CCU / LIFTING SKID / CONTAINER AUDIT CHECKLIST

Date of Audit: 5/21/2023


Location of Audit: Weatherford Balikpapan

CCU/Basket/Frame (2/3/4) Leg-Sling Set Shackles Findings


MGW
No. Description Tag No. Document
(Kgs) Inspection Report No. Insp date Validity Tag No. Ø W/R WLL. Inspection Report No. Validity Tag No. WLL. Inspection Report No. Validity
Review
T 22/BP/TTS/0088 2-Mar-23 2-Mar-25
4.165
ALUMINUM V 22/BP/TTS/0088 2-Mar-23 2-Sep-23 4-166
1 1036301 1690 WK 00195-1 18 7.8 23/BP/TTS/0140 2-Sep-23 4-167 4.75 23/BP/TTS/0140 2-Sep-23
BASKET 4-137
N 2-Mar-23 2-Mar-24
22/BP/TTS/0088
Findings
Physical Conclusion