MAN MOVEMENT

SL NO TIME(min) DESCRIPTION PROCESS


1 1.51-2.29 Measurement of rod to check the Operation cum
dimensions inspection

2 2.35-2.43 Lamp post adjustment operation

3 2.46-3.19 Tighten the rod to the chuck by Allen key operation

4 3.25-3.28 To start the machine operation

5 3.30-3.41 To adjust the rpm of machine operation

6 3.42-3.53 To adjust the tool post operation

7 3.58-5.29 Facing operation operation

8 5.36-5.49 Taking out rod from chuck operation

9 5.57-6.31 Measurement and inspection Operation cum


inspection

10 6.51-7.08 To adjust rod to chuck operation

11 7.11-7.19 To start the machine Operation

12 7.22-7.37 To adjust the tool post for turning operation

13 7.43-10.51 Turning operation Operation cum


inspection

14 11.03-11.25 Taking out rod from chuck Operation

15 11.44-12.21 Measurement with Vernier caliper and Operation cum


error was found in turning inspection

16 12.40-12.58 Again, rod is fitted to chuck for operation


turning

17 13.11-13.21 Machine was started operation

18 13.50-17.05 Turning operation Operation cum


inspection

19 17.29-17.51 Rod is taken out from chuck operation

20 18.15-18.31 Measurement is taken with Vernier Operation cum


caliper inspection