You are on page 1of 2

Operator Visual Inspection

Operator must visually inspect the hoisting apparatus prior to commencement of operation.(To be performe

Indicate inspected items with a check. P Month                             Year                            

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
Operating controls
Limit switches and stops
Warning devices
Hoist rope and chain
Trolley rails and wheels
Bridge rails and wheels
Hoist block and hooks
Brakes
Access to bridge
Lighting
Housekeeping

If other operators use the crane on any given day, they must indicate by signing that all of the above items

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
Operator 1:
Operator 2:
Operator 3:

Comments
ection
ration.(To be performed aprat from O&M Inspection)

19 20 21 22 23 24 25 26 27 28 29 30 31

all of the above items have been inspected.

19 20 21 22 23 24 25 26 27 28 29 30 31

Initials Date