Costing sheet
< 1km - 8 days < 1km - 12 days
Enquiry Title : Interprint Deco M Sdn Bhd 1km - 10 days 1km - 14 days
Our reference : 2km - 14 days 2km - 20 days
RFQ reference : 3km - 16 days 1 branching 3km - 25 days
Customer : WOG 4km - 20 days 4km - 30 days
Length : NPS 6 - 120 mtr & NPS 4 -156 mtr 5km - 25 days 5km - 40 days

Product / Scope BOM & Description Uom Brand Supplier Unit Cost Qty
Mob Demob Preliminaries, Mobilization, Transportation lot 500.00
Lodging 800.00 0
Lorry Crane ( loader) 40ft - subject to area 3,000.00 2

Cleaning N Testing Pig size 6 inch


Brush pc 260.00 1
Medium Bare pc 90.00 1
Soft Foam pig pc 200.00 2
Medium Cross pc 160.00 1
Pig size 4 inch
Brush pc 180.00 1
Medium cross pc 100.00 1
Medium Bare pc 100.00 1
Soft Foam pig pc 135.00 2
Compressor 750hp pc 460.00
Compressor 175hp pc 150.00
Lorry 5 ton - 6.4m x 2.4m 200.00 6
Generator pc 40.00
-
-

Others Fuel Compressor and Generator day 150.00 7


Fuel Lorry 5 ton day 50.00 7
H/stay day 140.00 7
Parking Ls
Millage - Electra Car km 0.90 400
Tol - car/lorry 1.00 100

Notes : Labour cost/BTA and consumable allocation


NGC Manpower No/Days Unit Cost Total Total Item
Supervisor 1 500.00 500.00 Total Material
Total Manpower
Admin 0 0.00 0.00
& Consumable
Cost

Total Item
Total Cost
Total 500.00 Contigency
Contigency
Outsource No Days Unit Cost Total
Amount
Manpower
Supervisor 1 7 290.00 2,030.00
Fitter 1 7 255.00 1,785.00 Total Item
Helper 2 7 225.00 3,150.00 Total cost
0 0.00 0.00 Margin
Consummable Total 6,965.00 Selling Price
White tape, Paint, arrow, etc 1 300.00 300.00
300.00

Prepared by: Verified by: Approved by:

Date : Date: Date:


2 >3branching

Total Material
Cost
-
-
6,000.00

260.00
90.00
400.00
160.00

180.00
100.00
100.00
270.00
-
-
1,200.00
-
-
-

1,050.00
350.00
980.00

360.00
100.00
11,500.00

Cost
11,500.00

7765.00

19265.00

Contingency
19,265.00

0.00

Margin
19,265.00
31.20%
28000.00