You are on page 1of 1

Flow chart of Methodology

The current
drainage Soil map LULC
Collecting and preparing data map DEM
map

GIS integration (sub catchment division)

SWMM installation /SWMM model setup

Perform a simulation

Thorough
Yes
Alter the depth No investigation on
Analysis of the result ;
of the conduit a conventional
is the system capable
or node, etc. drainage system
of carry stormwater?

Studying and writing a


Area inspection Comparison Implementing the
thorough report
recommendation

LID model in SWMM


Area inspection is used
using conventional
to choose and create
drainage system
LID parameters

You might also like