You are on page 1of 43

+

No.1505

SL Ram BOP Rev.A1


Security Guide
The manual covers matters needing attention for ensuring personal safety as well as protecting product and
connected equipment from damage.
All matters needing attention are given with symbols for clear warning and are also respectively described with
the following characters upon on the severity:
Notice
Ignoring proper prevention measures may cause injuries, deaths, serious personal injury or large property
loss.
Notice
Catch your attention on important information of the product or specific part during handling with the product
or files.
Competent person
No one but the competent person is authorized to assemble and operate the equipment. The competent
person shall be the person with certain experience on on-site well control and be able to assemble, perform
test run and operate the equipment according to specified safety practices and standards.
Correct way to use
Pay attention to the following:
Notice
The equipment and assemblies thereof shall be applied only to description in product catalogue or technical
manual, and shall be connected only with devices or assemblies that are approved by Shenkai or other
recommended manufacturers.
Safety first shall be complied for well control equipment. Any quick-wear metal and nonmetal part, in particular
the packer that influences the product safety and performance in test shall be replaced timely.
The product can work correctly and safely on the premise of correct transportation, storage, assembling,
installing, and being operated and maintained by the recommended mode.

Trademarks ○
R ○
R ○
R

, , , are the registered trademark of Shenkai.


Any third party using other names related to the trademarks in this manual for its own purpose (s) shall be treated as
infringing the rights and interests of the proprietor of the trademarks.
Shanghai SK Petroleum & Chemical Equipment Corporation Ltd holds the copyright ○c 2013. All rights reserved.
None of the manual or contents may be reproduced, transmitted or used without clear written authorization.
Rights reserved. All rights reserved, including patent right, utility model or appearance design exclusive right.
The BOP meets the requirements of standards API 16A and GB/ T20174 and gained logo usage license issued by API
and production license issued by State Administration for Quality Supervision and Inspection and Quarantine:

16A-0111, , XK14-001-0002 .
Shanghai SK Petroleum & Chemical Equipment Corporation Ltd hereby declares that by check the contents of the
manual are consistent with the product and cannot in the nature of things be free from error, the consistency is
maximized. The contents of the manual will be reviewed at fixed period and modified in the next version. Suggestions
for improvements are highly welcomed.
Shanghai SK Petroleum & Chemical Equipment Corporation Ltd holds the copyright ○c 2015. No inform will be made for
any change.
Shanghai SK Petroleum & Chemical Equipment Corporation Ltd Contract No.
Technical Support Department
Customer Hotline: +86(21)64290467 Fax: +86(21) 64290467
Website: www.shenkai.com Postal Code: 201114
Catalogue
1 Application ........................................................................................................................................... 1

2 Model & Specification and Technical Parameters ............................................................................... 2


2.1 Model......................................................................................................................................... 2
2.1.1 Bore Code ....................................................................................................................... 2
2.1.2 Rated working pressure .................................................................................................. 2
2.1.3 Temperature grade ......................................................................................................... 2
2.2 Ram BOP Technical Parameters .............................................................................................. 4
3 Working Principles and Structure Characteristics ............................................................................... 6
3.1 Working principle....................................................................................................................... 6
3.1.1 Hydraulic control principle .............................................................................................. 6
3.1.2 Principle of Sealing ......................................................................................................... 6
3.2 Structural features of main parts ............................................................................................... 7
3.2.1 Pipe ram assembly ......................................................................................................... 8
3.2.2 Side Door Seal Structure .............................................................................................. 10
3.2.3 Ram Shaft Seal Assembly ............................................................................................ 10
3.2.4 Secondary Seal System ............................................................................................... 12
3.2.5 Locking Shaft Seal Assembly ....................................................................................... 14
3.2.6 Manual locking mechanism of ram ............................................................................... 14
3.2.7 Hinge Structure ............................................................................................................. 16
3.3 Parts List ................................................................................................................................. 17
4 Installation and Use ........................................................................................................................... 24
4.1 Preparation before Use ........................................................................................................... 24
4.2 Usage and matters needing attention ..................................................................................... 26
5 Dismounting and Maintenance of BOP ............................................................................................. 27
5.1 Opening Door of BOP ............................................................................................................. 27
5.2 Replacement of ram and its sealing rubber core .................................................................... 28
5.3 Replacement of Seal Ring between Door and Body .............................................................. 28
5.4 Repair and replacement of cylinder assembly........................................................................ 29
5.5 Repair and Replacement of Hinge Assembly ......................................................................... 32
5.6 Installation Notes..................................................................................................................... 33
5.7 Daily Maintenance................................................................................................................... 33
5.8 Operating Period Maintenance ............................................................................................... 34
6 Preservation procedures ................................................................................................................... 36
6.1 Storing for periods greater than 30 days ................................................................................ 36
6.2 Storage of Rubber Parts ......................................................................................................... 36

7 Common Troubles and Troubleshooting ........................................................................................... 37


《SL Ram BOP Manual》Rev.A1

1 Application
Ram BOP with hydraulic control is a key part of well-control equipment. It’s used for
controlling wellhead pressure during well drilling, workover and testing etc., preventing
well blowout effectively and realizing safe construction. It can be used for the
following:(Figure 1-1):
 With proper pipe ram sealing the annular space between casing and drilling
string when there is pipe in the hole;
 With blind ram sealing the well head completely ;
 With shear/blind rams shearing the drilling tools to seal the well in some special
circs;
 When the well head is closed, use the kill manifold and choke manifold
connected to the spool and the outlet of the body doing mud circulating, choking
and releasing, well killing etc.;
 When ram BOP is used together with the choke manifold and kill manifold, it can
effectively control the bottom hole pressure and achieve near-balanced drilling
operation.

2FZ2870SL 、 2FZ3521SL 、
2FZ3535SL Ram BOP

2FZ3570SL Ram BOP

Fig.1-1 Appearance of Ram BOP

1
SL Ram BOP Manual Rev.A1

2 Model & Specification and Technical Parameters


2.1 Model

BOP type

Working Pressure Code:(Table 2-2)


Bore Code:(Table2-1)

Ram BOP Code:FZ—Single Ram BOP ; 2FZ—Double Ram BOP ;


3FZ—Triple Ram BOP

2.1.1 Bore Code


Table 2-1 Bore Code

Bore code Bore size (in) Bore code Bore size (in)
1
18 7 /16 " 48 18 3/4"
23 9" 53 20 3/4"
28 11" 54 21 1/4"
35 13 5/8" 68 26 3/4"
43 16 3/4" 76 30"

2.1.2 Rated working pressure

The BOP has rated working pressure at six grades, as shown in Table 2-2.
Table 2-2 Rated working pressure

Rated working pressure


Pressure code
MPa psi
14 13.8 2,000
21 20.7 3,000
35 34.5 5,000
70 69.0 10,000
105 103.5 15,000
140 138.0 20,000

2.1.3 Temperature grade

Minimum temperature is namely the minimum environmental temperature that might


be suffered from, and maximum temperature is namely the maximum temperature of the
liquid flowing through the equipment.
Metal parts of the equipment work within the temperature range as shown in Table
2-3.
2
《SL Ram BOP Manual》Rev.A1
Synthetic rubber materials in the equipment, contacting with the liquid in the well,
work at the temperature grade as shown in Table 2-4.
Table 2-3 Temperature grade of metal material

Code of
API code Range of working temperature
temperature grade
T-75 75 -59℃~121℃(-75 ºF ~250 ºF)
T-20 20 -29℃~121℃(-20 ºF ~250 ºF)
T-0 00 -18℃~121℃(0 ºF ~250 ºF)
Table 2-4 Temperature grade of nonmetal sealing material in contact with liquid in well

Lower limit (first letter) Upper limit (second letter)


Code Temperature Code Temperature
A -26℃(-15℉) A 82℃(180℉)
B -18℃(0℉) B 93℃(200℉)
C -12℃(10℉) C 104℃(220℉)
D -7℃(20℉) D 121℃(250℉)
E.g. AB represents the temperature grade of -26℃~93℃ (-15℉~200℉), and the specific
temperature grade is marked on the sealing part.

3
SL Ram BOP Manual Rev.A1

2.2 Ram BOP Technical Parameters


Table2-5 Specification and main technical parameters of Ram BOP
FZ2870SL 2FZ2870SL FZ3521SL 2FZ3521SL
Model
(Single) (Double) (Single) (Double)
5
Bore 279.4mm(11 in) 346.1mm(13 /8 in)
Rated working pressure 70MPa(10000psi) 21MPa(3000psi)
Hydrostatic test pressure 105MPa (15000psi) 31.5MPa(4500psi)
Hydraulic control rated
21 MPa(3000psi)
working pressure
Recommended hydraulic
8.4-10 .5MPa(1200-1500psi)
control operation pressure
Open 14.6 L×2 14.6 L×4 7.9 L×2 7.9 L×4
Hydraulic Fluid
Close 16.7 L×2 16.7 L×4 9.3 L×2 9.3 L×4
Closing Ratio 7.0 7.0 5.3 5.3
Locking Screw turns (each end) 21 21 23 23
Temperature grade
T-20
of metal material
Weight 4942kg 8947kg 3650kg 6730kg
Instructions:
a. The BOP is designed and manufactured according to specifications API Spec 16A.
b. The part in the BOP, in contact with liquid in well is resistant to hydrogen sulfide stress corrosion, and the
requirements of NACE MR-0175 are met.
c. The weight of BOP in the connection mode of upper flanged, lower flanged and side bolted is showed in the table
(see Fig.2-1, Fig.2-2, including ram assembly). The actual weight shall change with the change of the upper and the
lower connection and the side port.

Table 2-6 Specification and main technical parameters of Ram BOP


FZ3535SL 2FZ3535SL FZ3570SL 2FZ3570SL
Model
(Single) (Double) (Single) ((Double)
5 5
Bore 346.1mm(13 /8 in) 346.1mm(13 /8 in)
Rated working pressure 35MPa(5000psi) 70MPa(10000psi)
Hydrostatic test pressure 52.5MPa(7500psi) 105MPa (15000psi)
Hydraulic control rated
21 MPa(3000psi)
working pressure
Recommended hydraulic
8.4-10 .5MPa(1200-1500psi)
control operation pressure
Open 7.9 L×2 7.9 L×4 18L×2 18L×4
Hydraulic Fluid
Close 9.3 L×2 9.3 L×4 20.5L×2 20.5L×4
Closing Ratio 5.3 5.3 6.9 6.9
Locking Screw turns (each end) 23 23 26 26
Temperature grade
T-20
of metal material
Weight 3900kg 6980kg 7766kg 12996kg
Instructions:
a. The BOP is designed and manufactured according to specifications API Spec 16A.
b. The part in the BOP, in contact with liquid in well is resistant to hydrogen sulfide stress corrosion, and the
requirements of NACE MR-0175 are met.
c. The weight of BOP in the connection mode of upper flanged, lower flanged and side bolted is showed in the table
(see Fig.2-1, Fig.2-2, including ram assembly). The actual weight shall change with the change of the upper and the
lower connection and the side port.

4
《SL Ram BOP Manual》Rev.A1

Fig.2-1 Size diagram of appearance of single-ram BOP

Fig.2-2 Size diagram of appearance of double-ram BOP

A Length
B-1 Height-flange connection
B-2 Height-bolted connection
C Width-not including side port
Table 2-7 Size of appearance of ram BOP

Overall dimension
Model A B-1 B-2 C
mm mm mm mm
FZ2870SL Single Ram BOP 2589 1070 590 870
2FZ2870SL Double Ram Bop 2589 1610 1130 870
FZ3521SL Single Ram BOP 2550 940 502 845
2FZ3521SL Double Ram Bop 2550 1375 926 845
FZ3535SL Single Ram BOP 2550 940 502 845
2FZ3535SL Double Ram Bop 2550 1375 931 845
FZ3570SL Single Ram BOP 3274 1275 729 1095
2FZ3570SL Double Ram Bop 3274 1732 1168 1095
Instructions: The actual size shall change with the change of the upper and the lower connection
and the side port.
5
SL Ram BOP Manual Rev.A1

3 Working Principles and Structure Characteristics


3.1 Working principle
3.1.1 Hydraulic control principle to seal the wellhead effectively. The ram
top seal and body seal; sealing between
When pressure oil of hydraulic ram front seal and the pipe; sealing
pressure system is pumped into the between the body and the side door;
closing cavity of left and right cylinder, it sealing between ram and the side door.
pushes the piston with ram shaft and ram Produce of ram sealing divided into 2
assembly to move to the center along the steps. First when closing the ram, ram
orbit limited by the guide rid in the ram shaft affected by hydraulic oil pushes ram
chamber to realize well sealing. When it front seal rubber to press the front part of
pumped into the opening cavity of left and sealing distorted and seal off pipe string or
right cylinder, it pushes the piston with ram well hole forming front sealing, over
shaft and ram assembly to move to the compression between the top seal rubber
center to open the wellhead. The and the body seal the top part, forming top
conversion valve of hydraulic pressure sealing and accomplishes primary sealing.
system controls the ram switch; Ram Second when there is pressure in the well,
switch force is direct ratio with the forced it pushes the ram front seal from back part
area of piston and the hydraulic pressure of ram to extrude distortion more deeply,
on this area. at the same time, the ram up against the
body seal face, thus forming reliable
3.1.2 Principle of Sealing sealing. This is called well pressure
Ram BOP has 4 sealing parts in order assisting sealing
.

Fig3-1 The Consist parts of Ram BOP

6
SL Ram BOP Manual Rev.A1

3.2 Structural features of main parts


Ram BOP consists of some main parts such as body, side door, cylinder, piston, ram
shaft, locking shaft, cylinder head, and ram assembly etc.

Main pressure-containing parts such as


body and side door are cast with high-quality
alloy steel, the material conform to NACE
MR-01-75 specification, apply to the working
condition of acid medium and speci`ally heat
treatment. The pressure-containing parts has
do the hydrostatic test in accordance to the
specification of API 16A to ensure safety
during operating under working pressure.

There are high supporting rib and oblique


plane for settling and sloping to the well hole at
the bottom of the ram cavity of the body,
de-sanding automatically when opening and
closing the ram, prevent blocking and reducing
friction of the ram. It is also helpful for well
pressure assisting ram seal.

There is a guide-block on the front end of


ram, it can plug in the groove of the opposite
ram and the slope of guide-block can move
grilling tool toward well bore during closing
rams, ensure reliable sealing between the ram
and drilling tool.

The BOP using the inner flow to avoid


damaging the pipe during installing,
transporting and operating.

Ensure to seal well more safety and


reliable, there is a manual-operated control
system. If the control system of BOP is out of
control, you can use the manual-operated one
to close the ram. If you want to seal well for a
long time, then you can use manual-operated
control system. (See 3.2.6 )

Top, bottom and flange outlet connection


dimensions conform to Specification for
Drilling Through Equipment API Spec 16A.

7
SL Ram BOP Manual Rev.A1

3.2.1 Pipe ram assembly

ram assembly consists of ram


Ram block
block, holder, rubber and retracting
screw. Top and bottom of rams are
Retaining
symmetric. When top surface of the
Ram assembly Screw
ram rubber has been worn seriously,
another side can be used to prolong Holder
rubber life.
Retracting
For various size drilling tools, only Screw
need to change relevant rubber and
Rubber
ram block including blind ram, other
element are universal.
Fig 3-2 Pipe ram assembly

Floating performance of the ram is good. Because the ram seat (ram holder) and the
ram body (block) are separated, the ram can move slightly in the holder to ensure
positive alignment of the rubber faces as face seal contact occurs. There is 3mm
installation clearance between the ram body and the ram seat. When shutting off the ram,
the holder extrudes top rubber and makes it deform and bulge up to enhance
effectiveness of sealing and reduces the wear of the ram packer.
Note: The sign of “HO” (Hang-Off) on the ram body indicates that drilling tools could be
hanged on. Drilling tools shall not be hanged on the ram assembly without the sign of "HO".
Table 3-1 Parts of pipe ram of FZ2870SL
Pipe Ram Assembly Name(Qty)
Pipe Ram Retracting
Size Ram Block Retaining Holder Rubber
Assembly Screw
(2) Screw(4) (2) (2)
(2) (4)
2FZ2870ASL. 2FZ2870ASL. 2FZ3570ASL. 2FZ2870ASL. 2FZ2870ASL.
2 3/8" DFZ1310.01A-04
02A-00 02A-03 02A-03 02A-02 02A.01-00
2FZ2870ASL. 2FZ2870ASL. 2FZ3570ASL. 2FZ2870ASL. 2FZ2870ASL.
2 7/8" DFZ1310.01A-04
02B-00 02B-02 02A-03 02A-02 02B.01-00
2FZ2870ASL. 2FZ2870ASL. 2FZ3570ASL. 2FZ2870ASL. 2FZ2870ASL.
3 1/2" DFZ1310.01A-04
02C-00 02C-02 02A-03 02A-02 02C.01-00
2FZ2870ASL. 2FZ2870ASL. 2FZ3570ASL. 2FZ2870ASL. 2FZ2870ASL.0
4 1/2" DFZ1310.01A-04
02D-00 02D-02 02A-03 02A-02 2D.01-00
2FZ2870ASL. 2FZ2870ASL. 2FZ3570ASL. 2FZ2870ASL. 2FZ2870ASL.
5" DFZ1310.01A-04
02E-00 02E-02 02A-03 02A-02 02E.01-00
2FZ2870ASL. 2FZ2870ASL. 2FZ3570ASL. 2FZ2870ASL. 2FZ2870ASL.
5 1/2" DFZ1310.01A-04
02F-00 02F-02 02A-03 02A-02 02F.01-00
2FZ2870ASL. 2FZ2870ASL. 2FZ3570ASL. 2FZ2870ASL. 2FZ2870ASL.
7" DFZ1310.01A-04
02G-00 02G-02 02A-03 02A-02 02G.01-00
2FZ2870ASL. 2FZ2870ASL. 2FZ3570ASL. 2FZ2870ASL. 2FZ2870ASL.
Blind DFZ1310.01A-04
02H-00 02H-02 02A-03 02A-02 02H.01-00
2FZ2870ASL. 2FZ2870ASL. 2FZ3570ASL. 2FZ2870ASL. 2FZ2870ASL.
4" DFZ1310.01A-04
02I-00 02I-02 02A-03 02A-02 02I.01-00
Note: The number in the bracket means the quantity of rams in a pair

8
SL Ram BOP Manual Rev.A1
Table 3-2 Parts of pipe ram of FZ3521SL/FZ3535SL

Pipe Ram Assembly Name(Qty)


Pipe
Retracting
Size Ram Assembly Ram Block Retaining Holder Rubber
Screw
(2) (2) Screw(4) (2) (2)
(4)
2FZ3535TFI. 2FZ3535TFI. 2FZ3535TFI. 2FZ3535TFI. 2FZ3535TFI. 2FZ3535TFI.
3 1/2"
02B.00 02B.02 02A.03 02A.04 02A.05 02B.01.00
2FZ3535TFI. 2FZ3535TFI. 2FZ3535TFI. 2FZ3535TFI. 2FZ3535TFI. 2FZ3535TFI.
4 1/2"
02C.00 02C.02 02A.03 02A.04 02A.05 02C.01.00
2FZ3535TFI. 2FZ3535TFI. 2FZ3535TFI. 2FZ3535TFI. 2FZ3535TFI. 2FZ3535TFI.
5"
02D.00 02D.02 02A.03 02A.04 02A.05 02D.01.00
2FZ3535TFI. 2FZ3535TFI. 2FZ3535TFI. 2FZ3535TFI. 2FZ3535TFI. 2FZ3535TFI.
5 1/2"
02E.00 02E.02 02A.03 02A.04 02A.05 02E.01.00
2FZ3535TFI. 2FZ3535TFI. 2FZ3535TFI. 2FZ3535TFI. 2FZ3535TFI. 2FZ3535TFI.
7"
02F.00 02F.02 02A.03 02A.04 02A.05 02F.01.00
2FZ3535TFI. 2FZ3535TFI. 2FZ3535TFI. 2FZ3535TFI. 2FZ3535TFI. 2FZ3535TFI.
9 5/8"
02G.00 02G.02 02A.03 02A.04 02A.05 02G.01.00
2FZ3535TFI. 2FZ3535TFI. 2FZ3535TFI. 2FZ3535TFI. 2FZ3535TFI. 2FZ3535TFI.
Blind
02H.00 02H.02 02A.03 02A.04 02A.05 02H.01.00
2FZ3535TFI. 2FZ3535TFI. 2FZ3535TFI. 2FZ3535TFI. 2FZ3535TFI. 2FZ3535TFI.
2 3/8"
02J.00 02J.02 02A.03 02A.04 02A.05 02J.01.00
2FZ3535TFI. 2FZ3535TFI. 2FZ3535TFI. 2FZ3535TFI. 2FZ3535TFI. 2FZ3535TFI.
7 5/8"
02K.00 02K.02 02A.03 02A.04 02A.05 02K.01.00
2FZ3535TFI. 2FZ3535TFI. 2FZ3535TFI. 2FZ3535TFI. 2FZ3535TFI. 2FZ3535TFI.
2 7/8"
02L.00 02L.02 02A.03 02A.04 02A.05 02L.01.00
2FZ3535TFI. 2FZ3535TFI. 2FZ3535TFI. 2FZ3535TFI. 2FZ3535TFI. 2FZ3535TFI.
4"
02M.00 02M.02 02A.03 02A.04 02A.05 02M.01.00
Note: The number in the bracket means the quantity of rams in a pair
Table 3-3 Parts of pipe ram of FZ3570SL

Pipe Ram Assembly Name(Qty)


Pipe
Size Ram Assembly Ram Block Retaining Holder Retracting Screw Rubber
(2) (2) Screw(4) (2) (4) (2)

2FZ3570ASL. 2FZ3570ASL. 2FZ3570ASL. 2FZ3570ASL. 2FZ3570ASL. 2FZ3570ASL.


4 1/2”
05A-00 05A-04 05A-03 05A-02 05A-05 05A.01-00
2FZ3570ASL. 2FZ3570ASL. 2FZ3570ASL. 2FZ3570ASL. 2FZ3570ASL. 2FZ3570ASL.
全封
05B-00 05B-02 05A-03 05A-02 05A-05 05B.01-00
2FZ3570ASL. 2FZ3570ASL. 2FZ3570ASL. 2FZ3570ASL. 2FZ3570ASL. 2FZ3570ASL.
3 1/2”
05C-00 05C-02 05A-03 05A-02 05A-05 05C.01-00
2FZ3570ASL. 2FZ3570ASL. 2FZ3570ASL. 2FZ3570ASL. 2FZ3570ASL. 2FZ3570ASL.
5”
05D-00 05D-02 05A-03 05A-02 05A-05 05D.01-00
2FZ3570ASL. 2FZ3570ASL. 2FZ3570ASL. 2FZ3570ASL. 2FZ3570ASL. 2FZ3570ASL.
5 1/2”
05E-00 05E-02 05A-03 05A-02 05A-05 05E.01-00
2FZ3570ASL. 2FZ3570ASL. 2FZ3570ASL. 2FZ3570ASL. 2FZ3570ASL. 2FZ3570ASL.
7"
05F-00 05F-02 05A-03 05A-02 05A-05 05F.01-00
2FZ3570ASL. 2FZ3570ASL. 2FZ3570ASL. 2FZ3570ASL. 2FZ3570ASL. 2FZ3570ASL.
2 7/8”
05G-00 05G-02 05A-03 05A-02 05A-05 05G.01-00
2FZ3570ASL. 2FZ3570ASL. 2FZ3570ASL. 2FZ3570ASL. 2FZ3570ASL. 2FZ3570ASL.
9 5/8”
05H-00 05H-02 05A-03 05A-02 05A-05 05H.01-00
2FZ3570ASL. 2FZ3570ASL. 2FZ3570ASL. 2FZ3570ASL. 2FZ3570ASL. 2FZ3570ASL.
4”
05I-00 05I-04 05A-03 05A-02 05A-05 05I.01-00
Note: The number in the bracket means the quantity of rams in a pair

9
SL Ram BOP Manual Rev.A1

3.2.2 Side Door Seal Structure

The sealing between the door and the body adopts the structure of end face seal.

Fig. 3-3 Side Door Seal Structure

Table 3-4 Part list of Side Door Seal Structure

Qty Qty
No. BOP Model Part No./Model
(Single) (Double)
FZ2870SL 2FZ2870ASL.03.02-00 2 4
FZ3521SL 2FZ3535ASL.03.03-00 2 4
30
FZ3535SL 2FZ3535ASL.03.03-00 2 4
FZ3570SL 2FZ3570ASL.06-00 2 4

3.2.3 Ram Shaft Seal Assembly

Seal structure between door and ram shaft is lip ring.

26-1 26-2 26-3 26-4 26-5 26-6 26-7

Direction of
Direction of well hydraulic control
pressure pressure

Fig. 3-4 Ram Shaft Seal Assembly of FZ2870SL

Table 3-5 Part list of Ram Shaft Seal Assembly of FZ2870SL

Qty. Qty.
No. Description FZ2870SL Part No./Model
(Single) (Double)
26-1 Retainer ring 2FZ3570ASL.15-01 4 8
26-2 Wiper ring 2FZ3570ASL.15-02 4 8
26-3 Wiper ring holder 2FZ3570ASL.15-03 4 8
26-4 Y-ring for shaft seal of Ram SKZF133.01 4 8
26-5 Backup ring SKZF133.02 2 4
26-6 Packing Bearing Ring 2FZ3570ASL.15-06 2 4
26-7 Gasket 2FZ3570ASL.15-08 2 4

10
SL Ram BOP Manual Rev.A1

26-1 26-2 26-3 26-4 26-5 26-6 26-7

Direction of well Direction of hydraulic


pressure control pressure

Fig.3-5 Ram Shaft Seal Assembly of FZ3521SL/FZ3535SL

Table 3-6 Part list of Ram Shaft Seal Assembly of FZ3521SL/FZ3535SL

FZ3521SL/FZ3535SL Qty. Qty.


No. Description
Part No./Model (Single) (Double)
26-1 Retainer ring 135 GB/T893.1 4 8
26-2 Wiper ring 2FZ3535ASL.03.01-01 2 4
26-3 Wiper ring holder 2FZ3535ASL.03.01-02 2 4
26-4 Y-ring for shaft seal of Ram SKZF107.01 4 8
26-5 Backup ring SKZF107.02 4 8
26-6 Packing Bearing Ring 2FZ3535ASL.03.01-05 2 4
26-7 Gasket 2FZ3535ASL.03-04 2 4

26-1 26-2 26-3 26-4 26-5 26-6 26-7

Direction of well Direction of hydraulic


pressure control pressure

Fig.3-6 Ram Shaft Seal Assembly of FZ3570SL

Table 3-7 Part list of Ram Shaft Seal Assembly of FZ3570SL

Qty. Qty.
No. Description FZ3570SL Part No./Model
(Single) (Double)
26-1 Retainer ring 2FZ3570ASL.15-01 2 4
26-2 Wiper ring 2FZ3570ASL.15-02 2 4
26-3 Wiper ring holder 2FZ3570ASL.15-03 2 4
26-4 Y-ring for shaft seal of Ram SKZF133.01 4 8
26-5 Backup ring SKZF133.02 2 4
26-6 Packing Bearing Ring 2FZ3570ASL.15-06 2 4
26-7 Gasket 2FZ3570ASL.15-08 2 4

11
SL Ram BOP Manual Rev.A1

3.2.4 Secondary Seal System

The sealing part between the door and the Ram Shaft is comprised of two parts. The
first one is the sealing wellhead. And the other one is the oil pressure for sealing the
hydraulic control. The secondary seal is at the middle of the two parts. Generally, the
sealing is highly reliable by the sealing ring of several structure. But the sealing ring may
be damaged due to not being maintained for a long term or other reasons, leakage may
happen during well sealing. The secondary seal will be needed for emergency handling.
At the condition of well sealing, if any fluid flows from the access hole (at the bottom
of the door), the sealing ring shall have been damaged. Whether the sealing ring for well
sealing pressure or that for the oil sealing pressure is damaged can be damaged
according to the property of fluid. Now remove the Z1″ external hex blocking for greasing
hole at the top immediately. Rotate the hole screws clockwise by a socket head wrench.
Eject the secondary sealing grease in bar shape to the annular space via a one-way
valve, so as to reinforce the sealing ring and make sealing compensation.

Precautions during usage of secondary sealing device:

 To prevent the secondary sealing grease from being solidified and invalid when
the BOP is not used for a long term, the secondary sealing grease bar shall not
be mounted when the BOP leaves out of factory, and our company also doesn't
recommend to install the secondary sealing grease bar when the BOP is not
used. It shall not be mounted before being inserted to the well, and removed
after well completion and maintenance. It shall be washed to keep clean.
 Special tools shall be prepared in advance for urgent need.
 Observe frequently from the access hole (internal hexagonal plug screws with
hole) at the bottom whether drilling fluid or oil fluid flows during usage of BOP.
 After the sealing ring becomes invalid, the secondary sealing grease shall not be
ejected excessively, which shall be subject to the standard that the observation
hole would not be leaked. Because the friction resistance of secondary sealing
grease is high and particles are adhered, a major damage may happen to the
Ram Shaft.

12
SL Ram BOP Manual Rev.A1

28-1

28-2

28-3
Direction of
Direction of well pressure hydraulic control pressure
28-4

28-5

Fig.3-7 Secondary Seal System

Table 3-6 Parts list of Secondary Seal System

FZ3521SL/ FZ2870SL/
Qty. Qty.
No. Description FZ3535SL FZ3570SL
(Single) (Double)
Part No./Model Part No./Model
Z1″ External hexagonal
28-1 SFZ2835-38 SFZ1310-04 2 4
blocking
28-2 Cock SFZ2835-37 SFZ1310-30 2 4
28-3 Secondary sealing grease EM-09-1 EM-09-1 2 4
28-4 Check N/A SFZ1310.32-00 2 4
Z1/2″ Internal hexagonal
28-5 SFZ2835-40 SFZ1310-49 2 4
plug screw with hole

13
SL Ram BOP Manual Rev.A1

3.2.5 Locking Shaft Seal Assembly

17-1 17-2 17-3 17-4 17-5

Direction of
hydraulic control
pressure

Fig.3-8 Locking Shaft Seal Assembly

Table 3-7 Parts list of Locking Shaft Seal Assembly

FZ3521SL/FZ3535SL/FZ2870SL/FZ3570SL Qty. Qty.


No. Description
P/N (Single) (Double)
17-1 Retainer Ring 2FZ3570ASL.16-01 2 4
17-2 Thrust Shaft Sleeve 2FZ3570ASL.16-02 2 4
17-3 Lip ring 2FZ3570ASL.16.03-00 2 4
17-4 Wiper Seat Retainer 2FZ3570ASL.16-04 2 4
17-5 Wiper Ring 2FZ3570ASL.16-05 2 4

3.2.6 Manual locking mechanism of ram

The manual locking mechanism of ram is comprised of locking shaft, ram shaft,
manual-operated rod and hand wheel etc. (The length is generally 3.38m and 3.8m, or
customized).
The effect of manual locking mechanism is when it takes a long time to have well
sealing, and after the ram is closed hydraulically, rotate the hand wheel by manual force,
and lock the ram at the closed position. At this time, the hydraulic pressure may be
released.
 Locking -- When it is locked manually, rotate the hand wheel clockwise, and drive
the locking shaft for rotation by a joystick. Because the locking shaft locates at
the clamp seat, rotate the locking shaft to push it at the rear of cylinder head,
forcing the ram shaft moving toward the center of wellhead and locking the ram
assembly. (The rotation number is shown in Table 2-5 and Table 2-6 ).
 Unlocking -- The manual locking device can just close the ram instead of opening
the ram. If to open the ram that has been locked manually, firstly reset and
unlock the locking device manually, and open the ram by hydraulic pressure.
This is the only way. The detailed operation method is:
 Firstly rotate the hand wheel to the terminal point counter-clockwise (The
rotation number is shown in Table 2-5 and Table 2-6);
 And then rotate back for 1/8~1/4 turns, to prevent the lock screw from
jamming during change of temperature;
 And then the ram is opened by hydraulic pressure.

14
SL Ram BOP Manual Rev.A1

Connect the aquare


of locking shaft

Fig.3-9 Manual control assembly

The aquare

Connect the
Manual control
assembly

Table 3-10 Locking status (Upper is unlocking and Lower is locking)

15
SL Ram BOP Manual Rev.A1

3.2.7 Hinge Structure

9
The Hinge structure of FZ2870SL、FZ3521SL、
6 FZ3535SL as showen in the figure, is simple,easy to
7 disassemble, and the sealing is safe and reliable.
8
4
5

Fig.3-11 Hinge Structure


Table 3-10 Parts list of Hinge structure

FZ3521SL/FZ3535SL FZ2870SL Qty. Qty.


No. Description
Part No./Model Part No./Model (Single) (Double)
a
9 Hinge Block 2FZ3535ASL-05 2FZ2870ASL-04 4 8
6 Locating Pin GB118-86 A16×80 GB118-86 A20×80 8 16
7 Screw GB70-85 M20×90 GB70-85 M24×125 16 32
8 Oil cup N/A GB1152-79 M10×1 4 8
4 O Ring 43.7×3.55 47.5×5.3 8 16
5 O Ring N/A 80×2.65 4 8
Note:a. The part usually does not have interchangeability.

The Hinge structure of FZ3570SL, as showen in the


45
figure 3-12.Side door hinge is connect with side door, long
46
hinge pin through the top and bottom hinge. All along side
47 the oil way use the “O” seal ring.
48
49
50 44

Fig3-12 3570SL Hinge Structure

Table 3-11 Parts list of Hinge structure of 3570SL

FZ3570SL Qty. Qty.


No. Description
Part No./Model (Single) (Double)
45 Plug SFZ1310-04 4 8
46 O Ring 47.5×5.3 16 32
47 Hinge Pin 2FZ3570ASL-02 2 4
48 Oil cup GB1152 M10×1 4 8
49 Plug SFZ1310-01 4 8
50 Locating Pin 2FZ3570ASL-01 2 4
a Right Hinge Bracket 2FZ3570SL-25 1 2
44
Left Hinge Bracket 2FZ3570SL-03 1 2
Note:a. The part usually does not have interchangeability.

16
SL Ram BOP Manual Rev.A1

3.3 Parts List

Fig.3-13 Detail sketch of parts of FZ2870SL、FZ3521SL、FZ3535SL BOP

17
SL Ram BOP Manual Rev.A1

Fig.3-12 Parts List of FZ2870SL

Qty. Qty.
No. Description FZ2870SL Part No./Model
(Single) (Double)
1 Body 1 1
2 Ram Assembly 2FZ1870ASL.02()-00
3 Door bolt 2FZ2870ASL-06 12 24
4 O-ring 47.5×5.3 8 16
5 O-ring 80×2.65 4 8
6 Pin GB118-86 A20×80 8 16
7 Screw GB70-85 M24×125 16 32
8 Oil cup GB1152 M10×1 4 8
9a Hinge Block 2FZ2870ASL-04 4 8
10 O-ring 2FZ3570ASL-24 4 8
11 Plug SFZ2835-41 2 4
12 Screw GB5782 M12×45 8 16
13 Nozzle flange 2FZ2870ASL-10 2 4
14 O-ring 2FZ3570ASL-24 2 4
Right Cylinder head 2FZ2870ASL.03-11 1 2
15
Left Cylinder head 2FZ2870ASL.05-02 1 2
16 O-ring 2FZ3570ASL-17 4 8
17 Locking Shaft Seal Assembly See 3.2.5
18 Hydraulic cylinder 2FZ2835ASL.03-04 2 4
19 Screw GB79-85 M10×25 2 4
20 Locking nut 2FZ2870ASL.03-07 2 4
21 Piston 2FZ2870ASL.03-06 2 4
22 O-ring 2FZ3570ASL-13 2 4
23 Wear ring 2FZ3570ASL-11 4 8
24 Piston Seal 2FZ3570ASL.12-00 4 8
Right Door 2FZ2870ASL.03.01-00 1 2
25 a
Left Door 2FZ2870ASL.05.01-00 1 2
26 Ram Shaft Seal Assembly See 3.2.3
27 Locating Pin SFZ1310-50 2 4
28 Secondary Seal System See 3.2.4
29 Ram shaft 2FZ2870ASL.03-05 2 4
30 Side Door Seal 2FZ2870ASL.03.02-00 2 4
31 O-ring 31.5×3.55 8 16
32 Cylinder Manifold 2FZ2870ASL.03-09 2 4
33 Locking screw 2FZ2870ASL.03-10 2 4
34 Z 1/2” Plug SFZ1310-01 6 12
35 Cylinder Bolt 2FZ2870ASL.03-08 16 32
36 Cap Nut 2FZ3570DA.02-03 16 32
Note:a. The part usually does not have interchangeability.

18
SL Ram BOP Manual Rev.A1
Table 3-13 Parts List of FZ3521SL/FZ3535SL
FZ3521SL FZ3535SL Qty. Qty.
No. Description
Part No./Model Part No./Model (Single) (Double)
1 Body 1 1
2 Ram Assembly 2FZ3535TFI.02()-00 2FZ3535TFI.02()-00
3 Door bolt 2FZ3535ASL-06 2FZ3535ASL-06 16 32
4 O-ring 43.7×3.55 43.7×3.55 8 16
5 O-ring N/A N/A
6 Pin GB118-86 A16×80 GB118-86 A16×80 8 16
7 Screw GB70-85 M20×90 GB70-85 M20×90 16 32
8 Oil cup N/A N/A
a
9 Hinge Block 2FZ3535ASL-05 2FZ3535ASL-05 4 8
10 O-ring 31.5×3.55 31.5×3.55 4 8
11 Plug SFZ2835-41 SFZ2835-41 2 4
12 Screw GB5782 M12×45 GB5782 M12×45 8 16
13 Nozzle flange 2FZ3535ASL-09 2FZ3535ASL-09 2 4
14 O-ring 37.5×5.3 37.5×5.3 2 4
Right Cylinder head 2FZ3535ASL.03-17 2FZ3535ASL.03-17 1 2
15
Left Cylinder head 2FZ3535ASL.07-02 2FZ3535ASL.07-02 1 2
16 O-ring 236×7 236×7 4 8
Locking Shaft Seal
17 See 3.2.5
Assembly
18 Hydraulic cylinder 2FZ3535ASL.03-05 2FZ3535ASL.03-05 2 4
19 Screw GB79-85 M10×20 GB79-85 M10×20 2 4
20 Locking nut 2FZ3535ASL.03-11 2FZ3535ASL.03-11 2 4
21 Piston 2FZ3535ASL.03-10 2FZ3535ASL.03-10 2 4
22 O-ring 76×5.3 76×5.3 2 4
23 Wear ring 2FZ3535ASL.03-07 2FZ3535ASL.03-07 4 8
24 Piston Seal 2FZ3535ASL.03.09-00 2FZ3535ASL.03.09-00 4 8
a Right Door 2FZ3535ASL.03.02-00 2FZ3535ASL.03.02-00 1 2
25
Left Door 2FZ3535ASL.07.01-00 2FZ3535ASL.07.01-00 1 2
Ram Shaft Seal
26 See 3.2.3
Assembly
27 Locating Pin 2FZ3535-16 2FZ3535-16 2 4
Secondary Seal
28 See 3.2.4
System
29 Ram shaft 2FZ3535ASL.03-06 2FZ3535ASL.03-06 2 4
30 Side Door Seal 2FZ3535ASL.03.03-00 2FZ3535ASL.03.03-00 2 4
31 O-ring 31.5×3.55 31.5×3.55 8 16
32 Cylinder Manifold 2FZ3535ASL.03-16 2FZ3535ASL.03-16 2 4
33 Locking screw 2FZ3535ASL.03-18 2FZ3535ASL.03-18 2 4
34 Z 1/2” Plug SFZ2835-39 SFZ2835-39 6 12
35 Cylinder Bolt 2FZ3535ASL.03-13 2FZ3535ASL.03-13 12 24
36 Cap Nut 2FZ3570DA.02-03 2FZ3570DA.02-03 12 24
Note:a. The part usually does not have interchangeability.

19
SL Ram BOP Manual Rev.A1

Fig.3-14 Detail sketch of parts of FZ3570SL

20
SL Ram BOP Manual Rev.A1
Table 3-14 Parts List of FZ3570SL
FZ3570SL Qty. Qty.
No. Description
Part No./Model (Single) (Double)
1 Body 1 1
2 Ram Assembly 2FZ3570ASL.05()-00 2 2
3 Door bolt SFZ1310-33 16 32
Right Cylinder head 2FZ3570ASL-14 1 2
15
Left Cylinder head 2FZ3570ASL-23 1 2
16 O-ring, Cylinder head 2FZ3570ASL-17 2 4
Locking Shaft Seal
17 See 3.2.5 -- --
Assembly
18 Hydraulic cylinder 2FZ3570ASL-09 2 4
19 Screw GB71 M10X35 2 4
20 Piston lock nut SFZ1310-15 2 4
21 Piston 2FZ3570ASL-27 2 4
22 O-ring, Piston 2FZ3570ASL-13 2 4
23 Wear ring 2FZ3570ASL-11 4 8
24 Piston Seal 2FZ3570ASL.12-00 4 8
a Right door 2FZ3570ASL-26 1 2
25
Left door 2FZ3570ASL-19 1 2
26 Ram Shaft Seal Assembly See 3.2.3 -- --
27 Locating Pin SFZ1310-50 2 4
28 Secondary Seal System See 3.2.4 -- --
29 Ram shaft 2FZ3570ASL-08 2 4
30 Side Door Seal 2FZ3570ASL.06-00 2 4
31 O-ring GB1235 38X3.5 8 16
32 Cylinder.manifold SFZ1310-43 2 4
33 Locking screw 2FZ3570ASL-10 2 4
35 Cylinder Bolt SFZ1310-34 16 32
36 Nut SFZ1310-35 16 32
37 Gasket 36 GB 93 16 32
38 Backup ring 2FZ3570ASL-18 2 4
39 Centring ring SFZ1310-08 2 4
40 O-ring, cylinder 2FZ3570ASL-07 2 4
41 Screw GB70 M24x110 8 16
42 O-ring, Hinge Bracket 2FZ3570ASL-24 4 8
43 Locating Pin GB118 20×110 4 8
a Right Hinge Bracket 2FZ3570ASL-25 1 2
44
Left Hinge Bracket 2FZ3570ASL-03 1 2
45 Plug SFZ1310-04 12 24
46 O Ring 47.5×5.3 16 32
47 Hinge Pin 2FZ3570ASL-02 2 4
48 Oil cup GB1152 M10×1 4 8
49 Plug SFZ1310-01 20 40
50 Locating Pin 2FZ3570ASL-01 2 4
Note:a. The part usually does not have interchangeability.

21
SL Ram BOP Manual Rev.A1
Table 3-15 FZ2870SL Spare Parts list for one year

FZ2870SL Qty. Qty.


No. Description
Part No./Model (Single) (Double)
4 O-ring 47.5×5.3 8 16
5 O-ring 80×2.65 4 8
10 O-ring 2FZ3570ASL-24 4 8
14 O-ring 2FZ3570ASL-24 2 4
16 O-ring 2FZ3570ASL-17 4 8
17-3 Lip ring 2FZ3570ASL.16.03-00 2 4
17-5 Wiper ring 2FZ3570ASL.16-05 2 4
22 O-ring 2FZ3570ASL-13 2 4
23 Wear ring 2FZ3570ASL-11 4 8
24 Piston Seal 2FZ3570ASL.12-00 4 8
26-2 Wiper ring 2FZ3570ASL.15-02 4 8
26-4 Y-ring for shaft seal of Ram SKZF133.01 4 8
26-5 Backup ring SKZF133.02 2 4
28-3 Secondary sealing grease EM-09-1 2 4
30 Side Door Seal 2FZ2870ASL.03.02-00 2 4
31 O-ring 31.5×3.55 8 16

Table 3-16 FZ3521SL/FZ3535SL Spare Parts list for one year

FZ3521SL FZ3535SL Qty. Qty.


No. Description
Part No./Model Part No./Model (Single) (Double)
4 O-ring 43.7×3.55 43.7×3.55 8 16
10 O-ring 31.5×3.55 31.5×3.55 4 8
14 O-ring 37.5×5.3 37.5×5.3 2 4
16 O-ring 236×7 236×7 4 8
17-3 Lip ring 2FZ3570ASL.16.03-00 2FZ3570ASL.16.03-00 2 4
17-5 Wiper ring 2FZ3570ASL.16-05 2FZ3570ASL.16-05 2 4
22 O-ring 76×5.3 76×5.3 2 4
23 Wear ring 2FZ3535ASL.03-07 2FZ3535ASL.03-07 4 8
24 Piston Seal 2FZ3535ASL.03.09-00 2FZ3535ASL.03.09-00 4 8
26-2 Wiper ring 2FZ3535ASL.03.01-01 2FZ3535ASL.03.01-01 2 4
Y-ring for shaft
26-4 SKZF107.01 SKZF107.01 4 8
seal of Ram
26-5 Backup ring SKZF107.02 SKZF107.02 4 8
Secondary sealing
28-3 EM-09-1 EM-09-1 2 4
grease
30 Side Door Seal 2FZ3535ASL.03.03-00 2FZ3535ASL.03.03-00 2 4
31 O-ring 31.5×3.55 31.5×3.55 8 16

22
SL Ram BOP Manual Rev.A1
Table 3-17 FZ3570SL Spare Parts list for one year

FZ3570SL Qty. Qty.


No. Description
Part No./Model (Single) (Double)
16 O-ring, Cylinder head 2FZ3570ASL-17 2 4
17-3 Lip ring 2FZ3570ASL.16.03-00 2 4
17-5 Wiper ring 2FZ3570ASL.16-05 2 4
22 O-ring 2FZ3570ASL-13 2 4
23 Wear ring 2FZ3570ASL-11 4 8
24 Piston Seal 2FZ3570ASL.12-00 4 8
26-2 Wiper ring 2FZ3570ASL.15-02 2 4
26-4 Y-ring for shaft seal of Ram SKZF133.01 4 8
26-5 Backup ring SKZF133.02 2 4
28-3 Secondary sealing grease EM-09-1 2 4
30 Side Door Seal 2FZ3570ASL.06-00 2 4
31 O-ring GB1235 38X3.5 8 16
38 Backup ring 2FZ3570ASL-18 2 4
40 O-ring, cylinder 2FZ3570ASL-07 2 4
42 O-ring, Hinge Bracket 2FZ3570ASL-24 4 8
46 O-ring 47.5×5.3 16 32

23
SL Ram BOP Manual Rev.A1

4 Installation and Use


4.1 Preparation before Use
After the ram BOP is installed at the wellhead, check the following operations before
use, and it shall be used when it is thought no problem by the test running.

 Check if BOP is correctly installed: the hoisting bolt of the body is on the top; the
manual lock device is well installed and fixed with the hanger in the hand wheel
indicating the opening and closing cycles; the opposite angles of the attachment
bolts at all position are even and tightening.
 Check whether the size of mounted ram rubber cores and the size of drilling tools
under the well;
 Check whether the blowout control, the well control, and the choke manifold are
well connected;
 Use the control device to open and close all rams respectively twice by
2-3MPa(300psi~500psi) control pressure for test run.
 Remove air in the oil line.
 Check if the connection pipeline of the oil road is consistent with opening and
closing as indicated by BOP. In the case that the ram's opening and closing
action is not consistent with that as indicated by the console handle, adjust
the connection pipeline.
 Check whether the manual locking device is well connected, and whether it is
flexible to open and close the ram by manual lever, and record the rotating turns
of hand wheel during the well shut-in, and hang a sign on the hand wheel. After
the trial run, rotate the hand wheel leftward to return and unlock. Open the ram
by the hydraulic pressure;
 Have complete pressure test to the wellhead device, and the pressure test
standard shall be executed according to the well control regulations. After the
pressure test, tighten again the connection bolt, to prevent the loosening or
uneven. The tightening torque of flange bolt is showed at Table 4-1 or Table 4-2;
 When the BOP is performed with ground inspection and test, the BOP shall be
filled with water, and then open and close the ram for once to release the air in
the rear of ram chamber.

24
SL Ram BOP Manual Rev.A1
Table 4-1 Recommended value (Metric system) of connecting and tightening torque of stud and screw

Tightening Tightening Specifications Tightening


Specifications of Specifications of
torque torque of stud and torque
stud and screw stud and screw

m ft·
lb N·
m ft·
lb screw N·
m ft·
lb
M12 80 59 M33×3 1292 952 M52×3 5505 4060
M16 153 113 M36×3 1737 1280 M58×3 7892 5821
M20 266 196 M39×3 2272 1674 M64×3 10885 8028
M22 424 313 M42×3 2910 2145 M70×3 14549 10731
M27 643 474 M45×3 3654 2693 M76×3 18957 13982
M30×3 930 686 M48×3 4516 3328 M80×3 21565 15906
Table 4-2 Recommended value (British system) of connecting and tightening torque of stud and screw

Tightening Tightening Specifications Tightening


Specifications of Specifications of
torque torque of stud and torque
stud and screw stud and screw

m ft·
lb N·
m ft·
lb screw N·
m ft·
lb
1 1
/2-13UNC 80 59 1 /4-8UN 1292 953 2-8UN 5505 4060
5 3 1
/8-11UNC 153 113 1 /8-8UN 1737 1281 2 /4-8UN 7892 5821
3 1 1
/4-10UNC 266 196 1 /2-8UN 2272 1676 2 /2-8UN 10885 8028
7 5 3
/8-9UNC 424 313 1 /8-8UN 2910 2146 2 /4-8UN 14549 10731
3
1-8UN 643 474 1 /4-8UN 3654 2695 3-8UN 18957 13982
1 7 1
1 /8-8UN 930 686 1 /8-8UN 4516 3331 3 /4-8UN 24174 17830

25
SL Ram BOP Manual Rev.A1

4.2 Usage and matters needing attention


 The usage of BOP shall be responsible by specially-assigned person. Relevant
responsibilities are carried out. User shall know the working principles, the
performance and the technological process; and be able to operate, maintain,
care and have troubleshooting;
 When there is no pipe column in the well, if to make a test on closing the pipe ram,
the maximum hydraulic control pressure shall not exceed 3MPa so as to avoid of
damage to rubber core. When there is a pipe column in the well, it is forbidden to
close the full ram;
 When it takes a long time to have well sealing, lock the ram by a manual lock
device, and hang an instruction on the control console, so as to avoid of faulty
operation;
 After entering the destination layer, the ram shall be opened and closed once
everyday. Check if the closing and opening are flexible and if the manual clamp
device is under good condition. Every time after pulling out of the hole, the test
on opening and closing of full ram shall be done, and it is forbidden to close the
full ram when there is a pipe column in the well;
 It is forbidden to release the pressure by opening the ram, which may damage
the rubber core. Before open the rams shall wait 10 minutes after gauges
indicate pressure has been bled to 0 psi or open the choke/kill valves above and
below the rams to ensure the chambers are equalized.
 Every time before opening the ram, check whether the manual locking device has
been unlocked. After opening, check if the ram is at the fully-opened position
(completely returning into the body), to protect the ram from being damaged by
the drilling tool;
 The hydraulic oil shall be kept clean;
 After using the BOP, keep the ram at the fully-opened position for the purpose of
maintenance.
 Lugs on the BOP body is used only for lifting the BOP body, rather than lifting the
BOP set
 Recommended Hydraulic Oil for the Hydraulic System for BOP Stacks
 ISO Brand: HM32 (used for plunger pump system with low or no Zn)
 Mobil Brand: D.T.E24 (used for plunger pump system with low or no Zn)
 Shell Brand: Tellus32 (used for plunger pump system with low or no Zn)
Note: The kinematic viscosity of hydraulic oil is 17-33 mm2/s when the temperature is
at 50℃.

26
SL Ram BOP Manual Rev.A1

5 Dismounting and Maintenance of BOP


The BOP shall be subjected to appearance examination and seal test before starting
drilling each time or entering high-pressure hydrocarbon reservoir.
BOP shall be comprehensively disassembled for examination and cleaning after
serving a well each time, and any damaged parts shall be replaced timely. Oil shall be
coated on the ram chamber of the body to avoid rusting, and the screw thread oil shall be
coated on the connecting thread part.

5.1 Opening Door of BOP


5.1.1 Open the ram by hydraulic oil to keep the ram at the opening position; (▲!
Caution: The manual lock device shall be under unlocking status. )

5.1.2 Loosening the door bolts (▲! Caution: If the BOP is mounted on the well,
the door bolts shall not be uninstalled if any pressure in the well)

5.1.3 Open the door

27
SL Ram BOP Manual Rev.A1

5.2 Replacement of ram and its sealing rubber core


The ram rubber core is the key part deciding whether the BOP has the effect of well
sealing. Once being damaged, the BOP will lose its effect. So it must be ensured
complete and not damaged. Once any damage at the sealing surface is found, it must be
replaced timely.
5.2.1 Ram assembly is lift to the top from the rear part of ram axle.Pull it out of the
tail of ram draft.

5.2.2 Replace the rubber part of the ram. Unscrew the two ram bolts and take down
the holder. Remove the two ram rubber bolts.Take out the top seal from the groove of the
ram block with a screwdriver.Remove the whole rubber from the rams.▲!Note:It must
clean up the ram and the holder of mud or cement before install new rubber parts. It shall
be applied with lubricating oil during install ram rubber bolts. Tighten the screws
manually.

4 . Remove the whole rubber


from the rams.
3.Remove the two ram rubber bolts

2.Take down the holder

1.Unscrew the two ram bolts

5.3 Replacement of Seal Ring between Door and Body


When the sealing ring for the door is damaged, it has to remove the sealing ring of
28
SL Ram BOP Manual Rev.A1
the intermediate flange:

5.3.1 Pry the sealing ring by tools;

5.3.2 When replacing a seal, pay attention on the position of sealing ring that shall be
applied with lubricating oil during installation of sealing part.

5.4 Repair and replacement of cylinder assembly


If any damage or oil leakage is found at the front rod seal of ram draft, piston or
locking draft, they shall be disassembled for maintenance immediately.
5.4.1 Release the pressure in the cylinder. Put a clean vessel under the cylinder to
prevent the pollution by the hydraulic oil.

5.4.2 Remove nuts.

5.4.3 Remove cylinder head.

29
SL Ram BOP Manual Rev.A1

5.4.4 Replace the seals of the locking draft.

5.4.5 Unscrew the locking shaft (clockwise). Pull out the cylinder manifold. Check the
seal grooves and replace the damaged seals.

5.4.6 Pull out the cylinder manifold. Check the seal grooves and replace the
damaged seals.

5.4.7 Firstly remove the locking screw ,secondly unscrew the lock nut, finally remove
the piston; (Note: The installing steps is contrary to the steps of removing. When
screwing the lock nut, should pay attention to align the hole of locking screw on the piston
and lock nut.

30
SL Ram BOP Manual Rev.A1

5.4.8 Replace piston seal.

5.4.9 Open the door, pull out the ram shaft and replace the seal in the door;

31
SL Ram BOP Manual Rev.A1

5.5 Repair and Replacement of Hinge Assembly


If oil leakage occurs at the hinges,
need to check and replace the hinge seal.
And, the first fixed or hang a side door
assembly, preventing the hinge bracket 9
after the removal of danger. First unscrew
cylindrical pins(6) with internal thread, and
then wring out the hinge bolts(7) and pull
out the hinge bracket(9). Check and
replace the O ring.
6
▲ ! Note: in the pull of each hinge
bracket, must beat matching position 7
mark on the hinge bracket immediately,
to prevent the hinge bracket from
installing in wrong position, leading to
the death card or too tight situation
appears when the side door is closing!

For FZ3570SL BOP, first unscrew the plug (49)


and local pin(50), and pull out the Hinge Pin(47).
Unscrew cylindrical pins (43)with internal thread
and then wring out the hinge bolts(41), and pull
out the hinge bracket(44). Check and replace the 49
O ring. 50
▲!Note:Must remove the local pin(50) before 43
pull out the Hinge Pin(47), or the Hinge Pin(47)
41
would be damaged.
44 47

▲!Note: Generally, the hinge brackets and doors do not have interchangeability. If
there is need to replace the hinge brackets and doors for special requirement, shall
choose SHENKAI's parts and do some adjustments when assembly. Drill and ream
the hinge positioning pin hole(No.6 or No.43) again to make sure the
interchangeability.

32
SL Ram BOP Manual Rev.A1

After assemble, the following parts should be checked:


 In-walls of the hydraulic cylinder: the inner surfaces of the hydraulic cylinder
have the longitudinal strain but the strain is the slight linear friction strain or the
dot strain, which can be recovered by the extremely fine sand paper and oil
stone. If the strain is too deep and oil leak is still available regardless of having
replaced the new seal ring, recover the inner surface of the cylinder by the
mechanical processing method and meanwhile check relevant parts of the piston
to find out the strain reasons and solve them.
 The surfaces of the ram shaft and locking shaft: in the case of the strain on
the seal surface, the judging and handling method is the same with that of the
cylinder. If the solder peels off, it will cause the heavy leak. At this time, it is
required to replace with the new part or recover the damaged parts.
 Seal ring: check if there is abrasion in the lip of the sealing parts and if there is
extrusion and cut wound on the O-Ring first. In case of any damage or scratch
found in the sealing parts, replace them timely.
 Piston: when the moving seal surface of the piston has over 0.2mm-depth
uneven wear, replace it. On its surface, there should be no obvious scars which
may have an impact on seal. If the solder peels off, it will cause the heavy leak.
At this time, it is required to replace with the new part or recover the damaged
parts.

5.6 Installation Notes


The installation order is contrary to that of disassembly. Note the following points:

 Check if there is the burr or sharp edge on the parts. If any, remove them to
ensure no scratch caused to the seal ring. Note to clean parts.
 Grease the seal ring while installing it. Grease the relative sealing surface to
facilitate installation.
 Note the direction of the lip type seal ring and ensure opening of the lip to be
opposite the direction with pressure.
 Make the seal ring to smoothly pass the guiding part of the shaft head and avoid
scratch

5.7 Daily Maintenance


When the hydraulic pressure exceeding 3.5MPa (500psi) is needed to operate the
ram assembly, check the blocking condition in the body chamber and handle the
abnormity.
Operate and test BOP once every week according to API STD53 requirements.
▲!Note: in case of no drill columns in the well, please do not close the pipe ram or
variable bore ram to avoid causing the damage to the rubber core.
33
SL Ram BOP Manual Rev.A1

5.8 Operating Period Maintenance


For the existing BOP, besides the onsite daily maintenance, it is recommended to
have periodical examination according to requirements of SY/T 6160 Examination and
Maintenance of BOP, for the purpose of confirming the repair items. The period of
examination is divided into three-month examination, one-year examination and
three-year examination. The examination shall be done on time and may be performed in
advance according to usage condition. If one well is continuously operated over the
specified examination period, the examination shall be done according to requirements of
the next examination period after going back to the warehouse. ▲! Caution: The
maintenance of BOP shall be subject to relevant local regulations about usage of
BOP, and the BOP shall be certified periodically by the bop original manufacturer
or a qualified third party, so as to make sure the stability and the reliability of usage
of BOP.
The three-month examination content
1. Disassemble the BOP, carry out a visual examination of the parts;
2. Equipment shall be tested in accordance with API 16A.

One-year examination content:


1. Check the both side of the body, the top sealing surface inside of body, seal ring
groove, the sealing surface of bonnet and seal ring groove of bonnet. All of them
are not allowed to have any defect that affect the sealing performance;
2. Check the abrasion of bore of body;
3. Check the ram packers and seals. The sealing surface shall be avoided serious
deformation, wear, cracking, ageing of rubber core and phenomena the like;
4. Check the connecting channel of the ram and hook. There cannot have crack,
bending deformation; The width and height of ram are not allowed to have
serious avulsion and deformation;
5. Check the lock shaft, cannot have cracking, bending, grooved and switch lock
shaft should be flexible;
6. Check the thread hole, cannot have disorderly buckle, the phenomenon such as
lack of buckle;
7. Visual check ram cavity and flange of the body, cannot have cracking.
8. All rubber sealing parts, backing ring and O-ring that have been used over one
year or that have been damaged shall be replaced(see Table 3-15, Table 3-16 or
Table 3-17 ).

Three-year examination content:

1. Disassemble all of the parts and clean up. In addition to examinations according to
the requirements of the one-year check, also should deal with important size
measurement of main parts. a) If the wear extent of inner diameter of the cylinder is more

34
SL Ram BOP Manual Rev.A1
than 0.4 mm or there is obvious scars and the solder peels off, the cylinder should be
remanufacture or replacement; b) If the wear extent of piston rod is more than 0.25 mm ,it
should be remanufacture or replacement; c) If the wear ring diameter is lower than the
metal body, the wear ring should be replace; d)If cladding material of the lock shaft is
corroded and appear pits that would affect sealing, the lock shaft is overall bending or
thread damaged that would affect the lock or unlock, or the quartet at end is damaged
that will affect the connection with manual assembly, etc., the lock shaft should be
replaced.
2. Hardness testing shall be carried out on the pressure-containing parts and the
pressure-controlling parts such as body and bonnet. If the hardness is abnormal(>
HRC22), contacting manufacturer is necessary.
Repair and remanufacture parts shall be carried out according to API Spec 16A
appendix B. Replacement of parts shall be design and manufacturing by the OEM. After
checking the Bop, if the pressure-containing parts need to be welded to restore the
performance, the bop is not suitable for easy maintenance in the field, must be
remanufactured by the API Spec 16A qualified remanufacturer or authorized
remanufacturer.

35
SL Ram BOP Manual Rev.A1

6 Preservation procedures
Prior to shipping and storage, all equipment should avoid direct sunlight, rain and
snow shower, keep them away from acid and alkali, organic solution etc, which would
affect the quality of rubber material.

6.1 Storing for periods greater than 30 days


 All equipment shall be drained after testing and prior to storage;
 Prior to storage, parts and equipment shall have exposed metallic surfaces
protected with a rust preventative that does not become fluid and run at a
temperature of less than 50°C (125℉) (Recommendation: Lithium base grease 3#);
 All connection faces and ring gasket grooves shall be protected with durable
covers during storage;
 The hydraulic operating system shall be flushed with a non-freezing,
corrosion-inhibiting fluid. Ports shall be plugged prior to storing
(Recommendation: Antiwear hydraulic oil 32#) .

6.2 Storage of Rubber Parts


All rubber parts shall be properly stored according to the following regulations:
 It is a must to store rubber parts in the indoor, low light and dry place with
temperature of 0-25ºC and relative humidity 50% ~ 85% and to keep them away
from the heating equipment and direct sunlight. It’s better to preserve them in the
original packaging or the packaging similar to the original packaging materials,
which has the function of shading.
 Keep rubber parts clean while in storage. Prevent them from being contaminated
by solvents, oil, grease or other semi-solid or liquid matters and from being
directly contacted with sulphur, manganese, copper, copper alloy (including
bronze), polyvinyl chloride (PVC), timber containing wood preservative oil and
other rubber products including different rubber constituents.
 Keep rubber parts away from ozone-generating equipment( e.g.: mercury vapor
lamp, high-voltage electrical equipment, electric motor or any electrical devices
which can generate electric arc; avoid being directly exposed under the sunlight
or the light (e.g.: the fluorescent lamp) containing plenty of ultraviolet.
 Store the rubber parts which are under the slack state and have no bending,
extrusion and hanging. It is not allowed to tie the tag on the rubber parts by the
string, metal wire or adhesive tape in order to prevent causing deformation to the
sealing surface.
 Check the rubber parts frequently. In the case that they have clamminess,
softening, hardening, aging, embrittlement, cracking, bending, flaw etc, it is not
 Generally, the storage period of rubber parts is 2 years.

36
SL Ram BOP Manual Rev.A1

7 Common Troubles and Troubleshooting


No. Failure Causes Troubleshooting
a. The sealing ring for
intermediate flange of BOP a. Replace damaged assembly
is damaged; of flange sealing;
The medium in the well flows
b. The sealing face of the
1 out of the connection part of the b. Clean out the foreign matters
BOP body and the
body and the intermediate flange. on the sealing face and restore
intermediate flange have
bribes or have been the damaged parts.
damaged.
The connecting pipes of
The moving direction of ram is
control device and the Replace the pipe position at the
2 inconsistent with the nameplate
connection pipe of BOP are oil circuit port of BOP.
for control device of BOP
wrongly connected.
The hydraulic system works The contact port of ram has
Replace the ram and the
3 normally, but the ram is not other substances or deposit
intermediate flange.
closed properly. of sands and slurry.
If the sealing ring of front
rod of main piston is Replace the damaged sealing
If the medium in the well goes
damaged, the front rod axis ring for the front rod of main
4 into the cylinder, the oil may
may be deformed of main piston, and repair the front rod
contain moisture.
piston or the surface may be portion of main piston.
pulled.
The hydraulic portion of BOP If any damage is found at the
can not maintain the pressure, cylinder assembly of BOP, Replace each sealing ring, and
5 and the opening and closing of main piston and the sealing repair the sealing surface or
intermediate flange are ring for opening and closing replace with new parts.
inflexible. of ram.
The rubber core of ram seal Replace the rubber core of ram
may be damaged, or the top
After the ram is closed, the sealing, and repair the sealing
6 sealing surface for ram
pressure can't be sealed. surface of ram chamber of
chamber on the shell is
damaged. body.
a. The ram is jammed by
muddy sands;
Though the control oil circuit is b. The oil circuit of BOP is a. Clean up the muddy sand;
normal, the ram or the side door jammed; b. Clean up the oil circuit;
7
can't be opened by hydraulic c. The connecting pipes of c. Clean or replace the
force. control device and the connection pipes.
connection pipe of BOP
are blocked.

37
SL Ram BOP Manual Rev.A1

Prepared by:

(Technical engineer)

Audited by:

(Chief engineer)

38
Rev.A1

You might also like