Professional Documents
Culture Documents
Daily Weekly Safety Observation Register-Corrective Action Form (Individual) - Wk-12
Daily Weekly Safety Observation Register-Corrective Action Form (Individual) - Wk-12
1 PDC-Central Projects
2 PDC-Central Projects
3 PDC-Central Projects
4 PDC-Central Projects
5 PDC-Central Projects
6 PDC-Central Projects
7 PDC-Central Projects
8 PDC-Central Projects
9 PDC-Central Projects
10 PDC-Central Projects
11
12
13
14
15
Weekly Follow Up Safety Observation Report (Daily
Date: Month_OCTOBER_Day from _15_ to _20_2022
RISK
OBSERVATION RESPONSIBLE
(High/Medium/Low)
STATUS
ACTION TAKEN DATE CLOSED
(Open / Closed)
closed
18-10-2022
closed
18-10-2022
closed
18-10-2022
closed
18-10-2022
closed
18-10-2022
closed
18-10-2022
closed
18-10-2022
closed
18-10-2022
closed
18-10-2022
closed
18-10-2022
HSE CONSULTANT NAME
ENGR. SULTHAN
ENGR. SULTHAN
ENGR. SULTHAN
ENGR. SULTHAN
ENGR. SULTHAN
ENGR. SULTHAN
ENGR. SULTHAN
ENGR. SULTHAN
ENGR. SULTHAN
ENGR. SULTHAN
We
1 PDC-Central Projects
2 PDC-Central Projects
3 PDC-Central Projects
4 PDC-Central Projects
5 PDC-Central Projects
6 PDC-Central Projects
7 PDC-Central Projects
8 PDC-Central Projects
9 PDC-Central Projects
10 PDC-Central Projects
11
12
13
14
15
Weekly Follow Up Safety Observation Report (Daily
Date: Month_OCTOBER__Day from _22_ to _27_2022
RISK
OBSERVATION RESPONSIBLE
(High/Medium/Low)
STATUS
ACTION TAKEN DATE CLOSED
(Open / Closed)
CLOSED
CLOSED
CLOSED
CLOSED
CLOSED
CLOSED
CLOSED
CLOSED
CLOSED
CLOSED
HSE CONSULTANT NAME
ENGR. SULTHAN
ENGR. SULTHAN
ENGR. SULTHAN
ENGR. SULTHAN
ENGR. SULTHAN
ENGR. SULTHAN
ENGR. SULTHAN
ENGR. SULTHAN
ENGR. SULTHAN
ENGR. SULTHAN
Wee
10
11
12
13
14
15
Weekly Follow Up Safety Observation Report (Daily
Date: Month__DEC-JAN__Day from _11-01-2023___ to _17-01-202
RISK
OBSERVATION RESPONSIBLE
(High/Medium/Low)
STATUS
ACTION TAKEN DATE CLOSED
(Open / Closed)
ENGR. SULTHAN
ENGR. SULTHAN
ENGR. SULTHAN
ENGR. SULTHAN
ENGR. SULTHAN
ENGR. SULTHAN
ENGR. SULTHAN
ENGR. SULTHAN
ENGR. SULTHAN
Wee
10
11
12
13
14
15
Weekly Follow Up Safety Observation Report (Daily
Date: Month___Jan__Day from __18__ to __24__2023
RISK
OBSERVATION RESPONSIBLE
(High/Medium/Low)
STATUS
ACTION TAKEN DATE CLOSED
(Open / Closed)
closed 24/01/2023
Immediately removed LPG cylinder from the chemical
closed 24/01/2023
Hard Barricading provided.
closed 24/01/2023
Instructed to use full body harness while working at hei
closed 24/01/2023
Steel cut pieces removed and area cleaned.
closed 24/01/2023
Sewage water removed and overflowed area cleaned.
Housekeeping done and removed all unwanted material closed 24/01/2023
closed 24/01/2023
Immediately removed equipment from the chemical waste storage area .
closed 24/01/2023
Emptied the trash bin.
closed 24/01/2023
Hard barricade provided immediately to avoid falling ha
HSE CONSULTANT NAME
ENGR. SULTHAN
ENGR. SULTHAN
ENGR. SULTHAN
ENGR. SULTHAN
ENGR. SULTHAN
ENGR. SULTHAN
ENGR. SULTHAN
ENGR. SULTHAN
ENGR. SULTHAN
Wee
10
11
12
13
14
15
Weekly Follow Up Safety Observation Report (Daily
Date: Month___Feb2023__Day from __01__ to __07__2023
RISK
OBSERVATION RESPONSIBLE
(High/Medium/Low)
Civil materials stored in hazardous wastage
storage room. Should be remove from there MEDIUM SITE MANAGER
and stored designated area
Sewage water overflow please communicate
HIGH SITE MANAGER
with third party to remove.
Diesel power equipment’s kept in
undesignated area need to remove or kept in MEDIUM SITE MANAGER
designated store.
Empty water bottles blocked pedestrian
MEDIUM SITE MANAGER
walkway. empty bottles need to remove.
Employees eating food inside the hazardous
HIGH SITE MANAGER
chemical waste storage area.
In chemical room chemical cans stacked on HIGH SITE MANAGER
the ground.
STATUS
ACTION TAKEN DATE CLOSED
(Open / Closed)
ENGR. SULTHAN
ENGR. SULTHAN
ENGR. SULTHAN
ENGR. SULTHAN
ENGR. SULTHAN
ENGR. SULTHAN
ENGR. SULTHAN
ENGR. SULTHAN
Wee
11
12
13
14
15
Weekly Follow Up Safety Observation Report (Daily
Date: Month___Feb_____Day from __01__ to __07__2023
RISK
OBSERVATION RESPONSIBLE
(High/Medium/Low)
STATUS
ACTION TAKEN DATE CLOSED
(Open / Closed)
CLOSED 5/2/2023
Removed all unwanted materials.
CLOSED 5/2/2023
Housekeeping done and removed all unwanted materia
CLOSED 5/2/2023
Removed all unwanted scaffolding materials from base
CLOSED 5/2/2023
Removed the civil materials, now access way open and c
CLOSED 5/2/2023
Scaffold dismantled.
CLOSED 5/2/2023
Housekeeping done.
CLOSED 5/2/2023
Drip tray cleaned.
CLOSED 5/2/2023
Welding machine rejected and removed from basement
CLOSED 5/2/2023
Dismantled staircase removed.
CLOSED 5/2/2023
Removed the broken chair from building.
HSE CONSULTANT NAME
ENGR. SULTHAN
ENGR. SULTHAN
ENGR. SULTHAN
ENGR. SULTHAN
ENGR. SULTHAN
ENGR. SULTHAN
ENGR. SULTHAN
ENGR. SULTHAN
ENGR. SULTHAN
ENGR. SULTHAN
Wee
10
11
12
13
14
15
Weekly Follow Up Safety Observation Report (Daily
Date: Month___Feb_____Day from _08__ to __14__2023
RISK
OBSERVATION RESPONSIBLE
(High/Medium/Low)
STATUS
ACTION TAKEN DATE CLOSED
(Open / Closed)
CLOSED 2/12/2023
All cables are arranged properly.
CLOSED 2/12/2023
Excavation area backfilled.
Instructed to use full body harness while working at
CLOSED 2/12/2023
height.
Removed the rejected cable drum and new cable
CLOSED 2/12/2023
drum is provided.
CLOSED 2/12/2023
Housekeeping done.
CLOSED 2/12/2023
Housekeeping done.
Provided the Plug. CLOSED 2/12/2023
HSE CONSULTANT NAME
ENGR. SULTHAN
ENGR. SULTHAN
ENGR. SULTHAN
ENGR. SULTHAN
ENGR. SULTHAN
ENGR. SULTHAN
ENGR. SULTHAN
Wee
10
11
12
13
14
15
Weekly Follow Up Safety Observation Report (Daily
Date: Month____FEB_____Day from ___15_ to __21__2023
RISK
OBSERVATION RESPONSIBLE
(High/Medium/Low)
STATUS
ACTION TAKEN DATE CLOSED
(Open / Closed)
CLOSED 2/20/2023
Removed all cable from the floor
Immediately send back the designated storage area CLOSED 2/20/2023
ENGR. SULTHAN
ENGR. SULTHAN
ENGR. SULTHAN
ENGR. SULTHAN
ENGR. SULTHAN
ENGR. SULTHAN
Wee
RISK
OBSERVATION RESPONSIBLE
(High/Medium/Low)
Chemical Can left in the control room after Medium SITE MANAGER
paining works
STATUS
ACTION TAKEN DATE CLOSED
(Open / Closed)
ENGR. SULTHAN
ENGR. SULTHAN
ENGR. SULTHAN
ENGR. SULTHAN
ENGR. SULTHAN
ENGR. SULTHAN
ENGR. SULTHAN
ENGR. SULTHAN
ENGR. SULTHAN
ENGR. SULTHAN
ENGR. SULTHAN
ENGR. SULTHAN
ENGR. SULTHAN
ENGR. SULTHAN
ENGR. SULTHAN
ENGR. SULTHAN
Wee
RISK
OBSERVATION RESPONSIBLE
(High/Medium/Low)
Chemical wastages left on the site walk way HIGH SITE MANAGER
STATUS
ACTION TAKEN DATE CLOSED
(Open / Closed)
ENGR. SULTHAN
ENGR. SULTHAN
ENGR. SULTHAN
ENGR. SULTHAN
ENGR. SULTHAN
ENGR. SULTHAN
ENGR. SULTHAN
ENGR. SULTHAN
ENGR. SULTHAN
ENGR. SULTHAN
Wee
RISK
OBSERVATION RESPONSIBLE
(High/Medium/Low)
STATUS
ACTION TAKEN DATE CLOSED
(Open / Closed)
ENGR. SULTHAN
ENGR. SULTHAN
ENGR. SULTHAN
ENGR. SULTHAN
ENGR. SULTHAN
ENGR. SULTHAN
ENGR. SULTHAN
ENGR. SULTHAN
ENGR. SULTHAN
Wee
RISK
OBSERVATION RESPONSIBLE
(High/Medium/Low)
It was observed that painter did not wearing Medium Site Manager
the safety goggles
Civil wastage materials dumped near the
Low Site Manager
security room
STATUS
ACTION TAKEN DATE CLOSED
(Open / Closed)
ENGR. SULTHAN
ENGR. SULTHAN
ENGR. SULTHAN
ENGR. SULTHAN
ENGR. SULTHAN
ENGR. SULTHAN
ENGR. SULTHAN
ENGR. SULTHAN
ENGR. SULTHAN
ENGR. SULTHAN