PRESERVATION AND RELOCATION WORKS FOR 2 UNIT OF SOLAR MARS 100 WITH GENERATOR AT GAS DISTRICT COOLING PUTRAJAYA

PLANT 3, PRECINT 5, PUTRAJAYA FOR GAS DISTRICT COOLING (PUTRAJAYA) SDN.


BHD.

OPTION 1
Below are the quotes for some parting of the works for above project :

QUOTATION
DATE : 26/11/2015
QUOT NO: XWSB/DSSB/PLANT3/RELOCT./R6
Item Scope Description Unit Qty Price/day Price/week TOTAL

1) PPE
1 Preliminaries (item 2,3,4) 2) Transportation and Accommodations LS 1 5,000.00 5,000.00
3) Mobilization and Demobilization
5,000.00
Provision to supply qualified and experienced manpower for cleaning,
brushing and painting, but not limited to the following :

hours times: 0900 until 1800 :


2 a) Project coordinator NOS 1 600.00 8400/2 weeks 8,400.00
b) Supervisor NOS 1 500.00 7000/2 weeks 7,000.00
A c) Semi Skill NOS 6 350.00 29000/ 2 weeks 29,000.00
TOTAL 44,400.00
DISC. 5% 42,180.00
Provision to supply Materials, Equipments,
Manpower Breakdown for Cleaning, Brushing , Tools & Consumables for cleaning, brushing and painting (internal &
flushing for GT & Air blow, Drying, Painting for Gen-set external) :

1) Water jet
2) De-greaser
3) Detergent
4) Power brush N/A N/A 18,000.00
LOT
5) Anti-rust painting
6) KCC Ash Grey 1306 painting
7) Scaffolding
TOTAL 18,000.00
DISC. 3% 17,460.00

Provision to supply Materials, Equipments,


Tools & Consumables

List of Tools and Machineries as below, but not limited to the following :
3
1) Crane 80 tons NOS 1 7500/3 day N/A 22,500.00
B 2) Spider Bar 50 TON NOS 1 9,000/2 day N/A 18,000.00
8) Power Tools NOS LS 1,700.00 N/A 1,700.00
Lifting and relocation works of 2 Unit SOLAR MARS 100 9) Wooden Block 4 x 4 NOS LS 2,500.00 N/A 2,500.00
with Generator from open area (plant 3) to shade area 10) Chain Block (5T, 2T) NOS LS 2,500.00 N/A 2,000.00
(plant 3) 11) Sling Belt (10T, 8T, 7T, 3T, 2T) NOS LS 2,750.00 N/A 2,750.00
TOTAL 49,450.00
DISC. 5% 46,977.50

Provision to supply qualified and experienced manpower for skidding and


relocation works.
hours times: 0900 until 1800
a) Project coordinator NOS 1 700/ 7 day N/A 4,900.00
b) Supervisor NOS 1 600/ 7 day N/A 4,200.00
c) Semi Skill NOS 4 500/ 7 day N/A 14,000.00
d) Rigger NOS 1 600/ 7 day N/A 4,200.00
TOTAL 27,300.00
DISC. 3% 26,481.00
Provision to supply manpower and fabrication
4 C for 2 unit SOLAR MARS with generator LS 4 N/A N/A 120,000.00
Package Housing - Normal canvas (blue + orange)
- Normal design likes gas malaysia station DISC. 25% 90,000.00

This price excluded GSt 6%


Should you required further clafirication , please do not hestitate to contact us..

Thank you,

Prepared by,

Yusrie Bin Jamali