You are on page 1of 1

Head - Area - Volume relation :

Head : 235.50 240.78 241.50


Area : 0.20 0.30 0.32
Volume : 0.00 0.01 0.01

Discharge spillway : 9999.00 9999.00 9999.00 9999.00 9999.00


9999.00
Net head above spillway : 0.00 1.00 5.00 10.00 50.00
100.00
Discharge main gate : 9999.00 9999.00 9999.00 9999.00
9999.00 9999.00
Net head above main gate : 0.00 1.00 5.00 10.00
50.00 100.00
Max.storage flood control (t): 0.01 0.01 0.01 0.01
0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01
0.01 0.01 0.01 0.01
0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01
Max.level flood control (t) : 241.78 241.78 241.78 241.78
241.78 241.78 241.78 241.78 241.78 241.78 241.78 241.78
241.78 241.78 241.78 241.78
241.78 241.78 241.78 241.78 241.78 241.78 241.78 241.78
Desired target storage (t) : 0.01 0.01 0.01 0.01
0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01
0.01 0.01 0.01 0.01
0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01
Desired target level (t) : 240.78 240.78 240.78 240.78
240.78 240.78 240.78 240.78 240.78 240.78 240.78 240.78
240.78 240.78 240.78 240.78
240.78 240.78 240.78 240.78 240.78 240.78 240.78 240.78
Desired firm storage (t) : 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Desired firm storage level (t): 235.78 235.78 235.78 235.78
235.78 235.78 235.78 235.78 235.78 235.78 235.78 235.78
235.78 235.78 235.78 235.78
235.78 235.78 235.78 235.78 235.78 235.78 235.78 235.78
Dead storage level: 240.78
Dead storage : 0.01
Initial storage level: 234.78
Initial storage : 0.00
Full reservoir level (spillway level) : 240.78
Full reservoir storage (at spillway level): 0.01

You might also like