Professional Documents
Culture Documents
SL No. of SOR's
Description Total Remarks
NO. Received
1 No. of SOR received 466 466
6 Balance SOR 25 25
6 Balance SOR 55 55
Statement of BMRCL Quality SOR 3/11/2024
In House Lab
Quality lab test documents veirfied and following points observed(1). Incoming Raw material Register not
BMRC/PH2/QA/SOR/2022/ Bharath,
5 3/15/2022 maintained.(Fine aggregate,coarse aggregate .Cement,admixtures) (2). Batching plant started on 6th March for 50(5) SOR closed
NCC/005 AEE
pile concrete works, still content test, not conducted till date.(3) Incoming materials tests(Before unloading0 of fine
and coarse aggregate are not conducted.
BMRC/PH2/QA/SOR/2022/ Pile AP 666/P2 Rahul,
6 3/15/2022 50(2) SOR closed
NCC/006 Verified Pile bore log register, no signature of BMRCL Engineer and Contractor Engineer(Picture-1 & 2) AEE
BMRC/PH2/QA/SOR/2022/ Pile AP 558 Rahul,
7 3/15/2022 50(3) SOR closed
NCC/007 Welder is using E6013 electrodes instead of E8018 and Welder qualification Certificate are not available. AEE
BMRC/PH2/QA/SOR/2022/ In House Lab For information
8 3/17/2022 50 Good SOR
NCC/008 Witnessed GGBS (JSW Limited) sampling for third party testing of physical & chemical properties. only
Pile Cap AP 665
BMRC/PH2/QA/SOR/2022/ (1) Grouting of sonic tubes carried without approved mix Design.(2) Work carried out without approved method Rahul,
9 3/19/2022 50(4) SOR closed
NCC/009 statement .Method statement has not been submitted yet to quality section.(3).Third party Tests are not conducted AEE
on sonic logging tubes.
BMRC/PH2/QA/SOR/2022/ Pile AP 550-P3 For information
10 3/29/2022 50 Good SOR
NCC/010 Checked Pile cage reinforcement ,conforms to approved BBS and GFC Drawing. only
In House Lab
BMRC/PH2/QA/SOR/2022/ For information
11 3/31/2022 Witnessed routine Gradation test of fine & coarse aggregate,silt content test of fine aggregate:(1)Silt 50 Good SOR
NCC/011 only
content:8.9,9.2 %(Max.15%)
Pile AP 700-P2
BMRC/PH2/QA/SOR/2022/ For information
12 4/6/2022 Measured final depth of pile by scounding:Pile depth:30.02 m from EGL.The same is updated in the pile bore log 50 Good SOR
NCC/012 only
register.
In House Lab
BMRC/PH2/QA/SOR/2022/ For information
13 4/8/2022 Witnessed Tests on Aggregate.(1) Impact value test-AV -21.40%(Max 40 %)(2)Flakiness & Elongation index-test- 50 Good SOR
NCC/013 only
Combined index value-19.07 % (Max 40 %)
Pile Cap AP 666
BMRC/PH2/QA/SOR/2022/ Rahul,
14 4/12/2022 Cross sonic logging test done on 01.04.2022 for pile no. AP666/P4, till date result not received from third party 50(3) SOR closed
NCC/014 AEE
lab, Morover pile cap 666 concreting is completed on 11-04-2022 (Night).
In House Lab
BMRC/PH2/QA/SOR/2022/ For information
15 4/12/2022 Witnessed 28 day concrete cube test for the following piles:(1)Pile AP 555/P1.(2) Pile AP 557/P2.(3)Pile AP 50 Good SOR
NCC/015 only
652/P1.Details tabulated and concrete cube register attached
BMRC/PH2/QA/SOR/2022/ In House Lab For information
16 4/7/2022 50 Good SOR
NCC/016 Witnessed Calibration of Compression testing machine(CTM), percentage error within permissible limits only
Viaduct Initial Load Test on Piles
BMRC/PH2/QA/SOR/2022/ (1) Initial load tests are not yet conducted .However, more than 100 working piles are casted.Note:As per Rahul,
17 4/13/2022 698 50(6) SOR closed
NCC/017 Technical Specification Cluase 8.7.2-No working pile would be allowed to be undertaken till initial load tests have AEE
been satisfactory completed.
In House Lab
BMRC/PH2/QA/SOR/2022/ Permeability test for concrete is not conducted as per technical specification.Note:Total concrete consumed up to Bharath,
18 3/24/2022 50(6) SOR closed
NCC/018 now (3850 cum Approx).As per Technical Specification Clause 3.9.1:.At least two cylinders shall be made on AEE
each day's concreting until 60 cylinders have been made for each grade of concrete.
In House Lab
BMRC/PH2/QA/SOR/2022/ • Cubes are marked with serial number, date of casting, structure ID and grade of concrete. Bharath, For information
19 4/22/2022 50 Good SOR
NCC/019 • Cubes are arranged & placed in water curing tank w.r.t to the date of casting. AEE only
• Temperature controller fixed in curing tank to maintain the required temperature.
Pile AP 654-P4
BMRC/PH2/QA/SOR/2022/ Prolonged delay in the commencement of concreting after the completion of boring of pile: Rahul,
20 4/27/2022 50(2) SOR closed
NCC/020 • Pile boring completed at 12:40 am and concrete completed at 8:00 pm. AEE
• Time interval between completion of bore and placing of concrete is 19 hours 20minutes.
In House Lab
Witnessed in house lab tests on cement:
BMRC/PH2/QA/SOR/2022/ Source : Dalmia (OPC 53) & week no -18
21 5/5/2022 50(10) SOR closed
NCC/021 • Fineness of cement: 4.40 % (Average) (Max. 10%)
• Initial setting time 145 minutes (Min. 30 mins)
• Final setting time: 220 minutes (Max. 600 mins)
Pile Cap AP 665 & 666
BMRC/PH2/QA/SOR/2022/ Improper method of backfilling: Rahul,
22 5/5/2022 50(4) SOR closed
NCC/022 • Backfilling not done in 200mm thick layer. AEE
• Unapproved material used for back filling
Pile AP 571-P2
Witnessed concreting of the Pile AP 571/P2
* Slump at site: 175mm, 190mm
BMRC/PH2/QA/SOR/2022/ Rahul, For information
23 5/10/2022 * Temperature: 30.6'C, 29.2'C (Max.32'C) 50 Good SOR
NCC/023 AEE only
* Theoretical concrete quantity - 25.9 cum
* Actual concrete quantity - 26 cum
* No. of cubes casted - 15 nos (Required: 9 nos for 28 day cube test)
Pile AP664/P2
Prolonged delay in the commencemnet of concreting after the completion of boring of pile. Pile boring completed
at evening 20:50 and concrete completed at 11:00 at morning. Time interval between completion of bore and
BMRC/PH2/QA/SOR/2022/ Rahul,
29 07.06.2022 placing of concrete is 4 hours 10 minutes. 50(1) SOR closed
NCC/AirportP2/029 AEE
Pile AP 664/P4
Pile bore log register verified, polymer properties are not recorded prior to concrete pouring.
Backfilling of the foundation Pile cap carried out without the completion of curing period of pile cap.
Pile cap AP 696 : DOC - 07.06.2022
BMRC/PH2/QA/SOR/2022/ Rahul,
32 14.06.2022 Pile cap AP 697 : DOC - 07.06.2022 50(4) SOR closed
NCC/AirportP2/032 AEE
Pile cap AP 698 : DOC - 03.06.2022
Pile cap AP 699 : DOC - 03.06.2022
Witnessed 28 day sonic pipe grout cube strength test for pile no AP 702 & AP 703.
BMRC/PH2/QA/SOR/2022/ * AP 702 strength - 43.67 N/mm2 (Required : 35N/mm2) For information
36 20.06.2022 50 Good SOR
NCC/AirportP2/036 * AP 703 Strength - 43.87 N/mm2 (Required : 35N/mm2) only
* Witnessed cover block cube strength for 28 days - 62.67 N/mm2 (Required : 55 N/mm2)
Vadeyarpura Casting Yard
BMRC/PH2/QA/SOR/2022/ 15.06.2022 & Bharath,
37 Improper stacking of HDPE pipes, they are in direct contact with the ground and directly exposed to sunlight. 50(7) SOR closed
NCC/AirportP2/037 20.06.2022 AEE
(Observed for 5 days)
Pile AP 513 / P2
Concreting of the pile AP 513/P2 witnessed:
BMRC/PH2/QA/SOR/2022/ * Slump at site 195mm, 175mm, 180mm For information
39 01.07.2022 50 Good SOR
NCC/AirportP2/039 * Theoritical concret quantity - 22.5 m3 only
* Actual concrete quantity - 23.5 m3
* No. of cubes casted - 12 (Required : 9 for 28 day cube test)
Verified admisture manufacture test certificate and third party test report:
BMRC/PH2/QA/SOR/2022/ Brand: Fosroc Aura mix 400 For information
40 04.07.2022 50 Good SOR
NCC/AirportP2/040 Batch no - IN1MF00665753B only
Pictures attached.
Witnessed 28 days concrete cube strength for below mentioned structures and results are satisfactory.
* Pile AP 662/P2
BMRC/PH2/QA/SOR/2022/ * Pile AP C4/P5 For information
41 12.04.2022 50 Good SOR
NCC/AirportP2/041 * Pile AP 628/P3 only
* Pile AP C2/P1
Concrete cube register photos attached.
1. Witnessed sampling of 8mm, 10mm, 12mm, 16mm, 20mm, 25mm and 32mm dia of reinforcement TMT bar
(JSW Steel) for third party testing (physical and chemical tests) No of TMT samples 36 nos
BMRC/PH2/QA/SOR/2022/ 2. Witnessed sampling of OPC 53 grade cement (week no-27) fot third party (physical and chemical tests. For information
42 06.07.2022 50 Good SOR
NCC/AirportP2/042 only
Pictues attached of steel and cement sample card and register.
BMRC/PH2/QA/SOR/2022/ Batching Plant calibration witnessed, tolerances are found within acceptance limits. Site report and schwing stetter For information
44 07.07.2022 50 Good SOR
NCC/AirportP2/044 test report attached. only
Pile AP 671/P4
I) Pile sounding checked & verified along with the bore log register.
BMRC/PH2/QA/SOR/2022/ For information
48 28.07.2022 Depth pf pile: 30.60 from CTL. 50 Good SOR
NCC/AirportP2/048 only
COL-911.451, CTL -913.981.
II) Pile reinforcement cage length checked as per GFC drawing.
Pile Cap AP 629
DOC-30.07.2022
BMRC/PH2/QA/SOR/2022/ Rahul,
49 02.08.2022 * Back filling around the pile cap is not compared in layers of 200mm thickness 50(3) SOR closed
NCC/AirportP2/049 AEE
* Back filling carried out before completion of curing period
* Backfill material is not approved.
Pier Ap 711
BMRC/PH2/QA/SOR/2022/ Rahul, For information
50 03.08.2022 Pier reinforcement checked (No's of main vertical bars, spacing of rings, lapping), conforms to approved GFC 50 Good SOR
NCC/AirportP2/050 AEE only
drawing
Pile AP 631/P2
BMRC/PH2/QA/SOR/2022/ After excavation for pile cap, observed less number of pile vertical main reinforcement. Rahul,
51 02.08.2022 Major/Structural 50(8) SOR closed
NCC/AirportP2/051 As per drawing section 3-3. 20 no's of vertical reinforcement. AEE
At site only 10 no's provided.
BMRC/PH2/QA/SOR/2022/ Site Rahul,
52 02.08.2022 Rebar stacking not done properly, rebar laid directly on the ground surface. (Observed for 3 days) 50(3) SOR closed
NCC/AirportP2/052 AEE
In house lab
1. Witnessed sampling of OPC 53 grade week no- 30 & 31 for compatibility with admixture test.
BMRC/PH2/QA/SOR/2022/ Cement: Week no 30 - Dalmia OPC 53 grade Bharath, For information
53 04.08.2022 Week no 31 - Ultratech OPC 53 grade 50 Good SOR
NCC/AirportP2/053 AEE only
Admixture: Auramix 400, Auracast 270M
2. Witnessed sampling of concrete cubes of grade M35 & M50 for chloride content testing.
In House Lab
BMRC/PH2/QA/SOR/2022/ Bharath, For information
54 10.08.2022 Witnessed incoming material (before unloading) gradation of fine & coarse aggregates, silt content test of fine 50 Good SOR
NCC/AirportP2/054 AEE only
aggregate found ok.
Pile AP500/P3
BMRC/PH2/QA/SOR/2022/ 1) Pile sounding checked & verified along with the bore log register. Rahul, For information
55 11.08.2022 50 Good SOR
NCC/AirportP2/055 Depth of pile: 30.70 from CTL AEE only
2) Pile reinforcement cage checked, found as per GFC drawing.
Pilecap AP646
concreting of the Pilecap AP 646 witnessed:
BMRC/PH2/QA/SOR/2022/ * Slump at site : 150mm, 150mm Rahul, For information
56 22.08.2022 50 Good SOR
NCC/AirportP2/056 * Theoritical concrete quantity - 28.5m3 AEE only
* Actual concrete quantity - 29 m3
* No. of cubes casted - 12nos
In House lab
* Pile AP A07/P4
*Pile AP 508/P3
BMRC/PH2/QA/SOR/2022/ * Pile AP 674/P4 Bharath, For information
57 25.08.2022 50 Good SOR
NCC/AirportP2/057 * Pile AP 504/P3 AEE only
* Pile AP 505/P1
* Pile AP A07/P1
* Pile AP 644/P3
Pier AP 661
Concreting of the Pier AP 661 witnessed.
* Slump at site: 150mm, 155mm
BMRC/PH2/QA/SOR/2022/ Rahul, For information
60 01.09.2022 * Temperature : 30.3,31.8*C 50 Good SOR
NCC/AirportP2/060 AEE only
* Theoretical Concrete Quantity - 13.9m3
* Actual concrete quantity - 14m3
* No. of cubes casted - 12 nos
Pilecap AP 701
Improper method of backfilling carried out.
BMRC/PH2/QA/SOR/2022/ Rahul,
61 05.09.2022 * Backfilling not done in 200mm thick layer 50(1) SOR closed
NCC/AirportP2/061 AEE
* Without source of approval filling material used.
* Concrete and bitumen are used in the filling material.
Vadeyarpura Lab
Witnessed routine Gradation test of fine & coarse aggregate, silt content of fine aggregate, aggregate impact value
BMRC/PH2/QA/SOR/2022/ test and Flakiness & Elongation index test . Bharath, For information
66 09.09.2022 50 Good SOR
NCC/AirportP2/066 Silt content - 8.2% (Max 15%) AEE only
Impact value - 24.70% (Max 40%)
Combined Index value - 13.92% (max 40%)
Pilecap AP 485 P4
AP 518/P4
BMRC/PH2/QA/SOR/2022/ Rahul Thandel
72 20.09.2022 In bore log book, no details available regarding pile bore sketch, tremmie lowering details, concrete pouring details 50(7) SOR closed
NCC/AirportP2/072 AEE
and concrete quantity details.
Pier AP 696
Checked the concrete slump and temperature:
Grade of Concrete: M50
BMRC/PH2/QA/SOR/2022/ For information
73 19.09.2022 Slump: 140mm 50 Good SOR
NCC/AirportP2/073 only
Temperature : 30.00C,
Total Quantity: 13.75 cum
No. of cubes casted: 9 (Required 6 for 28 day cube test)
AP 522/P1
BMRC/PH2/QA/SOR/2022/ Rahul Thandel Complaince to be submitted from NCC.
75 20.09.2022 During the Pile concreting following points were observed. Withdrawn
NCC/AirportP2/075 AEE SOR 75 is withdrawn
* Found Polymer was mixed with concrete during the concrete.
Vadeyarpura Casting Yard
Pier AP711
Grade of concrete: M50
BMRC/PH2/QA/SOR/2022/ Bharath,
76 23.09.2022 DOC: 21.07.2022 50(10) SOR closed
NCC/AirportP2/076 AEE
Age of specimen: 60days
Average penetration: 6mm (Max.25mm)
As per DIN 1048 clause 7.8 Test shall be carried out when the age of the concrete is 28 to 35 days.
Vadeyarpura Casting Yard
BMRC/PH2/QA/SOR/2022/ Witnessed aggregate Gradation & Silt content test. Bharath, For information
77 23.09.2022 60 days 50 Good SOR
NCC/AirportP2/077 Source of Material: Besto mining AEE only
Within the limits of IS-383-2016 found okay.
AP 492/P1,P2 and P4 Piles
BMRC/PH2/QA/SOR/2022/ Development length of Pile reinforcement is lesser than required and details are mentioned below. Rahul Thandel
78 27.09.2022 50(4) SOR closed
NCC/AirportP2/078 * AP 492/P1, P2 & P4 all Rebars length found in between 390mm & 840mm against required of 1200mm as per AEE
drawing.
Pier AP 696
Checked the concrete slump and temperature
Grade of concrete: M25
BMRC/PH2/QA/SOR/2022/ ID:AP522/P2 Rahul Thandel For information
80 27.09.2022 50 Good SOR
NCC/AirportP2/080 Slump: 200mm AEE only
Temperature: 290c,
Total Quantity: 19.00 cum,
No. of cubes casted:12 (Required: 9 for 28 day cube test)
Vadeyarpura Casting yard Precast Piercap AP 852 DOC 15/09/22 AP 851 DOC 30/10/2022
BMRC/PH2/QA/SOR/2022/ 50(10) Bharath,
85 Package-3 03.10.2022 AP 852 observed Honeycomb and reinforcement in inside conical portion of the Precast Piercap SOR closed
NCC/AirportP2/085 50(1) AEE
AP 851 Piercap edges damaged both side faces.
I Girder AP 443-444
BMRC/PH2/QA/SOR/2022/ Bharath,
86 06.10.2022 HS02 Post concrete inspection of I Girder: 67(7) SOR closed
NCC/AirportP2/086 AEE
Found Honeycomb.
Pier AP 648
Witnessed Pier concrete pouring, concrete slump and temerature checked at site.
Grade of concrete: M50 Rahul Thandel
Slump at site: 150mm AEE
BMRC/PH2/QA/SOR/2022/ Temperature: 29.20c For information
91 18.10.2022 50 Good SOR
NCC/AirportP2/091 Total Qty:15.50cum only
No. of cube casted: 12 no's Bharath,
(Required no of cubes: 9 for 28 day cube test) AEE
Vadeyarpura Casting Yard
Witnessed moisture correction of Course & fine aggregates.
AP453/P2
Checked the penetration test of AP453/P2
BMRC/PH2/QA/SOR/2022/ Rahul Thandel For information
93 19.10.2022 Theoretical penetration: 106.52mm 50 Good SOR
NCC/AirportP2/093 AEE only
Actual Penetration: 60mm
Actual penetration is less than Theoretical penetration, hence considered as Hard Rock.
BMRC/PH2/QA/SOR/2022/ Vadeyarpura Casting Yard Pier Cap AP 842 Rahul Thandel For information
94 17.10.2022 50 Good SOR
NCC/AirportP2/094 Checked the Sheathing profile of Pier Cap. AEE only
BMRC/PH2/QA/SOR/2022/ Vadeyarpura Casting Yard Bharath,
95 25.10.2022 50(4) SOR closed
NCC/AirportP2/095 Top width of Pier cap is 3030mm but as per drawing it should be 3000mm. AEE
AP 520
BMRC/PH2/QA/SOR/2022/ Bharath,
97 21.10.2022 In pile cap AP520 it is observed pile development length provide only 1200mm straight reinforcement, as per GFC 50(2) SOR closed
NCC/AirportP2/097 AEE
drawing development length should be provided in L shape 1200+300mm.
Pilecap AP519
Witnessed concreting of Pile cap:
Slump: 155mm
BMRC/PH2/QA/SOR/2022/ Temperature: 28.9oC (Max.320C) Rahul Thandel For information
99 27.10.2022 50 Good SOR
NCC/AirportP2/099 Quantity: 28.0 Cum AEE only
Number of cubes casted: 12 (required: 9 for 28 day cube test)
Pile AP 516/P3
BMRC/PH2/QA/SOR/2022/ Rahul Thandel
102 01.11.2022 The development length of the pile reinforcement bars found 600mm instead of 1200mm. 50(4) SOR closed
NCC/AirportP2/102 AEE
As per the drawing 1200mm is required.
AP515
BMRC/PH2/QA/SOR/2022/ Rahul Thandel
103 02.11.2022 1. AP515/P2 pile head chipped 120mm below cut off level. 50(7) SOR closed
NCC/AirportP2/103 AEE
2. AP 515/P1 pile development is found to be 430mm & 730mm, as per GFC drawing it should be 1200mm.
AP 699 Piercap
BMRC/PH2/QA/SOR/2022/ * Reinforcement: Found ok Rahul Thandel For information
104 05.11.2022 50 Good SOR
NCC/AirportP2/104 * Sheathing profile: Found ok AEE only
* Formwork: Found ok
AP 452/P1
1. Checked sounding of pile AP452/P1 depth founf to be 9.11m.
2. Witnessed pile penetration test of AP452/P1,
* Strat time = 15:47
* End Time = 15:57
BMRC/PH2/QA/SOR/2022/ * Initial depth = 9.11m Rahul Thandel For information
105 03.11.2022 50 Good SOR
NCC/AirportP2/105 * Final depth = 9.19m AEE only
* Actual penetration = 80mm
* Theoretical penetration = 169.20mm
Actual penetration < Theoretical penetration, considered as Heard Rock.
AP 522/P1
* Found only 3 sonic pipes instead of 4 as per GFC drawing
BMRC/PH2/QA/SOR/2022/ Rahul Thandel
106 05.11.2022 * Only one pipe is grouted completely at site, however as per register 2 sonic pipe grouting is recorded as 50(9) SOR closed
NCC/AirportP2/106 AEE
completed.
* Depth of pile is not recorded in grouting register.
Vadeyarpura Lab
Witnessed 28 days cube test of
BMRC/PH2/QA/SOR/2022/ 1. Sonic tube Grout C05/P2 Bagalur station Bharath, For information
107 04.11.2022 50 Good SOR
NCC/AirportP2/107 2. M35 pile cap AP512 AEE only
3. M50 Pier AP692
Register attached.
I GirderAP 443-444/G4
Witnessed concreting of I Girder
Slump: 155mm, 160mm, 165mm
BMRC/PH2/QA/SOR/2022/ Bharath, For information
111 18.11.2022 Theoritical Qty: 25.328 cum 50 Good SOR
NCC/AirportP2/111 AEE only
Actual Qty: 26.00cum
Number of cubes casted: 21 no's (Required: 9 for 28 day cube test
Number of permeability cylinder casted: 2
Vadeyarpura Lab
BMRC/PH2/QA/SOR/2022/ Witnessed 28 days cube test & aggregate impact value test: Bharath, For information
112 19.11.2022 50 Good SOR
NCC/AirportP2/112 1. Aggregate Impact value: 23.90% (Max.45%) AEE only
2. Pier AP647 28days cube test: 63.5Mpa.
I Girder AP995-996/G01,
In post tensioned I Girder AP995-996/G01,
BMRC/PH2/QA/SOR/2022/ Bharath,
113 Package-3 24.11.2022 * HDPE Couplers are provided in curved zones. HDPE coupler joined with HDPE duct with Brown Tap & 50(10) SOR closed
NCC/AirportP2/113 AEE
Binding wire.
* Short lengths of ducts are used, whreas longer length to be used.
AP 452/P1
1. Checked Sounding of pile AP 452/P1 depth found to be 9.11m.
2. Witnessed pile penetration test of AP 452/P1,
* Start time= 15:47
BMRC/PH2/QA/SOR/2022/ * End time = 15:57 Rahul Thandel For information
114 03.11.2022 50 Good SOR
NCC/AirportP2/114 * Initial depth = 9.11m AEE only
* Final depth = 9.19m
* Actual penetration = 80mm
* Theoritical penetration = 169.20mm
Actual penetration < Theoritical penetration, considered as Hard Rock.
AP 490/P2
* Concreting of the Pile AP 490/P2 witnessed & slump checked found 200mm, & temperature found 26.2'C, 29.9
BMRC/PH2/QA/SOR/2022/ Rahul Thandel For information
115 29.11.2022 * Theoretical concrete quantity - 21.98 m3 50 Good SOR
NCC/AirportP2/115 AEE only
Actual concrete quantity - 22.5 m3
No.of cubes casted - 12no Found OK
Vadeyarpura Lab
Permeability test witnessed & found ok.
* Structure ID: AP713
* Structure: Pier Cap
* Grade : M55
BMRC/PH2/QA/SOR/2022/ Bharath, For information
117 29.11.2022 * DOC: 27-11-2022 50 Good SOR
NCC/AirportP2/117 AEE only
* Age of cube: 29 day's
* Date of test started: 25-11-2022
* Date of testing: 29-11-2022
Depth of penetration: 15mm
Permissible limit: 25..
AP 705
BMRC/PH2/QA/SOR/2022/ Rahul Thandel
118 29.11.2022 New pressure Gauge used for Temporary stressing of Pier cap frame is not calibrated from approved NABL 50(7) SOR closed
NCC/AirportP2/118 AEE
agency. Only calibration certificate given by supplier/manufacturer is present at site.
AP 446/P5
Checked sounding of Pile AP 446/P5
Liner Top level: 898.372
BMRC/PH2/QA/SOR/2022/ EGL: 897.814 Rahul Thandel For information
120 30.11.2022 50 Good SOR
NCC/AirportP2/120 COL: 895.564 AEE only
RFL: 887.652
Founding level: 886.452
Length of Pile: 12m
Bagaluru Station
In CHSL test Bagaluru Station observed
Pile A05/P4/RHS
* Pile Length: 28.00m
* Length of Sonic tube found:
BMRC/PH2/QA/SOR/2022/ Chethan Kumar
121 01.12.2022 a. 16m, 50(3) SOR closed
NCC/AirportP2/121 AEE
b. 16m,
c. Blocked,
d. 1.5m
* Date of casting: 26/09/202
* Pile Dia: 1.20m
Vadeyarpura Lab
Witnessed 28 days cube test of Pier AP 506
Date of Casting: 07.11.2022
BMRC/PH2/QA/SOR/2022/ Bharath, For information
126 05.12.2022 Date of Testing: 05.12.2022 50 Good SOR
NCC/AirportP2/126 AEE only
Age of Cubes: 28 days'
Qty. of Concrete: 13.5m3
No. of cubes casted: 9
Bagalur Station
Checked pile cap reinforcement with approved GFC and concrete of A04 Bagalur Station.
BMRC/PH2/QA/SOR/2022/ Dimension: 8700X5800X2000mm Chethan Kumar For information
129 13.12.2022 50 Good SOR
NCC/AirportP2/129 Theoretical Qty: 100.92 Cum AEE only
Actual Qty: 101 Cum
Number of cubes casted: 21 nos against required of 18 nos for 28 day cube test.
AP 517
BMRC/PH2/QA/SOR/2022/ Checked Pier concrete of AP 517 & verified with Mix-design Rahul Thandel For information
130 14.12.2022 50 Good SOR
NCC/AirportP2/130 TM-1: Slump: 165mm & Temperature: 27.8oC AEE only
TM-2: Slump: 135mm & Temperature: 27.5oC
BMRC/PH2/QA/SOR/2022/ AP 515 Rahul Thandel For information
131 15.12.2022 50 Good SOR
NCC/AirportP2/131 Checked Pier AP 515 Reinforcement with approved GFC drawing AEE only
Vadeyarpura Casting Yard
Checked the efficiency of Multi pull jack
BMRC/PH2/QA/SOR/2022/ Model: 50/200N Bharath, For information
132 16.12.2022 50 Good SOR
NCC/AirportP2/132 Capacity: 500T AEE only
Stress Ram Area: 1045.4cm2
Jack Efficiency:99.09%
AP 585-P1
Witnessed concreting works of the Pile AP-585/P1
BMRC/PH2/QA/SOR/2022/ Slump at site 190mm Rahul Thandel For information
133 28.12.2022 50 Good SOR
NCC/AirportP2/133 Theoretical concrete quantity -22.78 cum AEE only
Acutual concrete quantity - 23.0 cum
No. of cubes casted is 12 no's against required of 90 no's
Vadeyarpura Casting Yard
In Post Tension I- Girder AP 443-444/G4
DOC: 18-11-2022
Length: 28M
Date of Stressing : 17-12-2022
BMRC/PH2/QA/SOR/2022/ After completion of stage -2 stressing cracks & spalling is observed on both the end of I- Girder Bharath,
134 26.12.2022 50(21) SOR closed
NCC/AirportP2/134 AEE
In Post tension I Girder AP 443-444/G3,
DOC: 11-11-2022
Length:28M
Date of stressing: 20-12-2022
After completion of stage 1 stressing cracks & spalling is observed on both the end of I Girder.
Vadeyarpura Lab
BMRC/PH2/QA/SOR/2022/ Checked Curing Water Tank Temperature, Bharath,
138 03.01.2023 50(8) SOR closed
NCC/AirportP2/138 Tank-3-21.7oC, heater is not installed. AEE
IS-516:2.12: Curing water temperature should be maintained 27±2o C
Pile AP 585/P3
Concreting of the Pile AP 583/P3 witnessed,
Slump: 195mm, 185mm
BMRC/PH2/QA/SOR/2022/ Rahul Thandel For information
140 03.01.2023 Teperature: 23.6, 25.90C 50 Good SOR
NCC/AirportP2/140 AEE only
Theoretical Concrete Quantity-22.9m3
Actual concrete quantity-23m3
No. of cubes- 12 no's (Required: 9 for 28 day cube test)
Vadeyarpura Lab
Checked the steel MTC & report of
BMRC/PH2/QA/SOR/2022/ Invoice No: 22VJ2900372437 Bharath, For information
141 05.01.2023 50 Good SOR
NCC/AirportP2/141 Diameter: 32mm AEE only
Invoice No: 22VJ29003721118
Diameter: 20mm
AP 436
Witnessed the AP 436/P1 Pile termination,
Dia. Of Pile: 1200mm
BMRC/PH2/QA/SOR/2022/ Rahul Thandel For information
143 09.01.2023 Cut off level RL: 899.893 50 Good SOR
NCC/AirportP2/143 AEE only
Founding level RL: 888.212
Required total depth of pile from casing top RL: 14.94m
Actual total depth of pile from casing top RL: 15.15m
Vadeyarpura Lab
BMRC/PH2/QA/SOR/2022/ Checked Gradation of incoming 12.5mm Coarse Aggregate and found within the limits of IS383. Bharath, For information
144 09.01.2023 50 Good SOR
NCC/AirportP2/144 Invoice No: 2022-23/7687 AEE only
Vehicle No.: KA03AE6787
Pile AP 459
BMRC/PH2/QA/SOR/2022/ Measured development length for Pile R/F into Pile cap is lesser than required. Rahul Thandel
146 16.01.2023 50(8) SOR closed
NCC/AirportP2/146 Measured development length: 460mm & 470mm0mm. AEE
Required development length: 1200mm.
AP 435
Checked the boring Log book found, the time interval between completion of boring and placing of concrete is
BMRC/PH2/QA/SOR/2022/ within 6 hours. Rahul Thandel For information
151 18.01.2023 50 Good SOR
NCC/AirportP2/151 * AP 435/P4 completed in 3hr AEE only
* Ap 435/P2 completed in 2hr 15min
* AP 436/P2 completd in 5hr 25 min.
Quality lab
Witnessed the following lab tests:
BMRC/PH2/QA/SOR/2022/ * Aggregate Impact test: Bharath, For information
159 03.02.2023 50 Good SOR
NCC/AirportP2/159 AIV: 26.07% (max.45%) AEE only
* Aggregate Crushing test:
ACV: 25.64% (max.35%)
BMRC/PH2/QA/SOR/2022/ Pier A01 Bagalur Station Date of casting: 04.02.2023 Chethan Kumar For information
160 04.02.2023 50 Good SOR
NCC/AirportP2/160 Checked Pier Reinforcement & Formwork, found as per GFC drawing. AEE only
Quality lab
BMRC/PH2/QA/SOR/2022/ Witnessed the following lab tests: Bharath, For information
161 06.02.2023 50 Good SOR
NCC/AirportP2/161 * Gradation of coarse and fine aggregate, found as per gradation limits. AEE only
* Silt content - 7.4% (max.15%)
BMRC/PH2/QA/SOR/2022/ Pier AP 580 Date of Casting: 21.12.2022 Rahul Thandel
162 06.02.2023 Major/Structural 50(20) SOR closed
NCC/AirportP2/162 Found gap of width 8mm & 10mm at joint of Pier starter & Pier. AEE
BMRC/PH2/QA/SOR/2022/ Pier C01 Jakkur Station Date of Casting 11.02.2023 Chethan Kumar
172 11.02.2023 50(13) SOR closed
NCC/AirportP2/172 During concreting of Pier, RFI of reinforcement inspection is not cleared. AEE
Pile AP 593/P2
BMRC/PH2/QA/SOR/2022/ Rahul Thandel
173 10.02.2023 * Concreting of pile is found at 570mm below Pile Cap PCC. 67(7) SOR closed
NCC/AirportP2/173 AEE
* Concrete quantity (Upyo CTL): Theoretical: 24.13 cum, Actual: 28 cum
Pile AP471/P1
witnessed pile concreting checked slump, temperature & verified Batch sheet with mix design.
* Grade of concrete : M35
BMRC/PH2/QA/SOR/2022/ Rahul Thandel For information
174 21.02.2023 * Dia. Of Pile: 1000mm, length of pile:22.72m 50 Good SOR
NCC/AirportP2/174 AEE only
Quantity of concrete: Theoretical: 17.33 cum Actual: 17.50cum,
* Slump at site: 190, 180, 190mm
* Temperature: 27.3, 28.9, 26.50C (Max. 320C) Number of cubes casted: 12 (Required: 9 for 28 day cube test)
BMRC/PH2/QA/SOR/2022/ Pile AP 604/P3 LHS Pile sounding checked. Rahul Thandel For information
200 21.03.2023 50 Good SOR
NCC/AirportP2/200 Depth of Pile found to be 30.40m from CTL. The same is recorded in bore log register. AEE only
Pile AP422/P3
1. Pile depth by sounding checked and mentioned same in the bore log register.
BMRC/PH2/QA/SOR/2022/ Rahul Thandel For information
206 23.03.2023 Depth of pile: 9.092m from cut off level. 50 Good SOR
NCC/AirportP2/206 AEE only
Dia of the pile:1.2m
2. Pile reinforcement cage length checked and found as per GFC drawing.
Pile AP 594/P1
1. Pile depth by sounding checked and mentioned same in the bore log register.
BMRC/PH2/QA/SOR/2022/ Depth of Pile: 14.48m from Cut off level. Rahul Thandel For information
214 05.04.2023 50 Good SOR
NCC/AirportP2/214 Dia of the pile: 1000mm AEE only
2. Pile reinforcement cage length checked and found as per GFC drawing.
Reinforcement cage length: 15.69m.
Pile AP594/P4
Witnessed pile penetration test;
* Dia of pile : 1000mm
* Pile cut off level: 892.54m
BMRC/PH2/QA/SOR/2022/ Rahul Thandel For information
216 08.04.2023 * Liner top level: 895.276m 50 Good SOR
NCC/AirportP2/216 AEE only
* Founding level: 879.146m
* Theoretical penetration: 174.05mm
* Actual Penetration: 100.00mm
P.actual < P. theoretical hence considered as hard rock.
Quality lab
* Gradation of coarse and fine aggregates, found as per gradation limits
Witnessed the following lab tests:
* Aggregate Impact test:
BMRC/PH2/QA/SOR/2022/ AIV: 24.83% (max.45%) Bharath, For information
219 10.04.2023 50 Good SOR
NCC/AirportP2/219 * Aggregate Crushing test: AEE only
ACV: 25.50% (max.30%)
* Flakiness index: 6.08% Elongation index:8.68%
Combined index- 14.76% (Max 40%)
* Silt content - 7.30% (Max.15%)
AP 642/05 Pile
BMRC/PH2/QA/SOR/2022/ Rahul Thandel
224 13.04.2023 50(12) SOR closed
NCC/AirportP2/224 AEE
Pile concrete chipped 235mm below from cut off level.
Pile AP 596/P3 LHS
BMRC/PH2/QA/SOR/2022/ Witnessed Pile concreting, Rahul Thandel
225 15.04.2023 50(16) SOR closed
NCC/AirportP2/225 * Pile terminated at 23:50 and concrete pouring completed at 12:20 AEE
Total time taken to complete activity: 11 hours 30 mins
Quality lab
Witnessed Permeabilityfor Pier cap concrete cylinder.
* Grade : M50
BMRC/PH2/QA/SOR/2022/ * Structure : Pier Bharath, For information
226 17.04.2023 50 Good SOR
NCC/AirportP2/226 * Structure ID : A06 / 14.03.2023 AEE only
* Testing Start date: 13.04.2023
* Age of Cylinder: 30 days
* Average depth of penetration: 14.5mm (Max.25mm)
Quality lab
Witnessed the following lab tests:
* Gradation of coarse and fine aggregates, found as per gradation limits
BMRC/PH2/QA/SOR/2022/ * Aggregate Impact test: Bharath, For information
228 17.04.2023 50 Good SOR
NCC/AirportP2/228 AIV: 25.19% (max.45%) AEE only
* Aggregate Crushing test:
ACV: 27.44% (max.30%)
* Silt content - 8.8% (Max.15%)
AP 466 Pile Group
BMRC/PH2/QA/SOR/2022/ Rahul Thandel
229 19.04.2023 Found Accululation of Sewage water on Pile group . 50(15) SOR closed
NCC/AirportP2/229 AEE
Observed from 11.04.2023 to 19.04.2023
Casting Yard Mechanical Coupler work Shop
BMRC/PH2/QA/SOR/2022/ Bharath,
230 28.04.2023 1. There are no guages available to check the threading of rebar. 50(15) SOR closed
NCC/AirportP2/230 AEE
2. There is no register maintained for checking the threading of rebar through 'Go' and 'No Go'
Pier cap AP822
BMRC/PH2/QA/SOR/2022/ Bharath, For information
231 Package-3 18.04.2023 1. Pier cap reinforcement checked 50 Good SOR
NCC/AirportP2/231 AEE only
2. Checked Pier cap profiling found as per the GFC drawing.
Head Office
Rahul Thandel
BMRC/PH2/QA/SOR/2022/ Verified cube registers for the month of March 2023, 28 day compressive strength is lesser than required for the
233 50(11) AEE & SOR closed
NCC/AirportP2/233 following structres.
Bharath AEE
Pier Starter AP 676 & Pier cap AP521
Pile AP 469/P7
Pile boring log register verified:
BMRC/PH2/QA/SOR/2022/ Rahul Thandel
244 08.05.2023 Prolonged delay in the commencement of concrete after completion of boring. 50(18) SOR closed
NCC/AirportP2/244 AEE
* Pile boring completed at 04:35AM on 05.05.2023
* Concrete pouring completed at 05:45PM on 05.05.2023
Pier Cap AP 756
BMRC/PH2/QA/SOR/2022/ 1. Pier cap reinforcement checked (No;s of main bars, spacing and lapping), conforms to approved GFC drawing. Bharath, For information
245 09.05.2023 50 Good SOR
NCC/AirportP2/245 And Pier cap form work checked. AEE only
2. Checked Pier cap profiling found as per the GFC drawing.
Quality Lab
Verified MTC and third party reports of steel:
BMRC/PH2/QA/SOR/2022/ Bharath,
246 11.05.2023 Sampling and testing - one test done for each heat number instead of every 10 tonnes. Details tabulated. 50(14) SOR closed
NCC/AirportP2/246 AEE
Grade of the Steel: Fe550D
Brand: JSW Steel ltd.
AP 698 Pier Cap
BMRC/PH2/QA/SOR/2022/ Bharath, For information
247 09.05.2023 Witnessed the stressing of Post-Tension Pier cap. Stage-1 (Cable no 3,4,5&6). 50 Good SOR
NCC/AirportP2/247 AEE only
Checked the calibration reports of stressing apparatus, found calibrated & within the due dates.
Yelahanka Station
Expired cement bags are found in store room.
BMRC/PH2/QA/SOR/2022/ Cement Brand: Ultratech-OPC 53 grade, Karthick.S
248 12.05.2023 50(18) SOR closed
NCC/AirportP2/248 Cement Invoice date: 05.02.2023 AE/Quality
Week no: 06
Total stock at store room: 313 bags.
Pile AP 468/P1
1. Pile depth by sounding checked and mentioned same in the bore log register.
BMRC/PH2/QA/SOR/2022/ Depth of Pile: 12.98 from casing Top level Rahul Thandel For information
250 15.05.2023 50 Good SOR
NCC/AirportP2/250 Depth of Pile: 9.3m from cut off level AEE only
Dia of the Pile: 1200mm.
2. Pile reinforcement casge length checked and found as per GFC drawing. Reinforcement cage length: 10.5 m
AP 674/P3
BMRC/PH2/QA/SOR/2022/ Rahul Thandel
251 13.05.2023 Sonic testing witnessed for Pile AP 674/03. 50(7) SOR closed
NCC/AirportP2/251 AEE
Pile length from cut off level: 28mtr.
Test conducted in 3 tubes: 18.0 mtrs.
BMRC/PH2/QA/SOR/2022/ Quality lab Bharath, For information
252 15.05.2023 50 Good SOR
NCC/AirportP2/252 Witnessed concrete cube compressive test, details tabulated. AEE only
AP 620/P1
BMRC/PH2/QA/SOR/2022/ Development length of pile at site found 300 to 600mm instead of 1150mm. Rahul Thandel
253 17.05.2023 50(15) SOR closed
NCC/AirportP2/253 As per drawing Ld= 46D AEE
Where D= dia of bar-25mm
Pile Cap AP 631
BMRC/PH2/QA/SOR/2022/ Rahul Thandel
254 17.05.2023 Pier reinforcement coupler is not fixed evenly at top and bottom bar. Most of the reinforcement bars 5 mm to 10 50(19) SOR closed
NCC/AirportP2/254 AEE
mm gap observed between top bar to bottom bar.
BMRC/PH2/QA/SOR/2022/ Quality Lab Bharath, For information
255 19.05.2023 50 Good SOR
NCC/AirportP2/255 Verified MTC and Third party reports of admixture, test results are within the limits. AEE only
BMRCL Office Phase 2B Pkg-02
Verified Pile intergrity test reports.
Total scope: 561 No's
BMRC/PH2/QA/SOR/2022/ For information
256 23.05.2023 Total Pile cap completed as on 22.05.2023: 212 no's 50 Good SOR
NCC/AirportP2/256 only
Total PIT Tests conducted as on 22.05.2023: 220 no's
Note: As per the technical specification clause 8.7.10: One number of Intergrity test shall be carried out per each
group of piles.
BMRC/PH2/QA/SOR/2022/ Quality Lab Bharath, For information
257 23.05.2023 50 Good SOR
NCC/AirportP2/257 Witnessed concrete cube compressive test, details tabulated. AEE only
AP 586/P4 Routine Vertical Pile load test
Witnessed Routine Vertical Pile load test, observed calibration date and certificate issue date mismatched in
BMRC/PH2/QA/SOR/2022/ pressure cage calibration test repot. Rahul Thandel
258 23.05.2023 50(16) SOR closed
NCC/AirportP2/258 Calibrated on: 16.02.20233 AEE
Date of issue: 11.02.2023
Calibration agency: Ultra Cal
Testing agency: M/s Struct Geotech research laboratories pvt ltd.
AP 604/P1
BMRC/PH2/QA/SOR/2022/ Rahul Thandel
259 25.05.2023 The development length of Pile reinforcement is lesser than required. 50(19) SOR closed
NCC/AirportP2/259 AEE
Development length at site: 280 to 620mm (Required: 1200mm)
Quality lab
Witnessed Permeability test:
* Grade : M50
BMRC/PH2/QA/SOR/2022/ * Structure : Pier Bharath, For information
260 26.05.2023 50 Good SOR
NCC/AirportP2/260 * Structure ID : AP 637, DOC: 24.04.2023 AEE only
* Testing Start date: 22.05.2023
* Age of Cylinder: 28 days
* Average depth of penetration: 11.5mm (Max.25mm)
BMRC/PH2/QA/SOR/2022/ Pile Cap AP 676 RHS Rahul Thandel For information
261 25.05.2023 50 Good SOR
NCC/AirportP2/261 Pile Cap reinforcement checked, reinforcement found as per the GFC drawing. AEE only
Pier AP 673 LHS
Witnessed Pier concreting,slump, Temperature & verified Batch sheet with approved Mix design.
* Grade of concrete: M50
BMRC/PH2/QA/SOR/2022/ Rahul Thandel For information
262 01.06.2023 * Quantity of concrete: Theoretical: 37.10 Cum Actual: 37.50 Cum, 50 Good SOR
NCC/AirportP2/262 AEE only
* Slump at site: 150 & 145mm
* Temperature: 31.4 & 31.60C (Max.320C)
* Number of cubes Casted: 15 (Required: 12 for 28 dy cube test)
Pile AP 671/P8
1. Pile depth by sounding checked and mentioned same in the bore log register.
BMRC/PH2/QA/SOR/2022/ Depth of Pile: 31.4m from casing top level Rahul Thandel For information
263 02.06.2023 50 Good SOR
NCC/AirportP2/263 Depth of Pile: 28.0 from cut off level AEE only
Dia of the Pile: 1200mm
2. Pile reinforcement cage length checked and found as per GFC drawing. reinforcement cage length:29.2m
Pile AP 615/P5
Witnessed Pile concreting, slump, Temperature & verified Batch sheet with approved Mix design.
* Grade of concrete: M35
BMRC/PH2/QA/SOR/2022/ Rahul Thandel For information
270 13.06.2023 * Quantity of concrete: Theoretical 28.5 Cum, Actual: 30.0 Cum 50 Good SOR
NCC/AirportP2/270 AEE only
* Slump at site: 190, 195 & 185mm
* Temperature: 31.1, 30.6 & 31.9oC (Max.320C)
* Number of cubes Casted: 12 (Required: 09 for 28 days cube test)
Pile AP 524/03
Witnessed pile penetration test;
* Dia of pile : 1000mm
* Pile cut off level: 908.344m
BMRC/PH2/QA/SOR/2022/ Rahul Thandel For information
277 16.06.2023 * Liner top level: 911.325m 50 Good SOR
NCC/AirportP2/277 AEE only
* Founding level: 889.105m
* Theoretical penetration: 170.01 mm
* Actual Penetration: 140mm
P.actual < P. theoretical hence considered as hard rock.
Pier cap AP 36
BMRC/PH2/QA/SOR/2022/ Bharath, For information
278 Package-1 20.06.2023 Pier cap reinforcement checked (No's of main bars, spacing and lapping), conforms to approved GFC drawing. 50 Good SOR
NCC/AirportP2/278 AEE only
And Pier cap form work checked.
BMRC/PH2/QA/SOR/2022/ U Girder AP 701-702 RHS Bharath,
279 19.06.2023 50(25) SOR closed
NCC/AirportP2/279 Observed erected U Girder edges damaged and reinforceemnt exposed at near shear key portion. AEE
BMRC/PH2/QA/SOR/2022/ Quality lab Bharath, For information
280 20.06.2023 50 Good SOR
NCC/AirportP2/280 Witnessed concrete cube comressive test, details tabulated. AEE only
BMRC/PH2/QA/SOR/2022/ Witnessed Pier concreting, checked slump, temperature & verified Batch sheet with approved mix design. Bharath, For information
286 04.07.2023 50 Good SOR
NCC/AirportP2/286 AEE only
Note: Slump at batching plant is 185mm at 10.48am and for the same vehicle slump at site was 230mm (collapse)
at 11.26am. Again, slump was checked at 12:06 pm found 195mm, concrete TM has been rejected.
Pile AP 472-P3
Witnessed Pile concreting, slump, Temperature & verified Batch sheet with approved Mix design.
* Grade of concrete: M35
BMRC/PH2/QA/SOR/2022/ Rahul Thandel For information
287 02.07.2023 * Quantity of concrete: Theoretical 29.5 Cum, Actual: 31.0 Cum 50 Good SOR
NCC/AirportP2/287 AEE only
* Slump at site: 190, 195 & 195mm
* Temperature: 28.3, 28.9 & 29.30C (Max.320C)
* Number of cubes Casted: 15 (Required: 12 for 28 days cube test)
Batching Plant
BMRC/PH2/QA/SOR/2022/ Bharath, For information
288 03.07.2023 Witnessed batching plant calibration, the error percentage of aggregates, cement, water and admixture found within 50 Good SOR
NCC/AirportP2/288 AEE only
acceptable limits.
Pier AP 590
Witnessed Pier concreting,slump, Temperature & verified Batch sheet with approved Mix design.
* Grade of concrete: M50
BMRC/PH2/QA/SOR/2022/ Rahul Thandel For information
289 06.07.2023 * Quantity of concrete: Theoretical: 17.97 Cum Actual: 19 Cum, 50 Good SOR
NCC/AirportP2/289 AEE only
* Slump at site: 150 & 150 mm
* Temperature: 30.5, 30.80C (Max.320C)
* Number of cubes Casted: 12 (Required: 09 for 28 dy cube test)
BMRC/PH2/QA/SOR/2022/ Quality Lab Bharath, For information
290 05.07.2023 50 Good SOR
NCC/AirportP2/290 Witnessed concrete cube compressive test, details tabulated. AEE only
Bagalur Station C01 to C08
BMRC/PH2/QA/SOR/2022/ 50(16) Chethan Kumar
291 05.07.2023 Crash Barrier reinforcements are covered with back filling soil. Concrete blocks placed and cribs erected above SOR closed SOR closure sheet is in 50(25)
NCC/AirportP2/291 50(25) AEE
crash barrier reinforcement (C07, C06, C05, C04 & C02)
BMRC/PH2/QA/SOR/2022/ Pier AP 643 Rahul Thandel
292 07.07.2023 67(14) SOR closed
NCC/AirportP2/292 Pier reinforcement checked, observed coupler (Lapping) provided beyond the lapping zone. AEE
BMRC/PH2/QA/SOR/2022/ Quality Lab Bharath,
293 10.07.2023 50(28) SOR closed
NCC/AirportP2/293 Verified frequency of internal audits conducted at site, details are tabulated. AEE
In House Quality Lab Curing tank:
1. Found 12 concrete cubes without ID marking in curing tank.
BMRC/PH2/QA/SOR/2022/ 2. Ap 692 pedestal extra 6 cubes found in tank M55 grade. Bharath,
294 06.07.2023 50(17) SOR closed
NCC/AirportP2/294 3. Ap 675 Poier started extra 3 cubes found in tank M50 garde. AEE
4. Ap 632 Pier Crash barrier extra 3 cubes found in tank M35 grade.
5. Found 18 grout cubes without ID marking in curing tank.
BMRC/PH2/QA/SOR/2022/ Vadeyarpura Casting Yard Store Bharath, For information
295 10.07.2023 50 Good SOR
NCC/AirportP2/295 Verified incoming material anchor cone manufacturer certificaye found OK AEE only
Pile AP 541/P3
Pile depth by sounding checked and mentioned same in the bore log register.
BMRC/PH2/QA/SOR/2022/ Rahul Thandel For information
296 11.07.2023 Depth of Pile: 22.96m from casing top level. 50 Good SOR
NCC/AirportP2/296 AEE only
Depth of Pile: 20.29m from cut off level.
Dia of the Pile: 1000mm.
BMRC/PH2/QA/SOR/2022/ Quality lab Bharath, For information
297 11.07.2023 50 Good SOR
NCC/AirportP2/297 Witnessed concrete cube compressive test, details tabulated. AEE only
Pile AP 535-P1
During the site visit for pile concrete witness, it was observed pile terminated on 11.07.2023, terminated depth
BMRC/PH2/QA/SOR/2022/ 28.52m from casing top level and before concreting on 12.07.2023 15:27 pile depth re-checked found 27.2m from Rahul Thandel
298 12.07.2023 50(24) SOR closed
NCC/AirportP2/298 casing top level. AEE
Around 1.3m less from required depth.
Dia. of the pile: 1000m.
Near 606
BMRC/PH2/QA/SOR/2022/ Improper stacking of Pile cap reinforcement at site, reinforcement is exposed to rain, moist air, sunlight and in Rahul Thandel
299 12.07.2023 50(17) SOR closed
NCC/AirportP2/299 contact with ground surface mud and water. AEE
Observation period: 06.07.2023 to 11.07.2023.
Yelahanka A08/P6
BMRC/PH2/QA/SOR/2022/ Pile concrete built up inspected and found Chethan Kumar
300 14.07.2023 50(12) SOR closed
NCC/AirportP2/300 * Unsound and soil mixed concrete in the pile built up AEE
* Only 400mm instead of required 1000mm sound concrete from cut off level.
BMRC/PH2/QA/SOR/2022/ Quality lab Bharath,
301 15.07.2023 67(17) SOR closed
NCC/AirportP2/301 Witnessed cube testing, observed AP647 pedestal 28 days compressive strength is lesser than required. AEE
Quality Lab
Witnessed the following lab tests:
* Gradation of coarse and fine aggregates, found as per gradation limits.
* Aggregate Impact test:
AIV: 26.50% (max.45%)
BMRC/PH2/QA/SOR/2022/ Bharath, For information
303 17.07.2023 * Aggregate impact test: 50 Good SOR
NCC/AirportP2/303 AEE only
ACV:26.08% (Max. 30%)
* Flakiness and elongation index:
Flakiness index:6.13%, Elongation index: 9.76%
Combined index-15.89% (Max.40%)
* Silt Content-8.2% (Max.15% accordingly)
Pile AP 539/P2
Witnessed Pile concreting, slump, Temperature & verified Batch sheet with approved Mix design.
* Grade of concrete: M35
BMRC/PH2/QA/SOR/2022/ Rahul Thandel For information
320 09.08.2023 * Quantity of concrete: Theoretical 16.6 Cum, Actual: 17.5 Cum 50 Good SOR
NCC/AirportP2/320 AEE only
* Slump at site: 195, 185mm
* Temperature: 29.1, 28.5 (Max.320C)
* Number of cubes Casted: 15 (Required: 09 for 28 days cube test)
Portal Beam A06-C06 Concourse level Bag Stn
BMRC/PH2/QA/SOR/2022/ Chethan Kumar For information
321 17.08.2023 Portal beam reinforcement checked, No's of main bars, distribution bars, spacing & pedestal reinforcement 50 Good SOR
NCC/AirportP2/321 AEE only
confirms to approved GFC drawing.
Pier AP 421
BMRC/PH2/QA/SOR/2022/ Rahul Thandel For information
325 18.08.2023 Pier reinforcement checked No's of main bars, rings spacing & rings lapping confirms to approved GFC drawing. 50 Good SOR
NCC/AirportP2/325 AEE only
Reference drawing no: DDC-BMRCL-PH2A&2B-S2-P2-HBRKIA-VIA-DD-DWG-202119A1
Pier AP 421A
During the site visit, it is observed AP 421A is not as per GFCD. Eccentricity as per GFCD: 0.245m, however it is
BMRC/PH2/QA/SOR/2022/ casted with zero eccentricity. Rahul Thandel
326 18.08.2023 Major/Structural 50(14) SOR closed
NCC/AirportP2/326 AEE
Drawing no, issued on 31.07.2023: DDC-BMRCL-PH2A&2B-S2-P2-HBRKIA-VIA-DD-DWG-202074C
Pier date of casting: 13.08.2023
Pile AP 442/P1 File sent to HO on 24.02.2024
BMRC/PH2/QA/SOR/2022/ Rahul Thandel
327 21.08.2023 Found unsound and soil mixed concrete more than 1000 mm below from cut off level. 50(22) Open Returned back with comments handed over to
NCC/AirportP2/327 AEE
Date of casting: 21.12.2022 EE via
Pier cap AP 540
Witnessed Pier concreting, checked slump, temperature & verified batch sheet with Mix design.
* Grade of concrete: M35
BMRC/PH2/QA/SOR/2022/ Bharath, For information
328 19.08.2023 * Quantity of concrete: Theoretical 25.8 Cum, Actual: 26.0 Cum 50 Good SOR
NCC/AirportP2/328 AEE only
* Slump at site: 145, 170 & 165mm
* Temperature: 30.1, 30.7 & 31.5oC (Max.320C)
* Number of cubes Casted: 18 (Required: 09 for 28 days cube test)
Pile AP 606/P3 RHS
BMRC/PH2/QA/SOR/2022/ Rahul Thandel
329 24.08.2023 Pile boring log register verified: prolonged delay in the commencement of concreting after the completion of Open
NCC/AirportP2/329 AEE
boring of Pile.
Pile cage reinforcement AP 481/P1 RHS
BMRC/PH2/QA/SOR/2022/ Spacer bar used in Pile cage is not as per GFCD (No. DDC-BMRCL-PH2A&2B-S2-P2-HBRKIA-VIA-DD-DWG- Rahul Thandel
330 23.08.2023 67(15) SOR closed
NCC/AirportP2/330 PP-201052) AEE
* Spacer bar used: 20 mm dia (required: 25 mm dia)
Pile AP 418/1, 418/2, 418/3, 419/3 & 419/4
BMRC/PH2/QA/SOR/2022/ Rahul Thandel
331 28.08.2023 50(21) SOR closed
NCC/AirportP2/331 AEE
Pile concrete chipped below cut off level.
PSC Pier cap AP 546
BMRC/PH2/QA/SOR/2022/ Rahul Thandel For information
332 31.08.2023 50 Good SOR
NCC/AirportP2/332 AEE only
Pier cap reinforcement checked and Piercap profiling found as per the GFC drawing
BMRC/PH2/QA/SOR/2022/ Pile cap AP 602 RHS & AP 603 RHS Rahul Thandel
333 30.08.2023 50(19) SOR closed
NCC/AirportP2/333 Pile cap back filling done in single layer with unwanted materials/boulders. Without completion of curing period. AEE
Pier 2nd Lift AP 634
Witnessed Pier concreting, checked slump, temperature & verified batch sheet with Mix design.
* Grade of concrete: M50
BMRC/PH2/QA/SOR/2022/ Rahul Thandel For information
334 05.09.2023 * Quantity of concrete: Theoretical 32.02 Cum, Actual: 33 Cum 50 Good SOR
NCC/AirportP2/334 AEE only
* Slump at site: 135, 145 mm
* Temperature: 29.9, & 29.5oC (Max.320C)
* Number of cubes Casted: 18 (Required: 12 for 28 days cube test)
I Girder AP 444-445-G2
BMRC/PH2/QA/SOR/2022/ During post concrete inspection of I Girder. Observed Honey comb at bottom of the web (KR Puram side) and side Bharath,
335 05.09.2023 50(19) SOR closed
NCC/AirportP2/335 face hunch portion of I Girder. AEE
Date of casting - 28.08.2023
BMRC/PH2/QA/SOR/2022/ PSC Pier cap type-2 AP 909 Bharath, For information
336 Package-3 05.09.2023 50 Good SOR
NCC/AirportP2/336 Checked the cable profile of post tension Pier cap cables and are within the tolerance limits of 3mm AEE only
BMRC/PH2/QA/SOR/2022/ Pile AP 438/P2 Rahul Thandel
337 05.09.2023 50(17) SOR closed
NCC/AirportP2/337 Development length of Pile reinforcement into he Pile cap is not provided as per drawing. AEE
BMRC/PH2/QA/SOR/2022/ I Girder AP 444-445-G3 Bharath,
338 05.09.2023 50(11) SOR closed
NCC/AirportP2/338 After completion of Stage 1 stressing cracking and spalling is observed on live end of the I Girder. AEE
BMRC/PH2/QA/SOR/2022/ AP 603 LHS Pier Rahul Thandel
339 08.09.2023 50(19) SOR closed
NCC/AirportP2/339 Checked the Pier post concrete, Slurry & Honey comb observed. AEE
AP 606/P2 RHS
BMRC/PH2/QA/SOR/2022/ Rahul Thandel
340 08.09.2023 Pile boring log register verified: prolonged delay in the commencement of concreting after the completion of 50(18) SOR closed
NCC/AirportP2/340 AEE
boring of pile.
AP 462/P3
BMRC/PH2/QA/SOR/2022/ Rahul Thandel For information
342 11.09.2023 Witnessed the Pile termination 50 Good SOR
NCC/AirportP2/342 AEE only
Dia of Pile: 1200mm
AP 444-445/G4 I Girder
BMRC/PH2/QA/SOR/2022/ Bharath,
343 11.09.2023 After completion of stage 1 stressing, down stand side faces and bottom portionh damaged at live end of the I 50(14) SOR closed
NCC/AirportP2/343 AEE
Girder.
Quality lab
Witnessed the following routine, coarse and weekly materials lab tests:
* Gradation of coarse and fine aggregates, found as per gradation limits.
BMRC/PH2/QA/SOR/2022/ Bharath, For information
345 14.09.2023 * Aggregate Impact test: AIV:24.24% (max. 45%) 50 Good SOR
NCC/AirportP2/345 AEE only
* Flakiness and elongation index: 11.02%
* Flakiness index: 6.3% elongation index: 11.02%
* Combined index-17.32% (max 40%)
AP 438
BMRC/PH2/QA/SOR/2022/ Rahul Thandel
349 16.09.2023 Pile cap - 438 reinforcement checked, observed that distance measured from Pile cap shutter to Pier outer surface is Open
NCC/AirportP2/349 AEE
1.2 mtr towards (NHAI Side) and 2.2 mtr towards (Service road side) in transverse direction.
I Girder 618-619/G2
Witnessed I Girder 618-619/G2 concreting, checked slump, temperature & verified batch sheet with approved mix
design.
BMRC/PH2/QA/SOR/2022/ * Grade of concrete: M55 Bharath, For information
360 07.10.2023 50 Good SOR
NCC/AirportP2/360 * Quantity of concrete: Theoretical: 24.75 cum Actual: 25.5 cum, AEE only
* Slump at site: 180, 150mm
* Temperature 31.6 & 31.40C (Max.320C)
* Number of cubes casted: 18 (Required: 9 for 28 day cube test)
Pile AP 471/P2
BMRC/PH2/QA/SOR/2022/ Rahul Thandel
367 13.10.2023 Development length of Pile reinforcement into the Pile cap is not provided as per drawing. 50(22) SOR closed
NCC/AirportP2/367 AEE
AP 471/P52 Length provided at site-330mm and 400mm (required 1200mm as per GFC) from cut off level.
Pile AP 610/P3
BMRC/PH2/QA/SOR/2022/ Witnessed the Pile termination, Rahul Thandel For information
368 13.10.2023 50 Good SOR
NCC/AirportP2/368 Dia. Of Pile: 1200mm AEE only
Depth of Pile from CTL RL:29.2 mtr, the same is recorded in pile boring register
BMRC/PH2/QA/SOR/2022/ Pier AP 569, AP 601R, AP600L & AP 548 Rahul Thandel
369 16.10.2023 Major/Structural 50(25) SOR closed
NCC/AirportP2/369 Pier construction is not followed as per procedure order. AEE
I Girder AP 619-620/G1
BMRC/PH2/QA/SOR/2022/ Bharath,
371 25.10.2023 Major Observed Hoenycomb at downstand of live end and side face of I Girder. 50(26) SOR closed
NCC/AirportP2/371 AEE
Date of casting - 16.10.2023
AP Pier 535
Witnessed Pier concreting, checked slump, temperature & verified batch sheet with Mix design.
* Grade of concrete: M50
BMRC/PH2/QA/SOR/2022/ Rahul Thandel For information
373 03.11.2023 * Quantity of concrete: Theoretical 13.45 Cum, Actual: 14.5 Cum 50 Good SOR
NCC/AirportP2/373 AEE only
* Slump at site: 160, 150 mm
* Temperature: 29.5, & 30.3oC (Max.320C)
* Number of cubes Casted: 18 (Required: 9 for 28 days cube test)
BMRC/PH2/QA/SOR/2022/ Jakkur Station A08, A04, A03 & A02 Chethan Kumar
379 07.11.2023 50(18) SOR closed
NCC/AirportP2/379 Main pier reinforcement of pier is exposed more than 8 to 10 months and rusting has begun. AEE
Span AP 713-712
Following observations were made during bearing inspection
* AP 713-712 UP-A (Gap in b/w Bearing to pedestal -3mm and Bearing to wedge plate - 1mm)
BMRC/PH2/QA/SOR/2022/ * AP 713-712 UP-C (Gap in b/w Bearing to pedestal -4mm) Bharath,
406 11.12.2023 50(32) Open File sent to HO on 15.03.2024
NCC/AirportP2/406 * AP 713-712 UP-D (Gap in b/w Bearing to wedge plate -2mm) AEE
* AP 713-712 DN-B (Gap in b/w Bearing to pedestal -1mm)
* AP 713-712 DN-C (Gap in b/w Bearing to pedestal -2mm and 4mm)
* AP 713-712 DN-D (Gap in b/w Bearing to pedestal -1mm)
Span AP 712-711
Following observations were made during bearing inspection
* AP 712-711 UP-A (Gap in b/w Bearing to pedestal -2mm and Bearing to wedge plate - 1mm)
BMRC/PH2/QA/SOR/2022/ * AP 712-711 UP-C (Gap in b/w Bearing to pedestal -4mm) Bharath,
407 11.12.2023 50(32) Open File sent to HO on 15.03.2024
NCC/AirportP2/407 * AP 712-711 UP-D (Gap in b/w Bearing to pedestal -3mm) AEE
* AP 712-711 DN-B (Gap in b/w Bearing to pedestal -3mm and bearing to wedge plate -1mm)
* AP 712-711 DN-C (Gap in b/w Bearing to pedestal -2mm)
* AP 712-711 DN-D (Gap in b/w Bearing to pedestal -2mm)
Span AP 710-709
BMRC/PH2/QA/SOR/2022/ Span alignment done after 1st stage stressing, following observations were made during bearing inspection. Bharath,
409 16.12.2023 50(32) Open File sent to HO on 15.03.2024
NCC/AirportP2/409 * AP 710-709 UP-C (Gap in b/w bearing to pedestal - 1mm) AEE
* AP 710-709 DN-A (Gap in b/w bearing to pedestal - 1mm)
Span AP 708-707
Span alignment done after 1st stage stressing, following observations were made during bearing inspection.
BMRC/PH2/QA/SOR/2022/ Bharath,
410 16.12.2023 * AP 708-707 UP-D (Gap in b/w bearing to pedestal - 1mm) 50(32) Open File sent to HO on 15.03.2024
NCC/AirportP2/410 AEE
* AP 708-707 DN-B (Gap in b/w bearing to pedestal - 1mm)
* AP 708-707 DN-C (Gap in b/w bearing to pedestal - 1mm)
Span AP 711-710
Span alignment done after 1st stage stressing, following observations were made during bearing inspection.
BMRC/PH2/QA/SOR/2022/ * AP 711-710 UP-A (Gap in b/w bearing to pedestal - 2mm and bearing to wedge plate - 1mm) Bharath,
411 16.12.2023 50(32) Open File sent to HO on 15.03.2024
NCC/AirportP2/411 * AP 711-710 UP-C (Gap in b/w bearing to pedestal - 1mm) AEE
* AP 711-710 DN-A (Gap in b/w bearing to pedestal - 1mm)
* AP 711-710 DN-C (Gap in b/w bearing to pedestal - 1mm)
Quality lab
Witnessed tests on coarse aggregates:
BMRC/PH2/QA/SOR/2022/ 1) Aggregate Impact test: AIV-20.40% (Max.45%) Bharath, For information
412 16.12.2023 50 Good SOR
NCC/AirportP2/412 2) Aggregate crushing value - 24.65% (Max. 30%) AEE only
3) Flakiness index - 5.35% & Elongation Index - 10.42% (Max. 40%)
4) Permeability test on M35, depth of penetration 15.66mm (Max.25mm)
P 583-584/G1 I Girder
BMRC/PH2/QA/SOR/2022/ Bharath, For information
413 14.12.2023 Witnessed pre stressing of I girder pressure and elongationachieved are 101.03% / 103.67% and 101.03% / 50 Good SOR
NCC/AirportP2/413 AEE only
103.37% resepectively for cable 1 and 2.
Pile AP 719/P1
Witnessed Pile concreting, slump, Temperature & verified Batch sheet with approved Mix design.
* Grade of concrete: M35
BMRC/PH2/QA/SOR/2022/ Rahul Thandel For information
414 21.12.2023 * Quantity of concrete: Theoretical 32.79 Cum, Actual: 33 Cum 50 Good SOR
NCC/AirportP2/414 AEE only
* Slump at site: 200, 190 mm
* Temperature: 28.6, 29.7 (Max.320C)
* Number of cubes Casted: 15 (Required: 09 for 28 days cube test)
BMRC/PH2/QA/SOR/2022/ Stedrant Technoclinic Pvt ltd Bharath, For information
415 21.12.2023 50 Good SOR
NCC/AirportP2/415 Third party physical tests of Ht strand was witnessed. AEE only
Near AP 463
BMRC/PH2/QA/SOR/2022/ Rahul Thandel
416 21.12.2023 improper stacking of pile cap reinforcement at site, reinforcement is in contact with ground surface and kept 50(22) SOR closed
NCC/AirportP2/416 AEE
without cover.
A08 to C08 Portal Beam Bagalur station
BMRC/PH2/QA/SOR/2022/ Chethan Kumar
417 21.12.2023 Unauthorised repair work has been carried out at the two sides of the portal beam. Honey comb and reinforced 50(25) Open File sent to HO on 09.02.2024
NCC/AirportP2/417 AEE
exposed in service road side.
2024
BMRC/PH2/QA/SOR/2022/ Jakkur Station Pier Starter C02 Chethan Kumar
423 03.01.2024 50(21) Open File sent to HO on 26.02.2024
NCC/AirportP2/423 Pier starter cover (required: 50mm) is not found uniform, found 25mm at one face and 75-80 mm at another face. AEE
583-584/G4 I Girder
BMRC/PH2/QA/SOR/2022/ Witnessed pre stressing of I Girder AP 583-584/G4 pressure and elongation achieved are within permissible limits. Bharath, For information
424 02.01.2024 50 Good SOR
NCC/AirportP2/424 Pressure: 100-105% AEE only
Elongation: 95-105%
I Girder AP 445-446/G4
Witnessed I Girder 445-445/G4 concreting, checked slump, temperature & verified batch sheet with approved mix
design.
BMRC/PH2/QA/SOR/2022/ * Grade of concrete: M35 Bharath, For information
434 11.01.2024 50 Good SOR
NCC/AirportP2/434 * Quantity of concrete: Theoretical 24.95 Cum, Actual: 25.5 Cum AEE only
* Slump at site: 170, 165 and 150mm
* Temperature: 28.9, 29.0 & 28.7 (Max.320C)
* Number of cubes Casted: 24 (Required: 09 for 28 days cube test)
BMRC/PH2/QA/SOR/2022/ Vadeyarpura Casting yard Bharath, For information
435 13.01.2024 50 Good SOR
NCC/AirportP2/435 Checked drawings to verify availability of latest revision drawings at observations found okay AEE only
BMRC/PH2/QA/SOR/2022/ QC Lab Bharath, For information
436 18.01.2024 50 Good SOR
NCC/AirportP2/436 Observed aggregate impact value test on 2 different dources of aggreagtes. Found OK AEE only
Pile AP 468
BMRC/PH2/QA/SOR/2022/ Rahul Thandel
437 24.01.2024 Observed Pile built up less than 1m 50(26) SOR closed
NCC/AirportP2/437 AEE
Observed Pile build up is 750mm and soil mixed concrete can be seen.
BMRC/PH2/QA/SOR/2022/ Pile cap AP 457 Rahul Thandel
438 20.01.2024 50(13) SOR closed
NCC/AirportP2/438 Backfilling done in single layer, also found debris in backfill material. AEE
Viaduct curing register naer AP 434
BMRC/PH2/QA/SOR/2022/ Rahul Thandel
439 29.01.2024 Observed the curing registers are not updated at site. Open
NCC/AirportP2/439 AEE
NOTE: Pier and Pier starter casted after 04.01.2024 however, not available in curing register.
BMRC/PH2/QA/SOR/2022/ Yelahanka Station A07-C07 Pedestal on Portal Beam concourse level Chethan Kumar
440 01.02.2024 50(17) SOR closed
NCC/AirportP2/440 Observed Pedestal reinforcement cut by flame. AEE
BMRCL/LPMC/QC/SOR/2022/ Vadeyarapura There is no concrete surface for stacking of aggregates. There is a possibility that the soil below the aggregates may mix up
1 09.06.2022 Closed
NCC/PB2/01 Casting Yard while loading the aggregates. The concrete surface should be in desired slope for draining out the water if any.
67 (1)
Bharath (AEE)
BMRCL/LPMC/QC/SOR/2022/ Vadeyarapura CY
2 09.06.2022 Roof covering work is going slow. It should be covered at the earliest. Closed
NCC/PB2/02 Casting Yard
Vadeyarapura
BMRCL/LPMC/QC/SOR/2022/
3 09.06.2022 Casting Yard There should be a proper inclined support to vertical member of the aggregate stacking bins. 67(20) Closed
NCC/PB2/03
(Safety)
BMRCL/LPMC/QC/SOR/2022/ AP-687 to AP-716
4 09.06.2022 There should be proper housekeeping along the barricades from AP687 to AP716 Closed
NCC/PB2/04 (Safety)
BMRCL/LPMC/QC/SOR/2022/ AP-715 to AP-716
5 09.06.2022 There should no soil heap along the barricades near AP-715 to AP-716. Closed
NCC/PB2/05 (Safety) Rahul (AEE)
BMRCL/LPMC/QC/SOR/2022/ AP-715 Viaduct
6 09.06.2022 There should be no soil heap at AP 715. Closed
NCC/PB2/06 (Safety)
BMRCL/LPMC/QC/SOR/2022/ AP-716
7 09.06.2022 There should be tapered barricades at AP 716 for closure of the site. Closed
NCC/PB2/07 (Safety)
BMRCL/LPMC/QC/SOR/2022/ Vadeyarapura
8 09.06.2022 There should be no proper stacking of the reinforcement at one end for TMT bars in the casting/stacking yard. 67 (1) Closed
NCC/PB2/08 Casting Yard
BMRCL/LPMC/QC/SOR/2022/
9 09.06.2022 AP-692 to AP-694 There should be no proper bottom support of TMT bars in viaduct area AP692 to AP694 67 (1) Closed
NCC/PB2/09
Bharath (AEE)
BMRCL/LPMC/QC/SOR/2022/
10 09.06.2022 AP-692 There should be proper sump at AP 692 and other location also during pile cap work to collect the excess mud water. CY 67 (1) Closed
NCC/PB2/10
BMRCL/LPMC/QC/SOR/2022/ Layer wise backfilling should be done around the pile cap with good earth/quarry dust/sand including watering,
11 09.06.2022 Viaduct Area 67 (1) Closed
NCC/PB2/11 compacting with vibratory plate compactor complete as per specification.
BMRCL/LPMC/QC/SOR/2022/ Casting of U-Girder was done on 10.06.2022. During the casting yard site visit along with RE/Ph 2B on 20.06.2022, Bharath (AEE)
17 20.06.2022 Hennur Casting Yard Package -1 Withdrwan
NCC/PB2/17 inadequate arrangements for the curing of the U-Girder were observed. The age of U Girder was 10 days only. CY
BMRCL/LPMC/QC/SOR/2022/ Minor honeycombs were observed. Concrete Pouring in the haunch portion is to be studied in detail to avoid such Bharath (AEE)
18 23.06.2022 Hennur Casting Yard Package -1 Withdrwan
NCC/PB2/18 segregation/honeycomb. CY
It is observed that plastering work was found over the honeycomb portion without prior intimation of the same. It is
BMRCL/LPMC/QC/SOR/2022/ Bharath (AEE)
19 23.06.2022 Hennur Casting Yard Package -1 required to submit the U girder post concrete checklist to BMRCL engineer and take the approval. No methodology is Withdrwan
NCC/PB2/19 CY
submitted for rectification of the honeycombs.
It has been observed that sonic logging test of pile access tube found blocked at many locations e.g., AP 630/P4, AP
631/P4, AP 658/P3, AP 653/P$, AP 656/P4, etc due to which the test is conducted only up to the depth to which the tubes
BMRCL/LPMC/QC/SOR/2022/ Rahul (AEE) Compliance received from NCC on 30.10.2023
20 30.07.2022 Viaduct & Station are cleared. Open
NCC/PB2/20 Viaduct Received comments from LPMC for PIT report.
At the site it is found that the sonic tube pipe has no identification marking as per the approved vendor (Sonitec made by
Dextra).
BMRCL/LPMC/QC/SOR/2022/ Viaduct Pier AP 701, Rahul (AEE)
21 30.07.2022 It is observed that minor small visiblle bug holes appear in Pier concrete surface at AP 701, 702 & 704. Closed
NCC/PB2/21 702, 704 Viaduct
Anchoring of the barricading is not adequate near Ap704 & 664 also unwanted openings at AP 690 to 701 should be
Viaduct
BMRCL/LPMC/QC/SOR/2022/ closed. Rahul (AEE)
22 30.07.2022 AP 654, 664, 685, 672, Closed
NCC/PB2/22 Road cleaning is to be done from Ap 672 to 674 & AP 654 to 685. Housekeeping / removal of excess of soil from the Viaduct
674 & 704
excavation placed behind the barricading at 670 to be cleaned.
QC Lab at
BMRCL/LPMC/QC/SOR/2022/ During the witness of the cube compressive strength test at Vadeyarpura Casting yard QC lab, it was observed that the Bharath (AEE)
23 30.07.2022 Vadeyarpura Casting 67(2) Closed
NCC/PB2/23 application of the rate of the load was not maintained as per IS code 516 (Part1/sec1); 2021 i.e., 5.2kn/mm2. CY
Yard
BMRCL/LPMC/QC/SOR/2022/ It observed that pile AP 499/P4 concrete pouring completed but pile bore log register & concrete batch sheet was not
24 13.08.2022 AP 499/P4 67(4) Closed
NCC/PB2/24 witness by concerned BMRCL & NCC Engineer.
BMRCL/LPMC/QC/SOR/2022/
25 13.08.2022 AP 552 Pile Cap Honey comb and exposed rebar observed on AP 552 pile cap bottom portion of side surface. Rahul (AEE) Open
NCC/PB2/25
Viaduct
BMRCL/LPMC/QC/SOR/2022/ No barricading found flyover side at AP 676 & 560.
26 13.08.2022 AP 676 & 560 to 555 Safety Closed
NCC/PB2/26 Unwanted opening found from AP 560 to 555
BMRCL/LPMC/QC/SOR/2022/ Bagalur Station
27 13.08.2022 Curing found satisfactory for C03 Pile cap Bagalur station. 67 GOOD SOR
NCC/PB2/27 C03 Pile cap
BMRCL/LPMC/QC/SOR/2022/ C06/P1 It observed that pile C06/P1, Bagalur station concrete pouring completed, but boring log book is not updated. Also in
28 30.08.2022 Chethan (AEE) 67(3) Closed
NCC/PB2/28 Bag Stn /Pile concrete batch report pile ID name found mismatch (Pile ID:C01/P6 written in batch report instead of Pile ID:C06/P1)
The total number of piles completed as of 16.11.2022 is 784 out of 2198 I viaduct & 191 out of 454 in the station. As per
BMRCL/LPMC/QC/SOR/2022/ BMRCL letter No. BMRCL/Ph-2B/Pkg-2/16/2022-23/272 dated 13.07.2022. Static routine vertical load test to be carried Rahul Thandel(AEE)
73 19.11.2022 Viaduct & Station Open
NCC/PB2/73 out at 23 locations. as per technical specifications Cl.8.7.3, at least one routine test shall be performed fo every 100 piles Viaduct
unless otherwise specified by the engineer. static routine vertical pile load test yet to carried out till date.
As per BMRCL Letter No.BMRCL/Ph2B/Pkg2/16/2022-23/272 dated 13.07.2022, pile from the pile group of the
following Pier AP 504 identified for carrying out static routine vertical load test. It is noticed that pile cap of the Pier AP
BMRCL/LPMC/QC/SOR/2022/ Rahul Thandel(AEE)
74 19.11.2022 AP 504 Viaduct 504 casted without conducting the pile load test. Open
NCC/PB2/74 Viaduct
Pile ID AP 504, Dia 1.0, DOC of last pile of the group 01.08.2022, DOC of the pile cap 06.09.2022, Test to be conducted
Static routine vertical load test.
BMRCL/LPMC/QC/SOR/2022/ AS per Cl.5.2(d) (vil) of technical specifications, the proof test on each & every threaded bar must be conducted prior to Rahul Thandel(AEE)
75 24.11.2022 Viaduct & Station Open
NCC/PB2/75 leaving the system supplier's worshop. Viaduct
BMRCL/LPMC/QC/SOR/2022/ C01 Pier, Bagalur station concrete slump, Temperature of TM No KA50B 1489 witnessed at site and found within
76 25.11.2022 C01, Bagalur Station Chethan (AEE) 67 GOOD SOR
NCC/PB2/76 permissible limit.
BMRCL/LPMC/QC/SOR/2022/ AP 522 Pile Cap Rahul Thandel(AEE)
77 25.11.2022 AP 522 Pile cap reinforcement ckecked as per GFC drawings. Found OK. 67 GOOD SOR
NCC/PB2/77 Viaduct Viaduct
BMRCL/LPMC/QC/SOR/2022/ Vadeyarpura Casting Bharath (AEE)
78 25.11.2022 Witnessed Truck sample KA 03-AE-6778 Gradation test of fine aggregate found OK as per IS 383. 67 GOOD SOR
NCC/PB2/78 Yard CY
BMRCL/LPMC/QC/SOR/2022/ AP 446/P3 Pile Polymer property viscosity, PH, density of pile AP 446/P3 witnessed found with in permissible limit as per approved Rahul Thandel(AEE)
79 01.12.2022 67 GOOD SOR
NCC/PB2/79 Viaduct method statement of BMRCL Letter No.BMRCL/Ph-2B/Pkg-2/14/2021-22/01 dated 05.02.2022. Viaduct
BMRCL/LPMC/QC/SOR/2022/ AP 675/P1 RHS Pile AP 675/P1 (RHS) Pile concrete slump, Temperature of TM No KA 50B-1663 witnessed at site and found within Rahul Thandel(AEE)
80 01.12.2022 67 GOOD SOR
NCC/PB2/80 viaduct permissible limit. Viaduct
Pile C-02/P2 Jakkur Station pile length from COL is 28 meter. Cross hole sonic logging tube test conducted of
1. Tube-1: -10 meter
BMRCL/LPMC/QC/SOR/2022/ C-02/P2 Pile Jakkur
81 02.12.2022 2. Tube-4: -02 meter Chethan (AEE) 67(6) Open To be sent via 67(6) file
NCC/PB2/81 Station
3. Tube 2 & Tube 3: -28 meter
Date of Casting of C-02/P2 Pile Jakkur Station - 25.06.2022
C-07/P4 Pile Bagalur Station (1200mm Dia) Development length including L bend (1500mm) not found as per approved
BMRCL/LPMC/QC/SOR/2022/ C-07/P4 Pile Bagalur
82 03.12.2022 GFC drawings no. DDC-BMRCL-PH2A&2B-S2-BAGSTN-STC-GFC-DWG-1002-01-REV-1. C07/P4 Pile Bagalur Chethan (AEE) 67(1) Closed
NCC/PB2/82 Station
Station Development length found-520mm Date of Casting C07/P4 Pile Bagalur Station - 22.05.2022
During post concrete inspection of pier cap AP 694, it is observed that sheathing corrugated HDPE duct no 06 of Dia
BMRCL/LPMC/QC/SOR/2022/ Bharath (AEE)
83 08.12.2022 AP 694 Pier Cap 124mm is found broken at conical drum central portin. 67(5) Closed
NCC/PB2/83 CY
Date of casting of AP 694 Pier cap 05.12.2022
BMRCL/LPMC/QC/SOR/2022/ Vadeyarpura Casting At Batching plant Pile A-06/P7 Bagalur Station concrete slump, Temperature of TM No KA 50B 1662 witnessed and Bharath (AEE)
84 08.12.2022 67 GOOD SOR
NCC/PB2/84 Yard found within permissible limit. CY
BMRCL/LPMC/QC/SOR/2022/ AP 589/P3 Pile AP 589/P3, Pile boring in progress, Polymer properties, Viscosity, Density not found within permissible limit as per Rahul Thandel(AEE)
85 08.12.2022 67(6) Closed
NCC/PB2/85 Viaduct approved method statement of BMRCL Letter No.BMRCL/Ph-2B/Pkg-2/14/2021-22/01 dated 05.02.2022 Viaduct
BMRCL/LPMC/QC/SOR/2022/ C08 Pier Bagalur C08 Pier bagalur station concrete slump, temperature of TM No KA 50B 1448 witnessed at site and found within
86 08.12.2022 Chethan (AEE) 67 GOOD SOR
NCC/PB2/86 station permissible limit.
BMRCL/LPMC/QC/SOR/2022/ AP 522 Pier reinforcement checked as per GFC drawing no DOC-BMRCL-PH2A&2B-S2-P2-HBRKIA-VIA-DD-DWG- Rahul Thandel(AEE)
88 12.12.2022 AP 522 Pier Viaduct 67 GOOD SOR
NCC/PB2/88 201119A REV-RF Found OK. Viaduct
BMRCL/LPMC/QC/SOR/2022/ AP 640/P4 Pile Rahul Thandel(AEE)
89 14.12.2022 AP 640/P4 Pile concrete slump, Temperature of TM No KA 50B 1489 witnessed at site and found within permissible limit. 67 GOOD SOR
NCC/PB2/89 Viaduct Viaduct
During post concrete inspection of U Girder AP 703-704 RHS Honeycomb and exposed rebar observed as shown in
BMRCL/LPMC/QC/SOR/2022/ AP 703-704 RHS U
90 16.12.2022 attached picture. Withdrwan
NCC/PB2/90 Girder
Date of casting AP 703-704 RHS U Girder 13.12.2022
BMRCL/LPMC/QC/SOR/2022/ C05 Pier Bagalur Bagalur station C05 Pier reinforcement checked as per GFC drawing no-DDC-BMRCL-PH2A&2B-S2-BAGSTN-STC-
91 17.12.2022 Chethan (AEE) 67 GOOD SOR
NCC/PB2/91 Station GFC-DWG-1003-02-R1
During the quality walk at A01/P2 Pile (1200 mm dia) Bagalur station, it is observed that at cut off level 75mm cover is
BMRCL/LPMC/QC/SOR/2022/ A01/P2 Pile Bagalur
92 17.12.2022 not uniform. Chethan (AEE) 67(1) Closed
NCC/PB2/92 Station
Date of casting of A01/P2 Pile bagalur station 18.10.2022
During site visit, it was observed that no provision done to prevent the rusting of main pier reinforcement at AP 577 since
BMRCL/LPMC/QC/SOR/2022/ Rahul Thandel(AEE)
93 17.12.2022 AP 577 Viaduct more than 90 days. 67(2) Closed
NCC/PB2/93 Viaduct
Date of casting of AP 577 Pile cap 30.08.2022
BMRCL/LPMC/QC/SOR/2022/ Curing found satisfactory of AP 523 Pier. Rahul Thandel(AEE)
94 17.12.2022 AP 523 Pier Viaduct 67 GOOD SOR
NCC/PB2/94 Date of casting of AP 523 Pier 08.12.2022. Viaduct
BMRCL/LPMC/QC/SOR/2022/ AP 521 Pile Cap AP 521 Pile Cap reinforcement checked as per GFC drawing no DDC-BMRCL-PH2A-&2B-S2-P2-HBRKIA-VIA-DD- Rahul Thandel(AEE)
95 17.12.2022 67 GOOD SOR
NCC/PB2/95 Viaduct DWG-201119ARF. Viaduct
The Pile AP 459-P1 found unsound and soil mixed concrete at COL of the Pile after excavation. The Pile built up is less
BMRCL/LPMC/QC/SOR/2022/ Rahul Thandel(AEE)
96 19.12.2022 AP 459-P1 Viaduct than 1m. 67(2) Closed
NCC/PB2/96 Viaduct
Date of casting of Pile - 27.08.2022
BMRCL/LPMC/QC/SOR/2022/ The Pile Cap PCC of AP 457 near P1&P4 is found broken. Rahul Thandel(AEE)
97 19.12.2022 AP 457 Viaduct 67(6) Closed
NCC/PB2/97 Date of casting of PCC - 02.12.2022 Viaduct
BMRCL/LPMC/QC/SOR/2022/ It is observed that the Pile Dia. (1.0m) Concrete of AP 453/P4 is not circular above Cut Off Level (COL). Rahul Thandel(AEE)
98 19.12.2022 AP 453-P4 Viaduct 67(24) Closed
NCC/PB2/98 Date of concrete of Pile - 19.10.2022 Viaduct
Test Pile in between Initial Static Vertical Load test is being carried out on the test pile (TP-P2-V-1.2-1) in between AP 371 to 372 viaduct
BMRCL/LPMC/QC/SOR/2022/ Rahul Thandel(AEE)
99 20.12.2022 AP 371 to AP 372 (Near Hebbal BMTC Bus Depot). The settlement at 640T and 1600T was observed as 41.01mm and 58.04mm 67(16) Closed
NCC/PB2/99 Viaduct
Viaduct (Hebbal) respectively. However, as per Cl. 6.1.5 of IS 2911 Part-IV, the settlement observed is more than the permissible limit.
AP 675/P1 Pile LHS Viaduct (1200mm Dia) Development Length (1150mm) not found as per approved GFC drawings.
BMRCL/LPMC/QC/SOR/2022/ AP 675/P1 Pile LHS Rahul Thandel(AEE)
106 05.01.2023 AP 675/P1 Pile LHS Viaduct Development Length found - 600mm 67(4) Closed
NCC/PB2/106 Viaduct Viaduct
Date of casting AP 675/P1 Pile LHS Viaduct 09.08.2022
BMRCL/LPMC/QC/SOR/2022/ A04 Pile Cap A04 Jakkur Station Pile Cap reinforcement checked as per GFC drawing no DDC-BMRCL-PH-2A&2B-S2-JAKSTN-
107 07.01.2023 Chethan (AEE) 67 GOOD SOR
NCC/PB2/107 Jakkur Station STC-GFC-DWG-1002-01 RA.
BMRCL/LPMC/QC/SOR/2022/ AP 478 LHS Pile Cap AP 478 LHS Pile Cap concrete slump, Temperature of TM No KA 50B 1662 and KA 50B 1489 witnessed at site and Rahul Thandel(AEE)
108 07.01.2023 67 GOOD SOR
NCC/PB2/108 Viaduct found within permissible limit. Viaduct
BMRCL/LPMC/QC/SOR/2022/ AP 472/P5 LHS Pile Polymer property viscosity, PH, density of pile AP 472/P5 LHS witnessed found with in permissible limit as per approved Rahul Thandel(AEE)
109 10.01.2023 67 GOOD SOR
NCC/PB2/109 Viaduct method statement of BMRCL Letter No.BMRCL/Ph-2B/Pkg-2/14/2021-22/01 dated 05.02.2022. Viaduct
BMRCL/LPMC/QC/SOR/2022/ AP 676 LHS Pier The threaded length of the Pier reinforcement bars of AP 676 LHS not protected as per technical specification Section S.05
110 10.01.2023 67(8) Closed
NCC/PB2/110 Viaduct clause no 5.2.b
Vadeyarpura Casting In Quality Lab
BMRCL/LPMC/QC/SOR/2022/ Bharath (AEE)
111 10.01.2023 Yard Quality Control Witnessed 28 day concrete cube compressive strength test of AP 692, AP 062 and AP 803 Pier Cap M55 Grade as per 67 GOOD SOR
NCC/PB2/111 CY
Lab attached record. Results found OK.
Vadeyarpura Casting In Quality Lab
BMRCL/LPMC/QC/SOR/2022/ Bharath (AEE)
112 10.01.2023 Yard Quality Control 1. Witnessed Truck sample KA 03 AE 6787 gradation test of fine aggregate Found OK as per IS 383. 67 GOOD SOR
NCC/PB2/112 CY
Lab 2. Witnessed Truck sample KA 43 D 8967 gradation test of coarse aggregate Found OK as per IS 383.
Vadeyarpura Casting In Quality Lab
BMRCL/LPMC/QC/SOR/2022/ Bharath (AEE)
113 10.01.2023 Yard Quality Control Witnessed tests on Aggregate impact of coarse aggregate - Average 24.52% 67 GOOD SOR
NCC/PB2/113 CY
Lab Found OK as per IS 383-2016, Clause 5.4.2 (b)
BMRCL/LPMC/QC/SOR/2023/ AP-409/P2 Pile SPT of Pile AP409/P2 was witnessed on 16.01.2023. The RPM & torque of the piling rig machine found satisfactory. The Rahul Thandel(AEE)
114 18.01.2023 67 GOOD SOR
NCC/PB2/114 Viaduct socketing calculation was checked & verified jointly with concerned Engineer. Viaduct
During quality walk on 18.01.2023 near AP 573, it observed that the forged length of 35-40mm with threading founf of
BMRCL/LPMC/QC/SOR/2023/ AP-573 Pile cap Rahul Thandel(AEE)
115 18.01.2023 some pier main reinforcement bars against the required length of 64mm (2D) which are placed at site for pier letter No. 67(10) Closed
NCC/PB2/115 Viaduct Viaduct
BMRCL/ADVISOR/CIVIL/2018/55 dated 17.07.2018, (Technical Note-21)
Durng quality walk on 18.01.2023, AP-551 Pier Vertical reinforcement found tilted/bend on one side as shown in attached
BMRCL/LPMC/QC/SOR/2023/ Rahul Thandel(AEE)
116 18.01.2023 AP-551 Pier Viaduct picture. 67(19) Closed
NCC/PB2/116 Viaduct
Date of casting of AP-551 Pile Cap 08.08.2022
BMRCL/LPMC/QC/SOR/2023/ During quality walk on 18.01.2023, curing found satisfactory of AP-578 Pier. Date of casting of AP- 578 Rahul Thandel(AEE)
117 18.01.2023 AP-578 Pier Viaduct 67 GOOD SOR
NCC/PB2/117 Pier 08.01.2023 Viaduct
During quality walk on 18.01.2023, it observed that C05-P2 Pile Yelahanka Station concrete completed on 13.01.2023 but
BMRCL/LPMC/QC/SOR/2023/ C05/P2 Pile boring log book is not fully updted like pilymer prperties checking, cage lowering time and flushing timing as shown in File sent to HO on 31.08.2023
118 18.01.2023 Chethan (AEE) 67(13) Open
NCC/PB2/118 Yelahanka Station attached picture 3 and 4. The commencement of concrecting after the completion of the boring not as per technical File returned from HO on 07.09.2023 handed over to CK
specification clause no 8.4.3(a)
BMRCL/LPMC/QC/SOR/2023/ A-08 Pile Cap Jakkur During quality walk on 18.01.2023 at A08 Pile Cap Jakkur Station it observed backfilling material and proess is not as oer
119 18.01.2023 Chethan (AEE) 67(7) Closed
NCC/PB2/119 Station technical specification S.02 Clause No 2.2. Date of casting of A08 Pile Cap Jakkur Station-17.12.2022
During quality walk on 19.01.2023, The Pile built up of Pile AP-449/P3 and AP-449/P4 found less than 1.0 m as shown in
BMRCL/LPMC/QC/SOR/2023/ AP-449/P3 amd AP- attached pictures. Rahul Thandel(AEE)
120 19.01.2023 67(20) Closed
NCC/PB2/120 449/P4 Pile Viaduct Date of Casting of Pile AP-449/P3-18.11.2002 Viaduct
Date of Casting of Pile AP-449/P3-15.11.2022
During qulaity walk on 19.01.2023, at AP-682/P2 (RHS) Pile (1200 mm Dia) Development length (1200mm) not found as
BMRCL/LPMC/QC/SOR/2023/ AP-682/P2 Pile RHS Rahul Thandel(AEE)
121 19.01.2023 per approved GFC drawings. AP-682/P2 Pile Development Length found-750 mm 67(11) Closed
NCC/PB2/121 Viaduct Viaduct
Date of Casting of Pile AP-682/P2 RHS-21.08.2022
During quality walk on 19.01.2023 near A07 Bagalur Station, it observed that the forged length of 35-40mm with
BMRCL/LPMC/QC/SOR/2023/ A07 Pile Cap Bagalur threading found of some pier main reinforcement bars against the required length of 64mm (2D) which are place at site for
122 19.01.2023 Chethan (AEE) 67(9) Closed
NCC/PB2/122 Station pier reinforcement as shown in attached picture. The forged length shall be as per letter No.
BMRCL/ADVISOR/Civil/2018/55 dated 17.07.2018, (Technical Note-21)
During quality walk on 19.01.2023 at C03, C04 and C05 Bagalur Station, it observed that ground preparation waork being
BMRCL/LPMC/QC/SOR/2023/ C03,C04 and C05 carried out for portal beam support arrangements without casting of crash barrier. Date of csting of Pier C03 Bagalur
123 19.01.2023 Chethan (AEE) 67(19) Closed
NCC/PB2/123 Bagalur Station Station - 12.11.2022 Date of csting of Pier C04 Bagalur Station - 19.11.202
Date of csting of Pier C05 Bagalur Station - 17.12.2022
Vadeyarapura During post concrete inspection of Pier Cap AP 656(Type-2), Honeycomb and exposed reinforcement observed at inner
BMRCL/LPMC/QC/SOR/2023/ Bharath (AEE)
124 20.01.2023 Casting Yard AP-656 central portion of conical drum as shown in attached pictures. 50(10) Closed
NCC/PB2/124 CY
(Type-2) Pier Cap Date of casting of AP 656 Pier cap 12.01.2022
Vadeyarapura During post concrete inspection of Pier Cap AP 108(Type-2), Honeycomb and exposed reinforcement observed at inner
BMRCL/LPMC/QC/SOR/2023/ 20.01.2023 Bharath (AEE)
125 Casting Yard AP-108 Package -1 central portion of conical drum as shown in attached pictures. 50(10) Closed
NCC/PB2/125 Package - 1 CY
(Type-1) Pier Cap Date of casting of AP 108 Pier cap 13.01.2022
BMRCL/LPMC/QC/SOR/2023/ Vadeyarapura Batching plant calibration witnessed as per attached cheklist, tolerances are found within acceptance limits as per IS 4925. Bharath (AEE)
126 27.01.2023 67 GOOD SOR
NCC/PB2/126 Casting Yard Site report and schwing stetter test report attached. CY
In Quality Lab
Vadeyarpura Casting
BMRCL/LPMC/QC/SOR/2023/ 1. Witnessed Truck sample KA 03 AE 6782 Gradation test of Coarse Aggregate (20mm) Found OK as per IS 383. Bharath (AEE)
127 27.01.2023 Yard Quality Control 67 GOOD SOR
NCC/PB2/127 2. Witnessed Truck sample KA 53 D 5576 Gradation test of Coarse Aggregate (12.5mm) Found OK as per IS 383. CY
Lab
3. Witnessed Truck sample KA 03 AE 6787 Gradation test of fine Aggregate Found OK as per IS 383.
Vadeyarpura Casting In Quality Lab
BMRCL/LPMC/QC/SOR/2023/ Bharath (AEE)
128 28.01.2023 Yard Quality Control Witnessed tests on Aggregate crushing value of Coarse aggregate - average 26.93% Found OK as per IS 383-2016, Clause 67 GOOD SOR
NCC/PB2/128 CY
Lab 5.4.1 (b)
Physical tests on TMT 550D witnessed at V2 Civil Diagnostics Pvt Ltd lab (BMRCL approved 3rd party testing agency)
BMRCL/LPMC/QC/SOR/2023/ V2 Civil Diagnostics Bharath (AEE)
129 30.01.2023 Item-JSW TMT 550D 67 GOOD SOR
NCC/PB2/129 Pvt Ltd CY
Invoice No- 22D52900004761
Heat No-A3063093
AP 117 (Type-1)
BMRCL/LPMC/QC/SOR/2023/ Piercap Vadeyarpura Witnessed AP 117 (Type-1) Pier cap concreting, checked slump, temperature & verified batch sheet of vehicle No KA 50 Bharath (AEE)
147 17.02.2023 67 GOOD SOR
NCC/PB2/147 Casting Yard Quality B 1661 and KA 50 B 1488 with approved mix design as shown in attached pictures. Found within the permissible limits. CY
Control
BMRCL/LPMC/QC/SOR/2023/ Vadeyarpura Casting At batching plant witnessed AP510 (Type 2) Pier cap concreting, checked slump, temperature & verified batch sheet of Bharath (AEE)
148 20.02.2023 67 GOOD SOR
NCC/PB2/148 Yard Batching plant vehicle No KA 50 B 1665 with approved mix design as shown in attached pictures. Found within the permissible limits. CY
Vadeyarpura Casting
BMRCL/LPMC/QC/SOR/2023/ In Quality Lab Bharath (AEE)
149 20.02.2023 Yard Quality Control 67 GOOD SOR
NCC/PB2/149 Witnessed truck sample KA 03 AE 6786 Gradation test of Coarse aggregate (20mm) Found OK as per IS 383. CY
Lab
The Pile AP 585-P1 found unsound and soil - mixed concrete at COL of the pile after PCC. The pile built up is less then
BMRCL/LPMC/QC/SOR/2023/ AP 585-P1 Pile 1m. Rahul Thandel(AEE)
150 24.02.2023 67(11) Closed
NCC/PB2/150 Viaduct Date of Casting of Pile Cap AP-585 PCC -17.02.2023 Viaduct
Date of Casting of Pile AP-585-P1 27.12.2022
Witnessed AP 679 RHS Pile Cap Viaduct concreting, checked slump, temperature & verified batch sheet of vehicle No KA
BMRCL/LPMC/QC/SOR/2023/ AP 679 RHS Pile Cap Rahul Thandel(AEE)
151 24.02.2023 50 B 1663 and KA 50 B 1488 with approved mix design as shown in attached pictures. Found within the permissible 67 GOOD SOR
NCC/PB2/151 Viaduct Viaduct
limits.
BMRCL/LPMC/QC/SOR/2023/ A-02 Pile Cap Jakkur During quality walk on 24.02.2023 a A02 Pile Cap Jakkur Station it observed backfilling material and process is not as per
152 24.02.2023 Chethan (AEE) 67(1) Closed
NCC/PB2/152 Station rechnical specification Section S.02 clause No. 2.2. Date of casting of A-02 Pile Cap Jakkur Station -01.02.2023
BMRCL/LPMC/QC/SOR/2023/ C-01 Pier Jakkur During site cisit at C-01 Pier Jakkur Station curing found satisfactory as per rechnical specification Section-S.03 clause no.
153 24.02.2023 Chethan (AEE) 67 GOOD SOR
NCC/PB2/153 Station 3.12.6. Date of Casting of Pier Jakkur Station-10.02.2023
During site visit at AP-633/P2 and AP633/P3 Pile (1000 mm Dia) Development length (1200 mm) not found as per
approved GFC drawings no DDC-BMRCL-PH-2A&2B-S2-P2-HBRKIA-VIA-DD-DWG-201101 A RF
BMRCL/LPMC/QC/SOR/2023/ AP-633/P2 & AP- Rahul Thandel(AEE)
154 24.02.2023 AP-633/P2 & AP-633/P3 Pile Development Length found- 400 to 700 mm Date of 67(11) Closed
NCC/PB2/154 633/P3 Pile Vaiduct Viaduct
Casting og Pile AP-633/P3- 28.12.2022 Date of Casting of Pile AP-633/P2-
31.12.2022
BMRCL/LPMC/QC/SOR/2023/ Ap-703 Pier Cap Rahul Thandel(AEE)
155 24.02.2023 During site visit 15.02.2023 (Night Shift) at AP-703 pier cap first stage stressing witnessed jointly with BMRCL engineer. 67 GOOD SOR
NCC/PB2/155 Viaduct Viaduct
BMRCL/LPMC/QC/SOR/2023/ AP-590 Pile Cap During qulaity walk on 24.02.2023, at AP-590 Pile Cap PCC observed broken as shown in attached picture. Rahul Thandel(AEE)
156 24.02.2023 Date of casting of AP-590 Pile Cap PCc-05.02.2023 67(25) Closed
NCC/PB2/156 Viaduct Viaduct
BMRCL/LPMC/QC/SOR/2023/ During qulaity walk on 24.02.2023, at AP-485 Pile curing not found satisfactory as per technical Specification Section - Rahul Thandel(AEE)
157 24.02.2023 AP-485 Pier Viaduct Closed
NCC/PB2/157 S.03 clause no3.12.6 Date of casting of AP-485 Pier Viaduct - 18.02.2023 Viaduct
Routine Vertical Load Test is being carried out on the working pile at AP-460/P1 Viaduct. The final settement was
BMRCL/LPMC/QC/SOR/2023/ AP-460/P1 Pile Rahul Thandel(AEE)
158 25.02.2023 observed as 26.11mm. However, as per Cl.7.2.1.1(b) of IS Part-IV-2013, the settlement observed is more than the Open
NCC/PB2/158 Viaduct Viaduct
permission limit. Date of casting of pile AP-460/P1-31.08.2022
Vadeyarapura
BMRCL/LPMC/QC/SOR/2023/ During site visit at Casting Yard AP443-444/G1 I Girder one end edge broken found as shown in attached picture. Bharath (AEE)
159 25.02.2023 Casting Yard AP 443 67(9) Closed
NCC/PB2/159 Date of Casting of AP443-444/G1 I Girder-20.11.2022 CY
- 444/G1 I Girder
During Steel Yard visit on 21.02.2023 witness receiving of JSW TMT FE550D and review the Test Certificate as per
Vadeyarapura attached pictures. Results founf as per IS 1786:2008. Invoice No-22D52900005272
BMRCL/LPMC/QC/SOR/2023/ Truck No- MH 06 AC 3176 Cast/Heat No- Bharath (AEE)
160 27.02.2023 Casting Yard Steel 67 GOOD SOR
NCC/PB2/160 A3062358, A3062361 & B3062360 - 20 mm Dia Cast/Heat No-D918640-10 mm Dia Test CY
Yard
Certificate No-TMT/22-23/0000433798 & TMT/22-23/0000433799
Vadeyarapura
BMRCL/LPMC/QC/SOR/2023/ In Quality Lab-- third party test reports of Concrete Cube Compressive Strength of AP-660 Pier Cap (M55) and A05 Pier Bharath (AEE)
161 27.02.2023 Casting Yard Quality 67 GOOD SOR
NCC/PB2/161 (M50) Bagaluru Station checked as per attached report. Found OK as per IS 516 (Part 1) CY
Lab
BMRCL/LPMC/QC/SOR/2023/ during Quality walk minor Bug holes found at outer concrete surface of AP-713 Pier as shown in attached picture. Date of Rahul Thandel(AEE)
162 27.02.2023 AP-713 Pier Viaduct 67(24) Closed
NCC/PB2/162 casting AP-713 pier-22.08.2022 Viaduct
BMRCL/LPMC/QC/SOR/2023/ AP-682 RHS Pile Cap During quaity walk AP-682 RHS Pile Cap reinforcement checked as per GFC drawing no DDC-BMRCL-PH2A&2B-S2- Rahul Thandel(AEE)
163 27.02.2023 67 GOOD SOR
NCC/PB2/163 Viaduct P2-HBRKIA-VIA-DD-DWG-PP-201050,REV-RC Viaduct
During Quality walk, It observed AP-681 LHS for pier reinforcement(Approx. 12mts height) guy rope is not tied at top
BMRCL/LPMC/QC/SOR/2023/ AP-681 LHS Pier centre of the counter weight, Also counter weight is not placed at uniform distance from the pier face, The distance of Rahul Thandel(AEE)
164 27.02.2023 67(17) Closed
NCC/PB2/164 Viaduct counter weight from pier face is varies from 235mts to 7.5mts (Counter weight-2.5MT on each side) as per MD sir Viaduct
(BMRCL) instruction.)
During 521 (Type2) pre cast post tensioned Pier cap (M55 Grade) 28 days concrete cube test on 01.03.2023 with BMRCL
Vadeyarapura
BMRCL/LPMC/QC/SOR/2023/ representative, the three set cubes average compressive strength 57.17mpa obtained not meeting the expectance criteria Bharath (AEE)
165 01.03.2023 Casting Yard Quality 50(11) Closed
NCC/PB2/165 mentioned in IS 456:2000 (Reaffirmed 2021) clause 16.1 and 16.3 table no 11. Refer clause no 3.25 of technical CY
Lab
specifications. Date of casting of AP 521 Pier cap 01.03.2023
Vadeyarapura
During post concrete inspection of Pier Cap AP 510(Type2) Honeycomb and exposed reinforcement observed at inner
BMRCL/LPMC/QC/SOR/2023/ Casting Yard Bharath (AEE)
166 02.03.2023 central portion of conical drum as shown in attached pictures. 50(6) Closed
NCC/PB2/166 Piercap AP 510 (type- CY
Date of casting of AP 510(Type2) Pier cap 20.02.2023
2)
BMRCL/LPMC/QC/SOR/2023/ Pier reinforcement checked as per GFC drawing no DDC-BMRCL-PH2A&2B-S2-BAGSTN-STC-GFC-DWG-1003-02-
167 04.03.2023 C02 Bagalur Station Chethan (AEE) 67 GOOD SOR
NCC/PB2/167 REV-1 Found OK
BMRCL/LPMC/QC/SOR/2023/ Kodigehalli Station Pile concrete slump, Temperature of TM No KA 50B -1489 and KA 50B 1488 witnessed at site and found within
168 05.03.2023 Chethan (AEE) 67 GOOD SOR
NCC/PB2/168 A06/P2 permissible limit.
BMRCL/LPMC/QC/SOR/2023/ Rahul Thandel(AEE)
169 04.03.2023 AP 413/P3 Viaduct Pile bore depth checked after socketing and found ok as per SPT calculation certified by BMRCL. 67 GOOD SOR
NCC/PB2/169 Viaduct
BMRCL/LPMC/QC/SOR/2023/ Polymer property viscosity, PH, density of pile AP599/P4 LHS witnessed found with in permissible limit as per approved Rahul Thandel(AEE)
170 06.03.2023 AP 599/P4 Viaduct 67 GOOD SOR
NCC/PB2/170 method statement of BMRCL letter No.BMRCL/Ph2B/Pkg-2/14/2021-22/01 dated 05.02.2022 Viaduct
BMRCL/LPMC/QC/SOR/2023/ AP 633 Pilecap Pile cap reinforcement works checked as per GFC drawing no. DDC-BMRCL-PH2A&2B-S2-P2-HBRKIA-VIA-DD- Rahul Thandel(AEE)
171 06.03.2023 67 GOOD SOR
NCC/PB2/171 Viaduct DWG-201101A Rev-RE Found OK. Viaduct
BMRCL/LPMC/QC/SOR/2023/ The threaded length of the Pier reinforcement bars of AP 463 not protected as per technical specification Section S.05 Rahul Thandel(AEE)
172 09.03.2023 AP 463 Pier Viaduct 67(11) Closed
NCC/PB2/172 clause no 5.2.b. Date of casting of Pile cap AP463 11.02.2023 Viaduct
Routine Vertical Load Test of the working pile at AP-640/P1 Viaduct. Witnessed along with the BMRCL Engineer. The
BMRCL/LPMC/QC/SOR/2023/ Rahul Thandel(AEE)
173 09.03.2023 AP 640/P1 Viaduct final settement was observedwith in the permissible limit as per Cl.7.2.1.1(b) of IS 2911 Part-IV-2013, Report submission 67 GOOD SOR
NCC/PB2/173 Viaduct
awaited. Date of casting of Pile AP640/P1 10.12.2022
During the quality walk at 484/P2 Pile it is observed that at cut off level of pile Ap 484-P2 (1200 mm dia) the clear cover
BMRCL/LPMC/QC/SOR/2023/ AP-484 Rahul Thandel(AEE)
174 13.03.2023 of 75mm not uniform. The details shown in the picture 3&4 67(8) Closed
NCC/PB2/174 Viaduct Viaduct
Date of casting of AP 484/P2 Pile 23.09.2022
During the quality walk on 17.03.2023 at C05 Pile Cap Jakkur Station, it is observed that backfilling material and process
BMRCL/LPMC/QC/SOR/2023/
175 17.03.2023 C05 Jakkur Station is not as per technical specification section S.02 Clause No 2.2 Chethan (AEE) 67(23) Closed
NCC/PB2/175
Date of casting of C05 Pile Cap Jakkur Station 06.03.2023.
During the quality walk on 17.03.2023 at Jakkur Station C08 Pier reinforcement tying in progress. It is observed that Pier
BMRCL/LPMC/QC/SOR/2023/
176 17.03.2023 C08 Jakkur Station reinforcement not tied with guy ropes to counter weights and only three weighs found at Pier location. Chethan (AEE) 67(11) Closed
NCC/PB2/176
Date of casting of Pier Starter 18.01.2023.
Vadeyarapura During site visit on 11.03.2023 witnessed AP 635 (Type 2) Pier cap concreting, checked slump, temperature & verified
BMRCL/LPMC/QC/SOR/2023/ Bharath (AEE)
177 17.03.2023 Casting Yard AP 635 batch sheet of vehicle No KA 50 B 1489 with approved mix design as shown in attached pictures. Found within the 67 GOOD SOR
NCC/PB2/177 CY
(Type-2) Piercap permissible limits.
In Quality Lab
Vadeyarapura 1. Witnessed tests on Aggregate impact of coarse aggregate - Average 25.46%
BMRCL/LPMC/QC/SOR/2023/ Bharath (AEE)
178 17.03.2023 Casting Yard Found OK as per IS 383-2016, Clause 5.4.2 (b) 67 GOOD SOR
NCC/PB2/178 CY
Quality control lab 2. Witnessed tests on Aggregate crushing value of Coarse aggregate - average 26.44% Found OK as per IS 383-2016,
Clause 5.4.1 (b)
Vadeyarapura
BMRCL/LPMC/QC/SOR/2023/ In Quality Lab Bharath (AEE)
179 17.03.2023 Casting Yard 67 GOOD SOR
NCC/PB2/179 Witnessed truck sample KA 03 AE 6778 Gradation test of Coarse aggregate (20mm) Found OK as per IS 383. CY
Quality control lab
Efficiency of Multi pull jacks witnessed on 17.03.2023 Model : 50/200N
Capacity: 500T
BMRCL/LPMC/QC/SOR/2023/ Vadeyarapura Bharath (AEE)
180 20.03.2023 Stress Ram Area: 1045.4cm2 67 GOOD SOR
NCC/PB2/180 Casting Yard CY
Jack efficiency: 98.005%
Found OK as per IS 1343-2012
Quality Lab
During AP 676 LHS Pier Starter (M 50 Grade) 28 days concrete cube test on 20.03.2023 with BMRCL representative, the
BMRCL/LPMC/QC/SOR/2023/ Vadeyarapura Bharath (AEE)
181 20.03.2023 three cubes average compressive strength 45.50 mpa obtained not meeting the expectance criteria mentioned in IS 67(9) Closed
NCC/PB2/181 Casting Yard CY
456:2000 (Reaffirmed 2021) clause 16.1 and 16.3 table no 11. Refer clause no 3.25 of technical specifications. Date of
casting of AP 676 RHS Pier Starter 20.02.2023
After stage 1 and 2 stressing of all three ducts AP443-444/G1 I Girder, cracks observed at both stressing and dead end as
Vadeyarapura
BMRCL/LPMC/QC/SOR/2023/ shown attached photos. Bharath (AEE)
182 23.03.2023 Casting Yard AP 443 67(9) Closed
NCC/PB2/182 Date of casting of I Girder 20.11.2022 CY
- 444/G1 I Girder
Date of both stage stressing 20.03.2023
It observed that pile AP 612-P1, prolonged delay in the commencement of concrete after completion of boring. Pile boring
BMRCL/LPMC/QC/SOR/2023/ Viaduct completed at 6.30 Am on 21.03.2022 and concrete pouring completed 12:20 am on 22.03.2022. Time interval between Rahul Thandel(AEE)
183 27.03.2023 Open
NCC/PB2/183 AP 612-P1 boring completion and concrete pouring commencement is 17hrs 50 minutes which is not as per technical specifications Viaduct
clause no.8.4.3(a)
BMRCL/LPMC/QC/SOR/2023/ Viaduct At Pier cap 707 1st stage ducts (4nos) grouting witnessed temperature is 21.1oC water/cement ratio is 0.42 and presure Rahul Thandel(AEE)
184 28.03.2023 67 GOOD SOR
NCC/PB2/184 AP 707 after full injection of prout is maintained 5kg/sq.cm for 1min found satisfactory as per MORTH 1800/III. Viaduct
Physical tests (Yield strength, Ultimate tensile strength & % of Elongation) on TMT 550D witnessed at V2 Civil
Diagnostics Pvt Ltd (BMRCL approved 3rd party testing agency) as per attached records. Found OK as per IS 1786:2008.
BMRCL/LPMC/QC/SOR/2023/ V2 Civil Diagnostics Bharath (AEE)
185 29.03.2023 Item-JSW TMT 550D 67 GOOD SOR
NCC/PB2/185 Pvt Ltd CY
Invoice No- 22D52900005311
Heat No-B3064558
Dia of steel-25m
Checked the steel MTC of TMT 550D of test certificate no TMT/22-23/0002782255 and TMT/22-23/0002782256 as per
attached record. Found OK as per IS 1786:2008.
Vadeyarapura
BMRCL/LPMC/QC/SOR/2023/ Bharath (AEE)
186 29.03.2023 Casting Yard Item-JSW TMT 550D 67 GOOD SOR
NCC/PB2/186 CY
Quality control lab Invoice No- 831/22-23 dated 16.03.2023
Heat No-A3065130, A3065135 & A3065212
Dia of steel-32mm
In Quality Lab
Vadeyarapura 1. Witnessed Truck sample KA 03 AE 6779 Gradation test of Coarse Aggregate (20mm) of Besto Mining. Found OK as
BMRCL/LPMC/QC/SOR/2023/ Bharath (AEE)
187 29.03.2023 Casting Yard per IS 383. 67 GOOD SOR
NCC/PB2/187 CY
Quality control lab 2. Witnessed Truck sample KA 03 AE 6778 Gradation test of Coarse Aggregate (12.5mm) of Besto Mining. Found OK as
per IS 383.
During site visit on 29.03.2023 at A1 casting bed (AP 625 type 2 Pier cap) Vadeyarpura casting yard found satisfactory as
Vadeyarapura
BMRCL/LPMC/QC/SOR/2023/ per technical specification section S.03 clause no 3.12.6 as shown in attached picture. Bharath (AEE)
188 29.03.2023 Casting Yard (AP 67 GOOD SOR
NCC/PB2/188 CY
625 type 2 Pier cap)
Date of casting of AP 625 Type 2 pier cap 27.03.2023
During site visit on 06.04.2023, Pile (1200mm dia) developmemt length not found as per aprroved GFC drawings.
BMRCL/LPMC/QC/SOR/2023/ C02/P6 Yelahanka
189 06.04.2023 C02/P6 Pile development length found - 200-500mm Chethan (AEE) 67(15) Closed
NCC/PB2/189 Station
Date of casting of Pile C02/P6 28.02.2023
Witnessed Batching Plant (water) calibration on 03.04.2023, the error percentage found within acceptable limits.
Plant SL No:177/8050215,
Vadeyarapura Make: Schwing Stetter
BMRCL/LPMC/QC/SOR/2023/ Casting Yard Plant Capacity per batch = 2.5 m3, Bharath (AEE)
190 06.04.2023 67 GOOD SOR
NCC/PB2/190 Quality Batching Last calibrated on: 04-1-2023. CY
palnt As per IS: 4925(2004), clause-6.1.1 -The tolerance limit for individual batch is Cement & water: +/- 1%, Coarse & Fine
Aggregates: +/-2%, Admixture: +/- 3%.
Witness incoming JSW TMT 550D and review MTC of test certificate no TMT/22-23/0000449146, TMT/22-
23/0000449147, TMT/22-23/0000449148 and TMT/22-23/0000449149 as per attached record. Found OK as per IS
1786:2008.
Vadeyarapura
BMRCL/LPMC/QC/SOR/2023/ Bharath (AEE)
191 08.04.2023 Casting Yard 67 GOOD SOR
NCC/PB2/191 Item-JSW TMT 550D CY
Invoice No-23D52900000040 dated 07.04.2023
Heat No-B3084834, A3065560, B3064769, A3064630, A3064896, A3064897, A3064907, F924709 and G924776
Dia of steel-25 mm, 20 mm, 16 mm and 10 mm
In Quality Lab
1. Witnessed Tests on Aggregate Impact Value of Coarse Aggregate- Average 24.83% on 10.04.2023 as per attached
Vadeyarapura records. Found OK as per IS 383-2016, Clause 5.4.2 (b)
BMRCL/LPMC/QC/SOR/2023/ Bharath (AEE)
192 10.04.2023 Casting Yard 67 GOOD SOR
NCC/PB2/192 CY
Quality lab 2. Witnessed Tests on Aggregate Crushing Value of Coarse Aggregate- Average 25.03% on 10.04.2023 as per attached
records. Found OK as per IS 383-2016, Clause 5.4.1 (b)
In Quality Lab
1.Witnessed Truck sample KA 03 AE 6782 Gradation test of Coarse Aggregate (20 mm) of Besto Mining on 03.04.2023
as per attached records. Found OK as per IS 383.
Vadeyarapura 2. Witnessed Truck sample KA 03 AE 6781 Gradation test of Coarse Aggregate (12.5 mm) of Besto Mining on 03.04.2023
BMRCL/LPMC/QC/SOR/2023/ Bharath (AEE)
193 11.04.2023 Casting Yard as per attached records. Found OK as per IS 383. 67 GOOD SOR
NCC/PB2/193 CY
Quality lab
3. Witnessed Truck sample KA 03 AE 6785 Gradation test of fine Aggregate (M Sand) of Besto Mining on 11.04.2023 as
per attached records. Found OK as per IS 383.
After Stage 1 stressing of AP 443-AP 444/G2/HS/02 I Girder crack observed at dead end as shown attached photos.
Date of Casting of I Girder-30.09.2022.
BMRCL/LPMC/QC/SOR/2023/ Vadeyarapura Date stage 1 stressing-01.04.2023. Bharath (AEE)
194 11.04.2023 50(19) Closed
NCC/PB2/194 Casting Yard Date of stage 1 grouting-04.04.2023. CY
During site visit on 11.04.2023, at AP-680 RHS Pier Honeycomb observed at junction of Kicker and pier lift of concrete.
BMRCL/LPMC/QC/SOR/2023/ AP-680 RHS Pier Rahul Thandel(AEE)
195 11.04.2023 50(12) Closed
NCC/PB2/195 Viaduct Viaduct
Date of Casting of AP 680 RHS Pier -31.03.2023
BMRCL/LPMC/QC/SOR/2023/ AP-634 Pier reinforcement checked as per GFC drawing no.DDC-BMRCL-PH2A&2B-S2-P2-HBRKIA-VIA-DD-DWG- Rahul Thandel(AEE)
196 11.04.2023 AP-634 Pier Viaduct 67 GOOD SOR
NCC/PB2/196 201101A Rev-RE,( Sheet 01 of 02) and Found OK. Viaduct
BMRCL/LPMC/QC/SOR/2023/ During site visit on 11.04.2023 (Night Shift), AP-570 Pier 1st Lift concrete slump, temperature of TM No KA 50B-1489 & Rahul Thandel(AEE)
197 11.04.2023 AP-570 Pier Viaduct 67 GOOD SOR
NCC/PB2/197 TM No KA 50B-1486 witnessed at site and found within permissible limit. Viaduct
BMRCL/LPMC/QC/SOR/2023/ AP-606/P1 LHS Pile AP 606/P1 LHS, Pile bore depth checked after Socketing and found ok as Per SPT Calculation certified by BMRCL Rahul Thandel(AEE)
198 12.04.2023 67 GOOD SOR
NCC/PB2/198 Viaduct Engineer. Viaduct
BMRCL/LPMC/QC/SOR/2023/ AP-678 RHS Pier During site visit on 11.04.2023, at AP-678 RHS Pier curing found satisfactory. Rahul Thandel(AEE)
199 12.04.2023 67 GOOD SOR
NCC/PB2/199 Viaduct Date of Casting of AP-678 RHS Pier -05.04.2023 Viaduct
As pef Cl.6.5 of technical specification & as per the approved project quality management plan, apart from 1000hrs
BMRCL/LPMC/QC/SOR/2023/ Vadeyarpura casting Bharath (AEE)
200 18.04.2023 relaxation test conducted by the manufacturer, at lease 02 such tests are required to be conducted by an independent Open
NCC/PB2/200 yard CY
agency.
Vadeyarpura Casting
BMRCL/LPMC/QC/SOR/2023/ During site visit on 18.04.2023 witnessed Piercap concreting, checked slump, temperature &verified batch sheet of vehicle Bharath (AEE)
201 18.04.2023 Yard AP 821 (Type- 67 GOOD SOR
NCC/PB2/201 No KA 50 B 1663 with approved Mix design as shown in attached pictures. Found within the permissible limits. CY
2) Pier Cap
Vadeyarpura Casting During site visit on 08.05.2023 witnessed AP-591 (Type -2) Precast Pier Cap concreting, checked slump, temperature &
BMRCL/LPMC/QC/SOR/2023/ Bharath (AEE)
215 08.05.2023 Yard AP 591 (Type- verified Batch sheet of vehicle No KA 50 B 1661 with approved Mix design as shown in attached pictures. Found within 67 GOOD SOR
NCC/PB2/215 CY
2) Piercap the permissible limits.
In Quality Lab
a. Witnessed 28-day Concrete Cube Compressive Strength test on 02.05.2023 of AP-870 Pier Cap of M55 Grade as per
Vadeyarapura
BMRCL/LPMC/QC/SOR/2023/ attached record. Results found OK. Bharath (AEE)
216 08.05.2023 Casting Yard Quality 67 GOOD SOR
NCC/PB2/216 b. Witnessed 28-day Concrete Cube Compressive Strength test on 08.05.2023 of AP-495 Pier Cap of M55 Grade as per CY
Control Lab
attached record. Results found OK.
In Quality Lab
1. Witnessed Tests on Aggregate Impact Value of Coarse Aggregate- Average 27.49% on 08.05.2023 as per attached
Vadeyarapura records. Found OK as per IS 383-2016, Clause 5.4.2 (b)
BMRCL/LPMC/QC/SOR/2023/ Bharath (AEE)
217 08.05.2023 Casting Yard Quality 67 GOOD SOR
NCC/PB2/217 CY
Lab 2. Witnessed Tests on Aggregate Crushing Value of Coarse Aggregate- Average 27.58% on 08.05.2023 as per attached
records. Found OK as per IS 383-2016, Clause 5.4.1 (b)
Witness incoming JSW TMT 550D and review MTC of test certificate no TMT/23-24/0000457340 as per attached record.
Found OK as per IS 1786:2008.
In Quality Lab
1.Witnessed Truck sample KA 53 D 5576 Gradation test of Coarse Aggregate (20 mm) of Besto Mining on 13.05.2023 as
per attached records. Found OK as per IS 383.
Vadeyarapura
BMRCL/LPMC/QC/SOR/2023/ 2. Witnessed Truck sample KA 03 AE 6778 Gradation test of Coarse Aggregate (12.5 mm) of Besto Mining on 13.05.2023 Bharath (AEE)
219 13.05.2023 Casting Yard Quality 67 GOOD SOR
NCC/PB2/219 as per attached records. Found OK as per IS 383. CY
Lab
3. Witnessed Truck sample KA 03 AE 6785 Gradation test of fine Aggregate (M Sand) of Besto Mining on 13.05.2023 as
per attached records. Found OK as per IS 383.
BMRCL/LPMC/QC/SOR/2023/ A01/P6 Pile During site visit A01/P6 Yelahanka Station, Pile concrete slump, temperature of TM No KA 50B-1489 & TM No KA
220 13.05.2023 Chethan (AEE) 67 GOOD SOR
NCC/PB2/220 Yelahanka Station 50B-1661 witnessed at site and found within permissible limit.
A05-C05 and A04-
BMRCL/LPMC/QC/SOR/2023/ At Bagalur station A05-C05 and A04-C04 Portal Beam work is in progress without approved Method Statement from
221 13.05.2023 C04 Portal Beam Chethan (AEE) 67(8) Closed
NCC/PB2/221 BMRCL.
Bagalur Station
During site visit, it was observed that C02 and C04 Jakkur station Pier reinforcements have been exposed more than 110
days and getting rusted. No provision done to prevent the rusting of main pier reinforcement.
BMRCL/LPMC/QC/SOR/2023/ C02 and C04 Jakkur
222 15.05.2023 Chethan (AEE) 67(1) Closed
NCC/PB2/222 Station
Date of Casting of C02 Jakkur Station Pile Cap-16.01.2023
Date of Casting of C04 Jakkur Station Pile Cap-23.12.2022
During site visit at AP-620/P1 Pile (1200 mm Dia) Development length (1200 mm) not found as per approved GFC
BMRCL/LPMC/QC/SOR/2023/ AP-620/P1 Pile drawing DDC-BMRCL-PH2A&2B-S2-P2-HBRKIA-VIA-DD-DWG101080B-RB. Rahul Thandel(AEE)
223 15.05.2023 67(10) Closed
NCC/PB2/223 Viaduct AP-620/P1 Pile Development Length found—300 to 650 mm Viaduct
Date of Casting of Pile AP-620/P1-27.01.2023
BMRCL/LPMC/QC/SOR/2023/ AP-698 Pier Cap Bharath (AEE)
224 15.05.2023 During site visit 09.05.2023 at AP-698 pier cap first stage stressing witnessed jointly with BMRCL engineer. 67 GOOD SOR
NCC/PB2/224 Viaduct CY
BMRCL/LPMC/QC/SOR/2023/ Precast U Girders for spans from AP 700-703 erection work being carried out without approved Method statement from Bharath (AEE)
225 17.05.2023 Viaduct AP 7000-703 67(11) Closed
NCC/PB2/225 competant authority. CY
MTC of Ultra Tech cement ordinary portland cement, Grade 53 was checked for below mentioned parameters for 19 week
Vadeyarapura of 2023 and found satisfactory as per IS 269-2015.
BMRCL/LPMC/QC/SOR/2023/ Bharath (AEE)
226 17.05.2023 Casting Yard Quality 1. Table-1 Performance improves (Clause 5.1.1) 67 GOOD SOR
NCC/PB2/226 CY
Lab 2. Table-2 Chemical requirements for OPC (Clause 6.1)
3. Table-3 Physical requirements for OPC (Clause 7)
During Quality walk on 19.05.2023 and 20.05.2023 at AP-716 Pier Cap pedestals curing not found satisfactory as per
BMRCL/LPMC/QC/SOR/2023/ technical specification section S-03 clause no-3.12.6. Bharath (AEE)
227 20.05.2023 AP-716 Viaduct 67(9) Closed
NCC/PB2/227 CY
Date of casting AP-716 pedestals:-13.05.2023
During site visit at casting yard, it is observed that AP -834 Pier Cap sheathing corrugated HDPE duct no 05 of Dia 124
BMRCL/LPMC/QC/SOR/2023/ AP-834 Pier Cap Bharath (AEE)
228 20.05.2023 Package -3 mm is found broken at conical drum central portion. 67(5) Closed
NCC/PB2/228 Package-3 CY
Date of Casting of AP-834 Pier Cap 25.02.2023
MTC of JSW Ground Granulated Blast Furnace Slag was checked for below mentioned parameters for 18th week of 2023
Vadeyarapura
BMRCL/LPMC/QC/SOR/2023/ and found satisfactory as per IS-16714-2018. Bharath (AEE)
229 20.05.2023 Casting Yard Quality 67 GOOD SOR
NCC/PB2/229 1. Table-1 Chemical Requirements of GGBS (Clause 5.1). CY
Control Lab
2. Table-2 Physical Requirements for GGBS (Clause 6).
In V2 Civil Diagnostics Private Limited (BMRCL Approved 3rd Party Testing Agency)
a. Witnessed 28-day Concrete Cube Compressive Strength test on 19.05.2023 of AP-501 Pier Cap of M55 Grade as per
BMRCL/LPMC/QC/SOR/2023/ V2 Civil Diagnostics Bharath (AEE)
230 20.05.2023 attached record. Results found OK as per IS 456:2000 (Reaffirmed 2021) Clause 16.1 table no 11. 67 GOOD SOR
NCC/PB2/230 Private Limited CY
b. Witnessed 28-day Concrete Cube Compressive Strength test on 19.05.2023 of A02/P1 Yelahanka Station Pile of M35
Grade as per attached record. Results found OK as per IS 456:2000 (Reaffirmed 2021) Clause 16.1 table no 11.
Routine Vertical Load Test on working pile at AP-586/P4 Viaduct witnessed along with the BMRCL Engineer. The final
BMRCL/LPMC/QC/SOR/2023/ settlement was observed with in the permissible limit as per Cl.7.2.1.1(b) of IS 2911 Part-IV-2013, Report submission Rahul Thandel(AEE)
231 25.05.2023 AP-586/P4 Viaduct 67 GOOD SOR
NCC/PB2/231 awaited. Viaduct
Date of casting of pile AP-586/P4- 27.12.2022
During site visit at AP-604 /P1 Pile (1200 mm Dia) Development length (1200 mm) not found as per approved GFC
drawing DDC-BMRCL-PH2A&2B-S2-P2-HBRKIA-VIA-DD-201200A-RC
BMRCL/LPMC/QC/SOR/2023/ AP604/P1, LHS Rahul Thandel(AEE)
232 27.05.2023 AP-604/P1,LHS, Pile Development Length found—300 to 600 mm 67(4) Closed
NCC/PB2/232 Pile Viaduct Viaduct
Date of Casting of Pile AP-604/P1, LHS -24.03.2023
Date of AP604 LHS Pile Cap PCC-16.05.2023
AP 601/P2,LHS, Sonic testing witnessed. It is found that Access tube-3 & 4 found blockage & Access tube 1 & 2 signal
BMRCL/LPMC/QC/SOR/2023/ AP-601/P2,LHS, Rahul Thandel(AEE)
233 27.05.2023 recorded up to 15.00 meter from pile cut off level. 67(5) Closed
NCC/PB2/233 Pile Viaduct Viaduct
Date of Casting of Pile AP-601/P2,LHS -25.03.2023
Physical tests (Yield strength, Ultimate tensile strength & % of Elongation) on TMT 550D witnessed at Structwel lab
(BMRCL Approved 3rd Party Testing Agency) as per attached records. Found OK as per IS 1786:2008. Item-JSW
BMRCL/LPMC/QC/SOR/2023/ Bharath (AEE)
234 27.05.2023 Structwel Lab TMT 550D 67 GOOD SOR
NCC/PB2/234 CY
Heat No-F930974
Dia of steel-25 mm
HT strands (seven ply) of Brand-TATA steel ,Coil no-B5709F and Heat no-M28635 sampling witnessed at site and
BMRCL/LPMC/QC/SOR/2023/ Bharath (AEE)
235 27.05.2023 Structwel Lab Mechanical test witnessed at 3rd party lab (Structwel lab) along with BMRCL Engineer and NCC Engineer and results 67 GOOD SOR
NCC/PB2/235 CY
found satisfactory as per IS14268:2022.
During quality walk on 27.05.2023 at C-03,Pile Cap Yelahanka Station, it observed that backfilling material and process is
BMRCL/LPMC/QC/SOR/2023/ Yelahanka station not as per technical specification Section S.02 Clause No 2.2.
236 27.05.2023 Chethan (AEE) 67(20) Closed
NCC/PB2/236 C-03 Pile Cap.
Date of casting of C-03 Pile Cap Yehelanka Station-23.05.2023.
In Quality Lab
a. Witnessed 28-day Concrete Cube Compressive Strength test on 02.05.2023 of AP-829 Pier Cap of M55 Grade as per
attached record. Results found OK.
Vadeyarapura
BMRCL/LPMC/QC/SOR/2023/ b. Witnessed 28-day Concrete Cube Compressive Strength test on 08.05.2023 of AP-508 Pier Cap of M55 Grade as per Bharath (AEE)
237 02.06.2023 Casting Yard Quality 67 GOOD SOR
NCC/PB2/237 attached record. Results found OK. CY
Lab
c. Witnessed 28-day Concrete Cube Compressive Strength test on 08.05.2023 of AP-508 Pier Cap of M55 Grade as per
attached record. Results found OK.Witnessed 28-day Concrete Cube Compressive Strength test on 08.05.2023 of AP-625
Pier Cap of M55 Grade as per attached record. Results found OK.
BMRCL/LPMC/QC/SOR/2023/ A05 to C05 Bagluru During post concrete inspection of A05 to C05 bagaluru station, concourse level portal beam, Honeycomb, repair work and
238 03.06.2023 Chethan (AEE) 67(17) Closed
NCC/PB2/238 ststion CCL Level exposed reinforcement observed.
BMRCL/LPMC/QC/SOR/2023/ Viaduct Pile AP During site visit AP 671/P8 Pile concrete slump, temperature of TM No KA 50B-1661 & TM No KA 50B-1663 witnessed Rahul Thandel(AEE)
239 03.06.2023 67 GOOD SOR
NCC/PB2/239 671/P8 at site and found within permissible limit. Viaduct
During Site visit AP-674 (LHS) Pier reinforcement of size(2.2mx1.8m) and height Approx 12m checked as per GFC
BMRCL/LPMC/QC/SOR/2023/ Viaduct Pier AP-674 Rahul Thandel(AEE)
240 03.06.2023 drawing no.DDC-BMRCL-PH2A&2B-S2-P2-HBRKIA-VIA-DD-DWG-202080A-II Rev-RC,( Sheet 01 of 01) and Found 67 GOOD SOR
NCC/PB2/240 (LHS). Viaduct
OK.
In Quality Lab
1.Witnessed Truck sample KA 03 AE 6778 Gradation test of Coarse Aggregate (20 mm) of Besto Mining on 01.06.2023
as per attached records. Found OK as per IS 383.
Vadeyarapura
BMRCL/LPMC/QC/SOR/2023/ 2. Witnessed Truck sample KA 03 AE 6787 Gradation test of fine Aggregate (M Sand) of Besto Mining on 03.06.2023 as Bharath (AEE)
241 05.06.2023 Casting Yard Quality 67 GOOD SOR
NCC/PB2/241 per attached records. Found OK as per IS 383. CY
Lab
3. Witnessed Truck sample KA 03 AE 6778 Gradation test of Coarse Aggregate (12.5 mm) of Besto Mining on 05.06.2023
as per attached records. Found OK as per IS 383.
It observed that Pile AP-474/P2, RHS, Prolonged delay in the commencement of concrete after completion of boring.
Pile boring completed at 03:00 AM and concrete pouring completed 08:45 PM. Time interval between Boring completion
BMRCL/LPMC/QC/SOR/2023/ Viaduct Pier AP-474 Rahul Thandel(AEE)
242 06.06.2023 and concrete pouring commencement is 17 hours 45 minutes which is not as per technical specifications clause no. 8.4.3 67(25) Closed
NCC/PB2/242 RHS/P2. Viaduct
(a).
Date of Concrete of AP 474/P2 RHS :- 30.05.2023
During quality walk It observed that C-04/P1 Yelahanka Station, Pile development length not found as per approved GFC
drawings DDC-BMRCL-PH2A&2B-S2-YELSTN-STC-GFC-DWG-1002-04,REV-C.
BMRCL/LPMC/QC/SOR/2023/ Yelahanka Station
243 06.06.2023 Chethan (AEE) 67(12) Closed
NCC/PB2/243 C-04/P1 pile C-04/P1 Pile Development Length found:- 420mm-710 mm.
AP 167(TYPE-1) During site visit in Vadeyarpura Casting yard checked post concrete of Pier cap AP167 (Type-1,10.4m length) pedestals
BMRCL/LPMC/QC/SOR/2023/ Bharath (AEE)
245 09.06.2023 Vadeyarpura Csting reinforcement position as per approved drawing no:-BANG-2A&2B-DTD-GEN-STR-DWG-02280, REV-A1 and centre 67 GOOD SOR
NCC/PB2/245 CY
Yard line marking done by survey personal along with BMRCL Engineer and found with in tolerance limit.
During post concrete inspection of AP 678 RHS Pier viaduct concrete surface defects observed like scaling, Honeycomb
BMRCL/LPMC/QC/SOR/2023/ AP 678 RHS Pier Rahul Thandel(AEE)
246 09.06.2023 around 3-4m height from Pile cap as shown in attached pictures. Open
NCC/PB2/246 Viaduct Viaduct
Date of casting 05.04.2023
BMRCL/LPMC/QC/SOR/2023/ AP 494 Pier Cap AP 494 Pier cap stitch reinforcement as per GFC drawing no.BANG-2A&2B-DTD-GEN-STR-DWG-03424 Rev-A0 Bharath (AEE)
247 09.06.2023 67 GOOD SOR
NCC/PB2/247 Stitch viaduct (Sheet 05 of 07) and found ok CY
BMRCL/LPMC/QC/SOR/2023/ AP 646 Pier cap Bharath (AEE)
248 10.06.2023 During site visit 07.06.2023 Ap 646 Pier cap first stage stressing witnessed jointly with BMRCL engineer. 67 GOOD SOR
NCC/PB2/248 Viaduct CY
During quality walk AP-646, Pier Cap Pedestal reinforcement & shuttering checked as per GFC drawing No. BANG-2A&
BMRCL/LPMC/QC/SOR/2023/ AP-646 Pier Cap 2B-DTD-GEN-STR-DWG-03425 (A0) found ok. Bharath (AEE)
249 14.06.2023 67 GOOD SOR
NCC/PB2/249 Pedestals Viaduct Date of concrete of AP-646 Pier Cap:- 31.01.2023 CY
Date of Concrete of Stitch Concrete of AP-646 :-18.04.2023
BMRCL/LPMC/QC/SOR/2023/ AP-524/P3 Pile SPT of Pile AP 524/P3 was witnessed. The RPM and torque of the piling rig machine found satisfactory. The socketing Rahul Thandel(AEE)
250 16.06.2023 67 GOOD SOR
NCC/PB2/250 Viaduct calculation was checked and verified jointly with BMRCL Engineer. Viaduct
BMRCL/LPMC/QC/SOR/2023/ AP 472/P9 Pile During site visit AP 472/P9 Pile Polymer property like viscosity, PH, density witnessed found with in permissible limit as Rahul Thandel(AEE)
251 16.06.2023 67 GOOD SOR
NCC/PB2/251 Viaduct per approved method statement. Viaduct
During quality walk it observed that AP 581 Pier reinforcement of approx. height 8.5mts vertical main Bar twisted as
BMRCL/LPMC/QC/SOR/2023/ Rahul Thandel(AEE)
252 16.06.2023 AP 581 Pier Viaduct shown in picture1 and Picture 2 leading to dislocation of main reinforcement tied with rings/stirrups. 67(25) Closed
NCC/PB2/252 Viaduct
Date of Concrete of AP 581,Pier Starter:- 08.05.2023.
During quality walk it observed that AP-601/P5 LHS ,Pile concrete chipped 205 mm below from the cut-off level.As per
BMRCL/LPMC/QC/SOR/2023/ AP 601/P5 LHS Pile Rahul Thandel(AEE)
253 17.06.2023 technical specifications clause 8.4.3 cut off level of pile should be 75 mm inside pile cap. 67(17) Closed
NCC/PB2/253 Viaduct Viaduct
Date of concrete of AP-601/P5 , LHS:- 28.03.2023
In Quality Lab
1. Witnessed Tests on Aggregate Impact Value of Coarse Aggregate- Average Impact Value found 28.38% on 14.06.2023
Vadeyarapura as per attached records. Found OK as per IS 383-2016, Clause 5.4.2 (b)
BMRCL/LPMC/QC/SOR/2023/ Bharath (AEE)
254 17.06.2023 Casting Yard Quality 2. Witnessed Tests on Aggregate Crushing Value of Coarse Aggregate- Average Crushing Value found 28.36% on 67 GOOD SOR
NCC/PB2/254 CY
Lab 14.06.2023 as per attached records. Found OK as per IS 383-2016, Clause 5.4.1 (b)
3.Witnessed Tests on Flakiness and Elongation Index of Coarse Aggregate- Combined Index Value found 17.25% on
16.06.2023 as per attached records. Found OK as per IS 383-2016, Clause 5.3
Vadeyarapura During site visit on 16.06.2023 witnessed AP-580 (Type -2) Precast Pier Cap M55 grade concreting, checked slump,
BMRCL/LPMC/QC/SOR/2023/ Bharath (AEE)
255 17.06.2023 Casting Yard AP-580 temperature & verified Batch sheet of vehicle No KA 50 B 1489 and KA 50 B 1661 with approved Mix design as shown in 67 GOOD SOR
NCC/PB2/255 CY
(Type -2) Pier Cap attached pictures. Found within the permissible limits.
Witnessed incoming JSW TMT 550D and review MTC as per attached record on 17.06.2023 and 19.06.2023. Found OK
as per IS 1786:2008.
MTC of Ultra Tech Cement Ordinary Portland Cement, Grade 53 was checked for below mentioned parameters for 21st,
Vadeyarapura 22nd, 23rd and 24th week of 2023 as per attached record and found satisfactory as per IS-269-2015.
BMRCL/LPMC/QC/SOR/2023/ Bharath (AEE)
258 24.06.2023 Casting Yard Quality 1. Table -1 Performance Improvers (Clause 5.1.1). 67 GOOD SOR
NCC/PB2/258 CY
Control Lab 2. Table-2 Chemical Requirements for OPC (Clause 6.1).
3. Table-3 Physical Requirements for OPC (Clause 7).
AP-569 ( Type 2)
BMRCL/LPMC/QC/SOR/2023/ Precast Pier Cap During site visit AP-569 (Type2) Precast Pier cap reinforcement checked (No’s of main bars, spacing ), as per approved Bharath (AEE)
259 26.06.2023 67 GOOD SOR
NCC/PB2/259 Vadeyarapura GFC Drawing NO: BANG-2A&2B-DTD-GEN-STR-DWG-03420 to 03426 (Sheet 1-7) Revesion-A0 CY
Casting Yard
Vadeyarapura
BMRCL/LPMC/QC/SOR/2023/ During site visit on 24.06.2023 and 26.06.2023 at Vadeyarapura Casting Yard Steel Yard Pile reinforcement cage stacking Bharath (AEE)
260 26.06.2023 Casting Yard steel 67(8) Closed
NCC/PB2/260 not as per IS 4082:1996 Clause 4.13 as shown in attached pictures. CY
Yard
During site visit Pile AP-420/P4 and AP-421/P1 sonic test and AP-421/P1 and AP-421/P3 Pile Integrity Test witnessed
along with BMRCL Engineer and Reports are awaited.
BMRCL/LPMC/QC/SOR/2023/ AP-420 and 421 Rahul Thandel(AEE)
261 26.06.2023 Date of Concrete pile AP 421/P1- 01.04.2023. 67 GOOD SOR
NCC/PB2/261 PILE Viaduct Viaduct
Date of Concrete pile AP 421/P3 -30.03.2023.
Date of Concrete pile AP 420/P4- 04.02.2023.
During site visit AP-675 LHS and AP-617 Pier curing found satisfactory.
BMRCL/LPMC/QC/SOR/2023/ AP-675 LHS and AP- Rahul Thandel(AEE)
262 26.06.2023 Date of concrete Pier AP-675, LHS: - 14.06.2023 67 GOOD SOR
NCC/PB2/262 617 Pier Viaduct Viaduct
Date of concrete Pier AP-617:- 20.06.2023
During site visit it observed Pile Cap AP-673(RHS) backfilling process is not as per technical specification Section S.02
BMRCL/LPMC/QC/SOR/2023/ AP-673 RHS PILE Clause No 2.2 Rahul Thandel(AEE)
263 26.06.2023 67(26) Closed
NCC/PB2/263 CAP Viaduct Date of concrete of Pile Cap AP-673, RHS :- 19.06.2023 Viaduct
Witnessed incoming JSW TMT 550D and review MTC as per attached record on 01.07.2023. Found OK as per IS
1786:2008.
In Quality Lab
a. Witnessed 28-day Concrete Cube Compressive Strength test on 01.07.2023 of AP-570 Pier Cap of M55 Grade as per
attached record. Results found OK.
Vadeyarapura b. Witnessed 28-day Concrete Cube Compressive Strength test on 01.07.2023 of AP-773 Pier Cap of M55 Grade as per
BMRCL/LPMC/QC/SOR/2023/ Bharath (AEE)
265 03.07.2023 Casting Yard Quality attached record. Results found OK. 67 GOOD SOR
NCC/PB2/265 CY
Control Lab c. Witnessed 28-day Concrete Cube Compressive Strength test on 03.07.2023 of AP-171 Pier Cap of M55 Grade as per
attached record. Results found OK.
d. Witnessed 28-day Concrete Cube Compressive Strength test on 03.07.2023 of AP-497 Pier Cap Stitch of M55 Grade as
per attached record. Results found OK.
BMRCL/LPMC/QC/SOR/2023/ AP473/P3 RHS Pile During site visit AP 473/P3 RHS Pile Polymer property like viscosity, PH, density witnessed found with in permissible Rahul Thandel(AEE)
266 03.07.2023 67 GOOD SOR
NCC/PB2/266 Viaduct limit as per approved method statement. Viaduct
During Site visit AP-590 Pier reinforcement of size 1.6 m Diameter and height Approx 11.5m checked as per GFC
BMRCL/LPMC/QC/SOR/2023/ Rahul Thandel(AEE)
267 04.07.2023 AP-590 Pier Viaduct drawing no.DDC-BMRCL-PH2A&2B-S2-P2-HBRKIA-VIA-DD-DWG-202101A1 Rev-R1, (Sheet 01 of 02) and Found 67 GOOD SOR
NCC/PB2/267 Viaduct
OK.
It observed that Pile AP-472/P3, RHS, Prolonged delay in the commencement of concrete after completion of boring.
Pile boring completed at 02:00 PM on 01.07.2023 and concrete pouring completed 02.20 AM on 02.07.2023.
AP-472/P3 RHS
BMRCL/LPMC/QC/SOR/2023/ Time interval between Boring completion and concrete pouring commencement is 12 hours 20 minutes which is not as per Rahul Thandel(AEE)
268 04.07.2023 Viaduct 67(16) Closed
NCC/PB2/268 technical specifications clause no. 8.4.3 (a). Viaduct
Date of Concrete of AP 472/P3 RHS Pile :- 02.07.2023
During Quality walk It observed that Pile A08/P3, Kodigehalli Station, Prolonged delay in the commencement of concrete
after completion of boring.
BMRCL/LPMC/QC/SOR/2023/ A08/P3 Pile,
269 11.07.2023 Pile boring completed at 19:30 PM on 07.07.2023 and concrete pouring completed 15:20 PM on 08.07.2023 Chethan (AEE) Open
NCC/PB2/269 Kodigehalli station
Time interval between Boring completion and concrete pouring commencement is 17 hours 50 minutes which is not as per
technical specifications clause no. 8.4.3 (a)
During Quality walk, it observed that Pile A08 /P6 Yelahanka Station found unsound and soil-mixed concrete above cut Complaiance received from NCC on 14.08.2023 and
BMRCL/LPMC/QC/SOR/2023/ A08/P6, Pile
270 14.07.2023 off level which was not as per Technical Specification Clause 8.4.3 (k). Chethan (AEE) Open handed over to CK (should send PIT report for LPMC to
NCC/PB2/270 Yelahanka station
Date of concrete of A08/P6 Pile Yelahanka Station:- 17.04.2023 send recommendation)
A05-C05 Platform
BMRCL/LPMC/QC/SOR/2023/ During site visit C05-A05 Platform level Pier at Bagalur Station Pier concrete slump, temperature of TM No KA 50B-
271 14.07.2023 Level Pier, Bagalur Chethan (AEE) 67 GOOD SOR
NCC/PB2/271 1663 & TM No KA 50B-1489 witnessed at site and found within permissible limit.
Station
AP-591/P3
BMRCL/LPMC/QC/SOR/2023/ During site Visit AP-541/P3 Pile bore depth checked after socketing, SPT calculation, Cage length checked jointly with Rahul Thandel(AEE)
272 14.07.2023 Pile 67 GOOD SOR
NCC/PB2/272 BMRCL Engineer. Viaduct
Viaduct
During Quality walk It observed that Pile AP-535/P1, Prolonged delay in the commencement of concrete after completion
of boring.
BMRCL/LPMC/QC/SOR/2023/ AP-535/P1, Pile Rahul Thandel(AEE) File sent to HO on 20.10.2023 returned back from HO. PIT
273 14.07.2023 Pile boring completed at 11:00 AM on 11.07.2023 and concrete pouring completed 12:30 AM on 13.07.2023 67(18) Open
NCC/PB2/273 Viaduct Viaduct to be submitted again
Time interval between Boring completion and concrete pouring commencement is 37 hours 20 minutes which is not as per
technical specifications clause no. 8.4.3 (a)
During Quality walk, it was observed that main pier reinforcement of AP-571, AP-572, AP-573 has been exposed more
than 10 months,5 months & 5 months respectively and getting rusted. No provision done to prevent the rusting of main pier
BMRCL/LPMC/QC/SOR/2023/ AP-571/572/573 reinforcement. Rahul Thandel(AEE)
274 15.07.2023 67(14) Closed
NCC/PB2/274 Pier Viaduct Date of casting of AP-571 Pile Cap: -01.09.2022 Viaduct
Date of casting of AP-572 Pile Cap: -17.02.2023
Date of casting of AP-573 Pile Cap:- 23.02.2023
BMRCL/LPMC/QC/SOR/2023/ AP-623 Pier Cap During Night shift AP-623 Pier Cap 1st stage Stressing witnessed jointly with BMRCL Engineer. HT Strand Coil id:- Rahul Thandel(AEE)
275 15.07.2023 67 GOOD SOR
NCC/PB2/275 Viaduct C071790017 , Heat No-G 33370 MTC & 3rd Party Test report checked. Viaduct
BMRCL/LPMC/QC/SOR/2023/ AP-594 1 AP-594 Pier Viaduct During site visit AP-594 Pier concrete slump, temperature of TM No KA 50B-1663 & Rahul Thandel(AEE)
276 15.07.2023 67 GOOD SOR
NCC/PB2/276 Pier Viaduct TM No KA 50B-1487 witnessed at site and found within permissible limit. Compliance not required Viaduct
AP-606 LHS During site visit AP-606 LHS Pile Cap reinforcement and concrete checked as per approved Drawing no:-DDC-BMRCL-
BMRCL/LPMC/QC/SOR/2023/ Rahul Thandel(AEE)
277 15.07.2023 Pile Cap PH2A&2B-S2-P2-HBRKIA-VIA-DD-DWG-PP-201054 REC-RC and approved method statement and found within the 67 GOOD SOR
NCC/PB2/277 Viaduct
Viaduct permissible limit.
Vadeyarapura In Quality Lab
BMRCL/LPMC/QC/SOR/2023/ Bharath (AEE)
278 15.07.2023 Casting Yard Quality Witnessed 28-day 1st stage tendon grout Cube Compressive Strength test on 14.07.2023 of AP-649 Pier Cap as per 67 GOOD SOR
NCC/PB2/278 CY
Control Lab attached record. Results found OK as per MORTH 5th Revision Appendix-1800/III clause 4.2.2.
Witnessed Batching Plant calibration on 03.07.2023, the error percentage of aggregates, cement, water and admixture
found within acceptable limits.
Plant SL No:177/8050215,
Vadeyarapura
BMRCL/LPMC/QC/SOR/2023/ Make: Schwing Stetter Bharath (AEE)
279 15.07.2023 Casting Yard 67 GOOD SOR
NCC/PB2/279 Plant Capacity per batch = 2.5 m3, CY
Batching Plant
Last calibrated on: 03-04-2023.
As per IS: 4925(2004), clause-6.1.1 -The tolerance limit for individual batch is Cement & water: +/- 1%, Coarse & Fine
Aggregates: +/-2%, Admixture: +/- 3%.
In Quality Lab: -
1. Witnessed Tests on Aggregate Impact Value of Coarse Aggregate- Average Impact Value found 26.20% on 12.07.2023
Vadeyarapura as per attached records. Found OK as per IS 383-2016, Clause 5.4.2 (b)
BMRCL/LPMC/QC/SOR/2023/ Bharath (AEE)
280 15.07.2023 Casting Yard Quality 2. Witnessed Tests on Aggregate Crushing Value of Coarse Aggregate- Average Crushing Value found 27.13% on 67 GOOD SOR
NCC/PB2/280 CY
Control Lab 12.07.2023 as per attached records. Found OK as per IS 383-2016, Clause 5.4.1 (b)
3.Witnessed Tests on Flakiness and Elongation Index of Coarse Aggregate- Combined Index Value found 17.47% on
15.07.2023 as per attached records. Found OK as per IS 383-2016, Clause 5.3
Quality Lab: -
Vadeyarapura During AP 647 Pedestal (M55 Grade) 28 day’s concrete cube test on 15.07.2023 with BMRCL representative, the average
BMRCL/LPMC/QC/SOR/2023/ Bharath (AEE)
281 15.07.2023 Casting Yard Quality compressive strength 55.00mpa obtained not meeting the expectance criteria mentioned in IS 456:2000 (Reaffirmed 2021) 67(17) Closed
NCC/PB2/281 CY
Lab Clause 16.1 and 16.3 table no 11. Refer clause no 3.25 of technical specifications.
Date of casting of AP 647 Pedestal – 17.06.2023
AP-643 During quality walk AP-643 Pier reinforcement checked and Observed Coupler (Lapping) Provided at 6.17 m and 7.1 m
BMRCL/LPMC/QC/SOR/2023/ Rahul Thandel(AEE)
282 19.07.2023 Pier from pile cap top. Actual Pier concrete top from pile cap top is 7.012m. Coupler placed at the junction of Pier Cap and Pier 67(14) Closed
NCC/PB2/282 Viaduct
Viaduct concrete. On Lapping zone mentioned in drawing is 2Q (5.2 m from Pile cap top). Pier dimension -2.6m x 2m.
AP-599 LHS
BMRCL/LPMC/QC/SOR/2023/ During Quality Walk Pier AP-599 LHS (size: -2.2x1.8m) Corrosion/Rusting of Pier reinforcement found due to water Rahul Thandel(AEE)
283 19.07.2023 Pier 67(16) Closed
NCC/PB2/283 accumulation (Appx 500 mm depth) from top of Pile Cap. Viaduct
Viaduct
BMRCL/LPMC/QC/SOR/2023/ AP-601 LHS Pile Cap Rahul Thandel(AEE)
284 21.07.2023 During site visit it observed that AP-601 LHS Pile Cap Curing was not satisfactory (Hessian cloth is not provided at sides) 67(17) Closed
NCC/PB2/284 Viaduct Viaduct
Vadeyarapura
BMRCL/LPMC/QC/SOR/2023/ During Post Concrete inspection on 22.07.2023 of AP16-AP17/G4 I GIRDER Honey Comb and exposed rebar observed as Bharath (AEE)
285 22.07.2023 Casting Yard AP16- 67(21) Closed
NCC/PB2/285 shown in attached pictures in Vadeyarapura Casting Yard. CY
AP17/G4 I GIRDER
AP-661
BMRCL/LPMC/QC/SOR/2023/ Bharath (AEE)
286 22.07.2023 Pier Cap Pedestal During site visit AP-661 Pier Cap Pedestal reinforcement & Shuttering checked along with BMRCL Engineer. 67 GOOD SOR
NCC/PB2/286 CY
Viaduct
In Quality Lab
a. MTC of Ultra Tech Cement Ordinary Portland Cement, Grade 53 was checked for below mentioned parameters for 24th
week of 2023 as per attached record and found satisfactory as per IS-269-2015.
1. Table -1 Performance Improvers (Clause 5.1.1).
Vadeyarapura 2. Table-2 Chemical Requirements for OPC (Clause 6.1).
BMRCL/LPMC/QC/SOR/2023/ Bharath (AEE)
289 26.07.2023 Casting Yard Quality 3. Table-3 Physical Requirements for OPC (Clause 7). 67 GOOD SOR
NCC/PB2/289 CY
Control Lab
b. MTC of JSW Ground Granulated Blast Furnace Slag was checked for below mentioned parameters for 24th week of
2023 and found satisfactory as per IS-16714-2018.
1. Table-1 Chemical Requirements of GGBS (Clause 5.1).
2. Table-2 Physical Requirements for GGBS (Clause 6).
In Quality Lab
Vadeyarapura a. Witnessed 28-day Concrete Cube Compressive Strength test on 01.08.2023 of AP-043 Pier Cap of M55 Grade as per
BMRCL/LPMC/QC/SOR/2023/ Bharath (AEE)
290 01.08.2023 Casting Yard Quality attached record. Results found OK. 67 GOOD SOR
NCC/PB2/290 CY
Control Lab b. Witnessed 28-day Concrete Cube Compressive Strength test on 01.08.2023 of AP-593 Pier of M50 Grade as per
attached record. Results found OK.
In Quality Lab
a. Witnessed 28-day Concrete Cube Compressive Strength test on 03.08.2023 of AP-1065 Pier Cap of M55 Grade as per
attached record. Results found OK.
Vadeyarapura b. Witnessed 28-day Concrete Cube Compressive Strength test on 03.08.2023 of AP-656 Pier Cap Pedestal of M55 Grade
BMRCL/LPMC/QC/SOR/2023/ Bharath (AEE)
291 03.08.2023 Casting Yard Quality as per attached record. Results found OK. 67 GOOD SOR
NCC/PB2/291 CY
Control Lab c. Witnessed 28-day Concrete Cube Compressive Strength test on 03.08.2023 of AP-631 Pier Cap Stitch of M55 Grade as
per attached record. Results found OK.
d. Witnessed 28-day Concrete Cube Compressive Strength test on 03.08.2023 of C08 Yelahanka Station Pier Starter of
M50 Grade as per attached record. Results found OK.
AP-414/P2 During Quality walk, it observed that Pile AP-414 /P2 found unsound (Approx:-300-400mm ) and soil-mixed concrete
BMRCL/LPMC/QC/SOR/2023/ Rahul Thandel(AEE)
292 04.08.2023 Pile above cut off level which was not as per Technical Specification Clause 8.4.3 (k). 67(17) Closed
NCC/PB2/292 Viaduct
Viaduct Date of concrete of AP-414/P2 Pile: - 23-02-2023.
AP-411/P3 During Quality walk, it observed that Pile AP-411 /P3 found unsound (Approx:-300-400mm) and soil-mixed concrete
BMRCL/LPMC/QC/SOR/2023/ Rahul Thandel(AEE)
293 04.08.2023 Pile above cut off level which was not as per Technical Specification Clause 8.4.3 (k). 67(15) Closed
NCC/PB2/293 Viaduct
Viaduct Date of concrete of AP-411/P3 Pile: - 07-02-2023
AP-631
BMRCL/LPMC/QC/SOR/2023/ At Pier cap AP-631 1st stage ducts (4no’s) grouting witnessed temperature is 21.3﮿C, water /cement ratio is 0.40 and Bharath (AEE)
294 05.08.2023 Pier Cap 67 GOOD SOR
NCC/PB2/294 pressure after full injection of grout is maintained 5kg/sq.cm for 1min found satisfactory as per MORTH 1800/III. CY
Viaduct
In Quality Lab
Vadeyarapura Witnessed 28-day 1st stage tendon grout Cube Compressive Strength test on 07.08.2023 of AP-665 Pier Cap as per
BMRCL/LPMC/QC/SOR/2023/ Bharath (AEE)
295 07.08.2023 Casting Yard Quality attached record. Results found OK as per MORTH 5th Revision Appendix-1800/III clause 4.2.2. 67 GOOD SOR
NCC/PB2/295 CY
Control Lab
Date of 1st Stage tendon grouting of AP 665 Pier Cap-10.07.2023
In Quality Lab
Vadeyarapura 1. Witnessed Tests on Aggregate Impact Value of Coarse Aggregate- Average Impact Value found 23.87% on 07.08.2023
BMRCL/LPMC/QC/SOR/2023/ Bharath (AEE)
296 07.08.2023 Casting Yard Quality as per attached records. Found OK as per IS 383-2016, Clause 5.4.2 (b) 67 GOOD SOR
NCC/PB2/296 CY
Lab 2. Witnessed Tests on Aggregate Crushing Value of Coarse Aggregate- Average Crushing Value found 26.03% on
07.08.2023 as per attached records. Found OK as per IS 383-2016, Clause 5.4.1 (b)
Vadeyarapura During site visit on 09.08.2023 witnessed AP-105 (Type -1) Precast Pier Cap M55 grade concreting, checked slump,
BMRCL/LPMC/QC/SOR/2023/ Bharath (AEE)
297 09.08.2023 Casting Yard AP-105 temperature & verified Batch sheet of vehicle No KA 50 B 1661 and KA 50 B 1486 with approved Mix design as shown in 67 GOOD SOR
NCC/PB2/297 CY
(Type -1) Pier Cap attached pictures. Found within the permissible limits.
In Quality Lab
1.Witnessed Truck sample KA 03 AE 6782 Gradation test of Coarse Aggregate (20 mm) of Besto Mining on 08.08.2023
Vadeyarapura as per attached records. Found OK as per IS 383.
BMRCL/LPMC/QC/SOR/2023/ Bharath (AEE)
298 09.08.2023 Casting Yard Quality 2. Witnessed Truck sample KA 03 AE 6787 Gradation test of Coarse Aggregate (12.5 mm) of Besto Mining on 08.08.2023 67 GOOD SOR
NCC/PB2/298 CY
Control Lab as per attached records. Found OK as per IS 383.
3. Witnessed Truck sample KA 51 B 7935 Gradation test of Fine Aggregate (M Sand) of Besto Mining on 09.08.2023 as
per attached records. Found OK as per IS 383.
It observed that Yelahanka station A01/P4 Pile Prolonged delay in the commencement of concrete after completion of
boring. Pile boring completed at 03:00 AM on 08.08.2023 and concrete pouring completed 05:30 PM on 08.08.2023. Time
BMRCL/LPMC/QC/SOR/2023/ Yelahanka station
299 09.08.2023 interval between Boring completion and concrete pouring commencement is 14 hours 30 minutes which is not as per Chethan (AEE) 67(21) Closed
NCC/PB2/299 A01/P4 Pile
technical specifications clause no. 8.4.3 (a).
Date of Concrete Yelahanka station A01/P4 : - 08.08.2023.
AP-635
BMRCL/LPMC/QC/SOR/2023/ During Night shift AP-635 Pier Cap 1st stage Stressing witnessed jointly with BMRCL Engineer. HT Strand Coil id: - Bharath (AEE)
300 09.08.2023 Pier Cap 67 GOOD SOR
NCC/PB2/300 C091720248, Heat No-G34063 MTC checked. CY
Viaduct
BMRCL/LPMC/QC/SOR/2023/ AP 488/P2 Pile During site visit AP 488/P2 Pile Polymer property like viscosity, PH, density witnessed found with in permissible limit as Rahul Thandel(AEE)
301 11.08.2023 67 GOOD SOR
NCC/PB2/301 Viaduct per approved method statement. Viaduct
During Site visit AP-532 Pier (1.6 m dia) reinforcement & Shuttering checked as per GFC drawing no.DDC-BMRCL-
BMRCL/LPMC/QC/SOR/2023/ Rahul Thandel(AEE)
302 14.08.2023 AP-532 Pier Viaduct PH2A&2B-S2-P2-HBRKIA-VIA-DD-DWG-202101A Rev-RE, (Sheet 01 of 02) & DDC-BMRCL-PH2A&2B-S2-P2- 67 GOOD SOR
NCC/PB2/302 Viaduct
HBRKIA-VIA-DD-DWG-TYP-ECO-1 Rev-RA, (Sheet 01 of 01) and Found OK.
During site visit it observed Pile Cap AP 529
BMRCL/LPMC/QC/SOR/2023/ AP 529 PILE CAP 1. Backfilling process is not as per technical specification Section S.02 Clause No 2.2. Rahul Thandel(AEE)
303 14.08.2023 67(20) Closed
NCC/PB2/303 Viaduct 2. Curing is not as per technical specification Section S.03 Clause No 3.12.6 Viaduct
Date of concrete of Pile Cap AP-529: - 10.08.2023
A02-C02
BMRCL/LPMC/QC/SOR/2023/ During site visit A02-C02 Platform level Pier at Bagalur Station Pier concrete slump, temperature of TM No KA 50B-
304 14.08.2023 Platform Level Pier, Chethan (AEE) 67 GOOD SOR
NCC/PB2/304 1486 & TM No KA 50B-1487 witnessed at site and found within permissible limit.
Bagalur Station
BMRCL/LPMC/QC/SOR/2023/ C04 Pile Cap During site visit C04 Pile Cap Yelahanka Station reinforcement & shuttering checked as per approved Drawing no:-DDC-
305 14.08.2023 Chethan (AEE) 67 GOOD SOR
NCC/PB2/305 Yelahanka Station BMRCL-PH2A&2B-S2-YELSTN-STC-GFC-DWG-1002-04 REV-C.
During quality walk AP-634, Pier Cap Pedestal reinforcement & shuttering checked as per GFC drawing No. BANG-2A&
BMRCL/LPMC/QC/SOR/2023/ AP-634 Pier Cap Bharath (AEE)
306 18.08.2023 2B-DTD-GEN-STR-DWG-03425 (A0) found ok. 67 GOOD SOR
NCC/PB2/306 Pedestals Viaduct CY
Date of Concrete of Stitch Concrete of AP-634 :-08.07.2023
AP-442/P1 During Quality walk, it observed that Pile AP-442 /P1 found unsound and soil-mixed concrete below (Approx. 1 meter) cut
BMRCL/LPMC/QC/SOR/2023/ Rahul Thandel(AEE)
307 19.08.2023 Pile off level. Which is not as per Technical Specification Clause 8.4.3 (k). Open
NCC/PB2/307 Viaduct
Viaduct Date of concrete of AP-442/P1 Pile: - 22.12.2022
During quality walk AP 409/P4, Sonic test witnessed. It is observed that
• Access tube- 1,2, 3 found blockage 10.00 meter from Pile bottom level, signal recorded up to 6.50 meter from Pile cut off
BMRCL/LPMC/QC/SOR/2023/ AP-409/P4 Pile level only. Rahul Thandel(AEE)
308 19.08.2023 67(23) Closed
NCC/PB2/308 Viaduct • Access tube- 4 found blockage 11.50 meter from Pile bottom level, signal recorded up to 5.0 meter from Pile cut off level Viaduct
only.
Date of Casting of AP-409/P4 Pile Viaduct -19.01.2023
Vadeyarapura During site visit at Casting Yard AP443-444/G4 I Girder one end edge broken found as shown in attached picture.
BMRCL/LPMC/QC/SOR/2023/ Bharath (AEE)
309 19.08.2023 Casting Yard AP- 67(26) Closed
NCC/PB2/309 CY
443-444/G4 I Girder Date of Casting of AP443-444/G4 I Girder-18.11.2022
Vadeyarapura During site visit at Casting Yard Pier Cap AP-787 (Type-2), Honeycomb observed at inner and outer central portion of
BMRCL/LPMC/QC/SOR/2023/ 22.08.2023 Casting Yard Pier conical drum as shown in attached pictures. Bharath (AEE)
310 Package -3 67(16) Closed
NCC/PB2/310 Cap AP-787 (Type-2) CY
Package-3 Date of Casting of AP-787 (Type2) Pier Cap- 14.08.2023.
Vadeyarapura
During site visit at Casting Yard AP-126 (Type-1) Pier Cap one edge broken found as shown in attached picture.
BMRCL/LPMC/QC/SOR/2023/ Casting Yard AP-126 Bharath (AEE)
311 23.08.2023 Package -1 67(22) Closed
NCC/PB2/311 ( Type-1) Pier Cap CY
Date of Casting of AP-126 (Type-1) Pier Cap -17.08.2023
Package-1
Vadeyarapura
BMRCL/LPMC/QC/SOR/2023/ During at Vadeyarapura Casting Yard Steel Yard Steel Coil and Pile reinforcement cage stacking not as per IS 4082:1996 Bharath (AEE)
312 24.08.2023 Casting Yard steel 67(21) Closed
NCC/PB2/312 Clause 4.13 as shown in attached pictures. CY
Yard
Stedrant In third party lab Mechanical properties testing of Composite girder plate at Stradent Technoclinic pvt.ltd, it observed that
BMRCL/LPMC/QC/SOR/2023/ Bharath (AEE)
313 24.08.2023 Technoclinic Pvt.Ltd 1) For Heat no. G34605 and G34856 (16mm) Elongation was not as per IS 2062:2011, Table-2. 67(14) Closed
NCC/PB2/313 CY
(Third Party Lab). 2) For Heat no-G34856 (16mm) during Bend test Cracks observed on Bend portion.
AP-481/P1 During quality walk at Steel yard, it observed that AP-481/P1 Pile Cage Reinforcement Spacer bar observed 20 mm dia at
BMRCL/LPMC/QC/SOR/2023/ Rahul Thandel(AEE)
314 24.08.2023 Pile site. But as drawing no. DDC-BMRCL-PH-2A&2B-S2-P2-HBRKIA-VID-DD-DWG-PP-201052 REV- RC it mentioned 67(15) Closed
NCC/PB2/314 Viaduct
Viaduct 25mm dia 1000 C/C. Also Stiffener Bars is not welded at many locations.
During quality walk It observed that Pile AP 606-P3 (RHS) Prolonged delay in the commencement of concreting after the
BMRCL/LPMC/QC/SOR/2023/ AP 606-P3(RHS) Pile completion of boring of pile: - Rahul Thandel(AEE)
315 24.08.2023 Open
NCC/PB2/315 Viaduct • Pile boring completed at 4:30 AM on Dt.19.08.2023 and concrete completed at 11:40 PM on Dt.19.08.2023 Viaduct
• Time interval between completion of bore and placing of concrete is 19 hours 10 minutes.
Witnessed incoming JSW TMT 550D and review MTC as per attached record. Found OK as per IS 1786:2008.
Item-JSW TMT 550D
BMRCL/LPMC/QC/SOR/2023/ Vadeyarapura Invoice No-15078 Bharath (AEE)
316 25.08.2023 67 GOOD SOR
NCC/PB2/316 Casting Yard Heat No- A3068673, A3068677, A3068680, B3068668 CY
Dia of steel-20mm
MTC No- TMT/23-24/0003045361 and TMT/23-24/0003045362
In Quality Lab
MTC of Ultra Tech Cement Ordinary Portland Cement, Grade 53 was checked for below mentioned parameters for 29th
Vadeyarapura
BMRCL/LPMC/QC/SOR/2023/ and 30th week of 2023 as per attached record and found satisfactory as per IS-269-2015. Bharath (AEE)
317 28.08.2023 Casting Yard Quality 67 GOOD SOR
NCC/PB2/317 1. Table -1 Performance Improvers (Clause 5.1.1). CY
Control Lab
2. Table-2 Chemical Requirements for OPC (Clause 6.1).
3. Table-3 Physical Requirements for OPC (Clause 7).
In Quality Lab
Vadeyarapura MTC of JSW Ground Granulated Blast Furnace Slag was checked for below mentioned parameters for 30th week of 2023
BMRCL/LPMC/QC/SOR/2023/ Bharath (AEE)
318 28.08.2023 Casting Yard Quality and found satisfactory as per IS-16714-2018. 67 GOOD SOR
NCC/PB2/318 CY
Control Lab 1. Table-1 Chemical Requirements of GGBS (Clause 5.1).
2. Table-2 Physical Requirements for GGBS (Clause 6).
AP-1080
BMRCL/LPMC/QC/SOR/2023/ Pier Cap At Vadeyarpura casting yard AP-1080 Pier Cap (Type-2) of PKG-3 dispatch checked as per attached checklist. Bharath (AEE)
319 31.08.2023 67 GOOD SOR
NCC/PB2/319 Vadeyarpura casting Date of concrete of Pier Cap AP-1080 :-04.08.2023. CY
yard
A07-C07 Concourse Level Portal Beam Bagalur station: -
A07-C07
1) Reinforcement checked as per approved drawing: - DDC-BMRCL-PH2A&2B-S2-BAGSTN-STC-GFC-DWG-1004-04
BMRCL/LPMC/QC/SOR/2023/ Portal Beam
320 31.08.2023 REV-B and 1004-04A REV -B on 28.08.2023 Chethan (AEE) 67 GOOD SOR
NCC/PB2/320 (Concourse level)
2) Concrete slump and temperature witnessed along BMRCL representative for vehicle no:-KA50B1661 and KA50B1662
Bagalur station
on 30.08.2023.
During site visit at Vadeyarapura Casting Yard AP444-AP445-G2 I GIRDER Honey Comb observed as shown in attached
Vadeyarapura
BMRCL/LPMC/QC/SOR/2023/ pictures. Bharath (AEE)
321 01.09.2023 Casting Yard AP444- 50(19) Closed
NCC/PB2/321 CY
AP445-G2 I GIRDER
Date of Casting of AP444-AP445-G2 I GIRDER -28.08.2023
In Quality Lab
Vadeyarapura a. Witnessed 28-day Concrete Cube Compressive Strength test on 02.09.2023 of AP-1063 Pier Cap of M55 Grade as per
BMRCL/LPMC/QC/SOR/2023/ Bharath (AEE)
322 04.09.2023 Casting Yard Quality attached record. Results found OK. 67 GOOD SOR
NCC/PB2/322 CY
Control Lab b. Witnessed 28-day Concrete Cube Compressive Strength test on 04.09.2023 of AP-536 Pier Cap of M55 Grade as per
attached record. Results found OK.
During quality walk AP-640 Pier Cap Pedestal reinforcement &
AP-640
BMRCL/LPMC/QC/SOR/2023/ shuttering checked as per GFC drawing No. BANG-2A& 2B-DTD- Bharath (AEE)
323 04.09.2023 Pier Cap Pedestal 67 GOOD SOR
NCC/PB2/323 GEN-STR-DWG-03425 (A0) found ok. CY
Viaduct
Date of Concrete of Stitch Concrete of AP-640 :-18.07.2023
During site visit at batching plant and Casting Yard witnessed concrete with following details.
a. At Batching Plant AP-604 LHS Pier M50 grade concreting, checked slump, temperature & verified Batch sheet of
BMRCL/LPMC/QC/SOR/2023/ Vadeyarapura Bharath (AEE)
324 05.09.2023 vehicle No KA 50 B 1663 with approved Mix design as shown in attached pictures. Found within the permissible limits. 67 GOOD SOR
NCC/PB2/324 Casting Yard CY
b. At Casting Yard AP-909 (Type 2) Pier Cap M55 grade concreting, checked slump, temperature & verified Batch sheet
of vehicle No KA 50 B 1489 with approved Mix design as shown in attached pictures. Found within the permissible limits.
During quality walk A08 Pier Yelahanka Station Reinforcement & shuttering checked as per approved drawing DDC-
BMRCL/LPMC/QC/SOR/2023/ A-08 Pier Yelahanka
325 06.09.2023 BMRCL-PH2A&2B-S2-YELSTN-STC-GFC-DWG-1003-02 REV-C on 02.09.2023 Chethan (AEE) 67 GOOD SOR
NCC/PB2/325 station
Date of casting of pier starter : 25-08-2023
During Quality walk AP-493 Pier Cap 1st stage Stressing witnessed
jointly with BMRCL Engineer. HT Strand Coil id: - C091720302
BMRCL/LPMC/QC/SOR/2023/ AP-493 Bharath (AEE)
326 06.09.2023 Heat No-G34470 MTC checked. 67 GOOD SOR
NCC/PB2/326 Pier Cap Viaduct CY
Date of casting of Pier cap stitch Concrete:06.06.2023
During quality walk it observed that AP -438/P2 Pile development length not found as per GFC drawings DDC-BMRCL-
AP-438/P2
BMRCL/LPMC/QC/SOR/2023/ PH 2A& 2B- S2-P2-HBRKIA-VIA-DD, -DWG-201106A. Rahul Thandel(AEE)
327 06.09.2023 Pile 67(24) Closed
NCC/PB2/327 Pile development length found -500-800 mm Viaduct
Viaduct
Date of concrete of AP 438/P2:- 21.01.2023.
During site visit It observed that Pile AP-606/P2 RHS Prolonged delay in the commencement of concrete after completion
of boring.
BMRCL/LPMC/QC/SOR/2023/ AP-606/P2 RHS Pile Rahul Thandel(AEE)
328 07.09.2023 Pile boring completed at 07:30 AM on 05.09.2023 and concrete pouring completed 02:36 AM on 06.09.2023. 50(18) Closed
NCC/PB2/328 Viaduct Viaduct
Time interval between Boring completion and concrete pouring commencement is 19 hours 06 minutes which is not as per
technical specifications clause no. 8.4.3 (a)
In Quality Lab
a. Witnessed Truck sample KA 03 AE 6787 Gradation test of Fine Aggregate (M Sand) of Besto Mining on 01.09.2023 as
Vadeyarapura per attached records. Found OK as per IS 383.
BMRCL/LPMC/QC/SOR/2023/ Bharath (AEE)
329 07.09.2023 Casting Yard Quality b. Witnessed Truck sample KA 03 AE 6786 Gradation test of Coarse Aggregate (12.5 mm) of Besto Mining on 07.09.2023 67 GOOD SOR
NCC/PB2/329 CY
Lab as per attached records. Found OK as per IS 383.
c. Witnessed Truck sample KA 03 AE 6784 Gradation test of Coarse Aggregate (20 mm) of Besto Mining on 07.09.2023
as per attached records. Found OK as per IS 383.
In Quality Lab
1. Witnessed Tests on Aggregate Impact Value of Coarse Aggregate- Average Impact Value found 25.56% as per attached
Vadeyarapura records. Found OK as per IS 383-2016, Clause 5.4.2 (b)
BMRCL/LPMC/QC/SOR/2023/ Bharath (AEE)
330 07.09.2023 Casting YardQuality 2. Witnessed Tests on Aggregate Crushing Value of Coarse Aggregate- Average Crushing Value found 27.80% as per 67 GOOD SOR
NCC/PB2/330 CY
Lab attached records. Found OK as per IS 383-2016, Clause 5.4.1 (b)
3. Witnessed Tests on Flakiness and Elongation Index of Coarse Aggregate- Combined Index Value found 17.10% as per
attached records. Found OK as per IS 383-2016, Clause 5.3
After 1st Stage stressing of AP444-AP445/G4 I Girder crack observed at stressing end as shown attached photos.
Vadeyarapura
BMRCL/LPMC/QC/SOR/2023/ Bharath (AEE)
331 08.09.2023 Casting Yard AP444- 50(14) Closed
NCC/PB2/331 Date of 1st stage stressing of AP444-AP445/G4 I Girder-07.09.2023 CY
AP445/G4 I GIRDER
Date of Casting of AP444-AP445/G4 I Girder-19.08.2023
In Quality Lab
Vadeyarapura a. Witnessed 28-day Concrete Cube Compressive Strength test on 05.09.2023 of AP-598 LHS Pier Starter of M50 Grade
BMRCL/LPMC/QC/SOR/2023/ Bharath (AEE)
332 08.09.2023 Casting Yard Quality as per attached record. Results found OK. 67 GOOD SOR
NCC/PB2/332 CY
Control Lab b. Witnessed 28-day Concrete Cube Compressive Strength test on 08.09.2023 of AP-103 Pier Cap of M55 Grade as per
attached record. Results found OK.
BMRCL/LPMC/QC/SOR/2023/ AP-462/P3 Pile During site Visit AP-462/P3 Pile bore depth checked after socketing, SPT calculation and Cage length checked jointly Rahul Thandel(AEE)
333 09.09.2023 67 GOOD SOR
NCC/PB2/333 Viaduct with BMRCL Engineer. Viaduct
At Pier cap AP-493 1st stage ducts (4no’s) grouting witnessed
BMRCL/LPMC/QC/SOR/2023/ AP-493 temperature is 20.6 ﮿C, water /cement ratio is 0.40 and pressure Bharath (AEE)
334 09.09.2023 67 GOOD SOR
NCC/PB2/334 Pier Cap Viaduct after full injection of grout is maintained 5kg/sq.cm for 1min CY
found satisfactory as per MORTH 1800/III.
AP-528
BMRCL/LPMC/QC/SOR/2023/ During Site visit AP-532 Pier (1.8 m dia) reinforcement checked as per GFC drawing no.DDC-BMRCL-PH2A&2B-S2- Rahul Thandel(AEE)
335 11.09.2023 Pier 67 GOOD SOR
NCC/PB2/335 P2-HBRKIA-VIA-DD-DWG-202119 A Rev-RF. Found ok. Viaduct
Viaduct
AP-538 During site visit it observed Pile Cap AP-538 Curing is not as per technical specification Section S.03 Clause 3.12.6
BMRCL/LPMC/QC/SOR/2023/ Rahul Thandel(AEE)
336 13.09.2023 Pile Cap checked on date 12.09.2023 & 13.09.2023. 67(22) Closed
NCC/PB2/336 Viaduct
Viaduct Date of concrete of Pile Cap AP-538: - 10.09.2023
During Quality walk, it was observed that main pier reinforcement of AP-478 LHS, AP-479 LHS has been exposed more
BMRCL/LPMC/QC/SOR/2023/ AP-478 & 479 Pier than 8 months and getting rusted. No provision done to prevent the rusting of main pier reinforcement. Rahul Thandel(AEE)
337 13.09.2023 67(24) Closed
NCC/PB2/337 Viaduct Date of casting of AP-478 Pile Cap LHS: -07.01.2023 Viaduct
Date of casting of AP-479 Pile Cap LHS: -08.01.2023
AP-468/P5 During site visit AP 468/P5, Pile Polymer property like Viscosity (48 sec)
BMRCL/LPMC/QC/SOR/2023/ Rahul Thandel(AEE)
338 15.09.2023 Pile PH( 9.2), Density (<1 kg/cum) which is not found within permissible limit as per approved method statement. 67(23) Closed
NCC/PB2/338 Viaduct
Viaduct
During site visit AP-438 Pile Cap reinforcement checked , it was observed that Pile Cap inside shutter measured 1.2mts
AP-438
BMRCL/LPMC/QC/SOR/2023/ from Pier outer surface but in drawing it is 1.65mts on NHAI side and Pile Cap inside shutter measured 2.2mts from Pier Rahul Thandel(AEE)
339 16.09.2023 Pile Cap and Pier Open
NCC/PB2/339 outer surface but in drawing it is 1.65mts on service road side which is not as per Approved drawing :-DDC-BMRCL- Viaduct
Viaduct
PH2A&2B-S2-P2-HBRKIA-VIA-DD-DWG-201106A,REV-R1 AND 202106A,REV-R1 as shown in the the pictures.
Witnessed incoming Rashtriya Ispat Nigam Limited TMT FE 550D and review MTC as per attached record. Found OK as
per IS 1786:2008.
Item- Rashtriya Ispat Nigam Limited TMT FE 550D
BMRCL/LPMC/QC/SOR/2023/ Vadeyarapura Invoice No-7342303310 and 7342303327 Bharath (AEE)
340 16.09.2023 67 GOOD SOR
NCC/PB2/340 Casting Yard Heat No- 2306272, 2306282, 2306326 and 2306377 CY
Dia of steel-20mm
MTC No- QMS/R/QAD/RM/22/L/2023-24/9340/0085101
QMS/R/QAD/RM/22/L/2023-24/9340/0085701
In Quality Lab
Vadeyarapura
BMRCL/LPMC/QC/SOR/2023/ a. Witnessed Moisture Content of Coarse and Fine Aggregate of Besto Mining as per attached records. Bharath (AEE)
341 16.09.2023 Casting Yard Quality 67 GOOD SOR
NCC/PB2/341 b. Witnessed Gradation test of Coarse and Fine Aggregate of Besto Mining as per attached records. Found OK as per IS CY
Lab
383.
During site visit It observed that Pile AP-608/P3 LHS Prolonged delay in the commencement of concrete after completion
AP-608/P3 LHS
BMRCL/LPMC/QC/SOR/2023/ of boring. Pile boring completed at 03:45 AM on 14.09.2023 and concrete pouring completed at 02:40 AM on 15.09. Rahul Thandel(AEE) File sent to HO on 29.02.2024
342 16.09.2023 Pile 67(25) Open
NCC/PB2/342 2023.Time interval between Boring completion and concrete pouring commencement is 22 hours 55 minutes which is not Viaduct File came back and handed over to EE via
Viaduct
as per technical specifications clause no. 8.4.3 (a)
AP-608/P3 LHS
BMRCL/LPMC/QC/SOR/2023/ During site visit AP-600 RHS Pile Cap reinforcement and shuttering checked as per Approved drawing:-DDC-BMRCL- Rahul Thandel(AEE)
343 16.09.2023 Pile 67 GOOD SOR
NCC/PB2/343 PH2A&2B-S2-P2-HBRKIA-VIA-DD-DWG-PP201600 SHEET 4OF4 REV-RB along with BMRCL engineer. Viaduct
Viaduct
In Quality Lab
a. Witnessed 28-day Concrete Cube Compressive Strength test of AP-529 Pier of M50 Grade as per attached record.
Vadeyarapura Results found OK.
BMRCL/LPMC/QC/SOR/2023/ Bharath (AEE)
344 20.09.2023 Casting Yard Quality b. Witnessed 28-day Concrete Cube Compressive Strength test of AP-636 Pier Cap Pedestal of M55 Grade as per attached 67 GOOD SOR
NCC/PB2/344 CY
Control Lab record. Results found OK.
c. Witnessed 28-day Concrete Cube Compressive Strength test of AP-486 Pier Cap Stitch of M55 Grade as per attached
record. Results found OK.
In Quality Lab
Verified Cement 3rd Party Test Report of week no-35/2023 with following detail and Found OK as per approved Quality
Assurance Plant-R3 (QAP) via Letter No BMRCL/Ph-2B/Pkg 2/22/2022-23/410 dated 30.09.2022 Annexure-5 Inspection
Vadeyarapura
BMRCL/LPMC/QC/SOR/2023/ and Test Plant of incoming materials and products. Bharath (AEE)
345 21.09.2023 Casting Yard Quality 67 GOOD SOR
NCC/PB2/345 CY
Control Lab
Cement Name-Ultratech OPC 53 Grade
Invoice No-9194119643
Week No-35/2023
During quality walk it observed that AP-475/P2 LHS Pile concrete chipped 230 mm below from the cut-off level. As per
BMRCL/LPMC/QC/SOR/2023/ AP 475/P2 LHS Pile Rahul Thandel(AEE)
346 23.09.2023 technical specifications clause 8.4.3(K) cut off level of pile should be 75 mm inside pile cap. 67(19) Closed
NCC/PB2/346 Viaduct Viaduct
Date of concrete of AP-475/P2 LHS:- 17.12.2022
During site visit it observed Pile Cap AP 417, Backfilling process is not as per technical specification Section S.02 Clause
BMRCL/LPMC/QC/SOR/2023/ AP 417 Rahul Thandel(AEE)
347 23.09.2023 No 2.2. Open
NCC/PB2/347 Pile Cap Viaduct Viaduct
Date of concrete of Pile Cap AP-417: - 04.09.2023
During Night shift AP-536 Pier Viaduct of M50 grade concreting witnessed slump, temperature and verified concrete
BMRCL/LPMC/QC/SOR/2023/ Rahul Thandel(AEE)
348 23.09.2023 AP 536 Pier Viaduct Batch Report of vehicle No KA 50 B 1487 and KA 50 B 1486 found within the permissible limits as per approved mix 67 GOOD SOR
NCC/PB2/348 Viaduct
design.
Bagalur station A03-
During Night Shift Bagalur station A03-C03 Concourse Level Portal Beam Concrete slump and temperature witnessed
BMRCL/LPMC/QC/SOR/2023/ C03
349 24.09.2023 along with BMRCL representative for vehicle no :- KA50B1662, KA50B1486, KA50B1487 & KA50B1661 found within Chethan (AEE) 67 GOOD SOR
NCC/PB2/349 Portal Beam
permissible limit as per approved mix design.
(Concourse level)
In Quality Lab
Verified Concrete Admixture 3rd Party Test Report with following detail. Found OK as per approved Quality Assurance
Plant-R3 (QAP) via Letter No BMRCL/Ph-2B/Pkg 2/22/2022-23/410 dated 30.09.2022 Annexure-5 Inspection and Test
Vadeyarapura
BMRCL/LPMC/QC/SOR/2023/ Plan of incoming materials. Bharath (AEE)
350 27.09.2023 Casting Yard Quality 67 GOOD SOR
NCC/PB2/350 CY
Control Lab
Concrete Admixture Name-FOSROC AURAMIX 400
Invoice No-JB/23-24/20615
Batch No-1N1MF00784877B and 1N1MF00785127B
AP-896
BMRCL/LPMC/QC/SOR/2023/ Pier Cap At Vadeyarpura casting yard AP-896 Pier Cap (Type-2) dispatch checked as per attached checklist. Bharath (AEE)
351 27.09.2023 67 GOOD SOR
NCC/PB2/351 Vadeyarpura Casting Date of concrete of Pier Cap AP-896 :-23.06.2023. CY
yard
In Quality Lab
Vadeyarapura a. Witnessed 28-day Concrete Cube Compressive Strength test on 03.10.2023 of AP-89 Pier Cap of M55 Grade as per
BMRCL/LPMC/QC/SOR/2023/ Bharath (AEE)
352 03.10.2023 Casting Yard Quality attached record. Results found OK. 67 GOOD SOR
NCC/PB2/352 CY
Control Lab b. Witnessed 28-day Concrete Cube Compressive Strength test on 03.10.2023 of AP-910 Pier Cap of M55 Grade as per
attached record. Results found OK.
In Quality Lab
MTC of Ultra Tech Cement Ordinary Portland Cement, Grade 53 was checked for below mentioned parameters for 34th &
35th week of 2023 as per attached record and found satisfactory as per IS-269-2015 [approved Quality Assurance Plan-R3
Vadeyarapura (QAP) via Letter No BMRCL/Ph-2B/Pkg 2/22/2022-23/410 dated 30.09.2022 Annexure-5 Inspection and Test Plan of
BMRCL/LPMC/QC/SOR/2023/ Bharath (AEE)
353 05.10.2023 Casting Yard Quality incoming materials]. 67 GOOD SOR
NCC/PB2/353 CY
Control Lab
1. Table -1 Performance Improvers (Clause 5.1.1).
2. Table-2 Chemical Requirements for OPC (Clause 6.1).
3. Table-3 Physical Requirements for OPC (Clause 7).
In Quality Lab
Vadeyarapura a. Witnessed 28-day Concrete Cube Compressive Strength test on 04.10.2023 of A08 Yelahanka Station Pier of M50
BMRCL/LPMC/QC/SOR/2023/ Bharath (AEE)
354 05.10.2023 Casting Yard Quality Grade as per attached record. Results found OK. 67 GOOD SOR
NCC/PB2/354 CY
Control Lab b. Witnessed 28-day Concrete Cube Compressive Strength test on 05.10.2023 of AP-418 Pier Cap of M55 Grade as per
attached record. Results found OK.
During Quality walk, it was observed that main pier reinforcement of AP-559 , AP-560 has been exposed to atmosphere
AP-559 ,
more than 14 months and 13 months respectively getting rusted. No provision done to prevent the rusting of main pier
BMRCL/LPMC/QC/SOR/2023/ AP-560 Rahul Thandel(AEE)
355 05.10.2023 reinforcement. 67(25) Closed
NCC/PB2/355 Pier Viaduct
Date of casting of AP-559 Pile Cap: -30.07.2022
Viaduct
Date of casting of AP-560 Pile Cap : -13.08.2022
BMRCL/LPMC/QC/SOR/2023/ AP-573 During site visit on 04.10.2023 and 06.10.2023 of AP-573 Pier curing found satisfactory. Rahul Thandel(AEE)
356 06.10.2023 67 GOOD SOR
NCC/PB2/356 Pier Viaduct Date of casting of pier AP-573: -30.09.2023 Viaduct
In Quality Lab
MTC of JSW Ground Granulated Blast Furnace Slag was checked for below mentioned parameters for 34th & 35th week
Vadeyarapura
BMRCL/LPMC/QC/SOR/2023/ of 2023 and found satisfactory as per IS-16714-2018 [approved Quality Assurance Plan-R3 (QAP) via Letter No Bharath (AEE)
357 06.10.2023 Casting Yard Quality 67 GOOD SOR
NCC/PB2/357 BMRCL/Ph-2B/Pkg 2/22/2022-23/410 dated 30.09.2022 Annexure-5 Inspection and Test Plan of incoming materials]. CY
Control Lab
1. Table-1 Chemical Requirements of GGBS (Clause 5.1).
2. Table-2 Physical Requirements for GGBS (Clause 6).
In Quality Lab
Verified HDPE Corrugated Sheathing Duct MTC with following detail. Found OK as per approved Quality Assurance
Plant-R3 (QAP) via Letter No BMRCL/Ph-2B/Pkg 2/22/2022-23/410 dated 30.09.2022 Annexure-5 Inspection and Test
Vadeyarapura Plan of incoming materials.
BMRCL/LPMC/QC/SOR/2023/ Bharath (AEE)
358 06.10.2023 Casting Yard Quality 67 GOOD SOR
NCC/PB2/358 CY
Control Lab Name of Manufacture- Dynamic Prestress India Pvt.Ltd.(Plant IV)
Product Name-ID 107 mm HDPE Corrugated Sheathing Duct
Invoice No-IV0124/40002795
Lot No- I 1223
AP-788
BMRCL/LPMC/QC/SOR/2023/ Pier Cap At Vadeyarpura casting yard AP-788 Pier Cap (Type-2) profile checked along with BMRCL representative at site as per Bharath (AEE)
359 07.10.2023 67 GOOD SOR
NCC/PB2/359 Vadeyarpura Casting approved No. BANG-2A&2B-DTD-GEN-STR-DWG-03320 to 03322 Rev R0. Found OK. CY
yard
AP-788
BMRCL/LPMC/QC/SOR/2023/ Pier Cap At Vadeyarpura casting yard AP-788 Pier Cap (Type-2) reinforcement checked along with BMRCL representative at site Bharath (AEE)
360 07.10.2023 67 GOOD SOR
NCC/PB2/360 Vadeyarpura Casting as per approved No. BANG-2A&2B-DTD-GEN-STR-DWG-03420 to 03426-Rev A0. Found OK. CY
yard
BMRCL/LPMC/QC/SOR/2023/ A06 Pile Cap During site visit A06 Pile Cap Yelahanka Station reinforcement & shuttering checked as per approved Drawing no:-DDC-
361 07.10.2023 Chethan (AEE) 67 GOOD SOR
NCC/PB2/361
BMRCL/LPMC/QC/SOR/2023/ Yelahanka
A03 Station
Pier, Yelahanka BMRCL-PH2A&2B-S2-YELSTN-STC-GFC-DWG-1002-01
During REV-C.
site visit A03 Pier at Yelahanka Station Pier concrete slump, temperature of TM No KA 50B-1489 & TM No KA
362 07.10.2023 Chethan (AEE) 67 GOOD SOR
NCC/PB2/362 Station 50B-1486
During thewitnessed at site
quality walk and found
at A05/P2 within permissible
Yelahanka station, it islimit.
observed that, at cut-off level of Pile A05/P2 Yelahanka station
BMRCL/LPMC/QC/SOR/2023/ A05/P2 Yelahanka (1200 mm dia) the clear cover of 75 mm not uniform. The details shown in the picture 3 & 4.
363 09.10.2023 Chethan (AEE) 67(21) Closed
NCC/PB2/363 station
Date of Casting A05/P2 Yelahanka station Pile-23.02.2023.
BMRCL/LPMC/QC/SOR/2023/ AP-531/P1 Pile During site Visit AP-531/P1 Pile bore depth checked after socketing, SPT calculation and Cage length checked jointly Rahul Thandel(AEE)
364 09.10.2023 67 GOOD SOR
NCC/PB2/364 Viaduct with BMRCL Engineer. Viaduct
BMRCL/LPMC/QC/SOR/2023/ AP 543 During Site visit AP-543 Pier (1.6 m dia) reinforcement checked as per GFC drawing no.DDC-BMRCL-PH2A&2B-S2- Rahul Thandel(AEE)
365 09.10.2023 67 GOOD SOR
NCC/PB2/365 Pier Viaduct P2-HBRKIA-VIA-DD-DWG-202101BN Rev RG. Found ok. Viaduct
Witnessed incoming Rashtriya Ispat Nigam Limited TMT FE 550D and review MTC as per attached record. Found OK as
per IS 1786:2008.
Item- Rashtriya Ispat Nigam Limited TMT FE 550D
BMRCL/LPMC/QC/SOR/2023/ Vadeyarapura Invoice No-7342303832 and 7342303834 Bharath (AEE)
366 10.10.2023 67 GOOD SOR
NCC/PB2/366 Casting Yard Heat No- 2307187, 2307232, 2307237, 2307242, 2307252, 2307401, 2307424, 2307437 and 2307446 CY
Dia of steel-16 mm and 20mm
MTC No- QMS/R/QAD/RM/22/L/2023-24/9340/00103101
QMS/R/QAD/RM/22/L/2023-24/9340/00103201
In Quality Lab
Vadeyarapura 1. Witnessed Tests on Aggregate Impact Value of Coarse Aggregate- Average Impact Value found 25.77% on 09.10.2023
BMRCL/LPMC/QC/SOR/2023/ Bharath (AEE)
367 11.10.2023 Casting YardQuality as per attached records. Found OK as per IS 383-2016, Clause 5.4.2 (b) 67 GOOD SOR
NCC/PB2/367 CY
Lab 2. Witnessed Tests on Aggregate Crushing Value of Coarse Aggregate- Average Crushing Value found 26.47% on
11.10.2023 as per attached records. Found OK as per IS 383-2016, Clause 5.4.1 (b)
In Quality Lab
Vadeyarapura
BMRCL/LPMC/QC/SOR/2023/ a. Witnessed Moisture Content of Coarse and Fine Aggregate of Besto Mining on 09.10.2023 as per attached records. Bharath (AEE)
368 11.10.2023 Casting Yard Quality 67 GOOD SOR
NCC/PB2/368 b. Witnessed Truck sample KA 03 AE 6787 Gradation test of Fine Aggregate (M Sand) of Besto Mining on 11.10.2023 as CY
Lab
per attached records. Found OK as per IS 383.
Vadeyarapura
BMRCL/LPMC/QC/SOR/2023/ During at Vadeyarapura Casting Yard Steel Yard Steel stacking not as per IS 4082:1996 Clause 4.13 as shown in attached Bharath (AEE)
369 11.10.2023 Casting Yard steel 67(26) Closed
NCC/PB2/369 pictures. CY
Yard
Vadeyarapura During site visit at Vadeyarapura Casting Yard AP618-AP619-G3 I-GIRDER Honey Comb observed as shown in attached
BMRCL/LPMC/QC/SOR/2023/ Casting Yard AP618- pictures. Bharath (AEE)
370 12.10.2023 67(17) Closed
NCC/PB2/370 AP619-G3 I- CY
GIRDER Date of Casting of AP618-AP619-G3 I-GIRDER -08.10.2023.
During Post Concrete inspection of AP-419 (Type 2) Pier Cap Honey Comb and exposed rebar observed on exterior
Vadeyarapura
BMRCL/LPMC/QC/SOR/2023/ surface of Pier Cap as shown in attached pictures in Vadeyarapura Casting Yard. Bharath (AEE)
371 12.10.2023 Casting Yard AP-419 67(23) Closed
NCC/PB2/371 CY
(Type 2) Pier Cap
Date of Casting of AP-419 (Type 2) Pier Cap-05.10.2023.
Vadeyarapura During Post Concrete inspection of AP-1119 (Type 2) Pier Cap Honey Comb and exposed rebar observed on exterior
BMRCL/LPMC/QC/SOR/2023/ Casting Yard AP- surface of Pier Cap as shown in attached pictures in Vadeyarapura Casting Yard Bharath (AEE)
372 12.10.2023 Package -3 67(22) Closed
NCC/PB2/372 1119 (Type 2) Pier CY
Cap Date of Casting of AP-1119 (Type 2) Pier Cap-08.07.2023.
A01 During quality walk it observed that at A01 Pile Cap, Yelahanka Station reinforcement work in progress found Seepage
BMRCL/LPMC/QC/SOR/2023/
373 12.10.2023 Pile Cap,Yelahanka from exiting drain, also soil mixed with pile cap reinforcement getting corrosion which is not as per approved method Chethan (AEE) 67(20) Closed
NCC/PB2/373
Station statement via letter no BMRCL/Ph-2B/Pkg-2/2021-22/113 dated 12.04.2022.
During quality walk it observed that AP -471/P2 Pile development length not found as per GFC drawings DDC-BMRCL-
AP-471/P2, LHS
BMRCL/LPMC/QC/SOR/2023/ PH 2A& 2B- S2-P2-HBRKIA-VIA-DD -DWG-PP-201053 REV: RC Rahul Thandel(AEE)
374 12.10.2023 Pile 50(22) Closed
NCC/PB2/374 Pile development length found: - 300-330 mm Viaduct
Viaduct
Date of concrete of AP 471/P2, LHS: - 02.02.2023.
During Quality walk it observed that AP 672 LHS, Pier casted more than height required as per GFC drawing, now
concrete chipping/core cutting in progress.
BMRCL/LPMC/QC/SOR/2023/ AP-672 LHS, Pier It is noticed that as per GAD Drawing No: BMRCL/PH-2B/AIRPORT LINE /PKG-2/VDT/PP/013 REV: 2 issued on Rahul Thandel(AEE)
375 12.10.2023 Open
NCC/PB2/375 Viaduct dt.15.02.2022, U girder proposed in this span, but later as per GAD Drawing No: BMRCL/PH-2B/AIRPORT LINE /PKG- Viaduct
2/VDT/PP/013 REV:4 issued on dt.22.12.2022, I girder proposed.
Date of Casting of AP-672 LHS, Pier Viaduct: 16.05.2023
AP-610/P3
BMRCL/LPMC/QC/SOR/2023/ During site visit SPT of Pile AP 610/P3, RHS was witnessed. The RPM and torque of the piling rig machine found Rahul Thandel(AEE)
376 12.10.2023 Pile 67 GOOD SOR
NCC/PB2/376 satisfactory. The socketing calculation was checked and verified jointly with BMRCL Engineer. Viaduct
Viaduct
BMRCL/LPMC/QC/SOR/2023/ AP 677/P4 Pile During site visit AP 677/P4, Pile Bore depth checked and Polymer property like viscosity, PH, density witnessed found Rahul Thandel(AEE)
377 12.10.2023 67 GOOD SOR
NCC/PB2/377 Viaduct with in permissible limit as per approved method statement. Viaduct
During site visit It observed that Pier Cap AP-572, Pier surface finish is not proper and minor defects like scaling found on
BMRCL/LPMC/QC/SOR/2023/ Rahul Thandel(AEE)
379 17.10.2023 AP-572 Pier Viaduct concrete surface at height of 5mt (appx) and also random/unauthorized repaired done as shown in picture 1 & 2. 67(26) Closed
NCC/PB2/379 Viaduct
Date of casting of AP-572 Pier -12.09.2023
It observed that during 1st stage stressing of AP-510 Pier Cap, Cable no 3 elongation achieved 106.47% beyond the
desired tolerance of 105% ,when Pressure applied was 101.13%. Which is not as per as per Cl. 6.8 of Technical
BMRCL/LPMC/QC/SOR/2023/ AP-510 Specification and MORTH section 1800. Bharath (AEE)
380 17.10.2023 67(26) Closed
NCC/PB2/380 Pier Cap HT Strand Coil id: - R0693G CY
Heat No- M36844
Date of casting of AP 510 Pier cap stitch Concrete:11.05.2023
In Quality Lab
Vadeyarapura During 28 days Concrete Cube testing of AP-415 Pile Cap on 17.10.2023, it was observed that Constant rate of Loading is
BMRCL/LPMC/QC/SOR/2023/ Bharath (AEE)
382 18.10.2023 Casting Yard Quality not Maintained as per IS 516 (Part 1/Sec 1): 2021. As per IS 516 the constant Rate of Loading to be maintained at 5.25 Open
NCC/PB2/382 CY
Lab KN/Sec.
Date of casting of AP-415 Pile Cap-19.09.2023.
Vadeyarapura During site visit at Vadeyarapura Casting Yard AP619-AP620-G1 I-GIRDER Honey Comb observed as shown in attached
BMRCL/LPMC/QC/SOR/2023/ Casting Yard AP619- pictures. Bharath (AEE)
383 19.10.2023 67(15) Closed
NCC/PB2/383 AP620-G1 I- CY
GIRDER Date of Casting of AP619-AP620-G1 I-GIRDER-16.10.2023.
AP-507
BMRCL/LPMC/QC/SOR/2023/ At Pier cap AP-507 1st stage ducts (4no’s) grouting witnessed temperature is 23.6﮿C, water /cement ratio is 0.40 and Bharath (AEE)
384 19.10.2023 Pier Cap 67 GOOD SOR
NCC/PB2/384 pressure after full injection of grout is maintained 5kg/sq.cm for 1min found satisfactory as per MORTH 1800/III. CY
Viaduct
During site visit at batching plant witnessed concrete with following details.
a. During night shift on 16.10.2023 At Batching Plant A04-C04 Platform Level Portal Beam Bagalur Station M50 grade
Vadeyarapura concreting, checked slump, temperature & verified Batch sheet of vehicle No KA 50 B 1662 with approved Mix design as
BMRCL/LPMC/QC/SOR/2023/ Bharath (AEE)
385 28.10.2023 Casting Yard shown in attached pictures. Found within the permissible limits. 67 GOOD SOR
NCC/PB2/385 CY
Batching Plant b. During site visit on 28.10.2023 at Batching Plant AP-306 Pier Cap M55 grade concreting, checked slump, temperature
& verified Batch sheet of vehicle No KA 50 B 1486 with approved Mix design as shown in attached pictures. Found
within the permissible limits.
Vadeyarpura Casting
BMRCL/LPMC/QC/SOR/2023/ At Vadeyarpura Casting Yard AP-830 Pier Cap (Type-2) dispatch checked as per attached checklist. Bharath (AEE)
386 30.10.2023 yard AP-830 Pier 67 GOOD SOR
NCC/PB2/386 Date of concrete of Pier Cap AP-830-16.02.2023. CY
Cap (Type-2)
BMRCL/LPMC/QC/SOR/2023/ AP-448 Pile Cap During site visit AP-448 Pile Cap reinforcement and shuttering checked as per approved drawing:-DDC-BMRCL- Rahul Thandel(AEE)
387 30.10.2023 67 GOOD SOR
NCC/PB2/387 Viaduct PH2A&2B-S2-P2-HBRKIA-VIA-DD-DWG-2011310 Sheet 3 of 3 REV-RB found ok. Viaduct
During Quality walk, it was observed that main pier reinforcement of A08 Pier Jakkur Station has been exposed more than
BMRCL/LPMC/QC/SOR/2023/ A08 Pier Jakkur
388 31.10.2023 10 months and getting rusted. No provision done to prevent the rusting of main pier reinforcement. Chethan (AEE) 67(16) Closed
NCC/PB2/388 Station
Date of casting of A08 Pier Jakkur Station -18.12.2022
AP-414 During site visit it observed Pile Cap AP-414 Curing is not as per technical specification Section S.03 Clause 3.12.6
BMRCL/LPMC/QC/SOR/2023/ Rahul Thandel(AEE)
389 31.10.2023 Pile Cap checked on date 30.10.2023 & 31.10.2023. 67(20) Closed
NCC/PB2/389 Viaduct
Viaduct Date of concrete of Pile Cap AP-414: - 28.10.2023
BMRCL/LPMC/QC/SOR/2023/ AP-531 During site visit AP-531 Pile Cap reinforcement and shuttering checked as per approved drawing: -DDC-BMRCL- Rahul Thandel(AEE)
390 02.11.2023 67 GOOD SOR
NCC/PB2/390 Pile Cap Viaduct PH2A&2B-S2-P2-HBRKIA-VIA-DD-DWG-201101A Sheet 1 of 2, Sheet 4 of 4, REV-RE with BMRCL engineer. Viaduct
BMRCL/LPMC/QC/SOR/2023/ During site visit AP-535 Pier of M50 grade concreting witnessed slump, temperature and verified concrete Batch Report Rahul Thandel(AEE)
391 02.11.2023 AP-535 Pier Viaduct 67 GOOD SOR
NCC/PB2/391 of vehicle No KA 50 B 1611 and KA 50 B 1487 found within the permissible limits as per approved mix design. Viaduct
In Quality Lab
Vadeyarapura a. Witnessed 28-day Concrete Cube Compressive Strength test on 02.11.2023 of AP-784 Pier Cap of M55 Grade as per
BMRCL/LPMC/QC/SOR/2023/ Bharath (AEE)
392 03.11.2023 Casting Yard Quality attached record. Results found OK. 67 GOOD SOR
NCC/PB2/392 CY
Control Lab b. Witnessed 28-day Concrete Cube Compressive Strength test on 03.11.2023 of AP618-AP619-G2 I Girder of M55 Grade
as per attached record. Results found OK.
In Quality Lab
a. Witnessed 28-day Concrete Cube Compressive Strength test on 04.11.2023 of AP-421 Pier Cap of M55 Grade as per
attached record. Results found OK.
Vadeyarapura b. Witnessed 28-day Concrete Cube Compressive Strength test on 04.11.2023 of AP-500 Pier Cap Pedestal of M55 Grade
BMRCL/LPMC/QC/SOR/2023/ Bharath (AEE)
393 04.11.2023 Casting Yard Quality as per attached record. Results found OK. 67 GOOD SOR
NCC/PB2/393 CY
Control Lab c. Witnessed 28-day Concrete Cube Compressive Strength test on 04.11.2023 of AP-133 Pier Cap of M55 Grade as per
attached record. Results found OK.
d. Witnessed 28-day Concrete Cube Compressive Strength test on 04.11.2023 of AP-666 Pier Cap Stitch of M55 Grade as
per attached record. Results found OK.
In Quality Lab
Verified HDPE Corrugated Sheathing Duct MTC with following detail. The Wall thickness not found OK as per approved
Quality Assurance Plant-R3 (QAP) via Letter No BMRCL/Ph-2B/Pkg 2/22/2022-23/410 dated 30.09.2022 Annexure-5
Vadeyarapura Inspection and Test Plan of incoming materials.
BMRCL/LPMC/QC/SOR/2023/ Bharath (AEE)
401 07.11.2023 Casting Yard Quality Open
NCC/PB2/401 CY
Control Lab Name of Manufacture- Dynamic Prestress India Pvt.Ltd.(Plant IV)
Product Name-ID 85 mm HDPE Corrugated Sheathing Duct
Invoice No-IV0124/20003402
Lot No-J 1023
In Quality Lab
Vadeyarapura a. Witnessed Truck sample KA 03 AE 6781 Gradation test of Coarse Aggregate (20 mm) of Besto Mining as per attached
BMRCL/LPMC/QC/SOR/2023/ Bharath (AEE)
403 08.11.2023 Casting Yard Quality records. Found OK as per IS 383. 67 GOOD SOR
NCC/PB2/403 CY
Lab b. Witnessed Truck sample KA 53 D 5575 Gradation test of Coarse Aggregate (12.5 mm) of Besto Mining as per attached
records. Found OK as per IS 383.
Vadeyarapura In Quality Lab
BMRCL/LPMC/QC/SOR/2023/ Bharath (AEE)
404 09.11.2023 Casting Yard Quality Witnessed Permeability Test for Concrete of AP 538 Pier. Found OK average 20 mm as per BMRCL CGM Sir Technical 67 GOOD SOR
NCC/PB2/404 CY
Control Lab Note no 45 (BMRCL/CGM/QUALITY/2023/59 dated 12.06.2023).
AP-517
BMRCL/LPMC/QC/SOR/2023/ At Pier cap AP-517 1st stage ducts (4no’s) grouting witnessed temperature is 18.2﮿C, water /cement ratio is 0.40 and Bharath (AEE)
405 09.11.2023 Pier Cap 67 GOOD SOR
NCC/PB2/405 pressure after full injection of grout is maintained 5kg/sq.cm for 1 min found satisfactory as per MORTH 1800/III. CY
Viaduct
During quality walk AP-514 Pier Cap Pedestal reinforcement &
AP-514
BMRCL/LPMC/QC/SOR/2023/ shuttering checked as per GFC drawing No. BANG-2A& 2B-DTD- Bharath (AEE)
406 09.11.2023 Pier Cap Pedestal 67 GOOD SOR
NCC/PB2/406 GEN-STR-DWG-03425 (A0) found ok. CY
Viaduct
Date of Concrete of Stitch Concrete of AP-514 Pier Cap: -24.05.2023
Rahul Thandel(AEE)
BMRCL/LPMC/QC/SOR/2023/ It observed that Static Routine Vertical Load Test, Static Routine Lateral Load Test & Dynamic Load Test carried out
407 10.11.2023 Viaduct & Station Viaduct & Chethan Sattiopn Open
NCC/PB2/407 without approved Method Statement from competent authority.
AEE
BMRCL/LPMC/QC/SOR/2023/ Jakkur During quality walk It observed at Jakkur Station Steel stacking not as per IS 4082:1996 Clause 4.13 as shown in attached
408 10.11.2023 Chethan (AEE) 67(25) Closed
NCC/PB2/408 Station pictures.
During quality walk it observed that A05/P6 Jakkur Station, Pile concrete chipped 200 mm below from the cut-off level.
BMRCL/LPMC/QC/SOR/2023/ A05/P6 Pile Jakkur As per technical specifications clause 8.4.3(K) cut off level of pile should be 75 mm inside pile cap. Also, it observed that
409 10.11.2023 Chethan (AEE) 67(21) Closed
NCC/PB2/409 Station unauthorized repair work in progress at site.
Date of concrete of A05/P6 Jakkur Station LHS: - 21.07.2022
AP-727/P4 During site visit AP- 727/P4, Pile Polymer property like Viscosity (41 sec),
BMRCL/LPMC/QC/SOR/2023/ Rahul Thandel(AEE)
410 15.11.2023 Pile PH (10.6), Density (<1 kg/cum) which is not found within permissible limit as per table mentioned at 6(g) in approved 67(23) Closed
NCC/PB2/410 Viaduct
Viaduct method statement.
During site visit It observed that Pile AP-728/P3, Prolonged delay in the commencement of concrete after completion of
AP-728/P3
BMRCL/LPMC/QC/SOR/2023/ boring. Pile boring completed at 11:30 AM on 14.11.2023 and concrete pouring completed at 4:25 AM on 16.11.2023. Rahul Thandel(AEE)
411 15.11.2023 Pile 67(24) Closed
NCC/PB2/411 Time interval between Boring completion and concrete pouring commencement is 16 hours 55 minute which is not as per Viaduct
Viaduct
technical specifications clause no. 8.4.3 (a)
Vadeyarapura
BMRCL/LPMC/QC/SOR/2023/ During site visit at Vadeyarapura Casting Yard Steel Yard stacked steel coil getting rusting as shown in attached pictures. Bharath (AEE)
412 15.11.2023 Casting Yard steel 67(16) Closed
NCC/PB2/412 The storage of reinforcement not as per IS 4082:1996 Clause 4.13. CY
Yard
During site visit at Vadeyarpura Casting Yard
AP 212 Pier cap a. AP-212 Pier Cap (Type-1) reinforcement checked along with BMRCL representative at site as per approved No. BANG-
BMRCL/LPMC/QC/SOR/2023/ (Type 1) 2A & 2B-DTD-GEN-STR-DWG-02420 to 02424 & 02426 Rev A0 and BANG-2A & 2B-DTD-GEN-STR-DWG-02425, Bharath (AEE)
413 17.11.2023 67 GOOD SOR
NCC/PB2/413 Vadeyarpura casting 02430 to 02432 Rev A2 Found OK. CY
yard b. AP-212 Pier Cap (Type-1) profile checked along with BMRCL representative at site as per approved No. BANG-
2A&2B-DTD-GEN-STR-DWG-02320 to 02322 Rev R0. Found OK.
Witnessed incoming Jindal Steel and Power Limited TMT FE 550D and review MTC as per attached record. Found OK as
per IS 1786:2008.
Item- Jindal Steel and Power Limited TMT FE 550D
BMRCL/LPMC/QC/SOR/2023/ Vadeyarapura Bharath (AEE)
414 20.11.2023 Invoice No-RV6000079690 67 GOOD SOR
NCC/PB2/414 Casting Yard CY
Heat No- F34889 and GD0113
Dia of steel-32mm
MTC No- 0000599355
Vadeyarapura During visit at Batching Plant and Casting Yard witnessed AP-071 (Type -1) Precast Pier Cap M55 grade concreting,
BMRCL/LPMC/QC/SOR/2023/ Bharath (AEE)
415 21.11.2023 Casting Yard AP-071 checked slump, temperature & verified Batch sheet of vehicle No KA 50 B 1663 and KA 50 B 1487 with approved Mix 67 GOOD SOR
NCC/PB2/415 CY
(Type -1) Pier Cap design as shown in attached pictures. Found within the permissible limits.
During site visit AP-549 Pile Cap reinforcement checked , it was observed that Pile Cap inside shutter measured 1.1 meter
AP-549 from Pier outer surface but in drawing it is 1.35 meter on NHAI side and Pile Cap inside shutter measured 1.65 meter from
BMRCL/LPMC/QC/SOR/2023/ Rahul Thandel(AEE)
416 21.11.2023 Pile Cap Pier outer surface but in drawing it is 1.35 meter on service road side which is not as per Approved drawing :-DDC- 67(24) Closed
NCC/PB2/416 Viaduct
Viaduct BMRCL-PH2A&2B-S2-P2-HBRKIA-VIA-DD-DWG-201101A,REV-R1 & DDC-BMRCL-PH2A&2B-S2-P2-HBRKIA-
VIA-DD-DWG-202101A ,REV-R1 as shown in the pictures.
During site visit on 21.11.2023 and 22.11.2023 AP-588 Pier curing not observed.
BMRCL/LPMC/QC/SOR/2023/ AP-588 Rahul Thandel(AEE)
417 22.11.2023 67(21) Closed
NCC/PB2/417 Pier Viaduct Viaduct
Date of casting of pier AP-588: -16.11.2023
Efficiency of Multi pull jacks being used for I girder witnessed as per attached records. Found OK as per IS 1343-2012.
Serial No: 22034005 and 22034006
BMRCL/LPMC/QC/SOR/2023/ Vadeyarapura Model: 50/200N Bharath (AEE)
418 24.11.2023 67 GOOD SOR
NCC/PB2/418 Casting Yard Capacity: 500T CY
Stress Ram Area: 1045.4cm2
Jack Efficiency: 97.92% and 98.5%
BMRCL/LPMC/QC/SOR/2023/ Vadeyarapura Witnessed sampling of Ultratech OPC 53 grade Cement of Week 47/2023 and Week 48/2023 for third party test as per Bharath (AEE)
419 27.11.2023 67 GOOD SOR
NCC/PB2/419 Casting Yard attached record. CY
In Quality Lab
Vadeyarapura a. Witnessed Truck sample KA 43 A 2973 Gradation test of Coarse Aggregate (20 mm) of M/s Vishwas Construction
BMRCL/LPMC/QC/SOR/2023/ Bharath (AEE)
420 27.11.2023 Casting Yard Quality Industries Pvt. Ltd. as per attached records. Found OK as per IS 383. 67 GOOD SOR
NCC/PB2/420 CY
Lab b. Witnessed Truck sample KA 43 A 2974 Gradation test of Coarse Aggregate (12.5 mm) of M/s Vishwas Construction
Industries Pvt. Ltd. as per attached records. Found OK as per IS 383.
During Night shift AP-528 Pier Cap 1st stage Stressing witnessed
jointly with BMRCL Engineer. HT Strand Coil id: - B6476F
BMRCL/LPMC/QC/SOR/2023/ AP-528 Bharath (AEE)
424 02.12.2023 Heat No-M39700 and MTC checked. 67 GOOD SOR
NCC/PB2/424 Pier Cap Viaduct CY
Date of casting of AP-528 Pier cap stitch Concrete:27.10.2023
During site visit it observed Pile Cap AP-435
BMRCL/LPMC/QC/SOR/2023/ AP-435 PILE CAP 1. Backfilling process is not as per technical specification Section S.02 Clause No 2.2. Rahul Thandel(AEE)
425 02.12.2023 Open
NCC/PB2/425 Viaduct 2. Curing is not as per technical specification Section S.03 Clause No 3.12.6 Viaduct
Date of concrete of Pile Cap AP-435: - 25.11.2023
During site visit It observed that Routine Vertical Load Test of the working pile at AP-526/P1 (1000 mm dia) Viaduct
BMRCL/LPMC/QC/SOR/2023/ Rahul Thandel(AEE)
426 02.12.2023 AP-526/P1 Viaduct carried out without approved Method statement from competent authority. Open
NCC/PB2/426 Viaduct
Date of casting of pile AP-526/P1-20.06.2023
During Site visit AP-614 Pier (1.8 m dia) reinforcement checked as per GFC drawing no.DDC-BMRCL-PH2A&2B-S2-
BMRCL/LPMC/QC/SOR/2023/ AP 614 Rahul Thandel(AEE)
427 04.12.2023 P2-HBRKIA-VIA-DD-DWG-202119A-IV Rev RC along with BMRCL Engineer, Found ok. 67 GOOD SOR
NCC/PB2/427 Pier Viaduct Viaduct
Date of concrete of starter :-21-11-2023.
BMRCL/LPMC/QC/SOR/2023/ A06 Pile Cap, Jakkur During Night shift A06 Pile Cap, Jakkur Station concrete slump, temperature of TM No KA 50B-1487, TM No KA 50B-
428 04.12.2023 Chethan (AEE) 67 GOOD SOR
NCC/PB2/428 Station 1662 & TM No KA 50B-1661 witnessed at site and found within permissible limit.
In Quality Lab
Vadeyarapura a. Witnessed 28-day Concrete Cube Compressive Strength test on 02.12.2023 of AP 512 and AP 513 Pier Cap pedestal of
BMRCL/LPMC/QC/SOR/2023/ Bharath (AEE)
429 04.12.2023 Casting Yard Quality M55 Grade as per attached record. Results found OK. 67 GOOD SOR
NCC/PB2/429 CY
Control Lab b. Witnessed 28-day Concrete Cube Compressive Strength test on 04.12.2023 of AP-742 Pier Cap of M55 Grade as per
attached record. Results found OK.
Vadeyarapura In Quality Lab
BMRCL/LPMC/QC/SOR/2023/ Bharath (AEE)
430 04.12.2023 Casting Yard Quality Witnessed Permeability Test for Concrete of AP 210 Pier Cap. Found OK average 13 mm as per BMRCL CGM Sir 67 GOOD SOR
NCC/PB2/430 CY
Control Lab Technical Note no 45 (BMRCL/CGM/QUALITY/2023/59 dated 12.06.2023).
In Quality Lab
Vadeyarapura Witnessed 28-day 1st stage tendon grout Cube Compressive Strength test of AP-515 and AP-516 Pier Cap as per attached
BMRCL/LPMC/QC/SOR/2023/ Bharath (AEE)
431 05.12.2023 Casting Yard Quality record. Results found OK as per MORTH 5th Revision Appendix-1800/III clause 4.2.2. 67 GOOD SOR
NCC/PB2/431 CY
Control Lab
Date of 1st Stage tendon grouting of AP 515 and AP 516 Pier Cap-07.11.2023
In Quality Lab
a. Witnessed 28-day Concrete Cube Compressive Strength test on 05.12.2023 of AP 533 Pier of M50 Grade as per
Vadeyarapura attached record. Results found OK.
BMRCL/LPMC/QC/SOR/2023/ Bharath (AEE)
433 06.12.2023 Casting Yard Quality b. Witnessed 28-day Concrete Cube Compressive Strength test on 05.12.2023 of AP-136 Pier Cap of M55 Grade as per 67 GOOD SOR
NCC/PB2/433 CY
Control Lab attached record. Results found OK.
c. Witnessed 28-day Concrete Cube Compressive Strength test on 06.12.2023 of AP-546 Pier Cap Stitch of M55 Grade as
per attached record. Results found OK.
Witnessed incoming Jindal Steel and Power Limited TMT FE 550D and review MTC as per attached record. Found OK as
per IS 1786:2008.
Item- Jindal Steel and Power Limited TMT FE 550D
BMRCL/LPMC/QC/SOR/2023/ Vadeyarapura Invoice No-RV6000088945 Bharath (AEE)
434 06.12.2023 67 GOOD SOR
NCC/PB2/434 Casting Yard Heat No- GD0861, GD0863, F35214, GD0700 and GD0304, CY
Dia of steel-12 mm, 16 mm, 20 mm and 32mm
MTC No- 606973, 607015, 606974 and 606975
Vehicle No KA 01 AN 1329
Vadeyarapura During Post Concrete inspection after lifting and stacking on bed B1 of AP-70 (Type 1) Pier Cap Honey Comb and
BMRCL/LPMC/QC/SOR/2023/ Bharath (AEE)
435 07.12.2023 Casting Yard AP-70 exposed rebar observed on exterior surface of Pier Cap as shown in attached pictures in Vadeyarapura Casting Yard. 67(26) Closed
NCC/PB2/435 CY
(Type 1) Pier Cap Date of Casting of AP-70 (Type 1) Pier Cap-04.12.2023
During site visit on 06.12.2023 and 07.12.2023 it is found that storage of Sheathing Corrugated HDPE ducts is not store
BMRCL/LPMC/QC/SOR/2023/ Vadeyarapura Bharath (AEE)
436 07.12.2023 under cover as per approved Quality Assurance Plan-R3 (QAP) via Letter No BMRCL/Ph-2B/Pkg 2/22/2022-23/410 dated 67(14) Closed
NCC/PB2/436 Casting Yard CY
30.09.2022 Annexure-5 Inspection and Test Plan of incoming materials as shown in attached pictures.
BMRCL/LPMC/QC/SOR/2023/ AP 718/P1 Pile During site visit AP 718/P1, Polymer property like viscosity, PH, density witnessed found with in permissible limit as per Rahul Thandel(AEE)
437 05.12.2023 67 GOOD SOR
NCC/PB2/437 Viaduct approved method statement. Viaduct
BMRCL/LPMC/QC/SOR/2023/ AP-671 During site visit AP-671 Pile Cap reinforcement and shuttering checked as per approved Drawing No-DDC-BMRCL- Rahul Thandel(AEE)
438 06.12.2023 67 GOOD SOR
NCC/PB2/438 Pile Cap Viaduct PH2A&2B-S2-P2-HBRKIA-VIA-DD-DWG-201971A Sheet 2 of 3, Sheet 3 of 3, REV-RE with BMRCL engineer. Viaduct
AP-524 During quality walk AP-524 Pier Cap Pedestal reinforcement & shuttering checked as per GFC Drawing No. BANG-2A&
BMRCL/LPMC/QC/SOR/2023/ Bharath (AEE)
439 07.12.2023 Pier Cap Pedestal 2B-DTD-GEN-STR-DWG-03425 (A0) found ok. Number of pedestals-8 No’s. 67 GOOD SOR
NCC/PB2/439 CY
Viaduct Date of Concrete of Stitch Concrete of AP-524 Pier Cap: -09.10.2023
During site visit at Pier cap AP-528 1st stage ducts (4no’s) grouting work Following observation noticed.
1)Hydrometer instrument found damaged to measure density of grout mix
AP-528
BMRCL/LPMC/QC/SOR/2023/ 2) Thermometer not calibrated for measure temperature of grout mix. Bharath (AEE)
440 07.12.2023 Pier Cap 67(27) Closed
NCC/PB2/440 3) Expired FOSROC Cebex 200 admixture used in grout mix. CY
Viaduct
4) Grout machine pressure pipe found damaged, so that pressure not maintained 5kg/sq.cm for 1 min as per MORTH
1800/III.
During site visit on 06.12.2023 and 07.12.2023 A07-C07 Platform Level Portal Beam, Bagaluru Station curing not
A07-C07 Platform
observed as per Technical Specification S-03 clause-3.12.6
BMRCL/LPMC/QC/SOR/2023/ level
441 07.12.2023 Chethan (AEE) 67(22) Closed
NCC/PB2/441 Portal Beam,
Date of casting of pier A07-C07 Platform Level Portal Beam, Bagaluru Station: -28.11.2023
Bagaluru Station
During site visit It observed that Pile AP-718/P3 Prolonged delay in the commencement of concrete after completion of
AP-718/P3
BMRCL/LPMC/QC/SOR/2023/ boring. Pile boring completed at 15:00 PM on 04.12.2023 and concrete pouring completed at 23:55 PM on 04.11.2023. Rahul Thandel(AEE)
442 08.12.2023 Pile Open
NCC/PB2/442 Time interval between Boring completion and concrete pouring commencement is 8 hours 55 minutes which is not as per Viaduct
Viaduct
technical specifications clause no. 8.4.3 (a)
In Quality Lab
a. Witnessed 28-day Concrete Cube Compressive Strength test on 07.12.2023 of AP-530 Pile Cap of M35 Grade as per
Vadeyarapura attached record. Results found OK.
BMRCL/LPMC/QC/SOR/2023/ Bharath (AEE)
443 08.12.2023 Casting Yard Quality b. Witnessed 28-day Concrete Cube Compressive Strength test on 07.12.2023 of AP-492 Pier Cap of M55 Grade as per 67 GOOD SOR
NCC/PB2/443 CY
Control Lab attached record. Results found OK.
c. Witnessed 28-day Concrete Cube Compressive Strength test on 08.12.2023 of AP620-AP621-G4 I Girder of M55 Grade
as per attached record. Results found OK.
In Quality Lab
Vadeyarapura 1. Witnessed Tests on Aggregate Impact Value of Coarse Aggregate (Vishwas Construction Industries Pvt. Ltd.)- Average
BMRCL/LPMC/QC/SOR/2023/ Bharath (AEE)
444 09.12.2023 Casting YardQuality Impact Value found 25.89% as per attached records. Found OK as per IS 383-2016, Clause 5.4.2 (b) 67 GOOD SOR
NCC/PB2/444 CY
Lab 2. Witnessed Tests on Aggregate Crushing Value of Coarse Aggregate (Vishwas Construction Industries Pvt. Ltd.)-
Average Crushing Value found 23.59% as per attached records. Found OK as per IS 383-2016, Clause 5.4.1 (b)
During site visit at Vadeyarapura Casting Yard AP582-AP583-G2 I-GIRDER Honey Comb and exposed rebar observed as
Vadeyarapura
shown in attached pictures.
BMRCL/LPMC/QC/SOR/2023/ Casting Yard AP582- Bharath (AEE)
445 12.12.2023 67(22) Closed
NCC/PB2/445 AP583-G2 I- CY
Date of Casting of AP582-AP583-G2 I-GIRDER-07.12.2023
GIRDER
During quality walk on 12.12.2023 at AP-586,AP-571 & AP-569 Viaduct , it observed that ground preparation work being
AP-569, carried out without casting of crash barrier.
BMRCL/LPMC/QC/SOR/2023/ Rahul Thandel(AEE)
446 12.12.2023 AP-571 & Date of casting of Pier AP 569 -29.10.2023 Open
NCC/PB2/446 Viaduct
AP-586 Viaduct Date of casting of Pier AP-571-06.10.2022
Date of casting of Pier AP-586-27.10.2023
During site visit on 08-12-2023 AP 710-713(3 spans) Elastomeric bearing checked after span alignment (Span alignment
AP-710-713 span’s
BMRCL/LPMC/QC/SOR/2023/ done after 1st stage stressing) .A thin layer of epoxy material is not provided while placing the Elastomeric bearing as per Bharath (AEE)
447 12.12.2023 Elastomeric bearing Open
NCC/PB2/447 Technical note no -44 through letter BMRCL /CGM/QUALITY/2023/58 dated:-05-06-2023 and following are the CY
viaduct
observations of bearing at site:-
Routine Vertical Load Test on working pile at A04/P4 Yelahanka Station witnessed along with the BMRCL Engineer. The
BMRCL/LPMC/QC/SOR/2023/ A04/P4 Yelahanka final settlement was observed with in the permissible limit as per Cl.7.2.1.1(b) of IS 2911 Part-IV-2013, Report submission
448 13.12.2023 Chethan (AEE) 67 GOOD SOR
NCC/PB2/448 Station awaited.
Date of casting of pile A04/P4 Yelahanka Station :-30.03.2023
BMRCL/LPMC/QC/SOR/2023/ C06/P3 Pile During site Visit Pile bore C06/P3 Pile at Hebbal Station depth checked after socketing, SPT calculation, Cage length
449 13.12.2023 Chethan (AEE) 67 GOOD SOR
NCC/PB2/449 Hebbal Station checked jointly with BMRCL Engineer.
During site visit at Casting Yard I Girder AP 583-AP 584/G1 1st stage ducts (2no’s) grouting witnessed temperature is
Vadeyarapura
BMRCL/LPMC/QC/SOR/2023/ 17.6﮿C, water /cement ratio is 0.42 and pressure after full injection of grout is maintained 5kg/sq.cm for 1min found Bharath (AEE)
450 16.12.2023 Casting Yard AP583- 67 GOOD SOR
NCC/PB2/450 satisfactory as per MORTH 1800/III. CY
AP584-G1 I-Girder
Date of 1st Stage stressing of AP583-AP584-G1 I-Girder-14.12.2023
Stedrant
BMRCL/LPMC/QC/SOR/2023/ Third party Physical tests of HT strand was witnessed of coil No B6654D Heat No M42703 Make TATA WIRON was Bharath (AEE)
452 20.12.2023 Technoclinic Pvt.Ltd 67 GOOD SOR
NCC/PB2/452 done at Stedrant Technoclinic Pvt. Ltd and results were found satisfactory as per IS-14268: 2022 CY
(Third Party Lab)
Witnessed mechanical Coupler Testing (Static tensile test) of 32mm,25 mm,20 mm dia Coupler at 3rd party Lab (Stedrant
Technoclinic Pvt. Ltd) on 18.12.2023. The fractured was outside the mechanical splice length of the samples tested as per
Stedrant
BMRCL/LPMC/QC/SOR/2023/ IS-16172-2014 Annexure-B. splice. Bharath (AEE)
453 20.12.2023 Technoclinic Pvt.Ltd 67 GOOD SOR
NCC/PB2/453 1)32mm Dia. Coupler 6 nos sample Lot No.- 2095 Make- Sanfield CY
(Third Party Lab)
2) 25mm Dia.Coupler 4 nos sample Lot No.- 3201 Make- Sanfield
3) 20mm Dia.Coupler 4 nos sample Lot No.- 5344 Make- Sanfield
BMRCL/LPMC/QC/SOR/2023/ AP 719/P2 Pile During site visit AP 719/P2, Pile bore depth checked found ok. Polymer property like viscosity, PH, density witnessed Rahul Thandel(AEE)
454 21.12.2023 67 GOOD SOR
NCC/PB2/454 Viaduct found with in permissible limit as per approved method statement. Viaduct
During site visit A05 Pile cap Kodigeheli Station, Pile cap reinforcement and shuttering checked as per approved Drawing
BMRCL/LPMC/QC/SOR/2023/ A05 Pile Cap
455 21.12.2023 No-DDC-BMRCL-PH2A&2B-S2-KODSTN-STC-GFC-DWG-1002-01 REV C & DDC-BMRCL-PH2A&2B-S2- Chethan (AEE) 67 GOOD SOR
NCC/PB2/455 Kodigeheli Station
KODSTN-STC-GFC-DWG-1003-03 REV C.
During site Visit at AP-472/P1 Pile development length is observed 550mm which is not as per Technical specification
BMRCL/LPMC/QC/SOR/2023/ clause 8.3.5(a). Rahul Thandel(AEE)
456 26.12.2023 AP 472/P1 Pile 67(15) Closed
NCC/PB2/456 Viaduct
Date of casting of AP-472/P1 Pile: -22.06.2023
AP-466 During site Visit at AP-466 Pile Cap Curing is not as per technical specification Section S.03 Clause No 3.12.6
BMRCL/LPMC/QC/SOR/2023/ Rahul Thandel(AEE)
457 26.12.2023 Pile Cap 67(22) Closed
NCC/PB2/457 Viaduct
Viaduct Date of concrete of Pile Cap AP-466: - 23.12.2023
Vadeyarapura During inspection in Quality Lab it is found that Concrete Permeability apparatus is not calibrated as per approved Quality
BMRCL/LPMC/QC/SOR/2023/ Bharath (AEE)
458 03.01.2024 Casting Yard Quality Assurance Plan-R3 (QAP) via Letter No BMRCL/Ph-2B/Pkg 2/22/2022-23/410 dated 30.09.2022 Annexure-3 Lab 67(25) Closed
NCC/PB2/458 CY
Control Lab Equipment & Calibration Plan.
Vadeyarapura
BMRCL/LPMC/QC/SOR/2023/ During site visit at Vadeyarapura Casting Yard Steel Yard stacked steel getting rusting as shown in attached pictures. The Bharath (AEE)
459 03.01.2024 Casting Yard steel 67(29) Open File sent to HO on 14.03.2024
NCC/PB2/459 storage of reinforcement not as per IS 4082:1996 Clause 4.13. CY
Yard
In Quality Lab
a. Witnessed 28-day Concrete Cube Compressive Strength test of AP-488 Pier Cap of M55 Grade as per attached record.
Vadeyarapura Results found OK.
BMRCL/LPMC/QC/SOR/2023/ Bharath (AEE)
460 03.01.2024 Casting Yard Quality b. Witnessed 28-day Concrete Cube Compressive Strength test of AP-1049 Pier Cap of M55 Grade as per attached record. 67 GOOD SOR
NCC/PB2/460 CY
Control Lab Results found OK.
c. Witnessed 28-day Concrete Cube Compressive Strength test of AP 523 Pier Cap pedestal of M55 Grade as per attached
record. Results found OK.
During Quality Walk, It observed that C02 Jakkur Station Pier Starter cover (50 mm) is not found uniform as shown in
BMRCL/LPMC/QC/SOR/2023/ C02 Pier Starter, attached photographs.
461 03.01.2024 Chethan (AEE) 50(21) Closed
NCC/PB2/461 Jakkur Station
Date of Concrete of C02 Pier Starter, Jakkur Station :- 07.04.2023
During site visit It observed that C04/P1 Pile Hebbal Station , Prolonged delay in the commencement of concrete after
BMRCL/LPMC/QC/SOR/2023/ C04/P1 Pile Hebbal completion of boring. Pile boring completed at 19:30 PM on 30.12.2023 and concrete pouring completed at 4:35 AM on
462 03.01.2024 Chethan (AEE) Open
NCC/PB2/462 Station 31.12.2023. Time interval between Boring completion and concrete pouring commencement is 09 hours 05 minute which
is not as per technical specifications clause no. 8.4.3 (a)
BMRCL/LPMC/QC/SOR/2023/ A04/P4 Pile, Hebbal During site visit A04/P4 Pile, Hebbal Station concrete slump, temperature of TM No KA 50B-1486 & TM No KA 50B-
463 03.01.2024 Chethan (AEE) 67 GOOD SOR
NCC/PB2/463 Station 1489 witnessed at site and found within permissible limit as per Mix Design.
BMRCL/LPMC/QC/SOR/2023/ AP-481 LHS Pier The threaded length of the Pier reinforcement bars of AP-481 LHS not protected as per technical specification Section S.05 Rahul Thandel(AEE)
464 03.01.2024 67(23) Closed
NCC/PB2/464 Viaduct clause no 5.2.b Viaduct
During site Visit AP 372/P3 Pile bore depth checked after socketing, SPT calculation, Cage reinforcement checked as per
BMRCL/LPMC/QC/SOR/2023/ AP 372/P3 Rahul Thandel(AEE)
465 04.01.2024 approved GFC drawing no. DDC-BMRCL-PH2A&2B-S2-P2-HBRKIA-VIA-DD-DWG-201220A, Jointly with BMRCL 67 GOOD SOR
NCC/PB2/465 Pile Viaduct Viaduct
Engineer.
BMRCL/LPMC/QC/SOR/2023/ AP-470 During site visit AP-470 Pile Cap reinforcement and shuttering checked as per approved drawing: -DDC-BMRCL- Rahul Thandel(AEE)
466 04.01.2024 67 GOOD SOR
NCC/PB2/466 Pile Cap Viaduct PH2A&2B-S2-P2-HBRKIA-VIA-DD-DWG-201060A Sheet 3 of 3, REV-RE with BMRCL engineer. Viaduct
AP 473/P3,LHS, Sonic testing witnessed. It is found that Access tube 4 found blockage & Access tube 1,2 & 3 signal
BMRCL/LPMC/QC/SOR/2023/ AP473/P3,LHS, recorded up to 9.00 meter from pile cut off level. Rahul Thandel(AEE)
467 04.01.2024 67(28) Closed
NCC/PB2/467 Pile Viaduct AP 473/P3,LHS Pile length from cutoff level is 28.00 meter Viaduct
Date of Casting of Pile AP-473/P3,LHS -19.01.2023
In Quality Lab
a. Witnessed 28-day 1st stage tendon grout Cube Compressive Strength test of AP-527 Pier Cap on 03.01.2024 as per
attached record. Results found OK as per MORTH 5th Revision Appendix-1800/III clause 4.2.2.
Vadeyarapura
BMRCL/LPMC/QC/SOR/2023/ Date of 1st Stage tendon grouting of AP 527 Pier Cap-06.12.2023 Bharath (AEE)
468 04.01.2024 Casting Yard Quality 67 GOOD SOR
NCC/PB2/468 CY
Control Lab
b. Witnessed 28-day 1st stage tendon grout Cube Compressive Strength test of AP 581-AP 582-G1 I Girder on 04.01.2024
as per attached record. Results found OK as per MORTH 5th Revision Appendix-1800/III clause 4.2.2.
Date of 1st Stage tendon grouting of AP 581-AP 582-G1 I Girder -07.12.2023
In Quality Lab
Vadeyarapura 1. Witnessed Tests on Aggregate Impact Value of Coarse Aggregate (Vishwas Construction Industries Pvt. Ltd.)- Average
BMRCL/LPMC/QC/SOR/2023/ Bharath (AEE)
469 05.01.2024 Casting YardQuality Impact Value found 20.33% as per attached records. Found OK as per IS 383-2016, Clause 5.4.2 (b) 67 GOOD SOR
NCC/PB2/469 CY
Lab 2. Witnessed Tests on Aggregate Crushing Value of Coarse Aggregate (Vishwas Construction Industries Pvt. Ltd.)-
Average Crushing Value found 24.74% as per attached records. Found OK as per IS 383-2016, Clause 5.4.1 (b)
During site visit on 04.01.2024, 05.01.2024 and 06.01.2024, AP 599 ,Pile Cap, RHS Viaduct curing not observed as per
AP 599
BMRCL/LPMC/QC/SOR/2023/ Technical Specification S-03 clause-3.12.6 Rahul Thandel(AEE)
470 06.01.2024 Pile Cap, RHS 67(24) Closed
NCC/PB2/470 Viaduct
Viaduct
Date of casting of pier AP 599 ,Pile Cap, RHS Viaduct : -30.12.2023
Vadeyarapura During site visit at Casting Yard I Girder AP 584-AP 585/G2 1st stage ducts (2no’s) grouting witnessed temperature is
BMRCL/LPMC/QC/SOR/2023/ Casting Yard 18.4﮿C, water /cement ratio is 0.42 and pressure after full injection of grout is maintained 5kg/sq.cm for 1min found Bharath (AEE)
471 08.01.2024 67 GOOD SOR
NCC/PB2/471 AP 584-AP 585/G2 satisfactory as per MORTH 1800/III. CY
I-Girder Date of 1st Stage stressing of AP 584-AP 585/G2 I-Girder-03.01.2024
In Quality Lab
Vadeyarapura a. Witnessed Truck sample KA 43 A 2974 Gradation test of Coarse Aggregate (20 mm) of M/s Vishwas Construction
BMRCL/LPMC/QC/SOR/2023/ Bharath (AEE)
472 09.01.2024 Casting Yard Quality Industries Pvt. Ltd. as per attached records. Found OK as per IS 383. 67 GOOD SOR
NCC/PB2/472 CY
Lab b. Witnessed Truck sample KA 43 A 0814 Gradation test of Coarse Aggregate (12.5 mm) of M/s Vishwas Construction
Industries Pvt. Ltd. as per attached records. Found OK as per IS 383.
During site visit it observed AP-466 Pile cap backfilling process is not as per technical specification Section S.02 Clause
BMRCL/LPMC/QC/SOR/2023/ AP-466 PILE CAP Rahul Thandel(AEE)
473 09.01.2024 No 2.2. Open
NCC/PB2/473 Viaduct Viaduct
Date of concrete of AP 466 Pile cap: -23.12.2023
AP 447/P1 Routine Lateral Pile load test witnessed. It observed that calibration date and Device received date mismatched
in Pressure gauge calibration certificate.
BMRCL/LPMC/QC/SOR/2023/ AP-447/P1 PILE Testing Agency: - M/s Struct Geotech Research Laboratories Pvt Ltd. Rahul Thandel(AEE)
474 11.01.2024 Open
NCC/PB2/474 Viaduct Calibration Agency: - Ultra Cal Viaduct
Calibrated Date: -03.01.2024
DUC received: - 03.12.2024
During quality walk AP-535 Pier Cap Pedestal reinforcement and
AP-535
BMRCL/LPMC/QC/SOR/2023/ shuttering checked as per GFC drawing No. BANG-2A& 2B-DTD- Bharath (AEE)
475 11.01.2024 Pier Cap Pedestal 67 GOOD SOR
NCC/PB2/475 GEN-STR-DWG-03425 (A0) found ok. CY
Viaduct
Date of Concrete of Stitch Concrete of AP-535 Pier Cap :-28.11.2023
In Quality Lab
Vadeyarapura a. Witnessed 28-day Concrete Cube Compressive Strength test of AP-219 Pier Cap of M55 Grade as per attached record.
BMRCL/LPMC/QC/SOR/2023/ Bharath (AEE)
476 12.01.2024 Casting Yard Quality Results found OK. 67 GOOD SOR
NCC/PB2/476 CY
Control Lab b. Witnessed 28-day Concrete Cube Compressive Strength test of AP583-AP584-G4 I Girder of M55 Grade as per
attached record. Results found OK.
Vadeyarapura During site visit 02.01.2024, 03.01.2024, 10.01.2024 and 12.01.2024 at Vadeyarapura Casting Yard storage and stacking
BMRCL/LPMC/QC/SOR/2023/ Bharath (AEE)
477 12.01.2024 Casting Yard steel of aggregates (Vishwas Construction Industries Pvt. Ltd.) not same as aggregates (Besto Mining) material as shown in 67(14) Closed
NCC/PB2/477 CY
Yard attached pictures. The storage and stacking of Vishwas Construction Industries Pvt. Ltd not as per IS 4082:1996.
BMRCL/LPMC/QC/SOR/2023/ During Site visit AP-450 Pier (1.8 m dia) reinforcement checked as per GFC drawing no.DDC-BMRCL-PH2A&2B-S2- Rahul Thandel(AEE)
478 12.01.2024 AP-450 Pier Viaduct 67 GOOD SOR
NCC/PB2/478 P2-HBRKIA-VIA-DD-DWG-202130B Sheet 01 of 02 Rev RE. Found ok. Viaduct
A06-C06 Platform Level Portal Beam Bagalur station: -
A06-C06
1) Reinforcement checked as per approved drawing: - DDC-BMRCL-PH2A&2B-S2-BAGSTN-STC-GFC-DWG-1005-02
BMRCL/LPMC/QC/SOR/2023/ Portal Beam
479 12.01.2024 REV-A & 1005-02 REV -A Chethan (AEE) 67 GOOD SOR
NCC/PB2/479 (Platform level)
2) Concrete slump and temperature witnessed along BMRCL representative for vehicle no: -KA50B1486, KA50B1662
Bagalur station
and KA50B1487
Witnessed incoming JSW Steel Limited TMT FE 550D and review MTC as per attached record. Found OK as per IS
1786:2008.
Item- JSW Steel Limited TMT FE 550D
BMRCL/LPMC/QC/SOR/2023/ Vadeyarapura Invoice No-23D52900004637 Bharath (AEE)
480 16.01.2024 67 GOOD SOR
NCC/PB2/480 Casting Yard Heat No- A3073149, A3073152, A3073165 and A3073160 CY
Dia of steel-16 mm
MTC No- TMT/23-24/0000547113
Vehicle No KA 53 AB 0793
Vadeyarapura
BMRCL/LPMC/QC/SOR/2023/ During site visit at Casting Yard I Girder AP 583-AP 584/G1 2nd stage stressing witnessed (Cable no 3) as per drawing no Bharath (AEE)
485 19.01.2024 Casting Yard AP583- 67 GOOD SOR
NCC/PB2/485 DDC-BMRCL-PH-2A&2B-S2-P2-HBRKIA-VIA-DD-DWG-MISC-401002a (SH 03 OF 09) RE. CY
AP584-G1 I-Girder
During site visit at Vadeyarapura Casting Yard Honey Comb observed at bottom portion of AP445-AP446-G2 I-Girder as
Vadeyarapura
BMRCL/LPMC/QC/SOR/2023/ shown in attached pictures. Bharath (AEE)
486 20.01.2024 Casting Yard AP445- 67(30) Open File sent to HO on 14.03.2024
NCC/PB2/486 CY
AP446-G2 I-Girder
Date of Casting of AP445-AP446-G2 I-Girder -08.01.2024
In Quality Lab
a. MTC of Ultra Tech Cement Ordinary Portland Cement, Grade 53 was checked for below mentioned parameters for 50th
and 51st week of 2023 as per attached record and found satisfactory as per as per IS-269-2015 approved in Quality
Assurance Plan-R3 (QAP) via Letter No BMRCL/Ph-2B/Pkg 2/22/2022-23/410 dated 30.09.2022 Annexure-5 Inspection
and Test Plant of incoming materials and products.
1. Table -1 Performance Improvers (Clause 5.1.1).
Vadeyarapura
BMRCL/LPMC/QC/SOR/2023/ 2. Table-2 Chemical Requirements for OPC (Clause 6.1). Bharath (AEE)
487 24.01.2024 Casting Yard Quality 67 GOOD SOR
NCC/PB2/487 3. Table-3 Physical Requirements for OPC (Clause 7). CY
Control Lab
b. MTC of JSW Ground Granulated Blast Furnace Slag was checked for below mentioned parameters for 47th and 48th
week of 2023 and found satisfactory as per IS-16714-2018 approved in Quality Assurance Plan-R3 (QAP) via Letter No
BMRCL/Ph-2B/Pkg 2/22/2022-23/410 dated 30.09.2022 Annexure-5 Inspection and Test Plant of incoming materials and
products.
1. Table-1 Chemical Requirements of GGBS (Clause 5.1).
2. Table-2 Physical Requirements for GGBS (Clause 6).
During quality walk on Dt. 25.01.2024, pile depth of Hebbal station A03/P2 checked and it observed that in Pile Bore log
BMRCL/LPMC/QC/SOR/2023/
488 25.01.2024 Hebbal Station register has not done authorised certification and sequential page numbering yet. Till now approx. 15 nos pilling completed Chethan (AEE) 67(22) Closed
NCC/PB2/488
of Hebbal station.
During quality walk on Dt. 25.01.2024, it observed that in Pile Bore log register not done authorised certification and being
BMRCL/LPMC/QC/SOR/2023/ Rahul Thandel(AEE)
489 25.01.2024 Viaduct used without sequential page numbers in the bore log register. Till now approx. 18 nos. piling completed from Pier no AP- 67(23) Closed
NCC/PB2/489 Viaduct
375 to AP-372.
Witnessed Batching Plant calibration with BMRCL, NCC and Schwing Stetter representative the error percentage of
aggregates, cement, water and admixture found within acceptable limits as per approved Quality Assurance Plan-R3
(QAP) via Letter No BMRCL/Ph-2B/Pkg 2/22/2022-23/410 dated 30.09.2022 Annexure-3 Lab Equipment & Calibration
Plan.
Vadeyarapura
BMRCL/LPMC/QC/SOR/2023/ Plant SL No:177/8050215, Bharath (AEE)
490 27.01.2024 Casting Yard 67 GOOD SOR
NCC/PB2/490 Make: Schwing Stetter CY
Batching Plant
Plant Capacity per batch = 2.5 m3,
As per IS: 4925(2004), clause-6.1.1 -The tolerance limit for individual batch is Cement & water: +/- 1%, Coarse & Fine
Aggregates: +/-2%, Admixture: +/- 3%.
Report Awaited.
Routine Vertical Load Test of the Pile at AP 487/P2 Viaduct witnessed along with the BMRCL Engineer. The final
settlement was observed with in the permissible limit as per Cl.7.2.1.1(b) of IS 2911 Part-IV-2013, Report submission
BMRCL/LPMC/QC/SOR/2023/ awaited. Rahul Thandel(AEE)
492 03.02.2024 AP-487/P2 Viaduct 67 GOOD SOR
NCC/PB2/492 Viaduct
Date of casting of pile AP 487/P2- Dt.16.09.2022
AP-471
BMRCL/LPMC/QC/SOR/2023/ During site visit AP-471 Pile Cap RHS Viaduct reinforcement and shuttering checked as per approved drawing No. Rahul Thandel(AEE)
493 04.02.2024 Pile Cap RHS, 67 GOOD SOR
NCC/PB2/493 DDC-BMRCL-PH2A&2B-S2-P2-HBRKIA-VIA-DD-DWG-PP-201053 Sheet 4 of 4, REV-RC with BMRCL engineer. Viaduct
Viaduct
During Quality Walk, It observed that AP- 432, LHS, Pier Starter cover (50 mm) is not found uniform as shown in
BMRCL/LPMC/QC/SOR/2023/ AP-432 Pier Starter attached photographs. Rahul Thandel(AEE)
494 05.02.2024 Open
NCC/PB2/494 LHS Viaduct Viaduct
Date of Concrete of AP- 432, Pier Starter, LHS, Viaduct: - Dt.11.01.2024
During site visit It observed that Pile AP-334(M)/P5, Prolonged delay in the commencement of concrete after completion
BMRCL/LPMC/QC/SOR/2023/ AP-334(M)/P5 of boring. Pile boring completed at 03:30 AM on 07.02.2024 and concrete pouring completed at 15:15 PM on 07.02.2024. Rahul Thandel(AEE)
495 05.02.2024 Open
NCC/PB2/495 Pile Viaduct Time interval between Boring completion and concrete pouring commencement is 11 hours 45 minute which is not as per Viaduct
technical specifications clause no. 8.4.3 (a)
BMRCL/LPMC/QC/SOR/2023/ A03/P5, Pile, Hebbal A03/P5, Hebbal Station, Pile concrete slump, Temperature of TM No KA 50B-1486 and KA 50B 1661 witnessed at site
496 08.02.2024 Chethan (AEE) 67 GOOD SOR
NCC/PB2/496 Station and found within permissible limit as per approved mix design.
During site visit It observed that AP-598, Pier, LHS, Viaduct concrete surface finish is not proper minor defects like
BMRCL/LPMC/QC/SOR/2023/ AP-598 Pier LHS, Rahul Thandel(AEE)
497 09.02.2024 scaling, honeycomb observed and unauthorized repaired done as shown in picture. Open
NCC/PB2/497 Viaduct Viaduct
Date of casting of AP-598 Pier, LHS, Viaduct -Dt. 26.08.2023
Vadeyarapura In Quality Lab
BMRCL/LPMC/QC/SOR/2023/ Bharath (AEE)
498 09.02.2024 Casting Yard Quality Witnessed Tests on Aggregate Crushing Value of Coarse Aggregate (Vishwas Construction Industries Pvt. Ltd.)- Average 67 GOOD SOR
NCC/PB2/498 CY
Lab Crushing Value found 22.60% as per attached records. Found OK as per IS 383-2016, Clause 5.4.1 (b)
Vadeyarapura During post concrete inspection of AP16-AP17-G1 I Girder, minor cracks and Bug holes found at both sides of web
BMRCL/LPMC/QC/SOR/2023/ Bharath (AEE)
499 09.02.2024 Casting Yard AP16- portion of I Girder as shown in attached photos. Open
NCC/PB2/499 CY
AP17-G1 I Girder Date of Casting of AP16-AP17-G1 I Girder-23.01.2024.
During post concrete inspection of AP16-AP17-G2 I Girder honey comb and unauthorised repairing work found of I
Vadeyarapura
BMRCL/LPMC/QC/SOR/2023/ Girder as shown in attached photos that it is not as per technical specification section-S.03 clause 3.15. Bharath (AEE)
500 09.02.2024 Casting Yard AP16- Open
NCC/PB2/500 CY
AP17-G2 I Girder
Date of Casting of AP16-AP17-G2 I Girder-27.01.2024.
There is no register maintained of Incoming material (HT Strands) at Vadeyarapura Casting Yard Quality Lab as per
BMRCL/LPMC/QC/SOR/2023/ Vadeyarapura approved Quality Assurance Plan-R3 (QAP) via Letter No BMRCL/Ph-2B/Pkg 2/22/2022-23/410 dated 30.09.2022 Bharath (AEE)
501 10.02.2024 Open
NCC/PB2/501 Casting Yard Annexure-9 Register to be maintained at Casting Yard & Site. As on date more than 80 Nos Pier Cap and more than 30 CY
Nos I Gider 1st Stage stressing completed.
Vadeyarapura
BMRCL/LPMC/QC/SOR/2023/ During site visit at Vadeyarapura Casting Yard Steel on 11.01.2024 and 09.02.2024 Yard stacked steel getting rusting as Bharath (AEE)
502 10.02.2024 Casting Yard steel Open
NCC/PB2/502 shown in attached pictures. The storage of reinforcement not as per IS 4082:1996 Clause 4.13. CY
Yard
BMRCL/LPMC/QC/SOR/2023/ AP-728, Pile Cap, AP-728, Pile Cap, Viaduct concrete slump, Temperature of TM No KA 50B-1662, KA 50B 1487, KA 50B-1489 & KA Rahul Thandel(AEE)
503 10.02.2024 67 GOOD SOR
NCC/PB2/503 Viaduct 50B-1661 witnessed at site and found within permissible limit as per approved mix design. Viaduct
During site visit on 10-02-2023 AP-691-692 and AP692-693 (2 spans) Elastomeric bearing checked after span alignment
AP-691-693 span’s
BMRCL/LPMC/QC/SOR/2023/ (Span alignment done after 1st stage stressing). A thin layer of epoxy material is not provided while placing the Bharath (AEE)
504 12.02.2024 Elastomeric bearing Open
NCC/PB2/504 Elastomeric bearing as per Technical note no -44 through letter BMRCL /CGM/QUALITY/2023/58 dated :-05-06-2023 CY
viaduct
and following are the observations of bearing at site:-
AP-445/P1 During Quality walk, it observed that Pile AP-445 /P1 found unsound and soil-mixed concrete below cut off level as
BMRCL/LPMC/QC/SOR/2023/ Rahul Thandel(AEE)
505 12.02.2024 Pile shown in picture 1. Which is not as per Technical Specification Clause 8.4.3 (k). Open
NCC/PB2/505 Viaduct
Viaduct Date of concrete of AP-445/P1 Pile: - 09.12.2022
During site visit AP-547 Pier Cap
AP-547 a) Pedestal reinforcement and shuttering checked as per GFC drawing No. BANG-2A& 2B-DTD- GEN-STR-DWG-03425
BMRCL/LPMC/QC/SOR/2023/ Bharath (AEE)
506 12.02.2024 Pier Cap Pedestal (A0) found ok. 67 GOOD SOR
NCC/PB2/506 CY
Viaduct b) Concrete slump, temperature of TM No KA01AH-9401 witnessed at site and found within permissible limit as per Mix
Design.
In Quality Lab
a. Witnessed 28-day 1st stage tendon grout Cube Compressive Strength test of AP 584-AP 585-G2 I Girder on 03.02.2024
Vadeyarapura as per attached record. Results found OK as per MORTH 5th Revision Appendix-1800/III clause 4.2.2. Date of 1st Stage
BMRCL/LPMC/QC/SOR/2023/ Bharath (AEE)
507 13.02.2024 Casting Yard Quality tendon grouting of AP 584-AP 585-G2 I Girder -06.01.2024 67 GOOD SOR
NCC/PB2/507 CY
Control Lab b. Witnessed 28-day 1st stage tendon grout Cube Compressive Strength test of AP-545 Pier Cap on 13.02.2024 as per
attached record. Results found OK as per MORTH 5th Revision Appendix-1800/III clause 4.2.2. Date of 1st Stage tendon
grouting of AP-545 Pier Cap -16.01.2024
Witnessed incoming Jindal Steel and Power Limited TMT FE 550D and review MTC as per attached record. Found OK as
per IS 1786:2008.
Item- Jindal Steel and Power Limited TMT FE 550D
BMRCL/LPMC/QC/SOR/2023/ Vadeyarapura Invoice No-RV6000114114 Bharath (AEE)
508 13.02.2024 67 GOOD SOR
NCC/PB2/508 Casting Yard Heat No- G41061, R3F03439, F40528, G41068, G41074 and G40996 CY
Dia of steel-08 mm, 10 mm, 12 mm, 16 mm
MTC No- 629580, 629567, 629581, 629599
Vehicle No KA 01 AK 8217
During quality walk It observed that at AP-728 & AP- 471(LHS), Pile Cap Curing is not as per technical specification
AP-728 & AP- Section S.03 Clause No 3.12.6
BMRCL/LPMC/QC/SOR/2023/ Rahul Thandel(AEE)
509 14.02.2024 471(LHS), Pile Cap Open
NCC/PB2/509 Viaduct
Viaduct Date of concrete of Pile Cap AP-728: - 09.02.2024
Date of concrete of Pile Cap AP-471 (LHS): - 08.02.2024
During site visit it observed AP-722 Pile cap backfilling process is not as per technical specification Section S.02 Clause
AP-722
BMRCL/LPMC/QC/SOR/2023/ No 2.2. Rahul Thandel(AEE)
510 14.02.2024 PILE CAP Open
NCC/PB2/510 Date of concrete of AP 722 Pile cap: -16.01.2024 Viaduct
Viaduct
During visit at Batching Plant on 14.02.2024 and Casting Yard on 16.02.2024 Pile Concrete at Batching Plant and Pier cap
Concrete at Casting Yard witnessed with following details.
Vadeyarapura a. At Batching Plant AP-333M/P3 Pile M35 grade concreting, checked slump, temperature & verified Batch sheet of
BMRCL/LPMC/QC/SOR/2023/ Bharath (AEE)
512 16.02.2024 Casting Yard Quality vehicle No KA 50 B 1489 with approved Mix design as shown in attached pictures. Found within the permissible limits. 67 GOOD SOR
NCC/PB2/512 CY
Lab b. At Casting Yard AP-920 (Type -2) Precast Pier Cap M55 grade concreting, checked slump, temperature & verified
Batch sheet of vehicle No KA 50 B 1663 with approved Mix design as shown in attached pictures. Found within the
permissible limits.
Efficiency of Multi pull jacks being used for I girder witnessed as per attached records. Found OK as per IS 1343-2012.
Serial No: 22034005 and 22114642
BMRCL/LPMC/QC/SOR/2023/ Vadeyarapura Model: 50/200N Bharath (AEE)
523 27.02.2024 67 GOOD SOR
NCC/PB2/523 Casting Yard Capacity: 500T CY
Stress Ram Area: 1045.4cm2
Jack Efficiency: 100.00% and 98.76%
In Quality Lab
Vadeyarapura
BMRCL/LPMC/QC/SOR/2023/ Witnessed 28-day Cover Blocks (M-55 grade) Cube Compressive Strength test casted on 29.01.2024 as per attached Bharath (AEE)
524 27.02.2024 Casting Yard Quality 67 GOOD SOR
NCC/PB2/524 record. Results found OK as per approved mix design for cover blocks via letter no BMRCL/Ph-2B/Pkg-2/53/2022-23/193 CY
Control Lab
dated 31.05.2022.
In Quality Lab
MTC of Ultra Tech Cement Ordinary Portland Cement, Grade 53 was checked for below mentioned parameters for 1st &
Vadeyarapura
BMRCL/LPMC/QC/SOR/2023/ 2nd week of 2024 as per attached record and found satisfactory as per as per IS-269-2015. Bharath (AEE)
525 28.02.2024 Casting Yard Quality 67 GOOD SOR
NCC/PB2/525 1. Table -1 Performance Improvers (Clause 5.1.1). CY
Control Lab
2. Table-2 Chemical Requirements for OPC (Clause 6.1).
3. Table-3 Physical Requirements for OPC (Clause 7).
BMRCL/LPMC/QC/SOR/2023/ AP-468, Pile Cap, AP-468, Pile Cap, Viaduct concrete slump, Temperature of TM No KA 50B 1662, TN 34 AX 0094 & TN 88 J 1909 Rahul Thandel(AEE)
526 01.03.2024 67 GOOD SOR
NCC/PB2/526 Viaduct witnessed at site and found within permissible limit as per approved mix design. Viaduct
A05-C05 Portal Beam Yelahanka station (Concourse level): -
A05-C05 Concourse 1) Reinforcement checked as per approved drawing: - DDC-BMRCL-PH2A & 2B-S2-YELSTN-STC-GFC-DWG-1004-
BMRCL/LPMC/QC/SOR/2023/ Rahul Thandel(AEE)
527 02.03.2024 Level Portal Beam 02 REV-A & 1004-02A REV-A. 67 GOOD SOR
NCC/PB2/527 Viaduct
Yelahanka station 2) Concrete Batch Report, slump and temperature checked along with BMRCL representative for vehicle no: -
KA50B1489, KA50B1486 and KA50B1662 found ok as per approved Mix Design.
In Quality Lab
Vadeyarapura a. Witnessed Tests on Aggregate Crushing Value of Coarse Aggregate (Vishwas Construction Industries Pvt. Ltd.)-
BMRCL/LPMC/QC/SOR/2023/ Rahul Thandel(AEE)
528 02.03.2024 Casting Yard Quality Average Crushing Value found 25.00% as per attached records. Found OK as per IS 383-2016, Clause 5.4.1 (b) 67 GOOD SOR
NCC/PB2/528 Viaduct
Lab b. Witnessed Tests on Aggregate Crushing Value of Coarse Aggregate (Besto Mining)- Average Crushing Value found
26.52% as per attached records. Found OK as per IS 383-2016, Clause 5.4.1 (b)
In Quality Lab
Vadeyarapura a. Witnessed 28-day Concrete Cube Compressive Strength test of AP-209 (Type 1) Pier Cap of M55 Grade as per attached
BMRCL/LPMC/QC/SOR/2023/ Bharath (AEE)
529 05.03.2024 Casting Yard Quality record. Results found OK. 67 GOOD SOR
NCC/PB2/529 CY
Lab b. Witnessed 28-day Concrete Cube Compressive Strength test of AP-931 (Type 2) Pier Cap of M55 Grade as per attached
record. Results found OK.
In Quality Lab
a. Witnessed 28-day Concrete Cube Compressive Strength test AP 551 Pier of M50 Grade as per attached record. Results
Vadeyarapura found OK.
BMRCL/LPMC/QC/SOR/2023/ Bharath (AEE)
530 05.03.2024 Casting Yard Quality b. Witnessed 28-day Concrete Cube Compressive Strength test of AP-544 Pier Cap Pedestal of M55 Grade as per attached 67 GOOD SOR
NCC/PB2/530 CY
Control Lab record. Results found OK.
c. Witnessed 28-day Concrete Cube Compressive Strength test on of AP-571 Pier Cap Stitch of M55 Grade as per attached
record. Results found OK.
During Site Visit at Casting Yard it is found that AP-604 LHS Pre Cast Pier Cap (Type 2) Single track casted without
BMRCL/LPMC/QC/SOR/2023/ Vadeyarapura approved Method Statement that it is not as per technical specification Section-S.01 clause 1.1.8. Bharath (AEE)
531 06.03.2024 Open
NCC/PB2/531 Casting Yard CY
Date of Casting of AP-604 LHS (Type 2) Single Track Pier Cap-02.03.2024
During Site Visit at Casting Yard following point observed.
Vadeyarapura a. The threaded length of the diaphragm reinforcement bars of AP581-AP582-G3 I Girder not protected as per technical
BMRCL/LPMC/QC/SOR/2023/ Casting Yard specification Section S.05 clause no 5.2.b. Bharath (AEE)
532 06.03.2024 Open
NCC/PB2/532 AP 584-AP 582/G3 I b. No Provision done to prevent the rusting of dowel of deck slab reinforcement of AP581-AP582-G3 I Girder since more CY
Girder than 100 days.
Date of Casting of AP581-AP582-G3 I Girder-15.11.2023
During site visit at Casting Yard I Girder AP 723-AP 724/G4 1st stage ducts (2no’s) grouting witnessed temperature is
Vadeyarapura
BMRCL/LPMC/QC/SOR/2023/ 19.4﮿C & 18.6﮿C, water /cement ratio is 0.42 and pressure after full injection of grout is maintained 5kg/sq.cm for 1min Bharath (AEE)
533 07.03.2024 Casting Yard AP723- 67 GOOD SOR
NCC/PB2/533 found satisfactory as per MORTH 1800/III. CY
AP724-G4 I-Girder
Date of 1st Stage stressing of AP 723-AP 724/G4 I-Girder-01.03.2024
In Quality Lab
a. Witnessed 28-day 2nd stage tendon grout Cube Compressive Strength test of AP 581-AP 582-G2 I Girder as per
attached record. Results found OK as per MORTH 5th Revision Appendix-1800/III clause 4.2.2.
Date of 2nd Stage tendon grouting of AP 581-AP 582-G2 I Girder -10.02.2024
Vadeyarapura
BMRCL/LPMC/QC/SOR/2023/ b. Witnessed 28-day 2nd stage tendon grout Cube Compressive Strength test of AP 620-AP 621-G3 I Girder as per Bharath (AEE)
534 09.03.2024 Casting Yard Quality 67 GOOD SOR
NCC/PB2/534 attached record. Results found OK as per MORTH 5th Revision Appendix-1800/III clause 4.2.2. CY
Control Lab
Date of 2nd Stage tendon grouting of AP 620-AP 621-G3 I Girder -10.02.2024
c. Witnessed 28-day 1st stage tendon grout Cube Compressive Strength test of AP-586 Pier Cap as per attached record.
Results found OK as per MORTH 5th Revision Appendix-1800/III clause 4.2.2.
Date of 1st Stage tendon grouting of AP-586 Pier Cap -10.02.2024
Statement of BMRCL Quality SOR as on November 2023 3/12/2024
SOR SOR Status
Sl SOR Date of Categoriz Action
No. No. Issue ation Observation File No.
by
Remarks
(Vol) Open Closed
BMRC/PH2/QA/ Bagalur Station C01 to C08
Chethan Kumar
1 SOR/2022/NCC/ 05.07.2023 Crash Barrier reinforcements are covered with back filling soil. Concrete blocks placed and Open
AEE
AirportP2/291 cribs erected above crash barrier reinforcement (C07, C06, C05, C04 & C02)
BMRC/PH2/QA/ Pile AP 442/P1
Rahul Thandel
2 SOR/2022/NCC/ 21.08.2023 Found unsound and soil mixed concrete more than 1000 mm below from cut off level. Open
AEE
AirportP2/327 Date of casting: 21.12.2022
BMRC/PH2/QA/ Pile AP 606/P3 RHS
Rahul Thandel
3 SOR/2022/NCC/ 24.08.2023 Pile boring log register verified: prolonged delay in the commencement of concreting after the Open
AEE
AirportP2/329 completion of boring of Pile.
AP 438
BMRC/PH2/QA/
Pile cap - 438 reinforcement checked, observed that distance measured from Pile cap shutter to Rahul Thandel
4 SOR/2022/NCC/ 16.09.2023 Open
Pier outer surface is 1.2 mtr towards (NHAI Side) and 2.2 mtr towards (Service road side) in AEE
AirportP2/349
transverse direction.
CGM(Q) : It is
BMRC/PH2/QA/
AP 440 & AP 441 Rahul Thandel provisionally closed
5 SOR/2022/NCC/ 11.10.2023 Open
Pile reinforcement submerged in drainage waer. AEE anyhow compliance
AirportP2/363
may be sent again
BMRC/PH2/QA/
AP 413/P4 Pile load test Rahul Thandel
6 SOR/2022/NCC/ 06.11.2023 Open
Routine Pile load test carried out without approved method statement. AEE
AirportP2/378
BMRC/PH2/QA/ Pile AP 611/P4
Rahul Thandel
7 SOR/2022/NCC/ 10.11.2023 Pile boring log register verified: prolonged delay in the commenceemnt of concreting after the Open
AEE
AirportP2/382 completion of boring of pile.
Static Routine Test Piles Viaduct
BMRC/PH2/QA/
Rahul Thandel
8 SOR/2022/NCC/ 15.11.2023 Open
The total of Piles completed as of 15.11.2023 is 1860 out of 2765, no. of load tests conducted AEE
AirportP2/389
are lesser than required.
Statement of NCR issued 27-04-2023
SL NCR Date of Action
OBSERVATION STATUS REMARKS
NO. No. Issue by
Baglur Station Pile cap APC03 Chethan Kumar, Internal SOR received from
19 NCR-19 06.08.2022 Closed
Pile cap PCC damaged at several locations, Yet pile cap reinforcement work in progress. AEE BMRCL
Bagaluru Station
In CHSL test Bagaluru Station observed
Pile A05/P4/RHS
* Pile Length: 28.00m
* Length of Sonic tube found:
a. 16m, Chethan Kumar,
59 NCR-59 06.12.2022 Closed
b. 16m, AEE
c. Blocked,
d. 1.5m
* Date of casting: 26/09/202
* Pile Dia: 1.20m
Yelahanka Station
Chethan Kumar,
81 NCR-81 10.02.2023 Bore log register checked: Open
Overwriting and replacement of values using whitner done for bore depths, time an penetration tests. AEE
Internal SOR
Pile Cap AP 701 Pile Cap AP 701
Internal Rahul,
1 Curing of pile cap is 24.05.2022 Curing of pile cap is not being carried out properly. 50(7) SOR closed
NCR AEE
not being carried out DOC - 19.05.2022
properly.
Chethan
Internal Baglur Station Pile cap APC03 Internal NCR
2 Internal SOR 04.08.2022 50 (7) Kumar SOR closed
NCR-19 Pile cap PCC damaged at several locations, Yet pile cap reinforcement work in progress. Closed by CE-Pkg2
AEE
Vadeyarpura Casting Yard Internal NCR
Internal Bharath,
3 Internal SOR 12.09.2022 During site visit it is observed that M/s NCC Ltd using unapproved GI binding wire for pier cap works; Open Complaince to be submitted
NCR-28 AEE
i.e M/s MISCO and also found rusted. from NCC
Pile AP 514/P2
Internal Rahul Thandel Complaince to be submitted
7 Internal SOR 11.08.2022 * Friction pile bore depth: 30m Open
NCR-64 AEE from NCC
* Volume Polymer tank: 25cum (Required: 36m)
Rahul Thandel
Internal AP 456 & C07 Jakkur Station
8 Internal SOR 02.01.2023 AEE & SOR closed
NCR- 71 Pile Cap PCC found damaged.
Chethan AEE
BMRC/PH2/QA/
NCR-52a
1 SOR/2022/NCC/ Package-3 03.10.2022
NCR-52b
AirportP2/085
BMRC/PH2/QA/
2 SOR/2022/NCC/ NCR-53 Package-3 24.11.2022
AirportP2/113
Statement of SOR & NCR of P
Age in
Categorization
days
Statement of SOR & NCR of Package - 3
Observation
Vadeyarpura Casting yard Precast Piercap AP 852 DOC 15/09/22 AP 851 DOC
AP 852 observed Honeycomb and reinforcement in inside conical portion of the Prec
AP 851 Piercap edges damaged both side faces.
I Girder AP995-996/G01,
In post tensioned I Girder AP995-996/G01,
* HDPE Couplers are provided in curved zones. HDPE coupler joined with HDPE du
& Binding wire.
* Short lengths of ducts are used, whreas longer length to be used.
SOR Action SOR Status
File No.(Vol) by Open Closed
50(10) Bharath,
SOR closed
50(1) AEE
Bharath,
50(10) SOR closed
AEE
6/17/2023
Remarks
Month wise pending observations upto February 2024 3/12/2024
Pile AP 611/P4
BMRC/PH2/QA/SOR/
9 10.11.2023 Pile boring log register verified: prolonged delay in the commenceemnt of ü ü
2022/NCC/AirportP2/382
concreting after the completion of boring of pile.
Static Routine Test Piles Viaduct
BMRC/PH2/QA/SOR/
10 15.11.2023 ü ü
2022/NCC/AirportP2/389 The total of Piles completed as of 15.11.2023 is 1860 out of 2765, no. of load
tests conducted are lesser than required.
Sl SOR Date of SOR Status 3 month File sent to
No. No. Issue Observation Major SOR
old SOR HO
Remarks
Open Closed
AP 435 Pile cap
BMRC/PH2/QA/SOR/ File sent to HO on
11 02.12.2023 Pile cap back filling done in single layer with unwanted materials/boulders. ü ü
2022/NCC/AirportP2/395 05.03.2024
Without completion of curing period.
AP 718/P3
BMRC/PH2/QA/SOR/
12 06.12.2023 ü
2022/NCC/AirportP2/397 Pile boring log register verified: Prolonged delay in the commencement of
concreting after the completion of boring of pile.
Span AP 709-708
Following observations were made during bearing inspection
* AP 709-708 UP-A (Gap in b/w Bearing to pedestal -3mm and Bearing to Rectification done on
BMRC/PH2/QA/SOR/
13 11.12.2023 wedge plate - 2mm) ü 11.03.2023, Compliance to
2022/NCC/AirportP2/405
* AP 709-708 UP-B (Gap in b/w Bearing to pedestal -2mm) be submitted by NCC
* AP 709-708 UP-A (Gap in b/w Bearing to wedge plate -3mm)
* AP 709-708 DN-B (Gap in b/w Bearing to pedestal -3mm)
Span AP 713-712
Following observations were made during bearing inspection
* AP 713-712 UP-A (Gap in b/w Bearing to pedestal -3mm and Bearing to
wedge plate - 1mm) Rectification done on
BMRC/PH2/QA/SOR/
14 11.12.2023 * AP 713-712 UP-C (Gap in b/w Bearing to pedestal -4mm) ü 08.03.2023, Compliance to
2022/NCC/AirportP2/406
* AP 713-712 UP-D (Gap in b/w Bearing to wedge plate -2mm) be submitted by NCC
* AP 713-712 DN-B (Gap in b/w Bearing to pedestal -1mm)
* AP 713-712 DN-C (Gap in b/w Bearing to pedestal -2mm and 4mm)
* AP 713-712 DN-D (Gap in b/w Bearing to pedestal -1mm)
Span AP 712-711
Following observations were made during bearing inspection
* AP 712-711 UP-A (Gap in b/w Bearing to pedestal -2mm and Bearing to
wedge plate - 1mm)
Rectification done on
BMRC/PH2/QA/SOR/ * AP 712-711 UP-C (Gap in b/w Bearing to pedestal -4mm)
15 11.12.2023 ü 11.03.2023, Compliance to
2022/NCC/AirportP2/407 * AP 712-711 UP-D (Gap in b/w Bearing to pedestal -3mm)
be submitted by NCC
* AP 712-711 DN-B (Gap in b/w Bearing to pedestal -3mm and bearing to
wedge plate -1mm)
* AP 712-711 DN-C (Gap in b/w Bearing to pedestal -2mm)
* AP 712-711 DN-D (Gap in b/w Bearing to pedestal -2mm)
Span AP 710-709
Span alignment done after 1st stage stressing, following observations were made Rectification done on
BMRC/PH2/QA/SOR/
16 16.12.2023 during bearing inspection. ü 07.03.2023, Compliance to
2022/NCC/AirportP2/409
* AP 710-709 UP-C (Gap in b/w bearing to pedestal - 1mm) be submitted by NCC
* AP 710-709 DN-A (Gap in b/w bearing to pedestal - 1mm)
Sl SOR Date of SOR Status 3 month File sent to
No. No. Issue Observation Major SOR
old SOR HO
Remarks
Open Closed
Span AP 708-707
Span alignment done after 1st stage stressing, following observations were made
Rectification done on
BMRC/PH2/QA/SOR/ during bearing inspection.
17 16.12.2023 ü 07.03.2023, Compliance to
2022/NCC/AirportP2/410 * AP 708-707 UP-D (Gap in b/w bearing to pedestal - 1mm)
be submitted by NCC
* AP 708-707 DN-B (Gap in b/w bearing to pedestal - 1mm)
* AP 708-707 DN-C (Gap in b/w bearing to pedestal - 1mm)
Pile 373/P6
BMRC/PH2/QA/SOR/ Observed (on 07.02.2024) the batch slips are not signed by BMRCL engineers at File sent to HO on
26 07.02.2024 ü ü
2022/NCC/AirportP2/444 site. 06.03.2024
DOC of Pile: 03.02.2024
Sl SOR Date of SOR Status 3 month File sent to
No. No. Issue Observation Major SOR
old SOR HO
Remarks
Open Closed
Span AP 711-710
Span alignment done after 1st stage stressing, following observations were made
during bearing inspection. Rectification done on
BMRC/PH2/QA/SOR/
27 16.02.2024 * AP 711-710 UP-A (Gap in b/w bearing to pedestal - 2mm and bearing to ü 12.03.2023, Compliance to
2022/NCC/AirportP2/445
wedge plate - 1mm) be submitted by NCC
* AP 711-710 UP-C (Gap in b/w bearing to pedestal - 1mm)
* AP 711-710 DN-C (Gap in b/w bearing to pedestal - 3mm)
AP 440 Pile reinforcements
BMRC/PH2/QA/SOR/ File sent to HO on
28 21.02.2024 Pile reinforcement submerged in sewage water. ü ü
2022/NCC/AirportP2/449 06.03.2024
Observed from 29.01.2024 to 20.02.2024
AP 445 Pile 04
BMRC/PH2/QA/SOR/
29 21.02.2024 Pile build up found less than 1 meter. ü
2022/NCC/AirportP2/450
Length above COL: 300mm
AP 478 RHS Pile 03
BMRC/PH2/QA/SOR/
30 21.02.2024 Pile build up found less than 1 meter and concrete is mixed with soil. ü
2022/NCC/AirportP2/451
Length above COL: 700mm
Vadeyarpura Casting Yard I Girder AP 445-446/G4
BMRC/PH2/QA/SOR/ Observed improper stacking of I Girder
31 26.02.2024 ü Rectification In-progress
2022/NCC/AirportP2/454 I Girder is tilted and damaged
Area of damage:100X700mm
Total 34 32 2 1 8 8