You are on page 1of 1

NAMA PROYEK

PROYEK ROTAVIRUS
GEDUNG 37
PT. BIO FARMA (PERSERO)

PEMBERI TUGAS

JL. PASTEUR NO. 28 BANDUNG

MANAJEMEN KONSTRUKSI

Direview oleh :

SS.316 SCH.40 Ø2" SS.316 SCH.40 Ø2" PROJECT MANAGER

SS.316 SCH.40 Ø2" Muhammad Nasrudin

CATATAN
Ø1"

Ø1"

Ø1"

Ø1"

Ø1"

Ø1"
FULLY AUTOMATIC SWITCHOVER
CONTROL MODULE

SWITCHOVER MANIFOLD SYSTEM LEFT RIGHT


BANK LOW PRESSURE ALARM BANK

200 300
IN USE IN USE

100 400

500
SILENCE
NORMAL NORMAL
PRESSURE PRESSURE

OUTLET (READY) (READY)

PRESSURE Empty When


Not Lit
Empty When
Not Lit

LEFT BANK RIGHT BANK


PRESSURE PRESSURE
200 300 OUTLET PRESSURE 200 300

ADJUSTMENT
INCUBATOR ROOM

INCUBATOR ROOM
100 400 100 400

500 500
INCUBATOR

INCUBATOR

INCUBATOR

INCUBATOR

BSC ROOM
37.L1.19

37.L1.28

37.L1.29

37.L1.21
BSC

LANTAI 1

DIAGRAM SISTEM GAS CO2

THIS DRAWING IS THE SOLE PROPERTY OF PT. RAYAKONSULT.


THE INFORMATION CONTAINED THEREIN SHALL NOT BE USED
OR COPIED IN ANY MANNER WITHOUT THE WRITTEN PERMISSION
FROM PT. RAYAKONSULT.

REVISI
NO. TANGGAL KETERANGAN PARAF

KONSULTAN PERENCANA

SS.316 SCH.40 pt
consulting services
JL.BABAKAN JERUK II NO 34
TLP 62.22.2008100; FAX 62.22.2008600
BANDUNG 40163
PROJECT MANAGER

Rizky Yudiyana
ARSITEK

SQ-1.4
SQ-1.4
Wahyu Trisna Sri Handayani
AHLI STRUKTUR

Oentojo Tjiptobusono
BLAST FREEZER

AHLI MEKANIKAL HVAC


FREEZING AND

Muhammad Abdillah
SEED ROOM

AHLI MEKANIKAL PLUMBING

Anna Zuhpriha
37.L1.38

AHLI ELEKTRIKAL ARUS KUAT

Eko Priyono
AHLI ELEKTRIKAL ARUS LEMAH

Agus Supriyanto
JURU GAMBAR

RAYAKONSULT

JUDUL GAMBAR

LANTAI 1 DIAGRAM SISTEM


By OTHERS GAS

TANGGAL JANUARI 2023

DARI LOKASI LN2 DI SITE SKALA KODE PROYEK NO. GAMBAR NO. LEMBAR

NTS BF37-RTV P.UP.01.07 08


A1 R1