DESCRIPTION AND OPERATION 1 ALL
General 1 ALL
Fire Extinguisher Markings 1 ALL
FLIGHT CONTROLS 11-31-27
DESCRIPTION AND OPERATION 1 ALL
General 1 ALL
Flight Control Markings 1 ALL
Speed Limits Markings 1 ALL
Pedals Markings 1 ALL
ICE AND RAIN PROTECTION 11-31-30
11-CONTENTS Page 7
Aug 01/11
R
SYR
CHAPTER 11
__________
TABLE OF CONTENTS
_________________
_______
SUBJECT CH/SE/SU
________ C
_ ____ ___________
PAGE EFFECTIVITY
DESCRIPTION AND OPERATION 1 ALL
General 1 ALL
Rain-repellent reservoir marking 1 ALL
INDICATING/RECORDING SYSTEMS 11-31-31
DESCRIPTION AND OPERATION 1 ALL
General 1 ALL
Markings on Panel 49VU and 1 ALL
120VU.
MTOW Label on Panel 11VU. 1 ALL
LANDING GEAR 11-31-32
DESCRIPTION AND OPERATION 1 ALL
General 1 ALL
Landing Gear Markings 1 ALL
NAVIGATION 11-31-34
DESCRIPTION AND OPERATION 1 ALL
General 1 ALL
Markings of the Compass 1 ALL
Correction Cards
Markings of the Standby Compass 1 ALL
OXYGEN 11-31-35
DESCRIPTION AND OPERATION 1 ALL
General 1 ALL
Oxygen Mask Marking 1 ALL
Portable Oxygen 1 ALL
CABIN 11-32-00
DESCRIPTION AND OPERATION 1 ALL
General 1 ALL
PLACARDS AND MARKINGS 11-32-11
DESCRIPTION AND OPERATION 1 ALL
General 1 ALL
Owner and Manufacturer Placards 1 ALL
COMMUNICATIONS 11-32-23
DESCRIPTION AND OPERATION 1 ALL
General 1 ALL
Markings of the Communication 1 ALL
System.
INTERIOR PLACARDS 11-32-25
DESCRIPTION AND OPERATION 1 ALL
General 1 ALL
This subject gives data 1 ALL
applicable to the markings and
placards on the equipment and
furnishings in the cabin.
Component Location 1 ALL
Markings of the Cabin 1 ALL
11-CONTENTS Page 8
Aug 01/11
R
SYR
CHAPTER 11
__________
TABLE OF CONTENTS
_________________
SUBJECT
_______ CH/SE/SU
________ C
_ PAGE ___________
____ EFFECTIVITY
Attendant-Seats.
Placards and Markings on the 1 ALL
Cockpit door
Markings of the Stowage 1 ALL
Compartments and Partitions
Markings of the Stowage 1 ALL
Compartments and Partitions
Markings for the Passenger 1 ALL
Overhead Stowages
Markings of the Lavatory Units. 1 ALL
Markings of the Lavatory Waste 1 ALL
Chute
Markings of the Lavatory Doors. 1 ALL
Markings of the Attendant Call 1 ALL
and Reading-Light-Switch Panel.
Markings of the Seat Row Numbers 14 ALL
Markings for the Baby Nursing 14 ALL
Table in Lavatory A
Markings for the 14 ALL
Emergency-Escape-Slide
Markings for the Ceiling Panel, 14 ALL
Z260
INDICATING/RECORDING SYSTEMS 11-32-31
DESCRIPTION AND OPERATION 1 ALL
General 1 ALL
Markings of the Sockets. 1 ALL
Markings of the Panel 2042 VU. 1 ALL
Markings of the Panel 2000 VU. 1 ALL
Markings of the Panel 2001 VU. 1 ALL
Markings of Electrical System in 1 ALL
Lavatory A.
Markings of the Electical System 1 ALL
in Lavatory D.
WATER/WASTE 11-32-38
DESCRIPTION AND OPERATION 1 ALL
General 1 ALL
Markings of the Water System. 1 ALL
DOORS 11-32-52
DESCRIPTION AND OPERATION 1 ALL
General 1 ALL
Markings of the Passenger/Crew 1 ALL
Doors.
Markings of Slide armed/disarmed 1 ALL
indication.
Markings of Cabin Escape 1 ALL
Facilities.
11-CONTENTS Page 9
Aug 01/11
R
SYR
CHAPTER 11
__________
TABLE OF CONTENTS
_________________
SUBJECT
_______ CH/SE/SU
________ C
_ ____ ___________
PAGE EFFECTIVITY
Markings of the Emergency Exit 1 ALL
Doors.
Markings of Slide Rafts. 1 ALL
FUSELAGE 11-32-53
DESCRIPTION AND OPERATION 1 ALL
General 1 ALL
Markings in the Seat Tracks. 1 ALL
ELECTRICAL POWER 11-33-24
DESCRIPTION AND OPERATION 1 002-099,
General 1 002-099,
Markings on Battery 1 002-099,
OXYGEN 11-33-35
DESCRIPTION AND OPERATION 1 ALL
General 1 ALL
Oxygen Bottle Markings 1 ALL
LANDING GEAR 11-34-32
DESCRIPTION AND OPERATION 1 ALL
General 1 ALL
Markings in the NLG doors. 1 ALL
11-CONTENTS Page 10
Aug 01/11
R
SYR
CHAPTER 11
__________
TABLE OF CONTENTS
_________________
SUBJECT
_______ CH/SE/SU
________ C
_ PAGE ___________
____ EFFECTIVITY
Compartment Door, Z134
FUSELAGE 11-35-53
DESCRIPTION AND OPERATION 1 ALL
General 1 ALL
Component Location 1 ALL
Markings of the FWD Cargo 1 ALL
Compartment, Z132
11-CONTENTS Page 11
Aug 01/11
R
SYR
PLACARDS AND MARKINGS - GENERAL - DESCRIPTION AND OPERATION
___________________________________________________________
1. _______
General
This document shows the placards, stencils and markings and gives their
location on the aircraft.
R This chapter has the parts that follow:
- Placards and markings on the external side of the aircraft (Ref. ATA
11-20)
- Placards and markings on the internal side of the aircraft (Ref. ATA
11-30).
For more information about panel location, refer to AMM Chapter 06.
Use the AMM Chapter 06 as the primary reference.
There are three types of placards and markings ATA 100 specification.
A. Safety Data
These placards and markings are used for the flight crew, and passenger
cabins, and for equipment safety. They include WARNINGS and CAUTIONS.
B. Maintenance Data
These are servicing and maintenance instructions.
C. By Local Regulation
The aircraft must have these placards and markings. When these types of
placards are shown in Chapter 11, they are identified by (1).
2. Labels
______
A. General
B. Dimensions
(Ref. Fig. 001)
EFF :
ALL 11-00-00
Page 1
May 01/06
SYR
Dimensions of the Labels
Figure 001
EFF :
ALL 11-00-00
Page 2
May 01/98
SYR
3. Label
_________________
Replacement
This chapter gives the replacement procedure of the different types of
labels:
- Decals
- Nameplates (For example on circuit breaker panel)
- Identification bands on metal lines
- Labels on heat-resistant ducting
- Labels on laminations
- ESSO labels
- SSO (SCOTCHCAL) labels
- FOTOFOIL labels
- BSB (DUROFIX) labels
- Metal identification plates
- Labels on landing gear
- Engine leasing plate
R - DISA (SUPRAFIX FRS) labels
NOTE : This list does not include all the labels installed on the aircraft.
____
The installation or replacement of labels or instruction placards
attached by different types of threaded fasteners or rivets is not
given below since no special procedure is necessary.
EFF :
ALL 11-00-00
Page 3
May 01/06
SYR
PLACARDS AND MARKINGS - GENERAL - MAINTENANCE PRACTICES
_______________________________________________________
R TASK 11-00-00-000-002
R 1. __________________
Reason for the Job
R Self Explanatory
R 2. ______________________
Job Set-up Information
R -------------------------------------------------------------------------------
R REFERENCE QTY DESIGNATION
R -------------------------------------------------------------------------------
R B. Consumable Materials
R -------------------------------------------------------------------------------
R REFERENCE DESIGNATION
R -------------------------------------------------------------------------------
EFF :
ALL 11-00-00
Page 201
May 01/05
SYR
R C. Referenced Information
R -------------------------------------------------------------------------------
R REFERENCE DESIGNATION
R -------------------------------------------------------------------------------
R 3. __________
Job Set-up
R Subtask 11-00-00-941-056
R A. Get Access
R (1) Get access to the area where you must remove the decal.
R 4. Procedure
_________
R Subtask 11-00-00-120-055
R A. Stripping
R (1) Apply masking tape or masking paper on the area adjacent to the decal
R location.
R (2) Rub the marking surface with MISCELLANEOUS (Material No. 19-011) to
R remove the warnish.
R (3) Rub the marking surface with abrasive cloth, grade 240.
R (4) Clean the rubbed area with MISCELLANEOUS (Material No. 19-003).
R Subtask 11-00-00-370-053
R B. Painting
R 5. Close-up
________
R Subtask 11-00-00-942-068
R A. Make sure that the work area is clean and clear of tool(s) and other
R items.
EFF :
ALL 11-00-00
Page 202
May 01/05
SYR
R TASK 11-00-00-000-003
R 1. __________________
Reason for the Job
R Self Explanatory
R 2. ______________________
Job Set-up Information
R -------------------------------------------------------------------------------
R REFERENCE QTY DESIGNATION
R -------------------------------------------------------------------------------
R B. Consumable Materials
R -------------------------------------------------------------------------------
R REFERENCE DESIGNATION
R -------------------------------------------------------------------------------
R 3. __________
Job Set-up
R Subtask 11-00-00-941-058
R A. Get Access
R (1) Get access to the area where you must remove the placard.
EFF :
ALL 11-00-00
Page 203
Nov 01/09
SYR
R 4. Procedure
_________
R Subtask 11-00-00-000-050
R Subtask 11-00-00-110-073
R B. Cleaning
R (1) Remove unwanted glue with MISCELLANEOUS (Material No. 19-003) soaked
R with CLEANING AGENTS (Material No. 11-002) then thoroughly dry out.
R 5. Close-up
________
R Subtask 11-00-00-942-073
R A. Make sure that the work area is clean and clear of tool(s) and other
R items.
EFF :
ALL 11-00-00
Page 204
Nov 01/09
SYR
TASK 11-00-00-400-002
1. __________________
Reason for the Job
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
No specific cutter
No specific scissors
No specific spare blades
R No specific 1 CUTTER - THIN BLADE
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
EFF :
ALL 11-00-00
Page 205
May 01/11
SYR
3. __________
Job Set-up
Subtask 11-00-00-110-061
A. Not Applicable
4. Procedure
_________
Subtask 11-00-00-915-050
(1) Decals applied over a joint between two surfaces which move with
respect to each other.
(a) With gaps of 2.53 mm (0.0996 in.) and greater, cut the decal at
the center of the gap and wrap the decal around both edges. See
Method A.
(b) With gaps of less than 2.53 mm (0.0996 in.), cut the decal flush
with the front or upper edge of the joint and wrap the decal
around the rear or lower edge. See Method B.
(a) Before removing the backing paper, place the decal on the handle
and slit the decal overlap around each rounded corner.
(b) Remove the backing paper and apply the decal, pressing the
overlap around the edges of the handle.
EFF :
ALL 11-00-00
Page 206
May 01/11
SYR
Installation of Decals
Figure 201/TASK 11-00-00-991-001
EFF :
ALL 11-00-00
Page 207
Nov 01/09
R
SYR
Decal Cutting Procedure
Figure 202/TASK 11-00-00-991-007
EFF :
ALL 11-00-00
Page 208
Nov 01/09
R
SYR
(4) Cut decals, except pressure sensitive Polyester, around the heads of
fasteners on removable panels and punch the decal into the recessed
slot. Cut and remove an area of film of pressure-sensitive polyester
decals the approximate size of a protruding-head rivet or fastener.
Allow the adhesive to cure for 1/2 hour before sealing the edges.
(5) Puncture the decal film with a sharp pointed instrument at each
rivet, of decals applied over pressurized areas.
Subtask 11-00-00-960-051
EFF :
ALL 11-00-00
Page 209
Nov 01/09
SYR
TASK 11-00-00-400-003
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
A. Consumable Materials
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
Subtask 11-00-00-110-050
A. Cleaning
(1) Clean and degrease the Plexiglas surface on which the placard is to
be affixed, using CLEANING AGENTS (Material No. 11-002) then
thoroughly dry out.
4. Procedure
_________
Subtask 11-00-00-915-051
A. Installation of Labels
(1) Starting at one end peel off the protective backing paper over 10 mm
(0.3937 in.) approx. and fold back.
(2) Affix the peeled end to the Plexiglas and gradually remove the
backing paper while pressing the placard down onto the Plexiglas.
EFF :
ALL 11-00-00
Page 210
Nov 01/09
R
SYR
(3) Carefully smooth out the placard working from the center outwards.
5. Close-up
________
Subtask 11-00-00-942-052
A. Make sure that the work area is clean and clear of tool(s) and other
items.
EFF :
ALL 11-00-00
Page 211
Nov 01/09
R
SYR
TASK 11-00-00-400-001
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
A. Consumable Materials
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
Subtask 11-00-00-110-051
A. Cleaning
(1) Make sure that the tape is approximately 5 mm (0.1968 in.) longer
than the circumference of the metal line.
(2) Clean the surface on which you will bond the tape, using CLEANING
AGENTS (Material No. 11-004) or alternatively CLEANING AGENTS
(Material No. 11-003) or CLEANING AGENTS (Material No. 11-016), then
thoroughly dry out.
EFF :
ALL 11-00-00
Page 212
Nov 01/09
R
SYR
4. Procedure
_________
Subtask 11-00-00-915-052
(2) Affix the tape by evenly unrolling and gradually smoothing out to
prevent the formation of air bubbles.
(4) Apply two coats of STRUCTURE PAINTS (Material No. 16-003) to the
band, overlapping the edge of the band by 10 mm (0.3937 in.) approx.
using a soft hair brush.
(5) If the paint becomes damaged, apply STRUCTURE PAINTS (Material No.
16-016) to prevent attack of the adhesive by fluid (e.g. against
hydraulic fluid) and subsequent separation of the tape.
5. Close-up
________
Subtask 11-00-00-942-059
A. Make sure that the work area is clean and clear of tool(s) and other
items.
EFF :
ALL 11-00-00
Page 213
Nov 01/09
R
SYR
TASK 11-00-00-400-004
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
A. Consumable Materials
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
Subtask 11-00-00-110-052
A. Cleaning
(1) Degrease and clean the surface to which the label is to be affixed
using CLEANING AGENTS (Material No. 11-004), then thoroughly dry out.
4. Procedure
_________
Subtask 11-00-00-915-053
A. Label Installation
(a) Bond the label with BONDING AND ADHESIVE COMPOUNDS (Material No.
08-004) as per Vendors instructions.
EFF :
ALL 11-00-00
Page 214
Nov 01/09
R
SYR
(2) Label to be affixed to fabric impregnated with Viton synthetic
rubber.
(a) Apply BONDING AND ADHESIVE COMPOUNDS (Material No. 08-004) only
after the Viton coating has been treated with a bond coat
comprising MB primer of the same composition.
(b) Let the primer dry for 30 minutes before you install the label.
5. Close-up
________
Subtask 11-00-00-942-053
A. Make sure that the work area is clean and clear of tool(s) and other
items.
EFF :
ALL 11-00-00
Page 215
Nov 01/09
R
SYR
TASK 11-00-00-400-005
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
A. Consumable Materials
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
Subtask 11-00-00-110-053
A. Cleaning
(1) Degrease and clean the surface to which the label is to be affixed
using CLEANING AGENTS (Material No. 11-004), then thoroughly dry out.
4. Procedure
_________
Subtask 11-00-00-915-054
A. Label Installation
(2) Affix the label and smooth out working from the center outwards to
prevent the formation of air bubbles.
EFF :
ALL 11-00-00
Page 216
Nov 01/09
R
SYR
5. Close-up
________
Subtask 11-00-00-942-054
A. Make sure that the work area is clean and clear of tool(s) and other
items.
EFF :
ALL 11-00-00
Page 217
Nov 01/09
R
SYR
TASK 11-00-00-400-006
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
B. Consumable Materials
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
Subtask 11-00-00-110-054
A. Cleaning
(1) Degrease and clean the surfaces on which you will bond the ESSO
labels, with CLEANING AGENTS (Material No. 11-003) or CLEANING AGENTS
(Material No. 11-004) or CLEANING AGENTS (Material No. 11-016) then
thoroughly dry.
EFF :
ALL 11-00-00
Page 218
Nov 01/09
R
SYR
4. Procedure
_________
Subtask 11-00-00-915-055
(3) As soon as the adhesive softens and becomes tacky, install the label
and press down, specially around the edges.
5. Close-up
________
Subtask 11-00-00-942-055
A. Make sure that the work area is clean and clear of tool(s) and other
items.
EFF :
ALL 11-00-00
Page 219
Nov 01/09
R
SYR
TASK 11-00-00-400-007
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
A. Consumable Materials
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
Subtask 11-00-00-110-055
A. Cleaning
(1) Clean the surface on which you will bond the label, using CLEANING
AGENTS (Material No. 11-003) or CLEANING AGENTS (Material No. 11-
016), then thoroughly dry.
4. Procedure
_________
Subtask 11-00-00-915-056
R A. Label Installation
R (1) Apply BONDING AND ADHESIVE COMPOUNDS (Material No. 08-001) on the
R contact surface.
R (3) Overlap the edges of the placard with a bead of sealant SEALANTS
R (Material No. 09-001C).
EFF :
ALL 11-00-00
Page 220
May 01/10
SYR
5. Close-up
________
Subtask 11-00-00-942-056
A. Make sure that the work area is clean and clear of tool(s) and other
items.
EFF :
ALL 11-00-00
Page 221
Nov 01/09
R
SYR
TASK 11-00-00-400-008
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
No specific brush
No specific emery cloth, Grade 350
No specific pad
B. Consumable Materials
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
Subtask 11-00-00-110-056
A. Cleaning
(1) Roughen the surface on which you will bond the label, using emery
cloth, Grade 350 and then clean with CLEANING AGENTS (Material No.
11-003) or CLEANING AGENTS (Material No. 11-016), then thoroughly
dry.
(2) Remove the protective backing paper, then remove the adhesive
compound with a pad soaked in CLEANING AGENTS (Material No. 11-003)
or CLEANING AGENTS (Material No. 11-016).
EFF :
ALL 11-00-00
Page 222
Nov 01/09
R
SYR
4. Procedure
_________
Subtask 11-00-00-915-057
A. Label Installation
(2) Affix the label and apply light pressure to the label for about 30
seconds.
5. Close-up
________
Subtask 11-00-00-942-057
A. Make sure that the work area is clean and clear of tool(s) and other
items.
EFF :
ALL 11-00-00
Page 223
Nov 01/09
R
SYR
TASK 11-00-00-400-009
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
B. Consumable Materials
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
Subtask 11-00-00-110-057
A. Cleaning
(1) Roughen the surface on which you will have bond the label, using
emery cloth Grade 350 and clean with CLEANING AGENTS (Material No.
11-003) or CLEANING AGENTS (Material No. 11-016), then thoroughly
dry.
EFF :
ALL 11-00-00
Page 224
Nov 01/09
R
SYR
4. Procedure
_________
Subtask 11-00-00-915-058
A. Label Installation
(1) Apply a coat of BONDING AND ADHESIVE COMPOUNDS (Material No. 08-010)
to the surface on which you will bond the label.
(2) Affix the label and apply light pressure to the label for about 30
seconds.
5. Close-up
________
Subtask 11-00-00-942-058
A. Make sure that the work area is clean and clear of tool(s) and other
items.
EFF :
ALL 11-00-00
Page 225
Nov 01/09
R
SYR
TASK 11-00-00-400-010
Installation of the BSB (DUROFIX) Labels (Material No. 05-136) (Marking with
Reactivable Transfer Label)
1. __________________
Reason for the Job
This procedure gives the data necessary for the installation of the service
and safety labels (BSB) on the external surfaces of the aircraft.
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
EFF :
ALL 11-00-00
Page 226
Nov 01/09
R
SYR
B. Consumable Materials
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
Subtask 11-00-00-110-058
NOTE : You must let the paint cure during 24 hours minimum at ambient
____
temperature before you install the labels.
(1) Clean the label contact surface with a lint-free cotton cloth
MISCELLANEOUS (Material No. 19-003) soaked with CLEANING AGENTS
(Material No. 11-003) or CLEANING AGENTS (Material No. 11-016).
Subtask 11-00-00-915-062
EFF :
ALL 11-00-00
Page 227
Nov 01/09
R
SYR
(2) If the paint is not new, do the steps that follow:
(a) Apply the fixative SPECIAL MATERIALS (Material No. 05-029) on the
applicable painted area.
4. Procedure
_________
Subtask 11-00-00-915-059
NOTE : Let the paint dry before you install the label.
____
(2) Install the label with the markings against the contact surface.
(3) Apply a pressure on one of the ends of the label against the support
and pull the other end up to prevent wrinkles.
(4) Apply a pressure on the label against the surface with a plastic
scraper.
NOTE : To prevent wrinkles or air pockets, you must start from the
____
center to the edges.
(5) Apply a strong pressure on all the surface with a rubber roll.
(6) At the same time, remove the unwanted solution with a moist sponge.
(7) Apply the moist sponge to the backing paper of the label.
(9) Lightly remove the remaining compound from the label surface and
around the label with a sponge soaked with water.
(10) If applicable, make holes in the air pockets with a needle, and apply
a pressure with the plastic scraper.
EFF :
ALL 11-00-00
Page 228
Nov 01/09
R
SYR
(11) If the installation is incorrect
Subtask 11-00-00-916-051-A
(1) Apply a cross coat of PAINTS FOR DETAIL (INTERNAL AND EXTERN AL)
(Material No. 07-018) on all external functional and maintenance
markings with a soft hair brush.
NOTE : The labels must dry during for 24 hours minimum at room
____
temperature before you apply the varnish.
5. Close-up
________
Subtask 11-00-00-942-050
A. Make sure that the work area is clean and clear of tool(s) and other
items.
EFF :
ALL 11-00-00
Page 229
Nov 01/09
R
SYR
TASK 11-00-00-400-011
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
B. Consumable Materials
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
EFF :
ALL 11-00-00
Page 230
Nov 01/09
R
SYR
3. __________
Job Set-up
Subtask 11-00-00-110-059
(1) Clean the contact surface of the placard with MISCELLANEOUS (Material
No. 19-003) soaked in CLEANING AGENTS (Material No. 11-003) or
CLEANING AGENTS (Material No. 11-016).
4. Procedure
_________
Subtask 11-00-00-915-060
(1) Apply SEALANTS (Material No. 09-002) or SEALANTS (Material No. 09-
016) on the support with a soft hair brush.
(2) Install the placard and make sure that it is correctly bonded.
(3) Apply masking tape or masking paper on the area adjacent to the decal
location.
(4) Apply a cross coat of PAINTS FOR DETAIL (INTERNAL AND EXTERN AL)
(Material No. 07-018) on all external functional and maintenance
markings with a soft hair brush.
NOTE : The labels must dry for 24 hours minimum at room temperature
____
before you apply the varnish.
5. Close-up
________
Subtask 11-00-00-942-060
A. Make sure that the work area is clean and clear of tool(s) and other
items.
EFF :
ALL 11-00-00
Page 231
Nov 01/09
R
SYR
TASK 11-00-00-400-012
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
B. Consumable Materials
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
Subtask 11-00-00-120-051
(1) Rub the contact surface with silicon paper grade 320 to remove the
signs of paint.
EFF :
ALL 11-00-00
Page 232
May 01/10
SYR
Subtask 11-00-00-110-060
(1) Clean the contact surface with a MISCELLANEOUS (Material No. 19-003)
soaked in CLEANING AGENTS (Material No. 11-002).
Carefully remove the grease from the surface.
4. Procedure
_________
Subtask 11-00-00-915-061
(1) Apply BONDING AND ADHESIVE COMPOUNDS (Material No. 08-001) on the
contact surface. Lightly bend the placard to bond it better.
Subtask 11-00-00-916-052
(1) Apply 2 layers of PAINTS FOR DETAIL (INTERNAL AND EXTERN AL)
(Material No. 07-018) on the placard with a soft hair brush.
5. Close-up
________
Subtask 11-00-00-942-061
A. Make sure that the work area is clean and clear of tool(s) and other
items.
EFF :
ALL 11-00-00
Page 233
May 01/10
SYR
TASK 11-00-00-370-002
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
B. Consumable Materials
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
Subtask 11-00-00-110-062
(1) Clean the surface with a MISCELLANEOUS (Material No. 19-003) soaked
in CLEANING AGENTS (Material No. 11-004) to remove all the signs of
dirt.
NOTE : Do the cleaning operation until the cloth you use is clean.
____
EFF :
ALL 11-00-00
Page 234
May 01/11
SYR
Subtask 11-00-00-440-050
B. Surface Reactivation
(1) Before you apply the paint, make all the surfaces rough with abrasive
nylon pads and CLEANING AGENTS (Material No. 11-004).
NOTE : The surface on which you do the reactivation must be wet, but
____
it is possible to rub a dry surface if a vacuum cleaning
device is available to remove the dust when you have rubbed
the surface.
(2) If necessary, remove the remaining sealant with grade 220 emery
cloth.
(3) Lightly rub the screw or rivet rows to remove all the black signs.
(5) Use an abrasive rotative brush to clean the areas with round head
rivets.
Subtask 11-00-00-110-063
(1) Rinse the surfaces you have rubbed with CLEANING AGENTS (Material No.
R 11-004) then wipe with a MISCELLANEOUS (Material No. 19-003) before
the cleaning agent evaporates.
(2) Lightly wipe again all the upper sections of the aircraft (fuselage
above the windows, upper surface wings) with anti-dust pads before
application of the wash primer.
EFF :
ALL 11-00-00
Page 235
May 01/11
SYR
4. Procedure
_________
Subtask 11-00-00-370-050
NOTE : The time between the last cleaning operation and the
____
application of paint must not be more than 4 hours.
Subtask 11-00-00-916-053
(1) Apply a PAINTS FOR DETAIL (INTERNAL AND EXTERN AL) (Material No. 07-
018) on all exterior functional and maintenance markings.
5. Close-up
________
Subtask 11-00-00-942-051
EFF :
ALL 11-00-00
Page 236
Nov 01/09
R
SYR
TASK 11-00-00-960-001
1. __________________
Reason for the Job
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
B. Consumable Materials
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
EFF :
ALL 11-00-00
Page 237
May 01/10
SYR
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
C. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
Subtask 11-00-00-120-053-A
(2) Do the step that follow to remove the remaining adhesive compound:
(a) Clean the contact surfaces with a MISCELLANEOUS (Material No. 19-
003) soaked with CLEANING AGENTS (Material No. 11-003).
(c) Use adhesive tape to show the limits of the bonded area.
(d) Make sure that the contact surfaces are in the correct condition
R and apply protection if necessary (Ref. ASRM 51211100) and (Ref.
R ASRM 51231100).
EFF :
ALL 11-00-00
Page 238
May 01/10
SYR
(e) Apply finish paint on the contact surfaces.
(a) Clean the contact surfaces with a MISCELLANEOUS (Material No. 19-
003) soaked with CLEANING AGENTS (Material No. 11-003).
(b) Use adhesive tape to show the limits of the bonded area.
(c) Rub the contact surfaces with emery paper grade 320.
(e) Clean the contact surfaces with a MISCELLANEOUS (Material No. 19-
003) soaked with CLEANING AGENTS (Material No. 11-003).
Subtask 11-00-00-120-057
(1) Drill out the rivets that attach the reference plate to the
structure.
(4) Remove the remaining sealant from the area and clean with a
MISCELLANEOUS (Material No. 19-003) and CLEANING AGENTS (Material No.
11-026).
(6) Close the rivet holes with SEALANTS (Material No. 09-013).
(10) Clean the area with a MISCELLANEOUS (Material No. 19-003) and
CLEANING AGENTS (Material No. 11-026).
EFF :
ALL 11-00-00
Page 239
May 01/10
SYR
Subtask 11-00-00-120-056
(2) Do the step that follow to remove the remaining adhesive compound:
(a) Clean the contact surfaces with a MISCELLANEOUS (Material No. 19-
003) soaked with CLEANING AGENTS (Material No. 11-003).
(c) Use adhesive tape to show the limits of the bonded area.
(d) Make sure that the contact surfaces are in the correct condition
R and apply protection if necessary (Ref. ASRM 51211100) and (Ref.
R ASRM 51231100).
(a) Clean the contact surfaces with a MISCELLANEOUS (Material No. 19-
003) soaked with CLEANING AGENTS (Material No. 11-003).
(b) Use adhesive tape to show the limits of the bonded area.
(c) Rub the contact surfaces with emery paper grade 320.
(e) Clean the contact surfaces with a MISCELLANEOUS (Material No. 19-
003) soaked with CLEANING AGENTS (Material No. 11-003).
EFF :
ALL 11-00-00
Page 240
May 01/10
SYR
Subtask 11-00-00-860-051
(1) Before you install the reference triangle make sure that the rudder
and/or the elevator are in the correct position
- for the rudder (Ref. TASK 27-24-00-820-001).
- for the elevator (Ref. TASK 27-34-00-820-003), or (Ref. TASK 27-34-
00-820-003)
4. Procedure
_________
Subtask 11-00-00-915-071
(2) Install the reference triangle (Ref. AMM 11-21-27 P.Block 001) with
BONDING AND ADHESIVE COMPOUNDS (Material No. 08-001).
(3) Use adhesive tape to hold the reference triangle during the curing
time.
5. Close-up
________
Subtask 11-00-00-942-063
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
EFF :
ALL 11-00-00
Page 241
Nov 01/09
R
SYR
R TASK 11-00-00-400-021
R 1. __________________
Reason for the Job
R Self Explanatory
R 2. ______________________
Job Set-up Information
R A. Consumable Materials
R -------------------------------------------------------------------------------
R REFERENCE DESIGNATION
R -------------------------------------------------------------------------------
R B. Referenced Information
R -------------------------------------------------------------------------------
R REFERENCE DESIGNATION
R -------------------------------------------------------------------------------
EFF :
ALL 11-00-00
Page 242
Nov 01/09
SYR
3. __________
Job Set-up
Subtask 11-00-00-110-072
A. CLEANING
R (1) Clean and degrease the surface on which you will bond the placard
R with CLEANING AGENTS (Material No. 11-002), then fully dry the
R surface.
R NOTE : You must drill the holes or cut the placard before you install
____
R it.
4. Procedure
_________
Subtask 11-00-00-915-074
A. Installation of Labels
(Ref. Fig. 203/TASK 11-00-00-991-008)
R (1) Make sure that the adjacent placards are aligned vertically and/or
R horizontally.
R (2) If applicable, put the placard 20 mm (0.7874 in.) from the edge of
R its location or the end of corners.
R (4) Apply pressure on the placard against the surface (specially around
R the edges) and at the same time gradually remove the backing paper.
R (5) Carefully apply pressure on the placard from the center to the sides.
5. Close-up
________
Subtask 11-00-00-942-072
A. Make sure that the work area is clean and clear of tool(s) and other
items.
EFF :
ALL 11-00-00
Page 243
May 01/10
SYR
R Installation of Cabin Placards
R Figure 203/TASK 11-00-00-991-008
EFF :
ALL 11-00-00
Page 244
Nov 01/09
SYR
TASK 11-00-00-400-020
1. __________________
Reason for the Job
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
B. Consumable Materials
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
EFF :
ALL 11-00-00
Page 245
Nov 01/09
R
SYR
C. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
Subtask 11-00-00-860-053
(1) If necessary, make the aircraft level to find the center line before
you install the placard (Ref. TASK 08-22-00-200-001).
Subtask 11-00-00-110-071
(1) Clean the contact surface of the placard with MISCELLANEOUS (Material
No. 19-003) soaked in CLEANING AGENTS (Material No. 11-003) or
CLEANING AGENTS (Material No. 11-016).
4. Procedure
_________
Subtask 11-00-00-915-070
(1) Apply SEALANTS (Material No. 09-002) or SEALANTS (Material No. 09-
016) on the support with a soft brush.
(2) Install the placard (Ref. AMM 11-21-08 P.Block 001) and make sure
that it is correctly bonded.
5. Close-up
________
Subtask 11-00-00-942-071
A. Make sure that the work area is clean and clear of tool(s) and other
items.
EFF :
ALL 11-00-00
Page 246
Nov 01/09
R
SYR
TASK 11-00-00-370-003
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
R
No specific brush
No specific masking film
No specific tape
R No specific 1 ACCESS PLATFORM 4M (13 FT)-ADJUSTABLE
B. Consumable Materials
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
C. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
ASRM 51231100
EFF :
ALL 11-00-00
Page 247
Aug 01/11
SYR
3. __________
Job Set-up
Subtask 11-00-00-010-050
A. Get Access
Subtask 11-00-00-110-066
(1) Clean the surface with CLEANING AGENTS (Material No. 11-010) or
CLEANING AGENTS (Material No. 11-003) if the paint is fully cured,
and let it dry.
4. Procedure
_________
Subtask 11-00-00-370-052
NOTE : The base paint must be sufficiently dry (the paint manufacturer
____
gives the indications dry to tape or maskable drying time)
before you apply the paint with a stencil.
(a) For more information about the coatings (Ref. ASRM 51231100).
NOTE : Make sure that you keep the contrast between the color of
____
the base paint and the marking.
EFF :
ALL 11-00-00
Page 248
Aug 01/11
SYR
(4) Remove all the masking material and touch up as necessary.
Subtask 11-00-00-916-055
(1) When the paint is dry, apply PAINTS FOR DETAIL (INTERNAL AND EXTERN
AL) (Material No. 07-018) if necessary.
5. Close-up
________
Subtask 11-00-00-942-066
A. Close Access
(2) Make sure that the work area is clean and clear of tool(s) and other
items.
R
EFF :
ALL 11-00-00
Page 249
Nov 01/09
SYR
TASK 11-00-00-960-002
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
B. Consumable Materials
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
C. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
EFF :
ALL 11-00-00
Page 250
May 01/11
SYR
3. __________
Job Set-up
Subtask 11-00-00-941-055
A. Safety Precautions
(a) Put a warning notice in position to tell persons not to start the
engine.
(2) Make sure that the engine 1(2) shutdown occurred not less than 5
minutes before you do this procedure.
(a) Make sure that the ON legend of the ENG/FADEC GND PWR/1(2)
pushbutton switch is off.
Subtask 11-00-00-010-051
B. Get Access
4. Procedure
_________
Subtask 11-00-00-020-050
(2) Remove the nuts, the screws and the washers that attach the leasing
plate.
EFF :
ALL 11-00-00
Page 251
May 01/11
R
SYR
Subtask 11-00-00-110-067
(1) Clean and degrease the contact surface of the leasing plate with a
lint-free cloth MISCELLANEOUS (Material No. 19-003) made moist with
CLEANING AGENTS (Material No. 11-002).
Subtask 11-00-00-960-050
R (2) Install the washers, the screws and the nuts and TORQUE the two
R screws to between 1.14 and 1.26 m.daN (100.88 and 111.50 lbf.in).
(3) Safety the two screws together on every side of the plate with
lockwire MISCELLANEOUS (Material No. 19-009).
5. Close-up
________
Subtask 11-00-00-942-067
A. Close Access
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
EFF :
ALL 11-00-00
Page 252
May 01/11
SYR
**ON A/C 002-099,
TASK 11-00-00-960-003
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
Not Applicable
3. __________
Job Set-up
Subtask 11-00-00-941-057
A. Get Access
4. Procedure
_________
Subtask 11-00-00-020-051
(1) Hold the leasing plate and remove the screws that attach it.
Subtask 11-00-00-420-050
R
EFF :
002-099, 11-00-00
Page 253
Nov 01/09
SYR
5. Close-up
________
Subtask 11-00-00-942-070
A. Make sure that the work area is clean and clear of tool(s) and other
items.
R
EFF :
002-099, 11-00-00
Page 254
Nov 01/09
SYR
**ON A/C ALL
TASK 11-00-00-400-018
Installation of DISA (SUPRAFIX FRS Material No. 05-135) Labels (Marking with
Reactivable Transfer Label)
1. __________________
Reason for the Job
This procedure gives the data necessary for the installation of the
reactivable transfer labels (suprafix frs from DISA material no. 05-135)
related to service and safety, on the external surfaces of the aircraft.
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
No specific needle
No specific plastic container
No specific plastic scraper
No specific rubber roller
No specific soft-hair brush
No specific sponge
EFF :
ALL 11-00-00
Page 255
Nov 01/09
R
SYR
B. Consumable Materials
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
Subtask 11-00-00-110-068
NOTE : You must let the paint cure for 24 hours minimum at ambient
____
temperature before you install the labels.
(1) If the paint is fully cured, clean the contact surface of the label
with a lint-free cotton cloth MISCELLANEOUS (Material No. 19-003)
soaked with CLEANING AGENTS (Material No. 11-003), CLEANING AGENTS
(Material No. 11-016) or CLEANING AGENTS (Material No. 11-026).
Subtask 11-00-00-915-067
EFF :
ALL 11-00-00
Page 256
Nov 01/09
SYR
4. Procedure
_________
Subtask 11-00-00-915-068
(2) Install the label with the marking against the contact surface.
(3) Apply a pressure on one of the ends of the label against the support
and pull the other end up, to prevent wrinkles.
(4) Apply pressure to the label against the surface with a plastic
scraper.
NOTE : To prevent wrinkles and air pockets, you must start from the
____
center to the edges.
(5) Apply a strong pressure on all the surface with a rubber roller.
(6) At the same time, remove the unwanted solution with a moist sponge.
(7) Apply the moist sponge to the backing paper of the label.
(9) Lightly remove the remaining compound from the label surface and
around the label with a sponge soaked in water.
(10) If applicable, make holes in the air pockets with a needle, and apply
pressure with the plastic scraper.
EFF :
ALL 11-00-00
Page 257
Nov 01/09
SYR
Subtask 11-00-00-916-056
NOTE : The labels must dry during 24 hours minimum at room temperature
____
before you apply the varnish.
(1) Apply a cross-coat of varnish PAINTS FOR DETAIL (INTERNAL AND EXTERN
AL) (Material No. 07-018) on the label with a soft-hair brush.
5. Close-up
________
Subtask 11-00-00-942-069
A. Make sure that the work area is clean and clear of tool(s) and other
items.
EFF :
ALL 11-00-00
Page 258
Nov 01/09
SYR
TASK 11-00-00-400-019
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
B. Consumable Materials
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
C. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
EFF :
ALL 11-00-00
Page 259
Nov 01/09
SYR
3. __________
Job Set-up
Subtask 11-00-00-010-052
A. Get Access
(1) Remove the flap track fairing No. 3 (Ref. TASK 57-55-11-000-001).
Subtask 11-00-00-110-069
B. Cleaning
(1) Before you install the label, remove the grease and clean the surface
with CLEANING AGENTS (Material No. 11-004).
4. Procedure
_________
Subtask 11-00-00-915-069
A. Label Installation
(1) Apply a layer of BONDING AND ADHESIVE COMPOUNDS (Material No. 08-087)
to the surfaces (refer to the Vendors instructions).
(2) Install the label and apply a light pressure during approximately 20
minutes with the spring-loaded clamps.
5. Close-up
________
Subtask 11-00-00-410-050
A. Close Access
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
(2) Install the flap track fairing No. 3 (Ref. TASK 57-55-11-400-001).
EFF :
ALL 11-00-00
Page 260
Nov 01/09
SYR
EXTERIOR PLACARDS AND MARKINGS - DESCRIPTION AND OPERATION
__________________________________________________________
1. _______
General
This chapter gives the placards and markings on the external side of the
aircraft.
For more information about panel location, refer to AMM Chapter 06.
Use the AMM Chapter 06 as the primary reference.
2. Markings
_______________________________
of the Hoisting Points
(Ref. Fig. 001)
The blanking patches are installed on the hoisting points when the aircraft
is fully painted. Each blanking sheet is painted in the same color as the
adjacent area.
R NOTE : The marking must be installed near the hoisting point cover patch.
____
3. Markings
_____________________________________________
on Access Panels and Doors necessary
The access panels and doors that you open for the maintenance operation are
identified on the door or panel itself. The identification is on the
adjacent area if the panel or door surface is not sufficient. The height of
the letters is 13 mm (0.5118 in.).
A. Markings on Fuselage
(Ref. Fig. 002, 003, 004)
EFF :
ALL 11-20-00
Page 1
Nov 01/10
SYR
Blanking of the Hoisting Points
Figure 001
EFF :
ALL 11-20-00
Page 2
May 01/98
SYR
R Markings on the Fuselage and Tail Unit
R Figure 002
EFF :
ALL 11-20-00
Page 3
Nov 01/10
SYR
Markings on the Fuselage
Figure 003
EFF :
ALL 11-20-00
Page 4
Nov 01/10
R
SYR
Markings on the THS
Figure 004
EFF :
ALL 11-20-00
Page 5
Nov 01/10
R
SYR
Markings on the L Wing
Figure 005 (SHEET 1)
EFF :
ALL 11-20-00
Page 6
Nov 01/10
R
SYR
Markings on the L Wing
Figure 005 (SHEET 2)
R
EFF :
ALL 11-20-00
Page 7
Nov 01/10
SYR
Markings on the R Wing
Figure 006 (SHEET 1)
EFF :
ALL 11-20-00
Page 8
Nov 01/10
R
SYR
Markings on the R Wing
Figure 006 (SHEET 2)
EFF :
ALL 11-20-00
Page 9
Nov 01/10
R
SYR
Markings on the Engine Pylons and Cowls
Figure 007 (SHEET 1)
EFF :
ALL 11-20-00
Page 10
Nov 01/10
R
SYR
Markings on the Engine Pylons and Cowls
Figure 007 (SHEET 2)
EFF :
ALL 11-20-00
Page 11
Nov 01/10
R
SYR
FUSELAGE - DESCRIPTION AND OPERATION
____________________________________
1. _______
General
This section gives the information related to the placards and markings on
the external side of the aircraft.
To make use of this section easier, the two last digits of the ATA reference
of each subject identifies the related system.
EFF :
ALL 11-21-00
Page 1
May 01/98
SYR
LIFTING AND SHORING - DESCRIPTION AND OPERATION
_______________________________________________
1. _______
General
This subject gives the information related to the markings of the lifting
and shoring points on the fuselage.
EFF :
ALL 11-21-07
Page 1
May 01/98
SYR
R Markings of the Lifting and Shoring Points
Figure 001
EFF :
ALL 11-21-07
Page 2
May 01/07
SYR
LEVELING AND WEIGHING - DESCRIPTION AND OPERATION
_________________________________________________
1. _______
General
This subject gives the information related to the markings of the leveling
points on the fuselage.
EFF :
ALL 11-21-08
Page 1
May 01/98
SYR
R Markings of the Leveling Points
Figure 001
EFF :
ALL 11-21-08
Page 2
Nov 01/08
SYR
AIR CONDITIONING - DESCRIPTION AND OPERATION
____________________________________________
1. _______
General
This subject gives the information related to the air conditioning markings
on the fuselage
EFF :
ALL 11-21-21
Page 1
May 01/11
SYR
R Markings of the Skin Air Inlet and Outlet Valves
R Figure 001
EFF :
ALL 11-21-21
Page 2
May 01/07
SYR
R Markings of the LP Ground Connection
R Figure 002
EFF :
ALL 11-21-21
Page 3
May 01/07
SYR
R Markings of the Air Inlet of the Packs 1 and 2
Figure 003
EFF :
ALL 11-21-21
Page 4
May 01/11
SYR
R Markings of the External Air-Supply Caution
Figure 004
EFF :
ALL 11-21-21
Page 5
May 01/11
SYR
ELECTRICAL POWER - DESCRIPTION AND OPERATION
____________________________________________
1. _______
General
This subject gives the information related to the markings of the ground
electrical connection on the fuselage.
EFF :
ALL 11-21-24
Page 1
May 01/98
SYR
R Markings of the External Power Receptacle
Figure 001
EFF :
ALL 11-21-24
Page 2
May 01/07
SYR
FLIGHT CONTROLS - DESCRIPTION AND OPERATION
___________________________________________
1. _______
General
This subject gives the information related to the THS incidence markings on
the fuselage.
R NOTE : The centre of the triangle must be aligned with the trailing edge
____
R of the elevator. The direction of the triangle is not important.
EFF :
ALL 11-21-27
Page 1
Nov 01/05
SYR
R Markings for the THS Incidence
Figure 001
EFF :
ALL 11-21-27
Page 2
Aug 01/11
SYR
R Location of the Elevator and Rudder Neutral Position Triangle
Figure 002
EFF :
ALL 11-21-27
Page 3
Nov 01/09
SYR
FUEL - DESCRIPTION AND OPERATION
________________________________
1. _______
General
This subject gives the information related to the fuel markings on the
fuselage.
EFF :
ALL 11-21-28
Page 1
May 01/07
SYR
R Markings of the Magnetic Level Indicators and APU Fuel Drain
Figure 001
EFF :
ALL 11-21-28
Page 2
Aug 01/11
SYR
Markings of the Fuel Panel
Figure 002
EFF :
ALL 11-21-28
Page 3
May 01/07
R
SYR
R Markings on the APU Fuel Drain
R Figure 003
EFF :
ALL 11-21-28
Page 4
May 01/07
SYR
HYDRAULIC POWER - DESCRIPTION AND OPERATION
___________________________________________
1. _______
General
This subject gives the information related to the markings of the hydraulic
power system, on the fuselage.
D. Markings for the Hydraulics Compartment (Blue System) and Main Gear Doors
(Ref. Fig. 004)
E. Markings for the Hydraulics Compartment (Yellow System) and Main Gear
Doors
(Ref. Fig. 005)
EFF :
ALL 11-21-29
Page 1
May 01/98
SYR
R Markings for the Hydraulic Ground Connection of the Blue System
Figure 001
EFF :
ALL 11-21-29
Page 2
Aug 01/11
SYR
R Markings of the Hydraulic Reservoir Filling
Figure 002
EFF :
ALL 11-21-29
Page 3
Aug 01/11
SYR
R Markings for the Hydraulic Ground Connection of the Yellow System
Figure 003
EFF :
ALL 11-21-29
Page 4
Aug 01/11
SYR
R Markings for the Hydraulics Compartment (Blue System) and Main Gear Doors
Figure 004
EFF :
ALL 11-21-29
Page 5
Aug 01/11
SYR
R Markings for the Hydraulics Compartment (Yellow System) and Main Gear Doors
Figure 005
EFF :
ALL 11-21-29
Page 6
Aug 01/11
SYR
INDICATING/RECORDING SYSTEMS - DESCRIPTION AND OPERATION
________________________________________________________
1. _______
General
This subject gives the information related to the flight recorder markings.
EFF :
ALL 11-21-31
Page 1
May 01/98
SYR
R Flight Recorder Markings
Figure 001
EFF :
ALL 11-21-31
Page 2
Aug 01/11
SYR
LANDING GEAR - DESCRIPTION AND OPERATION
________________________________________
1. _______
General
This subjet provides information related to the markings on the landing gear
doors.
A. DOOR GROUND OPENING/CAUTION WHEN CLOSING Markings on the Nose Gear Leg
Door
(Ref. Fig. 001)
EFF :
ALL 11-21-32
Page 1
May 01/98
SYR
R Markings on the Nose Gear Leg Door
Figure 001
EFF :
ALL 11-21-32
Page 2
Aug 01/11
SYR
NAVIGATION - DESCRIPTION AND OPERATION
______________________________________
1. _______
General
This topic gives the information related to the navigation markings on the
R fuselage.
EFF :
ALL 11-21-34
Page 1
May 01/09
SYR
R Markings of the Forward and Aft Static Ports
R Figure 001
EFF :
ALL 11-21-34
Page 2
Nov 01/10
SYR
OXYGEN - DESCRIPTION AND OPERATION
__________________________________
1. _______
General
This subject gives the information related to the oxygen markings on the
fuselage.
EFF :
ALL 11-21-35
Page 1
May 01/98
SYR
R Markings of the Oxygen Discharge
Figure 001
EFF :
ALL 11-21-35
Page 2
May 01/07
SYR
PNEUMATIC - DESCRIPTION AND OPERATION
_____________________________________
1. _______
General
This subject gives the information related to the markings of the HP ground
connector.
EFF :
ALL 11-21-36
Page 1
May 01/98
SYR
R Markings of the HP Ground Connection
R Figure 001
EFF :
ALL 11-21-36
Page 2
Nov 01/07
SYR
WATER/WASTE - DESCRIPTION AND OPERATION
_______________________________________
1. _______
General
This subject gives the information related to the markings of the
water/waste system, on the fuselage.
EFF :
ALL 11-21-38
Page 1
Aug 01/11
SYR
R Markings on the Aft Toilet Service Door
Figure 001
EFF :
ALL 11-21-38
Page 2
Nov 01/10
SYR
R Markings on the Toilet Service Panels
R Figure 002
EFF :
ALL 11-21-38
Page 3
May 01/03
SYR
R Markings on the Potable-Water Drain-Panel
Figure 003
EFF :
ALL 11-21-38
Page 4
Aug 01/11
SYR
R Markings on the Potable-Water Service-Panel
Figure 004
EFF :
ALL 11-21-38
Page 5
Nov 01/10
SYR
R Markings on the Potable-Water Panel
Figure 005
EFF :
ALL 11-21-38
Page 6
Aug 01/11
SYR
Markings on the Potable-Water Drain Panel
R Figure 006
EFF :
ALL 11-21-38
Page 7
May 01/08
SYR
Markings on the Potable-Water Service Panel
R Figure 007
EFF :
ALL 11-21-38
Page 8
May 01/08
SYR
Markings on the Potable-Water Panel
R Figure 008
EFF :
ALL 11-21-38
Page 9
May 01/08
SYR
DOORS - DESCRIPTION AND OPERATION
_________________________________
R 1. _______
General
R This subject gives the information related to the stencils and markings on:
R - the passenger/crew doors
R - the emergency exits
R - the forward and aft cargo compartment doors
R - the avionics compartment door 812
R - the avionics compartment doors 811, 822 and 824
R - the lower access door
R - the bulk cargo-compartment door
A. Passenger/Crew Door
(Ref. Fig. 001)
B. Emergency Exits
(Ref. Fig. 002)
EFF :
ALL 11-21-52
Page 1
May 01/06
SYR
R Markings on the Passenger/Crew Doors
Figure 001 (SHEET 1)
EFF :
ALL 11-21-52
Page 2
Nov 01/07
SYR
R Markings on the Passenger/Crew Doors
Figure 001 (SHEET 2)
EFF :
ALL 11-21-52
Page 3
Nov 01/07
SYR
R Markings on the Emergency Exits
Figure 002
EFF :
ALL 11-21-52
Page 4
Nov 01/09
SYR
INTENTIONALLY BLANK
11-21-52
Page 5
May 01/98
SYR
R Markings on the Forward and Aft Cargo Compartment Doors
Figure 003 (SHEET 1)
EFF :
ALL 11-21-52
Page 6
Nov 01/07
SYR
R Markings on the Forward and Aft Cargo Compartment Doors
Figure 003 (SHEET 2)
EFF :
ALL 11-21-52
Page 7
Nov 01/07
SYR
R Markings on the Forward and Aft Cargo Compartment Doors
Figure 003 (SHEET 3)
EFF :
ALL 11-21-52
Page 8
Nov 01/07
SYR
R Markings on the Avionics Compartment Door 812
Figure 004
EFF :
ALL 11-21-52
Page 9
Aug 01/11
SYR
R Markings on the Cargo Door Control-Panel
Figure 005
EFF :
ALL 11-21-52
Page 10
Aug 01/11
SYR
R Markings on the Avionics Compartment Door 811
Figure 006
EFF :
ALL 11-21-52
Page 11
Nov 01/07
SYR
R Markings on the Avionics Compartment Door 822
Figure 007
EFF :
ALL 11-21-52
Page 12
May 01/07
SYR
R Markings on the Avionics Compartment Door 824
Figure 008
EFF :
ALL 11-21-52
Page 13
Aug 01/11
SYR
R Markings on the Lower Access Door
Figure 009
EFF :
ALL 11-21-52
Page 14
Aug 01/11
SYR
INTENTIONALLY BLANK
11-21-52
Page 15
Nov 01/04
SYR
R Markings on the Bulk Cargo-Compartment Door
Figure 010 (SHEET 1)
EFF :
ALL 11-21-52
Page 16
Aug 01/11
SYR
R Markings on the Bulk Cargo-Compartment Door
Figure 010 (SHEET 2)
EFF :
ALL 11-21-52
Page 17
Aug 01/11
SYR
R Markings Inside the Main Landing Gear Doors
Figure 011 (SHEET 1)
EFF :
ALL 11-21-52
Page 18
Nov 01/08
SYR
R Markings Inside the Main Landing Gear Doors
Figure 011 (SHEET 2)
EFF :
ALL 11-21-52
Page 19
Nov 01/08
SYR
FUSELAGE - DESCRIPTION AND OPERATION
____________________________________
1. _______
General
This subject gives the information related to the markings on the fuselage
of the aircraft.
EFF :
ALL 11-21-53
Page 1
May 01/07
R
SYR
R Markings on the Fuselage - Maintenance
Figure 001
EFF :
ALL 11-21-53
Page 2
Aug 01/11
SYR
MAIN AND NOSE LANDING GEAR - DESCRIPTION AND OPERATION
______________________________________________________
1. _______
General
This section gives the information related to the markings and placards on
the main and nose landing gear.
EFF :
ALL 11-22-00
Page 1
May 01/98
SYR
LANDING GEAR - DESCRIPTION AND OPERATION
________________________________________
1. _______
General
This subject gives the information related to the markings on the landing
gear.
A. Location of the tire inflating pressure placard on the main landing gear
(Ref. Fig. 001)
EFF :
ALL 11-22-32
Page 1
May 01/98
SYR
R Tire Inflating Pressure Placard on the Main Landing Gear
Figure 001
EFF :
ALL 11-22-32
Page 2
Nov 01/09
SYR
R Identification Labels - Tire Inflating Pressure with Aircraft on Wheels
Nose Landing Gear
Figure 002
EFF :
ALL
11-22-32 Page 3
Nov 01/04
SYR
R Identification Labels - Tire Inflating Pressure with Aircraft on Wheels
Main Landing Gear
Figure 003
EFF :
ALL
11-22-32 Page 4
Nov 01/04
SYR
Location of the Grounding Point on the Nose Landing Gear
Figure 004
EFF :
ALL 11-22-32
Page 5
May 01/98
SYR
Location of the Grounding Point on the Main Landing Gear
Figure 005
EFF :
ALL 11-22-32
Page 6
May 01/98
SYR
WINGS - DESCRIPTION AND OPERATION
_________________________________
1. _______
General
This section gives the information related to the markings and placards on
the wings.
EFF :
ALL 11-23-00
Page 1
May 01/98
SYR
LIFTING AND SHORING - DESCRIPTION AND OPERATION
_______________________________________________
1. _______
General
This subject gives the information related to the markings of the jacking
points under the wings.
EFF :
ALL 11-23-07
Page 1
May 01/98
SYR
R Markings of the Jacking Points
Figure 001
EFF :
ALL 11-23-07
Page 2
Nov 01/08
SYR
FLIGHT CONTROLS - DESCRIPTION AND OPERATION
___________________________________________
1. _______
General
This subject gives the information related to the markings of the flight
controls on the wings.
EFF :
ALL 11-23-27
Page 1
May 01/11
SYR
R Markings of the Hoisting Points
Figure 001
EFF :
ALL 11-23-27
Page 2
May 01/02
SYR
R Markings of the Flap Extension Angle
Figure 002
EFF :
ALL 11-23-27
Page 3
Aug 01/11
SYR
R Markings of the Slat Extension Angle
R Figure 003
EFF :
ALL 11-23-27
Page 4
Nov 01/09
SYR
Marking on Cover Inspection - RH Wing
R Figure 004
EFF :
ALL 11-23-27
Page 5
May 01/02
SYR
Marking on Cover Inspection - LH Wing
R Figure 005
EFF :
ALL 11-23-27
Page 6
May 01/02
SYR
R Marking on Flap Track 3
R Figure 006
EFF :
ALL 11-23-27
Page 7
May 01/06
SYR
FUEL - DESCRIPTION AND OPERATION
________________________________
1. _______
General
This subject gives the information related to the fuel markings on the
wings.
EFF :
ALL 11-23-28
Page 1
May 01/02
SYR
R Markings on the Wing Upper Surface
Figure 001
EFF :
ALL 11-23-28
Page 2
Nov 01/08
SYR
R Markings on the Wing Lower Surface (Left Wing)
Figure 002
EFF :
ALL 11-23-28
Page 3
May 01/07
SYR
R Markings on the Wing Lower Surface (Right Wing)
Figure 003
EFF :
ALL 11-23-28
Page 4
May 01/08
SYR
WINGS - DESCRIPTION AND OPERATION
_________________________________
1. _______
General
R This subject gives the information related to the markings on the wings.
EFF :
ALL 11-23-57
Page 1
May 01/08
SYR
R DO NOT WALK OUTSIDE THIS AREA Markings on the Wings
Figure 001
EFF :
ALL 11-23-57
Page 2
Nov 01/08
SYR
R Markings of the Escape Area
Figure 002
EFF :
ALL 11-23-57
Page 3
May 01/08
SYR
R Markings of the Escape Rope Bracket
Figure 003
EFF :
ALL 11-23-57
Page 4
Nov 01/08
SYR
PYLONS AND COWL DOORS - DESCRIPTION AND OPERATION
_________________________________________________
1. _______
General
This section gives the information related to the markings and placards on
the pylons and cowl doors.
EFF :
ALL 11-24-00
Page 1
May 01/98
SYR
FIRE PROTECTION - DESCRIPTION AND OPERATION
___________________________________________
1. _______
General
This subject gives the information related to the fire protection markings
on the pylons.
EFF :
ALL 11-24-26
Page 1
May 01/98
SYR
R EXTINGUISHER Markings on the Pylons
Figure 001
EFF :
ALL 11-24-26
Page 2
May 01/07
SYR
R EXTINGUISHER Markings on the Pylons
Figure 002
EFF :
ALL 11-24-26
Page 3
Nov 01/07
SYR
POWER PLANT - DESCRIPTION AND OPERATION
_______________________________________
1. _______
General
Stencils and markings are applied to the inside and outside of the nacelle
cowling.
They give operation and safety instructions and identify parts and
locations.
2. Description
___________
R
R The stencils and the markings are applied with epoxy paint and coated with
clear polyurethane (Refer to SRM 512311, P.Block 001).
R
R The markings in high temperature areas are applied with stencil ink.
R The letters are in gothic style and the space between lines is the same as
R the letter height.
3. ________________
Item Description
EFF :
ALL 11-24-71
Page 1
May 01/11
SYR
Markings on Engine Air Intake - L Side
Figure 001
EFF :
ALL 11-24-71
Page 2
May 01/98
SYR
Markings on Engine Air Intake - R Side
Figure 002
EFF :
ALL 11-24-71
Page 3
May 01/98
SYR
R Markings on Fan Cowl and Thrust Reverser - L Side
Figure 003
EFF :
001-002, 11-24-71
Page 4
May 01/11
SYR
INTENTIONALLY BLANK
R
11-24-71
Page 5
Nov 01/04
SYR
R Markings on Fan Cowl and Thrust Reverser - L Side
Figure 003A (SHEET 1)
EFF :
003-099, 11-24-71
Page 6
Aug 01/11
SYR
R Markings on Fan Cowl and Thrust Reverser - L Side
Figure 003A (SHEET 2)
EFF :
003-099, 11-24-71
Page 7
Aug 01/11
SYR
Markings on Fan Cowl and Thrust Reverser - R Side
Figure 004
R
EFF :
001-002, 11-24-71
Page 8
Nov 01/04
SYR
INTENTIONALLY BLANK
11-24-71
Page 9
Nov 01/04
SYR
R Markings on Fan Cowl and Thrust Reverser - R Side
R Figure 004A (SHEET 1)
EFF :
003-099, 11-24-71
Page 10
Nov 01/04
SYR
R Markings on Fan Cowl and Thrust Reverser - R Side
R Figure 004A (SHEET 2)
EFF :
003-099, 11-24-71
Page 11
Nov 01/04
SYR
**ON A/C ALL
EFF :
ALL 11-24-71
Page 12
May 01/09
SYR
R Markings on Nacelle R Side
Figure 005
EFF :
ALL 11-24-71
Page 13
May 01/08
SYR
Markings of the Inboard Fan Cowl Strakes
Figure 006
EFF :
ALL 11-24-71
Page 14
Nov 01/04
SYR
Engine Leasing Plate - Location
Figure 007
EFF :
002-099, 11-24-71
Page 15
Nov 01/04
SYR
STABILIZERS - DESCRIPTION AND OPERATION
_______________________________________
1. _______
General
This section gives the information related to the markings and placards on
the stabilizers.
EFF :
ALL 11-25-00
Page 1
May 01/98
SYR
FLIGHT CONTROLS - DESCRIPTION AND OPERATION
___________________________________________
1. _______
General
This subject gives the information related to the markings of the flight
controls on the stabilizers.
EFF :
ALL 11-25-27
Page 1
May 01/98
SYR
Markings of the Hoisting Points
Figure 001
EFF :
ALL 11-25-27
Page 2
May 01/98
SYR
STABILIZERS - DESCRIPTION AND OPERATION
_______________________________________
1. _______
General
This subject gives the information related to the markings on the
stabilizers.
EFF :
ALL 11-25-55
Page 1
May 01/98
SYR
R Markings on the Horizontal Stabilizer
Figure 001
EFF :
ALL 11-25-55
Page 2
Nov 01/08
SYR
R Markings of the Hoisting Points
R Figure 002
EFF :
ALL 11-25-55
Page 3
Nov 01/08
SYR
COCKPIT - DESCRIPTION AND OPERATION
___________________________________
1. _______
General
This section gives the information related to the markings and placards in
the cockpit.
To make use of this section easier, the two last digits of the ATA reference
of each subject identifies the related system.
EFF :
ALL 11-31-00
Page 1
May 01/98
SYR
AIR CONDITIONING - DESCRIPTION AND OPERATION
____________________________________________
1. _______
General
This subject gives the information related to the air conditioning system
markings in the cockpit.
EFF :
ALL 11-31-21
Page 1
May 01/98
SYR
R Air Conditioning System Markings in the Cockpit
Figure 001
EFF :
ALL 11-31-21
Page 2
May 01/05
SYR
COMMUNICATIONS - DESCRIPTION AND OPERATION
__________________________________________
1. _______
General
This subject gives the information related to communications markings in
the cockpit.
EFF :
ALL 11-31-23
Page 1
May 01/98
SYR
Hand Mic, Headset and Boomset Markings
Figure 001
EFF :
ALL 11-31-23
Page 2
May 01/98
SYR
Placard Registration Selcal Code Marking
Figure 002
EFF :
ALL 11-31-23
Page 3
May 01/98
SYR
ELECTRICAL POWER - DESCRIPTION AND OPERATION
____________________________________________
1. _______
General
This subject gives the information related to the electrical power markings
in the cockpit.
R
EFF :
ALL 11-31-24
Page 1
Feb 01/00
SYR
Electrical Power Markings in the Cockpit
Figure 001
EFF :
ALL 11-31-24
Page 2
May 01/98
SYR
EQUIPMENT/FURNISHINGS - DESCRIPTION AND OPERATION
_________________________________________________
1. _______
General
This subject gives the information related to the markings for
equipment/furnishings in the cockpit.
EFF :
ALL 11-31-25
Page 1
May 01/08
SYR
R Markings in the Cockpit
Figure 001
EFF :
ALL 11-31-25
Page 2
Nov 01/04
SYR
R Markings in the Cockpit
Figure 002
EFF :
001-003, 11-31-25
Page 3
Nov 01/04
SYR
R Markings in the Cockpit
Figure 002A
EFF :
004-099, 11-31-25
Page 4
Nov 01/04
SYR
R Owner and/or Manufacturer Plates in the Cockpit
Figure 003
EFF :
002-099, 11-31-25
Page 5
May 01/08
SYR
FIRE PROTECTION - DESCRIPTION AND OPERATION
___________________________________________
1. _______
General
This subject gives the information related to the fire protection markings
in the cockpit.
EFF :
ALL 11-31-26
Page 1
May 01/98
SYR
R Fire Extinguisher Markings
Figure 001
EFF :
ALL 11-31-26
Page 2
Nov 01/04
SYR
FLIGHT CONTROLS - DESCRIPTION AND OPERATION
___________________________________________
1. _______
General
This subject gives the information related to the flight controls markings
in the cockpit.
C. Pedals Markings
(Ref. Fig. 004)
EFF :
ALL 11-31-27
Page 1
May 01/98
SYR
R Flight Controls Markings
Figure 001
EFF :
ALL 11-31-27
Page 2
Nov 01/04
SYR
Flight Controls Markings
Figure 002
EFF :
ALL 11-31-27
Page 3
May 01/98
SYR
R Speed Limits Markings
Figure 003
EFF :
ALL 11-31-27
Page 4
Nov 01/04
SYR
R Pedals Markings
Figure 004
EFF :
ALL 11-31-27
Page 5
Nov 01/08
SYR
ICE AND RAIN PROTECTION - DESCRIPTION AND OPERATION
___________________________________________________
1. _______
General
This subject gives the information related to the replacement of the ice and
rain protection systems in the cockpit.
EFF :
ALL 11-31-30
Page 1
May 01/07
SYR
Rain-Repellent Reservoir Marking
Figure 001
R
EFF :
001-002, 11-31-30
Page 2
May 01/07
SYR
R Rain-Repellent Reservoir Marking
R Figure 001A
EFF :
ALL 11-31-30
Page 3
May 01/07
SYR
Rain-Repellent Marking
Figure 002
EFF :
001-002, 11-31-30
Page 4
May 01/07
SYR
INDICATING/RECORDING SYSTEMS - DESCRIPTION AND OPERATION
________________________________________________________
1. _______
General
This subject gives the information related to the indicating/recording
systems markings in the cockpit.
EFF :
ALL 11-31-31
Page 1
Nov 01/05
SYR
R Markings on Panel 49VU and 120VU
Figure 001
EFF :
ALL 11-31-31
Page 2
Nov 01/04
SYR
R MTOW Reversible Placard on Panel 11VU
R Figure 002
EFF :
ALL 11-31-31
Page 3
Nov 01/04
SYR
LANDING GEAR - DESCRIPTION AND OPERATION
________________________________________
1. _______
General
This subject gives the information related to the landing gear markings in
the cockpit.
EFF :
ALL 11-31-32
Page 1
May 01/98
SYR
Landing Gear Markings
Figure 001
EFF :
ALL 11-31-32
Page 2
May 01/98
SYR
NAVIGATION - DESCRIPTION AND OPERATION
______________________________________
1. _______
General
This subject gives the information related to the navigation markings in the
cockpit.
EFF :
ALL 11-31-34
Page 1
Nov 01/04
R
SYR
R Markings of the Compass Correction Cards
Figure 001
EFF :
ALL 11-31-34
Page 2
May 01/08
SYR
R Markings of the Standby Compass
Figure 002
EFF :
ALL 11-31-34
Page 3
Nov 01/04
SYR
OXYGEN - DESCRIPTION AND OPERATION
__________________________________
1. _______
General
This subject gives data relating to the oxygen markings in the cockpit.
B. Portable Oxygen
(Ref. Fig. 002)
EFF :
ALL 11-31-35
Page 1
May 01/98
SYR
R Oxygen Mask Marking
Figure 001
EFF :
ALL 11-31-35
Page 2
Nov 01/04
SYR
R Smoke Hood Marking
Figure 002
EFF :
ALL 11-31-35
Page 3
Nov 01/04
SYR
CABIN - DESCRIPTION AND OPERATION
_________________________________
1. _______
General
R This section gives data applicable to the markings and placards in the
R cabin.
R It is divided into these chapters:
R - 11-32-23-00 COMMUNICATIONS
R - 11-32-25-00 EQUIPMENT/FURNISHINGS
R - 11-32-31-00 INDICATING/RECORDING SYSTEMS
R - 11-32-38-00 WATER/WASTE
R - 11-32-52-00 DOORS
EFF :
ALL 11-32-00
Page 1
Nov 01/08
SYR
PLACARDS AND MARKINGS - DESCRIPTION AND OPERATION
_________________________________________________
1. _______
General
this subjet gives information related to the owner and manufacturer
identifications.
EFF :
ALL 11-32-11
Page 1
May 01/98
SYR
R Owner and Manufacturer Placards.
Figure 001
EFF :
ALL 11-32-11
Page 2
Nov 01/04
SYR
COMMUNICATIONS - DESCRIPTION AND OPERATION
__________________________________________
1. _______
General
This subject gives information related to the markings of the communication
system.
EFF :
ALL 11-32-23
Page 1
May 01/98
SYR
Markings of the Communication System
Figure 001
EFF :
ALL 11-32-23
Page 2
May 01/98
SYR
INTERIOR PLACARDS - DESCRIPTION AND OPERATION
_____________________________________________
1. General
_______
A. This subject gives data applicable to the markings and placards on the
equipment and furnishings in the cabin.
2. __________________
Component Location
EFF :
ALL 11-32-25
Page 1
May 01/11
SYR
R Markings of the Cabin Attendant Seats
Figure 001 (SHEET 1)
EFF :
ALL 11-32-25
Page 2
May 01/05
SYR
R Markings of the Cabin Attendant Seats
Figure 001 (SHEET 2)
EFF :
ALL 11-32-25
Page 3
May 01/05
SYR
R Markings of the Stowage Compartments and Partitions
Figure 002 (SHEET 1)
EFF :
ALL 11-32-25
Page 4
May 01/05
SYR
R Markings of the Stowage Compartments and Partitions
Figure 002 (SHEET 2)
EFF :
ALL 11-32-25
Page 5
May 01/05
SYR
R Markings of the Passenger Overhead Stowage Compartments
Figure 003 (SHEET 1)
EFF :
ALL 11-32-25
Page 6
May 01/05
SYR
R Markings of the Passenger Overhead Stowage Compartments
Figure 003 (SHEET 2)
EFF :
ALL 11-32-25
Page 7
May 01/05
SYR
Markings of the Lavatory Units
Figure 004 (SHEET 1)
R
EFF :
ALL 11-32-25
Page 8
May 01/11
SYR
Markings of the Lavatory Units
Figure 004 (SHEET 2)
R
EFF :
ALL 11-32-25
Page 9
May 01/11
SYR
Markings of the Lavatory Units
R Figure 004A (SHEET 1)
R
EFF :
001-002, 11-32-25
Page 10
May 01/11
SYR
Markings of the Lavatory Units
R Figure 004A (SHEET 2)
R
EFF :
001-002, 11-32-25
Page 11
May 01/11
SYR
Markings of the Lavatory Doors
Figure 005 (SHEET 1)
R
EFF :
ALL 11-32-25
Page 12
May 01/11
SYR
Markings of the Lavatory Doors
Figure 005 (SHEET 2)
R
EFF :
ALL 11-32-25
Page 13
May 01/11
SYR
K. Markings of the Seat Row Numbers
(Ref. Fig. 006)
EFF :
ALL 11-32-25
Page 14
May 01/11
R
SYR
INTENTIONALLY BLANK
R
11-32-25
Page 15
May 01/11
SYR
Markings of the Passenger Call and Reading-Light-Switch Panel
Figure 006 (SHEET 1)
EFF :
ALL 11-32-25
Page 16
May 01/11
R
SYR
Markings of the Passenger Call and Reading-Light-Switch Panel
Figure 006 (SHEET 2)
R
EFF :
ALL 11-32-25
Page 17
May 01/11
SYR
Markings of the Passenger Call and Reading-Light-Switch Panel
Figure 006 (SHEET 3)
EFF :
ALL 11-32-25
Page 18
May 01/11
R
SYR
Markings of the Passenger Call and Reading-Light-Switch Panel
Figure 006 (SHEET 4)
EFF :
ALL 11-32-25
Page 19
May 01/11
R
SYR
Markings for the Baby Nursing Table in Lavatory A
Figure 007
EFF :
ALL 11-32-25
Page 20
May 01/11
R
SYR
Markings for the Emergency Escape Slide, Z160
Figure 008
EFF :
ALL 11-32-25
Page 21
May 01/11
R
SYR
Placards at Door of Lavatory A
Figure 009
EFF :
ALL 11-32-25
Page 22
May 01/11
R
SYR
INDICATING/RECORDING SYSTEMS - DESCRIPTION AND OPERATION
________________________________________________________
1. _______
General
This subject gives information related to the markings of the indicating and
recording systems in the cabin.
EFF :
ALL 11-32-31
Page 1
May 01/99
SYR
R Markings of the Sockets
R Figure 001
EFF :
ALL 11-32-31
Page 2
May 01/99
SYR
Markings of the Panel 2042 VU
R Figure 002
EFF :
ALL 11-32-31
Page 3
May 01/99
SYR
Markings of the Panel 2000 VU
R Figure 003
EFF :
ALL 11-32-31
Page 4
May 01/99
SYR
Markings of the Panel 2001 VU
R Figure 004
EFF :
ALL 11-32-31
Page 5
May 01/99
SYR
Markings of the Electrical System in Lavatory A
R Figure 005
EFF :
ALL 11-32-31
Page 6
May 01/99
SYR
Markings of the Electrical System in Lavatory D.
R Figure 006
EFF :
ALL 11-32-31
Page 7
May 01/99
SYR
WATER/WASTE - DESCRIPTION AND OPERATION
_______________________________________
1. _______
General
This subject gives information related to the markings of the water system
on the cabin.
EFF :
ALL 11-32-38
Page 1
May 01/99
SYR
R Markings of the Water System
Figure 001
EFF :
ALL 11-32-38
Page 2
Feb 01/00
SYR
DOORS - DESCRIPTION AND OPERATION
_________________________________
R 1. _______
General
R This subject gives information related to the markings on the doors.
EFF :
ALL 11-32-52
Page 1
Nov 01/10
SYR
R Markings of the Passenger/Crew Doors
Figure 001 (SHEET 1)
EFF :
ALL 11-32-52
Page 2
May 01/05
SYR
R Markings of the Passenger/Crew Doors
Figure 001 (SHEET 2)
EFF :
ALL 11-32-52
Page 3
May 01/05
SYR
Markings of the Slide armed/disarmed Indication
R Figure 002
EFF :
ALL 11-32-52
Page 4
Nov 01/10
SYR
INTENTIONALLY BLANK
R
11-32-52
Page 5
Nov 01/10
SYR
Markings of the Emergency Exit Doors
R Figure 003 (SHEET 1)
EFF :
ALL 11-32-52
Page 6
Nov 01/10
SYR
Markings of the Emergency Exit Doors
R Figure 003 (SHEET 2)
EFF :
ALL 11-32-52
Page 7
Nov 01/10
SYR
Markings of the Slide Rafts
Figure 004
EFF :
ALL 11-32-52
Page 8
Nov 01/10
SYR
FUSELAGE - DESCRIPTION AND OPERATION
____________________________________
1. _______
General
This subject gives information related to the markings in the seat tracks.
EFF :
ALL 11-32-53
Page 1
Nov 01/10
SYR
R Markings in the Seat Tracks
Figure 001
EFF :
ALL 11-32-53
Page 2
Nov 01/10
SYR
ELECTRICAL POWER - DESCRIPTION AND OPERATION
____________________________________________
1. _______
General
This subject gives the informations related to the placards and markings of
the electrical power system, in the avionics compartment.
A. Markings on Battery
(Ref. Fig. 001)
EFF :
002-099, 11-33-24
Page 1
Nov 01/98
SYR
Marking on Battery Brackets
Figure 001
EFF :
002-099, 11-33-24
Page 2
Nov 01/98
SYR
OXYGEN - DESCRIPTION AND OPERATION
__________________________________
1. _______
General
This subject provides information related to the oxygen markings in the
avionics compartment.
EFF :
ALL 11-33-35
Page 1
May 01/98
SYR
R Oxygen Bottle Markings
Figure 001
EFF :
ALL 11-33-35
Page 2
Nov 01/04
SYR
LANDING GEAR - DESCRIPTION AND OPERATION
________________________________________
1. _______
General
This subject provides information concerning NLG doors markings.
EFF :
ALL 11-34-32
Page 1
May 01/98
SYR
Nose Landing Gear Doors Markings
Figure 001
EFF :
ALL 11-34-32
Page 2
May 01/98
SYR
FWD CARGO COMPARTMENT - DESCRIPTION AND OPERATION
_________________________________________________
1. _______
General
R This section gives data applicable to the markings and placards in the FWD
R cargo compartment.
R It is divided into these chapters:
R - 11-35-25-00 EQUIPMENT/FURNISHINGS
R - 11-35-38-00 WATER/WASTE
R - 11-35-53-00 FUSELAGE
EFF :
ALL 11-35-00
Page 1
Nov 01/08
SYR
EQUIPMENT/FURNISHINGS - DESCRIPTION AND OPERATION
_________________________________________________
R 1. _______
General
R This subject gives information related to the markings of the equipment and
R furnishing on the FWD cargo compartment.
R 2. __________________
Component Location
EFF :
ALL 11-35-25
Page 1
Feb 01/00
SYR
R Markings on the Left Sidewall-Lining, Z131
Figure 001 (SHEET 1)
EFF :
ALL 11-35-25
Page 2
May 01/05
SYR
R Markings on the Left Sidewall-Lining, Z131
Figure 001 (SHEET 2)
EFF :
ALL 11-35-25
Page 3
May 01/05
SYR
R Markings on the Right Sidewall-Lining, Z132
R Figure 002
EFF :
ALL 11-35-25
Page 4
Feb 01/00
SYR
R Max. Loading Height Markings on the Left Sidewall-Lining, Z131
Figure 003
EFF :
ALL 11-35-25
Page 5
May 01/05
SYR
R Max. Load Height Markings on the Right Sidewall-Lining, Z132
Figure 004
EFF :
ALL 11-35-25
Page 6
May 01/05
SYR
WATER/WASTE - DESCRIPTION AND OPERATION
_______________________________________
1. _______
General
This subject gives information related to the markings of the potable water
system.
EFF :
ALL 11-35-38
Page 1
May 01/98
SYR
Markings of the Potable Water Tank
Figure 001
EFF :
ALL 11-35-38
Page 2
May 01/98
SYR
DOORS - DESCRIPTION AND OPERATION
_________________________________
1. _______
General
This subject gives information related to the marking on the FWD cargo
compartment.
2. __________________
Component Location
EFF :
ALL 11-35-52
Page 1
Nov 01/08
SYR
Markings of the FWD Cargo-Compartment Door-Selector Access-Panel
Figure 001
EFF :
ALL 11-35-52
Page 2
Nov 01/08
SYR
FUSELAGE - DESCRIPTION AND OPERATION
____________________________________
1. _______
General
R This subject gives information related to the marking on the FWD cargo
compartment.
2. __________________
Component Location
EFF :
ALL 11-35-53
Page 1
Feb 01/00
SYR
R Markings on the FWD Cargo Compartment-Bulkhead, Z132
Figure 001
EFF :
ALL 11-35-53
Page 2
Nov 01/04
SYR
AFT CARGO COMPARTMENT - DESCRIPTION AND OPERATION
_________________________________________________
1. _______
General
R This section gives data applicable to the markings and placards in the aft
R cargo compartment.
R It is divided in to these chapters:
R - 11-36-25-00 Equipment/Furnishings
R - 11-36-53-00 Fuselage
EFF :
ALL 11-36-00
Page 1
Nov 01/08
SYR
EQUIPMENT/FURNISHINGS - DESCRIPTION AND OPERATION
_________________________________________________
R 1. _______
General
R This subject gives information related to the markings of the equipment and
R furnishings in the AFT cargo compartment.
R 2. __________________
Component Location
EFF :
ALL 11-36-25
Page 1
May 01/00
SYR
R Max. Loading Height Markings on the Left Sidewall-Lining, Z151
Figure 001
EFF :
ALL 11-36-25
Page 2
May 01/05
SYR
R Max. Loading Height Markings on the Right Sidewall-Lining, Z152
Figure 002
EFF :
ALL 11-36-25
Page 3
May 01/05
SYR
FUSELAGE - DESCRIPTION AND OPERATION
____________________________________
1. _______
General
This subject gives information related to the markings on the AFT cargo
compartment.
2. __________________
Component Location
EFF :
ALL 11-36-53
Page 1
Nov 01/04
SYR
R Markings of the AFT Cargo Compartment, Z152
Figure 001
EFF :
ALL 11-36-53
Page 2
Nov 01/04
SYR
R Markings of the BULK Cargo Compartment, Z162
Figure 002
EFF :
ALL 11-36-53
Page 3
Nov 01/04
SYR
WING, REAR FUSELAGE AND TAIL SECTIONS - DESCRIPTION AND OPERATION
_________________________________________________________________
1. General
_______
This section gives information related to the markings and placards on the
wing, the rear fuselage and tail sections.
11-37-49 - APU
EFF :
ALL 11-37-00
Page 1
May 01/98
SYR
AIR CONDITIONING - DESCRIPTION AND OPERATION
____________________________________________
1. _______
General
(Ref. Fig. 001)
This subject gives information related to the marking on the air
conditioning systems.
EFF :
ALL 11-37-21
Page 1
Aug 01/11
SYR
Marking on the Air Conditioning Systems
Figure 001
EFF :
ALL 11-37-21
Page 2
Aug 01/11
SYR
APU - DESCRIPTION AND OPERATION
_______________________________
1. _______
General
(Ref. Fig. 001, 002)
This subject gives information related to the marking on the tail section.
EFF :
ALL 11-37-49
Page 1
May 01/98
SYR
R Marking on the APU Compartment
Figure 001
EFF :
ALL 11-37-49
Page 2
Nov 01/05
SYR
Markings on the Access Door
Figure 002
EFF :
ALL 11-37-49
Page 3
May 01/98
SYR
R INTERIOR PLACARDS - DESCRIPTION AND OPERATION
_____________________________________________
EFF :
ALL 11-42-25
Page 1
Nov 01/07
SYR
R Placards at Door of Lavatory A
Figure 001
EFF :
ALL 11-42-25
Page 2
May 01/04
SYR